1 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8 pgrubb@ptsl.com Fax:

2

3 PROJECT SUMMARY PROJECT NAME:... WEST HILLS SHOPPING CENTRE LOWE S EXPANSION TRAFFIC IMPACT STUDY CLIENT:... ARMEL CORPORATION COMMERCE COURT WEST, 199 BAY STREET, SUITE 2900 TORONTO, ONTARIO P.O. BOX 459 M5L 1G4 CLIENT PROJECT MANAGER:... MR. COROSKY, VICE-PRESIDENT ARMEL CORPORATION CONSULTANT:... PARADIGM TRANSPORTATION SOLUTIONS LIMITED 22 KING STREET SOUTH, SUITE 300 WATERLOO ON N2J 1N8 PH: CONSULTANT PROJECT TEAM... PHIL GRUBB, ADAM J. MAKAREWICZ REPORT DATE:... JANUARY 2015 PROJECT NUMBER: P

4

5 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P EXECUTIVE SUMMARY CONTENT The content of this report summarizes an update to the West Hills Traffic Impact Study 1 for a proposed commercial development located west of Elmira Road and north of Paisley Road in the City of Guelph. The main requirement for this updated traffic impact study is to address the revised site plan which considers the addition of a Lowe s establishment. This report documents the additional traffic that is expected to occur as a result of the development and assesses the impact of the traffic on the surrounding road network. The findings, conclusions and recommendations of this study are summarized below and outlined in detail in the body of the report. FINDINGS The main conclusions of this study are as follows: The intersections within the study area are currently operating within acceptable levels of service during the PM and Saturday peak hours. The proposed expansion to the West Hills Commercial Node will consist of developing lands on the northwest quadrant of Paisley Road and Elmira Road. At present, the Costco establishment is currently operational with the remainder of the property vacant. The preliminary concept plan indicates that the development will ultimately consist of 7 buildings with various retail land uses and an additional 650 to 700 parking spaces are anticipated to be provided in addition to the 651 parking spaces provided for the Costco establishment. The total gross floor area (GFA) assumed for expansion will be 154,500 square feet. The proposed expansion to the West Hills Commercial Node is expected to generate approximately 209 PM peak hour and 598 Saturday peak hour new vehicular trips The proposed expansion is planned to have a new driveway connection (Lowe s Driveway) to Elmira Road which will be located directly opposite the driveway located on the east side of Elmira Road that provides access to the West Hills Shopping Centre. The driveway connection is proposed to be signalized with a single inbound and outbound travel lane. The intersections within the study area will continue to operate within acceptable levels of service during the PM and Saturday peak hours upon reaching the 2020 and 2025 horizon with the addition of the proposed development as well as planned other area developments. The SimTraffic simulation for the 2025 total horizon indicated that the 95th Percentile Queue Length for the Saturday Peak Hour of the roadway is expected to experience a slight overlap in the southbound direction between Paisley Road and Lowe s Driveway as well as Lowe s Driveway and the Costco Driveway. No overlap is expected for the weekday PM peak hour. It should be noted that the traffic counts utilized for the Saturday peak hour were conducted two weeks prior to Christmas which results in the highest traffic volumes along area roadways. This would be particularly true for the Elmira Road corridor given the amount of commercial establishments present. As a result of higher volumes than would typically occur, the overlap projected is not expected to be representative of typical conditions. 1 West Hills Shopping Centre Expansion, Prepared for Armel Corporation, Prepared by Paradigm Transportation Solutions Ltd, November Paradigm Transportation Solutions Limited Page i

6 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P In Practical terms what the analysis reveals at peak seasonal shopping periods during the Saturday peak hour is that minor delays in the southbound direction along Elmira Road could be experienced. Additionally it should be noted that the 95th-percentile queue is defined to be the queue length that has only a 5-percent probability of being exceeded during the analysis time period. It is a useful parameter for determining the appropriate length of turn pockets, but it is not typical of what an average driver would experience. Driver experiences would be better characterized by the mean queue length which has indicated that no overlap is expected to occur during the Saturday peak hour. RECOMMENDATIONS Based on the investigations carried out in this study, the following recommendations regarding traffic improvements are provided: Lowe s Driveway should be controlled with traffic control signals with a separate northbound left turn lane. Signalization of the intersection is expected to be required for opening day of the expansion. As part of a normal signal monitoring program it is recommended that the City optimize signal timings on a regular basis to minimize delays during PM and Saturday peak hours as traffic demands change due to the level of development activity within the immediate area. No other roadway improvements are required or recommended to accommodate the traffic related to the subject development. Paradigm Transportation Solutions Limited Page ii

