1 Bay Terrace Apartments Traffic Impact Analysis Prepared for: City of San Mateo September 16, 2011 Hexagon Office: 111 W. St. John Street, Suite 850 San Jose, CA Hexagon Job Number: 10MH08 Phone: Document Name: Bay Terrace Report doc

2 Bay Terrace Apartments September 16, 2011 Table of Contents 1. Introduction Existing Conditions Background Conditions Project Conditions Year 2030 Conditions Conclusion Appendices Appendix A: Appendix B: Traffic Counts Intersection Level of Service Calculations List of Tables Table 1 Level of Service Definitions at Signalized Intersections... 3 Table 2 Intersection Levels of Service Under Existing Conditions... 9 Table 3 Intersection Levels of Service Under Background Conditions Table 4 Project Trip Generation Table 5 Intersection Levels of Service Under Project Conditions Table 6 Parking Supply Comparison Table 7 Intersection Levels of Service Under 2030 Cumulative Conditions Table 8 Intersection Level of Service Summary List of Figures Figure 1 Site Location and Study Area... 4 Figure 2 Existing Traffic Volumes... 8 Figure 3 Background Traffic Volumes Figure 4 Project Trip Distribution Figure 5 Assignment of Project Trips Figure 6 Project Traffic Volumes Figure With Project Traffic Volumes Page i

3 Bay Terrace Apartments September 16, Introduction This report presents the results of the traffic impact analysis conducted for the proposed residential development located at the southeast corner of La Selva Street and Casa De Campo in San Mateo, California. The project site is adjacent to and immediately west of Los Prados Park. The proposed project would demolish the existing 120-unit apartment complex on the site and build a new 228-unit apartment complex. The project site would include a multi-level parking structure with a total of 397 stalls. Access to the parking structure and loading and service areas would be from La Selva Street. The location of the project site and the surrounding study area are shown on Figure 1. Scope of Study This study was conducted for the purpose of identifying the potential traffic impacts related to the proposed development. The impacts of the project were evaluated following the standards and methodologies set forth by the City of San Mateo. The traffic study includes an analysis traffic conditions at one signalized intersection in the vicinity of the project site during the weekday AM and PM peak hours as well as the Saturday peak hour. The study intersection is identified below. Study Intersection E. Hillsdale Boulevard and S. Norfolk Street Traffic conditions at the study intersection were analyzed for the weekday AM and PM peak hours because it is during these periods that the project will have the greatest impact on traffic conditions. In addition, because the study intersection serves Los Prados Park, which is heavily used on weekends, the peak hour on Saturday also was evaluated. Analysis Scenarios Traffic conditions were evaluated for the following scenarios: Existing Conditions Year 2010 Background Conditions Existing Conditions plus approved projects in the study area Project Conditions Background Conditions plus trips associated with the proposed project 2030 With Project Conditions Cumulative 2030 conditions with the proposed project Page 2

4 Bay Terrace Apartments September 16, 2011 Analysis Methodologies and Level of Service Standards Traffic conditions were evaluated using level of service (LOS). Level of Service is a qualitative description of operating conditions ranging from LOS A, or free-flow conditions with little or no delay, to LOS F, or forced-flow conditions with extreme delays. A general description of level of service (LOS) is provided in Table 1. Table 1 Level of Service Definitions at Signalized Intersections Level of Service Description Average Control Delay Per Vehicle (sec.) A Operations with very low delay occurring with favorable progression Up to 10.0 and/or short cycle lengths. B Operations with low delay occurring with good progression and/or 10.1 to 20.0 short cycle lengths. C Operations with average delays resulting from fair progression 20.1 to 35.0 and/or longer cycle lengths. Individual cycle failures begin to appear. D Operations with longer delays due to a combination of unfavorable 35.1 to 55.0 progression, long cycle lengths, or high V/C ratios. Many vehicles stop and individual cycle failures are noticeable. E Operations with high delay values indicating poor progression, long 55.1 to 80.0 cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences. This is considered to be the limit of acceptable delay. F Operation with delays unacceptable to most drivers occurring due Greater than 80.0 to oversaturation, poor progression, or very long cycle lengths. Source: Transportation Research Board, 2000 Highway Capacity Manual (Washington, D.C., 2000) p Level of service at signalized intersections in the City of San Mateo is evaluated based on the average control delay for all movements at the intersection. The City of San Mateo has established mid-level LOS D (with an average delay of 45 seconds or less) as the minimum acceptable level at the signalized study intersection. Significance Criteria The traffic impacts of the project are evaluated against the following criteria to determine whether the impacts are significant. Page 3

