1 DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA June 212

2 TABLE OF CONTENTS 1. Introduction... 1 Project Location and Description... 1 Analysis Scenarios... 1 Study Facilities... 1 Data Collection... 1 Traffic Forecasts... 3 Methodology... 3 Significance Criteria and Impacts Existing Conditions... 5 Intersection Operations... 5 Bicycle and Pedestrian Facilities Project Conditions... 8 Trip Generation... 8 Trip Distribution Existing Plus Project Conditions Intersection Operations Bicycle and Pedestrian Facilities Cumulative Conditions Cumulative No Project Conditions Cumulative Plus Project Conditions APPENDICES Appendix A: Traffic Volume Count Data Appendix B: Level of Service Calculations Sheets

3 LIST OF FIGURES Figure 1 Project Location and Study Intersections... 2 Figure 2 Existing Conditions Peak Hour Traffic Volumes and Lane Configurations... 6 Figure 3 Project Trip Distribution and Assignment Figure 4 Existing Plus Project Conditions Peak Hour Traffic Volumes and Lane Configurations Figure 5 Cumulative No Project Conditions Peak Hour Traffic Volumes and Lane Configurations Figure 6 Cumulative Plus Project Conditions Peak Hour Traffic Volumes and Lane Configurations LIST OF TABLES Table 1 Level of Service Definitions Signalized Intersections... 4 Table 2 Intersection Delay / Level of Service Existing Conditions... 5 Table 3 Existing Bicycle and Pedestrian Volumes... 7 Table 4 Trip Generation Rates Per Resident... 8 Table 5 Trip Generation Estimates... 9 Table 6 Intersection Delay / Level of Service Existing Plus Project Conditions Table 7 Intersection Delay / Level of Service Cumulative No Project Conditions Table 8 Intersection Delay / Level of Service Cumulative Plus Project Conditions... 15

4 Transportation Impact Study - Draft Castilian Redevelopment Project June INTRODUCTION The purpose of this study is to evaluate the potential transportation impacts of the Castilian Redevelopment Project, and identify improvements needed to mitigate deficiencies caused by the project. PROJECT LOCATION AND DESCRIPTION The Castilian Redevelopment Project will replace the vacant Castilian North and Castilian South student housing, a 5 unit complex for incoming freshman and transfer students being demolished due to seismic deficiencies, with housing for up to 275 graduate students. The proposed project is located north of Russell Boulevard, between State Route (SR) 113 and Wake Forest Drive - West 8 th Street, on the UC Davis campus. The project location is shown on Figure 1. ALYSIS SCERIOS The following scenarios were analyzed as part of this study: Existing Conditions Existing Plus Project Conditions Cumulative No Project Conditions Cumulative Plus Project Conditions STUDY FACILITIES Vehicle level of service was analyzed at the following study intersections (shown on Figure 1): 1. Russell Boulevard/State Route (SR) 113 Southbound () Ramps 2. Russell Boulevard/State Route (SR) 113 Northbound () Ramps 3. Russell Boulevard/Sycamore Lane 4. Russell Boulevard/Anderson Road La Rue Road DATA COLLECTION Study Intersections Intersection counts including vehicle turning movements, bicycle volumes, and pedestrian volumes were collected at the study intersections on October 26, 211 as part of the UC Davis Long Range Development Plan (LRDP) Mitigation Monitoring Program Update (Fehr & Peers, 211). The counts were collected during the AM (7: AM to 9: AM) and PM (4: PM to 6: PM) peak periods when school was in session. The counts show that the AM and PM vehicle peak hours occur from 8: AM to 9: AM and 5: PM to 6: PM, respectively. 1

5 Oeste Dr Mulberry Ln Linden Ln Anderson Rd S C am p u s W ay! 1! 2! 3! 4 H aw thor n L n Parkway Cir W ake Fo re st D r Oxford Cir Castilian Redevelopment Project PROJECT VICINITY FIGURE 1 8th St Sycamore Ln Orchard Park Dr Orchard Park Cir Guava Ln Acacia Ln Arthur St Barkley St Adams St Buchanan St Cleveland St Coolidge St C:\Projects\Castillian\GIS\MXD\fig1_vicinity.mxd Project Location Not to Scale

6 Transportation Impact Study - Draft Castilian Redevelopment Project June 212 Trip Generation Counts Traffic volumes data was collected at the driveways of the Colleges at La Rue student housing complex at UC Davis to develop trip generation rates for the proposed project. The Colleges at La Rue has three driveways serving its designated parking spaces. Residents also park along Orchard Park Drive adjacent to the housing complex. Video cameras recorded vehicles entering and exiting the driveways and on-street parking spaces on Orchard Park Drive for a 24-hour period on May 15, 212. Manual counts (recorded by a person) were conducted during the AM (7: AM to 9: AM) and PM (4: PM to 6: PM) peak periods as well, to verify and calibrate the video data. The camera recording the on-street parking spaces did not capture the all of the traffic entering and exiting the spaces and was adjusted based on the manual count data. TRAFFIC FORECASTS Cumulative intersection turning movement forecasts were developed for the study locations using an updated version of the Davis Travel Demand Model. The assumed cumulative land uses for UC Davis were consistent with those assumed for the UC Davis 23 Long Range Development Plan Final Environmental Impact Report (23 LRDP EIR). The horizon year for the 23 LRDP EIR is the 215/16 academic year; however, it is unlikely that full buildout of the 23 LRDP EIR land uses will occur by the 215/16 academic year. The model included the most recent land use assumptions for the City of Davis based on the City of Davis General Plan. The difference method, which adds the difference between the base and future year model runs to existing counts, was used to develop the cumulative turning movement forecasts. METHODOLOGY Transportation engineers and planners commonly use the term level of service (LOS) to measure and describe the operational status of the local roadway network. An intersection or roadway segment s level of service can range from LOS A (indicating free-flow traffic conditions with little or no delay), to LOS F (representing oversaturated conditions where traffic flows exceed design capacity, resulting in long queues and delays). The study intersections were analyzed using the methodology presented in the Transportation Research Board s Highway Capacity Manual (HCM) 2. The 21 Highway Capacity Manual includes minor updates to the HCM 2 methodologies for signalized intersections; however, these updates do not affect the analysis results for intersections in this study. Therefore, at signalized intersections, the HCM 2 methodology was used. Signalized Intersection Analysis The HCM 2 methodology determines the level of service (LOS) at signalized intersections by comparing the average control delay (i.e. delay resulting from initial deceleration, queue move-up time, time actually stopped, and final acceleration) per vehicle at the intersection to the thresholds shown in Table 1. 3

