1 TJKM Transportation Consultants Final Traffic Impact Study For 1200 Ashby Avenue Mixed-Use Development In City of Berkeley Pleasanton Fresno Sacramento Santa Rosa

2 TJKM Transportation Consultants Final Traffic Impact Study for 1200 Ashby Avenue Mixed-Use Development In City of Berkeley Prepared by: TJKM Transportation Consultants 3875 Hopyard Road Suite 200 Pleasanton, CA Tel: Fax: J:\JURISDICTION\B\Berkeley\ Ashby Avenue\Task 002\Report\R docx

3 Table of Contents Introduction and Summary... 1 Introduction... 1 Summary... 1 Intersection Analysis Methodology... 5 Study Intersections and Scenarios... 5 Level of Service Analysis Methodology... 5 Impact Criteria... 6 Existing Traffic Conditions... 7 Level of Service Analysis (Existing Traffic Conditions)... 7 TIRE Index (Existing Conditions)... 8 Transit Accessibility Existing plus Approved Projects Conditions Approved Projects Approved Projects Trip Generation and Trip Assignment Level of Service Analysis (Existing plus Approved Projects Conditions) Existing plus Approved plus Project Conditions Project Description Project Trip Generation Project Trip Distribution and Assignment Level of Service Analysis (Existing plus Approved plus Project Traffic Conditions) TIRE Index Analysis (Existing plus Approved plus Project Traffic Conditions) Project On-Site Parking Requirements On-Street Parking Conditions near Project Site Proposed Access and Circulation Conditions Traffic Forecast Intersection Level of Service Analysis 2030 Conditions plus Project Conditions Level of Service Analysis (2030 plus Project Conditions) Conclusions and Recommendations Study Participants and References TJKM Transportation Consultants Data Collection Persons Contacted References... 32

4 List of Appendices Appendix A Level of Service Methodology Appendix B Level of Service Worksheets: Existing Appendix C Level of Service Worksheets: Existing + Approved Projects Appendix D Proposed Median Improvement at San Pablo Avenue/ Carrison Street and AUTOTURN Analysis Appendix E Level of Service Worksheets: Existing + Approved + Project Appendix F Level of Service Worksheets: 2030 Conditions Appendix G Level of Service Worksheets: 2030 plus Proposed Project Conditions List of Figures Figure 1: Vicinity Map...3 Figure 2: Site Plan...4 Figure 3: Existing Lane Geometry...9 Figure 4: Existing Turning Movement Volumes Figure 5: Existing plus Approved Projects Turning Movement Volumes Figure 6: Proposed Commercial Trip Distribution Figure 7: Proposed Residential Trip Distribution Figure 8: Proposed Project Trip Assignment Figure 9: Existing plus Approved plus Project Conditions Turning Movement Volumes Figure 10: 2030 no Project Turning Movement Volumes Figure 11: 2030 plus Project Turning Movement Volumes List of Tables Table I: Intersection Level of Service - Existing Conditions (Weekday)...7 Table II: Intersection Level of Service - Existing Conditions (Saturday)...7 Table III: TIRE Index - Existing Conditions...8 Table IV: Intersection LOS - Existing plus Approved Projects Conditions (Weekday) Table V: Intersection LOS - Existing plus Approved Projects Conditions (Saturday) Table VI: Project Trip Generation (Weekday) Table VII: Project Trip Generation (Saturday) Table VIII: Intersection Level of Service - Existing plus Approved plus Project Conditions (Weekday) Table IX: Intersection Level of Service - Existing plus Approved plus Project Conditions (Saturday) Table X: TIRE Index Analysis - Existing plus Approved plus Project Conditions Table XI: On-Site Project Parking Table XII: On-Street Parking Occupancy in Project Vicinity Table XIII: Intersection Level of Service 2030 Conditions (Weekday) Table XIV: Intersection Level of Service 2030 Conditions (Saturday) Table XV: Intersection Level of Service 2030 plus Project Conditions (Weekday) Table XVI: Intersection Level of Service 2030 plus Project Conditions (Saturday)... 28

5 Introduction and Summary Introduction This report presents the results of TJKM s traffic impact and parking analysis of the proposed mixed-use development at 1200 Ashby Avenue in the City of Berkeley. The proposed project is located at the southeast corner of the intersection of Ashby Avenue and San Pablo Avenue. Project access will be via a right-in/right-out only driveway from Ashby Avenue for the commercial parking and a full-access driveway off Carrison Street for the residential parking. The project is a mixed-use residential and retail development. The proposed project will consist of 98 condominium units on four floors, 5,800 square feet (sq. ft.) of ground floor retail, and 2,000 sq. ft. of ground floor full service (not fast food) restaurant space. The project sponsor proposes to provide 114 parking spaces on the ground floor level. The 16 parking spaces for commercial use will have access from Ashby Avenue. There are 98 parking spaces for residential use with access from Carrison Street. The project sponsor proposes to include a southbound left turn lane of approximately 50 feet with a median cut at the intersection of San Pablo Avenue and Carrison Street to enable access to the driveway on Carrison Street. Figure 1 shows the project location and its vicinity. Figure 2 shows the proposed ground floor site plan with a proposed median break at the intersection of San Pablo Avenue and Carrison Street. The figure also illustrates the location of medians, lane widths and lane designation at intersections adjacent to the project site. Summary The proposed project is expected to generate approximately 34 trips (9 inbound and 25 outbound) during the a.m. peak hour and 41 trips (27 inbound and 14 outbound) during the p.m. peak hour, on a typical weekday. On weekends (Saturday), the proposed project is expected to generate approximately 71 trips (39 inbound and 32 outbound) during the peak hour. It is noted that these numbers include discounts for internal trips, pass-by trips, transit and pedestrian trips to best represent the expected new trips from the proposed development. Currently, all study intersections operate at LOS D or better during a.m., p.m. and Saturday peak hours, which meet City of Berkeley intersection LOS standards. Under Existing plus Approved Project Conditions, all study intersections are expected to continue operating at acceptable levels of service, with minor increases in delay during the weekday peak hours. During the Saturday peak hour, with the addition of project traffic from the West Berkeley Bowl project, the level of service at the intersection of San Pablo Avenue and Ashby Avenue deteriorates to LOS F. The West Berkeley Bowl project study has identified this as an impact and recommends a mitigation measure. Implementation of the mitigation measure would improve the intersection operations to LOS D during the Saturday peak hour. Under Existing plus Approved plus Project Conditions, all study intersections are expected to continue operating at acceptable levels of service, with minor increases in delay during the weekday peak hours. During the Saturday peak hour, the level of service at the intersection of San Pablo Avenue and Ashby Avenue is expected to continue operating at LOS F with an insignificant increase in V/C due to the added project traffic. Final Report Traffic Impact Study for 1200 Ashby Avenue Page 1