5

6 Bay Terrace Apartments September 16, 2011 City of San Mateo Level of Service Per the City s General Plan Policy C 2.7, all projects are required, at a minimum, to pay a transportation mitigation fee. The transportation mitigation fee is used to fund planned transportation improvements that are identified in the City of San Mateo Traffic Mitigation Program. In addition to paying the transportation impact fee, a development project may be required to fund off-site circulation improvements that are needed as a result of project generated traffic if: a) The acceptable level of service at a signalized intersection (mid-level LOS D with an average delay of more than 45 seconds) is exceeded by 4 seconds or more when the project traffic is added, and b) The intersection is subject to an increase in delay of 4 or more seconds, and c) The needed improvement of the intersection(s) is not funded in the applicable five-year City Capital Improvement Program from the date of application approval. The cost of the off-site improvements may be reimbursed by the City if a reimbursement program is established throughout the timeframe of the City of San Mateo s current Traffic Mitigation Program or at the time when the improvement was initially scheduled. Page 5

7 Bay Terrace Apartments September 16, Existing Conditions The project site is located at the southeast corner of La Selva Street and Casa De Campo. Automobile access to the proposed on-site parking garage would be provided via a single driveway on La Selva Street. A separate driveway on La Selva Street would serve loading, move-in, and trash pick-up. Site Access and Surrounding Roadway Network Regional access to the site is provided via US 101. US 101 is an eight-lane north-south freeway with auxiliary lanes in the vicinity of the site. US 101 extends northward through San Francisco and southward through San Jose. Access to the project site is provided via an interchange at East Hillsdale Boulevard. Local access to the site is provided by various roadways in the project vicinity as discussed below. Hillsdale Boulevard is an east-west arterial that extends from the College of San Mateo near SR 92 through San Mateo to Foster City, where it terminates at Beach Park Boulevard near the bay. The roadway cross section varies from six lanes in the vicinity of the proposed project to two lanes west of Edison Street. Hillsdale Boulevard has a full access interchange with US 101. Norfolk Street is a north-south roadway that functions as an arterial street between Hillsdale Boulevard and 3 rd Avenue. It continues as a collector street northward to Huron Avenue and southward to Los Prados Street. In the vicinity of the project site, it has four lanes. North of Hillsdale Boulevard it narrows to two lanes. La Selva Street is a two-lane street immediately west of the project site. This collector street extends westward from Norfolk Street and then turns south to front US 101. South of Los Prados Street, it functions as a local street terminating at Kimberley Way. The proposed project would have direct vehicular access via La Selva Street. Casa De Campo is a local two-lane east-west street adjacent to the northern edge of the project site. Immediately east of the project site, Casa De Campo turns northward forming a J shape with both ends terminating at La Selva Street. An entrance to Los Prados Park is located on Casa De Campo just east of the project site. Page 6

8 Bay Terrace Apartments September 16, 2011 Existing Bicycle and Pedestrian Facilities According to City of San Mateo Bike Map, there are numerous city-designated bikeways within the vicinity of the project site. The following streets in the project area have on-street bike lanes: Norfolk Street from Waters Park Drive to Ciro Avenue, La Selva Street from Norfolk Street to Los Prados Street, and Los Prados Street from Norfolk Street to La Selva Street. In addition, the following streets in the project area are designated as bike routes: Hillsdale Boulevard from Edison Street to Foster City, and Norfolk Street from Hillsdale Boulevard to La Selva Street. Pedestrian facilities near the site consist of sidewalks along all streets in the area. The portion of La Selva Street that fronts US 101 has a sidewalk on only the east side of the street immediately adjacent to the project site. The remaining streets in the study area have sidewalks along both sides of the street. Existing Transit Service Existing transit service to the study area is provided by the San Mateo County Transit District (SamTrans). SamTrans Bus Service There are five bus lines that operate in the vicinity of the project site. These are described below. Line 250 provides service between the College of San Mateo and the San Mateo Caltrain Station. In the vicinity of the project site, Line 250 operates on La Selva Street, Hillsdale Boulevard, and Norfolk Street. Line 250 operates with 30 minute headways on weekdays and Saturdays and 60 minute headways on Sundays. Line 251 provides service between the Hillsdale Shopping Center, the Hillsdale Caltrain Station, and the Bridgepoint Shopping Center. In the vicinity of the project site, Line 251 operates on Hillsdale Boulevard. Line 251 operates on weekdays and Saturdays with 60 minute headways. Line 54 operates on a limited schedule with a maximum of eight trips per day on weekdays only. It serves various attractions in San Mateo and Foster City including Hillsdale High School, the Edgewater Place Shopping Center, the Marin Cove Shopping Center, and the Foster City Library. In the vicinity of the project site, Line 54 operates on Hillsdale Boulevard. Line 359 provides service between the intersection of Hillsdale Boulevard and Norfolk Street and the Millbrae Transit Center with stops at the Beach Park Shopping Center, the Foster City Post Office and the Foster City Library. Line 359 operates only during the weekday AM and PM commute hours with 30 minute headways. Existing Traffic Volumes The existing peak-hour intersection volumes were obtained from traffic counts conducted in September and October The existing traffic volumes are shown on Figure 2. The new traffic counts conducted for this study are included in Appendix A. Page 7

