IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC

Size: px
Start display at page:

Download "IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC"

Transcription

1 IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Condominium Complex, Located at 1101 North Main Street, Los Angeles (the Traffic Report ), prepared by Overland Traffic Consultants in March The Traffic Report is provided as Appendix I to this Draft EIR. In addition, an Addendum to the report entitled Add Area Technical Analysis, prepared by Overland Traffic Consultants in October 2005 is provided as Appendix J to this Draft EIR. ENVIRONMENTAL SETTING Traffic volume data was collected and field surveys were conducted in the study area to determine the roadway and intersection geometry and traffic signal operations. Figure IV.L.-1 illustrates the study locations, type of intersection traffic control, and lane configurations for the future project impact analysis. A brief description of the affected roadway facilities is provided below with the street plans of the roadways, city street standards, and the Central City North Community Plan Area (CPA) Highway Circulation Map provided in Appendix B to the Traffic Report (found in Appendix I to this draft EIR). Freeway and Street Characteristics Freeways serving the project area are the Pasadena Freeway (I-110) and the Hollywood Freeway (U.S. 101) which are immediately west and south of the site, respectively. Project access to the Pasadena Freeway is primarily provided from Hill Street. This north-south freeway provides access o downtown Los Angeles with an average traffic volume of 168,000 vehicles per day between Figueroa Street and Stadium Way. Project access to the Hollywood Freeway is provided from Vignes Street and Alameda Street. This northsouth freeway provides access to downtown Los Angeles with an average traffic volume of 204, ,000 vehicles per day between Vignes Street and N. Spring Street. Major streets providing access to the downtown Los Angeles area include, Main Street, Alameda Street, N. Spring Street, College Street, Alpine Street, Vignes Street, Cesar E. Chavez Avenue, Elmyra Street, and Llewellyn Street. Main Street is designated as a secondary highway and provides two lanes in each direction. On the east side of the street, parking is unrestricted north of College Street and 1-hour parking with afternoon peak hour restrictions from 4-6 pm south of College Street. The west side of the street has unrestricted parking Page IV.L-1

2 north of College Street and 1-hour parking with morning peak hour restrictions from 7-9 am south of College Street. Alameda Street is designated a major highway which becomes N. Spring Street at College Street. Alameda Street provides three lanes in each direction with on street parking. North Spring Street is designated a major highway per the community plan. The street provides two lanes in each direction with parking restrictions on both sides of the street. South of Elmyra Street the roadway widens to provide a third travel lane in each direction on approach to College Street. College Street is designated a secondary highway in the community plan. One lane in each direction is provided between Alameda Street and Main Street. East of N. Spring Street/Alameda Street there is two hour metered parking between the hours of 9 am to 3 pm and peak hour restrictions during the morning and evening peak hours on both sides of the street. Alpine Street is designated a secondary highway in the community plan. Two lanes in each direction are provided and parking is restricted on both sides of the street. The roadway is divided west of Main Street by columns from the elevated portion of the Metrorail line. East of Alameda Street, Alpine Street becomes Vignes Street. Vignes Street is designated a major highway in the community plan. Two lanes in each direction are provided and parking is restricted on both sides of the street. Vignes Street becomes Alpine Street west of Main Street. Vignes Street is divided due to columns along its centerline from the elevated portion of the Metrorail line. Cesar E. Chavez Avenue is designated a major highway in the community plan. The street provides three lanes of traffic, left turn channelization, and restricted parking on both sides of the street. Elmyra Street is designated a collector street in the community plan. There is no striping and parking is unrestricted on both sides of the street. Llewellyn Street is designated a local street in the community plan. One lane in each direction is provided with unrestricted parking on both sides of the street. Transit Service Public transportation in the project area is provided by the Metropolitan Transportation Authority (Metro), the City of Los Angeles Department of Transportation (LADOT) and the Southern California Regional Railroad Authority (SCRRA). Metro provides routes 58, 76, and 376 along Main Street through the project area. LADOT provides the DASH service with the Lincoln Heights/Chinatown line along Page IV.L-2