7 Transportation Impact Study - Draft Castilian Redevelopment Project June 212 TABLE 1 LEVEL OF SERVICE DEFINITIONS SIGLIZED INTERSECTIONS Level of Service Control Delay (seconds per vehicle) A 1. B C D E F >8. Source: 2 Highway Capacity Manual (Transportation Research Board, 2) SIGNIFICANCE CRITERIA AND IMPACTS Based on the UC Davis 23 LRDP EIR, the following significance criteria was used to identify operational deficiencies, if the proposed project would: Cause the LOS to change from an acceptable level to an unacceptable level. The following LOS thresholds apply to the study intersections: o o LOS D is the minimum acceptable LOS for UC Davis LOS C is the minimum acceptable LOS for SR 113 and its associated interchanges Add 1 or more vehicles to the volume of a study intersection that is currently operating at an unacceptable level For this analysis, LOS C was used as the standard for the Russell Boulevard/SR 113 Ramps and Russell Boulevard/SR 113 Ramps intersections (i.e. LOS A, B, and C are considered acceptable operations, while LOS D, E, and F are considered unacceptable operations), and LOS D was used as the standard for the Russell Boulevard/Sycamore Lane and Russell Boulevard/Anderson Road intersections (i.e. LOS A, B, C, and D are considered acceptable operations, while LOS E and F are considered unacceptable operations). 4

8 Transportation Impact Study - Draft Castilian Redevelopment Project June EXISTING CONDITIONS This section describes the existing conditions of the roadway, bicycle, and pedestrian facilities in the study area. INTERSECTION OPERATIONS Existing conditions intersection level of service analysis was performed using SimTraffic microsimulation software which utilizes HCM 2 methodology. SimTraffic results are a product of a simulation that is designed to represent real-life drivers to the best extent possible; therefore, each simulation run represents a unique set of data. The results are based on an average of 1 runs. Figure 2 shows the existing, peak hour, vehicle traffic volumes and lane configurations at the study intersections. All of the study intersections are signalized. Table 2 shows the existing delay and level of service at the study intersections. TABLE 2 INTERSECTION DELAY / LEVEL OF SERVICE EXISTING CONDITIONS Intersection Control AM Peak Hour PM Peak Hour Delay LOS 1 Delay LOS 1./SR 113 Ramps Signal 9 A 7 A./SR 113 Ramps Signal 13 B 19 B./Sycamore Ln. Signal 19 B 22 C./Anderson Rd.-La Rue Rd. Signal 23 C 26 C Notes: 1 Intersection delay is reported in seconds per vehicle, and is based on the average of all approaches signalized intersections per HCM methodology. Bold text indicates unacceptable operations. Source: Fehr & Peers, 212 As shown in Table 2, the study intersections operate at acceptable levels of service during the AM and PM peak hours. 5

9 Mulberry Ln Acacia Ln 8th St Linden Ln Adams St Project Location Sycamore Ln Hawthorn Ln Anderson Rd Cleveland St Buchanan St Arthur St Guava Ln Wake Forest Dr Oxford Cir! 1! 2! 3! 4 Orchard Park Dr Parkway Cir Orchard Park Cir 1. /SR 113 Ramps 2. /SR 113 Ramps 3. /Sycamore Ln 4. /Anderson Rd 485 (431) 449 (18) 38 (72) () 186 (117) bf ccf ccf 21 (178) 36 (875) 51 (44) 62 (54) ce acc 51 (29) 419 (635) bf 151 (418) 3 (2) 225 (174) 18 (191) 617 (521) 214 (178) 75 (87) af ce acc 37 (6) 38 (67) 66 (59) 29 (183) 144 (171) 82 (75) 58 (463) 12 (7) ace èìëí èìëí èìëí èìëí SR 113 On-Ramp SR 113 Off-Ramp Sycamore Ln Anderson Rd aaccf accf accf 49 (154) 6 (38) 111 (37) 44 (16) 219 (66) 187 (212) LEGEND a Turn Lane AM (PM)! 1 èìëí Peak Hour Traffic Volume Study Intersection Traffic Signal Path: S:\GIS_Library\IntersectionVolume\MXD\Letter_Portrait_4INT.mxd Castilian Redevelopment Project PEAK HOUR TRAFFIC VOLUMES AND LANE CONFIGURATIONS - EXISTING CONDITIONS FIGURE 2