9

10 Bay Terrace Apartments September 16, 2011 Existing Levels of Service The results of the intersection level of service analysis under existing conditions are summarized in Table 2. The results indicate that the study intersection currently operates at an acceptable level of service during all analysis periods. The level of service calculation sheets are included in Appendix B. Table 2 Intersection Levels of Service Under Existing Conditions Existing Int. Peak Count Avg. # Intersection Name Hour Date Delay LOS 1 E. Hillsdale Boulevard and S. Norfolk Street AM 9/23/ C PM 9/23/ D SAT 10/30/ D Page 9

11 Bay Terrace Apartments September 16, Background Conditions This chapter describes background traffic conditions. Background conditions are defined as conditions just prior to completion of the proposed project. Traffic volumes for background conditions comprise volumes from the existing traffic counts plus traffic generated by approved developments in the vicinity of the site. This chapter describes the procedure used to determine background traffic volumes and the resulting traffic conditions. Any planned and funded transportation improvements in the study area are included in background conditions. Background Roadway Network It is assumed that the transportation network under background conditions would be the same as the existing transportation network. Approved Developments Lists of approved projects were obtained from the City of San Mateo and the City of Foster City. There are four approved projects in the vicinity of the project site, as listed below. Kaiser Medical Office Building Bay Meadows Specific Plan Phase 2 Gilead Sciences (Foster City) Pilgrim Triton Phase 1 (Foster City) Background Traffic Volumes Traffic from the approved development projects were added to existing traffic volumes to yield traffic volumes for background conditions. Background traffic volumes are shown on Figure 3. Page 10

12

13 Bay Terrace Apartments September 16, 2011 Background Intersection Levels of Service The results of the intersection level of service analysis under background conditions are summarized in Table 3. The results indicate that the small number of trips generated by nearby approved projects would not affect the average intersection delay. The study intersection would continue to operate at an acceptable level of service. The level of service calculation sheets are included in Appendix B. Table 3 Intersection Levels of Service Under Background Conditions Existing Background Int. Peak Avg. Avg. # Intersection Name Hour Delay LOS Delay LOS 1 E. Hillsdale Boulevard and S. Norfolk Street AM 34.0 C 34.0 C PM 35.7 D 35.7 D SAT 37.5 D 37.5 D Page 12

14 Bay Terrace Apartments September 16, Project Conditions Project conditions are represented by background conditions with the addition of traffic generated by the project and include any project-related transportation improvements. The proposed project is located at the southeast corner of La Selva Street and Casa De Campo in San Mateo, California. The project site is adjacent to and immediately west of Los Prados Park. The proposed project would demolish the existing 120-unit apartment complex on the site and build a new 228-unit apartment complex. The project site would include a multi-level parking structure with a total of 397 stalls. Access to the parking structure and loading and service areas would be from La Selva Street. Significance Criteria The traffic impacts of the project are evaluated against the following criteria to determine whether the impacts are significant. City of San Mateo Level of Service Per the City s General Plan Policy C 2.7, all projects are required, at a minimum, to pay a transportation mitigation fee. The transportation mitigation fee is used to fund planned transportation improvements that are identified in the City of San Mateo Traffic Mitigation Program. In addition to paying the transportation impact fee, a development project may be required to fund off-site circulation improvements which are needed as a result of project generated traffic if: a) The acceptable level of service at a signalized intersection (mid-level LOS D with an average delay of no more than 45 seconds) is exceeded by 4 seconds or more when the project traffic is added, and b) The intersection is subject to an increase in delay of 4 or more seconds, and c) The needed improvement of the intersection(s) is not funded in the applicable five-year City Capital Improvement Program from the date of application approval. The cost of the off-site improvements may be reimbursed by the City if a reimbursement program is established throughout the timeframe of the City of San Mateo s current Traffic Mitigation Program or at the time when the improvement was initially scheduled. Page 13

