1 L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive Loveland, CO Phone: FAX:

2 TABLE OF CONTENTS I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 2 Land Use... 2 Roads... 2 Existing Traffic... 2 Existing Operation... 2 Pedestrians Facilities... 7 Bicycle Facilities...7 Transit Facilities...7 III. PROPOSED DEVELOPMENT... 8 Trip Generation... 8 Trip Distribution...8 Background Traffic Projections... 8 Trip Assignment Signal Warrants Operation Analysis Geometry Pedestrian Level of Service Bicycle Level of Service Transit Level of Service IV. CONCLUSIONS/RECOMMENDATIONS DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES

3 LIST OF TABLES 1. Current Peak Hour Operation Trip Generation Short Range (2017) Background Peak Hour Operation Short Range (2017) Total Peak Hour Operation LIST OF FIGURES 1. Site Location Existing Geometry Recent Peak Hour Traffic Site Plan Trip Distribution Short Range (2017) Background Peak Hour Traffic Site Generated Peak Hour Traffic Short Range (2017) Total Peak Hour Traffic APPENDICES A. Base Assumptions Form/Recent Peak Hour Traffic B. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS Standards C. Short Range (2017) Background Peak Hour Operation D. Short Range (2012) Total Peak Hour Operation E. Pedestrian/Bicycle Level of Service DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES

4 I. INTRODUCTION This intermediate transportation impact study (TIS) addresses the capacity, geometric, and control requirements at and near the proposed development of Little Bears Day Care. The proposed Little Bears Day Care site is located in the northwest quadrant of the Riverside/McHugh intersection in Fort Collins, Colorado. During the course of the analysis, numerous contacts were made with the project developer (Hillside Construction, Inc.), the project planning consultant/architect (Hauser Architects), the project civil engineer (North Star Design), and the Fort Collins Traffic Engineering staff. This study generally conforms to the format set forth in the Fort Collins transportation impact study guidelines contained in the Larimer County Urban Area Street Standards (LCUASS). A Base Assumptions Form and related information are provided in Appendix A. The study involved the following steps: Collect physical, traffic, and development data; Perform trip generation, trip distribution, and trip assignment; Determine peak hour traffic volumes; Conduct capacity and operational level of service analyses on key intersections; Analyze signal warrants; Conduct level of service evaluation of pedestrian, bicycle, and transit modes of transportation. DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES Page 1

5 II. EXISTING CONDITIONS The location of Little Bears Day Care is shown in Figure 1. It is important that a thorough understanding of the existing conditions be presented. Land Use Land uses in the area are primarily either residential or commercial/office. Land adjacent to the site is flat (<3% grade) from a traffic operations perspective. The center of Fort Collins lies to the west of the proposed Little Bears Day Care. Roads The primary streets near the Little Bears Day Care site are Riverside Avenue and McHugh Street. Figure 2 shows a schematic of the existing geometry at the key intersections. Riverside Avenue is to the east of (adjacent to) the Little Bears Day Care site. It is a north-south street (a diagonal street northwest-southeast) designated as a four-lane arterial street on the Fort Collins Master Street Plan. Currently, it has a four-lane cross section, with a two-way continuous center-turn lane. At the Riverside/McHugh-Coloradoan Access intersection, Riverside Avenue has northbound and southbound center left-turn lanes and two travel lanes in each direction. The existing speed limit in this area is 35 mph. The Riverside/McHugh-Coloradoan Access intersection has stop sign control on McHugh Street and the Coloradoan Access. McHugh Street is to the south of the Little Bears Day Care site. It is classified as a collector street on the Fort Collins Master Street Plan. Currently, McHugh Street has a two-lane cross section in this area. At the Riverside/McHugh-Coloradoan Access intersection, McHugh Street has all eastbound movements combined in a single lane. Existing Traffic Recent peak hour traffic counts at the Riverside/McHugh-Coloradoan Access and Riverside/Site Access intersections are shown in Figure 3. Raw traffic data is provided in Appendix A. The traffic data for the key intersections was collected in April Existing Operation The key intersections were evaluated using techniques provided in the 2000 Highway Capacity Manual. Using the recent peak hour traffic shown in Figure 3, the current peak hour operation is shown in Table 1. Calculation forms are provided in DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES Page 2