6 Under 2030 plus Project conditions, the same two study intersections (San Pablo Avenue/Ashby Avenue and San Pablo Avenue/Seventh Street) as 2030 Conditions without the project are expected to operate below City LOS standards of LOS D or better. The expected increase in the V/C ratio due to additional traffic from the project at the intersection of Seventh Street/Ashby Avenue would be less than significant. The Project Sponsor has decided to dedicate five feet of right-of-way along the Ashby Avenue frontage of the property, which would enable the City to install the westbound left turn lane and upgrade the signal to provide a protected traffic signal phasing for the eastbound and the westbound left turn movements. With these improvements, the intersection of San Pablo Avenue and Ashby Avenue is expected to operate at levels of service better than future baseline conditions, even with the additional trips from the project. TIRE index results indicate that the addition of project traffic would not increase traffic volume substantially to result in a noticeable impact on the residential streets. TJKM reviewed the project site plan to evaluate on-site circulation and access. Both the accesses from Carrison Street and Ashby Avenue are expected to be adequate for cars and small trucks accessing the site. Due to the presence of narrow lanes (10.5 feet) and lack of on-street parking on Ashby Avenue, right turn maneuvers entering the Ashby Avenue driveway would require vehicles to slow down considerably. Therefore, TJKM conducted turning radii checks using AUTOTURN and recommends that a width of 22 feet (i.e. 12 feet lane for inbound traffic and 10 feet lane for outbound traffic) is adequate for the driveway on Ashby Avenue. With respect to site circulation and access, two signs should be installed facing exiting vehicles at the driveway on Ashby Avenue. One is a STOP sign and the other is a sign that reads Right Turn Only. This would ensure that exiting motorists at the site driveway is restricted from making a left turn onto Ashby Avenue. Similarly, another STOP should be installed at the residential access driveway on Carrison Street. The project will include 114 on-site parking spaces on the ground floor level. The proposed parking supply is two spaces below the City s requirement. The Project Sponsor has requested for a parking variance to reduce commercial parking requirement by two spaces. On-street parking occupancy surveys show that the project area parking is more occupied during the weekday mid-afternoon between 3:30 p.m. and 4:00 p.m. than between 6:30 p.m. and 7:00 p.m. Approximately 69 percent of the study area s 42 on-street spaces were occupied between 3:30 p.m. and 4:00 p.m., which is considered to be less than full based on traffic engineers typical occupancy threshold of 85 percent. Therefore, there is available on-street capacity for project parking that is within short walking distance from the site. Overall, given the on-site parking surplus and available on-street parking, project parking for residents, guests and retail patrons is expected to be sufficient. Final Report Traffic Impact Study for 1200 Ashby Avenue Page 2

7 City of Berkeley Traffic Impact Study for 1200 Ashby Avenue Mixed-Use Development Vicinity Map Figure 1 PARDEE ST. BOLIVAR DR. GRAYSON ST. HEINZ AVE. SEVENTH ST. EIGHTH ST. NINTH ST. TENTH ST. WALLACE ST. DERBY ST. WARD ST. MATTHEWS ST. MABEL ST. OREGON ST. PARK ST. PARK ST. ANTHONY ST. ASHBY AVE. POTTER ST. NINTH ST. 4 3 Project Site MURRAY ST. RUSSELL ST. BURNETT ST. 1 2 FOLGER AVE. 5 CARRISON ST. WEST FRONTAGE RD LACOSTE ST. CHRISTIE AVE. OVERLAND AVE. SHELLMOUND ST. 64TH ST. 63RD ST. 62ND ST. HOLLIS ST. 67TH ST. 66TH ST. 65TH ST. DOYLE ST. BEAUDRY ST. PEABODY LN. VALLEJO ST. SAN PABLO AVE. HASKELL ST. 63RD ST. MABEL ST. ACTON ST. DOHY ST. ALCATRAZ AVE. STANTON ST. SACRAMENTO ST. LEGEND Study Intersection /5/08 - AK

8 City of Berkeley Traffic Impact Study for 1200 Ashby Avenue Mixed-Use Development Site Plan Figure 2 LEGEND Bus Zone Recommended Improvement Recommended Pavement Marking 42 ASHBY AVENUE SAN PABLO AVENUE STOP 36 CARRISON STREET /6/08 - AK

9 Intersection Analysis Methodology Study Intersections and Scenarios Five intersections were selected for the study analysis after consultation with City of Berkeley staff. The intersections and their control types are as follows: 1. San Pablo Avenue/Ashby Avenue (Signal) 2. Ashby Avenue/Mabel Street (Signal) 3. Ashby Avenue/Ninth Street (Signal) 4. Ashby Avenue/Seventh Street (Signal) 5. San Pablo Avenue/Carrison Street (One-Way Stop) This study evaluated morning and evening peak hour traffic conditions on a typical weekday under the following five scenarios: 1. Existing Conditions Current (Year 2007) traffic volumes and roadway conditions. 2. Existing plus Approved Projects Conditions Identical to Existing Conditions, but with traffic added from approved/pending projects in the project site s vicinity. 3. Existing plus Approved plus Project Conditions Identical to Existing plus Approved Project Conditions, but with traffic added from the proposed project. 4. Year 2030 Conditions This scenario is based on projections from the latest Alameda County Congestion Management Agency (CMA) travel demand model. Twenty-three-year incremental traffic growth was added to existing volumes to estimate 2030 traffic conditions. 5. Year 2030 plus Project Conditions This scenario is identical to 2030 Conditions, but with the addition of proposed project traffic. Additional traffic analysis was conducted for the Saturday peak hour at the intersection of San Pablo Avenue and Ashby Avenue for all five scenarios. Level of Service Analysis Methodology Level of service (LOS) is qualitative description of intersection operations and is reported using an A through F letter rating system to describe travel delay and congestion. LOS A indicates free flow conditions with little or no delay, and LOS F indicates jammed conditions with excessive delays and long back-ups. The LOS methodology is detailed in Appendix A. Operating conditions at the study intersections were evaluated using the 2000 Highway Capacity Manual (HCM) Operations methodology contained in Synchro software. Peak hour intersection conditions for signalized intersections are reported as average control delay in seconds per vehicle with corresponding levels of service. For unsignalized intersections, results from the 2000 HCM Operations methodology include average control delay in seconds per vehicle for the overall intersection and the critical minor turning movement, as well as corresponding levels of service. Appendix A details LOS thresholds for both signalized and unsignalized intersections based on average control delay. Final Report Traffic Impact Study for 1200 Ashby Avenue Page 5

10 Impact Criteria The City s level of service standard is LOS D for signalized intersections. Intersections that exceed this service level threshold are considered impacted and should be considered for mitigation. For unsignalized intersections, additional considerations are involved, including the number of vehicles on the critical approach, vehicles contributed by the proposed project, and signal warrant analysis. Exceptions to the LOS D standard arise when the project is not expected to add more than three seconds of delay at an intersection that is operating at LOS E, or increase the V/C ratio by more than 0.01 at an intersection that is operating at LOS F without the proposed project. For residential streets, an increase of 0.1, which is approximately 25 percent increase in traffic volume, in TIRE (Traffic Infusion on Residential Environments) index is considered to be a significant impact. Final Report Traffic Impact Study for 1200 Ashby Avenue Page 6