15 Bay Terrace Apartments September 16, 2011 Project Traffic Estimates The magnitude of traffic produced by a new development and the locations where that traffic would appear are estimated using a three-step process: (1) trip generation, (2) trip distribution, and (3) trip assignment. In determining project trip generation, the magnitude of traffic entering and exiting the site is estimated for the AM and PM peak hours on weekdays and the Saturday peak hour. As part of the project trip distribution step, an estimate is made of the directions to and from which the project trips would travel. In the project trip assignment step, the project trips are assigned to specific streets and intersections in the study area. These procedures are described further in the following sections. Project Trip Generation The trip generation associated with the proposed residential development is based on the trip generation rates for apartments (land use #220) published in the Institute of Transportation Engineers (ITE) Trip Generation, Eighth Edition. After subtracting the trips generated by the existing use on site, the proposed project is estimated to generate 718 new trips on weekdays with 55 trips occurring during the AM peak hour and 67 trips occurring during the PM peak hour. On Saturdays, the proposed project is estimated to generate 690 new trips with 56 trips during the peak hour. The project trip generation estimates are presented in Table 4. Table 4 Project Trip Generation Weekdays Saturdays Daily AM Peak Hour PM Peak Hour Daily Mid-day Peak Hour Trips Trips Trips Land Use Size Rate 1 Trips Rate 1 In Out Total Rate 1 In Out Total Rate 1 Trips Rate 1 In Out Total Proposed Use Apartments 228 units Existing Use Apartments (120) units 6.65 (798) 0.51 (13) (48) (61) 0.62 (48) (26) (74) 6.39 (767) 0.52 (34) (29) (62) Net Project Trips Rates expressed in trips per dwelling unit. Source: Institute of Transportation Engineers, Trip Generation, 8th Edition. Project Trip Distribution and Assignment The project trip distribution pattern was estimated based on existing travel patterns on the surrounding roadway system and the locations of complementary land uses. The project trip distribution pattern is shown on Figure 4. A majority of trips to and from the proposed residential dwellings are expected to approach and depart to and from the west via the Hillsdale Boulevard, which provides direct access to US 101. The peak-hour trips generated by the proposed project were assigned to the roadway system in accordance with the estimated trip distribution pattern. The project trip assignment is shown on Figure 5. Project Traffic Volumes Project trips, as presented in the above project trip assignment, were added to background traffic volumes to obtain background plus project traffic volumes. Background traffic volumes plus project trips are typically referred to simply as project traffic volumes; this is contrasted with the term project trips, which is used to signify the traffic that is produced specifically by the project. The project traffic volumes are shown on Figure 6. Page 14

16

17

18

19 Bay Terrace Apartments September 16, 2011 Project Intersection Level of Service Analysis The results of the intersection level of service analysis under project conditions are summarized in Table 5. The results indicate that with the addition of project trips, the study intersection would continue to operate at an acceptable level of service. Table 5 Intersection Levels of Service Under Project Conditions Background Project Int. Peak Avg. Avg. Change # Intersection Name Hour Delay LOS Delay LOS in Delay /a/ 1 E. Hillsdale Boulevard and S. Norfolk Street AM 34.0 C 34.9 C +0.9 PM 35.7 D 36.2 D +0.5 SAT 37.5 D 37.9 D +0.4 Notes: /a/ Change in delay is measured relative to background conditions. Project Impacts on Bicycle and Pedestrian Facilities It is reasonable to assume that bicycle trips will comprise no more than two percent of the travel mode share to the site. Based on the gross trips generated by the project, the project is estimated to generate at most three bicycle trips per hour. As a result, no new off-site bicycle facilities would be required. It is reasonable to assume that pedestrian trips will comprise no more than five percent of the travel mode share (including the share that walks to transit) to the site. Thus, the project is estimated to generate no more than seven pedestrian trips per hour. This volume of pedestrian trips is not expected to exceed the carrying capacity of sidewalks along the site frontage or of sidewalks on streets surrounding the site. Thus, the project-generated pedestrian trips are not expected to require new sidewalks. The existing sidewalks should be adequate to accommodate all pedestrian traffic on and around the project site. Project Impacts on Transit Service Although no deduction for transit usage was applied to the estimated vehicular trip generation for the project, there is likely to be some transit use by residents. Assuming a transit mode share of three percent, the project would generate no more than four transit riders per hour. These riders could be accommodated by the existing bus routes that serve the project vicinity. Congestion Management Program The project would add traffic to US 101 a CMP roadway. CMP guidelines specify that a project must implement travel demand management (TDM) measures if the project produces 100 or more new peakhour trips on CMP roadways. Since the project would produce fewer than 100 trips on CMP roadways in any hour, it would not have a CMP impact. Site Access Vehicular access to the proposed parking garage would be provided via a single driveway on La Selva Street. In addition, a separate driveway on La Selva Street would be used for loading, move-in, and trash pick-up. The existing traffic volumes along La Selva Street are low enough that the addition of project trips would not disrupt traffic operations on this roadway. Page 18

