The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

Size: px
Start display at page:

Download "The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways."

Transcription

1 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on a traffic analysis prepared by Fehr and Peers Transportation Consultants (June 2009), which is attached as Appendix B to this report EXISTING SETTING This section discusses the transportation-related context in which the proposed project would be constructed and would operate, including a description of the study area and the street network that serves the potential project sites; existing transit service, bicycle, and pedestrian facilities near the project site; definitions of intersection and roadway segment LOS; and a summary of current conditions. Exhibit identifies the study area roadways and the potential project sites. EXISTING ROADWAY SYSTEM The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. State Route 99 State Route 99 (SR 99) is a north-south freeway within the study area with interchanges at Elk Grove Boulevard and Grant Line Road. It consists of two lanes in each direction from south of Grant Line Road to just south of Elk Grove Boulevard, where a High Occupancy Vehicle (HOV) lane is added in each direction. Elk Grove Boulevard Elk Grove Boulevard is a major east-west roadway that extends from Interstate 5 (I-5) to Grant Line Road. Through the study area, Elk Grove Boulevard is a four-lane roadway from East Stockton Boulevard to Elk Grove- Florin Road. East of Elk-Grove Florin Road, Elk Grove Boulevard narrows to two-lanes. Elk Grove-Florin Road Elk Grove-Florin Road is a north-south roadway that extends from East Stockton Boulevard to Florin Road in unincorporated Sacramento County where it becomes Watt Avenue. In the study area, Elk Grove-Florin Road is two-lanes south of Elk Grove Boulevard, with four lanes to the north. Waterman Road Waterman Road is a north-south two-lane roadway that extends from Grant Line Road to north of Calvine Road. Bradshaw Road Bradshaw Road is a north-south two-lane roadway that extends from Grant Line Road to Folsom Boulevard (in unincorporated Sacramento County). Through the study area, Bradshaw Road has two-lanes. East Stockton Boulevard East Stockton Boulevard is a north-south roadway that extends from south of Grant Line Road to Elk Grove Boulevard where it turns into Emerald Vista Drive. East Stockton Boulevard has three-lanes (two northbound and one southbound) for about 1,200 feet south of Elk Grove Boulevard and two lanes to the south. City of Elk Grove Traffic and Circulation

2 Source: Fehr & Peers 2009, Adapted by 2009 Traffic Study Intersections Exhibit Traffic and Circulation City of Elk Grove

3 Source: Fehr & Peers 2009, Adapted by 2009 Number of Lanes Existing Conditions Exhibit City of Elk Grove Traffic and Circulation

4 Grant Line Road Grant Line Road is a major north-south roadway that extends from SR 99 to White Rock Road in unincorporated Sacramento County. Through the study area, Grant Line Road is two-lanes. Kammerer Road Kammerer Road is an east-west two-lane roadway that extends from West Stockton Boulevard to Bruceville Road. The easterly portion of Kammerer Road will be realigned in conjunction with the ongoing construction of the SR 99/Grant Line Road interchange. The existing conditions described above for these roadways do not assume any of the improvements currently under construction at the SR 99/Grant Line Road interchange. As shown in Inset A of Exhibit 4.2-1, the existing conditions assume northbound SR 99 with a hook on-ramp and off-ramp to East Stockton Boulevard, which has stop-control for northbound and southbound traffic. Southbound SR 99 has a hook on-ramp and off-ramp to West Stockton Boulevard, which also includes stop-control for northbound and southbound traffic. EXISTING PUBLIC TRANSIT SERVICE The City of Elk Grove operates fixed-route bus service (e-tran) within the study area. Although Kammerer Road and the southern portion of Grant Line Road have no routes or stops, numerous routes with stops are available within the study area, including East Stockton Boulevard (Route 60), Elk Grove-Florin Road (Routes 57, 59, 60, 158), Elk Grove Boulevard (Routes 70, 156, 162), and Grant Line/Waterman Road (Routes 58, 160). Some of these services are peak hour only or have long headways. No existing transit services extend directly to the two potential project sites. EXISTING BICYCLE AND PEDESTRIAN FACILITIES Bicycle facilities do not exist near the potential project sites due to the industrial character of the area, although there are some intermittent pedestrian facilities (including sidewalks and crosswalks). Within the study area, crosswalks are generally provided at signalized intersections and sidewalks exist along the frontage of most developed properties. Class II (on-street with signing and striping) bike lanes are provided on Elk Grove-Florin Road, and portions of Elk Grove Boulevard and East Stockton Boulevard. STUDY AREA The following 24 intersections and 21 roadway segments were selected for analysis under existing conditions based on their proximity to the potential project sites, their expected usage by project traffic, and/or existing operational deficiencies that could be exacerbated by the project. Intersections 1 State Route 99 SB Ramps / Elk Grove Boulevard 2 State Route 99 NB On-Ramp / Elk Grove Boulevard 3 Elk Grove Boulevard / East Stockton Boulevard 4 State Route 99 NB Off-Ramp / East Stockton Boulevard 5 Elk Grove Boulevard / Elk Grove-Florin Road 6 Elk Grove Boulevard / Waterman Road 7 Elk Grove Boulevard / Bradshaw Road 8 Elk Grove-Florin Road / East Stockton Boulevard 9 Union Parkway / East Stockton Boulevard 10 Elkmont Way / East Stockton Boulevard 11 Grant Line Road / West Stockton Boulevard Traffic and Circulation City of Elk Grove

5 12 Grant line Road / East Stockton Boulevard 13 Grant Line Road / Waterman Road 14 Grant Line Road / Bradshaw Road 15 Elk Grove Boulevard / Grant Line Road 16 Grant Line Road / Bond Road 17 Grant Line Road / Wilton Road 18 Grant Line Road / Sheldon Road 19 Grant Line Road / Calvine Road 20 Bilby Road / Bruceville Road 21 Kammerer Road / Bruceville Road 22 State Route 99 NB Ramps / East Stockton Boulevard 23 State Route 99 SB Ramps / West Stockton Boulevard 24 Kammerer Road / East Stockton Boulevard Roadway Segments 1 Kammerer Road State Route 99 to Bruceville Road 2 Grant Line Road State Route 99 to Waterman Road 3 Grant Line Road Waterman Road to Bradshaw Road 4 Grant Line Road Bradshaw Road to Elk Grove Boulevard 5 Grant Line Road Elk Grove Boulevard to Bond Road 6 Grant Line Road Bond Road to Wilton Road 7 Grant Line Road Wilton Road to Sheldon Road 8 Grant Line Road Sheldon Road to Calvine Road 9 Waterman Road Bond Road to Elk Grove Boulevard 10 Waterman Road Elk Grove Boulevard to Grant Line Road 11 Elk Grove-Florin Road Bond Road to Elk Grove Boulevard 12 Elk Grove-Florin Road Elk Grove Boulevard to East Stockton Boulevard 13 Elk Grove Boulevard State Route 99 to Elk Grove-Florin Road 14 Elk Grove Boulevard Elk Grove-Florin Road to Waterman Road 15 Elk Grove Boulevard Waterman Road to Bradshaw Road 16 Elk Grove Boulevard Bradshaw Road to Grant Line Road 17 East Stockton Road Elk Grove Boulevard to Elk Grove-Florin Road 18 East Stockton Road Elk Grove-Florin Road to Grant Line Road 19 Bradshaw Road Bond Road to Elk Grove Boulevard 20 Bradshaw Road Elk Grove Boulevard to Grant Line Road 21 Kammerer Road east of Bruceville Road PLANNED FACILITIES The existing study intersections and roadways listed above along with the following planned roadways and intersections were selected for analysis under baseline and cumulative conditions, unless otherwise noted: Intersections 25 Grant Line Road / Survey Road 26 State Route 99 NB Off-Ramp / Grant Line Road 27 State Route 99 SB Off-Ramp / Grant Line Road 28 Kammerer Road / Promenade Parkway 29 Kammerer Road / Lent Ranch Parkway 30 Kammerer Road / Lotz Parkway 31 Kammerer Road / Big Horn Boulevard (cumulative only) City of Elk Grove Traffic and Circulation