11 Existing Traffic Conditions BayMetrics conducted weekday morning (7:00 a.m. - 9:00 a.m.) and evening (4:00 p.m. - 6:00 p.m.) turning movement counts at the five study intersections in May Turning movement counts for the Saturday peak hour at the intersection of San Pablo Avenue and Ashby Avenue was obtained from the West Berkeley Bowl Project Recirculated Traffic Impact Analysis (Saturday Peak Hour) and Revised Alternatives Analysis of the Draft Environmental Impact Report, prepared in January Figure 3 shows the lane geometry and control type for the five study intersections. It is noted that the westbound left turns are prohibited at the intersection of Ashby Avenue and San Pablo Avenue on weekdays between 4:00 p.m. to 6:00 p.m. Level of Service Analysis (Existing Traffic Conditions) Figure 4 illustrates the existing peak hour turning movement volumes at the five study intersections. Table I summarizes the results of the weekday intersection analysis under Existing Conditions. Detailed LOS calculations are located in Appendix B. Under Existing Conditions, all study intersections operate at an acceptable service level (LOS D or better). Table I: Intersection Level of Service - Existing Conditions (Weekday) Existing Conditions ID Intersection Control A.M. Peak Hour P.M. Peak Hour Delay V/C LOS Delay V/C LOS 1 Ashby Avenue and San Pablo Avenue Signal D D 2 Ashby Avenue and Mabel Street Signal B C 3 Ashby Avenue and Ninth Street Signal A C 4 Ashby Avenue and Seventh Street Signal D D 5 San Pablo Avenue and Carrison Street One-way Stop B B Notes: Delay = Average control delay in seconds per vehicle, LOS = Level of Service Values are for the critical minor approach of unsignalized intersections and overall for signalized intersections. Table II summarizes the results of the Saturday peak hour intersection analysis for the intersection of San Pablo Avenue/Ashby Avenue under Existing Conditions. Detailed LOS calculations are located in Appendix B. During the Saturday peak hour the intersection of Ashby Avenue and San Pablo Avenue operates acceptably at LOS D with 41.7 seconds of delay. Table II: Intersection Level of Service - Existing Conditions (Saturday) ID Intersection Control Saturday Peak Delay V/C LOS 1 Ashby Avenue and San Pablo Avenue Signal D Notes: Delay = Average control delay in seconds per vehicle, LOS = Level of Service Final Report Traffic Impact Study for 1200 Ashby Avenue Page 7

12 TIRE Index (Existing Conditions) Residential roadway segment conditions were evaluated under the existing scenario using the TIRE index. TIRE index methodology assigns a numerical value to residents perception of traffic effects on activities such as walking, crossing the street and maneuvering out of a driveway. The TIRE index ranges prepared by Goodrich Traffic Group is included in Appendix A. TIRE index values range from 0.0 to 5.0, with 3.6 or higher indicating that a street operates primarily as a collector street. Daily traffic volume data was collected on Mabel Street and Carrison Street over a period of four days (Wednesday, Thursday, Friday and Saturday) in March Table III shows the TIRE indexes for the two residential streets. Under Existing Conditions the TIRE index for both the streets ranges between 2.6 to 3.0. Table III: TIRE Index - Existing Conditions Roadway Weekday Weekend Segments Daily Volume TIRE Index Daily Volume TIRE Index Mabel Street Carrison Street Final Report Traffic Impact Study for 1200 Ashby Avenue Page 8

13 City of Berkeley Traffic Impact Study for 1200 Ashby Avenue Mixed-Use Development Existing Lane Geometry Figure 3 Intersection #1 Ashby Ave./San Pablo Ave. Intersection #2 Ashby Ave./Mabel St. Intersection #3 Ashby Ave./9th St. Intersection #4 Ashby Ave./7th St. Intersection #5 Carrison St./San Pablo Ave. PARDEE ST. BOLIVAR DR. GRAYSON ST. HEINZ AVE. SEVENTH ST. EIGHTH ST. NINTH ST. TENTH ST. WALLACE ST. DERBY ST. WARD ST. MATTHEWS ST. MABEL ST. OREGON ST. PARK ST. PARK ST. ANTHONY ST. ASHBY AVE. POTTER ST. NINTH ST. 4 3 Project Site MURRAY ST. RUSSELL ST. BURNETT ST. 1 2 FOLGER AVE. 5 CARRISON ST. WEST FRONTAGE RD LACOSTE ST. CHRISTIE AVE. OVERLAND AVE. SHELLMOUND ST. 64TH ST. 63RD ST. 62ND ST. HOLLIS ST. 67TH ST. 66TH ST. 65TH ST. DOYLE ST. BEAUDRY ST. PEABODY LN. VALLEJO ST. SAN PABLO AVE. HASKELL ST. 63RD ST. MABEL ST. ACTON ST. DOHY ST. ALCATRAZ AVE. STANTON ST. SACRAMENTO ST. LEGEND Study Intersection Traffic Signal Stop Sign /5/08 - AK

14 16 (52) 2 (16) 31 (122) 171 (538) 206 (277) 52 (143) City of Berkeley Traffic Impact Study for 1200 Ashby Avenue Mixed-Use Development Existing Turning Movement Volumes 121 (123) [165] 637 (791) [677] 138 (231) [156] Figure 4 Intersection #1 Ashby Ave./San Pablo Ave. Intersection #2 Ashby Ave./Mabel St. Intersection #3 Ashby Ave./9th St. 18 (14) 14 (39) 68 (33) Intersection #4 Ashby Ave./7th St. 91 (109) [130] 719 (951) [781] 158 (203) [126] 106 (140) [123] 603 (589) [576] 41 (0) [52] 877 (1,001) Intersection #5 Carrison St./San Pablo Ave. 194 (155) [206] 508 (802) [565] 43 (103) [98] 11 (26) 837 (1,181) 7 (42) 25 (10) 765 (709) 16 (34) 8 (15) 12 (9) 26 (50) 80 (25) 922 (1,154) 14 (12) 118 (50) 812 (893) 13 (43) 9 (17) 2 (6) 9 (12) 557 (351) 892 (857) 267 (141) 20 (42) 678 (905) 110 (70) 98 (274) 163 (337) 64 (160) 742 (1,076) 24 (26) 14 (26) PARDEE ST. BOLIVAR DR. GRAYSON ST. HEINZ AVE. SEVENTH ST. EIGHTH ST. NINTH ST. TENTH ST. WALLACE ST. DERBY ST. WARD ST. MATTHEWS ST. MABEL ST. OREGON ST. PARK ST. PARK ST. ANTHONY ST. ASHBY AVE. POTTER ST. NINTH ST. 4 3 Project Site MURRAY ST. RUSSELL ST. BURNETT ST. 1 2 FOLGER AVE. 5 CARRISON ST. WEST FRONTAGE RD LACOSTE ST. CHRISTIE AVE. OVERLAND AVE. SHELLMOUND ST. 64TH ST. 63RD ST. 62ND ST. HOLLIS ST. 67TH ST. 66TH ST. 65TH ST. DOYLE ST. BEAUDRY ST. PEABODY LN. VALLEJO ST. SAN PABLO AVE. HASKELL ST. 63RD ST. MABEL ST. ACTON ST. DOHY ST. ALCATRAZ AVE. STANTON ST. SACRAMENTO ST. LEGEND Study Intersection XX AM Peak Hour Volume (XX) PM Peak Hour Volume [XX] Saturday Peak Hour Volume /3/08 - JL