3 INSERT FIGURE IV.L.-1 Page IV.L-3

4 Main Street on weekends and weekdays. SCRRA provides a rail stop for the Metro Gold Line at the northwest corner of College Street and North Spring Street, southwest of the proposed project site. The transit lines are illustrated in Appendix C to this Traffic Report, which can be found in Appendix I to this Draft EIR. Analysis of Existing Traffic Conditions Traffic volume data used in the following peak hour intersectional analysis were based on traffic counts conducted by the Traffic Solution, an independent traffic data collection company, and data provided by LADOT. The AM and PM period counts were conducted from 7:00 am to 9:00 am and 4:00 pm to 6:00 pm. Traffic counts were conducted by counting the number of vehicles traveling through each study intersection making each turn or through movement. The peak hour volume for each intersection was then determined by adding the four highest consecutive 15-minute volumes for all movements. The traffic conditions analysis was conducted using the Critical Movement Analysis (CMA) method. All study intersections were evaluated using this methodology pursuant to the criteria established by the LADOT. The peak hour traffic counts were used along with current intersection lane configuration and traffic controls to determine the intersection s operating condition. A CMA analysis of the existing baseline and future traffic conditions analysis has been completed at those locations expected to have the highest potential for significant traffic impacts. Morning and afternoon peak hour conditions have been evaluated at eight key intersections selected by LADOT for review. Low volume intersections or intersections with minimal project traffic are not included in the significance test. The intersections studied are: (1) North Main Street & Alpine Street/Vignes Street; (2) North Main Street & College Street; (3) North Main Street & Elmyra Street; (4) Alameda Street & Cesar E. Chavez Avenue; (5) Alameda Street & Ord Street/North Main Street; (6) Alameda Street & Alpine Street; (7) Alameda Street & College Street; and (8) North Spring Street & Elmyra Street. The CMA procedure uses a ratio of the intersection s traffic volume to its capacity for rating an intersection s congestion level. The highest combinations of conflicting traffic volume (V) divided by the Page IV.L-4

5 capacity (C) value represents the intersection V/C ratio. Intersection capacity represents the maximum volume of vehicles which has a reasonable expectation of passing through an intersection in one hour under typical traffic flow conditions. The volume-to-capacity (V/C) ratio defines the proportion of an hour necessary to accommodate all the traffic moving through the intersection assuming all approaches were operating at full capacity. CMA ratios provide an ideal means for quantifying intersection operating characteristics. For example, if an intersection has a CMA value of 0.70, the intersection is operating at 70 percent capacity, with 30 percent unused capacity. One the volume-to-capacity ratio (i.e., CMA value) has been calculated, operating characteristics are assigned a level of service grade (A through F) to estimate the level of congestion and stability of the traffic flow. The term Level of Service (LOS) is used by traffic engineers to describe the quality of the traffic flow. Definitions of the LOS grades are shown in Table IV.L.-1. By applying the capacity procedures to the intersection data, the CMA values and the corresponding LOS for existing traffic conditions were calculated at each intersection. The existing LOS values for the study intersections are summarized in Table IV.L.-2. Supporting capacity worksheets are contained in Appendix E to the Traffic Report, which can be found in Appendix I to this Draft EIR. Table IV.L.-1 Level of Service Definitions LOS CMA Value Operating Conditions A Free flow conditions with low traffic density B A stable flow of traffic C Light congestion but stable, occasional backups behind left-turning vehicles Approaching instability, drivers are restricted in freely changing lanes. D Vehicles may be required to wait through more than one cycle. At or near capacity with possible long queues for left-turning vehicles. Blockage of intersection may occur if signal does not provide for protected turning movements. E F > 1.00 Jammed conditions with stoppages of long duration. Source: Overland Traffic Consultants, Inc., March Pursuant to the City of Los Angeles traffic impact guidelines, the following steps have been taken to develop the future traffic volume estimate: (a) (b) (c) (d) Existing traffic plus ambient growth to 2008 study year (added 3 percent total); Traffic in (a) plus related projects (without project scenario); Traffic in (b) with the Proposed Project traffic (with project scenario); Traffic in (c) plus the proposed traffic mitigation, if necessary. Page IV.L-5

6 Table IV.L.-2 Existing Levels of Service at Study Intersections AM Peak Hour PM Peak Hour No. Intersection CMA LOS CMA LOS 1 N. Main St. & Alpine St./Vignes St A A 2 N. Main St. & College St A A 3 N. Main Street & Elmyra St A A 4 Alameda St. & Cesar E. Chavez Ave A A 5 Alameda St. & Ord St./N. Main St A A 6 Alameda St. & Alpine St A A 7 Alameda St. & College St A A 8 N. Spring St. & Elmyra St A A Source: Overland Traffic Consultants, Inc., March ENVIRONMENTAL IMPACTS Thresholds of Significance The traffic impact of the Proposed Project s traffic volume has been calculated by adding the project volume to the above without project traffic estimates. Comparing the changes in the traffic conditions between the without and with project traffic volume scenarios provides the data to determine if the project traffic volume creates a significant traffic impact which would require traffic mitigation at any of the study intersections. According to the traffic impact standards adopted by LADOT for the environmental assessment and approved for this study, a traffic impact is considered significant if the related increase in the CMA value equals or exceeds the thresholds shown in Table IV.L.-3. Table IV.L.-3 CMA Thresholds LOS Final CMA Value Increase in CMA Value C D E, F > or more Source: Overland Traffic Consultants, Inc., March Proposed Project Site Impacts Construction Impacts Construction of the Proposed Project would require demolition of all existing structures, grading, and construction of the Proposed Project. Traffic during construction activities would be generated by construction equipment, crew vehicles, haul trucks, and vehicles delivering building materials. The number of construction workers and equipment would vary throughout the construction process in order to maintain a reasonable schedule of completion. Page IV.L-6

