Draft Report: West Berkeley Bowl Project

Size: px
Start display at page:

Download "Draft Report: West Berkeley Bowl Project"

Transcription

1 Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA Fax:

2 TABLE OF CONTENTS EXECUTIVE SUMMARY...i Page I. INTRODUCTION... 1 Study Purpose... 1 Report Organization... 1 Study Intersections and Forecast Scenarios... 1 Analysis Methodology... 6 II. EXISTING CONDITION... 9 Study Area... 9 Existing Traffic Counts...11 On-street Parking...11 Bicycle and Pedestrian Facilities...14 Transit Access...14 Existing Intersection Operations...14 III. IV. PROJECT CHARACTERISTICS...16 Project Description...16 Vehicle Trip Generation Assumptions...16 Project Trip Generation...17 Trip Distribution and Assignment...19 EXISTING PLUS PROJECT TRAFFIC CONDITIONS...21 Planned Roadway Improvements...21 Existing Plus Project Traffic...21 Analysis of Existing Plus Project Peak Hour Intersection Operations...20 Analysis of Existing Plus Project Daily Roadway Segment Operations...21 Mitigation Measures...24 V. CUMULATIVE (YEAR 2020) TRAFFIC CONDITIONS...25 Cumulative Without Project Traffic Projections...25 Cumulative With Project Traffic Projections...25 Analysis of Cumulative Peak Hour Intersection Operations...25 Analysis of Cumulative Daily Roadway Segment Operations...28 Mitigation Measures...29 VI. SITE ACCESS, CIRCULATION, AND PARKING...30 Vehicular Site Access...30 Pedestrian, Bicycle, and Transit Access...31 On-Site Circulation...31 Parking...33 APPENDICES Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Traffic Counts Existing Conditions LOS Calculation Worksheets Berkeley Bowl Zip Code Survey Existing Plus Project Conditions LOS Calculation Worksheets Cumulative (2020) Without Project Conditions LOS Calculation Worksheets Cumulative (2020) With Project Conditions LOS Calculation Worksheets

3 LIST OF FIGURES 1 Project Site Vicinity Map Ground Level Conceptual Project Site Plan b Subterranean Garage Conceptual Project Site Plan Study Intersection Locations Existing Lane Configurations Existing Traffic Volumes PM Peak Hour On-Street Parking Occupancy Project Trip Distribution and Assignment Existing Plus Project Traffic Volumes Cumulative (Year 2020) Without Project Traffic Volumes Cumulative (Year 2020) With Project Traffic Volumes a Consultants Recommendations Ground Level b Consultants Recommendations Subterranean Garage... 38

4 LIST OF TABLES 1 Signalized Intersection LOS Criteria Unsignalized Intersection LOS Criteria Existing (2003) Peak Hour Level of Service ITE Vehicle Trip Generation Rates Berkeley Bowl Trip Generation Rates per 1,000 Square Feet Vehicle Trip Generation Bicycle, Pedestrian, and Transit Trip Generation Existing and Existing Plus Project PM Peak Hour Intersection Level of Service Existing and Existing Plus Project Daily Roadway Segment Analysis Cumulative (2020) Without and With Project PM Peak Hour Intersection Level of Service Cumulative (2020) Without and With Daily Roadway Segment Analysis City Code Automobile Parking Requirements ITE Weekday Parking Demand Rates... 35

5 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 EXECUTIVE SUMMARY This report documents traffic impacts of a proposed grocery marketplace with supporting storage area and office at the southwest corner of the Heinz Avenue/9 th Street intersection in the City of Berkeley. Project Description The West Berkeley Bowl, an independent neighborhood serving full-service grocery marketplace, would be located on Heinz Avenue, between 8 th and 9 th Streets, in the City of Berkeley. The project is a two-story full-service grocery marketplace with underground parking garage, including general grocery store (51,065 square feet) and adjacent food service area (3,670 square feet), ancillary office (4,120 square feet), storage, (28,805 square feet), and community room (3,400 square feet). Project site access would be provided from 9 th Street at both Heinz Avenue and Ashby Avenue. The project would also dedicate land for use by the City as a bicycle path and provide 66 bicycle parking spaces in various locations throughout the project site. A total of 217 on-site parking spaces are depicted on the conceptual site plan. Study Area The following six intersections were analyzed during the weekday evening (PM) peak period (4:00 to 6:00 PM) to determine if the proposed project would have any significant traffic impacts on the surrounding roadway network: 1. 7 th Street/Heinz Avenue 2. 9 th Street/Heinz Avenue 3. San Pablo Avenue/Heinz Avenue 4. 7 th Street/Ashby Avenue 5. 9 th Street/Ashby Avenue 6. San Pablo Avenue/Ashby Avenue A morning (AM) peak period (7:00 to 9:00 AM) analysis was not performed as the proposed West Berkeley Bowl Store would not open until 9:00 AM; therefore, AM peak hour trip generation would be minimal. A roadway segment analysis was performed for 9 th Street north of Heinz Avenue for the weekday and Saturday condition. Scenarios The following scenarios were evaluated for this study: Existing Existing conditions. Existing Plus Project Existing traffic volumes plus project-related traffic. Cumulative Without Project Cumulative (2020) conditions considering future development in the area surrounding the project site and planned roadway improvements in the study area. Cumulative With Project Cumulative (2020) forecast conditions plus project-related traffic. i

6 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 Assumed Roadway Improvements Provision of a westbound left-turn lane at the Ashby Avenue/San Pablo Avenue intersection is assumed in the analysis of 2020 conditions. Findings Off-site impacts were less-than-significant at five of the six study intersections in both the Existing Plus Project and Cumulative Plus Project scenarios. A significant off-site impact was identified at the Heinz Avenue/San Pablo Avenue intersection in both the Existing Plus Project and Cumulative Plus Project scenarios. The intersection level of service (LOS) would degrade from an acceptable LOS D to an unacceptable LOS F during the Existing Plus Project scenario. In the Cumulative Plus Project scenario, the addition of project traffic would increase the critical movement volume-to-capacity (V/C) ratio by more than 0.01 at an intersection projected to operate at a deficient service level (LOS F). The City Parking Code requirement was found to be satisfied and on-site parking supplies were found to be sufficient to meet peak parking demand. Recommendations The following recommendations address off-site impacts and on-site issues. Off-Site Recommendations The following off-site improvement is recommended: Install a traffic signal, countdown pedestrian signal, and pedestrian crosswalk at the Heinz Avenue/San Pablo Avenue intersection. The installation of a traffic signal at this intersection would result in LOS B operations in both the Existing Plus Project and Cumulative Plus Project scenarios and reduce the project impact to a less-than-significant level. It would also improve pedestrian and bicycle access to the project, encouraging the use of alternative travel modes to the site. On-Site Recommendations The conceptual site plan was reviewed to evaluate site access, parking, and on-site circulation. Based on this review, the following measures are recommended, as summarized on Figures ES-1a and ES-1b: Install stop-signs at the first and third driveways, as shown on Figure ES-1a. Landscaping should be maintained in areas near driveways to a height of less than 2 feet and tree braches should be trimmed to heights greater than 6 feet to provide sight distance visibility for drivers. Install speed humps in the parking lot to slow drivers within the West Berkeley Bowl parking lot. Schedule deliveries for off-peak periods (i.e., before 4 p.m.) to prevent conflicts between large delivery vehicles and other vehicles/pedestrians. Install vehicle counting system equipment to inform drivers of the number of spaces available in the garage to prevent excessive circulation through the site, and operate as needed. ii

7 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 Modify the curb radius at the garage entry to 10 feet. Provide a two foot clearance between the wall and drive aisle on both sides of the garage ramp. Move the support columns in the parking garage three feet in from the drive aisles to facilitate parking maneuvers, depending on results of final structural analysis. Remove the first parking stall adjacent to the garage ramp, as shown on Figure ES-1b. iii

8 CONVERT TO PERPENDICULAR PARKING PROVIDE 15-FOOT MULTI-USE PATH AND 6-FOOT LANDSCAPE BUFFER July ES1A INSTALL SPEED HUMPS PROVIDE 10 RADIUS LIMIT HEIGHT OF LANDSCAPING INSTALL STOP SIGN INSTALL SPEED HUMP INSTALL STOP SIGN PROHIBIT LARGE DELIVERY VEHICLES DURING PEAK TIMES INSTALL PARKING GARAGE COUNT SYSTEM N Not to Scale West Berkeley Bowl GROUND LEVEL CONSULTANTS RECOMMENDATIONS FIGURE ES-1a

