MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

Size: px
Start display at page:

Download "MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D"

Transcription

1 MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS Fehr & Peers has completed a transportation analysis of the revised Alternative D (Roundabout Alternative) under the design year of 2045 for the Western Placerville Interchanges project. Compared to the Project Report, Alternative D has a revised design at the proposed roundabout for the Placerville Drive / Fair Lane / US-50 Westbound Ramps intersection and a new roundabout at the Forni Road / Lo-Hi Way / US-50 Eastbound Ramps intersection. Other changes include providing only one southbound lane on the US-50 overcrossing and revising the Placerville Drive / Forni Road intersection to side-street stop control with the eastbound left-turn movement prohibited. Figure 1 shows the proposed roundabout interchange design. Figure 1. Roundabout Interchange under Alternative D 2990 Lava Ridge Court, Suite 200 Roseville, CA (916) Fax (916)

2 Page 2 of 14 Fehr & Peers has prepared the following memoranda for this project. Analysis Methodology and Traffic Forecasts (December 22, 2008) describes the data collection Phase 1A Analysis (March 12, 2009) documents the calibration/validation of the Vissim model 2045 Alternative B Traffic Volume Forecasts (March 30, 2012) presents the 2045 travel demand forecasts Alternative B Analysis (April 18, 2012) analyzes operations for the No Build Alternative and Alternative B This memorandum summarizes the 2045 design year analysis results for the No Build Alternative, Alternative B (signals), and Alternative D (roundabouts). These results have some differences compared to the previously published results due to differences in software build version, pedestrian crosswalk locations, and signal timing optimization. Additionally, roundabout operations analysis results from the Sidra software (prepared by Reid Middleton) are provided for comparison with the Vissim analysis results. Sidra is a deterministic analysis method that analyzes intersections in isolation. Using Sidra for roundabout capacity analysis provides a check of Vissim s microsimulation results. Tables 1 and 2 below provide the thresholds used to assign level of service (LOS) to intersections and freeway segments according to the Highway Capacity Manual (Transportation Research Board, 2011). The HCM provides thresholds based on the intersection and freeway segment types. In particular, unsignalized intersections including roundabouts have lower delay thresholds than signalized intersections. TABLE 1: INTERSECTION LOS THRESHOLDS Average Delay (sec/veh) LOS Control and Roundabout Signal Control Description A < 10 < 10 Very low delay occurs due to little or no conflicting traffic. B > 10 to 15 > 10 to 20 Low delay occurs although conflicting traffic becomes noticeable. C > 15 to 25 > 20 to 35 Average delays result from increased conflicting traffic. D > 25 to 35 > 35 to 55 E > 35 to 50 > 55 to 80 Longer delays occur due to a reduction in available gaps. At signals, individual cycle failures are noticeable. High delays and extensive queues occur. This value indicates volume-to-capacity ratios. This is considered to be the limit of acceptable delay. F > 50 > 80 Delays are unacceptable to most drivers due to over-saturation. Note: sec/veh = seconds per vehicle Highway Capacity Manual, Transportation Research Board, 2011

