Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20

Size: px
Start display at page:

Download "Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20"

Transcription

1

2

3

4

5

6

7

8

9 Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 202 BRT 2030 BRT 2030 BRT Mitigation

10 COMPARE Wed May 8 2:02: 20 Page 3- Intersection #478: SANTA_CLARA/28TH Final Vol: Lanes: 0 0 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 202 BRT AM COMPARE Wed May 8 2:02: 20 Page 3-2 Intersection #478: SANTA_CLARA/28TH Final Vol: Lanes: 0 0 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 202 BRT PM Final Vol: Lanes: Rights=Include Vol Cnt Date: n/a Rights=Include Lanes: Final Vol: Cycle Time (sec): 85 79*** 0 43 Loss Time (sec): Critical V/C: *** Avg Crit Del (sec/veh): Avg Delay (sec/veh): LOS: C+ Final Vol: Lanes: Rights=Include Vol Cnt Date: 0/3/2006 Rights=Include Lanes: Final Vol: Cycle Time (sec): Loss Time (sec): *** Critical V/C: Avg Crit Del (sec/veh): Avg Delay (sec/veh): *** LOS: C Lanes: 0 0! 0 0 Final Vol: 2 22*** 78 Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: C- C- C- C C+ C+ D- B- B- C B B HCM2kAvgQ: Note: Queue reported is the distance per lane in feet. Lanes: 0 0! 0 0 Final Vol: 22 42*** 26 Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: 3 Oct 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: C- C- C- C C C C B- B- D B- B- HCM2kAvgQ: Note: Queue reported is the distance per lane in feet. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE

11 COMPARE Wed May 8 2:02: 20 Page 3-3 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) COMPARE Wed May 8 2:02: 20 Page 3-4 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) Intersection #470: Santa Clara/7th Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 202 BRT AM Intersection #470: Santa Clara/7th Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 202 BRT PM Final Vol: 74 39*** 23 Lanes: 0 0! 0 0 Final Vol: 5 45*** 220 Lanes: 0 0! 0 0 Signal=Permit Signal=Permit Final Vol: Lanes: Rights=Include Vol Cnt Date: n/a Rights=Overlap Lanes: Final Vol: Cycle Time (sec): Loss Time (sec): Critical V/C: *** Avg Crit Del (sec/veh): Avg Delay (sec/veh): Signal=Permit Signal=Permit Final Vol: Lanes: Rights=Include Vol Cnt Date: //2006 Rights=Include Lanes: Final Vol: Cycle Time (sec): Loss Time (sec): 6 982*** 0 Critical V/C: Avg Crit Del (sec/veh): Avg Delay (sec/veh): LOS: A LOS: A Lanes: 0 0! 0 0 Final Vol: Street Name: 7th St Santa Clara Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: B- B- B- C+ C+ C+ A A A A A A HCM2kAvgQ: Note: Queue reported is the distance per lane in feet. Lanes: 0 0! 0 0 Final Vol: Street Name: 7th St Santa Clara Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: Nov 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: B B B B- B- B- A A A A A A HCM2kAvgQ: Note: Queue reported is the distance per lane in feet. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE

12 COMPARE Wed May 8 2:02: 20 Page 3-5 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) COMPARE Wed May 8 2:02: 20 Page 3-6 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) Intersection #8524: SANTA_CLARA/24TH Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 202 BRT AM Intersection #8524: SANTA_CLARA/24TH Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 202 BRT PM Final Vol: Lanes: 0 0! 0 0 Final Vol: 87 35*** 24 Lanes: 0 0! 0 0 Final Vol: Lanes: Rights=Include Vol Cnt Date: n/a Rights=Include Lanes: Final Vol: Cycle Time (sec): 80 8*** 0 56 Loss Time (sec): Critical V/C: *** Avg Crit Del (sec/veh): Avg Delay (sec/veh): Final Vol: Lanes: Rights=Include Vol Cnt Date: //2006 Rights=Include Lanes: Final Vol: Cycle Time (sec): Loss Time (sec): *** Critical V/C: Avg Crit Del (sec/veh): Avg Delay (sec/veh): *** LOS: C LOS: D Lanes: 0 0! 0 0 Final Vol: 24 35*** 45 Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: C C C C+ C+ C+ D C C C- C C HCM2kAvgQ: Note: Queue reported is the distance per lane in feet. Lanes: 0 0! 0 0 Final Vol: Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: Nov 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: E+ E+ E+ E+ E+ E+ D D+ D+ E- C+ C+ HCM2kAvgQ: Note: Queue reported is the distance per lane in feet. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE

13 COMPARE Wed May 8 2:0:29 20 Page 3- Intersection #478: SANTA_CLARA/28TH Final Vol: Lanes: 0 0 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 2030 BRT AM COMPARE Wed May 8 2:0:29 20 Page 3-2 Intersection #478: SANTA_CLARA/28TH Final Vol: Lanes: 0 0 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 2030 BRT PM Final Vol: Lanes: Rights=Include Vol Cnt Date: 0/3/2006 Rights=Include Lanes: Final Vol: Cycle Time (sec): 85 22*** 0 82 Loss Time (sec): Critical V/C: *** Avg Crit Del (sec/veh): Avg Delay (sec/veh): LOS: C Final Vol: Lanes: Rights=Include Vol Cnt Date: 0/3/2006 Rights=Include Lanes: Final Vol: Cycle Time (sec): Loss Time (sec): *** Critical V/C: Avg Crit Del (sec/veh): Avg Delay (sec/veh): *** LOS: C Lanes: 0 0! 0 0 Final Vol: 3 77*** 257 Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: 3 Oct 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: D D D C C+ C+ F B- B- D+ C C HCM2k95thQ: Note: Queue reported is the distance per lane in feet. Lanes: 0 0! 0 0 Final Vol: 36 69*** 355 Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: 3 Oct 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: D D D C C+ C+ C- C C E+ C C HCM2k95thQ: Note: Queue reported is the distance per lane in feet. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE

14 COMPARE Wed May 8 2:0:29 20 Page 3-3 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) COMPARE Wed May 8 2:0:29 20 Page 3-4 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) Intersection #470: Santa Clara/7th Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 2030 BRT AM Intersection #470: Santa Clara/7th Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 2030 BRT PM Final Vol: 88 99*** 33 Lanes: 0 0! 0 0 Final Vol: 87 76*** 376 Lanes: 0 0! 0 0 Signal=Permit Signal=Permit Final Vol: Lanes: Rights=Include Vol Cnt Date: //2006 Rights=Overlap Lanes: Final Vol: Cycle Time (sec): Loss Time (sec): Critical V/C: *** Avg Crit Del (sec/veh): Avg Delay (sec/veh): Signal=Permit Signal=Permit Final Vol: Lanes: Rights=Include Vol Cnt Date: //2006 Rights=Include Lanes: Final Vol: Cycle Time (sec): Loss Time (sec): Critical V/C: *** Avg Crit Del (sec/veh): Avg Delay (sec/veh): LOS: C LOS: B Lanes: 0 0! 0 0 Final Vol: Street Name: 7th St Santa Clara Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: Nov 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: B B B D+ D+ D+ A A A C+ C+ C+ HCM2k95thQ: Note: Queue reported is the distance per lane in feet. Lanes: 0 0! 0 0 Final Vol: Street Name: 7th St Santa Clara Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: Nov 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: B B B C C C B+ B+ B+ B B B HCM2k95thQ: Note: Queue reported is the distance per lane in feet. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE

15 COMPARE Wed May 8 2:0:29 20 Page 3-5 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) COMPARE Wed May 8 2:0:29 20 Page 3-6 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) Intersection #8524: SANTA_CLARA/24TH Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 2030 BRT AM Intersection #8524: SANTA_CLARA/24TH Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 2030 BRT PM Final Vol: *** 48 Lanes: 0 0! 0 0 Final Vol: Lanes: 0 0! 0 0 Final Vol: Lanes: Rights=Include Vol Cnt Date: //2006 Rights=Include Lanes: Final Vol: Cycle Time (sec): 80 48*** 0 7 Loss Time (sec): Critical V/C: *** Avg Crit Del (sec/veh): Avg Delay (sec/veh): Final Vol: Lanes: Rights=Include Vol Cnt Date: //2006 Rights=Include Lanes: Final Vol: Cycle Time (sec): Loss Time (sec): *** Critical V/C: Avg Crit Del (sec/veh): Avg Delay (sec/veh): *** LOS: D- LOS: F Lanes: 0 0! 0 0 Final Vol: Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: Nov 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: D+ D+ D+ E E E F C C D E E HCM2k95thQ: Note: Queue reported is the distance per lane in feet. Lanes: 0 0! 0 0 Final Vol: *** 263 Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: Nov 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: F F F F F F E+ F F F C C HCM2k95thQ: Note: Queue reported is the distance per lane in feet. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE

16 COMPARE Thu May 9 7:08:57 20 Page 3- Intersection #8524: SANTA_CLARA/24TH Final Vol: *** 48 Lanes: 0 0! 0 0 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 2030 BRT AM Mitig. COMPARE Thu May 9 7:08:57 20 Page 3-2 Intersection #8524: SANTA_CLARA/24TH Final Vol: *** 38 Lanes: 0 0! 0 0 Santa Clara / Alum Rock EIR Supplemental Traffic Analysis (May 20) Level Of Service Computation Report 2000 HCM Operations (Future Volume Alternative) 2030 BRT PM Mitig. Final Vol: Lanes: Rights=Include Vol Cnt Date: //2006 Rights=Include Lanes: Final Vol: Cycle Time (sec): 80 48*** 0 7 Loss Time (sec): Critical V/C: *** Avg Crit Del (sec/veh): Avg Delay (sec/veh): LOS: D Final Vol: Lanes: Rights=Include Vol Cnt Date: //2006 Rights=Include Lanes: Final Vol: Cycle Time (sec): Loss Time (sec): *** Critical V/C: Avg Crit Del (sec/veh): Avg Delay (sec/veh): *** LOS: F Lanes: Final Vol: Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: Nov 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: C+ C+ B E E E F C C D E E HCM2k95thQ: Note: Queue reported is the distance per lane in feet. Lanes: Final Vol: Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Min. Green: Y+R: Volume Module: >> Count Date: Nov 2006 << Base Vol: Growth Adj: Initial Bse: Added Vol: ATI: Initial Fut: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** Green Time: Volume/Cap: Delay/Veh: User DelAdj: AdjDel/Veh: LOS by Move: E+ E+ C- F F F E+ F F F C C HCM2k95thQ: Note: Queue reported is the distance per lane in feet. Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE Traffix Copyright (c) 2008 Dowling Associates, Inc. Licensed to DMJM HARRIS, SAN JOSE

17 Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX B Additional Revisions to SC-AR DEIR Related to BRT Station Relocations

18 Draft Supplemental Transportation Analysis Page Santa Clara - Alum Rock Transit Corridor Item, Page -5, Section.2, Table -. Table - Proposed Santa Clara/Alum Rock Corridor Project Stations Diridon Station San Fernando Almaden Boulevard First/Second Streets Sixth Street Seventh Street Sixteenth Street Seventeenth Street Twenty-fourth Street Twenty-Eighth Street King Street Jackson Alum Rock Comments Alignment Option A uses the existing LRT platforms located on the west side of the station. Option B constructs a new LRT Platform in the parking lot east of the station. BRT uses the existing bus facility. LRT Alignment Option A only. Option A uses the existing LRT platforms. LRT Alignment Option A only. LRT only. BRT only. LRT only. BRT only. BRT only. Future BART transfer station. LRT only. LRT uses existing platforms. BRT uses existing bus facility. Item 2, Page 3-9, Section 3.3.2, Paragraph. For the BRT Alternative, only Santa Clara / 24 th, Alum Rock / King, Alum Rock / McCreery and Alum Rock / 680SB Ramp are adversely affected by the proposal. Alum Rock / King will also be adversely impacted during the AM peak if the Eastgate option is adopted for transition from side-running to semi-exclusive. The summary of comparison to No Build alternative is presented in Table 3-4.