7 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P CONTENTS 1.0 INTRODUCTION OVERVIEW STUDY AREA EXISTING CONDITIONS ROAD NETWORK TRAFFIC VOLUMES TRAFFIC OPERATIONS DEVELOPMENT CONCEPT DEVELOPMENT DESCRIPTION ASSESSMENT OF FUTURE TRAFFIC CONDITIONS BACKGROUND TRAFFIC GROWTH GENERAL BACKGROUND GROWTH OTHER AREA DEVELOPMENTS OTHER AREA DEVELOPMENT TRIP GENERATION OTHER AREA DEVELOPMENT TRIP DISTRIBUTION COMMUNITY CENTRE RE-ASSIGNMENT GROWTH SUMMARY BACKGROUND TRAFFIC OPERATIONS BACKGROUND TRAFFIC OPERATION BACKGROUND TRAFFIC OPERATION FUTURE TRAFFIC ESTIMATES DEVELOPMENT TRIP GENERATION PASS-BY TRIPS INTERNAL TRIPS DEVELOPMENT TRIP DISTRIBUTION FUTURE TOTAL TRAFFIC OPERATIONS NEED FOR IMPROVEMENTS INTERSECTION ASSESSMENT SPEEDVALE AVENUE AND ELMIRA ROAD SPEEDVALE AVENUE AND IMPERIAL ROAD WILLOW ROAD AND IMPERIAL ROAD PAISLEY ROAD AND IMPERIAL ROAD PAISLEY ROAD AND ELMIRA ROAD ELMIRA ROAD AND WEST HILLS DRIVEWAY/LOWE S DRIVEWAY ELMIRA ROAD AND COSTCO DRIVEWAY ELMIRA ROAD AND NORTH DRIVEWAY ELMIRA ROAD AND WILLOW ROAD ELMIRA ROAD QUEUE ASSESSMENT CONCLUSIONS AND RECOMMENDATIONS CONCLUSIONS RECOMMENDATIONS APPENDICES APPENDIX A EXISTING LEVEL OF SERVICE CONDITIONS APPENDIX B 2020 & 2025 BACKGROUND TRAFFIC LEVEL OF SERVICE CONDITIONS APPENDIX C ITE MULTI-USE DEVELOPMENT WORKSHEET APPENDIX D 2020 & 2025 TOTAL TRAFFIC LEVEL OF SERVICE CONDITIONS APPENDIX E SIMTRAFFIC QUEUE CALCULATIONS Paradigm Transportation Solutions Limited

8 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P FIGURES FIGURE 1.1: DEVELOPMENT LOCATION... 2 FIGURE 2.1: EXISTING CONDITIONS... 4 FIGURE 2.2A: 2014 EXISTING PM PEAK HOUR TRAFFIC VOLUMES... 7 FIGURE 2.2B: 2014 EXISTING SAT PEAK HOUR TRAFFIC VOLUMES... 8 FIGURE 3.1: PROPOSED DEVELOPMENT CONCEPT FIGURE 4.1A: 2020 BACKGROUND PM PEAK HOUR TRAFFIC VOLUMES FIGURE 4.1B: 2020 BACKGROUND SATURDAY PEAK HOUR TRAFFIC VOLUMES FIGURE 4.2A: 2025 BACKGROUND PM PEAK HOUR TRAFFIC VOLUMES FIGURE 4.2B: 2025 BACKGROUND SATURDAY PEAK HOUR TRAFFIC VOLUMES FIGURE 4.3A: SITE GENERATED PM PEAK HOUR TRAFFIC VOLUMES FIGURE 4.3B: SITE GENERATED SATURDAY PEAK HOUR TRAFFIC VOLUMES FIGURE 4.4A: 2020 TOTAL PM PEAK HOUR TRAFFIC VOLUMES FIGURE 4.4B: 2020 TOTAL SATURDAY PEAK HOUR TRAFFIC VOLUMES FIGURE 4.5A: 2025 TOTAL PM PEAK HOUR TRAFFIC VOLUMES FIGURE 4.5B: 2025 TOTAL SATURDAY PEAK HOUR TRAFFIC VOLUMES FIGURE 4.6: 2020 & 2025 ASSUMED LANE CONFIGURATION FIGURE 5.1: TH PERCENTILE QUEUE LENGTH ANALYSES TABLES TABLE 2.1: 2011 VS 2014 TRAFFIC VOLUME COMPARISON... 6 TABLE 2.2: LEVEL OF SERVICE DEFINITIONS... 9 TABLE 2.3: LEVEL OF SERVICE BY MODE FOR URBAN ROADWAYS... 9 TABLE 2.2A: 2014 EXISTING PM PEAK HOUR LEVEL OF SERVICE CONDITIONS TABLE 2.2B: 2014 EXISTING SATURDAY PEAK HOUR LEVEL OF SERVICE CONDITIONS TABLE 4.1: OTHER AREA DEVELOPMENTS TABLE 4.2: OTHER AREA DEVELOPMENT TRIP GENERATION TABLE 4.3: TRIP DISTRIBUTION TABLE 4.4A: 2020 BACKGROUND PM PEAK HOUR LEVEL OF SERVICE CONDITIONS TABLE 4.4B: 2020 BACKGROUND SAT PEAK HOUR LEVEL OF SERVICE CONDITIONS TABLE 4.5A: 2025 BACKGROUND PM PEAK HOUR LEVEL OF SERVICE CONDITIONS TABLE 4.5B: 2025 TOTAL SATURDAY PEAK HOUR LEVEL OF SERVICE CONDITIONS TABLE 4.6: DEVELOPMENT TRIP GENERATION TABLE 4.7: DEVELOPMENT TRIP GENERATION (EXTERNAL TRIPS ONLY) TABLE 4.8: DEVELOPMENT TRIP DISTRIBUTION TABLE 4.9A: 2020 TOTAL PM PEAK HOUR LEVEL OF SERVICE CONDITIONS TABLE 4.9B: 2020 TOTAL SATURDAY PEAK HOUR LEVEL OF SERVICE CONDITIONS TABLE 4.10A: 2025 TOTAL PM PEAK HOUR LEVEL OF SERVICE CONDITIONS TABLE 4.10B: 2025 TOTAL SATURDAY PEAK HOUR LEVEL OF SERVICE CONDITIONS Paradigm Transportation Solutions Limited