6 Mulberry Riverside Elizabeth Lemay McHugh SCALE: 1"=500' SITE LOCATION Figure 1 DELICH ASSOCIATES Little Bears Day Care TIS, May 2012 Page 3

7 Coloradoan Site Access Riverside McHugh - Denotes Lane - Two-way Continuous Left-turn Lane EXISTING GEOMETRY Figure 2 DELICH ASSOCIATES Little Bears Day Care TIS, May 2012 Page 4

8 441/519 3/1 497/475 4/4 0/4 0/2 0/2 Coloradoan 1/2 2/1 Site Access 3/0 419/490 21/30 1/1 481/ /65 20/25 0/0 69/99 Riverside McHugh AM/PM RECENT PEAK HOUR TRAFFIC Figure 3 DELICH ASSOCIATES Little Bears Day Care TIS, May 2012 Page 5

9 TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM EB LT/T/RT B B Riverside/McHugh-Coloradoan WB LT/T/RT A B (stop sign) NB LT A A SB LT A A Riverside/Site Access EB LT/RT B B (stop sign) NB LT A A DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES Page 6

10 Appendix B. A description of level of service for unsignalized intersections from the 2000 Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are provided in Appendix B. Little Bears Day Care is in a area termed other. The key intersections operate acceptably during both the morning and afternoon peak hours. At unsignalized intersections, acceptable operation is considered to be at level of service E for any approach leg for an arterial/collector or arterial/local intersection and level of service C for any approach leg for a collector/local intersection. Pedestrian Facilities Sidewalks exist along both sides of Riverside Avenue and McHugh Street. Sidewalks exist adjacent to this development. Bicycle Facilities The Fort Collins Bike Map shows that Riverside Avenue is a street with bike lanes. These bicycle lanes are not striped. However, there is enough width in the rightmost through lane for bicycles to function separate from motor vehicles. McHugh Street is designated as a bike route. Transit Facilities Currently, there is no Transfort service along Riverside Avenue in this area of Fort Collins. The nearest Transfort route is Route 5, which operates along Lemay Avenue. DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES Page 7

11 III. PROPOSED DEVELOPMENT Little Bears is a proposed day care development to be licensed for 104 students. Figure 4 shows the site plan of the Little Bears Day Care. The site plan shows the proposed building will continue to access Riverside Avenue via a shared access with the office building to the north. The short range analysis (Year 2017) includes development of Little Bears Day Care and an appropriate increase in background traffic, due to normal growth and other known developments in the area. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. A compilation of trip generation information contained in Trip Generation, 8 th Edition, ITE was used to estimate trips that would be generated by the proposed/expected use at this site. Students is the variable used for trip generation. Table 2 shows the expected trip generation on a daily and peak hour basis. Code Use Size 220 Day Care 104 Students TABLE 2 Trip Generation AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out Trip Distribution Directional distribution of the generated trips was determined for Little Bears Day Care. Future year data was obtained from the NFRRTP and other transportation impact studies in the area. Figure 5 shows the trip distribution used for Little Bears Day Care. The trip distribution was discussed with and agreed to by City staff. Background Traffic Projections Figure 6 shows the short range (2017) background peak hour traffic at the key intersections. Background traffic projections for the short range future horizon were obtained by reviewing the NFRRTP, reviewing transportation impact studies for other developments, and reviewing historic count data for this area of Fort Collins. Traffic volumes on the area arterial streets were increased at a rate of two percent per year. In addition to this, the site generated traffic volumes from Phase 6 of the PVH Lemay Campus Expansion were added to the traffic volumes. At the shared Site Access, the existing traffic volumes are low for the land uses using this shared access. The building DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES Page 8

12 SCALE: 1"=50' SITE PLAN Figure 4 DELICH ASSOCIATES Little Bears Day Care TIS, May 2012 Page 9

13 McHugh 50% Coloradoan Site Access 30% Riverside McHugh 20% Elizabeth TRIP DISTRIBUTION Figure 5 DELICH ASSOCIATES Little Bears Day Care TIS, May 2012 Page 10