7 All haul trucks would be brought onto the Proposed Project site and would be stored within the perimeter fence of the construction site. No detours around the construction site are expected, however, flagmen would be used as necessary to control traffic movement during the ingress and egress of trucks and heavy equipment. Construction hours and days are planned to occur from 9:00 am to 3:30 pm, Monday through Friday, as directed by the Mayor of Los Angeles with overtime hours and some weekends as required. Construction equipment would generally be contained onsite. At times when onsite staging would not be available, a street use permit would be required to stage larger construction equipment and trucks adjacent to the Proposed Project site. It is likely that short-term traffic impacts would occur in the immediate area during the busiest construction phase (i.e., foundation, building shell, and finish construction phases). Therefore, mitigation measures are provided below, to address this potentially significant, albeit temporary impact. Traffic Generation Traffic-generating characteristics of many land uses have been surveyed by the Institute of Transportation Engineers (ITE) and published in the Trip Generation handbook, 7 th Edition. This publication of traffic generation data is the industry standard for estimating traffic generation for different land uses. The ITE studies indicate that the land uses associated with the Proposed Project site generally exhibit the tripmaking characteristics as shown by the trip rates in Table IV.L.-4, below. Table IV.L.-4 Project Trip Generation Rates AM Peak Hour PM Peak Hour Land Use Daily Total In Out Total In Out Condominium (per unit) Industrial (per 1,000 sf) Notes: sf=square feet Source: Overland Traffic Consultants, Inc., March On the basis of these ITE trip generation rates, estimates of the project s driveway traffic volume were calculated. Traffic discounts were applied for transit usage and pedestrian traffic as allowed by LADOT. As shown in Table IV.L.-5 below, the Proposed Project could be expected to generate an average of 1,318 vehicle trips per weekday, with 99 morning peak hour trips and 117 afternoon peak hour trips. These trip estimates have been adjusted to account for the traffic generated by the existing uses to be removed as part of the project. After these traffic adjustments, it has been estimated that the net traffic added to the adjacent streets is approximately 1,102 daily trips with 71 morning trips and 87 afternoon trips. Page IV.L-7

8 Table IV.L.-5 Estimated Project Traffic Generation Daily AM Peak Hour PM Peak Hour Land Use Traffic Total In Out Total In Out 300 unit condos 1, Less 25% transit/ped Subtotal Residential 1, Less 31,000 sf industrial Net Trips 1, Notes: sf=square feet Source: Overland Traffic Consultants, Inc., March Traffic Distribution A primary factor affecting trip destination is the spatial distribution of population and employment centers which would generate project trip origins and destinations. The estimated project directional trip distribution is also based on the study area roadway network. Figure IV.L.-2 illustrates the estimated area wide project traffic distribution percentages. Figure IV.L.-3 shows the estimated project traffic percentages at the selected study intersections. Using the traffic assignment at each intersection and the estimated peak hour traffic volume as provided in Table IV.L.-5, peak hour traffic volumes at each study location have been calculated and are shown in Figure IV.L.-4. This estimated assignment of the project traffic flow provides the information necessary to analyze the potential traffic impacts generated by the project at the study intersections. Analysis of Future Traffic Conditions Future traffic volume projections have been developed to analyze the traffic conditions after completion of other planned land developments including the Proposed Project. Pursuant to the City of Los Angeles traffic impact guidelines, the following steps have been taken to develop the future traffic volume estimate: (a) (b) (c) (d) Existing traffic plus ambient growth to 2008 study year (added 3 percent total); Traffic in (a) plus related projects (without project scenario); Traffic in (b) with the Proposed Project traffic (with project scenario); Traffic in (c) plus the proposed traffic mitigation, if necessary. Page IV.L-8