19 Draft Supplemental Transportation Analysis Page 2 Santa Clara - Alum Rock Transit Corridor Item 3, Page 3-2, Section 3.3.2, Table 3-4. Table 3-4 Summary of Intersection Performance for BRT Intersection AM PM Santa Clara / Second Street Santa Clara / 24 th Street Alum Rock / King Alum Rock / McCreery Alum Rock / 680 SB Ramp - - This intersection is in the City of San Jose s jurisdiction. The intersection LOS remains at E. Critical movement delay increases by more than four seconds and volume-to-capacity ratio increases by more than 0.0. This exceeds the criteria for the City of San Jose. - This intersection is in the City of San Jose s jurisdiction. The intersection LOS changes from C to E. This exceeds the criteria for the City of San Jose. This intersection is in the City of San Jose s jurisdiction. The intersection LOS remains at F. The City however, does not have significance criteria in downtown. This intersection is in the City of San Jose s jurisdiction. The intersection LOS remains at F. Critical movement delay increases by more than four seconds and volume-to-capacity ratio increases by more than 0.0. This exceeds the criteria for the City of San Jose. - This intersection is in the City of San Jose s jurisdiction. The intersection LOS changes from B to F. This exceeds the criteria for the City of San Jose. This intersection is in the City of San Jose s jurisdiction. The intersection LOS changes from C to E. This exceeds the criteria for the City of San Jose. Item 4, Page 3-3, Section 3.3.4, Paragraph 3. The intersection of Santa Clara Street and 6 th Street will be signalized for both the LRT and BRT alternatives. There will be a station located near this intersection and signalizing will facilitate pedestrian crossing. Item 5, Page 3-3, Section 3.3.4, Paragraph 4. The intersection of Santa Clara Street and 27 th Street will be signalized for both the LRT and BRT alternatives. LRT and BRT will have station platforms in the vicinity of 27 th and 28 th Street. Also, the proposed BART station will be located immediately to the north which will add to the pedestrian traffic wanting to cross the street at this location.

20 Draft Supplemental Transportation Analysis Page 3 Santa Clara - Alum Rock Transit Corridor Item 6, Page 3-5, Section 3.3.4, Table 3-6. Table 3-6 Intersection Location Almaden Boulevard/ Post Street Santa Clara Street/ 6th Street Santa Clara Street/ 27th Street Alum Rock Avenue/ 34th Street Alum Rock Avenue/ Eastgate Avenue New Traffic Signals Reason for New Signal New traffic signal under LRT Option A for pedestrians to access platform. New traffic signal under LRT and BRT Alternatives for pedestrians to access station. New traffic signal under LRT and BRT Alternatives for pedestrians to access station. New traffic signal for LRT and BRT Alternatives if transition from shared to semi-exclusive operations occurs at 34th Street. New traffic signal for LRT and BRT Alternatives if transition from shared to semi-exclusive operations occurs at Eastgate Ave. Item 7, Page 3-27, Section 3.5.2, Paragraph 3 Alternative platform locations are considered at several locations. At Sixth Street the preferred location for the eastbound LRT or BRT stop is nearside immediately in front of the City Hall. An alternative platform location has a farside stop on the other side of Sixth Street. The alternative would place the City Hall stop across Sixth Street from City Hall.