10 Transportation Impact Study - Draft Castilian Redevelopment Project June 212 BICYCLE AND PEDESTRIAN FACILITIES Class I shared-use paths exist on the south side of Russell Boulevard through the entire study area, on the north side of Russell Boulevard between Orchard Circle Park and Sycamore Lane, and on the west side of La Rue Road south of Russell Boulevard. Class II bicycle lanes exist on Sycamore Lane and Anderson Road north of Russell Boulevard. Sidewalks exist on the north side of Russell Boulevard through entire study area with the exception of the section between Orchard Circle Park and Sycamore Lane, which has a shared-use path. Sidewalks also exist on both sides of Sycamore Lane and Anderson Road-La Rue Road. The Russell Boulevard/SR 113 Ramps and Russell Boulevard/SR 113 Ramps intersections have crosswalks on the north and south legs of the intersections (eastbound and westbound). Crosswalks are also located on all vehicle approaches of the Russell Boulevard/Sycamore Lane and Russell Boulevard/Anderson Road intersections. Bicycle and Pedestrian Volumes Bicycle and pedestrian volumes were collected at the study intersections during the AM and PM peak periods. Table 3 shows the volumes at each study intersection. TABLE 3 EXISTING BICYCLE AND PEDESTRIAN VOLUMES Intersection Bicycle Volume Pedestrian Volume AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour./SR 113 Ramps /SR 113 Ramps /Sycamore Ln /Anderson Rd.-La Rue Rd Source: Fehr & Peers, 212 The Russell Boulevard/Sycamore Lane intersection provides direct access to the shared-use path on the south side of Russell Boulevard, and has a bicycle only signal phase. The Russell Boulevard/Anderson Road-La Rue Road intersection has a dedicated southbound left turn lane for cyclists that connects to the southeast corner of the intersection, allowing access to the shared-use path on the south side of Russell Boulevard. 7

11 Transportation Impact Study - Draft Castilian Redevelopment Project June PROJECT CONDITIONS TRIP GENERATION Vehicle trip generation estimates were developed for the proposed Castilian Redevelopment Project based on 275 graduate student residents. The Colleges at La Rue is another student housing complex on the UC Davis campus with similar characteristics to the proposed project. Vehicle trip generation counts were conducted at the Colleges at La Rue to develop trip generation rates for the Castilian project. The Colleges at La Rue has three driveways that serve its designated parking spaces. Residents also park along Orchard Park Drive adjacent to the housing complex. Video cameras recorded vehicles entering and exiting the driveways and on-street parking spaces on Orchard Park Drive for a 24-hour period. Manual counts (recorded by a person) were conducted during the AM and PM peak periods to verify and calibrate the video data. Table 4 shows the trip generation rates developed based on the count data. TABLE 4 TRIP GENERATION RATES PER RESIDENT Time Total Rate Percent In Percent Out Daily % 5% AM Peak Hour.7 52% 48% PM Peak Hour.16 49% 51% Notes: Trip generation rates were developed based on count data collected at the Colleges at La Rue student housing. Source: Fehr & Peers, 212 The trip rates shown in Table 4 are reflective of the fact that UC Davis has a high percentage of travelers who use alternative modes of travel (e.g. walking, bicycling, transit, etc.) Based on surveys conducted in the fall of 211, the following percentages of students/faculty/staff living in the City of Davis or on the UC Davis campus use alternatives modes of travel: Bicycle 7% Transit 19% Auto Driver 11% The trip generation rates in Table 3 were developed using data from a student housing complex at UC Davis, and therefore inherently account for alternative modes of travel. The rates shown above provide trip generation estimates for vehicle trips only. Table 5 shows the daily, AM, and PM peak hour trip generation estimates based on 275 residents. 8

12 Transportation Impact Study - Draft Castilian Redevelopment Project June 212 TABLE 5 TRIP GENERATION ESTIMATES Land Use Size Daily Trips Total AM Trips AM Trips In/Out Total PM Trips PM Trips In/Out Student Housing 275 Residents / / 23 Notes: Trip generation estimates account for vehicle trips only. The trip generation rates were developed based on count data collected at the Colleges at La Rue student housing and inherently account for alternative mode reductions. Source: Fehr & Peers, 212 The proposed Castilian student housing is expected to generate approximately 6 daily, 2 AM peak hour, and 45 PM peak hour vehicle trips. Based on the alternative mode percentages from the travel survey collected in fall 211, the project is estimated to generate the following bicycle, pedestrian, and transit trips: Bicycle: AM 12, PM 18, Daily 3,78 Transit: AM 3, PM 75, Daily 1,3 TRIP DISTRIBUTION Project generated traffic volumes were distributed to the surrounding roadway network based on existing travel patterns in the area and the locations of complimentary land uses. The Davis Travel Demand Model was used to develop an initial trip distribution assignment for the project and adjustments were made based on existing traffic volume data and local knowledge of the area. Project generated trips were distributed to the study intersections based on the following: 1% to/from north of SR 113 3% to/from south on SR 113 1% to/from Russell Boulevard west of SR % to/from north on Sycamore Lane toward Covell Boulevard 5% to/from north on Anderson Road toward Covell Boulevard 5% to/from east on 8th Street toward F Street 35% to/from east on Russell Boulevard toward F Street 25% to/from south on La Rue Road 9

13 Transportation Impact Study - Draft Castilian Redevelopment Project June 212 1% to/from the shopping center north of Russell Boulevard between Sycamore Lane and Anderson Road (Trader Joe s) Figure 3 shows the project trip distribution and assignment. 1