3 Page 3 of 14 TABLE 2: FREEWAY LOS THRESHOLDS Average Density (vplpm 1 ) LOS Basic Ramp Junction & Weave Description A < 11 < 10 B > 11 to 18 > 10 to 20 C > 18 to 26 > 20 to 28 D > 26 to 35 > 28 to 35 Free-flow speeds prevail. Vehicles are almost completely unimpeded in their ability to maneuver. Free-flow speeds are maintained. The ability to maneuver with the traffic stream is only slightly restricted. Flow with speeds at or near free-flow speeds. Freedom to maneuver within the traffic stream is noticeably restricted, and lane changes require more care and vigilance on the part of the driver. Speeds decline slightly with increasing flows. Freedom to maneuver with the traffic stream is more noticeably limited, and the driver experiences reduced physical and psychological comfort. E > 35 to 45 > 35 to 43 2 traffic stream, leaving little room to maneuver. Any disruption can be Operation at capacity. There are virtually no usable gaps within the expected to produce a breakdown with queuing. F > 45 > 43 2 Represents a breakdown in flow. Notes: 1. vplpm = vehicles per lane per mile 2. The LOS E/F threshold of 43 vplpm comes from HCM The HCM 2010 threshold is volume to capacity ratio (v/c) greater than 1. Since capacity is an output and not an input for simulation analysis, v/c cannot be calculated. Highway Capacity Manual, Transportation Research Board, 2011 The traffic forecasts for the 2045 design year conditions, along with lane configurations and traffic control, are shown in Figures 2, 3, and 4. INTERSECTION OPERATIONS Table 3 lists the AM and PM peak hour study intersection level of service and average delay for the project alternatives under 2045 conditions. Under the No Build Alternative, three of the study intersections would operate at LOS F during both peak hours. The VISSIM model showed queues at theses intersections would spill back into adjacent intersections and onto the freeway mainline. The Alternative B improvements include traffic signals at all study intersections, additional capacity on Placerville Drive and Forni Road, and the construction of the US 50 / Ray Lawyer Drive interchange. With these improvements, all study intersections would operate at LOS C or better during both peak hours. Alternative D, which has roundabouts at the Placerville Drive interchange instead of signals, would also provide LOS C or better conditions at all study intersections during both peak hours.

4

5

6

7 Page 7 of 14 TABLE 3: INTERSECTION OPERATIONS 2045 CONDITIONS No Build Alternative Alt. B (Signals) Alt. D (Roundabouts) Intersection Control AM PM Control AM PM Control AM PM 1/2. Placerville Dr / Fair Ln / US 50 WB Signal F / 269 F / 244 Signal C / 28 C / 26 Roundabout A / 8 C / Placerville Dr / Forni Rd Sidestreet F / >180 F / > 180 Signal A / 9 B / 15 Sidestreet B / 13 C / Forni Rd / Lo-Hi Way / US 50 EB All-way F / 190 F / 244 Signal B / 16 C / 21 Roundabout A / 3 A / 8 5. Ray Lawyer Dr / Fair Ln All-way A / 8 C / 16 Signal B / 13 C / 21 Signal B / 13 B / Ray Lawyer Dr / US 50 WB Does not exist Signal A / 8 B / 14 Signal A / 7 B / Ray Lawyer Dr / Forni Rd / US 50 EB 1 All-way C / 20 E / 45 Signal C / 31 C / 29 Signal C / 31 C / Forni Rd / Courts Drwy Sidestreet A / 9 B / 12 Sidestreet A / 9 B / 13 Sidestreet A / 10 B / 14 Notes: Bold and underline font indicate LOS F conditions. LOS is assigned using the overall average delay, except for side-street stop control and uncontrolled intersections, which use the highest movement delay. 1. The US 50 eastbound connection does not exist in the No Build Alternative. Fehr & Peers The Vissim results for the roundabouts in Alternative D were confirmed using the Sidra software. Table 4 shows that the Sidra results are similar to those predicted by Vissim. The largest difference occurs for the Placerville Drive / Fair Lane / US 50 Westbound ramps. The higher delay in Vissim is due in part to ramp meter queues on the westbound on-ramp that cause vehicles exiting the roundabout to go slower than otherwise. Table 5 shows queue lengths for key movements at the study intersections. The storage listed under each alternative is the length of the turn pocket or the distance to the upstream intersection. Both Alternatives B and D would construct only a portion of a second southbound lane on Placerville Drive approaching Fair Lane. By the 2045 design year, a separate project is assumed to have been built that would widen Placerville Drive to four lanes with a center turn lane from Fair Lane to Ray Lawyer Drive (as shown in the project list for the Sacramento Area Council of Governments 2035 Metropolitan Transportation Plan / Sustainable Communities Strategy).