15 Transit Accessibility Alameda-Contra Costa County (AC) Transit Lines 72, 72R (Rapid Service), 72M (Macdonald), and 802 (All Nighter) along San Pablo Avenue would serve the proposed development. Routes 72, 72R, and 72M would connect the proposed project site to the El Cerrito Plaza BART station to the north and to the Oakland Amtrak station to the south. Buses on this route provide 24-hour service and also service during the weekend. Route 72R provides weekday peak-period Rapid Bus service along the San Pablo Avenue Corridor at approximately 12 minute headways. Route 802 would connect the proposed project site to the Berkeley Amtrak station and the Oakland 12th Street BART station. BART serves the major employment centers in downtown Oakland, downtown San Francisco, Walnut Creek/Concord and Pleasanton/Dublin. Bus stops for the northbound and southbound directions are located at the corners of the intersection of San Pablo Avenue and Ashby Avenue. AC Transit Route 9 along Ashby Avenue would also service the proposed development. Route 9 would connect the proposed project site to the Berkeley Marina, the University of California Berkeley (UC Berkeley), the Ashby BART station, the Berkeley BART station and the Claremont Hotel. Route 9 provides service between 6:30 a.m. and 9:30 p.m. on all days at approximately 20 to 30-minutes headways. Transbay Bus Route J would also serve the proposed development. Route J would connect the proposed project site to and from the San Francisco Downtown. Route J provides weekday service during both the a.m. and p.m. peak periods. Final Report Traffic Impact Study for 1200 Ashby Avenue Page 11

16 Existing plus Approved Projects Conditions This scenario is similar to Existing Conditions, but includes added traffic from the approved developments within the project site s vicinity. Approved Projects Approved projects include developments that are either under construction, built but not fully occupied, or not built but have final development approval from the City. There are seven approved projects in the proposed project s vicinity that are expected to generate traffic through the study intersections. These approved projects are listed below: 1. West Berkeley Bowl Project San Pablo Avenue Project San Pablo Avenue Project San Pablo Avenue Project Pardee Street Project San Pablo Avenue Project San Pablo Avenue Project Approved Projects Trip Generation and Trip Assignment Trip generation and trip assignment assumptions for the approved projects were based on the traffic study reports prepared for each project. Trips from the above developments were added to the existing intersection turning movement counts to estimate traffic volumes for Existing plus Approved Projects Conditions. The resulting turning movement volumes for this scenario are illustrated in Figure 5. Level of Service Analysis (Existing plus Approved Projects Conditions) Intersection LOS analysis results for Existing plus Approved Projects Conditions are shown in Table IV. Detailed calculations and queuing analyses are included in Appendix C. With the addition of traffic from the approved developments, service levels for the weekday peak periods at all study intersections will be unchanged, with a few minor increases in average delay. The addition of traffic from the West Berkeley Bowl project is expected to degrade operations at the San Pablo Avenue/Ashby Avenue intersection from an existing LOS D to LOS F during the Saturday peak hour. The West Berkeley Bowl project study has identified this as an impact and recommends a mitigation measure of modifying the traffic signal timing to provide a 120 second cycle length with protected/permitted eastbound left-turn phasing. Implementation of this measure would improve the intersection operations to LOS D during the Saturday peak hour. Although these improvement measures were identified as part of the West Berkeley Bowl project, these improvements are all contingent on installing westbound left turn phasing, which in turn is contingent on securing additional funding and ROW. Therefore, Existing plus Approved Projects Conditions and other future conditions were analyzed using the existing lane configuration and signal timing. Saturday peak hour intersection LOS analysis results for Existing plus Approved Projects Conditions are shown in Table V. Detailed calculations and queuing analyses are included in Appendix C. Final Report Traffic Impact Study for 1200 Ashby Avenue Page 12

17 Table IV: Intersection LOS - Existing plus Approved Projects Conditions (Weekday) Existing Conditions Existing Plus Approved Conditions ID Intersection Control A.M. Peak Hour P.M. Peak Hour A.M. Peak Hour P.M. Peak Hour Delay V/C LOS Delay V/C LOS Delay V/C LOS Delay V/C LOS 1 Ashby Ave./San Pablo Ave. Signal D D D D 2 Ashby Ave /Mabel St. Signal B C B C 3 Ashby Ave./Ninth St. Signal A C A D 4 Ashby Ave./Seventh St. Signal D D D D One-way 5 San Pablo Ave./Carrison St B B B B Stop Notes: Delay = Average control delay in seconds per vehicle, LOS = Level of Service Values are for the critical minor approach of unsignalized intersections and overall for signalized intersections. Table V: Intersection LOS - Existing plus Approved Projects Conditions (Saturday) Existing Conditions Existing Plus Approved Conditions ID Intersection Control Saturday Peak Saturday Peak Delay V/C LOS Delay V/C LOS 1 Ashby Avenue and San Pablo Avenue Signal D F Notes: Delay = Average control delay in seconds per vehicle, LOS = Level of Service Final Report Traffic Impact Study for 1200 Ashby Avenue Page 13

18 16 (109) 2 (16) 31 (251) 127 (127) [169] 674 (841) [724] 146 (261) [186] 171 (550) 206 (277) 52 (143) City of Berkeley Traffic Study for 1200 Ashby Avenue Mixed-Use Development Existing + Approved Projects Turning Movement Volumes Figure 5 Intersection #1 Ashby Ave./San Pablo Ave. 919 (1,129) Intersection #2 Ashby Ave./Mabel St. Intersection #3 Ashby Ave./9th St. 18 (14) 14 (39) 68 (33) Intersection #4 Ashby Ave./7th St. Intersection #5 Carrison St./San Pablo Ave. 98 (148) [173] 719 (969) [799] 163 (281) [211] 110 (144) [127] 608 (607) [595] 41 (0) [52] 196 (155) [291] 527 (812) [613] 43 (103) [98] 11 (27) 845 (1,227) 7 (43) 25 (10) 774 (713) 16 (34) 8 (15) 12 (13) 26 (50) 80 (72) 926 (1,159) 14 (12) 118 (180) 818 (897) 13 (43) 9 (17) 2 (6) 9 (12) 557 (363) 896 (898) 267 (141) 20 (49) 684 (944) 110 (85) 98 (274) 163 (341) 64 (171) 799 (1,082) 24 (26) 14 (26) PARDEE ST. BOLIVAR DR. GRAYSON ST. HEINZ AVE. SEVENTH ST. EIGHTH ST. NINTH ST. TENTH ST. WALLACE ST. DERBY ST. WARD ST. MATTHEWS ST. MABEL ST. OREGON ST. PARK ST. PARK ST. ANTHONY ST. ASHBY AVE. POTTER ST. NINTH ST. 4 3 Project Site MURRAY ST. RUSSELL ST. BURNETT ST. 1 2 FOLGER AVE. 5 CARRISON ST. WEST FRONTAGE RD LACOSTE ST. CHRISTIE AVE. OVERLAND AVE. SHELLMOUND ST. 64TH ST. 63RD ST. 62ND ST. HOLLIS ST. 67TH ST. 66TH ST. 65TH ST. DOYLE ST. BEAUDRY ST. PEABODY LN. VALLEJO ST. SAN PABLO AVE. HASKELL ST. 63RD ST. MABEL ST. ACTON ST. DOHY ST. ALCATRAZ AVE. STANTON ST. SACRAMENTO ST. LEGEND Study Intersection XX AM Peak Hour Volume (XX) PM Peak Hour Volume [XX] Saturday Peak Hour Volume /3/08 - JL