14 Adams St å ST 1% Acacia Ln Project Location å ST 15% Sycamore Ln 8th St Hawthorn Ln Mulberry Ln Linden Ln å ST 5% Anderson Rd åst 5% Cleveland St Buchanan St Arthur St å ST 1%! 1! 2 Guava Ln Wake Forest Dr Oxford Cir! 3 å ST 1% ST 35%! 4 å Orchard Park Dr Parkway Cir å ST 25% å ST 3% Orchard Park Cir 1. /SR 113 Ramps 2. /SR 113 Ramps 3. /Sycamore Ln 4. /Anderson Rd () () () () () bf ccf ccf èìëí èìëí èìëí èìëí SR 113 On-Ramp (1) () () () ce acc SR 113 Off-Ramp () (1) bf () () (1) (1) () (1) 6 (11) af Sycamore Ln ce acc 8 (12) () () (1) (2) () 3 (6) 3 (5) ace Anderson Rd aaccf accf accf 3 (5) (1) () (2) 4 (5) () LEGEND a Turn Lane AM (PM)! 1 èìëí å Project Peak Hour Traffic Volume Study Intersection Traffic Signal Trip Distribution Path: S:\GIS_Library\IntersectionVolume\MXD\Letter_Portrait_4INT.mxd Castilian Redevelopment Project PROJECT TRIP DISTRIBUTION AND ASSIGNMENT FIGURE 3

15 Transportation Impact Study - Draft Castilian Redevelopment Project June EXISTING PLUS PROJECT CONDITIONS INTERSECTION OPERATIONS Project generated traffic volumes were added to the existing traffic volumes at the study intersections for existing plus project conditions analysis. Table 6 shows the intersection level of service results. Figure 4 shows the existing plus project conditions traffic volumes. TABLE 6 INTERSECTION DELAY / LEVEL OF SERVICE EXISTING PLUS PROJECT CONDITIONS Existing Existing Plus Project Intersection Control AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Delay LOS 1 Delay LOS 1 Delay LOS 1 Delay LOS 1./SR 113 Ramps Signal 9 A 7 A 1 A 7 A./SR 113 Ramps Signal 12 B 19 B 12 B 2 B./Sycamore Ln. Signal 19 B 22 C 19 B 25 C./Anderson Rd.-La Rue Rd. Signal 23 C 26 C 25 C 28 C Notes: 1 Intersection delay is reported in seconds per vehicle, and is based on the average of all approaches signalized intersections per HCM methodology. Source: Fehr & Peers, 212 As shown in Table 6, the proposed project is not expected to change the level of service at the study intersections. BICYCLE AND PEDESTRIAN FACILITIES The proposed Castilian Redevelopment Project will increase traffic on roadways. Where bicyclists share the road with vehicles, increased traffic will impact conditions for bicyclists. Added roadway traffic will impact conditions for pedestrians, especially at uncontrolled crossings. However, because the amount of traffic added by the project is small, the impact is considered less-than-significant. 12

16 Mulberry Ln Acacia Ln 8th St Linden Ln Adams St Project Location Sycamore Ln Hawthorn Ln Anderson Rd Cleveland St Buchanan St Arthur St Guava Ln Wake Forest Dr Oxford Cir! 1! 2! 3! 4 Orchard Park Dr Parkway Cir Orchard Park Cir 1. /SR 113 Ramps 2. /SR 113 Ramps 3. /Sycamore Ln 4. /Anderson Rd 485 (431) 449 (18) 38 (72) () 186 (117) bf ccf ccf èìëí èìëí èìëí èìëí SR 113 On-Ramp 21 (179) 36 (875) 51 (44) 62 (54) () ce acc SR 113 Off-Ramp 51 (29) 419 (636) bf 151 (418) 3 (2) 225 (175) 18 (192) 617 (521) 214 (179) 81 (98) af Sycamore Ln ce acc 45 (72) 38 (67) 66 (59) 29 (184) 144 (173) 82 (75) 511 (469) 15 (75) ace Anderson Rd aaccf accf accf 52 (159) 6 (39) 111 (37) 44 (18) 223 (611) 187 (212) LEGEND a Turn Lane AM (PM)! 1 èìëí Peak Hour Traffic Volume Study Intersection Traffic Signal Path: S:\GIS_Library\IntersectionVolume\MXD\Letter_Portrait_4INT.mxd Castilian Redevelopment Project PEAK HOUR TRAFFIC VOLUMES AND LANE CONFIGURATIONS - EXISTING PLUS PROJECT CONDITIONS FIGURE 4

17 Transportation Impact Study - Draft Castilian Redevelopment Project June CUMULATIVE CONDITIONS Two cumulative conditions scenarios were analyzed: Cumulative No Project Cumulative Plus Project CUMULATIVE NO PROJECT CONDITIONS Traffic Forecasts Traffic volume forecasts for the cumulative no project scenario were prepared using the Davis Travel Demand Model via the difference method, which adds the difference between the base and future year model runs to the existing traffic volumes at the study intersections. The land use data in the travel demand model assumes that the existing Castilian buildings are operational and generate traffic. To provide an accurate estimate of cumulative no project conditions forecasts, the land use values associated with the existing Castilian buildings were removed before the model was run to represent the vacant buildings. Figure 5 shows the cumulative no project peak hour traffic volumes and lane configurations. Roadway Network No changes are expected on the study roadway segments or intersections for the cumulative conditions analysis. Intersection Operations Intersection level of service analysis was performed for the study intersections based on the cumulative no project traffic volume forecasts. Table 7 shows the results. 14