9 INSERT FIGURE IV.L.-2 Page IV.L-9

10 INSERT FIGURE IV.L.-3 Page IV.L-10

11 INSERT FIGURE IV.L.-4 Page IV.L-11

12 The future cumulative analysis includes other development projects located within the study area that are either under construction or planned. As part of this analysis, development lists were obtained from the LADOT and checked in the field to identify those projects that could produce additional traffic at the study intersections by the future study year It should be noted that the Proposed Project, or any actions taken by the City regarding the Proposed Project, does not have a direct bearing on these other related projects. The locations of the 70 related projects are shown in Figure IV.L.-5 and listed in Table III-1 (Related Projects). Estimates of the peak hour trips generated by the other developments were calculated by applying ITE trip generation rates to evaluate future traffic conditions with the related projects. The potential net increase in traffic from the related projects is shown in Table IV.L.-6. The potential traffic impact of the total traffic growth has been calculated by adding the existing traffic volume, the ambient growth factor and traffic from other development projects. Further cumulative without project peak hour traffic volume estimates are shown in Figures IV.L.-6 and IV.L.-7 for the morning and afternoon, respectively. No Land Table IV.L.-6 Related Projects Net Traffic Generation AM Peak Hour PM Peak Hour Use Size Daily In Out Total In Out Total Blossom Plaza Condominium Restaurant Cultural Office Artist Loft Residential Supermarket Apartment Apartment Beaumont LC High School Office Park 223 du 20,716 sf 17,424 sf 6,130 sf 5,000 sf 20,000 sf 30 du 600 du 27,000 sf 17,000 sf 4,200 sf 280 du 22,000 sf 200 du 5,000 sf 2,600 st 70,000 sf 11 acres 2, , , , , , Gov t Office 1,660 empl. 1, Jail 179,000 sf 3, Page IV.L-12

13 Land Table IV.L.-6 (continued) Related Projects Net Traffic Generation AM Peak Hour PM Peak Hour No. Use Size Daily In Out Total In Out Total 11 Residential 330 du 4, Commercial 50,000 sf 12 High School 500 st Residential 73 du School 380 st Residential 80 du Residential 600 du 4, ,000 sf 17 Condominium 460 du 2, Commercial 10,000 sf 1, Apartment 225 du 19 Apartment 450 du 3, ,000 sf 20 School 1,600 st 2, Condominium 277 du 1, Live/Work 38 du Police HQ Residential 280 du 1, Condominium 66 du Loft 209 du 1, Apartment 143 du Apartment 36 du Condominium 140 du Loft 103 du Condominium 40 du Condominium Apartment 570 du 280 du 50,000 sf 4, Little Tokyo Condominium 127 du ,000 sf First St South 6, Commercial 415,782 sf 35 Condo/Apt 1,154 du Hotel 500 room 36 Bar/Lounge 8,770 sf Office 82,000 sf 1, Office 30,000 sf 38 Apartment 375 du 3, Single Family 93 du 39 High School 1,206 st 1, Residential 153 du 1, Condominium 90 du Page IV.L-13

14 Land Table IV.L.-6 (continued) Related Projects Net Traffic Generation AM Peak Hour PM Peak Hour No. Use Size Daily In Out Total In Out Total Santee Ct 2, Condominium Apartment 80 du 299 du 44 Condominium 76 du 76 du Condominium 875 du 7, Restaurant 34,061 sf 10,000 sf 46 Metropolis Condominium Office Hotel 836 du 988,255 sf 480 room 46,000 sf 24,644 1, , ,151 3, Condominium 629 du 2, ,000 sf 48 Apartment 156 du 1, Loft Grocery Store Loft Condominium 7,500 sf 266 du 20,000 sf 10,000 sf 152 du 25,000 sf 520 du 30,000 sf 8, , Loft 116 du LA Live Hotel Cinema 1,200 room 3,600 seat 85,130 2,800 2,416 5,213 4,002 3,308 7, Theater 7,000 seat Restaurant 345,000 sf Office Apartment 498,000 sf 165,000 sf 800 du Apartment Restaurant Condominium Condominium Other 179 du 8,000 sf 311 du 7,294 sf 128 du 3,472 sf 2,200 sf 1, , Live/Work 78 du Restaurant/Bar 3,000 sf 56 Loft 82 du Apartment 20 du 1, Office 32,670 sf 37,600 sf Condominium 565 du Page IV.L-14

15 Land Table IV.L.-6 (continued) Related Projects Net Traffic Generation AM Peak Hour PM Peak Hour No. Use Size Daily In Out Total In Out Total 59 Condominium 300 du 1, Condominium 105 du ,500 sf 61 Clinic 31,655 sf Live/Work 91 du Condominium 182 du ,000 sf 64 Restaurant 5,000 sf Condominium 300 du 1, ,400 sf 66 State Park 32 acres Residential 150 du Apartment 264 du ,000 sf 69 High School 1,521 st -1, Office 118,000 sf Notes: du=dwelling unit, sf=square feet, st=students Source: Overland Traffic Consultants, Inc., March Page IV.L-15