8 Page 8 of 14 TABLE 4: ROUNDABOUT OPERATIONS COMPARISON 2045 CONDITIONS Vissim Sidra ntersection 1/2. Placerville Dr / Fair Lane / US 50 WB AM PM AM PM A / 8 C / 23 A / 7 B / Forni Rd / Lo-Hi Way / US 50 EB A / 3 A / 8 A / 10 B / 12 Fehr & Peers and Reid Middleton In Table 5, the reported queue length is the maximum queue measured for the movement averaged across the ten iterations using different random number seeds. This value should be higher than the 95th percentile queue, which is typically used for design, since the maximum queue corresponds to the 100th percentile queue. Each iteration represents one day, so the average of the results provides an estimate for a typical day. During both AM and PM peak hours, the queue lengths for the No Build Alternative would exceed the available storage at the Placerville Drive/Forni Road interchange. These results are consistent with the poor intersection operations shown in Table 3. Under Alternative B, the AM peak hour average maximum queue lengths would be shorter than the available storage for the key locations. During the PM peak hour, two locations would have queues that exceed the available storage. The queue on the northbound approach to the Placerville Drive / Fair Lane / US 50 Westbound Ramps will occasionally extend back into the upstream intersection at Placerville Drive / Forni Road. This causes additional delay at the upstream intersection, but the additional congestion is not enough to result in an unacceptable LOS. The second location where the queue would exceed the available storage is the southbound left turn movement at the Ray Lawyer Drive/US 50 Eastbound Ramps. This queue would block southbound through and right-turn movements. To minimize delay to the through and right-turns, the southbound left-turn phase should be a leading phase so that the queue can be cleared. Lengthening the turn pocket is not feasible because an adjacent back-to-back northbound left-turn pocket needs to be maintained. Widening of the roadway to provide side-by-side turn pocket lanes would require an expensive expansion of the freeway overcrossing. Since the upstream intersection at the westbound ramps would operate acceptably, widening the overcrossing would not be cost effective. Under Alternative D, only one location has a queue that exceeds the storage. The PM peak hour queue for the southbound left turn at Ray Lawyer Drive / US 50 Eastbound Ramps would also exceed the storage because the Ray Lawyer Drive interchange has the same configuration in both Alternatives B and D.

9 Page 9 of 14 TABLE 5: AVERAGE MAXIMUM QUEUE LENGTHS 2045 CONDITIONS Intersection Approach/Movement No Build Alternative Alternative B Alternative D Storage AM PM Storage AM PM Storage AM PM 1/2. Placerville Dr / Fair Ln / US 50 WB Northbound Southbound 100 >1,000 >1,000 >1, >1, Westbound Fair Ln >2,000 1,000 1,100 >1, >1, Westbound Off-ramp 850 >1,000 >1, Forni Rd / Lo-Hi Way / US 50 EB Southbound Left/Through 720 >1, Southbound Right 340 >1,000 >1, Eastbound Left Eastbound Through/Right Ray Lawyer Dr / US 50 WB 1 Northbound Left Westbound Left , , Westbound Right Ray Lawyer Dr / Forni Rd / US 50 EB 1 Southbound Left Eastbound Left , , Eastbound Through/Right Notes: Queues are reported in feet. Bold and underline font indicate queues that exceed the storage. 1. The Ray Lawyer Drive interchange does not exist under the No Build Alternative. Fehr & Peers