20 Bay Terrace Apartments September 16, 2011 Parking Parking supply for the proposed development was evaluated using the City of San Mateo Zoning Code parking standards as well as established rates from commonly cited parking references. For apartment uses, the City of San Mateo requirements are as follows: Studio: 1.3 spaces per unit 1 Bedroom: 1.6 spaces per unit 2 Bedroom: 1.8 spaces per unit 3 Bedroom or over 1,400 sf: 2.0 spaces per unit Guest Parking: Additional 0.2 spaces per unit A summary of the required parking supply by unit type using City of San Mateo standards is shown in Table 6. Based on City requirements, the project would need a total of 423 parking spaces (377 resident spaces and 46 guest spaces). The proposed parking supply for the project is 397 spaces (355 resident spaces and 42 guest spaces), which results in an average rate of 1.56 on-site resident parking spaces per unit and 0.18 on-site guest parking spaces per unit. Thus, the project is proposing 26 fewer parking stalls than required by City Zoning Code standards. However, actual parking demand does not always match City parking supply standards. For comparative purposes, the project s parking needs were estimated using rates from the following publications: (1) Parking by Weant and Levinson and (2) Parking Generation, 3 rd Edition by the Institute of Transportation Engineers (ITE). According to the parking ratios recommended in Parking, the project should provide a total of 374 parking spaces. Based on ITE rates, it is estimated that the project would need a total of 367 spaces. These publications, which are widely referenced by transportation and planning professionals, suggest that the overall project parking supply would be adequate. Additional parking also is available on the adjacent streets. The project site plan shows that there are a total of 62 parking spaces available adjacent the project site on the south side of Casa De Campo and on both sides of La Selva Street. Currently, these spaces are used by (1) existing residential land uses around the project site and (2) residents of the existing 120 apartments on the project site (which would be demolished should the proposed project move forward). The western side of La Selva Street abuts Highway 101 therefore the parking is available primarily for the project site. Hexagon conducted a parking demand survey on Thursday, September 15, 2011 at 4:00 AM to determine how many of the on-street spaces directly adjacent to the project site are currently being used. According to the Urban Land Institute s Shared Parking, parking demand for residential uses typically peaks between the hours of 11:00 PM and 5:00 AM. Thus, the survey reflects peak parking conditions for the adjacent residential uses. Hexagon s survey showed that 49 of the 62 on-street spaces were occupied. During the observations, there were vacant on-street parking spaces directly adjacent to many of the surrounding residential properties. This is a strong indication that most of the parking in front of the project site was being used by existing residents of the project site. It is unlikely that residents from nearby properties would pass on vacant parking spaces that are closer to their residences in favor of parking spaces in front of the project site, which are father away. Thus, given the distribution of parking on La Selva Street and Casa De Campo, most of the existing parking demand observed can likely be attributed to the existing apartments on the project site. To be conservative, it is estimated that at least 25 of the 49 vehicles parked adjacent to the project site belong to residents of the project site, and as many as 24 vehicles may belong to residents of adjacent properties. Thus, Hexagon estimates that there would be at least 38 onstreet parking spaces (62-24) available for residents of the proposed project, which would more than compensate for the shortfall of 26 spaces when compared to the City s parking code. While the City of San Mateo does not allow on-street spaces to count towards meeting the parking requirements set forth in the Zoning Code, the availability of ample on-street parking supports the case for the reduction in parking as allowed under the State Density Bonus Law provisions. In conclusion, the proposed project parking supply is expected to be adequate based on the parking rates recommended by two widely referenced parking publications. Using City of San Mateo parking standards, the on-site parking supply as proposed would be 26 spaces short, but there would be at least Page 19

21 Bay Terrace Apartments September 16, on-street parking spaces available. For these reasons, it is concluded that the parking supply for the project would be adequate. Page 20

22 Bay Terrace Apartments September 16, 2011 Table 6 Parking Supply Comparison City of San Mateo Zoning Code "Parking" Published Rates 2 ITE Published Rates 3 Unit Size Proposed # Units Rate Per Unit 1 Total Parking Required Rate Per Unit Total Parking Required Rate Per Unit Total Parking Required Provided onsite 4 Studio BR BR BR or any units >1,400 sf Guest Total Excludes 0.2 guest parking spaces per unit- shown separately 2. Rates per "Parking" by Weant and Levinson. Gross rates per unit type include guest parking. 3. Rates per ITE (land Use 221) "Parking Generation, 3rd Edition," 85-percentile, plus 10%. Gross rates per unit type include guest parking. 4. Average of 1.56 res. spaces/unit & 0.18 on-site guest spaces per unit Page 21

23 Bay Terrace Apartment September 16, Year 2030 Conditions The Year 2030 traffic volumes were obtained from the Year 2030 forecasts prepared for the 2008 City of San Mateo Traffic Mitigation Report Update. Year 2030 model forecasts include the traffic generated by the proposed project. Year 2030 forecasts are not available for the Saturday peak hour. Therefore, the analysis of levels of service in the year 2030 includes only the weekday AM and PM peak hours. The 2030 with project AM and PM peak-hour volumes are shown on Figure 7. Intersection Levels of Service Under Cumulative Year 2030 with Project Conditions The results of the intersection level of service analysis under Cumulative Year 2030 with Project Traffic Conditions are summarized in Table 7. The results indicate that under Cumulative Year 2030 conditions the study intersection would continue to operate at acceptable levels of service (mid-level LOS D or better). The AM peak hour level of service for year 2030 is expected to deteriorate from LOS C to LOS D because the travel demand model forecasts a significant increase in through traffic along Hillsdale Boulevard in the year The level of service calculation sheets are included in Appendix B. Although the project will not create any new impacts, it will be required to pay Traffic Impact Fees based on the cumulative traffic increase. Impact: Mitigation: The project will contribute to the growth in cumulative traffic demand. The project will be required to pay Traffic Impact Fees based on the cumulative traffic increase. Page 22