18 Transportation Impact Study - Draft Castilian Redevelopment Project June 212 TABLE 7 INTERSECTION DELAY / LEVEL OF SERVICE CUMULATIVE NO PROJECT CONDITIONS Intersection Control AM Peak Hour PM Peak Hour Delay LOS 1 Delay LOS 1./SR 113 Ramps Signal 1 A 7 A./SR 113 Ramps Signal 14 B 33 C./Sycamore Ln. Signal 22 C 36 D./Anderson Rd.-La Rue Rd. Signal 33 C 5 D Notes: 1 Intersection delay is reported in seconds per vehicle, and is based on the average of all approaches signalized intersections per HCM methodology. Bold text indicates unacceptable operations. Source: Fehr & Peers, 212 As shown in Table 7, the study intersections are expected to operate at acceptable levels of service under cumulative no project conditions. CUMULATIVE PLUS PROJECT CONDITIONS Intersection Operations Project generated traffic volumes were added to the cumulative no project forecasts for cumulative plus project conditions intersection level of service analysis. Table 8 shows the results. Figure 6 shows the cumulative plus project conditions traffic volumes. TABLE 8 INTERSECTION DELAY / LEVEL OF SERVICE CUMULATIVE PLUS PROJECT CONDITIONS Intersection Control Cumulative No Project Cumulative Plus Project AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Delay LOS 1 Delay LOS 1 Delay LOS 1 Delay LOS 1./SR 113 Ramps Signal 9 A 7 A 9 A 7 A./SR 113 Ramps Signal 14 B 33 C 14 B 35 C./Sycamore Ln. Signal 22 C 36 D 23 C 43 D./Anderson Rd.-La Rue Rd. Signal 33 C 5 D 38 D 53 D Notes: 1 Intersection delay is reported in seconds per vehicle, and is based on the average of all approaches signalized intersections per HCM methodology. Bold text indicates unacceptable operations. Source: Fehr & Peers, 212 As shown in Table 8, the proposed project is not expected to change the level of service at the study intersections under cumulative plus project conditions. 15

19 Mulberry Ln Acacia Ln 8th St Linden Ln Adams St Project Location Sycamore Ln Hawthorn Ln Anderson Rd Cleveland St Buchanan St Arthur St Guava Ln Wake Forest Dr Oxford Cir! 1! 2! 3! 4 Orchard Park Dr Parkway Cir Orchard Park Cir 1. /SR 113 Ramps 2. /SR 113 Ramps 3. /Sycamore Ln 4. /Anderson Rd 65 (515) 45 (295) 4 (95) 225 (15) bf ccf ccf èìëí èìëí èìëí èìëí SR 113 On-Ramp 32 (635) 425 (9) 55 (45) 82 (62) ce acc SR 113 Off-Ramp 65 (28) 585 (1,1) bf 16 (435) 5 (5) 42 (36) 19 (22) 1,3 (85) 215 (235) 75 (9) af Sycamore Ln ce acc 45 (6) 555 (1,35) 75 (7) 395 (23) 145 (175) 12 (165) 78 (7) 25 (75) ace Anderson Rd aaccf accf accf 7 (23) 8 (41) 165 (55) 45 (11) 43 (815) 345 (345) LEGEND a Turn Lane AM (PM)! 1 èìëí Peak Hour Traffic Volume Study Intersection Traffic Signal Path: S:\GIS_Library\IntersectionVolume\MXD\Letter_Portrait_4INT.mxd Castilian Redevelopment Project PEAK HOUR TRAFFIC VOLUMES AND LANE CONFIGURATIONS - CUMULATIVE NO PROJECT CONDITIONS FIGURE 5

20 Mulberry Ln Acacia Ln 8th St Linden Ln Adams St Project Location Sycamore Ln Hawthorn Ln Anderson Rd Cleveland St Buchanan St Arthur St Guava Ln Wake Forest Dr Oxford Cir! 1! 2! 3! 4 Orchard Park Dr Parkway Cir Orchard Park Cir 1. /SR 113 Ramps 2. /SR 113 Ramps 3. /Sycamore Ln 4. /Anderson Rd 65 (515) 45 (295) 4 (95) () 225 (15) bf ccf ccf èìëí èìëí èìëí èìëí SR 113 On-Ramp 32 (636) 425 (9) 55 (45) 82 (62) ce acc SR 113 Off-Ramp 65 (28) 585 (1,11) bf 16 (435) 5 (5) 42 (361) 19 (221) 1,3 (85) 215 (236) 81 (11) af Sycamore Ln ce acc 53 (72) 555 (1,35) 75 (7) 395 (231) 145 (177) 12 (165) 783 (76) 28 (8) ace Anderson Rd aaccf accf accf 73 (235) 8 (411) 165 (55) 45 (112) 434 (82) 345 (345) LEGEND a Turn Lane AM (PM)! 1 èìëí Peak Hour Traffic Volume Study Intersection Traffic Signal Path: S:\GIS_Library\IntersectionVolume\MXD\Letter_Portrait_4INT.mxd Castilian Redevelopment Project PEAK HOUR TRAFFIC VOLUMES AND LANE CONFIGURATIONS - CUMULATIVE PLUS PROJECT CONDITIONS FIGURE 6

21 APPENDIX A: TRAFFIC VOLUME COUNT DATA

22 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: SR 113 Ramps -- QC JOB #: CITY/STATE: Davis, CA DATE: Wed, Oct Peak-Hour: 8: AM -- 9: AM Peak 15-Min: 8:35 AM -- 8:5 AM Min Count SR 113 Ramps SR 113 Ramps Period (Northbound) (Southbound) (Eastbound) (Westbound) Hourly Beginning At Total Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Totals 7: AM :5 AM :1 AM :15 AM :2 AM :25 AM :3 AM :35 AM :4 AM :45 AM :5 AM :55 AM : AM :5 AM :1 AM :15 AM :2 AM :25 AM :3 AM :35 AM :4 AM :45 AM :5 AM :55 AM Peak 15-Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Total All Vehicles Heavy Trucks Pedestrians 4 4 Bicycles 1 1 Railroad Stopped Buses Comments: Report generated on 11/21/211 4:19 PM SOURCE: Quality Counts, LLC (