9 July ES1B RELOCATE SUPPORT COLUMNS 3 FEET FROM AISLE PROVIDE 2-FOOT CLEARANCE ON BOTH SIDES OF RAMP STRIPE CENTERLINE REMOVE PARKING SPACE N Not to Scale West Berkeley Bowl SUBTERRANEAN GARAGE CONSULTANTS RECOMMENDATIONS FIGURE ES-1b

10 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 I. INTRODUCTION This chapter discusses the purpose and organization of this report and methodology used in report preparation. Study Purpose The study purpose is to present the findings, conclusions, and recommendations of the transportation impact analysis conducted by Fehr & Peers for the proposed West Berkeley Bowl, an independent neighborhood serving full-service grocery marketplace. The project site is located on Heinz Avenue, between 8 th and 9 th Streets, in the City of Berkeley, as shown on Figure 1. The conceptual site plan is shown on Figures 2a and 2b. Project site access would be provided from 9 th Street both at Heinz Avenue and Ashby Avenue. This study evaluates the off-site transportation system impacts associated with the project and provides an assessment of site access and circulation based on the conceptual site plan shown on Figures 2a and 2b. Report Organization This report is divided into six chapters as described below: Chapter I - Introduction discusses the purpose and organization of this report. Chapter II - Existing Condition describes the project vicinity, including the surrounding roadway network, transit, pedestrian, and bicycle facilities, weekday evening (PM) peak hour on-street parking occupancy, weekday PM peak-hour vehicle traffic volumes, weekday and Saturday daily traffic volumes, and weekday PM peak hour intersection levels of service. Chapter III - Project Characteristics presents relevant project information, such as the project components and project trip generation, distribution, and assignment. Chapter IV - Existing Plus Project Traffic Conditions addresses the Existing (2003) Plus Project conditions and discusses project impacts. Chapter V - Cumulative (Year 2020) Traffic Conditions addresses the Cumulative (2020) condition, both without and with the project, and discusses project impacts. Chapter VI - Site Access, Circulation, and Parking describes project access, circulation, and parking issues. Study Intersections and Forecast Scenarios Six intersections in the vicinity of the project site were analyzed for the weekday PM peak hour: 1. 7 th Street/Heinz Avenue 2. 9 th Street/Heinz Avenue 3. San Pablo Avenue/Heinz Avenue 4. 7 th Street/Ashby Avenue 5. 9 th Street/Ashby Avenue 6. San Pablo Avenue/Ashby Avenue These intersection locations are shown on Figure 3. A roadway segment analysis was also performed for 9 th Street north of Heinz Avenue for the weekday and Saturday condition. 1

11 MARTIN LUTHER KING JR. SHATTUCK AVE. UNIVERSITY AVE. 6th ST. 123 SACRAMENTO ST. DWIGHT WAY 80 10th ST. 9th ST. 8th ST. 7th ST. ADELINE ST. HEINZ AVE. ANTHONY ST. 9th ST. PROJECT SITE 13 ASHBY AVE. HOLLIS ST. SAN PABLO AVE. MARKET STANFORD AVE. ST. POWELL ST. WAY N Not to Scale West Berkeley Bowl July PROJECT SITE VICINITY MAP FIGURE 1

12 July A N Not to Scale West Berkeley Bowl GROUND LEVEL CONCEPTUAL PROJECT SITE PLAN FIGURE 2a

13 July B N Not to Scale West Berkeley Bowl SUBTERRANEAN GARAGE CONCEPTUAL PROJECT SITE PLAN FIGURE 2b

14 SACRAMENTO ST. 6th ST. 123 DWIGHT WAY 10th ST. 9th ST. 8th ST. 7th ST. 80 HEINZ AVE. 1 ANTHONY ST th ST PROJECT SITE ASHBY AVE. 13 SAN PABLO AVE. HOLLIS ST. N Not to Scale LEGEND: 1 = Study Intersections West Berkeley Bowl July STUDY INTERSECTION LOCATIONS FIGURE 3

15 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 For this study, the following scenarios were evaluated: Existing Existing conditions. Existing Plus Project Existing traffic volumes plus project-related traffic. Cumulative Without Project Cumulative (2020) conditions taking into account future development in the area surrounding the project site and planned roadway improvements in the study area. Cumulative With Project Cumulative (2020) forecast conditions plus project-related traffic. Analysis Methodology Study intersection operations were evaluated using level of service calculations as discussed below. Level of Service Criteria Transportation engineers and planners commonly use a grading system called level of service (LOS) to measure and describe the operational status of a local roadway network. LOS is a description of an intersection s operation, ranging from LOS A (indicating free-flow traffic conditions with little or no delay) to LOS F (representing over-saturated conditions where traffic flows exceed design capacity, resulting in long queues and delays). Signalized Intersections At signalized intersections, traffic conditions were evaluated using the Transportation Research Board s 2000 Highway Capacity Manual methodology. This operation analysis uses various intersection characteristics (i.e., traffic volumes, lane geometry, and signal phasing) to estimate the average control delay experienced by motorists traveling through an intersection. Table 1 summarizes the relationship between delay and LOS for signalized intersections. Unsignalized Intersections For unsignalized (all-way stop-controlled and side-street stop-controlled) intersections, the 2000 Highway Capacity Manual methodology for unsignalized intersections was utilized. With this methodology, operations are defined by the average control delay per vehicle (measured in seconds) for each stop-controlled movement. This incorporates delay associated with deceleration, acceleration, stopping, and moving up in the queue. For side-street stop-controlled intersections, the delay is typically represented for each movement from the minor approaches only. Table 2 summarizes the relationship between delay and LOS for unsignalized intersections. 6

16 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 TABLE 1 SIGNALIZED INTERSECTION LOS CRITERIA Level of Service A B C D E F Description Operations with very low delay occurring with favorable progression and/or short cycle length. Operations with low delay occurring with good progression and/or short cycle lengths. Operations with average delays resulting from fair progression and/or longer cycle lengths. Individual cycle failures begin to appear. Operations with longer delays due to a combination of unfavorable progression, long cycle lengths, or high V/C ratios. Many vehicles stop and individual cycle failures are noticeable. Operations with high delay values indicating poor progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences. This is considered to be the limit of acceptable delay. Operation with delays unacceptable to most drivers occurring due to over saturation, poor progression, or very long cycle lengths. Average Control Delay (Seconds) < 10.0 > 10.0 to 20.0 > 20.0 to 35.0 > 35.0 to 55.0 > 55.0 to 80.0 > 80.0 Source: Highway Capacity Manual, Transportation Research Board, Level of Service TABLE 2 UNSIGNALIZED INTERSECTION LOS CRITERIA Description Average Control Per Vehicle (Seconds) A Little or no delays < 10.0 B Short traffic delays > 10.0 to 15.0 C Average traffic delays > 15.0 to 25.0 D Long traffic delays > 25.0 to 35.0 E Very long traffic delays > 35.0 to 50.0 F Extreme traffic delays with intersection capacity exceeded > 50.0 Source: Highway Capacity Manual, Transportation Research Board,

17 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 Significance Criteria According to the City of Berkeley, a significant traffic-related impact would occur if the addition of project-related traffic results in: Intersections where the project changes the projected service level from LOS D or better to LOS E or LOS F. Intersections projected to operate at LOS E or LOS F without the project and the project causes an increase in the critical movement volume-to-capacity ratio of 0.01 or more. The project will also be judged to have a significant impact if it substantially increases hazards due to a design feature or incompatible use. This last significance criterion will be assessed through a review of the project conceptual site plan. 8