9 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P 1.0 INTRODUCTION 1.1 Overview The content of this report summarizes an update to the West Hills Traffic Impact Study 2 for a proposed commercial development located west of Elmira Road and north of Paisley Road in the City of Guelph. The main requirement for this updated traffic impact study is to address the revised site plan which considers the addition of a Lowe s establishment. As a result of this update to the site plan, Armel Corporation has retained Paradigm Transportation Solutions Limited (Paradigm) to undertake the updated traffic impact study for this development. The purpose of the study is to determine the impact of the development traffic on the surrounding road network and identify any improvements necessary to accommodate this traffic. The scope of the study includes determination of the current traffic and site conditions in the vicinity of the development, development of estimates of the background traffic growth in the area, estimating the additional traffic that will be generated by the development, assessment of the impact of this traffic and provision of recommendations on the remedial measures necessary to accommodate the site traffic in a satisfactory manner. The study has followed the City s guidelines for traffic impact studies. 1.2 Study Area The subject of this report consists of development of the vacant lands located on the west side of Elmira Road and north of Paisley Road in the City of Guelph. The development is proposed to have three new driveway connections to Elmira Road. The location of the development site is illustrated in Figure 1.1. The intersections that have been evaluated in this study are consistent with the previous report including: 1) Speedvale Avenue and Elmira Road (Signalized), 2) Speedvale and Imperial Road (Signalized), 3) Willow Road and Imperial Road (Signalized), 4) Paisley Road and Imperial Road (Signalized), 5) Paisley Road and Elmira Road (Signalized), 6) Elmira Road and West Hills Driveway (Unsignalized), 7) Elmira Road and Costco Driveway (Signalized), 8) Elmira Road and North Driveway (Unsignalized), and 9) Willow Road and Elmira Road (Signalized). 2 West Hills Shopping Centre Expansion, Prepared for Armel Corporation, Prepared by Paradigm Transportation Solutions Ltd, November Paradigm Transportation Solutions Limited Page 1

10 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Figure 1.1: Development Location Paradigm Transportation Solutions Limited Page 2

11 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P 2.0 EXISTING CONDITIONS 2.1 Road Network This section provides an overview of the existing conditions on the roadways in the study area. Paisley Road is major east-west arterial roadway with an existing four lane urban-cross section. Paisley Road (Wellington Road 30 west of Guelph) runs from Woolwich-Guelph Town Line in the west to Edinburgh Road North in the east, at which point it becomes Paisley Street, continuing into downtown Guelph. In the immediate area of the subject site, Paisley Road has a four-lane urban cross-section. Paisley Road has traffic control signals with Imperial Road and Elmira Road. Separate eastbound and westbound left turn lanes are provided at the intersections with Imperial Road and Elmira Road. The posted speed is 50 km/h east of Imperial Road and 60 km/h west of Imperial Road. Development along this roadway consists mainly of existing residential and commercial uses. Paisley Road currently has a signalized intersection with the Hanlon Expressway, providing for all movements. With the future upgrading of the Hanlon Expressway, it is anticipated that this intersection will be replaced with a grade separation with only some limited movements to and from Hanlon Expressway. Imperial Road is a north-south collector roadway with a four-lane urban cross-section in the vicinity of the West Hills Shopping Centre. Imperial Road runs from north of Woodlawn Road West (Highway 7) in the north to Wellington Street West (Highway 24) in the south. North of the CNR tracks Imperial Road has a basic two lane cross-section with a turning lane. Developments along this roadway consist mainly of residential land uses and the posted speed limit is 50 km/h. South of the CNR, this roadway provides access to the West Hills Commercial Node and the West End Recreation Centre Site. Elmira Road is a north-south arterial roadway with a three-lane cross-section adjacent, north and south of the site (two through lanes, flush centre median/left turn lane) as well as bicycle lanes on each side of the road. It widens to a four-lane cross-section with additional left turn lanes at its intersection with Paisley Road. Elmira Road runs south to Fife Road and north to Wellington Road 7 where the roadway becomes Wellington County Road 86. Developments along this roadway consist mainly of residential land uses as well as pockets of vacant land. Willow Road is an east-west roadway that functions as an arterial road with a two-lane urban cross-section west of Elmira Road and a three lane cross-section (two through lanes and centre turn lane) with bicycle lanes east of Elmira Road. Willow Road runs from west of Elmira Road east to Edinburgh Road. Willow Road currently has a signalized intersection with the Hanlon Expressway, providing all movements and has a posted speed limit of 50 km/h. Figure 2.1 illustrates the existing lane configurations, traffic control on the above noted roadways. Paradigm Transportation Solutions Limited Page 3

12 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Figure 2.1: Existing Key Conditions Traffic Control Signals Stop Control Lane Configuration Elmira Road Imperial Road Project North Speedvale Avenue Willow Road North Driveay Costco Driveway Imperial Road Elmira Road West Hills Driveway Paisley Road West Hills Shopping Centre Lowes Expansion Traffic Impact Study Paradigm Figure 2.1 Existing Conditions Paradigm Transportation Solutions Limited Page 4