23 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: SR 113 Ramps -- QC JOB #: CITY/STATE: Davis, CA DATE: Wed, Oct Peak-Hour: 5: PM -- 6: PM Peak 15-Min: 5:15 PM -- 5:3 PM Min Count SR 113 Ramps SR 113 Ramps Period (Northbound) (Southbound) (Eastbound) (Westbound) Hourly Beginning At Total Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Totals 4: PM :5 PM :1 PM :15 PM :2 PM :25 PM :3 PM :35 PM :4 PM :45 PM :5 PM :55 PM : PM :5 PM :1 PM :15 PM :2 PM :25 PM :3 PM :35 PM :4 PM :45 PM :5 PM :55 PM Peak 15-Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Total All Vehicles Heavy Trucks Pedestrians 4 4 Bicycles Railroad Stopped Buses Comments: Report generated on 11/21/211 4:19 PM SOURCE: Quality Counts, LLC (

24 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: SR 113 Ramps -- QC JOB #: CITY/STATE: Davis, CA DATE: Wed, Oct Peak-Hour: 7:5 AM -- 8:5 AM Peak 15-Min: 8:35 AM -- 8:5 AM Min Count SR 113 Ramps SR 113 Ramps Period (Northbound) (Southbound) (Eastbound) (Westbound) Hourly Beginning At Total Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Totals 7: AM :5 AM :1 AM :15 AM :2 AM :25 AM :3 AM :35 AM :4 AM :45 AM :5 AM :55 AM : AM :5 AM :1 AM :15 AM :2 AM :25 AM :3 AM :35 AM :4 AM :45 AM :5 AM :55 AM Peak 15-Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Total All Vehicles Heavy Trucks Pedestrians Bicycles 1 1 Railroad Stopped Buses Comments: Report generated on 11/21/211 4:19 PM SOURCE: Quality Counts, LLC (

25 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: SR 113 Ramps -- QC JOB #: CITY/STATE: Davis, CA DATE: Wed, Oct Peak-Hour: 4:55 PM -- 5:55 PM Peak 15-Min: 5:15 PM -- 5:3 PM Min Count SR 113 Ramps SR 113 Ramps Period (Northbound) (Southbound) (Eastbound) (Westbound) Hourly Beginning At Total Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Totals 4: PM :5 PM :1 PM :15 PM :2 PM :25 PM :3 PM :35 PM :4 PM :45 PM :5 PM :55 PM : PM :5 PM :1 PM :15 PM :2 PM :25 PM :3 PM :35 PM :4 PM :45 PM :5 PM :55 PM Peak 15-Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Total All Vehicles Heavy Trucks Pedestrians Bicycles Railroad Stopped Buses Comments: Report generated on 11/21/211 4:19 PM SOURCE: Quality Counts, LLC (

26 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: Sycamore Ln -- QC JOB #: CITY/STATE: Davis, CA DATE: Wed, Oct Peak-Hour: 8: AM -- 9: AM Peak 15-Min: 8:3 AM -- 8:45 AM Min Count Sycamore Ln Sycamore Ln Period (Northbound) (Southbound) (Eastbound) (Westbound) Hourly Beginning At Total Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Totals 7: AM :5 AM :1 AM :15 AM :2 AM :25 AM :3 AM :35 AM :4 AM :45 AM :5 AM :55 AM : AM :5 AM :1 AM :15 AM :2 AM :25 AM :3 AM :35 AM :4 AM :45 AM :5 AM :55 AM Peak 15-Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Total All Vehicles Heavy Trucks Pedestrians Bicycles Railroad Stopped Buses Comments: Report generated on 11/21/211 4:19 PM SOURCE: Quality Counts, LLC (

27 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: Sycamore Ln -- QC JOB #: CITY/STATE: Davis, CA DATE: Wed, Oct Peak-Hour: 5: PM -- 6: PM Peak 15-Min: 5:1 PM -- 5:25 PM Min Count Sycamore Ln Sycamore Ln Period (Northbound) (Southbound) (Eastbound) (Westbound) Hourly Beginning At Total Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Totals 4: PM :5 PM :1 PM :15 PM :2 PM :25 PM :3 PM :35 PM :4 PM :45 PM :5 PM :55 PM : PM :5 PM :1 PM :15 PM :2 PM :25 PM :3 PM :35 PM :4 PM :45 PM :5 PM :55 PM Peak 15-Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Total All Vehicles Heavy Trucks Pedestrians Bicycles Railroad Stopped Buses Comments: Report generated on 11/21/211 4:19 PM SOURCE: Quality Counts, LLC (

28 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: Anderson Rd/La Rue Rd -- QC JOB #: CITY/STATE: Davis, CA DATE: Wed, Oct Peak-Hour: 8: AM -- 9: AM Peak 15-Min: 8:45 AM -- 9: AM Min Count Anderson Rd/La Rue Rd Anderson Rd/La Rue Rd Period (Northbound) (Southbound) (Eastbound) (Westbound) Hourly Beginning At Total Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Totals 7: AM :5 AM :1 AM :15 AM :2 AM :25 AM :3 AM :35 AM :4 AM :45 AM :5 AM :55 AM : AM :5 AM :1 AM :15 AM :2 AM :25 AM :3 AM :35 AM :4 AM :45 AM :5 AM :55 AM Peak 15-Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Total All Vehicles Heavy Trucks Pedestrians Bicycles Railroad Stopped Buses Comments: Report generated on 11/21/211 4:19 PM SOURCE: Quality Counts, LLC (