6 Roadway Segment 22 Big Horn Boulevard north of Kammerer Road (cumulative only) EXISTING INTERSECTION AND ROADWAY SEGMENT OPERATIONS Existing traffic counts at the 24 study intersections and 21 study roadway segments were collected in September 2005, May 2007, or July The roadway segments were counted over a 24-hour period during the mid-week. The intersections were counted during the a.m. (7:00 a.m. to 9:00 a.m.) and p.m. (4:00 p.m. to 6:00 p.m.) peak periods. To account for potential growth between 2005 and 2008, the 2005 counts were balanced to the counts collected in 2007 and 2008 for use in the existing conditions analysis. The traffic counts are provided in Appendix B. ROADWAY SEGMENT OPERATIONS Level of service (LOS) is a qualitative measure describing the operating condition of intersections and roadways. LOS ranges from A through F, which represents driving conditions from best to worst, respectively. In general, LOS A represents free-flow conditions with no congestion, and LOS F represents severe congestion and delay under stop-and-go conditions. Exhibit shows the average daily traffic (ADT) volume and LOS on the study roadway segments. As shown, the majority of the study roadways operate at LOS D or better under existing conditions, except for the segment of Elk Grove Boulevard from Elk Grove-Florin Road to Waterman Road (19,100 ADT), which operates at LOS F. INTERSECTION OPERATIONS Exhibits 4.2-4a and 4.2-4b display the existing a.m. and p.m. peak hour traffic volumes at the study intersections. Ten of the 24 intersections are controlled by traffic signals and the other 14 are controlled by stop signs. Table indicates that five of the 24 study intersections operate at LOS E or F during one or both peak hours. All but one of these deficient intersections is at or near the SR 99/Grant Line Road and SR 99/Elk Grove Boulevard interchange. Number of Lanes 1 Table Level of Service Definitions for Study Roadways Maximum Daily Volume LOS A LOS B LOS C LOS D LOS E 2 10,800 12,600 14,400 16,200 18, ,600 25,200 28,800 32,400 36, ,400 37,800 43,200 48,600 54, ,200 50,400 57,600 64,800 72,000 Notes: 1 Elk Grove General Plan Background Report shows all study roadways with moderate access control. Source: City of Elk Grove s Traffic Impact Analysis Guidelines, July Traffic and Circulation City of Elk Grove

7 Source: Fehr & Peers 2009, Adapted by 2009 Roadway Level of Service Existing Conditions Exhibit City of Elk Grove Traffic and Circulation

8 4.2.2 REGULATORY CONTEXT LOCAL City of Elk Grove General Plan The City of Elk Grove General Plan (General Plan) Circulation Element (City of Elk Grove 2008) addresses the city s development pattern, and the movement of people and goods within the region. Several relevant policies are documented below. CI-13: The City shall require that all roadways and intersections in Elk Grove operate at a minimum Level of Service D at all times. CI-14: The City recognizes that Level of Service D may not be achieved on some roadway segments, and may also not be achieved at some intersections. Roadways on which LOS D is projected to be exceeded are shown in the General Plan Background Report, based on the latest traffic modeling conducted by the City. On these roadways, the City shall ensure that improvements to construct the ultimate roadway system as shown in this Circulation Element are completed, with the recognition that maintenance of the desired level of service may not be achievable. Cl-14-Action: The City shall develop criteria to determine which roadway segments and intersections will not achieve the desired level of service standard. CI-15: Development projects shall be required to provide funding or to construct roadway / intersection improvements to implement the City s Circulation Master Plan. The payment of established traffic impact or similar fees shall be considered to provide compliance with the requirements of this policy with regard to those facilities included in the fee program, provided that the City finds that the fee adequately funds all required roadway and intersection improvements. If payment of established fees is used to provide compliance with this policy, the City may also require the payment of additional fees if necessary to cover the fair share cost of facilities not included in the fee program. CI-16: Where a development project is required to perform new roadway construction or road widening, the entire roadway shall be completed to its planned width from curb to-curb prior to the operation of the project for which the improvements were constructed, unless otherwise approved by the City Engineer. Such roadway construction shall also provide facilities adequate to ensure pedestrian safety as determined by the City Engineer. CI-17: The City shall regulate truck travel as appropriate for the transport of goods, consistent with circulation, air quality, congestion management, and land use goals. CI-18: To the extent possible, major traffic routes for residential areas should be separate from those used by the city s industrial areas, with the purpose of avoiding traffic conflicts and potential safety problems. CI-19: The circulation system serving the city s industrial areas should be designed to safely accommodate heavy truck traffic. Bicycles CI-5-Action 5: The City shall develop and implement Pedestrian and Bikeway Master Plans to provide safe and convenient pedestrian and on- and off-street bicycle facilities throughout the City. Traffic and Circulation City of Elk Grove

9 Source: Fehr & Peers 2009, Adapted by 2009 Peak Hour Traffic Volumes and Lane Configurations Existing Conditions Exhibit 4.2-4a City of Elk Grove Traffic and Circulation

10 Source: Fehr & Peers 2009, Adapted by 2009 Peak Hour Traffic Volumes and Lane Configurations Existing Conditions Exhibit 4.2-4b City of Elk Grove Traffic and Circulation