19 Existing plus Approved plus Project Conditions Project Description The project site is proposed at 1200 Ashby Avenue in the City of Berkeley, located at the southeast corner of the San Pablo Avenue / Ashby Avenue intersection. Project access will be via a right-in/right-out only driveway from Ashby Avenue for the ground level commercial parking and a full-access driveway on Carrison Street for the ramp to the underground residential parking. The project is a mixed-use residential and retail development. The proposed project will consist of 98 condominium units on four floors, 5,800 sq. ft. of ground floor retail, and 2,000 sq. ft. of ground floor full service (not fast food) restaurant space. The project sponsor proposes to provide 114 parking spaces on the ground floor level. The 16 parking spaces for commercial use will have access from Ashby Avenue. There are 98 parking spaces for residential use with access from Carrison Street. The project sponsor proposes to include a southbound left turn lane of approximately 50 feet with a median cut at the intersection of San Pablo Avenue and Carrison Street to enable access to the driveways on Carrison Street. Appendix D includes an illustration of the proposed median improvement at the intersection of Carrison Street and San Pablo Avenue. Project Trip Generation Trip generation of the proposed project was estimated based on rates provided in Trip Generation, 7th Edition published by the Institute of Transportation Engineers (ITE) and the Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region published by San Diego Association of Governments (SANDAG). The proposed mixed-use development is expected to generate approximately 34 trips (9 inbound and 25 outbound) during the weekday a.m. peak hour and 41 trips (27 inbound and 14 outbound) during the weekday p.m. peak hour. Table VI shows the proposed project trip generation for a typical weekday. Table VII shows the project trip generation for a typical Saturday. The proposed project is expected to generate approximately 71 trips (39 inbound and 32 outbound) during the Saturday peak hour. A mixed-use development typically generates fewer peak hour vehicle trips than those generated by comparable single-use developments, in this case due to internal trip matching between residential and retail uses. Furthermore, the project site is located on a transit-rich corridor that includes the AC Transit Rapid and local bus lines on San Pablo Avenue. City of Berkeley has recently developed a traffic model as part of the West Berkeley Circulation Master Plan, which estimates the percentage reduction in vehicle trips to account for walk, bicycle and transit trips. The transit/ walk/bicycle trip reduction rates were provided by City staff for both residential and commercial trips based on the traffic model. The trip reductions provided are listed below: Residential - 48 percent (weekday), 22 percent (weekend) Commercial 14 percent (weekday), 14 percent (weekend) Final Report Traffic Impact Study for 1200 Ashby Avenue Page 15

20 Table VI: Project Trip Generation (Weekday) Daily A.M. Peak Hour P.M. Peak Hour Use Size A.M. P.M. Rate Trips In Out Total In Out Total Rate Rate Condominiums (230) 98 du Total Residential Trips (Before Reduction) Internal Trips (Residential) Transit/Walk/Bicycle Trips (Residential) - 48% Subtotal (Residential) Specialty Retail (SANDAG) ksf Quality Restaurant (931) ksf Total Commercial Trips (Before Reduction) Internal Trips (Commercial) Transit/Walk/Bicycle Trips (Commercial) - 14% Subtotal (Commercial) Project Total Total Pass-By Trips (Commercial) Net New Trips (Project Total Pass-By Trips) Source: ITE Trip Generation Manual, 7th Edition (2003), San Diego Association of Governments Trip Generation Rates (SANDAG) Notes: 1. d.u. = occupied dwelling units, ksf = 1,000 square feet of gross floor area 2. Internal trip reduction and percentage of pass-by trips for commercial use is based on the ITE Trip Generation Handbook 3. Transit/Walk/Bicycle Trip Reduction rates were provided by City. The rates are based on the West Berkeley Circulation Master Plan Table VII: Project Trip Generation (Saturday) Daily Peak Hour Use Size Saturday Rate Trips Peak Rate In Out Total Condominiums (230) 98 du Total Residential Trips (Before Reduction) Internal Trips (Residential) Transit/Walk/Bicycle Trips (Residential) - 22% Subtotal (Residential) Specialty Retail (SANDAG) ksf Quality Restaurant (931) ksf Total Commercial Trips (Before Reduction) Internal Trips (Commercial) Transit/Walk/Bicycle Trips (Commercial) - 14% Subtotal (Commercial) Project Total Total Pass-By Trips (Commercial) Net New Trips(Project Total Pass-By Trips) Source: ITE Trip Generation Manual, 7th Edition (2003) San Diego Association of Governments Trip Generation Rates (SANDAG) Notes: 1. d.u. = occupied dwelling units, ksf = 1,000 square feet of gross floor area 2. Internal trip reduction and percentage of pass-by trips for commercial use is based on the ITE Trip Generation Handbook 3. Transit/Walk/Bicycle Trip Reduction rates were provided by City. The rates are based on the West Berkeley Circulation Master Plan Final Report Traffic Impact Study for 1200 Ashby Avenue Page 16

21 The above mentioned discounts, including discounts for internal, pass-by, transit, bicycle, and pedestrian trips, were applied to best estimate the expected new trips from the proposed development. Project Trip Distribution and Assignment Trip distribution assumptions for the proposed project were developed based on existing travel patterns and knowledge of the study area. The distribution assumptions are listed below: 24 percent to/from west via Ashby Avenue 2 percent to/from north via Seventh Street 2 percent to/from north via Ninth Street 20 percent to/from north via San Pablo Avenue 32 percent to/from south via San Pablo Avenue 20 percent to/from east via Ashby Avenue The trip distribution assumptions for the study intersections are illustrated in Figure 6 (commercial) and Figure 7 (residential). The project trips were assigned to the study area roadway network based on the above trip distribution assumptions. The resulting trips assigned to the study intersections are illustrated in Figure 8. Turning movement volumes for Existing plus Approved plus Project Conditions are illustrated in Figure 9. Figures 6 to 9 also illustrates the trip distribution, trip assignment, and the project turning movements at the two access driveways. Level of Service Analysis (Existing plus Approved plus Project Traffic Conditions) Intersection LOS analysis results for Existing plus Approved plus Project Conditions are shown in Table VIII for the weekday peak periods. Detailed calculations and queuing analyses are included in Appendix E. With the addition of the proposed project and approved developments, service levels during weekday peak periods at all study intersections are expected to remain unchanged, with a few minor increases in average delay. Saturday peak hour intersection LOS analysis results for Existing plus Approved plus Project Conditions are shown in Table IX. Detailed calculations and queuing analyses are included in Appendix E. During the Saturday peak hour, the intersection of Ashby Avenue and San Pablo Avenue is expected to continue operating at an unacceptable level of LOS F with five seconds increase in average delay. For intersection operating in oversaturated conditions, which is typical for an intersection operating at LOS F, the intersection delays cannot be measured accurately using Synchro. Therefore, the threshold based on the volume-to-capacity (V/C) ratio was assessed for the above intersection operating at LOS F. Increase in the V/C ratio due to additional traffic from the project for the above intersection would be 0.01, which is below the City s significance threshold. Final Report Traffic Impact Study for 1200 Ashby Avenue Page 17