29 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: Anderson Rd/La Rue Rd -- QC JOB #: CITY/STATE: Davis, CA DATE: Wed, Oct Peak-Hour: 5: PM -- 6: PM Peak 15-Min: 5:1 PM -- 5:25 PM Min Count Anderson Rd/La Rue Rd Anderson Rd/La Rue Rd Period (Northbound) (Southbound) (Eastbound) (Westbound) Hourly Beginning At Total Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Totals 4: PM :5 PM :1 PM :15 PM :2 PM :25 PM :3 PM :35 PM :4 PM :45 PM :5 PM :55 PM : PM :5 PM :1 PM :15 PM :2 PM :25 PM :3 PM :35 PM :4 PM :45 PM :5 PM :55 PM Peak 15-Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Total All Vehicles Heavy Trucks Pedestrians Bicycles Railroad Stopped Buses Comments: Report generated on 11/21/211 4:19 PM SOURCE: Quality Counts, LLC (

30 APPENDIX B: LEVEL OF SERVICE CALCULATIONS SHEETS

31 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Existing Conditions AM Peak Hour Intersection 1 SR 113 Ramps/. Signalized % C % 8..4 A % C % A % A % A % A % A % A Total % 9..5 A Intersection 2 SR 113 Ramps/. Signalized % C % C % C % C % C % A % A % A % A % A Total % B Fehr & Peers 6/13/212

32 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Existing Conditions AM Peak Hour Intersection 3 Sycamore Ln./. Signalized % D % A % B % C % B % B % C % C % C Total % B Intersection 4 Anderson Rd.-La Rue Rd./. Signalized % D % C % A % B % D % B % B % C % D % C % A % C % D % B % A % C Total % C Fehr & Peers 6/13/212

33 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Existing Conditions PM Peak Hour Intersection 1 SR 113 Ramps/. Signalized % C % B % C % A % 6..2 A % A % A % A % A Total % A Intersection 2 SR 113 Ramps/. Signalized % C % D % C % C % C % A % A % B % B % B Total % B Fehr & Peers 6/13/212

34 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Existing Conditions PM Peak Hour Intersection 3 Sycamore Ln./. Signalized % D % A % C % D % B % B % C % C % C Total % C Intersection 4 Anderson Rd.-La Rue Rd./. Signalized % D % C % A % C % D % C % B % C % D % C % A % C % D % C % A % C Total % C Fehr & Peers 6/13/212

35 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Existing Plus Project Conditions AM Peak Hour Intersection 1 SR 113 Ramps/. Signalized % C % A % C % A % A % A % A % A % A Total % A Intersection 2 SR 113 Ramps/. Signalized % C % C % C % C % C % A % A % A % B % B Total % B Fehr & Peers 6/13/212

36 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Existing Plus Project Conditions AM Peak Hour Intersection 3 Sycamore Ln./. Signalized % D % A % B % C % B % B % C % C % C Total % B Intersection 4 Anderson Rd.-La Rue Rd./. Signalized % D % C % A % B % D % B % B % C % D % C % 7..9 A % C % D % B % A % C Total % C Fehr & Peers 6/13/212

37 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Existing Plus Project Conditions PM Peak Hour Intersection 1 SR 113 Ramps/. Signalized % C % B % C % A % A % A % A % A % A Total % A Intersection 2 SR 113 Ramps/. Signalized % D % B % C % C % C % A % 8..6 A % B % C % B Total % C Fehr & Peers 6/13/212

38 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Existing Plus Project Conditions PM Peak Hour Intersection 3 Sycamore Ln./. Signalized % D % A % C % D % B % C % C % C % C Total % C Intersection 4 Anderson Rd.-La Rue Rd./. Signalized % E % C % A % C % D % C % B % C % D % C % A % C % D % C % B % C Total % C Fehr & Peers 6/13/212

39 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Cumulative No Project Conditions AM Peak Hour Intersection 1 SR 113 Ramps/. Signalized % C % A % 2..7 B % A % B % A % A % A % A Total % A Intersection 2 SR 113 Ramps/. Signalized % B % B % C % C % C % A % A % B % B % B Total % B Fehr & Peers 6/13/212

40 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Cumulative No Project Conditions AM Peak Hour Intersection 3 Sycamore Ln./. Signalized % D % A % B % D % B % C % C % C % C Total % C Intersection 4 Anderson Rd.-La Rue Rd./. Signalized % D % C % A % C % D % C % B % C % E % D % B % D % D % C % A % C Total % C Fehr & Peers 6/13/212

41 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Cumulative No Project Conditions PM Peak Hour Intersection 1 SR 113 Ramps/. Signalized % C % A % C % A % 7..2 A % A % A % A % A Total % A Intersection 2 SR 113 Ramps/. Signalized % D % E % D % D % D % A % A % C % D % D Total % C Fehr & Peers 6/13/212

42 SimTraffic Post-Processor Average Results from 1 Runs Volume and Delay by Movement Castilian Redevlopment Project Cumulative No Project Conditions PM Peak Hour Intersection 3 Sycamore Ln./. Signalized % D % B % C % E % B % C % D % D % D Total % D Intersection 4 Anderson Rd.-La Rue Rd./. Signalized % E % D % C % D % D % C % C % D % E % D % C % D % E % E % C % E Total % D Fehr & Peers 6/13/212

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By:

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By: TRAFFIC IMPACT ANALYSIS FOR STERLING 5 th STREET APARTMENTS PROJECT Davis, CA Prepared For: Din/Cal 3, Inc. 3411 Richmond Avenue, Suite 200 Houston, Texas 77046 Prepared By: KD Anderson & Associates, Inc.