24

25 Bay Terrace Apartment September 16, 2011 Table 7 Intersection Levels of Service Under 2030 Cumulative Conditions Year 2030 w/ Project Int. Peak Avg. # Intersection Name Hour Delay LOS 1 E. Hillsdale Boulevard and S. Norfolk Street AM 36.7 D PM 34.8 C Notes: 2030 forecasts are not available for the Saturday peak hour. Therefore, this analysis includes only the weekday AM and PM peak hours. Page 24

26 Bay Terrace Apartment September 16, Conclusion The project would not cause a significant impact at the signalized study intersection. However, the project would, as a result of its contribution to cumulative increases in traffic, be required to pay its fair share to the City of San Mateo Traffic Impact Fee. Off-Site Impacts and Mitigation Impact: Mitigation: The project will contribute to the growth in cumulative traffic demand. The project will be required to pay Traffic Impact Fees based on the cumulative traffic increase. The intersection levels of service for all study scenarios are shown in Table 8. Page 25

27 Bay Terrace Apartments September 16, 2011 Table 8 Intersection Level of Service Summary Year 2030 w/ Existing Background Project Project Int. Peak Count Avg. Avg. Avg. Change in Avg. # Intersection Name Hour Date Delay LOS Delay LOS Delay LOS Delay /a/ Delay LOS 1 E. Hillsdale Boulevard and S. Norfolk Street AM 9/23/ C 34.0 C 34.9 C D PM 9/23/ D 35.7 D 36.2 D C SAT 10/30/ D 37.5 D 37.9 D +0.4 n/a n/a Notes: /a/ Change in delay is measured relative to background conditions. /b/ 2030 forecasts are not available for the peak hour on Saturday. Page 26

28 Bay Terrace Apartments Transportation Impact Analysis Technical Appendices September 16, 2011

29 Appendix A Traffic Counts

30 AM Peak-Hour Volume Count Worksheet AUTO-CENSUS Traffic Monitoring and Analysis Date: 9/23/ Castlewood Dr. #1 Counter: Logan & Huy Los Gatos, CA Intersection Name: Norfolk & Hillsdale Phone Fax Weather: Clear City:San Mateo Norfolk Hillsdale Norfolk Hillsdale North Approach East Approach South Approach West Approach Start Time Right Thru Left Total Right Thru Left Total Right Thru Left Total Right Thru Left Total 7: : : : , , : , , : , , ,365 8: , , , ,716 8: , , , ,017 9: , , , , ,355 Peak Hour Right Thru Left Total Right Thru Left Total Right Thru Left Total Right Thru Left Total PK Hour 7:00-8: , , ,412 7:15-8: , , ,233 4,004 7:30-8: , , ,461 4,311 7:45-8: , , ,490 4,280 8:00-9: , , ,445 4,054 Peak Volumes: , , ,461 4,311 Cut and Paste NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR , Norfolk Out In Total Right Thru Left Total 3936 Left 263 Total 2899 Right 65 In 1,461 Thru 961 Hillsdale In 1874 Thru 1740 Out 2475 Right 237 Hillsdale Out 1025 Left Left Thru Right Out In Total

31 PM Peak-Hour Volume Count Worksheet AUTO-CENSUS Traffic Monitoring and Analysis Date: 9/23/ Castlewood Dr. #1 Counter: Logan & Huy Los Gatos, CA Intersection Name: Norfolk & Hillsdale Phone Fax Weather: Clear City: San Mateo Norfolk Hillsdale Norfolk Hillsdale North Approach East Approach South Approach West Approach Start Time Right Thru Left Total Right Thru Left Total Right Thru Left Total Right Thru Left Total 4: : : : : , ,647 5: , , , ,165 5: , , , ,635 5: , , , ,263 6: , , , , ,768 Peak Hour Right Thru Left Total Right Thru Left Total Right Thru Left Total Right Thru Left Total PK Hour 4:00-5: , ,647 3,654 4:15-5: , , , ,807 3,891 4:30-5: , , , ,862 4,155 4:45-5: , , , ,273 4,646 5:00-6: , , , ,121 4,574 Peak Volumes: , , , ,273 4,646 Cut and Paste NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR , , Norfolk Out In Total Right Thru Left Total 4122 Left 354 Total 2785 Right 54 In 2,273 Thru 1,229 In 1416 Thru 1215 Out 1849 Right 690 Hillsdale Hillsdale Out 1369 Left Left Thru Right ,521 Out In Total Norfolk