13 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P 2.2 Traffic Volumes In order to properly assess intersection operations, Turning Movement Counts (TMC s) are used to quantify the movement of vehicles through the area. Existing traffic data at an intersection or on a road section forms the foundation for analysis. TMC s are usually taken during peak periods at an intersection to complete level of service analysis. Since the development is commercial in nature, we have only carried the PM and Saturday peak hour analysis forward as the concentration of traffic activity for the proposed development will occur during these peak hours primarily. The following describes the traffic data that has been collected: Existing PM peak hour turning movement counts were provided by the City of Guelph for the following intersections: Elmira Road and Willow Road (April 2013), Paisley Road and Imperial Road (October 2012), Paisley Road and Elmira Road (April 2013), and Paisley Road and West Hills Driveway (October 2012). Existing Saturday peak hour turning movement counts were also conducted by Paradigm for the following intersections: Paisley Road and Elmira Road (December 2014), Paisley Road and Imperial Road (December 2014), Elmira Road and Willow Road (December 2014). Existing PM and Saturday turning movement counts were conducted by Paradigm for the following intersections: Speedvale Avenue and Elmira Road (December 2014), Speedvale Avenue and Imperial Road (December 2014), Imperial Road and Willow Road (December 2014), Imperial Road and Community Centre Driveway (December 2014), Imperial Road and West Hills Driveway (December 2014), Elmira Road and West Hills Driveway (December 2014), Elmira Road and Costco Driveway (December 2014), Elmira Road and North Driveway (January 2015). The 2011 volumes which were used for the previous report were compared to the 2013 and 2014 turning movement counts for the respective intersections to determine how much growth has occurred along the Paradigm Transportation Solutions Limited Page 5

14 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P area roadways. Table 2.1 outlines the growth for the intersections and indicate a negative growth has occurred from year 2011 to year 2014 during the weekday PM peak hour for more than half of the intersections within the study area. However, for the Saturday peak hour, all intersections within the study area experience a substantial increase in growth. This may be a result of the timing of the counts within the Christmas period and the operation of the Costco site. It is expected that typical Saturday volumes will be lower. TABLE 2.1: 2011 VS 2014 TRAFFIC VOLUME COMPARISON Intersection Peak hour 2011 Volume 2014 Volume % Increase Paisley Road & Elmira Road Paisley Road & Imperial Road Imperial Road & Willow Road Speedvale Avenue & Imperial Road Speedvale Avenue & Elmira Road Average PM 1,858 1, % Saturday 779 1, % PM 2,756 1, % Saturday 1,239 2, % PM 1,262 1, % Saturday 791 1, % PM 1,897 2, % Saturday 958 1, % PM 1,959 2, % Saturday 841 1, % PM % Saturday % Based on historical traffic data, the PM peak hour counts conducted prior to 2014 were not factored to 2014 volumes given the trend over the last 3 years indicates a decrease in volume. It is also noted that all volumes associate with the Saturday peak hour have been established based on 2014 volumes. The existing balanced weekday PM peak hour and Saturday peak hour traffic volumes are illustrated in Figures 2.2A and 2.2B. Additionally, for the purposes of this report, the counts at the West Hills driveway connections to Paisley Road and Imperial Road were not evaluated as these counts were used to estimate the amount of traffic the West Hills Commercial Node is currently generating. Paradigm Transportation Solutions Limited Page 6

15 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Figure 2.2A: 2014 Existing PM Peak Hour Traffic Volumes Speedvale Avenue Project North North Driveway Willow Road Elmira Road 478 Imperial Road Costco Driveway Community Centre Driveway West Hills Driveway 124 Lowe's Driveway West Hills Shopping Centre Lowes Expansion Traffic Impact Study Paradigm West Hills Driveway Paisley Road West Hills Driveway Figure 2.2A 2014 Existing PM Peak Hour Traffic Volumes Paradigm Transportation Solutions Limited Page 7

16 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Figure 2.2B: 2014 Existing Sat Peak Hour Traffic Volumes Speedvale Avenue Project North Willow Road North Driveway Elmira Road Imperial Road 11 Costco Driveway Community Centre Driveway West Hills Driveway West Hills Driveway 88 Lowe's Driveway Paisley Road West Hills Shopping Centre Lowes Expansion Traffic Impact Study Paradigm West Hills Driveway Figure 2.2B 2014 Existing Saturday Peak Hour Traffic Volumes Paradigm Transportation Solutions Limited Page 8

17 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P 2.3 Traffic Operations Intersection level of service is a recognized method of quantifying the efficiency of traffic flow at intersections. It is based on the delay experienced by individual vehicles executing the various movements. The delay is related to the number of vehicles desiring to make a particular movement compared to the estimated capacity for that movement. Table 2.2 contains the level of service criteria for signalized and stop-controlled intersections. The highest or best possible rating is level of service A, under which the average total delay on a movement, approach or intersection is less than 10 seconds per vehicle. Level of Service E is the point at which remedial measures are considered, depending on the nature and extent of the delays. However, Level of Service E is commonly accepted for left-turning traffic at intersections. When the average delay exceeds 50 seconds at unsignalized intersections, or 80 seconds at signalized intersections, the movement is classified as Level of Service F and remedial measures are usually implemented, if they are feasible. TABLE 2.2: LEVEL OF SERVICE DEFINITIONS Signalized Intersections Unsignalized Intersections Level of Service Average Total Delay Average Total Delay (sec/veh) (sec/veh) A < = 10 < = 10 B > 10 & < = 20 > 10 & < = 15 C > 20 & < = 35 > 15 & < = 25 D > 35 & < = 55 > 25 & < = 35 E > 55 & < = 80 > 35 & < = 50 F > 80 > 50 The level of service for urban roadways is also depicted visually in Table 2.3. This figure provides a visual of how level of service A to level of service F would typically appear on an urban roadway. TABLE 2.3: LEVEL OF SERVICE BY MODE FOR URBAN ROADWAYS Paradigm Transportation Solutions Limited Page 9