16 INSERT FIGURE IV.L.-5 Page IV.L-16

17 INSERT FIGURE IV.L.-6 Page IV.L-17

18 INSERT FIGURE IV.L.-7 Page IV.L-18

19 None of the study intersections are impacted by the project traffic volume using the significant impact criteria established by LADOT. It should be noted that the impact analysis does not consider any changes to the existing intersection configuration (i.e., future roadway improvements). Future cumulative with project peak hour traffic volumes are shown in Figures IV.L.-8 and IV.L.-9 for the morning and afternoon, respectively. Congestion Management Program Review The Congestion Management Program (CMP) was adopted to regulate and monitor regional traffic growth and transportation improvement programs. The CMP designates a transportation network which includes all state highways and some arterials within the County of Los Angeles. If the level of service standard deteriorates on the CMP network, then the local jurisdiction must prepare a deficiency plan to be in conformance with the LA County CMP. The intent of the CMP is to provide information to decision makers to assist in the allocation of transportation funds through the State Transportation Improvement Program (STIP) process. For purposes of the CMP, a substantial change in freeway segments are defined as an increase or decrease of 0.10 in the demand to capacity ratio and a change in LOS. A CMP traffic impact analysis is required if a project will add 150 or more trips to the freeway, in either direction during either the AM or PM weekday peak hour. As shown in Figure IV.L.-4 (peak hour project traffic assignment), the Proposed Project does not exceed the CMP traffic limits. Based on this information, no additional freeway analysis is necessary. Parking and Access The Los Angeles Municipal Code (LAMC) specifies parking requirements for condominium residential developments at a ratio of 2 spaces per unit. Thus, 544 parking spaces (i.e., 2 spaces x 272 dwelling units) would be required for the Proposed Project. Guest parking at a rate of one-quarter space per unit is also usually provided, which would amount to 68 guest parking spaces for the Proposed Project. In total, 612 parking spaces would be required of the Proposed Project. As the Proposed Project would provide a total on-site parking supply of 614 spaces, adequate on-site parking is anticipated, and no parking overflow impacts are expected. Vehicular access to the subterranean parking structure will be provided by a project driveway located on Llewellyn Street at mid-block. One inbound-only driveway and one outbound-only driveway will provide access to and from the structure. Page IV.L-19

20 INSERT FIGURE IV.L.-8 Page IV.L-20

21 INSERT FIGURE IV.L.-9 Page IV.L-21

22 Add Area Impacts The following Add Area analysis summarizes the information provided in the traffic report Add Area analysis, prepared by Overland Traffic Consultants in October This Add Area analysis is provided as Appendix J to this Draft EIR. In order to determine the potential traffic impacts of development on the vacant land area northeast of North Spring Street and College Street (the Add Area ), vehicle trip generation was conducted for six development scenarios according to standard practice. These trips were then distributed to the roadway network and study intersections in a similar manner to the proposed project with adjustments for access locations. The trips were added to the without project conditions as listed in the approved traffic study, and critical movement analysis (CMA) was conducted. The project trips were then added to the increased without project conditions. Evaluation of traffic impacts was conducted for each of the six development scenarios. Construction Impacts Development of the Add Area would require grading and construction of the proposed project. Traffic during construction activities would be generated by construction equipment, crew vehicles, haul trucks, and vehicles delivering building materials. The number of construction workers and equipment would vary throughout the construction process in order to maintain a reasonable schedule of completion. All haul trucks would be brought onto the Add Area and would be stored within the perimeter fence of the construction site. No detours around the construction site are expected, however, flagmen would be used as necessary to control traffic movement during the ingress and egress of trucks and heavy equipment. Construction equipment would generally be contained onsite. At times when onsite staging would not be available, a street use permit would be required to stage larger construction equipment and trucks adjacent to the Add Area. It is likely that short-term traffic impacts would occur in the immediate area during the busiest construction phase (i.e., foundation, building shell, and finish construction phases). Therefore, mitigation measures are provided below, to address this potentially significant, albeit temporary impact. Traffic Generation Six development scenarios were evaluated, including a large and small commercial alternative, large and small residential alternative, and large and small mixed-use alternative. Vehicle trip generation was conducted based upon standard Institute of Transportation Engineers (ITE) Trip Generation as required by LADOT. Table IV.L.-7, below, portrays the six alternatives and vehicle trip generation for each of these scenarios. Standard pass-by and conservative internal capture credits have been incorporated. Although this is an area where there is likely to be high transit and pedestrian activity, estimates of these Page IV.L-22