18 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 II. EXISTING CONDITION The following chapter generally describes the project study area, including the surrounding roadway network, transit, pedestrian, bicycle facilities, and on-street parking in the vicinity of the project site. Study Area The project site is located on the southwest corner of the Heinz Avenue/9 th Street intersection in the southwest area of the City of Berkeley. Berkeley is located in western Alameda County, adjacent to the cities of Emeryville and Albany, located south and north, respectively. Land uses surrounding the project site are currently residential, commercial, and educational. The project study area is bound by Heinz Avenue to the north, Ashby Avenue to the south, San Pablo Avenue to the east, and 7 th Street to the west. This study area was chosen as it is the area most likely to experience direct traffic impacts, if any, from the proposed project. Major roads in the study area include Interstate 80 (I-80), Ashby Avenue, and San Pablo Avenue. The following discusses the roadways in the study area. Existing lane configurations and traffic control at the study intersections are shown on Figure 4. I-80 is an eight-lane freeway facility that connects the San Francisco Bay Area to the Sacramento region and further east. Although I-80 is generally an east-west facility, it runs parallel to the Bay in a north-south orientation through Berkeley. An interchange is provided at Ashby Avenue in the study area. Ashby Avenue (State Route 13 [SR 13]) is an east-west major street located south of the project site, which connects I-80 to SR 24. Four travel lanes are provided on Ashby Avenue west of San Pablo Avenue and two travel lanes are provided east of San Pablo Avenue. Parking restrictions along portions of Ashby Avenue provide for one additional travel lane in the peak direction of flow during peak commute hours. San Pablo Avenue (SR 123) is a north-south major street located east of the project site that connects the Richmond/El Cerrito area in the north to the Oakland/Emeryville area in the south. In the study area, four travel lanes are provided on San Pablo Avenue in addition to left-turn pockets at major intersections. Heinz Avenue is an east-west local street that forms the northern boundary of the project site. Heinz Avenue extends from west of 7 th Street to San Pablo Avenue. Two travel lanes are provided with on-street parking allowed. Heinz Avenue between 7 th Street and San Pablo Avenue is a designated bicycle boulevard. 7 th Street is a north-south collector street located west of the project site. Two travel lanes are provided with on-street parking allowed and left-turn pockets at major intersections in the study area. Recent improvements have added lanes between Anthony Street and Folger Avenue. 9

19 SACRAMENTO ST th ST. 9th ST. 8th ST. 7th ST. 80 HEINZ AVE. 1 ANTHONY ST th ST PROJECT SITE ASHBY AVE. 13 SAN PABLO AVE. HOLLIS ST. N Not to Scale 1 2 7th St. 9th St. 3 San Pablo Ave. 4 7th St. Heinz Ave. Heinz Ave. Heinz Ave. Ashby Ave. 5 Ashby Ave. 9th St. 6 Ashby Ave. San Pablo Ave. LEGEND: = Stop Sign = Signalized Intersection West Berkeley Bowl July EXISTING LANE CONFIGURATIONS FIGURE 4

20 Draft Report Traffic Impact Analysis - West Berkeley Bowl July th Street is a north-south local street that would provide primary site access from Ashby Avenue. Two travel lanes are available with permitted on-street parking. In the study area, to the north of Heinz Avenue, 9 th Street is also a designated bicycle boulevard. South of Heinz Avenue, 9 th Street is generally unimproved, providing access to the Orchard Supply Hardware parking lot. Parking is also allowed on this section of 9 th Street, although not in designated parking spaces. 9 th Street is also discontinuous between Heinz Avenue and Ashby Avenue. A traffic signal was recently installed at the 9 th Street/Ashby Avenue intersection. In conjunction with the signalization of the 9 th Street/Ashby Avenue intersection, the City of Berkeley recently upgraded the traffic signals at the 7 th Street/Ashby Avenue intersection and installed a traffic signal at the 7 th Street/Potter Street intersection. Existing Traffic Counts Weekday evening (4:00 to 6:00 PM) peak period intersection turning movement counts were conducted at four of the study intersections in March 2003 and automatic counts were conducted on 9 th Street, north of Heinz Avenue, for three weekdays and a Saturday in March Traffic counts at the San Pablo Avenue/Ashby Avenue intersection were conducted in November 2002 and at the 7 th Street/Ashby Avenue intersection in May Counts were conducted on clear days with area schools in normal session. The existing traffic counts are provided in Appendix A. For each intersection count period, the 1-hour with the highest traffic volumes was identified and is represented on Figure 5. The peak hour data is used as the basis for analysis. The existing weekday and Saturday daily volumes on 9 th Street, north of Heinz Avenue, are also shown on Figure 5. On-street Parking On-street parking is permitted on all streets adjacent to the project site. There are no time restrictions on Heinz Avenue, 8 th, 9 th, or 10 th Streets in the study area, except for a 5-minute parking restriction in front of the East Bay French-American School. A weekday peak hour on-street parking occupancy survey was conducted for the following streets surrounding the project site: 8 th Street between Heinz Avenue and Grayson Street 9 th Street between Heinz Avenue and Grayson Street 9 th Street south of Heinz Avenue 10 th Street between Heinz Avenue and Grayson Street Heinz Avenue between 7 th and 8 th Streets Heinz Avenue between 8 th and 9 th Streets Heinz Avenue between 9 th and 10 th Streets 9 th Street between Anthony Street and Ashby Avenue Approximately 260 on-street parking spaces are provided in the vicinity of the proposed West Berkeley Bowl. The parking space occupancy survey indicates that during the mid-day (around noon), the majority of on-street parking spaces are occupied. Parking occupancy diminishes during the PM peak period with approximately 175 spaces (67 percent) occupied at 4:00 PM, 126 spaces (48 percent) occupied at 5:00 PM, and 90 spaces (35 percent) occupied at 6:00 PM, as detailed on Figure 6. 11

21 GRAYSON ST. 123 SACRAMENTO ST. 8th ST. 7th ST. 9th ST. 10th ST. DAILY TRAFFIC VOLUMES 1,700 - WEEKDAY 80 HEINZ AVE. 1 ANTHONY ST th ST SATURDAY PROJECT SITE ASHBY AVE. 13 SAN PABLO AVE. HOLLIS ST. N Not to Scale th St th St San Pablo Ave San Pablo Ave Heinz Ave. Heinz Ave. Heinz Ave. Ashby Ave th St San Pablo Ave Ashby Ave. Ashby Ave. LEGEND: XX = PM Peak Hour Traffic Volumes West Berkeley Bowl July EXISTING PM PEAK HOUR TRAFFIC VOLUMES FIGURE 5

22 HEINZ AVE. LEGEND: 10 XX% (XX%) [XX%] = Approximate number of on-street parking spaces = Observed parking occupancy at 4PM = Observed parking occupancy at 5PM = Observed parking occupancy at 6PM July th ST. 7th ST. GRAYSON ST. 69% (64%) [57%] 76% (69%) [45%] 71% (49%) [40%] % (37%) [21%] 65% (39%) [27%] 83% (50%) [25%] PROJECT SITE 35 77% (31%) [17%] ANTHONY ST % (15%) [15%] 10th ST. 9th ST. 8th ST. 7th ST. NOTE: Observed parking occupancies on a typical weekday in April Parking supply based on the observed number of legal spaces. N Not to Scale West Berkeley Bowl PM PEAK PERIOD ON-STREET PARKING OCCUPANCY FIGURE 6 SAN PABLO AVE.

23 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 Bicycle and Pedestrian Facilities Pedestrian facilities in the study area are comprised of sidewalks, pedestrian signals at the 7 th Street/Heinz Avenue intersection, and crosswalks. Heinz Avenue and 9 th Street are designated bicycle boulevards in the study area. Bicycle boulevards have been developed throughout the City of Berkeley as roadways where motorized travel is discouraged and bicycle travel is encouraged. Heinz Avenue and 9 th Street connect to other bicycle boulevards in the City including those on Russell Street, Virginia Street, Milvia Boulevard, Channing Way, California/King Streets, and Bowditch/ Hillegass Streets. Transit Access Alameda County Transit Authority (AC Transit) provides seven transit routes service in the study area: Routes 72, 72M, 72R, Route 9, Route 19, Route H, and Route Z. Routes 72, 72M, 72R connect San Pablo/El Cerrito/Richmond to downtown Oakland via San Pablo Avenue in the study area. A transit stop is provided at the Heinz Avenue/San Pablo Avenue intersection. Connections to numerous Bay Area Rapid Transit (BART) stations and other transit lines can be made from this route. This route provides 24-hour service with headways ranging between 1 hour between midnight and 4:00 AM to less than 10 minutes during peak periods. Weekend service is also provided on this route. Route 72R provides weekday peak period Rapid Bus service along the San Pablo Avenue corridor. Route 9 connects the Claremont Hotel to the Berkeley Marina and provides service to the Ashby and Berkeley BART Stations. Service is provided between 6:00 AM and 9:00 PM on this route. Headways are approximately 20 minutes during the week, with 40-minute headways on the weekend. Stops are provided in the study area on 7 th Street and Ashby Avenue. Route 19 connects the North Berkeley BART station to the Fruitvale BART station via 7 th Street in the study area. Weekday and weekend service is provided between 6:00 AM and 9:00 PM with 30-minute headways. Route H provides transbay service between San Francisco and El Cerrito. Westbound service is provided during the AM commute period, while eastbound service is provided during the PM commute period with a stop at the San Pablo Avenue/Ashby Street intersection. Route Z provides transbay service between San Francisco and Albany. Westbound service is provided during the AM commute period, while eastbound service is provided during the PM commute period with a stop at the 7 th Street/Heinz Avenue intersection. Existing Intersection Operations Existing intersection conditions were evaluated for the weekday PM peak hour at the six study intersections. Table 3 summarizes the intersection analysis results. As shown, all of the study intersections operate at acceptable service levels during the PM peak hour. Detailed intersection LOS calculation worksheets are presented in Appendix B. 14