18 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P The operations of the intersections in the study area were evaluated using the existing traffic volumes illustrated in Figures 2.2A and 2.2B as well as the current intersection lane configuration and traffic control that is illustrated in Figure 2.1. Synchro 7 traffic analyses software was used for this assessment with HCM 2000 procedures. The results are summarized in Table 2.2A and Table 2.2B and the detailed Synchro reports are provided in Appendix A. The intersection analysis considered the following measures of performance: The level of service for each turning movement, and The volume to capacity ratio for each intersection. Based on the above criteria and the entries in Table 2.2A and 2.2B, the following is noted: During the PM and Saturday peak hours the unsignalized and signalized intersections within the study area are operating at acceptable levels of service with minimal delays. Detailed Synchro output is provided in Appendix A. Paradigm Transportation Solutions Limited Page 10

19 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P TABLE 2.2A: 2014 EXISTING PM PEAK HOUR LEVEL OF SERVICE CONDITIONS Direction / Movement / Approach Analysis Period Peak Hour Control Type Intersection # Intersection MOE LEFT Eastbound Westbound Northbound Southbound THROUGH RIGHT APPROACH LEFT THROUGH RIGHT APPROACH LEFT THROUGH RIGHT APPROACH LEFT THROUGH RIGHT APPROACH OVERALL Speedvale Avenue LOS C C C C C C C C A A A A B B B B B 1 & Delay (s) V/C Elmira Road Queue, 95th (m) Speedvale Avenue LOS C C C C C C C C B B B B B B B B C 2 & Delay (s) V/C Imperial Road Queue, 95th (m) Willow Road LOS B B B B B B B B A A A A A A A A B 2014 Existing Conditions PM Signalized Unsignalized Signalized Delay (s) & V/C Imperial Road Queue, 95th (m) Paisley Road LOS C C C C C C C C B B B B B B B B C Delay (s) & V/C Imperial Road Queue, 95th (m) Paisley Road LOS C C C C C C C C B B B B A B B B B Delay (s) & V/C Elmira Road Queue, 95th (m) Elmira Road LOS B B B A A A A A A A Delay (s) & V/C West Hills Driveway Queue, 95th (m) Elmira Road LOS B B B A A A B B B B Delay (s) & V/C Costco Driveway Queue, 95th (m) Unsignalized 8 Elmira Road LOS B B B A A A A A A A Delay (s) & V/C North Driveway Queue, 95th (m) Elmira Road LOS B B B B B B B B A A A A A A A A A Signalized 9 & Delay (s) V/C Willow Road Queue, 95th (m) Paradigm Transportation Solutions Limited Page 11

20 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P TABLE 2.2B: 2014 EXISTING SATURDAY PEAK HOUR LEVEL OF SERVICE CONDITIONS Direction / Movement / Approach Analysis Period Peak Hour Control Type Intersection # Intersection MOE LEFT Eastbound Westbound Northbound Southbound THROUGH RIGHT APPROACH LEFT THROUGH RIGHT APPROACH LEFT THROUGH RIGHT APPROACH LEFT THROUGH RIGHT APPROACH OVERALL Speedvale Avenue LOS C C C C C C C C A A A A A A A A B 1 & Delay (s) V/C Elmira Road Queue, 95th (m) Speedvale Avenue LOS C C C C C C C C B B B B A B B B B 2 & Delay (s) V/C Imperial Road Queue, 95th (m) Willow Road LOS B B B B B B B B A A A A A A A A B Signalized 3 & Delay (s) V/C Imperial Road Queue, 95th (m) Paisley Road LOS C C C C C C C C B B B B B B B B C 2015 Existing Conditions Saturday Unsignalized Delay (s) & V/C Imperial Road Queue, 95th (m) Paisley Road LOS C C C C C C C C B B B B B A A A B Delay (s) & V/C Elmira Road Queue, 95th (m) Elmira Road LOS B B B A A A A A A A Delay (s) & V/C West Hills Driveway Queue, 95th (m) Elmira Road LOS B B B A A A B B B B Signalized 7 & Delay (s) V/C Costco Driveway Queue, 95th (m) Unsignalized 8 Elmira Road LOS B B B A A A A A A A Delay (s) & V/C North Driveway Queue, 95th (m) Elmira Road LOS B B B B C B B C A A A A A A A A A Signalized 9 & Delay (s) V/C Willow Road Queue, 95th (m) Paradigm Transportation Solutions Limited Page 12

21 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P 3.0 DEVELOPMENT CONCEPT 3.1 Development Description The West Hills Shopping Centre is located north of Paisley Road west of Imperial Road and east of Elmira Road and is bounded by vacant lands currently to the west and north in the City of Guelph. The current site has approximately 152,600 square feet (GFA) currently occupied which consists of the following uses: Supermarket Financial Institution s Restaurants Optical store Dentistry Hair Salon Tax Service centre. The existing West Hills Shopping Centre currently has access provided via a single all directional access to Elmira Road, two all-directional driveway connections to Paisley Road and a single right in/left in/right out access to Imperial Road. All existing driveway connections are controlled by stop signs for the driveway approaches with the exception of the most westerly access on Paisley Road which is controlled by traffic control signals. The proposed expansion to the West Hills Commercial Node will consist of developing lands on the northwest quadrant of Paisley Road and Elmira Road. At present, the Costco establishment is currently operational with the remainder of the property vacant. The preliminary concept plan indicates that the development will ultimately consist of 7 buildings with various retail land uses and a range of 650 to 700 parking spaces are anticipated to be provided to facilitate the future development in addition to the 651 spaces provided for the Costco establishment. The total gross floor area (GFA) for the proposed expansion will be 154,500 square feet. The conceptual site components are shown in detail below as well as on the conceptual site plan as illustrate in Figure 3.1. The site components are further described: Lowe s 104,805ft 2 of Home Improvements Superstore. Block A - 5,100 ft 2 General Retail Block B 5,100 ft 2 General Retail Block C 5,100 ft 2 General Retail Block D 4,950 ft 2 General Retail Block E 6,975 ft 2 General Retail Block F - 4,950 ft 2 General Retail Paradigm Transportation Solutions Limited Page 13