11 4.2.3 IMPACTS AND MITIGATION MEASURES METHOD OF ANALYSIS The analysis of traffic impacts evaluated the a.m. and p.m. peak-hour service levels at the study intersections and roadway segments for the following conditions: Existing, Baseline No Project, and Baseline Plus Project. The following discussion summarizes the process and assumptions that were used to develop the analysis. Intersections The study intersections were analyzed using procedures and methodologies contained in the 2000 Highway Capacity Manual (2000 HCM). Table displays the average control delay per vehicle for each LOS range for signalized and unsignalized intersections. The LOS for signalized and all-way stop-controlled intersections is based on the average delay of all vehicles passing through the intersection. The LOS for side-street stopcontrolled intersections is based on the delay for the minor street movement with the greatest delay. Roadway Segments Roadway segments were analyzed by comparing average daily traffic volumes to capacity thresholds presented in the City of Elk Grove s Traffic Impact Analysis Guidelines (July 2000). Consistent with assumptions in the City s General Plan background report, all study roadways were assumed to have moderate access control. Table identifies daily volume thresholds for each LOS category for two-, four-, six-, and eight-lane roadways with moderate access control. THRESHOLDS OF SIGNIFICANCE Based on Appendix G of the State CEQA Guidelines and standards established in the City of Elk Grove s Traffic Impact Analysis Guidelines, an impact on transportation and circulation would be significant if implementation of the proposed project would: degrade operation at an intersection or roadway segment from LOS A through LOS D to LOS E or LOS F; increase the volume-to-capacity (V/C) ratio by more than 0.05 at roadway segments that operate or will operate in future conditions at unacceptable LOS without the project; increase delay by more than five seconds at study intersections that are, or will be, operating at unacceptable LOS without the project; result in an appreciable number of pedestrians or bicyclists along routes where no designated bicycle facilities or pedestrian walkways exist; substantially increase hazards caused by a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses; create a demand for public transit services substantially above that which is provided, or planned to be provided, by local transit providers or disrupt or interfere with existing or planned public transit services or facilities; or result in inadequate parking capacity. City of Elk Grove Traffic and Circulation

12 Table Intersection Control Delay and Level of Service Existing Conditions Intersection Traffic Control AM Peak Hour PM Peak Hour Delay 1 LOS 2 Delay 1 LOS 2 1. State Route 99 SB Ramps / Elk Grove Boulevard Signal 23 C 37 D 2. State Route 99 NB On-Ramp / Elk Grove Boulevard Signal 11 B 16 B 3. Elk Grove Boulevard / East Stockton Boulevard Signal 28 C 50 D 4. State Route 99 NB Off-Ramp / East Stockton Boulevard Side-Street Stop 18 C >80 F 5. Elk Grove Boulevard / Elk Grove-Florin Road Signal 26 C 48 D 6. Elk Grove Boulevard / Waterman Road Signal 26 C 31 C 7. Elk Grove Boulevard / Bradshaw Road All-Way Stop 11 B 13 B 8. Elk Grove-Florin Road / East Stockton Boulevard Side-Street Stop 17 C 20 C 9. Union Parkway / East Stockton Boulevard Side-Street Stop 15 C 15 C 10. Elkmont Way / East Stockton Boulevard All-Way Stop 10 B 14 B 11. Grant line Road / West Stockton Boulevard Side-Street Stop >80 F >80 F 12. Grant line Road / East Stockton Boulevard Signal 52 D 47 D 13. Grant Line Road / Waterman Road Side-Street Stop 15 B 16 C 14. Grant Line Road / Bradshaw Road Side-Street Stop 11 B 13 B 15. Elk Grove Boulevard / Grant Line Road All-Way Stop 10 A 10 B 16. Grant Line Road / Bond Road Signal 19 B 18 B 17. Grant Line Road / Wilton Road Signal 25 C 45 D 18 Grant Line Road / Sheldon Road Side-Street Stop >80 F 56 F 19 Grant Line Road / Calvine Road Signal 14 B 10 A 20. Bilby Road / Bruceville Road Signal 10 A 11 B 21. Kammerer Road / Bruceville Road Side-Street Stop 10 A 11 B 22. State Route 99 NB Ramps / East Stockton Boulevard Side-Street Stop >80 F >80 F 23. State Route 99 SB Ramps / West Stockton Boulevard Side-Street Stop 41 E 45 E 24. Kammerer Road / East Stockton Boulevard Side-Street Stop 10 A 9 A Notes: 1 For signalized and all-way stop-controlled intersections, the overall average intersection control delay is reported in seconds per vehicle. For side-street stop-controlled intersections, the average control delay for the worst movement is reported in seconds per vehicle. >80 is reported when Synchro is unable to calculate the average control delay for stop-controlled intersections due to oversaturated conditions. 2 Level of Service based on Highway Capacity Manual (Transportation Research Board 2000). Shading indicates that the intersection operates unacceptably based on the significance criteria. Source: Fehr & Peers Traffic and Circulation City of Elk Grove

13 Level of Service Table Level of Service Definitions for Study Intersections Signalized Average Control Delay (seconds / vehicle) Unsignalized A B C D E F > 80.0 >50.0 Source: Highway Capacity Manual, Transportation Research Board The project site is located in a commercial and industrial area, so few pedestrians or cyclists pass by the site. Development of the project might result in minor demand for public transit services by employees, although the number of riders would be small. The introduction of project employees to the area could increase a desirable demand for expanded pedestrian and bicycle facilities (e.g., bike lanes) in the local area. Similar to the public transit service demand, the demand for pedestrian and bicycle facilities generated by the proposed project would be small. Therefore, the potential impacts related to pedestrians, cyclists, or public transit are not evaluated further. Baseline No Project Conditions Traffic Model Assumptions and Forecasting Methodologies Baseline no project weekday and peak hour traffic volume forecasts for study roadways and intersections were developed using v.01 of the SACMET regional travel demand model. This version of the SACMET travel demand model contains the latest land uses for Phased I and II of the Laguna Ridge Specific Plan (2,500 dwelling units north of Poppy Ridge Road), Sterling Meadows, and Elk Grove Marketplace retail parcels. No development was assumed south of Kammerer Road. The following roadway improvements within the study area were assumed under baseline conditions without the proposed project: Lotz Parkway constructed as a four-lane arterial from Big Horn Boulevard across Whitelock Parkway to Poppy Ridge Road, and as a two-lane arterial from just south of Poppy Ridge Road to Kammerer Road. Promenade Parkway constructed as a six-lane arterial from Kammerer Road north to Lent Ranch Parkway, and as a four-lane arterial from Lent Ranch Parkway to its intersection with Lotz Parkway (just south of Whitelock Parkway). Kammerer Road realigned to connect directly with the SR 99 / Grant Line Road interchange and widened from two to six lanes from Survey Road easterly to a short distance west of Lotz Parkway. SR 99 / Grant Line Road interchange upgraded to an L-9 configuration with diagonal on- and off-ramps, loop on-ramps, a six-lane overcrossing, and traffic signals at both ramp-terminal intersections. The above improvements, specifically the reconfiguration of the SR 99 / Grant Line Road interchange and the realignment of Kammerer Road, changes the list of intersections analyzed under baseline conditions from those evaluated under existing conditions: City of Elk Grove Traffic and Circulation