24 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 TABLE 3 EXISTING (2003) PEAK HOUR LEVEL OF SERVICE Location Control 1 Peak Hour Delay 2 LOS 7 th Street/Heinz Avenue Signal PM 9 seconds A 9 th Street/Heinz Avenue AWSC PM 8 seconds A San Pablo Avenue/Heinz Avenue SSSC PM 25 seconds D 7 th Street/Ashby Avenue Signal PM 42 Seconds D 9 th Street/Ashby Avenue Signal PM 9 seconds A San Pablo Avenue/Ashby Avenue Signal PM 30 seconds C Notes: 1 Signal = Signalized intersection AWSC = All-way stop-controlled intersection SSSC = Side-street stop-controlled intersection 2 For side-street stop-controlled intersections, delay for worst movement calculated using the 2000 Highway Capacity Manual methodology. For all-way stop-controlled intersections, average delay calculated using the 2000 Highway Capacity Manual methodology. Source: Fehr & Peers,

25 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 III. PROJECT CHARACTERISTICS This chapter provides an overview of the proposed project components and addresses the proposed project s trip generation, distribution, and assignment characteristics. This allows for an evaluation of project impacts on the surrounding roadway network. Project Description The West Berkeley Bowl, an independent neighborhood serving full-service grocery marketplace, would be located on the south side of Heinz Avenue, between 8 th and 9 th Streets in the City of Berkeley. The project is a two-story full-service grocery marketplace with underground parking garage, including general grocery store (51,065 square feet) and adjacent food service area (3,670 square feet), ancillary office (4,120 square feet), storage, (28,805 square feet), and community room (3,400 square feet). The community room would be used periodically for such events as holiday parties or office meetings, and is expected to be used a maximum of four times per month. The project would also dedicate land for use by the City as a bicycle path and provide 66 bicycle parking spaces. The West Berkeley Bowl would be open from 9:00 AM until 8:00 PM Monday through Saturday and from 10 AM until 6 PM. on Sunday. As the store would not be open during the AM peak period, AM peak hour trip generation would be negligible and an AM peak hour analysis was not performed. The conceptual site plan depicts 217 on-site parking spaces. Vehicle Trip Generation Assumptions Project vehicle trips for the proposed project were estimated using trip generation rates from the Institute of Transportation Engineers (ITE) Trip Generation Manual (7 th Edition) for office, storage area, and grocery store, as shown in Table 4. TABLE 4 ITE VEHICLE TRIP GENERATION RATES 1 Proposed Use Weekday Weekday PM Peak Hour Saturday Saturday Peak Hour Daily Daily In Out Total In Out Total Grocery marketplace Ancillary office Ancillary storage Notes: 1 Average ITE rate per 1,000 square feet. Source: Trip Generation Manual (7 th Edition), Institute of Transportation Engineers, To supplement the analysis, Fehr & Peers staff conducted a weekday PM peak period (4:00 to 6:00 PM) trip generation survey at the existing Berkeley Bowl, located at 2020 Oregon Street in Berkeley, to determine vehicle, pedestrian, bicycle, and transit usage. Table 5 shows the PM peak-hour vehicular, bicycle, pedestrian, and transit trip generation rate per 1,000 square feet of grocery store. Survey data is provided in Appendix C. These rates were derived by comparing the survey results to the size of the existing Berkeley Bowl store. The site-specific rates were used to estimate alternative mode trip generation to the site. 16

26 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 TABLE 5 BERKELEY BOWL TRIP GENERATION RATES PER 1,000 SQUARE FEET Mode PM Peak Hour In Out Total Vehicle Bicycle Pedestrian Transit Notes: Rates derived from surveys conducted at the existing store located at 2020 Oregon Street. Source: Fehr & Peers, The limited survey shows that the vehicle trip rates generally conformed to the ITE Manual s estimates. (Six percent lower than the trip rates in the 6th Edition ITE Manual and three percent higher than the 7 th Edition ITE Manual.) Due to the limited data collected for the Oregon Street store, however, Fehr & Peers was directed by City Staff to utilize current ITE trip generation rates for the purposes of this analysis, as the ITE data is based on numerous surveys, while the Berkeley Bowl rates are based on one day of data collection. Nevertheless, the site-specific rates are useful in estimating the alternative mode trip generation for the project. Pass-by trips were also accounted for in the calculation of project trip generation. Pass-by trips are trips already on the roadway system that would stop at the project site on an already planned trip, such as someone stopping at the grocery store on their way home from work. Documented ITE average pass-by trip percentage for grocery stores is thirty-six percent (36%) during the PM peak hour. Pass-by data is not available from ITE for Saturdays for grocery stores. Therefore, for the purposes of calculating trip generation, the PM rate was assumed to be the same for Saturdays. Project Trip Generation Trip generation rates as described above were applied to the proposed project components to determine overall project vehicle and alternative modes trip generation. As the community center portion of the project would be used infrequently at off-peak hours, and often for employee-related functions, this area was not considered to generate traffic during the peak hours of analysis. As shown in Table 6, the proposed project would generate approximately 3,780 weekday daily vehicle trips including 386 PM peak hour vehicle trips (194 in and 192 out) and 6,270 Saturday daily vehicle trips including 382 Saturday peak hour vehicle trips (197 in and 185 out). 17

27 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 TABLE 6 VEHICLE TRIP GENERATION Proposed Use Size Daily Weekday PM Peak Hour In Out Total Daily Saturday Peak Hour In Out Total Grocery marketplace 1 54,735 sf 5, , Less 36 % Pass-by (2,020) (103) (103) (206) (3,500) (106) (106) (212) Net New Grocery Market Place Trips 3, , Ancillary office 4,120 sf Ancillary storage 28,805 sf Net New Trips (with pass-by) 3, , Note: Vehicle Trips derived using the ITE rates presented in Table 4. 1 Includes grocery and food service. Source: Fehr & Peers, A Saturday intersection analysis was not performed as Saturday peak hour trip generation is equivalent to weekday trip generation and background traffic volumes are much lower on Saturdays than on weekdays. Therefore, any project impacts would be accounted for in the weekday conditions analysis. As shown in Table 7, the project would generate approximately 76 bicycle trips, 116 pedestrian trips, and 32 transit trips during the weekday PM peak hour. On Saturdays, West Berkeley Bowl would generate 81 bicycle trips, 123 pedestrian trips, and 34 transit trips during the Saturday peak hour. Saturday peak hour alternate mode trip generation was derived using the ratio of ITE weekday PM peak hour to Saturday peak hour trip generation applied to the observed rates presented in Table 5. TABLE 7 BICYCLE, PEDESTRIAN, AND TRANSIT TRIP GENERATION Alternative Mode Weekday 1 Saturday 2 PM Peak Hour Peak Hour In Out Total In Out Total Bicycle Pedestrian Transit Net New Trips Trip generation derived from surveys conducted at the existing store located at 2020 Oregon Street. 2 Saturday peak hour trip generation rate calculated: ITE Saturday peak hour rate X (Observed PM peak hour rate/ite PM peak hour rate) Source: Fehr & Peers,