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

TRAFFIC IMPACT ANALYSIS FOR. STERLING FIFTH STREET APARTMENTS PROJECT Davis, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. STERLING FIFTH STREET APARTMENTS PROJECT Davis, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR STERLING FIFTH STREET APARTMENTS PROJECT Davis, CA Prepared For: Din/Cal 3, Inc. 3411 Richmond Avenue, Suite 200 Houston, Texas 77046 Prepared By: KD Anderson & Associates,

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Draft Report: West Berkeley Bowl Project

Draft Report: West Berkeley Bowl Project Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley 1031-1925 F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA 94549 925-284-3200 Fax:

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

D R A F T TRAFFIC IMPACT ANALYSIS FOR. DARK HORSE GOLF RESORT EXPANSION Nevada County, CA. Prepared For:

D R A F T TRAFFIC IMPACT ANALYSIS FOR. DARK HORSE GOLF RESORT EXPANSION Nevada County, CA. Prepared For: D R A F T TRAFFIC IMPACT ANALYSIS FOR DARK HORSE GOLF RESORT EXPANSION Nevada County, CA Prepared For: ASIAN PACIFIC GROUP 18000 Van Karman Avenue, Suite 500 Irvine, CA 92612 Prepared By: KD Anderson &

More information

Richards Boulevard Olive Drive Corridor

Richards Boulevard Olive Drive Corridor Richards Boulevard ive Corridor December 2016 RS16-3438 Richards Boulevard-ive Corridor Table of Contents EXECUTIVE SUMMARY... 5 1.0 INTRODUCTION... 8 Study Area... 8 Report Organization... 11 2.0 EXISTING

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA Tube Counts Type of report: Tube Count - Volume Data LOCATION: Scotts Valley Dr QC JOB #: 245667 SPECIFIC LOCATION: ft from Tabor St DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA DATE: Mar 2 24 - Mar

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Traffic Impact Study for the Maria Drive Apartment Complex

Traffic Impact Study for the Maria Drive Apartment Complex Traffic Impact Study for the Maria Drive Apartment Complex Prepared for the City of Petaluma Submitted by Whitlock & Weinberger Transportation, Inc. 490 Mendocino Avenue Suite 201 Santa Rosa, CA 95401

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

TRAFFIC IMPACT STUDY FOR

TRAFFIC IMPACT STUDY FOR TRAFFIC IMPACT STUDY FOR YUBA CROSSINGS MIXED USE DEVELOPMENT Yuba City, CA Prepared For: Yuba Crossings LLC 1825 Del Paso Blvd Sacramento, CA 95815 Prepared By: KDAnderson & Associates, Inc. 3853 Taylor

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS Executive Summary... 2 Project Background... 2 Conditions... 2 Findings... 3 Recommendations... 4 Introduction... 6

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

1650 South Delaware Street

1650 South Delaware Street 65 South Delaware Street Final Transportation Impact Analysis Prepared for: City of San Mateo June 8, 28 Hexagon Transportation Consultants, Inc. Hexagon Office: 4 North Second Street, Suite 4 San Jose,

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

5.9 TRANSPORTATION AND TRAFFIC

5.9 TRANSPORTATION AND TRAFFIC 5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

Environmental Assessment Derry Road and Argentia Road Intersection

Environmental Assessment Derry Road and Argentia Road Intersection Air and Noise Study Environmental Assessment Derry Road and Argentia Road Intersection Project 11-4295 City of Mississauga, Region of Peel October 17, 2014 1 Region of Peel Environmental Assessment for

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma.

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma. Revised Report Traffic Study for Safeway Fuel Center at Washington Square Shopping Center In The Pleasanton Fresno Sacramento Santa Rosa TJKM www.tjkm.com Revised Report Traffic Study for Safeway Fuel

More information

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II TRAFFIC IMPACT ANALYSIS LOTUS RANCH El Centro, California July 31, 2015February 12, 2016 LLG Ref. 3-14-2392 Prepared by: KC Yellapu, P.E Senior Transportation Engineer & Charlene Sadiarin Transportation

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

4131 Chain Bridge Road

4131 Chain Bridge Road Traffic Impact Study 4131 Chain Bridge Road City of Fairfax, VA 05/04/16 May 4, 2016 Prepared for: Paradigm 1415 North Taft Street Suite 100 Arlington, VA 22201 This report is printed on environmentally

More information

DRAFT WATERMAN GARDENS MASTER PLAN TRAFFIC IMPACT STUDY

DRAFT WATERMAN GARDENS MASTER PLAN TRAFFIC IMPACT STUDY DRAFT WATERMAN GARDENS MASTER PLAN TRAFFIC IMPACT STUDY PREPARED FOR: Housing Authority of the County of San Bernardino Pyatok Architects The Planning Center/DCE PREPARED BY: 3850 Vine Street, Suite 140

More information

TRAFFIC IMPACT ANALYSIS WESTMINSTER SEMINARY. Escondido, California June 25, LLG Ref Transportation Engineer II

TRAFFIC IMPACT ANALYSIS WESTMINSTER SEMINARY. Escondido, California June 25, LLG Ref Transportation Engineer II TRAFFIC IMPACT ANALYSIS WESTMINSTER SEMINARY Escondido, California June 25, 2015 LLG Ref. 3-15-2420 Prepared by: Pedram Massoudi Transportation Engineer II Under the Supervision of: John Boarman, P.E.

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Mineola Village Green

Mineola Village Green Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment MEMORANDUM Date: June 22, 2018 Project #: 21562 To: Colin McArthur, AICP From: Project: Subject: Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit

More information

700 University Avenue Mixed-Use Development. Traffic Impact Analysis

700 University Avenue Mixed-Use Development. Traffic Impact Analysis 700 University Avenue Mixed-Use Development Traffic Impact Analysis January 20, 2006 Prepared by 700 UNIVERSITY AVENUE MIXED- USE DEVELOPMENT TRAFFIC IMPACT STUDY Table of Contents 1.0 Executive Summary...

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information