32 Saturday Peak-Hour Volume Count Worksheet AUTO-CENSUS Traffic Monitoring and Analysis Date: 10/30/ Castlewood Dr. #1 Counter: Patti and Ryan Los Gatos, CA Intersection Name: Norfolk & Hillsdale Phone Fax Weather: Clear City:San Mateo Norfolk Hillsdale Norfolk Hillsdale North Approach East Approach South Approach West Approach Start Time Right Thru Left Total Right Thru Left Total Right Thru Left Total Right Thru Left Total 11: : : : , ,055 12: , , ,393 12: , , , ,786 12: , , , , ,137 12: , , , , ,494 1: , , ,031 1, , ,828 Peak Hour Right Thru Left Total Right Thru Left Total Right Thru Left Total Right Thru Left Total PK Hour 11:00-12: , , ,393 3,744 11:15-12: , , ,466 3,920 11:30-12: , , ,493 4,003 11:45-12: , , ,439 3,893 12:00-1: , , ,435 3,900 Peak Volumes: , , ,493 4,003 Cut and Paste NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR , Norfolk Out In Total Right Thru Left Total 3398 Left 226 Total 2419 Right 47 In 1,493 Thru 846 Hillsdale In 1375 Thru 1188 Out 1905 Right 421 Hillsdale Out 1044 Left Left Thru Right ,436 Out In Total

33 Appendix B Level of Service Calculations

34 COMPARE Fri Dec 03 16:40: Page 3-1 Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) Existing AM Intersection #50: Norfolk Avenue and Hillsdale Boulevard Signal=Split/Rights=Include Final Vol: *** 39 Lanes: Signal=Protect Signal=Protect Final Vol: Lanes: Rights=Include Vol Cnt Date: 9/23/2010 Rights=Include Lanes: Final Vol: Cycle Time (sec): *** Loss Time (sec): Critical V/C: *** 1 Avg Crit Del (sec/veh): Avg Delay (sec/veh): LOS: C Lanes: Final Vol: 473*** Signal=Split/Rights=Include Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: 23 Sep 2010 << Base Vol: Growth Adj: Initial Bse: Added Vol: PasserByVol: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** Green/Cycle: Volume/Cap: Uniform Del: IncremntDel: InitQueuDel: Delay Adj: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: D D D D E E E C B E C C HCM2kAvgQ: Note: Queue reported is the number of cars per lane. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to Hexagon Trans., San Jose

35 COMPARE Fri Dec 03 16:40: Page 3-2 Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) Approved AM Intersection #50: Norfolk Avenue and Hillsdale Boulevard Signal=Split/Rights=Include Final Vol: 263*** Lanes: Signal=Protect Signal=Protect Final Vol: Lanes: Rights=Include Vol Cnt Date: 9/23/2010 Rights=Include Lanes: Final Vol: Cycle Time (sec): *** Loss Time (sec): Critical V/C: *** 1 Avg Crit Del (sec/veh): Avg Delay (sec/veh): LOS: C Lanes: Final Vol: 475*** Signal=Split/Rights=Include Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: 23 Sep 2010 << Base Vol: Growth Adj: Initial Bse: Added Vol: Approved Pr: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** Green/Cycle: Volume/Cap: Uniform Del: IncremntDel: InitQueuDel: Delay Adj: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: D D D D E E E C B E C C HCM2kAvgQ: Note: Queue reported is the number of cars per lane. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to Hexagon Trans., San Jose

36 COMPARE Fri Dec 03 16:40: Page 3-3 Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) Project AM Intersection #50: Norfolk Avenue and Hillsdale Boulevard Signal=Split/Rights=Include Final Vol: *** 39 Lanes: Signal=Protect Signal=Protect Final Vol: Lanes: Rights=Include Vol Cnt Date: n/a Rights=Include Lanes: Final Vol: Cycle Time (sec): *** Loss Time (sec): Critical V/C: *** 1 Avg Crit Del (sec/veh): Avg Delay (sec/veh): LOS: C Lanes: Final Vol: 513*** Signal=Split/Rights=Include Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: Base Vol: Growth Adj: Initial Bse: Added Vol: Project Tri: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** Green/Cycle: Volume/Cap: Uniform Del: IncremntDel: InitQueuDel: Delay Adj: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: D D D D E E E C B E C C HCM2kAvgQ: Note: Queue reported is the number of cars per lane. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to Hexagon Trans., San Jose