28 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 Trip Distribution and Assignment Project trips were distributed based on information provided by the project applicant. A zip code survey was conducted for a one-week period at the existing Berkeley Bowl, where all patrons were asked to provide their residential zip code (See Appendix C). The survey results were used to determine the regional distribution of Berkeley Bowl patrons. The data were adjusted to account for patrons who would continue to shop at the existing store, due to its location relative to the new store. The project trip distribution percentages are graphically shown on Figure 7. It should be noted that the zip code survey revealed that seventy-five percent (75%) of all patrons were from within a five mile radius of the store. Trips generated by the proposed project were assigned to the roadway system based on the directions of approach and departure as described above. Project driveway and parking space locations were taken into consideration in the routing of project trips to the site. The PM peak hour project trip assignments are also shown on Figure 7. Note that for purposes of the intersection analysis, to be conservative, this study did not include the pass-by trip reduction. 19

29 6% 2% % SACRAMENTO ST. 80 6% 7% HEINZ AVE. 10th ST. 9th ST. 8th ST. 7th ST. 2 1 ANTHONY ST. 9th ST PROJECT DAILY TRAFFIC VOLUMES WEEKDAY SATURDAY PROJECT SITE ASHBY AVE. 6% 13 5% SAN PABLO AVE. HOLLIS ST. 35% 10% N Not to Scale th St th St San Pablo Ave. 4 7th St Heinz Ave. Heinz Ave. Heinz Ave. Ashby Ave th St San Pablo Ave. 18 Ashby Ave. 47 Ashby Ave NOTE: DOES NOT INCLUDE PASS-BY TRIPS. LEGEND: XX = PM Peak Hour Traffic Volumes West Berkeley Bowl July PROJECT TRIP DISTRIBUTION AND ASSIGNMENT FIGURE 7

30 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 IV. EXISTING PLUS PROJECT TRAFFIC CONDITIONS This chapter discusses the impact of the proposed project under near-term conditions. Planned Roadway Improvements No roadway improvements beyond those improvements which have recently been implemented were assumed for the analysis of near-term project impacts. These improvements include signalization of the 9 th Street/Ashby Avenue intersection and traffic signal upgrades at the 7 th Street/Ashby Avenue intersection and signal installation at the 7 th Street/Potter Street intersection. An additional northbound through lane on the east side of 7 th Street from Ashby Avenue to Anthony Street was also recently completed. Existing Plus Project Traffic The peak hour project volumes without the pass-by reduction were added to the existing traffic volumes to determine Existing Plus Project traffic volumes at the study intersections. The resulting weekday PM peak hour volumes are shown for each intersection on Figure 8, as well as weekday daily and Saturday daily volumes for 9 th Street to the north of Heinz Avenue. Analysis of Existing Plus Project Peak Hour Intersection Operations The Existing Plus Project intersection analysis is provided in Table 8. The analysis results indicate that all study intersections would operate at acceptable LOS ranges (i.e., LOS D or better) with the addition of project traffic, except for the San Pablo Avenue/Heinz Avenue intersection, which is projected to operate at LOS F. The proposed project would result in deficient operations at this intersection, which would operate at an acceptable service level prior to the addition of project traffic, which is significant based on the City of Berkeley s significance criteria. Detailed intersection LOS calculation worksheets are provided in Appendix D. Analysis of Existing Plus Project Daily Roadway Segment Operations The Existing Plus Project daily roadway segment analysis is shown in Table 9. The analysis indicates that the proposed project would increase daily traffic volumes on 9 th Street, north of Heinz Avenue, by 348 vehicles during a typical weekday, resulting in 2,048 vehicles per weekday on 9 th Street. On Saturday, daily traffic volumes would increase by 586 vehicles, resulting in 1,336 vehicles per Saturday on 9 th Street. The City of Berkeley does not have specific criteria to identify an impact to a bicycle boulevard. However, one characteristic of bicycle boulevards is the low volume of vehicles they serve. According to the City of Berkeley s Bicycle Plan (December 1998), a low volume facility is one that serves less than 3,000 to 4,000 vehicles per day (vpd). For purpose of this analysis, the project shall be deemed to have a significant impact on a bicycle boulevard facility if it results in daily traffic volumes over 3,000 vpd. As the resulting maximum daily traffic volume on 9 th Street with the addition of project traffic is less than 2,100 vpd, the proposed project would not significantly impact operations of the 9 th Street bicycle boulevard. 21

31 SACRAMENTO ST th ST. 7th ST. 9th ST. 10th ST. DAILY TRAFFIC VOLUMES 2,048 - WEEKDAY 80 HEINZ AVE. 1 ANTHONY ST th ST ,336 - SATURDAY PROJECT SITE ASHBY AVE. 13 SAN PABLO AVE. HOLLIS ST. N Not to Scale th St th St ,006 San Pablo Ave th St Heinz Ave. Heinz Ave. Heinz Ave. Ashby Ave , th St San Pablo Ave Ashby Ave Ashby Ave , NOTE: DOES NOT INCLUDE PASS-BY TRIPS. LEGEND: XX = PM Peak Hour Traffic Volumes July West Berkeley Bowl EXISTING PLUS PROJECT TRAFFIC VOLUMES FIGURE 8

32 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 TABLE 8 EXISTING AND EXISTING PLUS PROJECT PM PEAK HOUR INTERSECTION LEVEL OF SERVICE Existing Existing Plus Project 3 Intersection Control 1 Delay 2 LOS Delay 2 LOS 7 th Street/Heinz Avenue Signal 9 Sec. A 9 Sec. A 9 th Street/Heinz Avenue AWSC 8 Sec. A 9 Sec. A San Pablo Avenue/Heinz Avenue SSSC 25 Sec. D > 50 Sec. F 7 th Street/Ashby Avenue Signal 42 Sec. D 46 Sec. D 9 th Street/Ashby Avenue Signal 9 Sec. A 13 Sec. B San Pablo Avenue/Ashby Avenue Signal 30 Sec. C 36 Sec. D Notes: 1 Signal = Signalized intersection. AWSC = All-way stop-controlled intersection. SSSC = Side-street stop-controlled intersection. 2 For side street stop-controlled intersections, delay for worst movement (in seconds per vehicle) calculated using the 2000 Highway Capacity Manual methodology. For all-way stop-controlled intersections, average delay calculated using the 2000 Highway Capacity Manual methodology. 3 Intersection analysis does not assume any pass-by reductions. Source: Fehr & Peers, TABLE 9 EXISTING AND EXISTING PLUS PROJECT DAILY ROADWAY SEGMENT ANALYSIS Segment Time Period Existing Daily Volume Project Daily Volume 1&2 Existing Plus Project Daily Volume 9 th Street, North of Heinz Avenue Weekday 1, ,048 Saturday ,336 1 Based on discussions with City Staff, the Berkeley Bowl zip code survey, and existing turning movements at the study intersection, this analysis assumes 6 percent of daily project traffic would use 9 th Street, north of Heinz Avenue. The 3,000 vehicle threshold would not be met until more than 23 percent of weekday daily or 26 percent of Saturday daily project traffic uses 9 th Street, north of Heinz Avenue. 2 Roadway analysis does not assume any pass-by reductions. Source: Fehr & Peers,

33 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 Mitigation Measures Impact Statement: Based on the City of Berkeley significance criteria, the proposed project would have a significant traffic impact at the San Pablo Avenue/Heinz Avenue intersection. The addition of project traffic would increase delay, resulting in a service level deterioration from LOS D to LOS F for the side-street movements from Heinz Avenue to San Pablo Avenue, specifically those vehicles leaving the West Berkeley Bowl and turning left onto San Pablo Avenue. Several measures were considered to mitigate this impact: Restrict left-turns from Heinz Avenue to San Pablo Avenue during peak periods. The prohibition of left-turns from Heinz Avenue would improve the service level to LOS C for the right-turn movements from Heinz Avenue to San Pablo Avenue, and improve the overall intersection level of service to LOS A. However, this mitigation could result in secondary neighborhood and bicycle boulevard impacts as vehicles may travel through neighborhood streets north of the project site to where a traffic signal is provided at San Pablo Avenue. Direct West Berkeley Bowl patrons through the 9 th Street/Ashby Avenue intersection in order to minimize traffic through the intersection of Heinz Avenue/San Pablo Avenue. This routing, however, is circuitous and unless strictly enforced, individuals may ignore the direction and either use Heinz Avenue or 9 th Street to the north. Install a traffic signal at the Heinz Avenue/San Pablo Avenue intersection. Due to the close spacing between the intersections of Heinz Avenue/San Pablo Avenue and Ashby Avenue/ San Pablo Avenue, these two intersections would need to be interconnected and coordinated to provide optimal traffic flow through the study area. Intersection signalization would improve the service level to LOS B during the PM peak hour, and provide secondary benefits to pedestrians and transit users. Signalization of this intersection would enable pedestrians and transit users to cross San Pablo Avenue at a controlled crossing location. Consultant Recommendations: It is recommended that the project applicant install a traffic signal at the Heinz Avenue/San Pablo Avenue intersection to improve traffic flow in the area and reduce the potential for secondary neighborhood and bicycle boulevard impacts. The installation of a traffic signal would improve intersection operations to an acceptable LOS B, and provide secondary pedestrian, bicycle and transit benefits, and reduce this impact to a less-than-significant level. As San Pablo Avenue is a designated Smart Corridor within the City of Berkeley, any new traffic signals installed along San Pablo Avenue must meet the Smart Corridor Design Criteria. Additionally, a countdown pedestrian signal and crosswalk should also be provided to facilitate bicycle and pedestrian movement across San Pablo Avenue. Installation of a pedestrian signal at Heinz Avenue and San Pablo would enhance pedestrian and bicyclist access to the site and could increase alternative travel mode usage to the site. 24