14 494/575 2/0 553/534 3/1 0/4 0/2 0/2 Coloradoan 0/2 1/2 Site Access 3/0 463/541 29/36 1/1 531/ /76 25/34 0/0 80/117 Riverside McHugh AM/PM SHORT RANGE (2017) BACKGROUND PEAK HOUR TRAFFIC Figure 6 DELICH ASSOCIATES Little Bears Day Care TIS, May 2012 Page 11

15 that is proposed to be the Little Bears Day Care is 7,559 square feet and has an existing office use. The other building using the Site Access is approximately 3,500 square feet and also has an existing office use. In order to be conservative, trip generation for the 3,500 square foot building was calculated using Code 710 General Office from Trip Generation, 8 th Edition, ITE. The site generated traffic from this office building was assigned to the Site Access. Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the resultant of the trip distribution process. The site generated trip assignment for Little Bears Day Care is shown in Figure 7. The site generated traffic was combined with the background traffic to determine the total forecasted traffic for the study area. Figure 8 shows the short range (2017) total peak hour traffic at the key intersections. Signal Warrants As a matter of policy, traffic signals are not installed at any location unless warrants are met according to the Manual on Uniform Traffic Control Devices. The Riverside/McHugh-Coloradoan intersection will not likely meet peak hour volume signal warrants in the future. Operation Analysis Operation analyses were performed at the Riverside/McHugh-Coloradoan Access and Riverside/Site Access intersections. The operation analyses were conducted for the short range analysis, reflecting a year 2017 condition. Using the traffic volumes shown in Figure 6, the key intersections operate in the short range (2017) background peak hour as indicated in Table 3. Calculation forms for these analyses are provided in Appendix C. The key intersections operate acceptably during the peak hours. Table 4 shows the short range (2017) peak hour operation at the key intersections with full development of the Little Bears Day Care. Calculation forms are provided in Appendix D. The analysis indicated that the key intersections will operate at acceptable levels of service during both the morning and afternoon peak hours. Geometry The short range (2017) geometry will remain as it exists today. No additional auxiliary lanes are required. DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES Page 12

16 22/20 22/20 Coloradoan Site Access 19/22 20/23 12/14 8/9 13/12 9/8 Riverside McHugh AM/PM SITE GENERATED PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES Little Bears Day Care TIS, May 2012 Page 13

17 19/24 21/25 494/575 24/20 553/534 25/21 0/4 0/2 0/2 Coloradoan Site Access 3/0 475/555 37/45 1/1 544/ /76 34/42 0/0 80/117 Riverside McHugh AM/PM SHORT RANGE (2017) TOTAL PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES Little Bears Day Care TIS, May 2012 Page 14

18 TABLE 3 Short Range (2017) Background Peak Hour Operation Intersection Movement Level of Service AM PM EB LT/T/RT B C Riverside/McHugh-Coloradoan WB LT/T/RT A C (stop sign) NB LT A A SB LT A A Riverside/Site Access EB LT/RT B B (stop sign) NB LT A A TABLE 4 Short Range (2017) Total Peak Hour Operation Intersection Movement Level of Service AM PM EB LT/T/RT C C Riverside/McHugh-Coloradoan WB LT/T/RT A C (stop sign) NB LT A A SB LT A A Riverside/Site Access EB LT/RT B B (stop sign) NB LT A A DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES Page 15

19 Pedestrian Level of Service Appendix E shows a map of the area that is within 1320 feet of Little Bears Day Care. The Little Bears Day Care site is located within an area termed as other, which sets the level of service threshold at LOS C for all measured factors. There are five destination areas within 1320 feet of the proposed Little Bears Day Care: 1) the Coloradoan, 2) the residential neighborhood to the southeast, 3) PVH Lemay Campus, 4) the residential neighborhood to the west, and 5) the commercial uses along Lemay Avenue. In most cases, sidewalks are completed within the pedestrian influence area. Appendix E contains a Pedestrian LOS Worksheet. Bicycle Level of Service Appendix E contains a map of the bicycle influence area that is within 1320 feet of Little Bears Day Care. Based upon Fort Collins bicycle LOS criteria, there is one destination area within 1320 feet of Little Bears Day Care. This is 1) the commercial uses along Lemay Avenue. A bicycle LOS worksheet is provided in Appendix E. The bicycle level of service is acceptable. Transit Level of Service Currently, there is no Transfort service along Riverside Avenue in this area of Fort Collins. The nearest Transfort route is Route 5, which operates along Lemay Avenue. Lemay Avenue is within 0.25 miles of the Little Bears Day Care site. The Fort Collins Transit System Map shows that Lemay Avenue will have high frequency (20 minute) transit service in the future. Transit future level of service will be acceptable. DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES Page 16