10 Page 10 of 14 Table 6 compares the average maximum queue predicted by the Vissim model with the 95th percentile back of queue estimated by the Sidra software. At Placerville Drive / Fair Lane, Sidra predicts shorter queues for three of the four approaches but longer queues for the northbound approach. At Forni Road / Lo-Hi Way, the queues are similar for both softwares. TABLE 6: ROUNDABOUT QUEUE LENGTHS COMPARISON 2045 CONDITIONS Vissim Sidra Intersection Storage AM PM AM PM 1/2. Placerville Dr / Fair Lane / US 50 WB Northbound Southbound >1, Westbound Fair Ln >1, Westbound Off-ramp Forni Rd / Lo-Hi Way / US 50 EB Southbound Eastbound Note: Queues are reported in feet. Bold and underline font indicate queues that exceed the storage. Values are rounded up to the nearest 25 feet (the assumed length of an average queued vehicle). Fehr & Peers and Reid Middleton FREEWAY OPERATIONS Figures 5 and 6 list the AM and PM peak hour level of service and average density under 2045 conditions. The freeway operations results are shown on a freeway lane configuration schematic diagram. Detailed analysis results are provided in the appendix. Under the No Build Alternative, the eastbound weaving section between Missouri Flat Road and Forni Road would operate at LOS F during both peak hours. The congestion would be caused by a queue extending from the northbound approach at the Placerville Drive / Fair Lane / US 50 Westbound Ramps intersection, across the freeway overcrossing, and onto the Forni Road off-ramp. Congestion at the westbound US 50 ramp terminal intersection would also cause LOS F conditions in the westbound direction. This congestion would prevent some vehicles from reaching the downstream facilities during the peak hour.

11 Page 11 of 14 FIGURE 5: EASTBOUND FREEWAY OPERATIONS 2045 CONDITIONS Notes: Bold and underline font indicate LOS F conditions. Average density is reported in vehicles per lane per mile. Fehr & Peers Both the Alternative B and D improvements to the Placerville Drive / Forni Road interchange would eliminate congestion under 2045 conditions. Under the build alternatives, all freeway facilities would operate at LOS D or better during the AM peak hour. During the PM peak hour, the worst locations eastbound at the Ray Lawyer Drive on-ramp and westbound between Placerville Drive and Missouri Flat Road would operate at an acceptable LOS E.

12 Page 12 of 14 FIGURE 6: WESTBOUND FREEWAY OPERATIONS 2045 CONDITIONS Notes: Bold and underline font indicate LOS F conditions. Average density is reported in vehicles per lane per mile. Fehr & Peers RAMP METERING The Alternative B and D designs include a ramp meter for the westbound on-ramp at Placerville Drive. The ramp meter storage length depends on the westbound US-50 weaving length between Placerville Drive and Missouri Flat Road. Based on the existing Weber Creek bridge abutments, the minimum weaving length was 845 feet. Using this as a starting point, several values for the weaving length were analyzed under the 2045 PM peak hour to determine freeway operations as shown in Table 7. Based on these results, the weaving length of 1,100 feet was selected, which in turn provided a ramp meter storage length of 567 feet.

13 Page 13 of 14 TABLE 7: WEAVING ANALYSIS RESULTS 2045 PM PEAK HOUR CONDITIONS Location Weaving Length LOS / Density (vphpl) 845 ft F / 49 Westbound US-50: Placerville Dr to Missouri Flat Rd 1,000 ft E / 42 1,100 ft E / 39 1,200 ft E / 38 Note: The analysis assumed no ramp metering on the on-ramp. 1. vphpl vehicles per hour per lane Fehr & Peers To determine the ramp meter configuration, the AM and PM peak hour demand volume was tested within the limits of ramp meter operational parameters: a minimum metering rate of 240 vehicles per hour per lane (vphpl) and a maximum metering rate of 900 vphpl. The resulting queue was checked against the available storage (567 feet) provided by the design. Caltrans policy is to provide an HOV bypass lane at all ramp meters so that HOVs have a travel time advantage. For the calculations, HOVs were assumed to be 15 percent of the on-ramp traffic. Table 8 summarizes the results of the ramp meter storage analysis. The calculations are provided in the technical appendix. TABLE 8: MAXIMUM METERING RATE WITHOUT QUEUES EXCEEDING STORAGE 2045 CONDITIONS Configuration AM Peak Period PM Peak Period 1 metered lane / 1 HOV bypass lane 620 vphpl 1 >900 vphpl 2 metered lanes 358 vphpl 838 vphpl 2 metered lanes / 1 HOV bypass lane 305 vphpl 713 vphpl Note: 1. vphpl vehicles per hour per lane Fehr & Peers The initial design with one metered lane and one HOV bypass lane did not provide enough storage on the ramp under design year conditions during the PM peak period. At the maximum practical metering rate of 900 vphpl, the estimated queue would be more than two miles. With two metered lanes, the PM peak period ramp meter queue can be accommodated on the ramp although an exception to the Caltrans HOV bypass lane policy would be needed. The ramp configuration with two metered lanes and a HOV bypass lane would also work acceptably. However, this design would be more costly to construct, would shorten