34 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 V. CUMULATIVE (YEAR 2020) TRAFFIC CONDITIONS This chapter discusses cumulative (Year 2020) traffic conditions both without and with the project. The future traffic conditions analysis takes into consideration forecasted land use development within the area surrounding the project site. Cumulative Without Project Traffic Projections Cumulative (2020) traffic forecasts were developed using the data from the Emeryville Traffic Impact Fee Program model. This model is based on the Alameda County Congestion Management Agency model with refinements in the Berkeley/Emeryville area to account for known developments. Cumulative Without Project peak hour traffic volumes at each study intersection are shown on Figure 9. Daily weekday and Saturday traffic volumes on 9 th Street, north of Heinz Avenue, are also shown on Figure 9. City staff has indicated that a westbound left-turn pocket from Ashby Avenue to San Pablo Avenue would be installed by This improvement has been assumed in the analysis. City staff indicated that the East Bay French-American School, located at the northeast corner of the Heinz Avenue/9th Street intersection, should be considered in the cumulative analysis. The school intends to increase enrollment by 50 students by the year Any additional activity at the school would occur during the AM peak period (7:00 to 9:00 AM) prior to the opening of West Berkeley Bowl, and during the afternoon peak period (2:00 to 4:00 PM), prior to the peak operation of the store (observed from 4:45 to 5:45 PM at the existing Berkeley Bowl store). Therefore, since the East Bay French-American School and the West Berkeley Bowl activities would peak at separate times, operational conflicts between the two facilities would be minimal. In addition, field observations made by Fehr & Peers staff at the school suggest that student dropoff/pick-up activities operate efficiently. However, brief periods of congestion do occur for 10 to 15 minutes around bell times. The school traffic control personnel currently make use of two-way radios to efficiently load students during afternoon bell times. School planned system improvements include converting four to six curbside parking spaces to 5-minute restrictions (in addition to the spaces that are already restricted). This would provide increased flexibility and more efficient operation for the school during drop-off/pick-up periods. Cumulative With Project Traffic Projections The project volumes were added to the Cumulative Without Project traffic volumes to form the basis for the Cumulative With Project analysis. Cumulative With Project weekday peak hour traffic volumes at each study intersection are shown on Figure 10. Daily weekday and Saturday traffic volumes on 9 th Street, north of Heinz Avenue are also shown on Figure 10. Analysis of Cumulative Peak Hour Intersection Operations The cumulative (2020) conditions analysis was performed using the same methodology discussed previously. Table 10 presents the result of this analysis, and indicates that all study intersections are projected to operate within an acceptable service level range (i.e., LOS D or better) in the cumulative without the project scenario, except for the Heinz Avenue/San Pablo Avenue intersection, which is projected to operate at LOS F prior to the addition of project traffic. The proposed project would increase the critical movement V/C by more than 0.01 at the Heinz Avenue/San Pablo Avenue intersection. This is considered significant based on the City of Berkeley s significance criteria. Detailed intersection LOS calculation worksheets for the Without Project scenario are provided in Appendix E; Appendix F provides LOS calculations worksheets for the With Project scenario. 25

35 SACRAMENTO ST HEINZ AVE. 8th ST. 7th ST. 1 ANTHONY ST. 4 9th ST. 2 9th ST. 10th ST DAILY TRAFFIC VOLUMES 1,750 - WEEKDAY SATURDAY PROJECT SITE ASHBY AVE. 13 SAN PABLO AVE. HOLLIS ST. N Not to Scale th St th St ,238 San Pablo Ave th St Heinz Ave. Heinz Ave. Heinz Ave. Ashby Ave , th St , San Pablo Ave Ashby Ave. Ashby Ave. LEGEND: , XX = PM Peak Hour Traffic Volumes July West Berkeley Bowl CUMULATIVE (YEAR 2020) WITHOUT PROJECT TRAFFIC VOLUMES FIGURE 9

36 SACRAMENTO ST HEINZ AVE. 8th ST. 7th ST. 1 ANTHONY ST. 4 10th ST. 9th ST. 2 9th ST DAILY TRAFFIC VOLUMES 2,098 - WEEKDAY 1,361 - SATURDAY PROJECT SITE ASHBY AVE. 13 SAN PABLO AVE. HOLLIS ST. N Not to Scale th St th St ,272 San Pablo Ave th St Heinz Ave. Heinz Ave. Heinz Ave. Ashby Ave , th St , San Pablo Ave Ashby Ave Ashby Ave , NOTE: DOES NOT INCLUDE PASS-BY TRIPS. LEGEND: XX = PM Peak Hour Traffic Volumes July West Berkeley Bowl CUMULATIVE (YEAR 2020) WITH PROJECT TRAFFIC VOLUMES FIGURE 10

37 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 TABLE 10 CUMULATIVE (2020) WITHOUT AND WITH PROJECT PM PEAK HOUR INTERSECTION LEVEL OF SERVICE Without Project With Project 3 Intersection Control 1 Delay 2 LOS Delay 2 LOS 7 th Street/Heinz Avenue Signal 9 Sec. A 9 Sec. A 9 th Street/Heinz Avenue AWSC 8 Sec. A 9 Sec. A San Pablo Avenue/Heinz Avenue SSSC 42 Sec. E > 50 Sec. F 7 th Street/Ashby Avenue Signal 52 Sec. D 55 Sec. D 9 th Street/Ashby Avenue Signal 9 sec. A 13 Sec. B San Pablo Avenue/Ashby Avenue Signal 38 Sec. D 54 Sec. D Notes: 1 Signal = Signalized intersection. AWSC = All-way stop-controlled intersection. SSSC = Side-street stop-controlled intersection. 2 For side-street stop-controlled intersections, delay for worst movement (in seconds per vehicle) calculated using the 2000 Highway Capacity Manual methodology. For all-way stop-controlled intersections, average delay calculated using the 2000 Highway Capacity Manual methodology. 3 Intersection analysis does not assume any pass-by reductions. Source: Fehr & Peers, Analysis of Cumulative Daily Roadway Segment Operations The Cumulative (2020) daily roadway segment analysis is shown in Table 11 and indicates the proposed project would increase daily traffic volumes on 9 th Street, north of Heinz Avenue, by 348 vehicles during a typical weekday. This results in daily volumes on this roadway of approximately 2,098. On Saturday, daily traffic volumes would increase by 586 vehicles to approximately 1,361. With the addition of project traffic, daily traffic volumes on 9 th Street, north of Heinz Avenue would remain low (less than 3,000) and bicycle boulevard operations would not be significantly impacted. TABLE 11 CUMULATIVE (2020) WITHOUT AND WITH PROJECT DAILY ROADWAY SEGMENT ANALYSIS Segment 9 th Street, North of Heinz Avenue Time Period Cumulative Daily Volume Project Daily Volume 1 & 2 Cumulative Plus Project Daily Traffic Volume Weekday 1, ,098 Saturday ,361 1 Based on discussions with City Staff, the Berkeley Bowl zip code survey, and existing turning movements at the study intersection, this analysis assumes 6 percent of daily project traffic would use 9 th Street, north of Heinz Avenue. The 3,000 vehicle threshold would not be met until more than 23 percent of weekday daily or 26 percent of Saturday daily project traffic uses 9 th Street, north of Heinz Avenue. 2 Roadway analysis does not assume any pass-by reductions. Source: Fehr & Peers,