23 reductions were not incorporated in the Add Area to present a more conservative estimate of future conditions. Table IV.L.-7 Add Area Trip Generation Summary Daily AM Peak Hour PM Peak Hour Alternative Description Size Traffic In Out Total In Out Total Commercial (large) Commercial (small) Office Pass-by credit Internal capture 214,102 sf 1,070,510 sf 30% 10% 11,139 8,279 (3,342) (780) 151 1,100 (45) (11) (29) (7) 247 1,250 (74) (17) (149) (35) 538 1,061 (161) (38) 1,035 1,278 (311) (72) Total 1,284,612 sf 15,297 1, , ,400 1,930 Office Pass-by credit Internal capture 21,190 sf 105,950 sf 50% 5% 939 1,395 (470) (23) (8) (0) (5) (0) (13) (1) (13) (1) (16) (1) (29) (1) Total 127,140 sf 1, Residential (large) Apartments 481 DU 3, Residential (small) Apartments 47 DU Mixed Use (large) Mixed Use (small) Apartments Pass-by credit Internal capture 214,102 sf 384 DU 30% 10% 11,139 2,580 (3,342) (780) (45) (11) (29) (7) (74) (17) (149) (35) (161) (38) 1, (311) (72) Total 9, Apartments Pass-by credit Internal capture 21,190 sf 46 DU 50% 5% (470) (23) 15 5 (8) (0) (5) (0) (13) (1) (13) (1) (16) (1) 1, (523) (26) Total Notes: du=dwelling unit, sf=square feet Source: Overland Traffic Consultants, Inc., October Traffic Distribution The trips estimated for the Add Area were then distributed to the eight study intersections. They were distributed based upon travel patterns in the area similar to the Proposed Project. Approximately 20 percent of the trips would be from the northeast, 15 percent from the west, and 65 percent from the south. The trips created by the Add Area were added to the existing conditions increased by ambient growth and other related projects in the area to create a new without project condition for each of the Add Area scenarios. Page IV.L-23

24 Analysis of Future Traffic Conditions Critical movement analysis was conducted for the six Add Area alternative future without project traffic conditions. As would be anticipated, future conditions without the project increased with the addition of the Add Area commensurate with the increase in the level of development scenarios. There reaches a point in the Add Area development scenarios with the large commercial alternative where two intersections would deteriorate to a poor level of service. The project traffic was added to each of the six Add Area future without project conditions to evaluate the increase in the levels of service (LOS). Table IV.L.-8 provides a LOS for the without project conditions. Review of this information indicates that all development scenarios can be accommodated without deterioration until we reach the large commercial development. This scenario creates more than double the number of trips of the next smaller development (mixed-use large). Detailed summary CMA and LOS for the project with the lowest trip generation (residential small) and the largest trip generation (commercial large) are provided in Tables IV.L.-9 and IV.L.-10. Table IV.L.-8 Add Area Scenarios Included in Without Project Conditions Add Area Scenarios Original Peak Analysis Small Large Small Large Hour LOS LOS LOS LOS LOS Residential Mixed Use Commercial Small Intersection LOS N. Main St. & AM A A A A A A B Alpine St/Vignes St PM A A A A B A B N. Main St. & AM A A A A A A E College St. PM A A A A A A E N. Main St. & AM A A A A A A A Elmyra St. PM A A A A A A A Alameda St. & AM B B B B B B D Cesar Chavez Ave. PM A A A B B A D Alameda St. & AM A A A A A A A Ord St/N Main St PM A A A A A A B Alameda St. & AM A A A A A A A Alpine St. PM A A A A A A B Alameda St. & AM A A A A A A A College St. PM A A A A A A A N. Spring St. & AM A A A A A A A Elmyra St. PM A A A A A A B Source: Overland Traffic Consultants, Inc., October Large LOS Page IV.L-24

25 Table IV.L.-9 CMA Summary Without Project Add Area Residential (Small) and With Project Peak Future without Project Future with Project Intersection Hour CMA LOS CMA LOS Impact N. Main St. & AM A A Alpine St/Vignes St PM A A N. Main St. & AM A A College St. PM A A N. Main St. & AM A A Elmyra St. PM A A Alameda St. & AM B B Cesar Chavez Ave. PM A A Alameda St. & AM A A Ord St/N Main St PM A A Alameda St. & AM A A Alpine St. PM A A Alameda St. & AM A A College St. PM A A N. Spring St. & AM A A Elmyra St. PM A A Source: Overland Traffic Consultants, Inc., October Table IV.L.-10 CMA Summary Without Project Add Area Commercial (Large) and With Project Peak Future without Project Future with Project Intersection Hour CMA LOS CMA LOS Impact N. Main St. & AM B B Alpine St/Vignes St PM B B N. Main St. & AM E E * College St. PM E E 0.016* N. Main St. & AM A A Elmyra St. PM A A Alameda St. & AM D D Cesar Chavez Ave. PM D D Alameda St. & AM A A Ord St/N Main St PM B B Alameda St. & AM A A Alpine St. PM B B Alameda St. & AM A A College St. PM A A N. Spring St. & AM A B Elmyra St. PM B B * Significant impact as identified by LADOT. Source: Overland Traffic Consultants, Inc., October Page IV.L-25