14 Page 14 of 14 the weaving length between the Placerville Drive and Missouri Flat Road interchanges, and require shorter tapers to merge the three lanes at the ramp meter down to one lane at the ramp gore. SUMMARY AND CONCLUSION Traffic operations for the project alternatives were analyzed under 2045 conditions during the AM and PM peak hours. The No Build Alternative would have significant congestion (LOS F) at the Placerville Drive / Forni Road ramp terminal intersections. The subsequent queues would extend onto the US-50 mainline and cause LOS F conditions. In contrast, Alternatives B and D would provide LOS C or better at the study intersections and LOS E or better at the freeway study segments. Where the build alternatives differ (at the Placerville Drive / Forni Road interchange), the roundabout alternative (Alternative D) would have the same or lower overall intersection delay compared to the signal alternative (Alternative B). For Alternative B, the maximum queue on the northbound approach to the Placerville Drive / Fair Lane / US 50 Westbound Ramps intersection would extend into the upstream intersection at Placerville Drive / Forni Road during a portion of the peak hour. From the traffic operations analysis, the build alternatives perform similarly. The differences between the build alternatives for traffic operations and other traffic considerations are listed below in Table 9. TABLE 9: ALTERNATIVES COMPARISON Consideration Alternative B (Signals) Alternative D (Roundabouts) Vehicle Delay Higher on average; higher during off-peak hours Higher for some movements; lower during off-peak hours Vehicle Safety More severe crashes Less severe crashes; fewer crashes for single-lane approaches Vehicle Access Some U-turns prohibited All U-turns allowed at roundabouts; no left out at Placerville Dr/Forni Rd Bicycle/Pedestrian Safety Signal-controlled crossings; longer crossing distance Low-speed crossings; shorter crossing distance Bicycle/Pedestrian Convenience Higher delay Lower delay Emergency Response Signal preemption Lower off-peak delay Fehr & Peers

JCE 4600 Basic Freeway Segments

JCE 4600 Basic Freeway Segments JCE 4600 Basic Freeway Segments HCM Applications What is a Freeway? divided highway with full control of access two or more lanes for the exclusive use of traffic in each direction no signalized or stop-controlled

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

Richards Boulevard Olive Drive Corridor

Richards Boulevard Olive Drive Corridor Richards Boulevard ive Corridor December 2016 RS16-3438 Richards Boulevard-ive Corridor Table of Contents EXECUTIVE SUMMARY... 5 1.0 INTRODUCTION... 8 Study Area... 8 Report Organization... 11 2.0 EXISTING

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

P07033 US 50 EB Weaving Analysis between El Dorado Hills and Silva Valley Ramp Metering Analysis for US 50 EB On-Ramp at Latrobe Road

P07033 US 50 EB Weaving Analysis between El Dorado Hills and Silva Valley Ramp Metering Analysis for US 50 EB On-Ramp at Latrobe Road 180 Grand Avenue, Suite 250 428 J Street, Suite 500 Oakland, CA 94612 Sacramento, CA 95814 510.839.1742 916.266.2190 510.839.0871 fax 916.266.2195 Dowling Associates, Inc. www.dowlinginc.com traffic@dowlinginc.com

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

3.0 Future (2040) Transportation

3.0 Future (2040) Transportation 30 Future () Transportation Conditions Future traffic and structural bridge conditions within the I-84 Hartford Project Area have been analyzed to identify the needs and deficiencies which the Project