22 Table VIII: Intersection Level of Service - Existing plus Approved plus Project Conditions (Weekday) ID Intersection Control Existing Plus Approved Projects Conditions Existing Plus Approved Projects Plus Proposed Project Conditions A.M. Peak Hour P.M. Peak Hour A.M. Peak Hour P.M. Peak Hour Delay V/C LOS Delay V/C LOS Delay V/C LOS Delay V/C LOS 1 Ashby Ave./San Pablo Ave. Signal D D D D 2 Ashby Ave./Mabel St. Signal B C B C 3 Ashby Ave./Ninth St. Signal A D A D 4 Ashby Ave./Seventh St. Signal D D D D 5 San Pablo Ave./Carrison St. One-way Stop B B B B Notes: Delay = Average control delay in seconds per vehicle, LOS = Level of Service Values are for the critical minor approach of unsignalized intersections and overall for signalized intersections. Table IX: Intersection Level of Service - Existing plus Approved plus Project Conditions (Saturday) ID Intersection Control Existing Plus Approved Projects Conditions Saturday Peak Existing Plus Approved Projects Plus Proposed Project Condition Saturday Peak Delay V/C LOS Delay V/C LOS 1 Ashby Avenue and San Pablo Avenue Signal F F Notes: Delay = Average control delay in seconds per vehicle, LOS = Level of Service TIRE Index Analysis (Existing plus Approved plus Project Traffic Conditions) TIRE index results for Existing plus Approved plus Project Conditions are shown in Table X for the weekday and weekend traffic. With the addition of the proposed project, the increase in traffic volume on residential street is expected to be less than 11 percent. Results indicate that the addition of project traffic would not increase traffic volume by more than 25 percent, indicating that the project would not result in a noticeable impact on neighborhood quality of life. Table X: TIRE Index Analysis - Existing plus Approved plus Project Conditions Roadway Segments Existing Conditions Existing + Project Conditions Weekday Weekend Weekday Weekend Daily Volume TIRE Index Daily Volume TIRE Index Daily Volume TIRE Index Daily Volume TIRE Index Percentage Change in Daily Traffic Weekday Weekend Mabel Street % 4% Carrison Street % 7% Final Report Traffic Impact Study for 1200 Ashby Avenue Page 18

23 City of Berkeley Traffic Impact Study for 1200 Ashby Avenue Mixed-Use Development Proposed Commercial Trip Distribution Figure 6 AVE. SEVENTH ST. NINTH ST. 32% SAN PABLO 28% 20% 15% 20% ASHBY AVE. SAN PABLO AVE. 100% ASHBY AVE. Commercial Project Driveway 100% 24% 14% 6% 10% 5% 30% 2% 15% ASHBY AVE. 15% 22% 63% 20% HOLLIS ST. 5% 5% 5% FOLGER AVE. 5% SAN PABLO AVE. 23% 28% MABEL ST. CARRISON ST. LEGEND XX% /5/08 - JL Study Intersection Commercial Trips Driveways N O R T H Not to Scale * During restricted hours (4 p.m. to 6 p.m.) westbound left turn shifts from San Pablo Avenue to Mabel Street.

24 City of Berkeley Traffic Impact Study for 1200 Ashby Avenue Mixed-Use Development Proposed Residential Trip Distribution Figure 7 20% ASHBY AVE. 32% 10%* SEVENTH ST. NINTH ST. SAN PABLO 23% 37% 20% 10% AVE. 24% 6% 6% 24% 5% 30% 2% 2% 35% 62% SAN PABLO AVE. ASHBY AVE. 10% MABEL ST. 10% 10% 5% 5% 5% FOLGER AVE. 23% 28% 90% 10% 10% 10 % CARRISON ST. HOLLIS ST. 5% 23% 90% 10% Residential Project Entrance 90% 10%* CARRISON AVE. LEGEND XX% /6/08 - JL Study Intersection Commercial Trips Driveways N O R T H Not to Scale * During restricted hours (4 p.m. to 6 p.m.) westbound left turn shifts from San Pablo Avenue to Mabel Street.

25 1 (1) 0 (2) 3 (12) 0 (0) [0] 1 (4) [4] 1 (4) [2] City of Berkeley Traffic Study for 1200 Ashby Avenue Mixed-Use Development Proposed Project Trip Assignment Intersection #1 Ashby Ave./San Pablo Ave. Intersection #2 Ashby Ave./Mabel St. Intersection #3 Ashby Ave./9th St. Intersection #4 Ashby Ave./7th St. Figure 8 Intersection #5 Carrison St./San Pablo Ave. 0 (6) [0] 1 (3) [4] 1 (0) [0] 0 (0) [1] 1 (1) [2] 2 (4) [2] 14 (5) [11] 4 (1) [4] 3 (3) [4] 2 (2) 3 (6) 2 (1) 0 (2) 2 (0) 1 (4) 2 (9) 1 (1) 8 (3) 2 (7) 1 (1) 6 (2) 1 (0) 1 (2) 1 (5) 20 (7) PARDEE ST. BOLIVAR DR. GRAYSON ST. HEINZ AVE. SEVENTH ST. EIGHTH ST. NINTH ST. TENTH ST. WALLACE ST. DERBY ST. WARD ST. MATTHEWS ST. MABEL ST. OREGON ST. PARK ST. PARK ST. ANTHONY ST. ASHBY AVE. POTTER ST. NINTH ST. 4 3 Project Site MURRAY ST. RUSSELL ST. BURNETT ST. 1 2 FOLGER AVE. 5 CARRISON ST. WEST FRONTAGE RD LACOSTE ST. CHRISTIE AVE. OVERLAND AVE. SHELLMOUND ST. 64TH ST. 63RD ST. 62ND ST. HOLLIS ST. 67TH ST. 66TH ST. 65TH ST. DOYLE ST. BEAUDRY ST. PEABODY LN. VALLEJO ST. SAN PABLO AVE. HASKELL ST. 63RD ST. MABEL ST. ACTON ST. DOHY ST. ALCATRAZ AVE. STANTON ST. SACRAMENTO ST. Ashby Ave. Driveway Carrison St. Driveways Commercial Access Residential Access 20 (7) 2 (1) LEGEND Study Intersection XX AM Peak Hour Volume (XX) PM Peak Hour Volume [XX] Saturday Peak Hour Volume N O R T H Not to Scale 4 (15) 3 (11) 4 (17) 1 (4) /6/08 - AK