22 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P As the plan for the ancillary retail is currently conceptual and actual demand of the site may achieve more efficient coverage; for the purposes of analysis, approximately 49,695 square feet of general ancillary retail has been assumed. Access to the development is proposed via three driveway connections to Elmira Road; which are shown to be all directional with some modifications to be determined as a result of this report. The driveway connections are further described below: Lowe s Driveway is located approximately 185 meters north of the intersection of Elmira Road and Paisley Road which will function with all movements permitted. It is noted that the Lowes Driveway will be located directly opposite an existing all-directional driveway connection on the east side of the roadway providing access to the West Hills Shopping Centre. This is a preferred access arrangement as this will minimize the amount of left turn overlaps between the two driveway connections as well as provide a centralized access for the two developments on either side of Elmira Road. Traffic control for the intersection of Elmira Road and Lowe s Driveway is assumed to be with traffic control signals as indicated on the most recent concept plan with a single inbound and outbound travel lane. Costco Driveway is an existing driveway connection located approximately 360 meters north of the intersection of Paisley Road and Elmira Road. Future plans indicate that the east leg of this intersection will provide access to the existing recreation centre as well as a further phase of the West Hills Shopping Centre. Traffic control at this driveway connection is provided through traffic control signals with a single inbound and two outbound travel lanes. It is also noted that there is a separate northbound left turn lane and separate southbound right turn lane at the intersection with Elmira Road. North Driveway is an existing driveway located approximately 511 meters north of the intersection of Paisley Road Elmira Road that functions with all movements permitted. Stop sign control is provided for the eastbound approach and a separate northbound left turn lane is also provided. Previous concepts for the property contemplated a potential additional driveway connection from the site to Paisley Road, likely aligned with Whitelaw Road. More detailed analysis of site grading has determined that such a connection is not feasible and possible. The conceptual layout of the development is illustrated in Figure 3.1. Paradigm Transportation Solutions Limited Page 14

23 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Figure 3.1: Proposed Development Concept Paradigm Transportation Solutions Limited Page 15

24 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P 4.0 ASSESSMENT OF FUTURE TRAFFIC CONDITIONS 4.1 Background Traffic Growth Two horizon years have been developed for the future background traffic estimates. The first horizon year has assumed full build out of the development will occur at or before the 2020 horizon year. The second scenario has assumed a horizon year of 2025, 5 years after full-build out to remain consistent with the City s guidelines for traffic impact studies. The 2020 and 2025 horizon years are described below: General Background Growth The likely future traffic volumes in the vicinity of the development site will consist of the traffic generated by the development plus the background traffic growth on the roadway network. Historic traffic volumes at the area intersections from years 2011 and 2013/2014 indicates that traffic has experience a negative growth during the weekday PM peak hour and a substantial increase during the Saturday peak hour. The increase associated with the Saturday peak hour could be a reflection of an increase in holiday shopping given the counts were conducted two weeks prior to Christmas as well as a reflection of the amount of commercial development that has been completed within the area prior to To remain conservative as well as to not overestimate the general growth in background traffic, a growth rate of 1% per annum as well as the inclusion of other area developments has been considered to provide a reasonable representation of the projected traffic estimates along the area roadways Other Area Developments During this period of time, it is possible that there will be other new developments in the area that will increase the existing traffic volumes on the area roadways. The previous 2011 traffic impact study indicated a substantial amount of residential development that is planned to be developed and will have a direct impact along the area roadways. The background development activity within the study area over the next 5 to 10 years is identified in Table 4.1. TABLE 4.1: OTHER AREA DEVELOPMENTS Other Area Active Developments Year Location Development Name Commercial (ft 2 ) Residential Units Notes Northwest Quadrant Imperial & Paisley West Hills Shopping Centre Phase 2 27,930 - Assumed General Retail West of Tovell Drive Armel Lower Density Subdivisions Single Family Units 2020 Southeast Quadrant Elmira & Willow Armel Multi-Res Site Townhouse, 10 Single Family Southwest Quadrant Elmira & Tovell Armel Multi-Res Site Townhouse, 120 Single Family East of Elmira, South of Rec Centre West Hills Shopping Centre Phase 3 102,312 - Assumed Supermarket and General Retail 2020 Horizon Total 130, Southeast Quadrant Paisley & Whitelaw Southwest Quadrant Paisley & Whitelaw Southeast Quadrant Elmira & Paisley Southeast Quadrant Ryde & Paisley Armel Multi-Res Site Townhouses, 290 Single Family Armel Multi-Res Site Townhouses, 290 Single Family Armel Multi-Res Site Townhouse, 240 Single Family Armel Multi-Res Site Townhouse, 80 Single Family East of Deerpath Drive Armel Multi-Res Site Townhouse, 100 Single Family 2025 Horizon Total - 1,310 Paradigm Transportation Solutions Limited Page 16