14 The SR 99 ramp terminal intersections with East Stockton Boulevard and West Stockton Boulevard (intersections 22 and 23 under existing conditions) are replaced by the SR 99 ramp terminal intersections with Grant Line Road (intersections 26 and 27 under baseline conditions). East Stockton Boulevard is realigned to the east to connect with Survey Road. Thus, East Stockton / Grant Line Road (intersection 12 under existing conditions) is replaced with Survey Road / Grant Line Road (intersection 25 under baseline conditions). Kammerer Road is realigned to connect with Grant Line Road. West Stockton Boulevard / Kammerer Road (intersection 24 under existing conditions) is replaced with Promenade Parkway / Grant Line Road and Kammerer Road / Lent Ranch Road (intersections 28 and 29 under baseline conditions). The above study intersection changes are illustrated in Exhibit The analysis did not assume a new interchange on SR 99 between Elk Grove Boulevard and Grant Line Road, nor did it assume a loop on-ramp from East Stockton Boulevard (at the SR 99 / Elk Grove Boulevard interchange) onto northbound SR 99. Traffic Forecasts The baseline no project traffic forecasts for daily, a.m. peak hour, and p.m. peak hour conditions were developed by adding the difference between the baseline no project and existing year traffic model forecast to the existing traffic counts. In situations where the street currently does not exist, the baseline no project forecast was used directly and then balanced with forecasts from intersections where an existing traffic count was collected. In some instances, modifications to the traffic model s forecasts were necessary to estimate more accurately the amount of traffic entering and/or exiting specific parcels. For example, adjustments were made at Promenade Parkway based on more detailed trip generation and distribution assumptions developed for a site access analysis of the Elk Grove Promenade. Traffic Operations Analysis Roadway Segment Operations Exhibit identifies the ADT volume and LOS on the study roadway segments under baseline conditions. As shown, the majority of the study roadways continue to operate at LOS D or better under baseline no project conditions except for the following roadway segments: Kammerer Road Promenade Parkway to State Route 99 (68,100 ADT, LOS F) Grant Line Road Survey Road to Waterman Road (38,300 ADT, LOS F) Grant Line Road Bond Road to Wilton Road (17,000 ADT, LOS E) Elk Grove Boulevard State Route 99 to Elk Grove-Florin Road (36,100 ADT, LOS F) Elk Grove Boulevard Elk Grove-Florin Road to Waterman Road (19,500 ADT, LOS F) Intersection Operations Exhibits 4.2-6a and 4.2-6b display the baseline no project peak hour traffic forecasts and lane configurations at the study intersections. The study intersections were reanalyzed under baseline no project conditions. Table displays the results. Table indicates that 14 of the study intersections operate at LOS E or F during one or both peak hours. All but two of these deficient intersections are located near or on Elk Grove Boulevard and Kammerer Road / Grant Line Road. Traffic and Circulation City of Elk Grove

15 Source: Fehr & Peers 2009, Adapted by 2009 Roadway Level of Service Baseline No Project Conditions Exhibit City of Elk Grove Traffic and Circulation

16 Table Intersection Control Delay and Level of Service Baseline Conditions Intersection Traffic Control AM Peak Hour PM Peak Hour Delay 1 LOS 2 Delay 1 LOS 2 1. State Route 99 SB Ramps / Elk Grove Boulevard Signal >80 F >80 F 2. State Route 99 NB On-Ramp / Elk Grove Boulevard Signal 19 B 23 C 3. Elk Grove Boulevard / East Stockton Boulevard Signal 50 D 75 E 4. State Route 99 NB Off-Ramp / East Stockton Boulevard Side-Street Stop >80 F >80 F 5. Elk Grove Boulevard / Elk Grove-Florin Road Signal 32 C >80 F 6. Elk Grove Boulevard / Waterman Road Signal 31 C 39 D 7. Elk Grove Boulevard / Bradshaw Road All-Way Stop 15 B 33 D 8. Elk Grove Florin Road / East Stockton Boulevard Side-Street Stop 32 D >80 F 9. Union Parkway / East Stockton Boulevard Side-Street Stop 14 B 21 C 10. Elkmont Way / East Stockton Boulevard All-Way Stop 12 B 44 E 13. Grant Line Road / Waterman Road Signal 14 B 25 C 14. Grant Line Road / Bradshaw Road Side-Street Stop 44 E 56 F 15. Elk Grove Boulevard / Grant Line Road Side-Street Stop 78 F >80 F 16. Grant Line Road / Bond Road Side-Street Stop 38 D 34 C 17. Grant Line Road / Wilton Road Signal >80 F >80 F 18. Grant Line Road / Sheldon Road Side-Street Stop >80 F >80 F 19. Grant Line Road / Calvine Road All-Way Stop 20 B 10 A 20. Bilby Road / Bruceville Road Signal >80 F >80 F 21. Kammerer Road / Bruceville Road Signal 12 B 40 E 25. Grant Line Road / East Stockton Boulevard Side-Street Stop 24 C 37 D 26. Grant Line Road / NB State Route 99 Ramps Signal 50 D 73 E 27. Grant Line Road / SB State Route 99 Ramps Signal 54 D 51 D 28. Kammerer Road / Promenade Parkway Side-Street Stop >80 F >80 F 29. Kammerer Road / Lent Ranch Parkway Signal 15 B 14 B 30. Kammerer Road / Lotz Parkway Signal 16 B 12 B Notes: 1 For signalized and all-way stop-controlled intersections, the overall average intersection control delay is reported in seconds per vehicle. For side-street stop-controlled intersections, the average control delay for the worst movement is reported in seconds per vehicle. >80 is reported when Synchro is unable to calculate the average control delay for stop-controlled intersections due to oversaturated conditions. 2 Level of Service based on Highway Capacity Manual (Transportation Research Board 2000). Shading indicates that the intersection operates unacceptably based on the significance criteria. Source: Fehr & Peers Traffic and Circulation City of Elk Grove

17 Source: Fehr & Peers 2009, Adapted by 2009 Peak Hour Traffic Volumes and Lane Configurations Baseline No Project Conditions Exhibit 4.2-6a City of Elk Grove Traffic and Circulation

18 Source: Fehr & Peers 2009, Adapted by 2009 Peak Hour Traffic Volumes and Lane Configurations Baseline No Project Conditions Exhibit 4.2-6b City of Elk Grove Traffic and Circulation