37 COMPARE Fri Dec 03 16:40: Page 3-4 Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) Cumulative 2030 AM Intersection #50: Norfolk Avenue and Hillsdale Boulevard Signal=Split/Rights=Include Final Vol: 242*** Lanes: Signal=Protect Signal=Protect Final Vol: Lanes: Rights=Include Vol Cnt Date: n/a Rights=Include Lanes: Final Vol: Cycle Time (sec): *** Loss Time (sec): Critical V/C: *** 1 Avg Crit Del (sec/veh): Avg Delay (sec/veh): LOS: D Lanes: Final Vol: 572*** Signal=Split/Rights=Include Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: Base Vol: Growth Adj: Initial Bse: Added Vol: PasserByVol: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** Green/Cycle: Volume/Cap: Uniform Del: IncremntDel: InitQueuDel: Delay Adj: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: E D D D E E E C C E C C HCM2kAvgQ: Note: Queue reported is the number of cars per lane. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to Hexagon Trans., San Jose

38 COMPARE Tue Nov 30 13:49: Page 3-1 Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) Existing PM Intersection #50: Norfolk Avenue and Hillsdale Boulevard Signal=Split/Rights=Include Final Vol: *** 64 Lanes: Signal=Protect Signal=Protect Final Vol: Lanes: Rights=Include Vol Cnt Date: 9/23/2010 Rights=Include Lanes: Final Vol: Cycle Time (sec): Loss Time (sec): *** 2 Critical V/C: Avg Crit Del (sec/veh): Avg Delay (sec/veh): *** LOS: D Lanes: Final Vol: 425*** Signal=Split/Rights=Include Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: 23 Sep 2010 << Base Vol: Growth Adj: Initial Bse: Added Vol: PasserByVol: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** Green/Cycle: Volume/Cap: Uniform Del: IncremntDel: InitQueuDel: Delay Adj: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: D D D D E E D C C E C C HCM2kAvgQ: Note: Queue reported is the number of cars per lane. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to Hexagon Trans., San Jose

Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20

Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20 Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 202 BRT 2030 BRT 2030 BRT Mitigation COMPARE Wed May 8 2:02: 20

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

1650 South Delaware Street

1650 South Delaware Street 65 South Delaware Street Final Transportation Impact Analysis Prepared for: City of San Mateo June 8, 28 Hexagon Transportation Consultants, Inc. Hexagon Office: 4 North Second Street, Suite 4 San Jose,

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

APPENDIX I TRAFFIC IMPACT ANALYSIS

APPENDIX I TRAFFIC IMPACT ANALYSIS I NITIAL S TUDY/MITIGATED NEGATIVE D ECLARATION NO. 1844 15 M ARCH 2018 K ILLEFER SQUARE A PARTMENTS C ITY OF ORANGE, COUNTY OF ORANGE, CALIFORNIA APPENDIX I TRAFFIC IMPACT ANALYSIS P:\WSH1601\March 2018\Killefer

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

APPENDIX G. Traffic Data

APPENDIX G. Traffic Data APPENDIX G Traffic Data HCM Signalized Intersection Capacity Analysis 2: Duanesburg Road & I-88 Ramps 10/7/2004 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl)

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Trip Generation and Parking Study New Californian Apartments, Berkeley

Trip Generation and Parking Study New Californian Apartments, Berkeley Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter

More information

700 University Avenue Mixed-Use Development. Traffic Impact Analysis

700 University Avenue Mixed-Use Development. Traffic Impact Analysis 700 University Avenue Mixed-Use Development Traffic Impact Analysis January 20, 2006 Prepared by 700 UNIVERSITY AVENUE MIXED- USE DEVELOPMENT TRAFFIC IMPACT STUDY Table of Contents 1.0 Executive Summary...

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA. Section 1 INTRODUCTION 1

GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA. Section 1 INTRODUCTION 1 GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA TABLE OF CONTENTS Page Section 1 INTRODUCTION 1 Section 2 BACKGROUND INFORMATION 6 Public Road Network... 6 Non Auto Facilities and Services...

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

3.4 TRANSPORTATION. Introduction. Existing Conditions. Existing Roadway Network

3.4 TRANSPORTATION. Introduction. Existing Conditions. Existing Roadway Network 3.4 TRANSPORTATION Introduction This section of the EIR summarizes the effects on existing and future (2035) transportation and circulation system resulting from vehicle trips associated with the Project.

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

Report. Traffic Impact Study for the Proposed Mixed-Use Development at 555 Pacific Avenue. In The City of Santa Cruz.

Report. Traffic Impact Study for the Proposed Mixed-Use Development at 555 Pacific Avenue. In The City of Santa Cruz. TJKM Transportation Consultants Report Traffic Impact Study for the Proposed Mixed-Use Development at 555 Pacific Avenue In The City of Santa Cruz February 11, 2014 Pleasanton Fresno Sacramento Santa Rosa

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Draft Report: West Berkeley Bowl Project

Draft Report: West Berkeley Bowl Project Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley 1031-1925 F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA 94549 925-284-3200 Fax:

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information