25 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Other Area Development Trip Generation The traffic generated by the background development have been estimated for the weekday PM and Saturday peak hours using the Institute of Transportation Engineers (ITE) Trip Generation Manual 3. Since the commercial components are part of a multi-use site, an onsite trip reduction of 20% was applied to the commercial trip generation estimates as per the ITE Trip Generation Manual (Chapter 7 Multi-Use Developments), which indicates that trips to/from retail from other retail land uses is 20%. In accordance with the ITE guidelines the reduction was taken before determination of passby trips. The total trips estimated to be generated by the other area developments are summarized in Table 4.2. TABLE 4.2: OTHER AREA DEVELOPMENT TRIP GENERATION Year Location Land Use ITE Code # of Units GFA (ft 2 ) Trips PM Peak Saturday Rate In Out Total Rate In Out Total Northwest Quadrant Imperial & Paisley General Retail ,930 Total Passby 34% % New 66% % West of Tovell Drive Single Family Detached Total Southeast Quadrant Elmira & Willow Townhouse Total Southwest Quadrant Elmira & Tovell Mid-Rise Apartments Total Total Supermarket (Addition) ,093 Passby 36% % New 66% % East of Elmira, South of Rec Centre General Retail ,219 Total Passby 34% % New 66% % Total Total ,242 Passby New Total Other Area Total Passby New Southeast Quadrant Paisley & Whitelaw Mid-Rise Apartments Total Southwest Quadrant Paisley & Whitelaw Mid-Rise Apartments Total Southeast Quadrant Elmira & Paisley Mid-Rise Apartments Total Single Family Detached Total Southeast Quadrant Ryde & Townhouse Paisley - Total Total 1170 Total Single Family Detached Total East of Deerpath Drive Townhouse Total Total 2025 Other Area Total Total Total Passby New Trip Generation Eighth Edition, Institute of Transportation Engineers, Washington D.C., 2003 Paradigm Transportation Solutions Limited Page 17

26 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Other Area Development Trip Distribution The trip distribution for the background development is based on trip distribution found in a previous report entitled West Hills Commercial Centre Phase 2 Traffic Impact Study 4 as well as the distribution found on the area roadways. It is expected that the majority of trips are oriented/destined towards areas east of the study area. The trip distribution is summarized in Table 4.3. TABLE 4.3: TRIP DISTRIBUTION North South East West Travel Origin (To/From) Percentage via Elmira Road 13% via Imperial Road 7% via Elmira Road 6% via Imperial Road 13% via Speedvale Road 15% via Willow Road 6% via Paisley Road 17% via Speedvale Road 10% via Willow Road 1% via Paisley Road Total 12% 100% Community Centre Re-Assignment For the 2020 and 2025 horizon, the fourth leg of the intersection of Elmira Road and Costco Driveway is expected to be operational with some traffic diverted from the Community Centre that currently uses the intersection of Imperial Road and the Community Centre Driveway. Additionally it should be noted that the first internal intersection on the east leg of the intersection of Elmira Road and Costco Driveway will be limited to right/left in and right out only, thus outbound traffic from Phase II of the West Hills Shopping Centre has been re-routed to additional driveways servicing the overall development Growth Summary In summary, the following assumptions have been made with regard to traffic growth for the 2020 horizon: A growth rate of 1.0% per annum was assumed for the PM and Saturday Peak Hours. These growth rates are consistent with the previously submitted and approved traffic impact study. Traffic related to Other Area Developments for the 2020 and 2025 horizon was assumed. It is estimated that these developments will result in an additional 1,309 PM peak hour and 1,384 Saturday peak hour trips along the area roadways when full-build out. The fourth leg of Elmira Road and Costco Driveway is assumed to have some traffic diverted from the existing Community Centre once the fourth leg is constructed. The amount of diverted traffic is assumed to be approximately 50% of the traffic currently being generated along the west leg of the intersection of Imperial Road and Community Centre Driveway. 4 West Hills Commercial Centre Phase 2, Traffic Impact Study, Prepared for Armel Corporation, Prepared by Paradigm, December Paradigm Transportation Solutions Limited Page 18

27 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P With the first intersection driveway connection along the east leg of the intersection of Elmira Road and Costco Driveway limited to right/left in and right out only, outbound traffic from Phase II of the West Hills Shopping Centre has been re-routed to additional driveways servicing the overall development. The background traffic volumes for the respective horizon years are provided in the following Figures: Figures 4.1A and 4.1B Background Horizon, and Figures 4.2A and 4.2B Background Horizon. Paradigm Transportation Solutions Limited Page 19

28 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Figure 4.1A: 2020 Background PM Peak Hour Traffic Volumes Speedvale Avenue Project North Willow Road North Driveway Elmira Road Imperial Road Costco Driveway 0 Community Centre Driveway Lowe's Driveway West Hills Driveway West Hills Driveway West Hills Driveway Paisley Road West Hills Shopping Centre Lowes Expansion Traffic Impact Study Paradigm Figure 4.1A 2020 Background PM Peak Hour Traffic Volumes Paradigm Transportation Solutions Limited Page 20

29 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Figure 4.1B: 2020 Background Saturday Peak Hour Traffic Volumes Speedvale Avenue Project North Willow Road North Driveway Elmira Road 29 Imperial Road Costco Driveway 0 Community Centre Driveway West Hills Driveway West Hills Driveway 189 Lowe's Driveway West Hills Driveway Paisley Road West Hills Shopping Centre Lowes Expansion Traffic Impact Study Paradigm Figure 4.1B 2020 Background Saturday Peak Hour Traffic Volumes Paradigm Transportation Solutions Limited Page 21

