1 MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss Landing, California July 19, B First Street Gilroy, California Phone/ Fax/

2 TABLE OF CONTENTS EXECUTIVE SUMMARY... V 1 INTRODUCTION Project Description Project Access Scope of Work Traffic Operation Evaluation Methodologies Level of Service Standards Transportation Agency for Monterey County (TAMC) Regional Impact Fees EXISTING TRAFFIC CONDITIONS Existing Traffic Network Existing Transit Systems Existing Bikeway and Pedestrian Facilities Existing Traffic Data Existing Conditions Intersection Operations Existing Traffic Conditions - Roadway Segment Operations EXISTING PLUS PROJECT PHASE 1 TRAFFIC CONDITIONS Project Traffic Scenario Description Project Trip Generation Project Trip Distribution and Assignment Project Access and Circulation Existing Plus Project Phase 1 Traffic Conditions - Intersection Operations Transportation Agency for Monterey County Regional Impact Fees EXISTING PLUS PROJECT PHASES 1 AND 2 TRAFFIC CONDITIONS Introduction Project Trip Generation Project Trip Distribution and Assignment Existing Plus Project Phases 1 and 2 Traffic Conditions - Intersection Operations EXISTING PLUS PROJECT BUILDOUT TRAFFIC CONDITIONS Definition of Project Phase Project Phase 3 Trip Generation Project Phase 3 Trip Distribution and Assignment Existing Plus Project Buildout Traffic Conditions - Intersection Operations PARKING SUPPLY Introduction Parking Supply Versus Demand Other Parking-Related Issues I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page i

3 TABLE OF CONTENTS (Continued) 7 METHODS TO ENCOURAGE ALTERNATIVE MODES OF TRANSPORTATION Existing Project Components That Encourage Alternative Transportation Proposed Methods to Encourage Alternative Transportation Additional Methods to Encourage Alternative Transportation RECOMMENDATIONS Recommended Improvements Under Existing Conditions Recommended Improvements Under Existing Plus Project Phase 1 Conditions Recommended Improvements Under Existing Plus Project Phases 1 and 2 Conditions Recommended Improvements Under Existing Plus Project Buildout Conditions 22 9 REFERENCES List of References List of Contacts I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page ii

4 LIST OF EXHIBITS 1A. Project Location Map (Regional) 1B. Project Location Map (Local) 1C. Project Site Plan 2. Location of Study Intersections 3. Existing Transit Routes in Project Vicinity 4. Existing Peak Hour Volumes 5A. Intersection Levels of Service 5B. Recommended Intersection Improvements 6. Project Trip Generation 7. Project Phase 1 Year 2010 Trip Distribution and Assignment 8. Existing Plus Project Phase 1 Year 2010 Peak Hour Volumes 9A. Project Phase 2 Year 2015 Trip Distribution and Assignment 9B. Phil s Fish Market Trip Reduction Peak Hour Volumes 9C. Project Phase 2 With Reduction Trip Distribution and Assignment 10. Existing Plus Project Phases 1 and 2 Year 2015 Peak Hour Volumes 11. Project Phase 3 Year 2030 Trip Distribution and Assignment 12. Existing Plus Project Buildout Year 2030 Peak Hour Volumes 13. Evaluation of Project Parking Supply I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page iii

5 LIST OF APPENDICES A1. Level of Service Description Unsignalized Intersections Two-Way Stop Control A2. Peak Hour Threshold Volumes for Segment LOS B. Intersection Level of Service Calculations Existing Traffic Conditions C. Intersection Level of Service Calculations Existing Plus Project Phase 1 Traffic Conditions D. Intersection Level of Service Calculations Existing Plus Project Phases 1 and 2 Traffic Conditions E. Intersection Level of Service Calculations Existing Plus Project Buildout Traffic Conditions F. Existing Employee Residences By Zip Code I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page iv

6 EXECUTIVE SUMMARY This traffic report summarizes a traffic analysis of the Monterey Bay Aquarium Research Institute (MBARI) Master Plan Update. The MBARI facility is located on Sandholdt Road in Moss Landing, Monterey County, California. The study project consists of a proposed expansion of the existing MBARI facility, to be constructed in three phases between the Years 2010 and Scope of Work: In total, this traffic study includes a traffic impact analysis of operations at 4 intersections during typical weekday AM and PM peak hours, as well as one existing road segment analysis. The following were analyzed in this study: Intersections 1. Highway 1/Dolan Road; 2. Highway 1/Moss Landing Road (North); 3. Highway 1/Moss Landing Road (South)-Potrero Road; and 4. Highway 1/Merrritt Street (Highway 183). In addition, levels of service are evaluated under existing conditions only for the segment of Highway 1 between Moss Landing Road (North) and Dolan Road. The traffic scenarios evaluated as part of this traffic study are: Existing Traffic Conditions (Year 2008); Existing Plus Project Phase 1 Conditions (Year 2010); Existing Plus Project Phases 1 and 2 Conditions (Year 2015); and Existing Plus Project Buildout Conditions (Year 2030). Data Sources: Existing traffic volumes were collected at the study intersections on May 30 and June 2, 2008, during the weekday AM (i.e. 7:00 9:00 am) and PM (i.e. 4:00 6:00 pm) peak hours. Existing volumes at the study roadway segment were derived from the intersection traffic counts. Analysis Assumptions: The traffic analysis is based upon the methodologies within the 2000 Highway Capacity Manual. The software package Traffix (version 7.8) was used to perform the intersection analysis within this report. Existing Conditions: Existing conditions utilize the aforementioned existing traffic volumes at the study intersections and roadway segment. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page v

7 Recommended Improvements: 1. Add a right turn acceleration lane on northbound Highway 1 north of the Highway 1/Dolan Road intersection. 2. Extend the existing median left turn acceleration lane on Highway 1 north of the Highway 1/Moss Landing Road (North) intersection. 3. Implement the following improvements at the Highway 1/Moss Landing Road- Potrero Road intersection: a. Restripe eastbound Potrero Road as one left and one right turn lane; and b. Restripe Moss Landing Road approach as one through lane and one right turn lane. 4. Implement the Artichoke Avenue improvements at the Highway 1/Merritt Street (Highway 183) intersection. 5. Widen Highway 1 to four lanes. Existing Plus Project Conditions: The MBARI facility is located on Sandholdt Road in Moss Landing, Monterey County, California. The study project consists of a proposed expansion of the existing MBARI facility, to be constructed in three phases between the Years 2010 and Phase 1 would add 75 staff by the Year Phase 2 would add an additional 20 staff by the Year Phase 3 would add an additional 100 staff by the Year Each phase of the project would construct one or two new buildings to house the new employees. Project Trip Generation: Exhibit 6 contains the trip generation estimate for Phase 1 of the study project. Trip rates published in the Institute of Transportation Engineers (ITE) Trip Generation, 7 th Edition, 2003, would not represent a good approximation of the trip generation for the study project. This is the case because not only is there no ITE rate that would be a good approximation for a marine research facility, but also the facility has an existing vanpool program that it will expand to accommodate the future employees. Therefore, the trip generation for the project has been derived using various assumptions and information provided by the project applicant. These assumptions include the following: 1. All employees commute into the facility during the AM peak hour and return home during the PM peak hour. 2. All of the employees that drive into the facility will leave and return to the facility one during the day, most likely during their lunch hour. 3. Five percent of all new employees will be dropped off and picked up at the facility each day. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page vi