19 BASELINE PLUS PROJECT CONDITIONS This section describes effects of the baseline plus project conditions on the surrounding transportation system. Exhibit identifies the potential project site locations. The amount of traffic associated with the proposed project was estimated using a three-step process: 1 Trip generation Estimated the amount of traffic entering and exiting the project sites. 2 Trip distribution Projected the paths used to approach and depart from the sites, along with the percentage of traffic using each path. 3 Trip assignment Assigned the trips to specific roadway segments and intersection turning movements. The results of this process are described in detail below. TRIP GENERATION Project trip generation was based on its planned maximum capacity. This maximum capacity was broken down by permitted daily peak tonnage for each project component, including a materials recovery facility, hazardous household waste collection center, special wastes collection center, and other permitted uses. From these specified peak tonnages, the number and type of vehicles needed to transport the waste was estimated, resulting in an estimate of daily vehicles of each type (Residential Recycling / Green Waste, Commercial Garbage and Recycling, Self Haul, etc). Due to the large percentage of truck traffic that would be generated by the proposed project, truck trips were converted into passenger car equivalents (PCEs) to account for the impact of truck traffic on roadway operations. PCE rates are based on the size and carrying capacity of a vehicle. According to the Transportation Research Board s Special Report 223, heavy vehicles range from 1.5 to 3.7 PCEs. The number of trips would occur during the a.m. and p.m. peak periods was estimated based on the Sacramento Recycling and Transfer Station Study (HDR Engineering 2007), which collected hourly traffic counts at an existing waste transfer facility during the peak periods. For the purposes of assigning PCE-trips to the adjacent roadway network, one-half of truck-trips were assumed to be entering the site and one-half of truck-trips were assumed to be exiting the site during the a.m. and p.m. peak hours. For employee trips, 85 percent of employees were assumed to enter the site during the a.m. peak hour and exit the site during the p.m. peak hour, which reflects inbound / outbound trip percentages for typical industrial uses in Trip Generation, 7 th Edition (Institute of Transportation Engineers 2003). The proposed project s peak hour and daily trip generation was estimated under two scenarios: 1. Franchise Commercial Hauler: Assumes that commercial garbage and recycling services are conducted by a single franchise entity. 2. Multiple Commercial Haulers: Assumes that commercial garbage and recycling services are conducted by multiple commercial entities. The franchise commercial haulers scenario has a slightly lower trip generation, as it assumes that a franchise entity would consolidate waste collection and delivery into fewer trucks, to save on equipment and fuel costs. The scenario with multiple commercial haulers assumes a higher trip generation, as more companies would be delivering waste to the transfer facility. Tables and identify the project PCE trip generation for each scenario for weekday a.m. and p.m. peak hours. A more detailed description of how the project s trip generation was developed is provided in Appendix B. City of Elk Grove Traffic and Circulation

20 Source: Fehr & Peers 2009, Adapted by 2009 Potential Project Site Locations Exhibit Traffic and Circulation City of Elk Grove

21 Table Daily, AM, and PM Trip Generation (Franchised Commercial Hauler) Vehicle Types Passenger Car Equivalent (PCE) Ratio 1 Total Vehicles Per Day Daily AM Peak Hour PM Peak Hour PCE Total Trips 1 Percent of Daily Trips 2 Total Vehicles Total PCE s Percent of Daily Trips 2 Total Vehicles Total PCE s Residential Garbage Recycling / Green Waste Commercial Garbage and Recycling Commercial Self Haul (5 ton trucks) Residential Self Haul (pickup trucks) Private Self Haul HHW 3 (cars and pickup trucks) % % % % % % % % % % 4 9 Employee Cars and Pickup Trucks % % Buy-Back (cars and pickup trucks) Outbound Transfer Trucks / Trailers (18 Wheelers) Outbound from MRF 3 Transfer Truck / Trailers (18 Wheelers) Outbound HHW Vans and Flatbeds (Up to 18 Wheelers) % % % % % % % % 0 0 Total 699 2, Notes: 1 PCE = Passenger Car Equivalent 2 3 Percent of Daily Traffic 6.9% 5.9% 6.4% 5.5% Percent of Daily Trips from Sacramento Transfer and Recycling Traffic Study PCE and percent daily trip percentage from buy-back assumed the same as residential self haul. Vehicle counts are based on a permitted maximum waste acceptance of 2,000 tons per day of Municipal Solid Waste and 500 tons per day of recyclable materials. HHW = Household Hazardous Waste MRF = Material Recovery Facility Source: Fehr & Peers City of Elk Grove Traffic and Circulation

22 Table Daily, AM, and PM Trip Generation (Multiple Commercial Haulers) Vehicle Types Residential Garbage Recycling/ Green Waste Passenger Car Equivalent (PCE) Ratio 1 Total Vehicles Per Day Daily AM Peak Hour PM Peak Hour PCE Total Trips 1 Percent of Daily Trips 2 Total Vehicles Total PCE s Percent of Daily Trips 2 Total Vehicles Total PCE s % % 4 21 Commercial Garbage and Recycling , % % 8 43 Commercial Self Haul (5 ton trucks) Residential Self Haul (pickup trucks) Private Self Haul HHW (cars and pickup trucks) % % % % % % 4 9 Employee Cars and Pickup Trucks % % Buy-Back (cars and pickup trucks) % % 3 6 Outbound Transfer Trucks/Trailers (18 Wheelers) Outbound from MRF 3 Transfer Truck/Trailers (18 Wheelers) Outbound HHW Vans and Flatbeds (Up to 18 Wheelers) % % % % % % 0 0 Total 801 3, Notes: 1 PCE = Passenger Car Equivalent 2 3 Percent of Daily Traffic 6.7% 5.9% 6.1% 5.2% Percent of Daily Trips from Sacramento Transfer and Recycling Traffic Study PCE and percent daily trip percentage from buy-back assumed the same as residential self haul. Vehicle counts are based on a permitted maximum waste acceptance of 2,000 tons per day of Municipal Solid Waste and 500 tons per day of recyclable materials. HHW = Household Hazardous Waste MRF = Material Recovery Facility Source: Fehr & Peers Traffic and Circulation City of Elk Grove