30 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Figure 4.2A: 2025 Background PM Peak Hour Traffic Volumes Speedvale Avenue Project North Willow Road North Driveway Elmira Road Imperial Road Costco Driveway 0 Community Centre Driveway Lowe's Driveway West Hills Driveway West Hills Driveway West Hills Driveway Paisley Road West Hills Shopping Centre Lowes Expansion Traffic Impact Study Paradigm Figure 4.2A 2025 Background PM Peak Hour Traffic Volumes Paradigm Transportation Solutions Limited Page 22

31 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P Figure 4.2B: 2025 Background Saturday Peak Hour Traffic Volumes Speedvale Avenue Project North Willow Road North Driveway Elmira Road 31 Imperial Road Costco Driveway 0 Community Centre Driveway West Hills Driveway West Hills Driveway 194 Lowe's Driveway West Hills Driveway Paisley Road West Hills Shopping Centre Lowes Expansion Traffic Impact Study Paradigm Figure 4.2B 2025 Background Saturday Peak Hour Traffic Volumes Paradigm Transportation Solutions Limited Page 23

32 West Hills Shopping Centre Lowe s Expansion Traffic Impact Study January P 4.2 Background Traffic Operations Level of service conditions were assessed for the 2020 and 2025 future background traffic volumes using Synchro Version 7 with HCM 2000 procedures Background Traffic Operation For the 2020 future background traffic volumes, the intersections within the study area were assessed based upon the existing lane configurations, traffic control, and modified signal timings. The results are summarized in Table 4.4A and 4.4B, detailed calculations can be found in Appendix B. The following is noted: During the PM and Saturday peak hours the unsignalized and signalized intersections within the study area are expected to operate at acceptable levels of service with minimal delays. Detailed Synchro output is provided in Appendix B Background Traffic Operation For the 2025 future background traffic volumes, the intersections within the study area were assessed based upon the existing lane configurations, traffic control, and modified signal timings. The results are summarized in Table 4.5A and 4.5B, detailed calculations can be found in Appendix B. The following is noted: During the PM and Saturday peak hours the unsignalized and signalized intersections within the study area are expected to operate at acceptable levels of service with minimal delays. Detailed Synchro output is provided in Appendix B. Paradigm Transportation Solutions Limited Page 24

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Prepared By: 332 Lorne Avenue East Stratford ON N5A 6S4 Prepared for: Paul Kemper, President

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL

TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL Prepared For: 1602850 Ontario Ltd. 2800 Highway 7 Vaughan, Ontario L4K 1W8 Prepared By: URS Canada Inc.

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial

More information

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development Solmar Development Corp. 144&176 John St. and 2 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development TRANSPORTATION IMPACT STUDY 18145 November 217 LEA Consulting Ltd. Consulting

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS 161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes. Prepared By: Stantec Consulting Ltd. Version 2

2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes. Prepared By: Stantec Consulting Ltd. Version 2 2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes Prepared By: Stantec Consulting Ltd. Version 2 April 2014 Stantec Consulting Ltd. 400-1331 Clyde Avenue, Ottawa ON K2C

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2 TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Environmental Assessment Derry Road and Argentia Road Intersection

Environmental Assessment Derry Road and Argentia Road Intersection Air and Noise Study Environmental Assessment Derry Road and Argentia Road Intersection Project 11-4295 City of Mississauga, Region of Peel October 17, 2014 1 Region of Peel Environmental Assessment for

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Craigieburn Employment Precinct North and English Street

Craigieburn Employment Precinct North and English Street Craigieburn Employment Precinct North and English Street METROPOLITAN PLANNING AUTHORITY Intersection Analyses 7 February 2014 Intersection Analyses Craigieburn Employment Precinct North and English Street

More information

4131 Chain Bridge Road

4131 Chain Bridge Road Traffic Impact Study 4131 Chain Bridge Road City of Fairfax, VA 05/04/16 May 4, 2016 Prepared for: Paradigm 1415 North Taft Street Suite 100 Arlington, VA 22201 This report is printed on environmentally

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS January 2, 2018 Mr. Paul DeBotton Marple Associates, L.P. 1604 Walnut Street, 4 th Floor Philadelphia, PA 19103 RE: Langford Run Road Traffic Analysis Proposed Mid County Shopping Center Marple Township,

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation TRAFFIC IMPACT DATA For Dillons #98 On-Site Relocation COMMERCIAL DEVELOPMENT 1740 Massachusetts Street Lawrence, KS Revised April 6, 2011 Prepared by: Pickering Firm, Inc. Introduction The project site

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Capability City of Mississauga Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga,

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

Costco Gasoline Fuel Station Transportation Characteristics

Costco Gasoline Fuel Station Transportation Characteristics Exhibit A MEMORANDUM Date: May 23, 2013 Project #: I-10 To: Jennifer Murillo, Costco Wholesale Terry Odle, Mulvanny G2 Architecture From: Sonia Hennum, PTOE Project: Subject: Signal Hill Costco Gasoline

More information

LCPS Valley Service Center

LCPS Valley Service Center Traffic Impact Study LCPS Valley Service Center Loudoun County, Virginia November 4, 2015 Prepared For: Loudoun County Public Schools 21000 Education Court Ashburn, VA 20148 Prepared by: 1140 Connecticut

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information