38 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 Mitigation Measures Impact Statement: The proposed project would increase the critical V/C ratio at the intersection of Heinz Avenue/San Pablo Avenue by more than As this intersection is projected to operate at a deficient level of service, this increase is considered significant. Consultant Recommendations: Implement the mitigation measure recommended in the Existing Plus Project scenario (i.e., signalization of the Heinz Avenue/San Pablo Avenue intersection, installation of a pedestrian crosswalk and count down pedestrian signal). With implementation of this mitigation measure, the service level would improve to LOS B during the PM peak hour and reduce project impacts on the intersection to a less-than-significant level. In addition, implementation of these improvements would improve pedestrian, bicycle and transit access to the site and could increase alternative travel mode usage to the site. 29

39 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 VI. SITE ACCESS, CIRCULATION, AND PARKING This chapter evaluates and provides recommendations for project site access, on-site circulation, and parking. These recommendations are summarized on Figures 11a and 11b (at the end of this chapter). Vehicular Site Access The project would have three vehicle access points from 9 th Street: The first driveway would connect the project parking lot to Heinz Avenue (via 9 th Street). The second driveway would be at the 9 th Street extension, north of Anthony Street. The third driveway would be offset with Anthony Street. All driveways would provide for unrestricted access in and out of the project site, although no traffic control is shown on the conceptual site plan for vehicles exiting the site. Impact Statement: No traffic control for vehicles exiting the site is shown on the conceptual site plan. Consultant Recommendation: Install stop-signs at the first and third driveways as shown on Figure 11a. Impact Statement: Landscaping proposed adjacent to project driveways could limit visibility of drivers exiting the site. Consultant Recommendation: Landscaping should be maintained in areas near driveways to a height of less than 2 feet and tree braches should be trimmed to heights greater than 6 feet to provide sight distance visibility for drivers. The project applicant would improve the portion of 9 th Street, south of Heinz Avenue to the property line, including roadway paving, construction of sidewalks, curbs, and gutters along the eastern property line. The project would dedicate land on the eastern and southern project frontages to the City for use as a bicycle path. These improvements would improve bicycle and pedestrian circulation throughout the area. The project applicant would also extend 9 th Street to the north from Anthony Street to the project site. Improvements (i.e., curb, gutter, and sidewalks) would be constructed with this extension. The conceptual site plan was also reviewed to determine if driveway placement and 9 th Street improvements would encourage traffic passing through the site on 9 th Street between Ashby Avenue and Heinz Avenue. Traffic passing through the West Berkeley Bowl parking lot is likely to occur similar to the current condition through the Orchard Supply Hardware parking lot. Impact Statement: Vehicle traffic could use the West Berkeley Bowl parking lot to travel between Heinz Avenue and Ashby Avenue via 9 th Street. Consultant Recommendation: Install speed humps in the parking lot to slow drivers within the West Berkeley Bowl parking lot. 30

40 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 A subterranean garage is also proposed with access from the upper parking area adjacent to the storage area loading docks. Impact Statement: At the subterranean garage entrance, conflicts could exist between delivery vehicles and patrons entering the garage. Consultant Recommendation: Schedule deliveries for off-peak periods (i.e., before 4 PM) to prevent conflicts between large delivery trucks and vehicles entering the garage. Additionally, prohibit large delivery trucks during peak shopping periods when traffic flows through the garage are heavy. Pedestrian, Bicycle, and Transit Access The project would dedicate land on the eastern and southern project frontages to the City for use as a bicycle path. The proposed project would not remove any pedestrian or bicycle facilities in the area. The path should be designed as a multi-use path with appropriate transitions at both ends. The proposed project is expected to increase bicycle usage by 76 bicycle trips (45 inbound, 31 outbound) during the PM peak hour. These bicycle trips would most likely use Heinz Avenue and 9 th Street, portions of which are designated as bicycle boulevards within the study area. The proposed project would add additional vehicular traffic on these roadway facilities which could discourage bicycle activity in the area. However, as previously shown in Tables 8 and 10, traffic increases on 9 th Street would be less-than-significant, and the total daily volume would remain well below the desired threshold for bicycle boulevards (i.e., 3,000 to 4,000 vpd). As discussed previously, AC Transit operates several routes in the study area. It is projected that an additional 32 weekday PM peak hour transit trips (18 inbound, 14 outbound) would be generated by the proposed project. This increase in transit trips is not considered significant. Therefore, transit impacts from this project would be considered less-than-significant. The traffic mitigation measure to signalize the San Pablo Avenue/Heinz Avenue intersection would enhance transit user access to the project site as a controlled crosswalk would be provided across San Pablo Avenue at Heinz Avenue. On-Site Circulation On-site circulation was reviewed with respect to the following: drive aisles, dead-end drive aisles, vehicle/pedestrian conflicts, delivery vehicles, shopping cart return areas, and parking stall dimensions. These elements are further discussed below. Drive Aisles The surface parking area provides two main north-south drive aisles serving the parking areas. All drive aisles are at least 24 feet wide (the minimum width generally allowed for two-way travel and perpendicular parking). The garage area provides three north-south 26-foot wide drive aisles. The ramp connecting the garage parking to the main level is proposed to be 20 feet with one foot on both sides between the drive area and the wall. This width is sufficient to provide two-way travel, although a minimum clearance of two feet between the aisle and the wall is recommended. Impact Statement: The garage ramp provides one foot clearance between the wall and drive aisle on both sides of the ramp. 31

41 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 Consultant Recommendation: Provide two feet of clearance between the wall and drive aisle on both sides of the garage ramp. Drive aisles are of sufficient width to accommodate vehicle circulation, although the curb radius at the subterranean garage entry is not sufficient to allow southbound vehicles entry into the garage without entering the travel lane of exiting traffic. Impact Statement: The curb radius at the subterranean garage entry is not sufficient to allow southbound vehicles entry into the garage without entering the travel lane of exiting traffic. Consultant Recommendation: Modify the curb radius at the garage entry to 10 feet. Impact Statement: circulation. The first parking stall adjacent to the garage ramp would impede vehicle Consultant Recommendation: Remove the first parking stall adjacent to the garage ramp, as shown on Figure 11b. Dead-End Drive Aisles Dead end drive aisles are parking aisles that are obstructed at one end thereby increasing navigational difficulty through the drive aisles. Although no dead-end drive aisles are shown on the conceptual site plan, a driver entering the garage does not know if spaces are available in the garage. Impact Statement: Excessive site circulation could occur when the parking garage is at or near capacity. Consultant Recommendation: Install vehicle counting system equipment to inform drivers of the number of spaces available in the garage to prevent excessive circulation through the site, and operate as needed. Vehicle/Pedestrian Conflicts A review of the conceptual site plan indicates that pedestrian paths are provided within the site, across the 9 th Street extension, north of the Anthony Street driveway and the internal connection between the southerly and main parking lots. These facilities separate to the greatest extent possible pedestrian and vehicle traffic. Vehicle/pedestrian conflicts are expected to occur within parking lots as drivers access parked vehicles and drive to/from the site. Additional traffic associated with drivers traveling through the site between Heinz Avenue and Ashby Avenue is also expected. Speed humps previously recommended for installation within the site would slow traffic and enhance pedestrian safety. Delivery Vehicles The location of the project s proposed storage area would require large delivery vehicles to enter the main project parking lot via the extension of 9 th Street at Anthony Avenue and maneuver through approximately 15 parking spaces to access the loading dock area. Delivery operations are oriented to the Ashby Avenue corridor and away from the neighborhood to the north of the project site. 32