23 TRIP DISTRIBUTION Three trip distribution patterns were developed under baseline conditions one for residential trips, another for commercial trips, and a third for outbound vehicles transporting waste from the project site to landfills and recycling centers outside of Elk Grove. Exhibit identifies the residential trip distribution pattern, which is based on the location of residential land uses in Elk Grove assumed under baseline conditions. Certain types of trips into the project site would have a residential origin or destination, these include: Residential garbage recycling / waste Residential self haul (pickup trucks) Private self haul household waste Employee cars and pickup trucks Buy-back cars and pickup trucks Exhibit shows the commercial trip distribution pattern, which is based on the location of commercial land uses in Elk Grove under baseline conditions. The types of trips into the project site that would have a commercial origin or destination include: Commercial garbage and recycling Commercial self haul (5 ton trucks) Outbound vehicles only have two destinations north on Grant Line Road to the landfills in unincorporated Sacramento County and south on SR 99 to landfills and recycling centers in San Joaquin County and other points south. To provide for a conservative analysis, all outbound transfer trucks/trailers and household waste vans and flatbeds trips (totaling 92 daily trips or about 680 PCEs) were assumed to be distributed on both northbound Grant Line Road and southbound SR 99. Outbound material recycling facility vehicles (totaling 23 daily trips or about 170 PCEs) are assumed to distribute 100 percent southbound on SR 99, due to the lack of a recycling facility in unincorporated Sacramento County. TRIP ASSIGNMENT The trip generation and distribution estimates described above were used to assign trips for the project sites to the surrounding roadway network. The trips from Table were added to the baseline no project volumes using the distribution patterns described for residential, commercial, and outbound vehicles to develop baseline plus project conditions franchised commercial hauler scenario. Likewise, the trips from Table were added to the baseline no project volumes using the distribution patterns described for each trip type to develop volumes for baseline plus project conditions multiple commercial hauler scenario. Estimating plus project volumes by adding project trips to no project volumes likely provides an overestimate of overall volumes under plus project conditions. This is because waste collection already occurs in the City. The proposed project simply provides a local alternative for processing the waste, rather than transporting it to a facility outside of the City. However, by locating a transfer facility in the City, some roadway facilities would experience a net increase in trips. For this reason, it was decided to analyze trips associated with the transfer facility as new trips, to provide for the most conservative analysis. Exhibit shows daily traffic volumes and LOS on study roadway segments once project traffic (from both the franchise commercial haulers and multiple commercial haulers scenarios) is added to no project volumes. Exhibits a, b and c show peak hour turning movements at study intersections under baseline plus project conditions for franchised commercial haulers, and Exhibits a, b, and c summarize peak hour turning movements at study intersections for the multiple commercial hauler scenario. City of Elk Grove Traffic and Circulation

24 Source: Fehr & Peers 2009, Adapted by 2009 Residential Trip Distribution Baseline Conditions Exhibit Traffic and Circulation City of Elk Grove

25 Source: Fehr & Peers 2009, Adapted by 2009 Non-residential Trip Distribution Baseline Conditions Exhibit City of Elk Grove Traffic and Circulation

26 Differences between the two potential project sites were evaluated by separately analyzing the two study intersections that would provide site access for each site location. Elkmont Way / East Stockton Boulevard Grant Line Road / Survey Road The volumes of these intersections under each potential site location are identified on the peak hour turning movement figures. IMPACTS AND MITIGATION MEASURES IMPACT Roadway Segments. The proposed project would increase ADT for roadways within the study area. However, in no case does the project increase ADT volumes enough to result in additional segments operating unacceptably or increase the volume-to-capacity ratio of already-deficient segments by Therefore, this impact would be considered less than significant. The majority of the study roadways continue to operate at LOS D or better under baseline plus project conditions, as identified in Exhibit While the proposed project would increase ADT on all of the study segments, in no case does the project increase ADT volumes enough to result in additional segments operating unacceptably or increase the volume-to-capacity ratio of already-deficient segments by Similar to baseline no project conditions, the following segments would operate unacceptably: Kammerer Road Promenade Parkway to SR 99: Franchised Commercial Haulers (68,400 ADT, LOS F), Multiple Commercial Haulers (68,600 ADT, LOS F) Grant Line Road Survey Road to Waterman Road: Franchised Commercial Haulers and Multiple Commercial Haulers (39,200 ADT, LOS F)Grant Line Road Bond Road to Wilton Road: Franchised Commercial Haulers and Multiple Commercial Haulers (17,700 ADT, LOS E) Elk Grove Boulevard SR 99 to Elk Grove-Florin Road: Franchised Commercial Haulers and Multiple Commercial Haulers (36,100 ADT, LOS F) Elk Grove Boulevard Grove-Florin Road to Waterman Road: Franchised Commercial Haulers and Multiple Commercial Haulers (19,500 ADT, LOS F) Because the proposed project would not increase the V/C ratio of these already-deficient segments by 0.05 or more, the project s traffic contribution to roadway segments would be considered a less-than-significant impact. Mitigation Measure Roadway Segments No mitigation measures would be necessary. Level of Significance after Mitigation The project s impacts on roadway segments would be less than significant. Traffic and Circulation City of Elk Grove

27 Source: Fehr & Peers 2009, Adapted by 2009 Average Daily Traffic volume and Level of Service Baseline Plus Project Conditions Exhibit City of Elk Grove Traffic and Circulation

28 Source: Fehr & Peers 2009, Adapted by 2009 Peak Hour Traffic Volumes and Lane Configurations Baseline Plus Project Conditions (Franchised Commercial Hauler) Exhibit a City of Elk Grove Traffic and Circulation

29 Source: Fehr & Peers 2009, Adapted by 2009 Peak Hour Traffic Volumes and Lane Configurations Baseline Plus Project Conditions (Franchised Commercial Hauler) Exhibit b City of Elk Grove Traffic and Circulation

30 Source: Fehr & Peers 2009, Adapted by 2009 Peak Hour Traffic Volumes and Lane Configurations Baseline Plus Project Conditions (Franchised Commercial Hauler) Exhibit c City of Elk Grove Traffic and Circulation

31 Source: Fehr & Peers 2009, Adapted by 2009 Peak Hour Traffic Volumes and Lane Configurations Baseline Plus Project Conditions (Multiple Commercial Haulers) Exhibit a City of Elk Grove Traffic and Circulation

32 Source: Fehr & Peers 2009, Adapted by 2009 Peak Hour Traffic Volumes and Lane Configurations Baseline Plus Project Conditions (Multiple Commercial Haulers) Exhibit b City of Elk Grove Traffic and Circulation

33 Source: Fehr & Peers 2009, Adapted by 2009 Peak Hour Traffic Volumes and Lane Configurations Baseline Plus Project Conditions (Multiple Commercial Haulers) Exhibit c City of Elk Grove Traffic and Circulation