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

Low-Cost Improvements to Express-Highway Bottleneck Locations

Low-Cost Improvements to Express-Highway Bottleneck Locations Low-Cost Improvements to Express-Highway Bottleneck Locations Low-Cost Improvements to Express- Highway Bottleneck Locations Project Manager Seth Asante Project Principal Mark Abbott Data Analysts Ben

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Chapter 6. CEE 320 Anne Goodchild. Spring 2008 CEE 320

Chapter 6. CEE 320 Anne Goodchild. Spring 2008 CEE 320 Chapter 6 Freeway Level of Service Anne Goodchild Definitions Level of Service (LOS) Chief measure of quality of service Describes operational conditions within a traffic stream. Does not include safety

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Pembina Emerson Border Crossing Interim Measures Microsimulation

Pembina Emerson Border Crossing Interim Measures Microsimulation Pembina Emerson Border Crossing Interim Measures Microsimulation Final Report December 2013 Prepared for: North Dakota Department of Transportation Prepared by: Advanced Traffic Analysis Center Upper Great

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK Gene

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Craigieburn Employment Precinct North and English Street

Craigieburn Employment Precinct North and English Street Craigieburn Employment Precinct North and English Street METROPOLITAN PLANNING AUTHORITY Intersection Analyses 7 February 2014 Intersection Analyses Craigieburn Employment Precinct North and English Street

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

14 TRAFFIC AND CIRCULATION

14 TRAFFIC AND CIRCULATION 14 TRAFFIC AND CIRCULATION INTRODUCTION This chapter summarizes the traffic impact analysis (TIA) performed for the preferred project as well as the Commercial Project Alternative. The TIA for the preferred

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

Interstate 85 Widening Phase III Interchange Modification Report Exit 106 E. Cherokee Street. Cherokee County, SC

Interstate 85 Widening Phase III Interchange Modification Report Exit 106 E. Cherokee Street. Cherokee County, SC Interstate 85 Widening Phase III Interchange Modification Report Exit 16 E. Cherokee Street Cherokee County, SC Prepared for: South Carolina Department of Transportation Prepared by: Stantec Consulting

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Technical Feasibility Report

Technical Feasibility Report Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Prepared By: 53 Regional Drive Concord, NH 03301 NHDOT Project # 13742 Federal Project #T-A000(018) September 2018 TABLE OF CONTENTS

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Interchange Justification Report

Interchange Justification Report Interchange Justification Report Interstate 29 at 85 th Street- Exit 74 Sioux Falls, SD SEH No. 132589 October 1, 2018 Prepared by: Short Elliott Hendrickson Inc. Executive Summary The Interchange Justification

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

Mr. Kyle Zimmerman, PE, CFM, PTOE County Engineer

Mr. Kyle Zimmerman, PE, CFM, PTOE County Engineer Los Alamos County Engineering Division 1925 Trinity Drive, Suite B Los Alamos, NM 87544 Attention: County Engineer Dear Kyle: Re: NM 502 Transportation Corridor Study and Plan Peer Review Los Alamos, New

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT

SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT May 8, 2018 Page i TABLE OF CONTENTS Table of Contents... i 1. Introduction... 1 1.1 Summary... 1 2.

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

D R A F T TRAFFIC IMPACT ANALYSIS FOR. DARK HORSE GOLF RESORT EXPANSION Nevada County, CA. Prepared For:

D R A F T TRAFFIC IMPACT ANALYSIS FOR. DARK HORSE GOLF RESORT EXPANSION Nevada County, CA. Prepared For: D R A F T TRAFFIC IMPACT ANALYSIS FOR DARK HORSE GOLF RESORT EXPANSION Nevada County, CA Prepared For: ASIAN PACIFIC GROUP 18000 Van Karman Avenue, Suite 500 Irvine, CA 92612 Prepared By: KD Anderson &

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by:

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by: State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report Prepared for: City of Morro Bay Prepared by: (Caltrans Project No. 0515000104, EA 0F670) State Route 1/State Route

More information

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment 2.1.5 Traffic and Circulation This section addresses the potential impacts to traffic and circulation associated with construction and long-term operation of the proposed project. The traffic and circulation