20 IV. CONCLUSIONS/RECOMMENDATIONS This study assessed the impacts of the Little Bears Day Care development on the short range (2017) street system in the vicinity of the proposed development. Little Bears is a day care development located in the northwest quadrant of the Riverside/McHugh intersection in Fort Collins, Colorado. As a result of this analysis, the following is concluded: The development of Little Bears Day Care is feasible from a traffic engineering standpoint. At full development, Little Bears Day Care will generate approximately 465 daily trip ends, 83 morning peak hour trip ends, and 85 afternoon peak hour trip ends. Current operation at the key intersections is acceptable. In the short range (2017) future, given development of Little Bears Day Care and an increase in background traffic, the key intersections operate acceptably during the peak hours. No additional auxiliary lanes are required at the Riverside/Site Access intersection. Acceptable level of service is achieved for pedestrian, bicycle, and transit modes based upon the measures in the multi-modal transportation guidelines. DELICH Little Bears Day Care TIS, May 2012 ASSOCIATES Page 17

21 APPENDIX A

22

23 Mulberry Riverside Elizabeth Lemay McHugh SCALE: 1"=500' SITE LOCATION Figure 1 DELICH ASSOCIATES Little Bears Day Care TIS, April 2012 Page 3

24 SCALE: 1"=40' SITE PLAN Figure 3 DELICH ASSOCIATES Little Bears Day Care TIS, April 2012 Page 7

25 Code Use Size TABLE 2 Trip Generation AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out 220 Day Care 104 Students Larimer County Urban Area Street Standards January 2, 2001

26 McHugh 50% Coloradoan Site Access 30% Riverside McHugh 20% Elizabeth TRIP DISTRIBUTION Figure 2 DELICH ASSOCIATES Little Bears Day Care TIS, April 2012 Page 5

27 22/20 22/20 Coloradoan Site Access 19/22 20/23 12/14 8/9 13/12 9/8 Riverside McHugh AM/PM SITE GENERATED PEAK HOUR TRAFFIC Figure 2 DELICH ASSOCIATES Little Bears Day Care TIS, April 2012 Page 5

28 Mulberry Riverside Lemay Elizabeth McHugh SCALE: 1"=500' PEDESTRIAN INFLUENCE AREA DELICH ASSOCIATES Little Bears Day Care TIS, April 2012

29 Mulberry Riverside Lemay Elizabeth McHugh SCALE: 1"=500' BICYCLE INFLUENCE AREA DELICH ASSOCIATES Little Bears Day Care TIS, April 2012

30 ! " #$ $%%&'$ ()*!!" (01,2(0 +,-.-/ /1-3,234)3'-)553, )-,4)33.-,326% ) ,32 1) ,32 )(5 (,)+12 %417 9,)+12-3.:(0 )(5 )(5 #73, )(5 )(5 -)6,1) )(5 )(5 (,)6:,) 55 " " " " " " "* * * * " ""* " "* "* " " " " " " " " " " " "! " *" " *" " ** " "" ' ; ; ; 6( *" " " "* * " " ** " """ * " " "* * *" * " " "* * " " " * *! * " " * " "* * " "" ' ; ;* ;* ;

31 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO Phone: (970) TABULAR SUMMARY OF VEHICLE COUNTS Date: Observer: Joe Day: Tuesday Jurisdiction: Fort Collins R = right turn Intersection: Riverside/Driveway S = straight L = left turn Time Northbound: Riverside Southbound: Riverside Total Eastbound: Driveway Westbound: Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7: : : : : : :30-8: PHF n/a 4: : : : : : :30-5: PHF n/a