42 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 Impact Statement: Conflicts would exist between large delivery vehicles and parked cars. Consultant Recommendation: Schedule deliveries for off-peak periods to prevent conflicts between large delivery trucks and other vehicles. Shopping Cart Return Areas Shopping cart return areas are proposed throughout the site. Parking Stall Dimensions City of Berkeley requires that 90 degree parking stalls be 18 feet long and 8 feet wide with 26 foot wide drive aisles. Spaces adjacent to a support column must be 8 ½ feet wide and spaces adjacent to a wall must by 9 feet wide. According to the project architect, all parking spaces have been designed to meet City of Berkeley parking requirements. Parking stalls for high turnover uses typically provide wider parking stalls to facilitate parking maneuvers into and out of the site. The support columns in the garage are located one foot from the drive aisles. Impact Statement: The location of the parking garage support columns could impede parking maneuvers due to their proximity to the drive aisles. Consultants Recommendation: Move the support columns in the parking garage three feet in from the drive aisles to facilitate parking maneuvers, depending on results of final structural analysis. Parking A total of 217 on-site parking spaces are shown in the conceptual site plan as part of the project. The proposed on-site parking supply was compared to both City Code parking requirements and ITE parking demand rates. The project would provide on-site parking exceeding City Code requirements and is sufficient to satisfy the ITE peak parking demand. City Code Parking requirements were reviewed to ensure that the proposed project would provide sufficient parking based on City Code requirements. The City of Berkeley requires: One space for every 500 square feet of grocery store One space for every 500 square feet of office development One space for every 500 square feet of storage area One space for every 500 square feet of community room As shown in Table 12, the project is required to provide 183 parking spaces. The on-site parking space supply (216 spaces, assuming loss of one space per recommendation above) would exceed City Code requirements. 33

43 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 Land Use Type TABLE 12 CITY CODE AUTOMOBILE PARKING REQUIREMENTS Size Parking Code Requirement Parking Spaces Required Grocery marketplace 1 54,735 sf 1/500 sf 110 Storage area 28,805 sf 1/500 sf 58 Office 4,120 sf 1/500 sf 8 Community Room 3,400 sf 1/500 sf 7 1 Includes grocery and food service. Total Parking Required 183 Total Provided 217 Surplus (Deficit) 34 Source: City of Berkeley Parking Code Requirements. Bicycles Based on City Code requirements, one bicycle parking space per every 2,000 square feet of nonresidential development is required, equating to a bicycle parking space requirement of 46. The proposed bicycle parking supply of 66 spaces would exceed City Code Requirements. Weekday Parking Demand Peak weekday parking demand rates, as presented in ITE s Parking Generation (2 nd Edition) were reviewed to estimate peak weekday parking demands for the project. ITE weekday peak parking demand rates for the various project uses are shown in Table 13. Observations of parking shortages at the existing Berkeley Bowl indicate that the use of the maximum parking demand rate for the grocery store, rather than the average demand rate as presented in ITE s Parking Generation, would be appropriate to conservatively estimate peak grocery store parking demand for this project. Information contained in the Urban Land Institute s publication Shared Parking, as well as practical experience, indicates that peak demand for the storage area and office portions of the project would occur during the weekday mid-day, and peak demand for the supermarket and restaurant would occur on weekday evenings, as presented in Table 13. Based on a conservative assessment of peak parking demand rates, a mid-day weekday peak demand of 124 spaces and a weekday PM peak demand of 212 spaces could be expected. This level of peak demand could be accommodated on site. 34

44 Draft Report Traffic Impact Analysis - West Berkeley Bowl July 2004 TABLE 13 ITE WEEKDAY PARKING DEMAND RATES Land Use Size Peak Parking Demand Rate Percent Utilization 1 Parking Demand Midday PM Midday PM Grocery marketplace 54,735 sf 3.60/1,000 sf 50 % 100 % Storage area 28,805 sf 0.50/1,000 sf 100 % 50 % 14 7 Office 4,120 sf 2.79/1,000 sf 100 % 75 % 11 8 Total Parking Demand Notes: 1 Percent utilization estimated based on information provided in Shared Parking, practical experience of Fehr & Peers staff and discussions with Berkeley Bowl. Source: Parking Generation (2 nd Edition), Institute of Transportation Engineers and Shared Parking, Urban Land Institute,

45 CONVERT TO PERPENDICULAR PARKING PROVIDE 15-FOOT MULTI-USE PATH AND 6-FOOT LANDSCAPE BUFFER July A INSTALL SPEED HUMPS PROVIDE 10 RADIUS LIMIT HEIGHT OF LANDSCAPING INSTALL STOP SIGN INSTALL SPEED HUMP INSTALL STOP SIGN PROHIBIT LARGE DELIVERY VEHICLES DURING PEAK TIMES INSTALL PARKING GARAGE COUNT SYSTEM N Not to Scale West Berkeley Bowl GROUND LEVEL CONSULTANTS RECOMMENDATIONS FIGURE 11a

46 July B RELOCATE SUPPORT COLUMNS 3 FEET FROM AISLE PROVIDE 2-FOOT CLEARANCE ON BOTH SIDES OF RAMP STRIPE CENTERLINE REMOVE PARKING SPACE N Not to Scale West Berkeley Bowl SUBTERRANEAN GARAGE CONSULTANTS RECOMMENDATIONS FIGURE 11b

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Final. Traffic Impact Study For 1200 Ashby Avenue Mixed-Use Development. In City of Berkeley. November 26, TJKM Transportation Consultants

Final. Traffic Impact Study For 1200 Ashby Avenue Mixed-Use Development. In City of Berkeley. November 26, TJKM Transportation Consultants TJKM Transportation Consultants Final Traffic Impact Study For 1200 Ashby Avenue Mixed-Use Development In City of Berkeley Pleasanton Fresno Sacramento Santa Rosa www.tjkm.com TJKM Transportation Consultants

More information

700 University Avenue Mixed-Use Development. Traffic Impact Analysis

700 University Avenue Mixed-Use Development. Traffic Impact Analysis 700 University Avenue Mixed-Use Development Traffic Impact Analysis January 20, 2006 Prepared by 700 UNIVERSITY AVENUE MIXED- USE DEVELOPMENT TRAFFIC IMPACT STUDY Table of Contents 1.0 Executive Summary...

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma.

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma. Revised Report Traffic Study for Safeway Fuel Center at Washington Square Shopping Center In The Pleasanton Fresno Sacramento Santa Rosa TJKM www.tjkm.com Revised Report Traffic Study for Safeway Fuel

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2 TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Trip Generation and Parking Study New Californian Apartments, Berkeley

Trip Generation and Parking Study New Californian Apartments, Berkeley Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

5.9 TRANSPORTATION AND TRAFFIC

5.9 TRANSPORTATION AND TRAFFIC 5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

1650 South Delaware Street

1650 South Delaware Street 65 South Delaware Street Final Transportation Impact Analysis Prepared for: City of San Mateo June 8, 28 Hexagon Transportation Consultants, Inc. Hexagon Office: 4 North Second Street, Suite 4 San Jose,

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By:

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By: TRAFFIC IMPACT ANALYSIS FOR STERLING 5 th STREET APARTMENTS PROJECT Davis, CA Prepared For: Din/Cal 3, Inc. 3411 Richmond Avenue, Suite 200 Houston, Texas 77046 Prepared By: KD Anderson & Associates, Inc.

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

Abrams Associates TRIP GENERATION AND PARKING ANALYSIS. City of Berkeley

Abrams Associates TRIP GENERATION AND PARKING ANALYSIS. City of Berkeley TRIP GENERATION AND PARKING ANALYSIS 2556 TELEGRAPH PROJECT City of Berkeley Prepared for: Realtex Group 505 Sansome Street, Suite 400 San Francisco, CA 94111 Prepared by: 1875 Olympic Boulevard, Suite

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Task 5.1: Existing Conditions Review and Analysis

Task 5.1: Existing Conditions Review and Analysis City of Oceanside Coast Highway Corridor Task 5.1: Existing Conditions Review and Analysis Technical Memorandum August 2014 DOCUMENT CONTROL Client: Project Name: Report Title: City of Oceanside City of

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Final Report 2011 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

APPENDIX H. Transportation Impact Study

APPENDIX H. Transportation Impact Study APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

JELLY BEAN SQUARE. ±18,000 square feet available JELLY BEAN SQUARE. Suites Ranging from 1,100 Square Feet to 9,760 Square Feet

JELLY BEAN SQUARE. ±18,000 square feet available JELLY BEAN SQUARE. Suites Ranging from 1,100 Square Feet to 9,760 Square Feet CREATIVE OFFICE / LIGHT MANUFACTURING WITH AUXILIARY LAB ±18,000 square feet available Suites Ranging from 1,100 Square Feet to 9,760 Square Feet 6400-6450 Hollis Street Emeryville, CA property highights

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information