More information

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Capability City of Mississauga Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga,

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

East 20 th Street Circulation Study

East 20 th Street Circulation Study Whitlock & Weinberger Transportation, Inc. 490 Mendocino Avenue Suite 201 Santa Rosa, CA 95401 voice (707) 542-9500 fax (707) 542-9590 475 14 th Street Suite 290 Oakland, CA 94612 voice (510) 444-2600

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Capacity and Level of Service for Highway Segments (I)

Capacity and Level of Service for Highway Segments (I) Capacity and Level of Service for Highway Segments (I) 1 Learn how to use the HCM procedures to determine the level of service (LOS) Become familiar with highway design capacity terminology Apply the equations

More information

Final Interchange Justification Report

Final Interchange Justification Report I- / TROSPER ROAD Final Interchange Justification Report Prepared for: Prepared by: I-/Trosper Road Final Interchange Justification Report Prepared for City of Tumwater Israel Rd SW, Olympia, WA 0

More information

ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE:

ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: TRAVEL DEMAND FORECASTS May 12, 2005 Prepared for Minnesota

More information

Sacramento Intermodal Transportation Facility. Final Traffic and Transportation/Pedestrian and Bicycle Facilities Technical Report

Sacramento Intermodal Transportation Facility. Final Traffic and Transportation/Pedestrian and Bicycle Facilities Technical Report Sacramento Intermodal Transportation Facility Final Traffic and Transportation/Pedestrian and Bicycle Facilities Technical Report Sacramento, California 03-Sac-00 PM EA 03-965100 3ENVR October 2008 Table

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE

ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE NATE LARSON HDR SEATTLE, WA ABHISHEK DAYAL VALLEY METRO PHOENIX, AZ ITE WESTERN DISTRICT ANNUAL MEETING JULY 16, 2013 Presentation

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

TRAFFIC IMPACT STUDY FOR

TRAFFIC IMPACT STUDY FOR TRAFFIC IMPACT STUDY FOR YUBA CROSSINGS MIXED USE DEVELOPMENT Yuba City, CA Prepared For: Yuba Crossings LLC 1825 Del Paso Blvd Sacramento, CA 95815 Prepared By: KDAnderson & Associates, Inc. 3853 Taylor

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Functional Design Report

Functional Design Report Presented to: City of Beverly MassDOT Highway Division Rte 128 Exit 19 Interchange Improvements Project Beverly, MA Functional Design Report May 30, 2014 Submitted by: Jacobs 343 Congress Street Boston,

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

MADERAS HOTEL TRANSPORTATION IMPACT ANALYSIS. LLG Ref Transportation Planner III & Jorge Cuyuch Transportation Engineer I

MADERAS HOTEL TRANSPORTATION IMPACT ANALYSIS. LLG Ref Transportation Planner III & Jorge Cuyuch Transportation Engineer I TRANSPORTATION IMPACT ANALYSIS MADERAS HOTEL Poway, California June 21, 2016 LLG Ref. 3-16-2602 Prepared by: Amelia Giacalone Transportation Planner III & Jorge Cuyuch Transportation Engineer I Under the

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

Effect of Police Control on U-turn Saturation Flow at Different Median Widths

Effect of Police Control on U-turn Saturation Flow at Different Median Widths Effect of Police Control on U-turn Saturation Flow at Different Widths Thakonlaphat JENJIWATTANAKUL 1 and Kazushi SANO 2 1 Graduate Student, Dept. of Civil and Environmental Eng., Nagaoka University of

More information

Measuring Autonomous Vehicle Impacts on Congested Networks Using Simulation

Measuring Autonomous Vehicle Impacts on Congested Networks Using Simulation 0 Measuring Autonomous Vehicle Impacts on Congested Networks Using Simulation Corresponding Author: David Stanek, PE Fehr & Peers 0 K Street, rd Floor, Sacramento, CA Tel: () -; Fax: () -0; Email: D.Stanek@fehrandpeers.com

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information