32 APPENDIX B

33 HCM Unsignalized Intersection Capacity Analysis Recent AM 3: McHugh & Riverside Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 1 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS B A A A Approach Delay (s) Approach LOS B A Intersection Summary Average Delay 1.9 Intersection Capacity Utilization 33.6% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

34 HCM Unsignalized Intersection Capacity Analysis Recent PM 3: McHugh & Riverside Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 1 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS B B A Approach Delay (s) Approach LOS B B Intersection Summary Average Delay 2.1 Intersection Capacity Utilization 37.5% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

35 HCM Unsignalized Intersection Capacity Analysis Recent AM 6: Site Access & Riverside Movement EBL EBR NBL NBT SBT SBR Lane Configurations Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Median storage veh) 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol 497 vc2, stage 2 conf vol 267 vcu, unblocked vol tc, single (s) tc, 2 stage (s) 5.8 tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS B A Approach Delay (s) Approach LOS B Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 23.7% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

36 HCM Unsignalized Intersection Capacity Analysis Recent PM 6: Site Access & Riverside Movement EBL EBR NBL NBT SBT SBR Lane Configurations Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Median storage veh) 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol 611 vc2, stage 2 conf vol 270 vcu, unblocked vol tc, single (s) tc, 2 stage (s) 5.8 tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS B A Approach Delay (s) Approach LOS B Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 24.4% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

37 UNSIGNALIZED INTERSECTIONS Average Total Delay Level-of-Service sec/veh A < 10 B > 10 and < 15 C > 15 and < 25 D > 25 and < 35 E > 35 and < 50 F > 50

38 Table 4-3 Fort Collins (City Limits) Motor Vehicle LOS Standards (Intersections) Land Use (from structure plan) Intersection type Signalized intersections (overall) Other corridors within: Low density Commercial Mixed use mixed use All other corridors districts residential areas D E* D D Any Leg E E D E Any Movement E E D E Stop sign control N/A F** F** E (arterial/collector or local any approach leg) Stop sign control (collector/local any approach leg) N/A C C C * mitigating measures required ** considered normal in an urban environment

39 APPENDIX C

40 HCM Unsignalized Intersection Capacity Analysis Short Bkgrd AM 3: McHugh & Riverside Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 1 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS B A A A Approach Delay (s) Approach LOS B A Intersection Summary Average Delay 2.2 Intersection Capacity Utilization 37.1% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

41 HCM Unsignalized Intersection Capacity Analysis Short Bkgrd PM 3: McHugh & Riverside Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 1 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS C C A Approach Delay (s) Approach LOS C C Intersection Summary Average Delay 2.5 Intersection Capacity Utilization 42.0% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

42 HCM Unsignalized Intersection Capacity Analysis Short Bkgrd AM 6: Site Access & Riverside Movement EBL EBR NBL NBT SBT SBR Lane Configurations Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Median storage veh) 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol 556 vc2, stage 2 conf vol 294 vcu, unblocked vol tc, single (s) tc, 2 stage (s) 5.8 tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS B A Approach Delay (s) Approach LOS B Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 25.3% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

43 HCM Unsignalized Intersection Capacity Analysis Short Bkgrd PM 6: Site Access & Riverside Movement EBL EBR NBL NBT SBT SBR Lane Configurations Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Median storage veh) 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol 676 vc2, stage 2 conf vol 296 vcu, unblocked vol tc, single (s) tc, 2 stage (s) 5.8 tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS B A Approach Delay (s) Approach LOS B Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 25.9% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

44 APPENDIX D

45 HCM Unsignalized Intersection Capacity Analysis Short Total AM 3: McHugh & Riverside Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 1 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS C A A A Approach Delay (s) Approach LOS C A Intersection Summary Average Delay 2.4 Intersection Capacity Utilization 38.2% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

46 HCM Unsignalized Intersection Capacity Analysis Short Total PM 3: McHugh & Riverside Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 1 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS C C A Approach Delay (s) Approach LOS C C Intersection Summary Average Delay 2.7 Intersection Capacity Utilization 44.0% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

47 HCM Unsignalized Intersection Capacity Analysis Short Total AM 6: Site Access & Riverside Movement EBL EBR NBL NBT SBT SBR Lane Configurations Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Median storage veh) 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol 569 vc2, stage 2 conf vol 340 vcu, unblocked vol tc, single (s) tc, 2 stage (s) 5.8 tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS B A Approach Delay (s) Approach LOS B Intersection Summary Average Delay 0.7 Intersection Capacity Utilization 30.8% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