26 CUMULATIVE IMPACTS Cumulative Construction Impacts Several of the related projects may have overlapping construction schedules with the Proposed Project, and, thereby, potentially combining with the Proposed Project to result in a cumulative construction impact. However, the mitigation measures listed below would minimize any potential cumulative construction impact. Furthermore, the Mayor of the City of Los Angeles has directed the City to limit all construction hours on major streets to the off-peak hours of 9:00 am to 3:30 pm, Monday through Friday, and 8:00 am to 6:00 pm on Saturdays. Cumulative Operational Impacts The analysis of traffic impacts considers the effects of background growth in the region, the development of the Add Area, and the related projects listed in Table III-1 (Related Projects). Consequently, the potential impacts of cumulative growth are already incorporated into the traffic model and are equivalent to those indicated for the Future with Project condition above. As impacts under the Future with Project condition would not be considered significant, as discussed above, cumulative impacts would be less than significant. Table IV.L.-11 Future Traffic Conditions without Project Existing Future without Project No. Intersection Peak Hour CMA LOS CMA LOS 1 N. Main St. & AM A A Alpine St./Vignes St. PM A C 2 N. Main St. & AM A A College St. PM A A 3 N. Main St. & AM A A Elmyra St. PM A A 4 Alameda St. & AM A C Cesar E Chavez Ave. PM A C 5 Alameda St. & AM A A Ord St./N. Main St. PM A C 6 Alameda St. & AM A A Alpine St. PM A B 7 Alameda St. & AM A A College St. PM A A 8 N. Spring St. & AM A B Elmyra St. PM A B Source: Overland Traffic Consultants, Inc., March Page IV.L-26

27 Table IV.L.-12 Future Traffic Conditions with Project Future without Project Future with Project No. Intersection Peak Hour CMA LOS CMA LOS Impact 1 N. Main St. & AM A A Alpine St/Vignes St PM C C N. Main St. & AM A A College St. PM A A N. Main St. & AM A A Elmyra St. PM A A Alameda St. & AM C C Cesar Chavez Ave PM C C Alameda St. & AM A A Ord St/N Main St PM C C Alameda St. & AM A A Alpine St. PM B B Alameda St. & AM A A College St. PM A A N. Spring St. & AM B C Elmyra St. PM B A Source: Overland Traffic Consultants, Inc., March MITIGATION MEASURES The following mitigation measures listed below are recommended to address the potential conflicts between construction activities, street traffic and pedestrians: IV.L.-1 Prior to the issuance of construction permits the developer shall prepare Work Area Traffic Control Plans that at a minimum should include: Identification of a designated haul route to be used by construction trucks; Provide an estimate of the number to trucks trips and anticipated trips; Identification of traffic control procedures, emergency access provisions, and construction alternative crew parking locations; Identification of the onsite location of vehicle and equipment staging; Provide a schedule of construction activities; Limitations on any potential lane closures to off-peak travel periods; Scheduling the delivery of construction materials during non-peak travel periods, to the extent possible; Page IV.L-27

28 Coordinating deliveries to reduce the potential of trucks waiting to unload building materials; Prohibiting parking by construction workers on neighborhood streets as determined in conjunction with city staff; and Projects involving the import/export of 1,000 cubic yards or more of dirt shall obtain haul route approval by the Department of Building and Safety. IV.L.-2 To ensure pedestrian safety, the developer shall ensure that there are appropriate access restrictions to the Proposed Project site, covered sidewalks, and designating alternative pedestrian routes. The analysis contained in this section has determined that the change in traffic volume generated by the project would not significantly impact the traffic flow at any of the study intersections during the operation of the proposed project. Therefore, no additional project traffic mitigation measures are necessary. LEVEL OF SIGNIFICANCE AFTER MITIGATION With the implementation of the mitigation measures listed above, construction traffic impacts would be less than significant. Traffic impacts associated with the operation of the Proposed Project would be less than significant. Page IV.L-28

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

TRANSPORTATION 1. INTRODUCTION

TRANSPORTATION 1. INTRODUCTION IV.F TRANSPORTATION 1. INTRODUCTION This section evaluates potential impacts associated with Project-related traffic, circulation, and access. The analysis summarizes the findings of the traffic study

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

3.8 TRANSPORTATION, CIRCULATION AND PARKING

3.8 TRANSPORTATION, CIRCULATION AND PARKING 3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING 1. INTRODUCTION This section is based on the technical report Traffic Impact Study Health Sciences Campus Project, City of Los Angeles,

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION IV. ENVIRONMENTAL IMPACT ANALYSIS 1. INTRODUCTION This section is based on a traffic and parking impact study that was prepared for the proposed CSMC West Tower Project by Linscott, Law & Greenspan, Engineers,

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY IV.K TRANSPORTATION 1. INTRODUCTION This section provides an analysis of potential impacts associated with traffic, parking, and access. The analysis provides an overview of existing traffic conditions