34 IMPACT Elk Grove-Florin Road / East Stockton Boulevard Intersection. The addition of project traffic to baseline traffic conditions would degrade operations below acceptable levels at the Elk Grove-Florin Road / East Stockton Boulevard Intersection. This impact would be considered significant. The Elk Grove-Florin Road / East Stockton Boulevard Intersection operates at LOS D in the a.m. peak hour and at LOS F during the p.m. peak hour. The addition of project traffic to baseline traffic conditions would degrade acceptable operations to unacceptable levels (LOS E) in the a.m. peak hour and would increase the average delay at this intersection by more than five seconds in the p.m. peak hour (Table 4.2-7). The project s traffic contribution to this intersection would be considered a significant impact. Table Intersection Control Delay and Level of Service Baseline Plus Project Conditions Intersection 1. State Route 99 SB Ramps/ Elk Grove Boulevard 2. State Route 99 NB On- Ramp / Elk Grove Boulevard 3. Elk Grove Boulevard / East Stockton Boulevard 4. State Route 99 NB Off- Ramp / East Stockton Boulevard 5. Elk Grove Boulevard / Elk Grove-Florin Road 6. Elk Grove Boulevard / Waterman Road 7. Elk Grove Boulevard / Bradshaw Road 8. Elk Grove Florin Road / East Stockton Boulevard 9. Site 4 - Union Parkway / East Stockton Boulevard 9. Site 5 - Union Parkway / East Stockton Boulevard 9. Sites 2 and 3 - Union Parkway / East Stockton Boulevard 10. Site 4 - Elkmont Way / East Stockton Boulevard Traffic Control Baseline No Project Conditions AM Peak Hour PM Peak Hour Baseline Plus Franchise Commercial Haulers AM Peak Hour PM Peak Hour Baseline Plus Multiple Commercial Haulers AM Peak Hour PM Peak Hour Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Signal > 80 / F >80 / F >80 / F >80 / F >80 / F >80 / F Signal 19 / B 23 / C 19 / B 24 / C 18 / B 24 / C Signal 50 / D 75 / E 51 / D 77 / E 52 / D 78 / E Side-Street Stop >80 / F >80 / F >80 / F >80 / F >80 / F >80 / F Signal 32 / C >80 / F 32 / C >80 / F 32 / C >80 / F Signal 31 / C 39 / D 32 / C 40 / D 32 / C 40 / D All-Way Stop Side-Street Stop Side-Street Stop Side-Street Stop Side-Street Stop All-Way Stop 15 / B 33 / D 15 / B 33 / D 15 / B 34 / D 32 / D >80 / F 35 / E >80 / F 36 / E >80 / F 14 / B 21 / C 14 / B 21 / C 14 / B 21 / C / B 21 / C 14 / B 21 / C / B 21 / C 14 / B 21 / C 12 / B 44 / E 16 / C >80 / F 17 / C >80 / F City of Elk Grove Traffic and Circulation

35 Table Intersection Control Delay and Level of Service Baseline Plus Project Conditions Intersection 10. Site 5 - Elkmont Way / East Stockton Boulevard 10. Sites 2 and 3 - Elkmont Way / East Stockton Blvd 13. Grant Line Road / Waterman Road 14. Grant Line Road / Bradshaw Road 15. Elk Grove Boulevard / Grant Line Road 16. Grant Line Road / Bond Road 17. Grant Line Road / Wilton Road 18 Grant Line Road / Sheldon Road 19 Grant Line Road / Calvine Road 20. Bilby Road / Bruceville Road 21. Kammerer Road / Bruceville Road 25. Site 4 - Grant Line Road / East Stockton Boulevard 25. Site 5 - Grant Line Road / East Stockton Boulevard 25. Sites 2 and 3 - Grant Line Road / East Stockton Blvd. 26 Grant Line Road / NB State Route 99 Ramps 27. Grant Line Road / SB State Route 99 Ramps Traffic Control Side-Street Stop Side-Street Stop Baseline No Project Conditions AM Peak Hour PM Peak Hour Baseline Plus Franchise Commercial Haulers AM Peak Hour PM Peak Hour Baseline Plus Multiple Commercial Haulers AM Peak Hour PM Peak Hour Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS / B 48 / E 13 / B 48 / E / B 47 / E 13 / B 47 / E Signal 14 / B 25 / C 14 / B 26 / C 14 / B 26 / C Side-Street Stop All-Way Stop 44 / E 56 / F 49 / E 65 / F 49 / E 65 / F 78 / F >80 / F >80 / F >80 / F >80 / F >80 / F Signal 38 / D 34 / D 40 / D 36 / D 40 / D 36 / D Signal >80 / F >80 / F >80 / F >80 / F >80 / F >80 / F Side-Street Stop >80 / F >80 / F >80 / F >80 / F >80 / F >80 / F Signal 20 / B 10 / A 21 / C 10 / A 21 / C 10 / A Signal >80 / F >80 / F >80 / F >80 / F >80 / F >80 / F Side-Street Stop 12 / B 40 / E 12 / B 41 / E 12 / B 42 / E Signal 24 / C 37 / D 27 / C 41 / D 27 / C 42 / D Signal / C 41 / D 27 / C 41 / D Signal / C 36 / D 33 / C 36 / D Signal 50 / D 73 / E 48 / D3 71 / E3 47 / D3 71 / E3 Signal 54 / D 51 / D 48 / D 65 / E 48 / D3 64 / E Traffic and Circulation City of Elk Grove

36 Table Intersection Control Delay and Level of Service Baseline Plus Project Conditions Intersection 28. Kammerer Road / Promenade Parkway 29. Kammerer Road / Lent Ranch Parkway 30. Kammerer Road / Lotz Parkway Traffic Control Baseline No Project Conditions AM Peak Hour PM Peak Hour Baseline Plus Franchise Commercial Haulers AM Peak Hour PM Peak Hour Baseline Plus Multiple Commercial Haulers AM Peak Hour PM Peak Hour Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Delay 1 /LOS 2 Signal >80 / F >80 / F >80 / F >80 / F >80 / F >80 / F Signal 15 / B 14 / B 15 / B 14 / B 15 / B 14 / B Signal 16 / B 12 / B 16 / B 12 / B 16 / B 12 / B Notes: 1 For signalized and all-way stop-controlled intersections, the overall average intersection control delay is reported in seconds per vehicle. For side-street stop-controlled intersections, the average control delay for the worst movement is reported in seconds per vehicle. >80 is reported when Synchro is unable to calculate the average control delay for stop-controlled intersections due to oversaturated conditions. 2 Level of Service based on Highway Capacity Manual (Transportation Research Board 2000). 3 Project trips were added to non-critical movements which have low vehicle delay. Because the overall intersection delay is an average of all the movements, the addition of the project volume decreases the overall intersection delay. Shading indicates that the intersection operates unacceptably based on the significance criteria. Bold italic indicates project impact based on the significance criteria. Source: Fehr & Peers 2009 Mitigation Measure Elk Grove-Florin Road / East Stockton Boulevard Intersection Install a traffic signal at the Elk Grove-Florin Road / East Stockton Boulevard intersection as planned for in the City s Capital Improvement Program. Currently this improvement is included in the fee program and is anticipated to be constructed prior to the operations of the transfer station. If the improvement is not in place, this project will be required to construct it. Level of Significance after Mitigation This mitigation would provide LOS C operations in the a.m. and LOS D operations in the p.m. peak hour with the addition of project traffic. Implementation of this mitigation measure would reduce the impact to a less-thansignificant level. Exhibit identifies the baseline plus project conditions with the identified mitigation measures implemented. IMPACT Elkmont Way / East Stockton Boulevard Intersection (Site 4 Only). The addition of project traffic to baseline traffic conditions would degrade already unacceptable operations at the Elkmont Way / East Stockton Boulevard Intersection if Site 4 is selected as the preferred facility site. No impact would occur at this intersection if Site 2 is selected. The impact at this intersection with the development of Site 4 would be considered significant. The Elkmont Way / East Stockton Boulevard Intersection operates at LOS E in the p.m. peak hour. The addition of project traffic associated with the development of Site 4 to baseline traffic conditions would increase the average delay at this intersection by more than five seconds in the p.m. peak hour (Table 4.2-7). The project s traffic contribution to this intersection would be considered a significant impact if Site 4 is selected as the preferred facility site. No impact would occur at this intersection if Site 2 is selected. Mitigation Measure Elkmont Way / East Stockton Boulevard Intersection (Site 4 Only) City of Elk Grove Traffic and Circulation