48 HCM Unsignalized Intersection Capacity Analysis Short Total PM 6: Site Access & Riverside Movement EBL EBR NBL NBT SBT SBR Lane Configurations Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Median storage veh) 1 Upstream signal (ft) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol 688 vc2, stage 2 conf vol 340 vcu, unblocked vol tc, single (s) tc, 2 stage (s) 5.8 tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS B A Approach Delay (s) Approach LOS B Intersection Summary Average Delay 0.7 Intersection Capacity Utilization 27.5% ICU Level of Service A Analysis Period (min) 15 Michael Delich Synchro 6 Matthew J. Delich, P. E. 5/10/2012

49 APPENDIX E

50 Mulberry Riverside Lemay Elizabeth McHugh SCALE: 1"=500' PEDESTRIAN INFLUENCE AREA DELICH ASSOCIATES Little Bears Day Care TIS, April 2012

51 Pedestrian LOS Worksheet Description of Applicable Destination Area Within 1320 Destination Area Classification Project Location Classification: Other Level of Service (minimum based on project location classification) Directness Continuity Street Crossings Visual Interest & Amenities Minimum C C C C C 1 Coloradoan Commercial Actual B C C C C Security Proposed B C C C C Minimum C C C C C 2 Neighborhood to the SE Residential Actual B C B C B Proposed B C B C B Minimum C C C C C 3 PVH Lemay Campus Commercial Actual B C B B B Proposed B C B B B Minimum C C C C C Neighborhood to the 4 Residential Actual C C C C C west Proposed C C C C C Minimum C C C C C Commercial uses along 5 Commercial Actual C C C C C Lemay Avenue Proposed C C C C C Minimum 6 Actual Proposed Minimum 7 Actual Proposed Minimum 8 Actual Proposed Minimum 9 Actual Proposed Minimum 10 Actual Proposed

52 Mulberry Riverside Lemay Elizabeth McHugh SCALE: 1"=500' BICYCLE INFLUENCE AREA DELICH ASSOCIATES Little Bears Day Care TIS, April 2012

53 Bicycle LOS Worksheet Level of Service Connectivity Minimum Actual Proposed Base Connectivity: C B B Specific connections to priority sites: 1 Description of Applicable Destination Area Within 1320 Commercial uses along Lemay Avenue Destination Area Classification Commercial C B B 2 3 4

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. CastleGlenn Consultants Inc. Engineers, Project Managers & Planners March 11 th, 2013 Domenic Idone, P. Eng Planning Manager R.W. Tomlinson Ltd. 5597 Power Road Ottawa, Ontario K1G 3N4 Dear Mr. Idone:

More information

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) 116 20 8 405 137 56 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.81 0.81 0.67 0.67 0.89 0.89 Hourly flow

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA (St. Tammany Parish Mandeville, LA) Prepared For The Pittman Companies Michael N Pittman, MD 328 East Boston St Covington, LA 70433

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

Wellington Street West

Wellington Street West Transportation Brief prepared for: 185 Davenport Road Suite 300 Toronto, ON M5R 1J1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 November 5, 2013 TO3131TOH Transportation Brief November

More information

267 O Connor Street Residential Development

267 O Connor Street Residential Development M a y 2014 267 O Connor Street Residential Development Transportation Brief Google 2014 Bing 2014 Prepared for: MASTERCRAFT STARWOOD Prepared by: Study 267 O'Connor Type Street May 2014 Study Residential

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure MMM Group Limited Traffic Study CASA MIA Community Care Facility Vancouver, BC Communities Transportation Buildings Infrastructure February 2013 5011001-033 STANDARD LIMITATIONS This report was prepared

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

(A) Project Manager, Infrastructure Approvals

(A) Project Manager, Infrastructure Approvals February 14th, 2014 BY E-MAIL: wally.dubyk@ottawa.ca City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor, Ottawa, Ontario K1P 1J1 Attention: Wally Dubyk, C.E.T (A) Project

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings TECHNICAL MEMORANDUM Summary of Findings Date: June 17, 2014 Project #: 17121.15 To: Si Lau, P.E.; City of Oakland, CA From: Erin Ferguson, P.E.; Aaron Elias, P.E.; Daphne Dethier; and Mark Bowman, P.E.;

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 March 2015 Prepared for Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 JRL consulting JRL consulting TABLE OF CONTENTS 1 INTRODUCTION... 2 1.1 BACKGROUND... 2 2 EXISTING

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

Dartmouth, NS B3B 1X7 Tel: WSP. Canada Inc.