8 4. Twenty-five percent of the new employees will take advantage of the existing vanpool program currently in place at the facility. The project applicant has pledged to supply the necessary infrastructure to achieve this level of usage of the vanpool service. Utilizing these assumptions, trip generation rates were derived for both the employees and vanpools. In addition, reductions were made to the trip generation, in order to take into account the percentage of employees that would use the vanpool service. Phase 1 of the study project would generate 191 daily trips, with 60 trips (56 in, 4 out) during the AM peak hour, and 60 trips (4 in, 56 out) during the PM peak hour. Project Trip Distribution and Assignment: The project trip distribution is based upon the locations where the existing MBARI employees currently live. It is assumed that the residences of the new employees would be spread out in the same proportion as the existing employees. Trip assignment is via Moss Landing Road off of Highway 1. All trips to the south of Moss Landing Road (South) are split between Moss Landing Road (South) and Moss Landing Road (North). All trips north of Moss Landing Road (North) would use Moss Landing Road (North) to access the project site. Project Access: Direct access to the project site would be provided via Sandholdt Road, which is only accessible via Moss Landing Road, which connects to Highway 1 to the east and southeast of the project site. Driveways into parking lots adjacent to the buildings of each project phase will serve as the connections to the street system. Recommended Improvements: No additional improvements are r at the study intersections under Existing Plus Project Phase 1 conditions, beyond those previously recommended under Existing conditions. 1. The study project would be responsible for payment of its applicable TAMC regional impact fees. 2. Reserve parking spaces for future vanpool vans. 3. Designate three of the new parking spaces constructed under Phase 1 as ADA spaces. Construct necessary walkway ramps and loading/unloading areas adjacent to these spaces. 4. Consider implementing incentives to encourage employee usage of transit to travel to and from the project site. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page vii

9 Existing Plus Project Phases 1 and 2 Conditions: Project Trip Generation: Phase 2 would add 20 new employees to the MBARI facility, and construct one new building to house them. Phase 2 is the only study phase whose construction is dependent upon the removal of existing uses. A restaurant, Phil s Fish Market, would be closed as part of Phase 2, and the restaurant site would be redeveloped with the building that would house the new employees. Phase 2 would also remove an existing MBARI building; however, all of the employees that currently use that building would relocated into the new building, therefore generating no net change in trip activity from the building s removal. Trip generation for the MBARI employees under Phase 2 uses the same assumptions and information used in deriving the trip generation for Phase 1. Trip generation for the restaurant has been estimated based upon trip rates published by the Institute of Transportation Engineers in its publication Trip Generation, 7 th Edition, Including the trip reductions associated with the restaurant closure, Phase 2 of the study project would generate a net -550 daily trips, with 10 trips (12 in, -2 out) during the AM peak hour, and - 39 trips (-36 in, -3 out) during the PM peak hour. Project Trip Distribution and Assignment: Phase 2 of the study project utilizes the same trip distribution as Phase 1. The trip reductions for the removal of the restaurant also utilize that same trip distribution. Recommended Improvements: No additional improvements are required at the study intersections under Existing Plus Project Phases 1 and 2 conditions beyond those previously recommended under Existing and Existing Plus Project Phase 1 conditions. Existing Plus Project Buildout Conditions: Project Trip Generation: Phase 3 of the study project is composed of 75 additional employees, bringing the total additional employment of the facility to 195 people. Like the other two phases, Phase 3 would construct a new building to house the new employees. Trip generation has been estimated for Phase 3 of the study project. This derivation utilizes the same assumptions as were used in deriving the trip generation for Phases 1 and 2. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page viii

10 Phase 3 would generate 255 daily trips, with 80 trips (75 in, 5 out) during the AM peak hour, and 80 trips (5 in, 75 out) during the PM peak hour. Full project buildout, combining Phases 1, 2, and 3, would generate a net -104 daily trips, with 150 trips (143 in, 7 out) during the AM peak hour, and 101 trips (-27 in, 128 out) during the PM peak hour. Project Trip Distribution and Assignment: Phase 3 of the study project utilizes the same trip distribution as Phases 1 and 2. Recommended Improvements: In addition to those improvements previously recommended under Existing, Existing Plus Project Phase 1, and Existing Plus Project Phases 1 and 2, the following improvements are recommended under Existing Plus Project Buildout Conditions: 1. Restripe eastbound Moss Landing Road as one left and one right turn lane at the Highway 1/Moss Landing Road (North) intersection. 2. Designate two of the new parking spaces to be constructed under Phase 3 as ADA spaces. Construct necessary walkway ramps and loading/unloading areas adjacent to these spaces. Parking Supply: The study project proposes a total of 214 parking spaces, with spaces being added under each project phase 89 spaces in Phase 1, 18 spaces in Phase 2, and 107 spaces in Phase 3. All of these spaces are to be added adjacent to two buildings being built in Phases 1 and 3. Parking demand for each project phase will be created primarily by employees. Assuming that one employee generates one parked vehicle, the phases would generate 75, 20, and 100 vehicles in the parking lot. While the parking supply added under Phases 1 and 3 would be sufficient to accommodate the demand, the added spaces under Phase 2 would not be. However, the excess number of spaced under Phase 1, 14 spaces, would provide the missing supply for Phase 2, thereby resulting in adequate parking supply for Phase 2. The project applicant plans to expand its current employee vanpool service with each phase of the study project. The applicant expects that 25% of the new employees will use the vanpool service, equal to the percentage that use the service now. In this context, the parking supply will be more than adequate, as the actual parking demand will be lower than simply the number of new employees. Once the additional vanpools are in service, it is recommended that parking spaces be reserved for use by only the vanpool vans. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page ix

11 Sidewalks: Two of the buildings will be over 800 feet away from the new parking area, requiring employees within those buildings to walk that distance to reach those buildings. It is therefore recommended that the project applicant extend the existing sidewalk on Sandholdt Road northward along the entire new project frontage. Americans With Disabilities Act Parking Spaces The parking layout proposed by the project applicant does not identify which spaces will be reserved for disabled users (i.e. Americans with Disabilities Act (ADA) compliant). According to Monterey County guidelines, for the number of spaces proposed, five spaces must be ADA spaces. Three of these spaces should be designated under Phase 1 and the remaining two spaces under Phase 3. In combination with the designation of the ADA spaces, walkway ramps and loading/unloading areas should be added adjacent to the parking spaces. Methods to Encourage Alternative Modes of Transportation: The study project is encouraging use of alternative modes of transportation in the following ways: 1. Carpool Program MBARI encourages employees to carpool, primarily through the designation of specific on-site parking spaces as carpool-only spaces. 2. Vanpool Program As noted in Chapter 3, MBARI also runs a vanpool program for its employees. Five vans, each equipped with bicycle racks, travel to Santa Cruz County (two vans), the Monterey Peninsula (two vans), and Santa Clara County (one van) each workday. Currently, 25% of all MBARI employees utilize this vanpool service. MBARI is also proposing to use the following method to encourage use of alternative transportation for the new employees associated with this study project: 1. Vanpool Program Expansion The project applicant is proposing to expand the vanpool program for this project. MBARI will invest in the necessary infrastructure to also achieve a 25% utilization of the vanpool program by all new employees. This expansion of the vanpool program is accounted for within the trip generation for the project. In addition to those methods previously described above, there is another method that the study project can implement that would encourage use of alternative modes of transportation by employees, residents, and hotel patrons. This includes the following: 1. Provide incentives for employees to take public transportation, including partial or full reimbursement for employee transit passes. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page x

12 1 INTRODUCTION This traffic report summarizes a traffic analysis of the Monterey Bay Aquarium Research Institute (MBARI) Master Plan Update. The MBARI facility is located on Sandholdt Road in Moss Landing, Monterey County, California. The study project consists of a proposed expansion of the existing MBARI facility, to be constructed in three phases between the Years 2010 and Exhibits 1A and 1B show the location of the MBARI project in the context of northern Monterey County and the greater Moss Landing area, respectively, while Exhibit 1C shows the proposed site plan. The purpose of this Traffic Impact Analysis (TIA) was to determine the traffic impacts from the construction of the proposed MBARI Master Plan Update project. The TIA presents the results from a series of analyses performed to determine the existing traffic conditions and how traffic conditions would change with the implementation of the updated master plan. 1.1 Project Description The proposed project is to be constructed in three distinct phases. Phase 1 would add 75 staff to the facility, by the Year Phase 2 would add an additional 20 staff by the Year Phase 3 would add an additional 100 staff by the Year 2030 Each phase of the project would construct one or two new buildings to house the new employees. Unlike in other phases, Phase 2 would actually remove an existing business, in order to accommodate the new building. The other new buildings would be constructed on currently vacant land. 1.2 Project Access The MBARI site is located west of Highway 1, which runs in a north-south direction on the shore of Monterey Bay. There would be two primary regional access points to the site off of Highway 1, both from either end of Moss Landing Road, which intersects Highway 1 in two locations. Other regionally important highways are Highway 101, the main north-south highway through Santa Clara and Monterey Counties, and two highways that link Highway 101 to Highway 1 Highway 156 and Highway 183 both of which are located to the south of the study project site. Local access to the project site would be provided directly via Sandholdt Road, which is a dead-end road that connects to Moss Landing Road at its southeastern end. Sandholdt Road traverses a two-lane bridge over the Moss Landing Harbor en route to the project site. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 1

13 1.3 Scope of Work The scope of work for this traffic study was developed to identify the potential traffic impacts that may be associated with the development of the MBARI project. Intersections were selected for analysis based on the potential for the project to impact the facility. A principal study area was identified, focused along the Highway 1 corridor through Moss Landing. Within the study area, the intersections that would potentially be impacted by the project were identified and included in the analysis. The study intersections are shown on Exhibit 2A. The local intersections included in this analysis were identified as potentially having the greatest impact from the project based on preliminary analysis of project trip generation and trip distribution. The boundaries of the study have been selected to include intersections that presently experience some congestion and/or may be measurably affected during the peak commute hours. Beyond the limits of the study area, the project trips disperse onto numerous local streets. As the distance from the project increases the number of trips considered reduces and the distribution assumptions are less reliable. In total, this traffic study includes a traffic impact analysis of operations at 4 intersections and one roadway segment, during typical weekday AM and PM peak hours. Where required, mitigation measures were recommended to fully mitigate the impacts due to the implementation of the proposed MBARI Master Plan Update. The following intersections were analyzed in this study: Intersections 1. Highway 1/Dolan Road; 2. Highway 1/Moss Landing Road (North); 3. Highway 1/Moss Landing Road (South)-Potrero Road; and 4. Highway 1/Merrritt Street (Highway 183). In addition, levels of service are evaluated under existing conditions only for the segment of Highway 1 between Moss Landing Road (North) and Dolan Road. Exhibit 2A shows the study intersections and road network under existing traffic conditions. The traffic scenarios evaluated as part of this traffic study are: Existing Traffic Conditions (Year 2008); Existing Plus Project Phase 1 Conditions (Year 2010); Existing Plus Project Phases 1 and 2 Conditions (Year 2015); and Existing Plus Project Buildout Conditions (Year 2030). I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 2

14 1.4 Traffic Operation Evaluation Methodologies The following paragraphs describe the methodologies utilized in this analysis to evaluate the operations of all of the study intersections and roadway segments. All analysis is based upon the 2000 Highway Capacity Manual methodologies. The intersection and segment analyses along the Highway 68 corridor utilize these same methodologies, but with some slight adjustments and calibrations; details regarding these variations are also described below Intersection Operational Analysis Intersection traffic operations were evaluated based on the Level of Service (LOS) concept. LOS is a qualitative description of an intersection and roadway s operation, ranging from LOS A to LOS F. Level of service A represents free flow un-congested traffic conditions. Level of service F represents highly congested traffic conditions with what is commonly considered unacceptable delay to vehicles on the road segments and at intersections. The intermediate levels of service represent incremental levels of congestion and delay between these two extremes. Intersection operations were evaluated using technical procedures documented in the 2000 Highway Capacity Manual (HCM). The TRAFFIX software program (version 7.8) was utilized to model the traffic impact of the different development scenarios and to calculate intersection levels of service. At one- and two-way stop controlled intersections, the operating efficiency of vehicle movements that must yield to through movements are analyzed. The level of service for vehicle movement on the controlled approaches is based on the distribution of gaps in the major street traffic stream and driver judgment in selecting gaps. Appendix A1 shows the relationship between the vehicle delay and level of service for two-way stop controlled intersections. The 2000 HCM calculates the level of service of the minor street approaches. Using this data, an overall intersection level of service was calculated. Both are reported in this study because traffic on the minor street approaches has the lowest priority of right-of-way at the intersection and are the most critical in terms of delay. Generally, LOS E/F operations on the side street approach are the thresholds that warrant improvements Roadway Operational Analysis The volume threshold planning methodology based on the 2000 HCM was used in the evaluation of operating conditions on the study Highway 1 segment under Existing conditions. A description of levels of service thresholds for the roadway segments is included as Appendix A Level of Service Standards The study area selected covers the jurisdiction of two public agencies; they are Monterey County and the California Department of Transportation (Caltrans), a state agency. The local and state agencies have different level of service standards. However, all of the study intersections are along a state highway, and therefore the Caltrans level of service standard takes precedence. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 3

15 The Caltrans level of service goal is the transition between LOS C and LOS D. Caltrans has jurisdiction over improvements to all of the study intersections. 1.6 Transportation Agency for Monterey County (TAMC) Regional Impact Fees The Transportation Agency for Monterey County (TAMC) has established a regional transportation impact fee, which would fund various roadway improvements throughout Monterey County. The currently proposed TAMC fee has been structured to cover costs of roadway infrastructure improvements throughout Monterey County due to future developments. This fee is expected to raise nearly $370 million dollars towards necessary roadway improvements. The currently proposed fee is documented in the report Regional Impact Fee Nexus Study Update, Kimley-Horn and Associates, March 26, I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 4

16 2 EXISTING TRAFFIC CONDITIONS This chapter presents a description of the existing road network, existing traffic volumes, intersection levels of service, and an overview of traffic flow conditions within the study area under existing traffic conditions. 2.1 Existing Traffic Network The primary regional access to the MBARI site is provided by Highway 1. Other significant regional highways are Highway 101, Highway 156, and Highway 183. Important arterial and collector streets relevant to the MBARI Master Plan Update study are Moss Landing Road, Dolan Road, Potrero Road, and Merritt Street (Highway 183). Direct project access is via Sandholdt Road. Exhibit 2A shows the study intersections and road network. A brief description of the most important streets in the study road network follows, with the state highways first, and then the remaining roadways in alphabetical order. Highway 1 is a state highway within Monterey County providing access to Watsonville and Santa Cruz to the north, and to San Luis Obispo to the south via Monterey and Carmel. Through its connection to Highway 156 in Castroville, it also provides access to Highway 101 and the greater San Francisco Bay Area. In the vicinity of the project, Highway 1 is a conventional two-lane highway, with left turn channelization at all major intersections. A vehicle turnout is located along northbound Highway 1 just south of Moss Landing Road (South). The speed limit on Highway 1 is 55 miles per hour (MPH) south of Moss Landing Road (South) and Potrero Road, and 50 MPH north of those same roadways. Dolan Road is a major east-west roadway in northern Monterey County. Dolan Road connects between Highway 1 and Castroville Boulevard, thereby serving as both a northern bypass of Castroville and a link between Moss Landing and Prunedale. The speed limit on Dolan Road is 55 MPH. Merritt Street (Highway 183) is a two-lane arterial street that travels through the center of Castroville. Merritt Street provides the sole access to the northern portion of Castroville, and extends in a southwesterly direction between Castroville and Salinas. The speed limit on Merritt Street is 30 MPH. Moss Landing Road is a two-lane roadway in Moss Landing. Moss Landing Road provides access the core commercial and governmental area of Moss Landing, and, with its connection to Sandholdt Road, provides access to the Moss Landing Harbor. The speed limit on Moss Landing Road is 25 MPH. Potrero Road is a two-lane, east-west roadway in southern Moss Landing, providing access to both residential and commercial areas near Highway 1, as well as Salinas River State Beach. The speed limit on Potrero Road is 25 MPH. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 5

17 Sandholdt Road is a two-lane roadway in Moss Landing. Sandholdt Road provides access to the Moss Landing Harbor, as well as various residential and marine-related commercial businesses, including the exiting MBARI facility. The speed limit on Sandholdt Road is 25 MPH. 2.2 Existing Transit Systems The largest single public transit provider in Monterey County is Monterey-Salinas Transit (MST). Monterey-Salinas Transit operates from five key transit centers, the Monterey Transit Plaza, Salinas Transit Center, Watsonville Transit Center, Edgewater Transit Exchange in Seaside/Sand City, and Marina Transit Exchange. Each of these centers operates on a time-transfer "pulse" schedule providing easy connections and quick transfers to multiple routings. MST currently provides transit service in the vicinity of the project site. Two routes service the Moss Landing Area, both along Highway 1. Route 27 runs between Marina and Watsonville in 2-hour increments during on weekdays only (roughly 6:30 6:30 PM in the northbound direction and 8:00 AM 8:00 PM in the southbound direction). Route 28 travels between Salinas and Watsonville in hourly increments seven days a week (roughly 7:00 AM 10:00 PM in the northbound direction, and 6:00 AM 10:00 PM in the southbound direction). There are no bus stops near the project site. The nearest stops are located in each direction of Highway 1 between Moss Landing Road and Dolan Road. Refer to Exhibit 3 for the existing MST routes in the project vicinity. 2.3 Existing Bikeway and Pedestrian Facilities Bikeways There are three basic types of bicycle facilities. Each type is described below: Bike path (Class I) - A completely separate right-of-way designed for the exclusive use of cyclists and pedestrians, with minimal crossings for motorists. These paths should have a minimum width of 8 feet when two-way travel is required and 5 feet in width to accommodate one-way movement. Bike lane (Class II) - A lane on a regular roadway, separated from the motorized vehicle right of-way by paint striping, designated for the exclusive or semi-exclusive use of bicycles. Bike lanes allow one-way bike travel. A minimum width of 5 feet should be provided and adjacent curbside parking avoided where feasible; where curbside parking is allowed adjoining a bike lane, the combined width of the parking and adjacent bike lane should be not less than 13 feet. Bike route (Class III) - Provides shared use of the roadway, designated by signs or permanent markings and shared with motorists. Existing Bike facilities in project vicinity Only Sandholdt Road, between Moss Landing Road and the western end of its bridge over the Moss Landing Harbor, has Class II bicycle lanes. Highway 1 and Merritt Street (Highway 183) have shoulders of at least 8 feet in width that can be used by bicyclists. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 6

18 The other roadways do not have dedicated bicycle facilities. Pedestrian facilities Sandholdt Road has an incomplete system of sidewalks. Sidewalks are present along both sides of Sandholdt Road along the entire frontage of the existing MBARI facility. However, there are no sidewalks along the remainder of Sandholdt Road, although the sidewalk along the eastern side of the street extends a few hundred feet further north than on the western, or project, site of the street. Merritt Street (Highway 183) does not have sidewalks near its intersection with Highway 1, although it does have them within portions of Castroville. Moss Landing Road only has a sidewalk for a two-block portion of the roadway near its southern intersection with Highway 1, and only on the western frontage of the street. The other study roadways lack any pedestrian facilities. Sandholdt Road also has a lighted crosswalk located just north of the bridge over the harbor. The embedded lights within the roadbed light up when a pedestrian pushes a button on the sidewalk. This provides additional warning and visibility to vehicular traffic that a pedestrian is crossing. 2.4 Existing Traffic Data To establish existing traffic flow conditions, new traffic counts were conducted at the study intersections on May 30 and June 2, 2008, during the weekday AM (i.e. 7:00 9:00 am) and PM (i.e. 4:00 6:00 pm) peak hours. From the peak period traffic counts, the AM and PM peak hour turning movement volumes were identified. Each intersection was analyzed at its individual peak hour. Because all of the counts were not collected on the same day, the counts did not necessarily balance between intersections where there were no driveways or other crosstraffic. The intersection traffic volumes were therefore balanced between many of the adjacent intersections along the Highway 1 corridor, to account for variations in the counts. Along the corridor, the intersection with the highest approach volume was selected as the controlling volume, and volumes at the other intersections along the corridor were balanced between intersections to the controlling volume, regardless of when the count was collected. This provides a reasonable worst-case analysis as the highest volume of traffic observed over the count period was used for the study. The existing peak hour traffic volumes are presented on Exhibit Existing Conditions Intersection Operations Existing conditions AM and PM intersection levels of service are summarized on Exhibit 4. The LOS calculation sheets for existing traffic conditions can be found in Appendix B. Recommended intersection improvements are indicated on Exhibit 5B. All four of the study intersections are two-way stop-controlled. Please reference Exhibit 2 for the locations of the study intersections. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 7

19 All of the study intersections would operate at a deficient LOS F on the side street approach during the PM peak hour. A description of each of the deficiently-operating intersections, along with the recommended improvements, can be found below. Highway 1 / Dolan Road: Operations at the Highway 1/Dolan Road intersection are currently at an overall acceptable LOS A during the AN and PM peak hours, but the side-street approach (i.e. westbound Dolan Road) operates at an unacceptable LOS F during the PM peak hour. The addition of a northbound right turn acceleration lane would improve side street operations to within acceptable levels of service. Implementation of this improvement would likely require removal of much of the existing landscaping along the eastern frontage of Highway 1, as well as possibly an acquisition of additional right-of-way from the adjacent property owner, the Moss Landing Power Plant. The design of this lane should be carefully coordinated with the power plant to ensure that any concerns of the power plant operator are addressed. Highway 1 / Moss Landing Road (North): Operations of the side-street approach at this intersection under Existing Conditions are at an unacceptable LOS F during the PM peak hour. The existing median left turn acceleration lane is very short 75 feet long, enough space to fit at most three vehicles back-to-back. In addition, this acceleration lane is on an upgrade, which, in combination with the shortness of the lane, does not provide sufficient acceleration distance for merging vehicles to approach mainline travel speeds. Is it is therefore recommended that the existing median left turn acceleration lane at the Highway 1/Moss Landing Road (North) intersection be extended in length north of the intersection. This improvement would result in acceptable levels of service on the side street approach. Highway 1 / Moss Landing Road Potrero Road: Operations on the side-street approach at the Highway 1/Moss Landing Road-Potrero Road intersection under Existing Conditions are at an unacceptable LOS F during the PM peak hour. The restriping of the Potrero Road approach as one left turn lane and one right turn lane, and the restriping of the Moss Landing Road approach as one through lane (for traveling onto southbound Highway 1) and one right turn lane, would result in acceptable side-street operations. Highway 1 / Merritt Street (Highway 183): Side-street operations at this intersection are at an unacceptable LOS F during the PM peak hour. Monterey County is currently pursuing an improvement at this intersection that would provide an alternative access into Castroville without using the existing southbound left turn lane, as well as upgrade northbound and westbound right turn channelization Dubbed Artichoke Avenue, this improvement would create a new roadway off of southbound Highway 1 that would travel underneath the highway and intersect with Mead Street, a roadway within northern Castroville that connects with Merritt Street (Highway 183). This will provide an alternative that drivers can use to enter Castroville, as opposed to the existing southbound Highway 1 left turn lane at the I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 8

20 intersection. In addition, improved right turn channelization will be added to the intersection, which will lessen delays for vehicles on Merritt Street (Highway 183) merging onto northbound Highway 1. This improvement would result in acceptable sidestreet operations. 2.6 Existing Traffic Conditions - Roadway Segment Operations Existing morning and evening peak hour level of service results have been evaluated for Highway 1 between Moss Landing Road (North) and Dolan Road. This evaluation is based upon the intersection volume counts at the two study intersections at each end of this segment Highway 1/Dolan Road and Highway 1/Moss Landing Road (North). Threshold volumes to determine the level of service on specific types of roads as provided in Appendix A2 were used in the evaluation of this roadway segment; these serve primarily as a general guide as to whether major roadway widening is required. However, other factors may affect traffic flow conditions on roadway segments including intersection channelization design, type of traffic control devices, bicycle and pedestrian volume, driveway activities, average travel speed, and on-street parking activities. Existing operations of Highway 1 between Moss Landing Road (North) and Dolan Road are at a deficient LOS E during both the AM and PM peak hours. It is recommended that Highway 1 be widened to four lanes, resulting in acceptable operations of LOS B. The feasibility of widening the highway to four lanes is not definite, due to environmental, topographical, and governmental constraints. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 9

21 3 EXISTING PLUS PROJECT PHASE 1 TRAFFIC CONDITIONS This section describes the analysis results of the study intersection and roadway segment operations under Existing Plus Project Phase 1 traffic conditions. This traffic scenario is defined as traffic conditions at the Year Project Traffic Scenario Description The MBARI facility is located on Sandholdt Road in Moss Landing, Monterey County, California. The study project consists of a proposed expansion of the existing MBARI facility, to be constructed in three phases between the Years 2010 and Construction of the proposed project would occur in three distinct phases. Phase 1 would add 75 staff to the facility, by the Year Phase 2 would add an additional 20 staff by the Year Phase 3 would add an additional 100 staff by the Year Each phase of the project would construct one or two new buildings to house the new employees. The three project phases are analyzed in order of occurrence Phase 1, Phases 1 and 2, and Phases 1, 2, and 3 (i.e. project buildout). Chapter 3 (Existing Plus Project Phase 1) focuses on traffic operations with Phase 1 of the project open, Chapter 4 (Existing Plus Project Phases 1 and 2) summarizes operations with Phases 1 and 2 open, and Chapter 5 (Existing Plus Project Buildout) reviews operations with all three phases of the project built. The project site is located along Sandholdt Road. All of the new buildings associated with this project would be constructed along this street. 3.2 Project Trip Generation Exhibit 6 contains the trip generation estimate for Phase 1 of the study project. Trip rates published in the Institute of Transportation Engineers (ITE) Trip Generation, 7 th Edition, 2003, would not represent a good approximation of the trip generation for the study project. This is the case because not only is there no ITE rate that would be a good approximation for a marine research facility, but also the facility has an existing vanpool program that it will expand to accommodate the future employees. Therefore, the trip generation for the project has been derived using various assumptions and information provided by the project applicant. These assumptions include the following: 1. All employees commute into the facility during the AM peak hour and return home during the PM peak hour. 2. All of the employees that drive into the facility will leave and return to the facility one during the day, most likely during their lunch hour. 3. Five percent of all new employees will be dropped off and picked up at the facility each day. 4. Twenty-five percent of the new employees will take advantage of the existing vanpool program currently in place at the facility. The project applicant has I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 10

22 pledged to supply the necessary infrastructure to achieve this level of usage of the vanpool service. Utilizing these assumptions, trip generation rates were derived for both the employees and vanpools. In addition, reductions were made to the trip generation, in order to take into account the percentage of employees that would use the vanpool service. As shown on Exhibit 6, Phase 1 of the study project would generate net 191 daily trips, with 60 trips (56 in, 4 out) during the AM peak hour, and 60 trips (4 in, 56 out) during the PM peak hour. 3.3 Project Trip Distribution and Assignment Trip distribution defines the origins and destinations of all trips to and from a project site. The project trip distribution is based upon the existing locations of MBARI employees; the new employees are assumed to live in the same proportion of locations as the existing employees. A breakdown of the number of existing employees by zip code is contained within Appendix F. Exhibit 7 shows the local project trip distribution graphically. The local trip distribution is also repeated on the following page: The trip distribution for the study project is as follows: To/From North: 41% Highway 1 North 41% To/From South: 57% Highway 1 South 33.0% Merritt Street (Highway 183) 20% Moss Landing Road Neighborhoods 2% To/From East: 4% Dolan Road East 4% To/From West: 0% TOTAL: 100% Project trips would utilize three different routes to and from the project site. Trips to and from the south of Moss Landing would utilize Moss Landing Road (South) and Moss Landing Road (North) en route to the site. Trips to and from the north of Moss Landing would exclusively use Moss Landing Road (North) (100%). Due to the circuitousness of travel to the site via this route, it is not anticipated that any trips to and from the north of Moss Landing would use Moss Land Road (South) to access the project site. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 11

23 Exhibit 7 represents the project Phase 1 trips assigned to the study intersections. The project Phase 1 trips in Exhibit 7 were added to the Existing condition traffic volumes to create Existing Plus Project traffic volumes. These traffic volumes are shown on Exhibit Project Access and Circulation Direct access to the project site would be provided via Sandholdt Road. This roadway is only accessible via Moss Landing Road, which connects to Highway 1 to the east and southeast of the project site. Driveways into parking lots adjacent to the buildings of each project phase will serve as the connections to the street system. 3.5 Existing Plus Project Phase 1 Traffic Conditions - Intersection Operations The traffic that would be generated by Phase 1 of the study project was combined with the existing traffic to create Existing Plus Project Phase 1 condition traffic volumes. Existing Plus Project Phase 1 morning and evening peak hour turning volumes are illustrated on Exhibit 8. Exhibit 5A tabulates corresponding morning and evening peak hour levels of service, the details of which are presented in Appendix C. Exhibit 5B summarizes the recommended improvements at the study intersections. All four of the study intersections would continue to operate at deficient levels of service under this scenario; a description of each intersection s operations follows below. In addition, the study project s impact significance upon the intersection is also included, in italics, at the end of the discussion for each intersection. Highway 1 / Dolan Road: Operations of the side street at the intersection would continue at LOS F during the PM peak hour under Existing Plus Phase 1 conditions. The previously recommended improvements under Existing conditions at this intersection would continue to result in acceptable levels of service. Implementation of those improvements is again recommended. Highway 1 / Moss Landing Road (North): Side-street operations at this intersection during the PM peak hour would continue to be at an unacceptable LOS F. It is again recommended that the previously recommended improvements at this intersection be implemented. This will result in acceptable operations. Highway 1 / Moss Landing Road Potrero Road: Operations on the side street at this intersection under Existing Plus Project conditions would continue to be at an unacceptable LOS F during the PM peak hour. Implementation of the previously recommended improvement would continue to result in acceptable operations at this intersection. Highway 1 / Merritt Street (Highway 183): Side-street operations at this intersection would continue to be at an unacceptable LOS F during the PM peak hour. Implementation of the previously recommended improvement at this intersection would continue to result in acceptable intersection operations. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 12

24 3.6 Transportation Agency for Monterey County Regional Impact Fees The study project will be responsible for payment of the Transportation Agency for Monterey County (TAMC) impact fees, which include funding for various regional traffic infrastructure improvements throughout Monterey County. The project s impacts towards specific regional improvements funded by the TAMC fees would be mitigated on a cumulative basis by payment of the impact fees. Examples of these roadways would be Highway 1, Highway 68, Highway 101, and Highway156. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 13

25 4 EXISTING PLUS PROJECT PHASES 1 AND 2 TRAFFIC CONDITIONS This section describes the analysis results of the study intersection and roadway segment operations under Existing Plus Project Phases 1 and 2 traffic conditions. This scenario is defined as traffic conditions with construction of Phases 1 and 2 of the study project, which is anticipated to occur by the Year Introduction Existing Plus Project Phases 1 and 2 conditions represents operations in the Year 2015 with construction of Phases 1 and 2 of the study project. This chapter details the derivation of the trip generation of Phase 2, along with the operations of the study intersections with Phases 1 and 2 constructed. 4.2 Project Trip Generation The trip generation estimate for Phase 2 of the study project is shown on Exhibit 6. This phase would add 20 new employees to the MBARI facility, and construct one new building to house them. Phase 2 is the only study phase whose construction is dependent upon the removal of existing uses. A restaurant, Phil s Fish Market, would be closed as part of Phase 2, and the restaurant site would be redeveloped with the building that would house the new employees. Phase two would also remove an existing MBARI building; however, all of the employees that currently use that building would relocated into the new building, therefore generating no net change in trip activity from the building s removal. Trip generation for the MBARI employees under Phase 2 uses the same assumptions and information used in deriving the trip generation for Phase 1. Trip generation for the restaurant has been estimated based upon trip rates published by the Institute of Transportation Engineers in its publication Trip Generation, 7 th Edition, Including the trip reductions associated with the restaurant closure, Phase 2 of the study project would generate a net -550 daily trips, with 10 trips (12 in, -2 out) during the AM peak hour, and -39 trips (-36 in, -3 out) during the PM peak hour. 4.3 Project Trip Distribution and Assignment Phase 2 of the study project utilizes the same trip distribution as Phase 1. The trip reductions for the removal of the restaurant also utilize that same trip distribution. Exhibit 9A depicts the trip distribution and assignment for just the new employee trips under Phase 2 of the study project, while Exhibit 9B shows the trip assignment of the removed restaurant. Exhibit 9C contains the sum of these two assignments. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 14

26 4.4 Existing Plus Project Phases 1 and 2 Traffic Conditions - Intersection Operations Existing traffic volumes were added to the trip assignment of Phases 1 and 2 of the study project, including the removal of the restaurant trips, to create Existing Plus Project Phases 1 and 2 traffic conditions. Existing Plus Project Phases 1 and 2 morning and evening peak hour turning volumes are illustrated on Exhibit 10. Exhibit 5A tabulates corresponding morning and evening peak hour levels of service, the details of which are presented in Appendix D. Operations at all four of the study intersections under Existing Plus Project Phases 1 and 2 conditions would reduce in side-street delay, compared with Existing Pus Project Phase 1 conditions. However, operations of said side streets would still operate deficiently at all four study intersections. Each of the study intersections is described below. The recommended mitigation measure to mitigate the incremental impact of the study project follows below, and is displayed in italics following the discussion Highway 1 / Dolan Road: Operations on the side street at this intersection would be at an unacceptable LOS F during the PM peak hour. The previous recommendation at this intersection would continue to improve operations to within acceptable levels of service. Highway 1 / Moss Landing Road (North): Operations at this intersection during the PM peak hour on the side-street approach would be at an unacceptable LOS F. The previously recommended improvements at this intersection would continue to result in acceptable operations. Highway 1 / Moss Landing Road Potrero Road: Operations of the side-street approach at this intersection would continue to be at an unacceptable LOS F during the PM peak hour. Implementation of the previously recommended improvements at this intersection would continue to improve operations to within acceptable levels of service: Highway 1 / Merritt Street (Highway 183): Operations at this intersection during the PM peak hour would be at an unacceptable LOS F for the side-street. The previously proposed improvements at this intersection would result in acceptable operations at the intersection: I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 15

27 5 EXISTING PLUS PROJECT BUILDOUT TRAFFIC CONDITIONS This section describes the analysis results of the study intersection and roadway segment operations under Existing Plus Project Buildout traffic conditions. This scenario is defined as traffic conditions roughly twenty years and beyond existing conditions, or the Year 2030, and includes trips from the study project. 5.1 Definition of Project Phase 3 The study project is composed of three phases. The previous scenarios reviewed and analyzed conditions with implementation of Phases 1 and 2. This chapter analyzes intersection operations with all three phases in place. Phase 3 of the study project is composed of 75 additional employees, bringing the total additional employment of the facility to 195 people. Like the other two phases, Phase 3 would construct a new building to house the new employees. 5.2 Project Phase 3 Trip Generation Trip generation has been estimated for Phase 3 of the study project. This derivation utilizes the same assumptions as were used in deriving the trip generation for Phases 1 and 2. As shown on Exhibit 6, Phase 3 of the study project would generate 255 daily trips, with 80 trips (75 in, 5 out) during the AM peak hour, and 80 trips (5 in, 75 out) during the PM peak hour. Full project buildout, combining Phases 1, 2, and 3, would generate a net -104 daily trips, with 150 trips (143 in, 7 out) during the AM peak hour, and 101 trips (-27 in, 128 out) during the PM peak hour. 5.3 Project Phase 3 Trip Distribution and Assignment Phase 3 of the study project utilizes the same trip distribution as Phases 1 and 2. Exhibit 11 contains the trip distribution and assignment for the Phase 3 project trips. These trips were added to the existing traffic volume to create the Existing Plus Project Buildout condition traffic volumes depicted on Exhibit Existing Plus Project Buildout Traffic Conditions - Intersection Operations Exhibit 5A tabulates corresponding morning and evening peak hour levels of service at the study intersections, the details of which are presented in Appendix E. Exhibit 5B summarizes the recommended improvements at these intersections. All four of the study intersections would experience unacceptable side-street operations of LOS F during the PM peak hour under Existing Plus Project Buildout traffic conditions. A discussion of the traffic operations for each individual intersection follows. For a reference of the location of each of the intersections please see Exhibit 2A. The I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 16

28 recommended mitigation measure to mitigate the incremental impact of the study project follows below, and is displayed in italics following the discussion. Highway 1 / Dolan Road: The previously recommended improvement at this intersection would continue to improve intersection operations to within acceptable levels of service. Highway 1 / Moss Landing Road (North): The previously recommended improvement at this intersection would not fully improve operations to within acceptable levels of service. It is also recommended that eastbound Moss Landing Road be restriped as one left turn lane and one right turn lane. This can be accomplished by restriping both directions of the approach, which would relocate the westbound lane leaving the intersection approximately 12 feet to the north. This would effectively narrow the existing paved island that separates the mainline Moss Landing Road lanes from the existing southbound right turn channelization from southbound Highway 1 to Moss Landing Road. The combination of the earlier improvement with this additional improvement would result in acceptable operations at this intersection. Highway 1 / Moss Landing Road Potrero Road: Implementation of the previously recommended improvements would continue to improve operations at this intersection to within acceptable levels of service: Highway 1 / Merritt Street (Highway 183): Implementation of the previously recommended improvements at this intersection would result in acceptable operations. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 17

29 6 PARKING SUPPLY The following sections summarize the results of a review of the proposed parking supply for the study project, and how it compares to the projected parking demand. 6.1 Introduction Exhibit 1C, the project site plan, includes provision for 214 parking spaces within the project site. This chapter discusses the adequacy of that supply and recommends any necessary changes to the layout or number of spaces. 6.2 Parking Supply Versus Demand Exhibit 13 summarizes the proposed project parking supply, and compares it to the anticipated parking demand for the project site. The study project proposes a total of 214 parking spaces, with spaces being added under each project phase 89 spaces in Phase 1, 18 spaces in Phase 2, and 107 spaces in Phase 3. All of these spaces are to be added adjacent to two buildings being built in Phases 1 and 3. Parking demand for each project phase will be created primarily by employees. While there will be miscellaneous other users who will generate parking demand maintenance and janitorial, visitors, US mail, currier services, etc. most of the demand will be created by the employees. The other users would generate very little parking demand. Assuming that one employee generates one parked vehicle, the phases would generate 75, 20, and 100 vehicles in the parking lot. While the parking supply added under Phases 1 and 3 would be sufficient to accommodate the demand, the added spaces under Phase 2 would not be. However, the excess number of spaced under Phase 1, 14 spaces, would provide the missing supply for Phase 2, thereby resulting in adequate parking supply for Phase 2. The project applicant plans to expand its current employee vanpool service with each phase of the study project. The applicant expects that 25% of the new employees will use the vanpool service, equal to the percentage that use the service now. In this context, the parking supply will be more than adequate, as the actual parking demand will be lower than simply the number of new employees. Once the additional vanpools are in service, it is recommended that parking spaces be reserved for use by only the vanpool vans. 6.3 Other Parking-Related Issues Sidewalks: Two of the buildings, the sole Phase 2 building and one Phase 3 building, will be over 800 feet away from the new parking area. Employees within those buildings will need to walk that distance to reach those buildings. It is therefore recommended that the project applicant extend the existing sidewalk on Sandholdt Road northward along the entire new project frontage, in order to better facilitate these employee walking trips. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 18

30 Americans With Disabilities Act Parking Spaces The parking layout proposed by the project applicant does not identify which spaces will be reserved for disabled users (i.e. Americans with Disabilities Act (ADA) compliant). According to Monterey County guidelines, for the number of spaces proposed, five spaces must be ADA spaces. Three of these spaces should be designated under Phase 1 and the remaining two spaces under Phase 3. In combination with the designation of the ADA spaces, walkway ramps and loading/unloading areas should be added adjacent to the parking spaces. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 19

31 7 METHODS TO ENCOURAGE ALTERNATIVE MODES OF TRANSPORTATION This chapter discusses ways that the study project is proposing to encourage use of alternative modes of transportation to the project site, as well as other methods that the project can implement to further encourage use of alternative modes of transportation at the project site. 7.1 Existing Project Components That Encourage Alternative Transportation Currently, the study project encourages use of alternative transportation through the following programs: 1. Carpool Program MBARI encourages employees to carpool, primarily through the designation of specific on-site parking spaces as carpool-only spaces. 2. Vanpool Program As noted in Chapter 3, MBARI also runs a vanpool program for its employees. Five vans, each equipped with bicycle racks, travel to Santa Cruz County (two vans), the Monterey Peninsula (two vans), and Santa Clara County (one van) each workday. Currently, 25% of all MBARI employees utilize this vanpool service. 7.2 Proposed Methods to Encourage Alternative Transportation MBARI is also proposing to use the following method to encourage use of alternative transportation for the new employees associated with this study project: 1. Vanpool Program Expansion Chapter 3 discusses the fact that the project applicant is proposing to expand the vanpool program for this project. MBARI will invest in the necessary infrastructure to also achieve a 25% utilization of the vanpool program by all new employees. This expansion of the vanpool program is accounted for within the trip generation for the project. 7.3 Additional Methods to Encourage Alternative Transportation In addition to those methods previously described above, there is another method that the study project can implement that would encourage use of alternative modes of transportation by employees, residents, and hotel patrons. This includes the following: 1. Provide incentives for employees to take public transportation. This could include partial or full reimbursement for employee transit passes. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 20

32 8 RECOMMENDATIONS The following sections summarize the recommended improvements within this report. For brevity, necessary improvements are not repeated beyond the scenario when first recommended. 8.1 Recommended Improvements Under Existing Conditions 1. Add a right turn acceleration lane on northbound Highway 1 north of the Highway 1/Dolan Road intersection. 2. Extend the existing median left turn acceleration lane on Highway 1 north of the Highway 1/Moss Landing Road (North) intersection. 3. Implement the following improvements at the Highway 1/Moss Landing Road- Potrero Road intersection: c. Restripe eastbound Potrero Road as one left and one right turn lane; and d. Restripe Moss Landing Road approach as one through lane and one right turn lane. 4. Implement the Artichoke Avenue improvements at the Highway 1/Merritt Street (Highway 183) intersection. 5. Widen Highway 1 to four lanes. 8.2 Recommended Improvements Under Existing Plus Project Phase 1 Conditions No additional improvements are required at the study intersections beyond those previously recommended under Existing conditions. 1. The study project would be responsible for payment of its applicable TAMC regional impact fees. 2. Reserve parking spaces for future vanpool vans. 3. Designate three of the new parking spaces constructed under Phase 1 as ADA spaces. Construct necessary walkway ramps and loading/unloading areas adjacent to these spaces. 4. Consider implementing incentives to encourage employee usage of transit to travel to and from the project site. 8.3 Recommended Improvements Under Existing Plus Project Phases 1 and 2 Conditions No additional improvements are required beyond those previously recommended under Existing, and Existing Plus Project Phase 1 conditions. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 21

33 8.4 Recommended Improvements Under Existing Plus Project Buildout Conditions In addition to those improvements previously recommended under Existing, Existing Plus Project Phase 1, and Existing Plus Project Phases 1 and 2, the following improvements are recommended under Existing Plus Project Buildout Conditions: 1. Restripe eastbound Moss Landing Road as one left and one right turn lane at the Highway 1/Moss Landing Road (North) intersection. 2. Designate two of the new parking spaces to be constructed under Phase 3 as ADA spaces. Construct necessary walkway ramps and loading/unloading areas adjacent to these spaces. I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 22

34 9 REFERENCES 9.1 List of References 1. Kimley-Horn and Associates, Regional Impact Fee Nexus Study Update, March 26, List of Contacts 1. Keith Raybould, Monterey Bay Aquarium Research Institute (MBARI), Moss Landing, California. 2. Chad Alinio, Monterey County Public Works Department, Salinas, California I:\2008\Jobs\ \8-058\Report\8-058 Report1.doc Page 23

35 MONTEREY BAY AQUARIUM RESEARCH INSTITUTE IN MOSS LANDING, CA SOURCE: AAA HIGGINS ASSOCIATES I:\2008\Jobs\ \8-058\Excel\8-058 Exhibits EXHIBIT 1A PROJECT LOCATION MAP (REGIONAL)

36 MONTEREY BAY AQUARIUM RESEARCH INSTITUTE SOURCE: AAA HIGGINS ASSOCIATES I:\2008\Jobs\ \8-058\Excel\8-058 Exhibits EXHIBIT 1B PROJECT LOCATION MAP (LOCAL)

37 8-058 Exhibits I:\2008\Jobs\ \8-058\Excel\8-058 Exhibits EXHIBIT 1C PROJECT SITE PLAN

38

39 Monterey-Salians Transit Route 27 Source: Monterey Salinas Transit, Exhibits I:\2008\Jobs\ \8-058\Excel\8-058 Exhibits EXHIBIT 3 EXISING TRANSIT ROUTES IN PROJECT VICINITY

40 Monterey-Salinas Transit Route 28 Source: Monterey Salinas Transit, Exhibits I:\2008\Jobs\ \8-058\Excel\8-058 Exhibits EXHIBIT 3 EXISTING TRANSIT ROUTES IN PROJECT VICINITY (CONTINUED)

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT MONTEREY, CALIFORNIA Prepared for Denise Duffy & Associates 947 Cass St. Suite 5 Monterey, CA 93940 April 16,

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Draft Report: West Berkeley Bowl Project

Draft Report: West Berkeley Bowl Project Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley 1031-1925 F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA 94549 925-284-3200 Fax:

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

7359 WISCONSIN AVENUE MONTGOMERY COUNTY, MARYLAND

7359 WISCONSIN AVENUE MONTGOMERY COUNTY, MARYLAND 7359 WISCONSIN MONTGOMERY COUNTY, MARYLAND September 1, 2017 7359 Wisconsin Avenue September 2017 7359 WISCONSIN Local Area Transportation Review Montgomery County, Maryland September 1, 2017 Prepared

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By:

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By: TRAFFIC IMPACT ANALYSIS FOR STERLING 5 th STREET APARTMENTS PROJECT Davis, CA Prepared For: Din/Cal 3, Inc. 3411 Richmond Avenue, Suite 200 Houston, Texas 77046 Prepared By: KD Anderson & Associates, Inc.

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Replacement Project EIR Appendices TRAFFIC IMPACT ANALYSIS LAKE WOHLFORD DAM Escondido, California December 19,

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

TRAFFIC IMPACT STUDY FOR

TRAFFIC IMPACT STUDY FOR TRAFFIC IMPACT STUDY FOR YUBA CROSSINGS MIXED USE DEVELOPMENT Yuba City, CA Prepared For: Yuba Crossings LLC 1825 Del Paso Blvd Sacramento, CA 95815 Prepared By: KDAnderson & Associates, Inc. 3853 Taylor

More information

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject:

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject: MEMORANDUM Date: August 12, 2014 TG: 13329.01 To: From: Subject: Jeremy Krout EPD Solutions Inc. Rafik Albert EPD Solutions Inc. Rawad Hani Transpo Group AP North Lake Solar Project Traffic Scoping The

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II TRAFFIC IMPACT ANALYSIS LOTUS RANCH El Centro, California July 31, 2015February 12, 2016 LLG Ref. 3-14-2392 Prepared by: KC Yellapu, P.E Senior Transportation Engineer & Charlene Sadiarin Transportation

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information