4.5 TRANSPORTATION AND CIRCULATION

4.5 TRANSPORTATION AND CIRCULATION The transportation and circulation section of this Draft EIR describes the existing transportation system in the Planning Area and analyzes the potential impacts associated with the proposed land uses

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

5.9 TRANSPORTATION AND TRAFFIC

5.9 TRANSPORTATION AND TRAFFIC 5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II TRAFFIC IMPACT ANALYSIS LOTUS RANCH El Centro, California July 31, 2015February 12, 2016 LLG Ref. 3-14-2392 Prepared by: KC Yellapu, P.E Senior Transportation Engineer & Charlene Sadiarin Transportation

More information

APPENDIX H. Transportation Impact Study

APPENDIX H. Transportation Impact Study APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Proposed Commercial Service at Paine Field Traffic Impact Analysis

Proposed Commercial Service at Paine Field Traffic Impact Analysis Gibson Traffic Consultants 80 Wetmore Avenue Suite 0 Everett, WA 980.9.86 Prepared for: Federal Aviation Administration July 0 GTC #09-07 TABLE OF CONTENTS. EXECUTIVE SUMMARY.... PROJECT IDENTIFICATION....

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma.

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma. Revised Report Traffic Study for Safeway Fuel Center at Washington Square Shopping Center In The Pleasanton Fresno Sacramento Santa Rosa TJKM www.tjkm.com Revised Report Traffic Study for Safeway Fuel

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Sacramento Intermodal Transportation Facility. Final Traffic and Transportation/Pedestrian and Bicycle Facilities Technical Report

Sacramento Intermodal Transportation Facility. Final Traffic and Transportation/Pedestrian and Bicycle Facilities Technical Report Sacramento Intermodal Transportation Facility Final Traffic and Transportation/Pedestrian and Bicycle Facilities Technical Report Sacramento, California 03-Sac-00 PM EA 03-965100 3ENVR October 2008 Table

More information

Draft Report: West Berkeley Bowl Project

Draft Report: West Berkeley Bowl Project Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley 1031-1925 F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA 94549 925-284-3200 Fax:

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Replacement Project EIR Appendices TRAFFIC IMPACT ANALYSIS LAKE WOHLFORD DAM Escondido, California December 19,

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

Appendix C. Traffic Impact Study

Appendix C. Traffic Impact Study Appendix C Traffic Impact Study TRAFFIC STUDY FOR THE EAGLE ROCK AGGREGATE TERMINAL Prepared by: FEHR & PEERS 201 Santa Monica Blvd. Suite 500 Santa Monica, CA 90401-2213 T. (310) 458-9916 F. (310) 394-7663

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

1650 South Delaware Street

1650 South Delaware Street 65 South Delaware Street Final Transportation Impact Analysis Prepared for: City of San Mateo June 8, 28 Hexagon Transportation Consultants, Inc. Hexagon Office: 4 North Second Street, Suite 4 San Jose,

More information

4.12 TRAFFIC AND CIRCULATION Introduction

4.12 TRAFFIC AND CIRCULATION Introduction 4.12 TRAFFIC AND CIRCULATION 4.12.1 Introduction This section of the EIR describes the existing transportation and traffic conditions on roadways surrounding the project area, and analyzes the potential

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

700 University Avenue Mixed-Use Development. Traffic Impact Analysis

700 University Avenue Mixed-Use Development. Traffic Impact Analysis 700 University Avenue Mixed-Use Development Traffic Impact Analysis January 20, 2006 Prepared by 700 UNIVERSITY AVENUE MIXED- USE DEVELOPMENT TRAFFIC IMPACT STUDY Table of Contents 1.0 Executive Summary...

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By:

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By: TRAFFIC IMPACT ANALYSIS FOR STERLING 5 th STREET APARTMENTS PROJECT Davis, CA Prepared For: Din/Cal 3, Inc. 3411 Richmond Avenue, Suite 200 Houston, Texas 77046 Prepared By: KD Anderson & Associates, Inc.

More information

Task 5.1: Existing Conditions Review and Analysis

Task 5.1: Existing Conditions Review and Analysis City of Oceanside Coast Highway Corridor Task 5.1: Existing Conditions Review and Analysis Technical Memorandum August 2014 DOCUMENT CONTROL Client: Project Name: Report Title: City of Oceanside City of

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

D R A F T TRAFFIC IMPACT ANALYSIS FOR. DARK HORSE GOLF RESORT EXPANSION Nevada County, CA. Prepared For:

D R A F T TRAFFIC IMPACT ANALYSIS FOR. DARK HORSE GOLF RESORT EXPANSION Nevada County, CA. Prepared For: D R A F T TRAFFIC IMPACT ANALYSIS FOR DARK HORSE GOLF RESORT EXPANSION Nevada County, CA Prepared For: ASIAN PACIFIC GROUP 18000 Van Karman Avenue, Suite 500 Irvine, CA 92612 Prepared By: KD Anderson &

More information

TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH

TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH, California November 11, 2016 LLG Ref. 3-14-2334 EXECUTIVE SUMMARY The Project proposes the development of 550 luxury residential dwelling units, public trails,

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT MONTEREY, CALIFORNIA Prepared for Denise Duffy & Associates 947 Cass St. Suite 5 Monterey, CA 93940 April 16,

More information

DRAFT WATERMAN GARDENS MASTER PLAN TRAFFIC IMPACT STUDY

DRAFT WATERMAN GARDENS MASTER PLAN TRAFFIC IMPACT STUDY DRAFT WATERMAN GARDENS MASTER PLAN TRAFFIC IMPACT STUDY PREPARED FOR: Housing Authority of the County of San Bernardino Pyatok Architects The Planning Center/DCE PREPARED BY: 3850 Vine Street, Suite 140

More information

Traffic Impact Study for the Maria Drive Apartment Complex

Traffic Impact Study for the Maria Drive Apartment Complex Traffic Impact Study for the Maria Drive Apartment Complex Prepared for the City of Petaluma Submitted by Whitlock & Weinberger Transportation, Inc. 490 Mendocino Avenue Suite 201 Santa Rosa, CA 95401

More information

Perris Apartments Traffic Impact Analysis City of Perris, California

Perris Apartments Traffic Impact Analysis City of Perris, California Perris Apartments Traffic Impact Analysis City of Perris, California Prepared for: JD Pierce Company, Inc. 2222 Martin St., Suite 100 Irvine, CA 92612 Prepared by: TJW ENGINEERING, INC. 540 N. Golden Circle

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information