26 16 (109) 2 (16) 31 (251) 127 (127) [169] 675 (845) [728] 147 (265) [188] 172 (551) 206 (277) 52 (145) City of Berkeley Traffic Impact Study for 1200 Ashby Avenue Mixed-Use Development Existing Plus Approved Plus Project Conditions Turning Movement Volumes Figure 9 Intersection #1 Ashby Ave./San Pablo Ave. 919 (1,129) 3 (12) Intersection #2 Ashby Ave./Mabel St. Intersection #3 Ashby Ave./9th St. 18 (14) 14 (39) 68 (33) Intersection #4 Ashby Ave./7th St. Intersection #5 Carrison St./San Pablo Ave. 98 (154) [173] 720 (972) [803] 164 (281) [211] 110 (144) [127] 609 (608) [596] 43 (0) [56] 210 (160) [302] 531 (813) [617] 46 (106) [102] 13 (29) 848 (1,233) 7 (43) 25 (12) 776 (713) 17 (38) 8 (15) 12 (13) 28 (51) 80 (72) 928 (1,168) 14 (12) 119 (181) 826 (900) 13 (43) 9 (17) 2 (6) 9 (12) 557 (363) 898 (905) 267 (141) 21 (50) 690 (946) 111 (85) 98 (274) 163 (341) 64 (171) 800 (1,084) 25 (31) 34 (33) PARDEE ST. BOLIVAR DR. GRAYSON ST. HEINZ AVE. SEVENTH ST. EIGHTH ST. NINTH ST. TENTH ST. WALLACE ST. DERBY ST. WARD ST. MATTHEWS ST. MABEL ST. OREGON ST. PARK ST. PARK ST. ANTHONY ST. ASHBY AVE. POTTER ST. NINTH ST. 4 3 Project Site MURRAY ST. RUSSELL ST. BURNETT ST. 1 2 FOLGER AVE. 5 CARRISON ST. WEST FRONTAGE RD LACOSTE ST. CHRISTIE AVE. OVERLAND AVE. SHELLMOUND ST. 64TH ST. 63RD ST. 62ND ST. HOLLIS ST. 67TH ST. 66TH ST. 65TH ST. DOYLE ST. BEAUDRY ST. PEABODY LN. VALLEJO ST. SAN PABLO AVE. HASKELL ST. 63RD ST. MABEL ST. ACTON ST. DOHY ST. ALCATRAZ AVE. STANTON ST. SACRAMENTO ST. Commercial Access Ashby Ave. Driveway Carrison St. Driveway Residential Access 20 (7) 2 (1) LEGEND Study Intersection XX AM Peak Hour Volume (XX) PM Peak Hour Volume [XX] Saturday Peak Hour Volume N O R T H Not to Scale 977 (1,394) 5 (13) 3 (11) 762 (752) 4 (17) 24 (20) 1 (4) 14 (26) /6/08 - JL

27 Project On-Site Parking Requirements The project includes a total of 114 on-site parking spaces, which would include 110 regular spaces and four accessible spaces. Table XI illustrates the project off-street parking requirements and proposed on-site parking supply. As shown in the table, the project will provide two parking spaces less than the City s requirement. The Project Sponsor has requested a parking variance to reduce the commercial parking requirement by two spaces. Table XI: On-Site Project Parking Land Use Size City Requirement Total Required Spaces Condominium 98 du 1 space per du 98 Food Service 2.0 ksf 1 space per 300 sq. ft. 7 Retail 5.5 ksf 2 spaces per ksf 11 Total City Required Spaces 116 Total Proposed Parking Spaces 114 Source: City of Berkeley Zoning Code Notes: du = occupied dwelling units, ksf = 1,000 square feet of gross floor area On-Street Parking Conditions near Project Site On-street parking occupancy surveys were conducted in May 2007 between the approximate hours of 3:30-4:00 p.m. and 6:30-7:00 p.m. A total of five block faces in the vicinity of the project site was surveyed. The number of parking spaces was estimated by measuring block lengths and assuming approximately 25 feet per space. Survey results are shown in Table XII. Table XII: On-Street Parking Occupancy in Project Vicinity Block Face From To Space Number Occupancy per Block face Type of spaces 3:30-4:00 P.M. 6:30-7:00 P.M. San Pablo Avenue E Carrison St. Ashby Ave. U % 3 60% San Pablo Avenue W Murray St. Folgers St. U % 1 25% Carrison Street N San Pablo Ave. Mabel St. U % 9 64% Carrison Street S San Pablo Ave. Mabel St. U % 12 86% San Pablo Avenue E Carrison St. Haskell St. R % 3 60% Overall Study Area Spaces 42 Overall spaces occupied 29 69% 28 67% Number of Unregulated spaces (U) 37 88% of total Number of Regulated Spaces (R) 5 12 % of total According to survey results, on-street parking in the vicinity of the project is more occupied during the mid-afternoon between 3:30 p.m. and 4:00 p.m. Of the approximately 42 on-street parking spaces in the study area, approximately 69 percent were occupied during this period. Of the 13 available spaces, four spaces were available along Carrison Street frontage of the proposed project site. Traffic engineers typically consider an occupancy rate of 85 percent or more to be full. Since the vast majority of study area parking is unregulated (except for once-per-month street sweeping), there is available on-street capacity for project parking that is a short walking distance (up to two blocks) from the site. When combining this surplus in on-street parking to the on-site parking supply, the project is expected to have enough parking available for residents, residential guests, and retail patrons. Final Report Traffic Impact Study for 1200 Ashby Avenue Page 23