More information

TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT

TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT Located at southeast corner of Winnetka Avenue and Prairie Street In the City of Los Angeles Prepared for: Sky Tech Management & Construction

More information

5.9 TRANSPORTATION AND TRAFFIC

5.9 TRANSPORTATION AND TRAFFIC 5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic impacts were analyzed for both the

More information

700 University Avenue Mixed-Use Development. Traffic Impact Analysis

700 University Avenue Mixed-Use Development. Traffic Impact Analysis 700 University Avenue Mixed-Use Development Traffic Impact Analysis January 20, 2006 Prepared by 700 UNIVERSITY AVENUE MIXED- USE DEVELOPMENT TRAFFIC IMPACT STUDY Table of Contents 1.0 Executive Summary...

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject:

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject: MEMORANDUM Date: August 12, 2014 TG: 13329.01 To: From: Subject: Jeremy Krout EPD Solutions Inc. Rafik Albert EPD Solutions Inc. Rawad Hani Transpo Group AP North Lake Solar Project Traffic Scoping The

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION

V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION The following Section presents a summary of the Traffic Study for the Proposed Civic Center/Metlox Development Project in the City of Manhattan

More information

4.11 TRANSPORTATION AND CIRCULATION

4.11 TRANSPORTATION AND CIRCULATION 4.11 TRANSPORTATION AND CIRCULATION This section analyzes onsite development s impacts to the local transportation and circulation system. The analysis is based upon the traffic study prepared by KOA Corporation

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Replacement Project EIR Appendices TRAFFIC IMPACT ANALYSIS LAKE WOHLFORD DAM Escondido, California December 19,

More information

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways.

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways. 4.7 Transportation and Circulation This report documents the results of a study of the potential traffic impacts created by the Whittier Main Oil Field Development Project. The study is included as Appendix

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

3J. Transportation, Circulation and Parking

3J. Transportation, Circulation and Parking This section presents the methodology, findings, and conclusions of the traffic impact analysis prepared by Fehr & Peers/Kaku Associates to evaluate the potential traffic and circulation impacts of the

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

Draft Report: West Berkeley Bowl Project

Draft Report: West Berkeley Bowl Project Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley 1031-1925 F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA 94549 925-284-3200 Fax:

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

4.4 Transportation and Circulation

4.4 Transportation and Circulation 4.4.1 Introduction This section evaluates the potential for construction traffic and operational impacts to result from implementation of the proposed project. This includes the potential for the project

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Appendix C. Traffic Impact Study

Appendix C. Traffic Impact Study Appendix C Traffic Impact Study TRAFFIC STUDY FOR THE EAGLE ROCK AGGREGATE TERMINAL Prepared by: FEHR & PEERS 201 Santa Monica Blvd. Suite 500 Santa Monica, CA 90401-2213 T. (310) 458-9916 F. (310) 394-7663

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC 3.13 TRANSPORTATION / TRAFFIC As a result of the analysis undertaken in the Initial Study for the Los Angeles Mission College Facilities Master Plan, the (LACCD) determined that the proposed project may

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization...

1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization... Table of Contents SUMMARY PAGE S.1 Project Location and Project Characteristics... S-1 S.2 Project Objectives... S-9 S.3 Project Approvals... S-11 S.4 Impacts and Mitigation Measures... S-12 S.5 Alternatives...

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC The following summarizes the information provided in the traffic report prepared by Fehr & Peers/Kaku Associates entitled, Traffic Study for

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

Costco Gasoline Fuel Station Transportation Characteristics

Costco Gasoline Fuel Station Transportation Characteristics Exhibit A MEMORANDUM Date: May 23, 2013 Project #: I-10 To: Jennifer Murillo, Costco Wholesale Terry Odle, Mulvanny G2 Architecture From: Sonia Hennum, PTOE Project: Subject: Signal Hill Costco Gasoline

More information

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2 TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING 1. INTRODUCTION This section is based on the technical report Traffic Study for the Villa Marina Residential Project, prepared by Kaku

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i EXECUTIVE SUMMARY MacKenzie Engineering and Planning, Inc. performed an analysis of the traffic impacts resulting from the proposed project site located at 25 SE 4th Avenue, Delray Beach, Florida (PCN

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Traffic Study for Barstow 2014 General Plan Amendment. Prepared for: The City of Barstow. Prepared by: ADVANTEC Consulting Engineers

Traffic Study for Barstow 2014 General Plan Amendment. Prepared for: The City of Barstow. Prepared by: ADVANTEC Consulting Engineers Traffic Study for Barstow 2014 General Plan Amendment Prepared for: The City of Barstow Prepared by: June 20, 2014 TABLE OF CONTENTS 1. Executive Summary... 1 2. Project Background & Description... 3 2.1

More information