Dartmouth, NS B3B 1X7 Tel: WSP. Canada Inc. Traffic Impact Study: Proposed Residential Development Herring Cove Road Halifax, NS Presented to: FH Construction Ltd. 1 Spectacle Lake Drive Dartmouth, NS B3B 1X7 Tel: 902 835 9955 Fax: 902 835 1645

More information

770 SOMERSET STREET RESIDENTIAL DEVELOPMENT

770 SOMERSET STREET RESIDENTIAL DEVELOPMENT Downtown North York by PFHLai / CC-BY-3. September 217 77 SOMERSET STREET RESIDENTIAL DEVELOPMENT Transportation Impact Assessment 77 Somerset Street Residential Development Transportation Impact Assessment

More information

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc.

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc. TRANSPORTATION ANALYSIS Wawa US 441 and Morningside Drive Prepared for: Brightwork Real Estate, Inc. TABLE OF CONTENTS Introduction... 1 Project Description... 1 Estimated Daily Project Traffic... 3 Estimated

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants TJKM Transportation Consultants Draft Report Traffic Impact Study for the Residential Development at 4659 Proctor

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

1140 Wellington Street West Transportation Brief

1140 Wellington Street West Transportation Brief 1140 Wellington Street West Transportation Brief October 2013 Study 1140 Wellington Type Street West October 2013 Study Transportation Name Brief February 2011 TB Check List TIS / TB/ CTS Check List prepared

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment MEMORANDUM Date: June 22, 2018 Project #: 21562 To: Colin McArthur, AICP From: Project: Subject: Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by:

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by: 700 Hunt Club Road Transportation Impact Study - Addendum #1 Submitted by: 14 June 2013 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com 14 June 2013

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

Minto Mahogany Stage 2

Minto Mahogany Stage 2 Minto Mahogany Stage 2 Transportation Impact Study prepared for: Minto Developments Inc 200-180 Kent Street Ottawa, ON K1P 0B6 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 June 27, 2017

More information

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825 TRAFFIC IMPACT ANALYSIS FOR RESIDENCE INN PROJECT Davis, CA Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825 Prepared By: KD Anderson & Associates, Inc. 3853 Taylor Road,

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Freeway Weaving and Ramp Junction Analysis

Freeway Weaving and Ramp Junction Analysis TEXAS TECH UNIVERSITY Freeway Weaving and Ramp Junction Analysis Along IH 27 at Plainview, TX Hao Xu, Jared A. Squyres, Wesley Kumfer, and Hongchao Liu 7/15/2011 Table of Contents Project Description...

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

LEMON FLATS SECOND ACCESS

LEMON FLATS SECOND ACCESS LEMON FLATS SECOND ACCESS RECONNAISSANCE STUDY SEPTEMBER 2007 APPENDIX A Synchro Analysis Worksheets HCM Signalized Intersection Capacity Analysis 2005 - Background 3: Anka Street & Lemon Flats Second

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Interstate 80 Corridor Study

Interstate 80 Corridor Study Interstate 80 Corridor Study Final Technical Memorandum 5: Traffic Volumes, Accident Locations and Operational Deficiencies West Verdi (SR 425) Interchange to West McCarran Boulevard (SR 651) and East

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

C. iv) Analysis/Results

C. iv) Analysis/Results The Pettengill Road project is located outside the borders of the model in an external zone. As a result, inserting all Pettengill Road trip generation assumptions into the NRPC model and running a new

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

Appendix B: Traffic Reports

Appendix B: Traffic Reports Appendix B: Traffic Reports 407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION Report Markham Road Station Traffic Study Prepared for Ministry of Transportation, Ontario

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic