1 MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed City of Three Rivers, Michigan Traffic Impact Study Introduction This memorandum presents the results of a Traffic Impact Study (TIS) for the proposed Three Rivers Youth Sports Complex in the City of Three Rivers, Michigan. The project site is located generally between N. Main Street (BR-131) and Buckhorn Road, approximately ⅓ mile south of Lovers Lane. The proposed development plans include approximately 72 acres of sports complex development with site access provided via one driveway to N. Main Street (BR-131) and one driveway to Buckhorn Road. The Michigan Department of Transportation (MDOT) has jurisdiction over N. Main Street (BR-131) and has required a TIA for the project in accordance with MDOT Traffic & Safety Note 607C. The purpose of this study is to evaluate the traffic-related impacts (if any) of the proposed development on the following study intersections: N. Main Street (BR-131) & US-131, N. Main Street (BR-131) & Hoffman Street, N. Main Street (BR-131) & Clifton Drive, Portage Avenue & Hoffman Street, and The proposed site access points. The scope of the study was developed based the information outlined by the City of Three Rivers in the Request for Proposals, information as discussed at the project kick-off meeting, Fleis & VandenBrink s (F&V) knowledge of the study area and understanding of the development program, information provided by MDOT in accordance with MDOT Traffic & Safety Note 607C, accepted traffic engineering practice, and methodologies published by the Institute of Transportation Engineers (ITE). The study analyses were completed using Synchro and SimTraffic (Version 9) traffic analysis software. Data Collection The existing weekday AM, PM and Saturday (SAT) turning movement traffic volume data were collected by F&V subconsultant Traffic Data Collection, Inc. (TDC) on Thursday, August 18, 2016 and Saturday, August 20, 2016 during the weekday AM (7:00 AM to 9:00 AM) and PM (4:00 AM to 6:00 PM) and Saturday AM (9:00 AM to 12:00 PM) and PM (12:00 PM to 3:00 PM) peak periods at the study intersections Stansbury Boulevard, Suite 150 Farmington Hills, MI P: F: TIS FINAL Memo.docx

2 Traffic Impact Study January 5, 2017 Page 2 of 7 Additionally, 24-hour count data was collected on N. Main Street (BR-131) south of Clifton Drive on Thursday, August 18, 2016 and Saturday, August 20, The 24-hour data was collected again on Thursday, September 8, 2016 and Saturday, September 10, 2016 to assess the effects of season traffic variation. A comparison of the 24-hour traffic volume data collected in August and in September showed a seasonal increase in traffic volumes of approximately 7% during the weekday and weekend data collection periods in September. Therefore, the turning movement count data collected in August was increased by 7% at all study intersections to provide a conservative analysis. This approach was agreed upon by MDOT, the St. Joseph County Road Commission (SJCRC), and the City of Three Rivers. Lastly, F&V collected an inventory of existing lane use and traffic controls at the study intersections and obtained existing signal timing information from MDOT. The existing AM, PM, SAT AM, and SAT PM seasonally-adjusted peak hour traffic volumes were identified based on the data collected and the peak hour turning movement volumes at each intersection were utilized for this study. This data was used as a baseline to establish existing traffic conditions without the proposed development. The applicable data referenced in this memorandum are attached. Existing Conditions Existing peak hour vehicle delays and Levels of Service (LOS) were calculated at the study intersections using Synchro (Version 9) traffic analysis software. This analysis was based on the existing lane use and traffic control shown on the attached Figure 1, the existing peak hour traffic volumes shown on the attached Figure 2, and the methodologies presented in the Highway Capacity Manual, 2010 (HCM). Typically, LOS D is considered acceptable, with LOS A representing minimal delay, and LOS F indicating failing conditions. Additionally, SimTraffic network simulations were reviewed to evaluate network operations and vehicle queues. The results of the existing conditions analysis are attached and summarized in Table 1. Table 1: Existing Intersection Operations AM Peak PM Peak SAT AM Peak SAT PM Peak Intersection Control Delay Approach (s/veh) LOS Delay (s/veh) LOS Delay (s/veh) LOS Delay (s/veh) LOS 1. N. Main Street (BR-131) Signalized EB 25.7 C 25.7 C 27.3 C 26.5 C & US-131 WB 31.6 C 31.1 C 30.6 C 31.3 C NB 5.1 A 6.8 A 4.9 A 5.1 A SB 5.9 A 8.5 A 5.0 A 6.0 A Overall 10.0 A 11.3 B 9.3 A 9.3 A 2. N. Main Street (BR-131) STOP EB 10.7 B 11.1 B 9.4 A 10.9 B & Clifton Drive (Minor) NB LT 0.0 A 7.9 A 0.0 A 7.8 A SB Free Free Free Free 3. N. Main Street (BR-131) Signalized EB 24.5 C 26.5 C 25.3 C 26.4 C & Hoffman Street WB 24.6 C 25.5 C 25.0 C 25.8 C NB 8.7 A 9.6 A 9.0 A 9.4 A SB 9.0 A 9.8 A 9.4 A 10.1 B Overall 15.0 B 15.9 B 15.5 B 15.5 B 4. Hoffman Street STOP EB 8.3 A 10.1 B 8.3 A 8.5 A & Portage Avenue (All-Way) WB 8.4 A 9.3 A 8.2 A 8.2 A NB 8.1 A 8.8 A 8.2 A 8.2 A SB 8.9 A 9.7 A 8.3 A 8.4 A Overall 8.5 A 9.6 A 8.3 A 8.4 A The results of the existing conditions analysis indicate that all study intersection approaches and movements currently operate acceptably at a LOS C or better during all peak periods. Additionally, a review of network simulations indicated acceptable traffic operations during all peak hours TIS FINAL Memo.docx

3 Traffic Impact Study January 5, 2017 Page 3 of 7 Crash Review F&V obtained the most recent available three years (June 2013 to June 2016) of crash data for each of the four study intersections. The data was obtained from the Traffic Crash Analysis Tool (TCAT) maintained by the Traffic Improvement Association of Michigan (TIA). The crash data is summarized in Table 2. Table 2: Intersection Crash Analysis Summary Table CRASH TYPE Location Control US-131 & N. Main Street (BR-131) Signalized N. Main Street (BR-131) & Clifton Road Stop 0 N. Main Street (BR-131) & Hoffman Street Signalized Hoffman Street & Portage Avenue Stop The results of the analysis show that there were a total of 48 crashes, including one Fatal, two Type A, five Type B, and nine Type C injuries. The majority (67%) of crashes were rear-end and angle crashes (38% and 29%, respectively). The results are discussed below by location. US-131 & N. Main Street (BR-131) There were 28 crashes at the intersection of US-131 & N. Main Street (BR-131) resulting in an average of 9.3 crashes per year over the three-year analysis period. The most prevalent crash type at the intersection was rear-end crashes; these 12 crashes accounted for 43% of reported crashes during the analysis period. The remaining crashes were comprised seven angle, five head-on left-turn, two sideswipe, and two other crashes. Most of the crashes resulted in property damage only, but eleven total crashes resulted in injuries, six of which had possible (C-level) injuries. Two of the crashes resulted in incapacitating injuries and one crash resulted in a fatality. This fatality occurred when a vehicle making a southbound left turn failed to yield and was struck by a vehicle travelling northbound on US-131. N. Main Street (BR-131) & Clifton Road There was no reported crash history at the intersection of N. Main Street & Clifton Road during the three-year analysis period. N. Main Street (BR-131) & Hoffman Street There were 17 crashes at the intersection of N. Main Street & Hoffman Street resulting in an average of 5.7 crashes per year over the three-year analysis period. The most prevalent crash type at the intersection was rear-end crashes; these eight crashes accounted for 47% of reported crashes during the analysis period. The remaining crashes were comprised five angle, two head-on left-turn, and two sideswipe crashes. Most of the crashes resulted in property damage only, but four total crashes resulted in injuries, three of which had possible (C-level) injuries. One of the crashes resulted in a non-incapacitating injury. Hoffman Street & Portage Avenue There were three crashes at the intersection of Hoffman Street & Portage Avenue resulting in an average of 1.0 crash per year over the three-year analysis period. Two angle crashes and one rear-end crash were reported; all three of these crashes resulted in property damage only. The results of the crash analysis show that based on the frequency, type, and severity of crashes at the intersections, a correctable crash pattern does not exist. It is not expected that an increase in traffic volumes related to the sports complex development would result in an increase in crash rates at any of the study intersections. Angle Head-On Left Other/Unknown Rear-End Rear-End Left Rear-End Right Sideswipe Opposite Sideswipe Same Total Crashes (3 years) TIS FINAL Memo.docx

4 Traffic Impact Study January 5, 2017 Page 4 of 7 Background Conditions Historical traffic volume data was reviewed in order to determine the applicable growth rate for the existing traffic volumes to the project build-out year of The historical growth rates on US-131 indicate that between 2010 and 2015, the average annual growth rate was stagnant or declining to the south of N. Main Street and the average annual growth rate was 0.6% to the north of N. Main Street. Additionally, the historical growth rates on N. Main Street (BR-131) indicate that between 2000 and 2015, the average annual growth rate was stagnant or declining to the south of US-131; however, an average annual growth rate of 2.3% was identified more recently from Therefore, a conservative growth rate of 1% was utilized throughout the study area except for the N. Main Street corridor, where a conservative growth rate of 2% was applied for the analysis of background conditions without the proposed development. In addition to background growth, it is important to account for traffic that will be generated by approved developments within the vicinity of the study area that have yet to be constructed or are currently under construction. No background developments were identified within the study area that are expected to be completed prior to the site buildout of the proposed development. Background Operations Background peak hour vehicle delays and LOS were calculated based on the existing lane use and traffic control shown on the attached Figure 1, the background traffic volumes shown on the attached Figure 3, and the methodologies presented in the HCM. The results of the background conditions assessment are attached and summarized in Table 3. Table 3: Background Intersection Operations AM Peak PM Peak SAT AM Peak SAT PM Peak Intersection Control Delay Approach (s/veh) LOS Delay (s/veh) LOS Delay (s/veh) LOS Delay (s/veh) LOS 1. N. Main Street (BR-131) Signalized EB 25.4 C 25.4 C 27.1 C 26.2 C & US-131 WB 31.7 C 31.9 C 30.6 C 31.3 C NB 5.5 A 7.4 A 5.3 A 5.4 A SB 6.5 A 10.1 B 5.4 A 6.6 A Overall 10.5 B 12.4 B 9.6 A 9.8 A 2. N. Main Street (BR-131) STOP EB 10.8 B 11.4 B 9.5 A 11.3 B & Clifton Drive (Minor) NB LT 0.0 A 8.0 A 0.0 A 7.9 A SB Free Free Free Free 3. N. Main Street (BR-131) Signalized EB 24.6 C 26.7 C 25.5 C 26.6 C & Hoffman Street WB 24.8 C 25.7 C 25.2 C 26.0 C NB 8.8 A 9.8 A 9.2 A 9.7 A SB 9.2 A 10.1 B 9.6 A 10.4 B Overall 14.9 B 16.0 B 15.5 B 15.6 B 4. Hoffman Street STOP EB 8.4 A 10.4 B 8.4 A 8.6 A & Portage Avenue (All-Way) WB 8.5 A 9.5 A 8.3 A 8.3 A NB 8.2 A 8.9 A 8.2 A 8.3 A SB 9.0 A 9.8 A 8.4 A 8.6 A Overall 8.6 A 9.8 A 8.3 A 8.5 A The results of the background conditions analysis indicate that all study intersection approaches and movements will continue to operate acceptably at a LOS C or better during all peak periods. Additionally, a review of network simulations indicated acceptable traffic operations during all peak hours TIS FINAL Memo.docx

5 Traffic Impact Study January 5, 2017 Page 5 of 7 Land Use Site Trip Generation and Assignment The number of weekday, AM, PM, SAT AM, and SAT PM peak hour vehicle trips that would be generated by the proposed development was forecast based on data published by the Institute of Transportation Engineers (ITE) in Trip Generation, 9 th Edition and the Trip Generation Handbook, 3 rd Edition. Trip Generation contains data that allows site-generated vehicle trips to be estimated for the Saturday peak hour of the facility based on total fields at a Soccer Complex. This data does not discern between the Saturday AM and the Saturday PM peak hours. Therefore, when the Saturday peak hour inbound and outbound trips for the site were calculated, it was assumed that the higher volume of outbound site-generated trips would correspond with the Saturday PM peak hour, when vehicles are more likely to be leaving the site. The site-generated inbound and outbound trips were assumed to be reversed for the Saturday AM peak hour. The site trip generation forecast was reviewed and approved by the City of Three Rivers for use in this study. The trip generation calculations are summarized in Table 4. ITE Code Amount Units Table 4: Site Trip Generation SAT AM SAT PM Average AM Peak Hour PM Peak Hour Peak Hour Peak Hour Daily Traffic In Out Total In Out Total In Out Total In Out Total Soccer Complex Fields 1, The vehicle trips that would be generated by the proposed development were assigned to the study roadway network based on the proposed site access locations and the methodologies published by ITE. This methodology indicates that new trips will originate from nearby residences and will return to their direction of origin. The distribution of site-generated traffic was reviewed and approved by the City of Three Rivers for use in this study. The calculated trip distributions are summarized in Table 5. Table 5: Site Trip Distribution AM / PM / SAT AM / SAT PM Peak Hour To / From via IN OUT North N. Main Street 15% 15% Buckhorn Rd. 20% 20% South N. Main Street 20% 20% US % 20% Portage Ave. 25% 25% 100% 100% The site-generated vehicle trips were assigned to the study road network based on these trip distribution patterns and are shown on the attached Figure 4. The site-generated trips were added to the background traffic volumes to calculate the future peak hour traffic volumes shown on the attached Figure 5. Future Conditions Future peak hour vehicle delays and LOS with the proposed development were calculated based on the existing lane use, existing traffic control, and proposed site access plan shown on the attached Figure 1, the future traffic volumes shown on the attached Figure 5, and the methodologies presented in the HCM. The results of the analysis of future conditions are attached and are summarized in Table TIS FINAL Memo.docx

6 Intersection Control Approach Traffic Impact Study January 5, 2017 Page 6 of 7 Table 6: Future Intersection Operations AM Peak PM Peak SAT AM Peak SAT PM Peak Delay Delay Delay Delay (s/veh) LOS (s/veh) LOS (s/veh) LOS (s/veh) LOS 1. N. Main Street (BR-131) Signalized EB 25.4 C 25.0 C 26.0 C 24.9 C & US-131 WB 31.7 C 33.6 C 31.1 C 32.5 C NB 5.6 A 7.8 A 6.2 A 6.6 A SB 6.6 A 12.9 B 6.9 A 9.1 A Overall 10.6 B 14.0 B 11.1 B 12.0 B 2. N. Main Street (BR-131) STOP EB 11.0 B 11.8 B 9.8 A 11.9 B & Clifton Drive (Minor) NB LT 0.0 A 8.1 A 0.0 A 8.1 A SB Free Free Free Free 3. N. Main Street (BR-131) Signalized EB 24.7 C 27.8 C 27.4 C 28.8 C & Hoffman Street WB 24.8 C 25.7 C 25.2 C 26.0 C NB 8.8 A 10.4 B 9.9 A 10.6 B SB 9.2 A 10.6 B 11.3 B 12.8 B Overall 14.9 B 16.5 B 16.2 B 16.9 B 4. Hoffman Street STOP EB 8.5 A 11.4 B 9.2 A 9.5 A & Portage Avenue (All-Way) WB 8.6 A 10.4 B 9.1 A 9.1 A NB 8.2 A 10.3 B 9.8 A 9.7 A SB 9.0 A 10.8 B 9.7 A 10.3 B Overall 8.7 A 10.8 B 9.5 A 9.8 A 5. N. Main Street (BR-131) STOP WB 10.5 B 14.2 B 15.9 C 20.8 C & W. Site Access (Minor) NB Free Free Free Free SB LT 7.7 A 8.5 A 8.3 A 8.5 A 6. Buckhorn Road STOP EB 9.3 A 11.2 B 12.7 B 12.8 B & E. Site Access (Minor) NB LT 7.5 A 7.8 A 7.8 A 7.9 A SB Free Free Free Free The results of the future conditions analysis indicate that all study intersection approaches and movements will continue to operate acceptably at a LOS C or better during all peak periods. Additionally, a review of network simulations indicated acceptable traffic operations during all peak hours. Access Management The two proposed site driveways were evaluated for a right-turn lane and taper according to the guidelines outlined in MDOT Traffic and Safety Note 604A. Additionally, the E. Site Drive was evaluated for a left-turn lane or a left turn passing flare according to the guidelines outlined in MDOT Traffic and Safety Notes 605A and 603A, respectively. The results of this analysis indicate that a right-turn lane is warranted at the proposed W. Site Drive and a right turn taper is warranted at the proposed E. Site Drive. In addition, a left-turn passing lane is warranted at the proposed E. Site Drive. Site circulation is provided via a two-way, two-lane roadway connection linking the west site access and the east site access, which allows for the maintenance of personal and emergency vehicle circulation throughout the five parking areas and throughout the site TIS FINAL Memo.docx

7 Traffic Impact Study January 5, 2017 Page 7 of 7 Cost Estimation The proposed road improvements are located at the west and east site access locations. There are no recommended external road improvements. Table 7 summarizes each of the proposed road improvements by location and provides an estimate of construction costs for each individual improvement. Table 7: 2021 Future Improvements Summary Intersection Roadway Improvement Estimated Cost N. Main Street & W. Site Drive Construct NB right turn lane $20,000 Buckhorn Rd. & E. Site Drive Conclusions Construct SB right turn taper $3,000 Construct NB left turn passing lane $27,000 The conclusions of this Traffic Impact Study are as follows: 1. All study intersection approaches and movements currently operate acceptably during all peak periods. 2. Under background traffic conditions without the proposed development, traffic operations will operate in a manner similar to existing conditions with minor increases in vehicle delays and LOS. 3. The analysis of future traffic conditions with the proposed development showed that the sports complex will not have a significant impact on the study intersections. Future vehicle delays will be similar to background conditions and minor increases in delay will not be discernable. 4. All approaches and movements at the proposed site driveways will operate acceptably at a LOS C or better during all peak periods. 5. A right-turn lane is warranted at the proposed W. Site Drive and a right turn taper is warranted at the proposed E. Site Drive. In addition, a left-turn passing lane is warranted at the proposed E. Site Drive. Any questions related to this memorandum, study, analyses, and results should be addressed to Fleis & VandenBrink. Attached: Figures 1-5 Traffic Volume Data Synchro/SimTraffic Results Turn Lane Warrants TIS FINAL Memo.docx

8

9

10

11

12

13 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 24L & 4PU File Name : TMC_1 Main & US-131_Wk Site Code : TMC_1 Start Date : 8/18/2016 Page No : 1 Groups Printed- Pass Cars - Single Units - Heavy Trucks US-131 Southbound N. Main Street (BR-131) Westbound US-131 Northbound Wilbur Road Eastbound Start Time Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total **** BREAK **** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Comments: 4 hour video traffic study conducted during typical weekday (Thursday) from 7:00-9:00 AM morning & 4:00-6:00 PM afternoon peak hours. Signalized, skewed intersection, no ped. signals. US 131 is divided highway. Video SCU cameras were located within NE & NW intersection quadrants.

14 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 24L & 4PU File Name : TMC_1 Main & US-131_Wk Site Code : TMC_1 Start Date : 8/18/2016 Page No : 2

15 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 24L & 4PU File Name : TMC_1 Main & US-131_Wk Site Code : TMC_1 Start Date : 8/18/2016 Page No : 3 US-131 Southbound N. Main Street (BR-131) Westbound US-131 Northbound Wilbur Road Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM :30 AM :45 AM :00 AM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks

16 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 24L & 4PU File Name : TMC_1 Main & US-131_Wk Site Code : TMC_1 Start Date : 8/18/2016 Page No : 4 US-131 Southbound N. Main Street (BR-131) Westbound US-131 Northbound Wilbur Road Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 12:45 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks

17 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 24L & 4PU File Name : TMC_1 Main & US-131_Sat Site Code : TMC_1 Start Date : 8/20/2016 Page No : 1 Groups Printed- Pass Cars - Single Units - Heavy Trucks US 131 Southbound N. Main Street (BR-131) Westbound US 131 Northbound Wilbur Road Eastbound Start Time Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Int. Total 09:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Comments: 6 hour video traffic study conducted during typical weekend (Saturday) from 9:00 AM - 3:00 PM peak hours. Signalized skewed intersection, no ped. signals. US 131 is a divided roadway. Video SCU cameras were located within NE & SW intersection quadrants.

18 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 24L & 4PU File Name : TMC_1 Main & US-131_Sat Site Code : TMC_1 Start Date : 8/20/2016 Page No : 2

19 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 24L & 4PU File Name : TMC_1 Main & US-131_Sat Site Code : TMC_1 Start Date : 8/20/2016 Page No : 3 US 131 Southbound N. Main Street (BR-131) Westbound US 131 Northbound Wilbur Road Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 09:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:00 AM 11:00 AM :15 AM :30 AM :45 AM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks

20 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 24L & 4PU File Name : TMC_1 Main & US-131_Sat Site Code : TMC_1 Start Date : 8/20/2016 Page No : 4 US 131 Southbound N. Main Street (BR-131) Westbound US 131 Northbound Wilbur Road Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 PM to 02:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 01:30 PM 01:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks

21 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 4SY File Name : TMC_2 Main & Clifton_Wk Site Code : TMC_2 Start Date : 8/18/2016 Page No : 1 Groups Printed- Pass Cars - Single Units - Heavy Trucks N. Main Street (BR-131) Southbound Field Driveway Westbound N. Main Street (BR-131) Northbound Clifton Street Eastbound Start Time Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total **** BREAK **** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Comments: 4 hour video traffic study conducted during typical weekday (Thursday) from 7:00-9:00 AM morning & 4:00-6:00 PM afternoon peak hours. Non-signalized intersection, Clifton Street is stop controlled for Main Street. Video SCU camera was located within NW intersection quadrant.

22 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 4SY File Name : TMC_2 Main & Clifton_Wk Site Code : TMC_2 Start Date : 8/18/2016 Page No : 2

23 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 4SY File Name : TMC_2 Main & Clifton_Wk Site Code : TMC_2 Start Date : 8/18/2016 Page No : 3 N. Main Street (BR-131) Southbound Field Driveway Westbound N. Main Street (BR-131) Northbound Clifton Street Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM :00 AM :15 AM :30 AM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks

24 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 4SY File Name : TMC_2 Main & Clifton_Wk Site Code : TMC_2 Start Date : 8/18/2016 Page No : 4 N. Main Street (BR-131) Southbound Field Driveway Westbound N. Main Street (BR-131) Northbound Clifton Street Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 12:45 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks

25 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 4SY File Name : TMC_2 Main & Clifton_Sat Site Code : TMC_2 Start Date : 8/20/2016 Page No : 1 Groups Printed- Pass Cars - Single Units - Heavy Trucks N. Main Street (BR-131) Southbound Field Driveway Westbound N. Main Street (BR-131) Northbound Clifton Street Eastbound Start Time Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Int. Total 09:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Comments: 6 hour video traffic study conducted during typical weekend (Saturday) from 9:00 AM - 3:00 PM peak hours. Non-signalized, intersection no ped. signals. with push button peds. all quadrants. Video SCU camera was located within NW intersection quadrant.

26 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 4SY File Name : TMC_2 Main & Clifton_Sat Site Code : TMC_2 Start Date : 8/20/2016 Page No : 2

27 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 4SY File Name : TMC_2 Main & Clifton_Sat Site Code : TMC_2 Start Date : 8/20/2016 Page No : 3 N. Main Street (BR-131) Southbound Field Driveway Westbound N. Main Street (BR-131) Northbound Clifton Street Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 09:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 10:15 AM 10:15 AM :30 AM :45 AM :00 AM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks

28 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 4SY File Name : TMC_2 Main & Clifton_Sat Site Code : TMC_2 Start Date : 8/20/2016 Page No : 4 N. Main Street (BR-131) Southbound Field Driveway Westbound N. Main Street (BR-131) Northbound Clifton Street Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 PM to 02:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 01:15 PM 01:15 PM :30 PM :45 PM :00 PM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks

29 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 5DW File Name : TMC_3 Main & Hoffman_Wk Site Code : TMC_3 Start Date : 8/18/2016 Page No : 1 Groups Printed- Pass Cars - Single Units - Heavy Trucks - Peds N. Main Street (BR-131) Southbound Hoffman Street Westbound N. Main Street (BR-131) Northbound Hoffman Street Eastbound Start Time Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total **** BREAK **** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Peds % Peds Comments: 4 hour video traffic study conducted during typical weekday (Wednesday) from 7:00-9:00 AM morning & 4:00-6:00 PM afternoon peak hours. Signalized intersection with ped. signals all quadrants. No push button. Video SCU camera was located within SE intersection quadrant.

30 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 5DW File Name : TMC_3 Main & Hoffman_Wk Site Code : TMC_3 Start Date : 8/18/2016 Page No : 2

31 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 5DW File Name : TMC_3 Main & Hoffman_Wk Site Code : TMC_3 Start Date : 8/18/2016 Page No : 3 N. Main Street (BR-131) Southbound Hoffman Street Westbound N. Main Street (BR-131) Northbound Hoffman Street Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM :00 AM :15 AM :30 AM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Peds % Peds

32 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 5DW File Name : TMC_3 Main & Hoffman_Wk Site Code : TMC_3 Start Date : 8/18/2016 Page No : 4 N. Main Street (BR-131) Southbound Hoffman Street Westbound N. Main Street (BR-131) Northbound Hoffman Street Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 12:45 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Peds % Peds

33 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 5DW File Name : TMC_3 Main & Hoffman_Sat Site Code : TMC_3 Start Date : 8/20/2016 Page No : 1 Groups Printed- Pass Cars - Single Units - Heavy Trucks - Peds N. Main Street (BR-131) Southbound Hoffman Street Westbound N. Main Street (BR-131) Northbound Hoffman Street Eastbound Start Time Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Int. Total 09:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Peds % Peds Comments: 6 hour video traffic study conducted during typical weekend (Saturday) from 9:00 AM - 3:00 PM peak hours. Signalized intersection with ped. signals for all quadrants. No push buttons.. Video SCU camera was located within SE intersection quadrant.

34 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 5DW File Name : TMC_3 Main & Hoffman_Sat Site Code : TMC_3 Start Date : 8/20/2016 Page No : 2

35 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 5DW File Name : TMC_3 Main & Hoffman_Sat Site Code : TMC_3 Start Date : 8/20/2016 Page No : 3 N. Main Street (BR-131) Southbound Hoffman Street Westbound N. Main Street (BR-131) Northbound Hoffman Street Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 09:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 10:30 AM 10:30 AM :45 AM :00 AM :15 AM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Peds % Peds

36 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Dry/AM Rain/PM Deg's 80's Count By: Video VCU 5DW File Name : TMC_3 Main & Hoffman_Sat Site Code : TMC_3 Start Date : 8/20/2016 Page No : 4 N. Main Street (BR-131) Southbound Hoffman Street Westbound N. Main Street (BR-131) Northbound Hoffman Street Eastbound Start Time Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Rgt Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 PM to 02:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 01:15 PM 01:15 PM :30 PM :45 PM :00 PM Total Volume % App. Total PHF Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Peds % Peds

37 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 1TM File Name : TMC_4 Portage & Hoffman_Wk Site Code : TMC_4 Start Date : 8/18/2016 Page No : 1 Groups Printed- Pass Cars - Single Units - Heavy Trucks - Peds Portage Avenue Southbound Hoffman Street Westbound Portage Avenue Northbound Hoffman Street Eastbound Start Time Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Rgt Thru Left Peds App. Total Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total **** BREAK **** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % Pass Cars % Pass Cars Single Units % Single Units Heavy Trucks % Heavy Trucks Peds % Peds Comments: 4 hour video traffic study conducted during typical weekday (Wednesday) from 7:00-9:00 AM morning & 4:00-6:00 PM afternoon peak hours. Non-signalized, all-way stop controlled intersection. Video SCU camera was located within SW intersection quadrant.

38 Traffic Data Collection (TDC) tdccounts.com Phone: (586) Traffic Study Performed For: Fleis & VandenBrink Project: Three Rivers Traffic Study Type: 4 Hr. Video Turning Movement Count Weather: Clear, Dry Deg's 80's Count By: Video VCU 1TM File Name : TMC_4 Portage & Hoffman_Wk Site Code : TMC_4 Start Date : 8/18/2016 Page No : 2

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017 Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: Sue Polka, City Engineer, City of Arden Hills From:

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

Kansas City Missouri Public Works 414 East 12th Street Kansas City, Mo

Kansas City Missouri Public Works 414 East 12th Street Kansas City, Mo Page No : 1 Groups Printed- Unshifted Southbound Westbound Northbound Eastbound Start Time Peds App. Total Peds App. Total Peds App. Total Peds App. Total Exclu. Total Inclu. Total Int. Total 07:00 AM

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

TRANSPORTATION TECHNICAL REPORT

TRANSPORTATION TECHNICAL REPORT TRANSPORTATION TECHNICAL REPORT for Sunrise Elementary School Replacement PREPARED FOR: Puyallup School District PREPARED BY: 6544 NE 61 st Street, Seattle, WA 98115 ph: (26) 523-3939 fx: (26) 523-4949

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS

TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS PARE PROJECT NO. 17120.00 REPORT TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS SUBMITTED TO: GEORGETOWN CAPITAL MANAGEMENT PO BOX 369 GEORGETOWN, MA 01833

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study )

Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study ) Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study ) D-bar-A Project Traffic Impact Study November 3 rd, 2015 1427

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Mineola Village Green

Mineola Village Green Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

Letter of Transmittal

Letter of Transmittal Letter of Transmittal To: Chris Lovell City of Richmond Hill Date: 5/2/6 Job 2582 Re: Richmond Hill-South Bryan County Transportation STudy WE ARE SENDING YOU THE FOLLOWING ITEMS ( attached) ( under separate

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis Congregate Care Facility Billerica, Massachusetts Prepared For: Hawthorn Development, LLC 35 Kettle Court Salem, OR 973 Prepared By: Sebago Technics, Inc. 75 John Roberts Road,

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

LCPS Valley Service Center

LCPS Valley Service Center Traffic Impact Study LCPS Valley Service Center Loudoun County, Virginia November 4, 2015 Prepared For: Loudoun County Public Schools 21000 Education Court Ashburn, VA 20148 Prepared by: 1140 Connecticut

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Volume 2 Appendix Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. June 18, 2018

Volume 2 Appendix Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. June 18, 2018 Volume 2 Appendix 2727 Turtle Creek Boulevard Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Maple Avenue Drive 1 Fairmount Street Gillespie

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900