28 Proposed Access and Circulation The proposed project s access will consist of a right-in/right-out driveway on Ashby Avenue approximately 150 feet east of San Pablo Avenue and a full-access driveway on Carrison Street approximately 150 feet east of San Pablo Avenue. The site plan shows access to on-site ground level commercial parking from the right-in/right-out driveway on Ashby Avenue. The full-access driveway on Carrison Street will provide access to the ground level on-site residential parking. Both the accesses are expected to be adequate for cars and small trucks accessing the site. Due to the presence of narrow lanes (10.5 feet) and lack of on-street parking on Ashby Avenue, right turn maneuvers entering the Ashby Avenue driveway would require vehicles to slow down considerably. TJKM conducted turning radii checks for passenger cars and small trucks entering and exiting the driveway on Ashby Avenue. AUTOTURN figures showing the turning templates for passenger car and small truck at the driveway are included in Appendix D. Passenger cars could turn into the driveway easily if a 12 feet lane is provided for the inbound traffic. Small trucks would need to utilize both inbound and outbound lanes of the driveway to enter and exit the project site. Based on the AUTOTURN analysis, TJKM recommends that a width of 22 feet (i.e. 12-foot lane for inbound traffic and 10-foot lane for outbound traffic) be provided for the driveway on Ashby Avenue. The driveway apron (curb-cut) will be designed as per Caltrans Standard Plan A87A, which would provide sufficient width for small trucks to ingress and egress the driveway. To access San Pablo Avenue or points west from the ground level parking, residential project vehicles would exit to turn right onto westbound Carrison Street, then make a right turn onto San Pablo Avenue, and then turn left at the Ashby Avenue/San Pablo Avenue intersection. Residential project vehicles from east on Ashby Avenue have two options. They are expected to turn left onto southbound Mabel Street, turn right on Carrison Street, and turn right into the project driveway. Alternatively, these vehicles can turn left on San Pablo Avenue, turn left on Carrison Street, and turn left into the project driveway. Carrison Street currently provides only right-in/right-out access to northbound San Pablo Avenue since there is a median separator on San Pablo Avenue. The proposed project would create a partial median break that allows an inbound left turn pocket from southbound San Pablo Avenue onto Carrison Street. See Figure 2 for recommended improvements for the San Pablo Avenue/Carrison Street intersection. To access southbound San Pablo Avenue, project vehicles would exit the driveway on Carrison Street, turn right onto northbound San Pablo Avenue and then make a U-turn at the San Pablo Avenue/Ashby Avenue intersection. Entering project vehicles accessing the Carrison Street driveway from Ashby Avenue are expected to turn left at San Pablo Avenue/Carrison Street intersection onto Carrison Street to the project driveway. With respect to site circulation and access, two signs should be installed facing exiting vehicles at the driveway on Ashby Avenue. One is a STOP sign and the other is a sign that reads Right Turn Only. This would ensure that exiting motorists at the site driveway are restricted from making a left turn onto Ashby Avenue. Another STOP sign should be installed at the residential access driveway exit on Carrison Street. Based on the City s Zoning Code, all commercial construction greater than 10,000 square feet shall require off-street loading spaces. Since the proposed commercial development is less than 10,000 square feet, off-street loading space is not required. As shown in the section on-street parking conditions near project site, there are ample parking spaces available around the project site. These on-street parking spaces can be used for loading operations without causing any detrimental impact on parking availability or on traffic flow. Final Report Traffic Impact Study for 1200 Ashby Avenue Page 24

Draft Report: West Berkeley Bowl Project

Draft Report: West Berkeley Bowl Project Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley 1031-1925 F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA 94549 925-284-3200 Fax:

More information

700 University Avenue Mixed-Use Development. Traffic Impact Analysis

700 University Avenue Mixed-Use Development. Traffic Impact Analysis 700 University Avenue Mixed-Use Development Traffic Impact Analysis January 20, 2006 Prepared by 700 UNIVERSITY AVENUE MIXED- USE DEVELOPMENT TRAFFIC IMPACT STUDY Table of Contents 1.0 Executive Summary...

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Abrams Associates TRIP GENERATION AND PARKING ANALYSIS. City of Berkeley

Abrams Associates TRIP GENERATION AND PARKING ANALYSIS. City of Berkeley TRIP GENERATION AND PARKING ANALYSIS 2556 TELEGRAPH PROJECT City of Berkeley Prepared for: Realtex Group 505 Sansome Street, Suite 400 San Francisco, CA 94111 Prepared by: 1875 Olympic Boulevard, Suite

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma.

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma. Revised Report Traffic Study for Safeway Fuel Center at Washington Square Shopping Center In The Pleasanton Fresno Sacramento Santa Rosa TJKM www.tjkm.com Revised Report Traffic Study for Safeway Fuel

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

TRAFFIC IMPACT STUDY FOR

TRAFFIC IMPACT STUDY FOR TRAFFIC IMPACT STUDY FOR YUBA CROSSINGS MIXED USE DEVELOPMENT Yuba City, CA Prepared For: Yuba Crossings LLC 1825 Del Paso Blvd Sacramento, CA 95815 Prepared By: KDAnderson & Associates, Inc. 3853 Taylor

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2 TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

TRAFFIC IMPACT ANALYSIS WESTMINSTER SEMINARY. Escondido, California June 25, LLG Ref Transportation Engineer II

TRAFFIC IMPACT ANALYSIS WESTMINSTER SEMINARY. Escondido, California June 25, LLG Ref Transportation Engineer II TRAFFIC IMPACT ANALYSIS WESTMINSTER SEMINARY Escondido, California June 25, 2015 LLG Ref. 3-15-2420 Prepared by: Pedram Massoudi Transportation Engineer II Under the Supervision of: John Boarman, P.E.

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By:

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By: TRAFFIC IMPACT ANALYSIS FOR STERLING 5 th STREET APARTMENTS PROJECT Davis, CA Prepared For: Din/Cal 3, Inc. 3411 Richmond Avenue, Suite 200 Houston, Texas 77046 Prepared By: KD Anderson & Associates, Inc.

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

TRAFFIC IMPACT ANALYSIS 661 BEAR VALLEY. Escondido, California September 1, LLG Ref

TRAFFIC IMPACT ANALYSIS 661 BEAR VALLEY. Escondido, California September 1, LLG Ref TRAFFIC IMPACT ANALYSIS 661 BEAR VALLEY Escondido, California September 1, 2015 LLG Ref. 3-13-2299 EXECUTIVE SUMMARY The Project (Project) proposes the development of 55 residential dwelling units on 40.88

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

5.9 TRANSPORTATION AND TRAFFIC

5.9 TRANSPORTATION AND TRAFFIC 5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis

More information

APPENDICES. Appendix R Traffic Impact Analysis (January 2017)

APPENDICES. Appendix R Traffic Impact Analysis (January 2017) APPENDICES Appendix R Traffic Impact Analysis (January 2017) 661 Bear Valley Parkway EIR March 2017 APPENDICES This page intentionally left blank 661 Bear Valley Parkway EIR March 2017 TRAFFIC IMPACT ANALYSIS

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II TRAFFIC IMPACT ANALYSIS LOTUS RANCH El Centro, California July 31, 2015February 12, 2016 LLG Ref. 3-14-2392 Prepared by: KC Yellapu, P.E Senior Transportation Engineer & Charlene Sadiarin Transportation

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

1650 South Delaware Street

1650 South Delaware Street 65 South Delaware Street Final Transportation Impact Analysis Prepared for: City of San Mateo June 8, 28 Hexagon Transportation Consultants, Inc. Hexagon Office: 4 North Second Street, Suite 4 San Jose,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

MADERAS HOTEL TRANSPORTATION IMPACT ANALYSIS. LLG Ref Transportation Planner III & Jorge Cuyuch Transportation Engineer I

MADERAS HOTEL TRANSPORTATION IMPACT ANALYSIS. LLG Ref Transportation Planner III & Jorge Cuyuch Transportation Engineer I TRANSPORTATION IMPACT ANALYSIS MADERAS HOTEL Poway, California June 21, 2016 LLG Ref. 3-16-2602 Prepared by: Amelia Giacalone Transportation Planner III & Jorge Cuyuch Transportation Engineer I Under the

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

Traffic Impact Study for the Maria Drive Apartment Complex

Traffic Impact Study for the Maria Drive Apartment Complex Traffic Impact Study for the Maria Drive Apartment Complex Prepared for the City of Petaluma Submitted by Whitlock & Weinberger Transportation, Inc. 490 Mendocino Avenue Suite 201 Santa Rosa, CA 95401

More information