21 Draft Supplemental Transportation Analysis Page 4 Santa Clara - Alum Rock Transit Corridor Item 8, Page 3-28, Section 3.5.2, Table 3-2 Table 3-2 Proposed Santa Clara/Alum Rock Corridor Project Stations Platform Location and Type Station LRT BRT Diridon Vasona platform Existing bus transfer facility. Park-and- Ride Yes, existing Diridon lot San Fernando Vasona platform N/A No Option A only. Comments LRT Option A platform is located on the rail side of Diridon, the LRT Option B and BRT platform is on the auto side of Diridon. Almaden Boulevard First/Second Streets Sixth Street Sixteenth Street Twenty-Eighth Street King Street Jackson Alum Rock Center on Almaden Boulevard, just north of Post Street. Side Platforms between First and Second. Nearside EB side platform and farside WB side platform at Sixth Street. Farside EB and WB platforms at Sixteenth Street. Nearside EB and WB platforms at Twenty-Eighth Street. For semi-exclusive running the platforms would be farside opposite in the median. Farside opposite platforms in the median. Center platform in Capitol Avenue as part of Capitol LRT project. N/A No Pedestrian signal at Post Street/Almaden Boulevard provides access to platform. Option A only. Side platforms between First and Second Streets. Nearside EB and farside WB side platforms at Sixth Seventh Street. Farside Nearside EB and farside WB platforms at Sixteenth Seventeenth Street. Nearside EB and farside WB platforms at Twenty-Eighth Fourth Street. For semi-exclusive running the platforms would be farside opposite in the median. Farside opposite platforms in the median. BRT uses the Alum Rock Transit Center. No No No No No No Yes, existing transit center The LRT, BRT, and other bus route platforms will occupy the entire block face on both sides of the street between First and Second Sts. Bus routes 22 and 522 will be jointly located with LRT platforms. Bus route 22 will be jointly located with BRT platform. An optional platform location at Sixth Street uses a farside EB LRT platform. Bus routes 22 and 300 will be jointly located with the LRT platforms. Bus route 22 will be jointly located with the BRT platforms. Bus route 22 will be jointly located with the EB LRT and BRT platform. Bus route 22 will be located on the opposite side of Twenty-Eight Street for the WB LRT platform and will be jointly located with the WB BRT platform. For the side running LRT platforms bus route 522 will be jointly located with the LRT platform in the EB direction and bus routes 22 and 522 in the WB direction. For BRT, bus route 22 will be jointly located with the WB platform. Bus route 522 stops will be staggered between the LRT stops and also located at Jackson. Local bus stops will be staggered between the BRT stops. Both LRT and BRT could be extended to Eastridge Transit Center.

22 Draft Supplemental Transportation Analysis Page 5 Santa Clara - Alum Rock Transit Corridor Item 9, Page 3-29, Section 3.5.2, Figure 3-4

23 ALMADEN BL ALMADEN S. 880 N. HEDDING OAKLAND RD BARRYESSA RD MABURY RD KEY Light Rail Station Bus Rapid Transit Station Both Light Rail and BRT Station TAYLOR 0 Capitol Avenue Light Rail Line COLEMAN 87 THE THE ALAMEDA Diridon Station BIRD AV CAHILL MONTGOMERY VasonaLight RailLine MONTGOMERY Arena AUTUMN AUTUMN DELMAS AV AV W. PARK W. SANTA CLARA SAN AV FERNANDO SAN CARLO S MARKET 2ND 3RD 4TH 6TH 7TH SAN JOSE ATE UNIVERSITY 0TH TH E. JULIAN E.. JAME S 3TH E. 6TH N. 9TH SANTA CLARA SAN 2 E. ANTONIO 26TH 28TH KING RD McKEE RD ALUM ROCK SUNSET AV JACKSON AV 680 AV ALEXANDER AV CAPITOL Alum Rock Light Rail Station CAPITOL AV McLAUGHLIN 680 Guadalupe Light Rail Line WILLOW 87 VINE AV MONTEREY RD KEYES 280 ORY N. 24THAV RD ORY RD Light Rail Extension to Eastridge on Capitol Expressway LRT Corridor EXPRESSWAY Station Locations.cdr SANTA CLARA / ALUM ROCK TRANSIT CORRIDOR Figure 3-4 PROPOSED ATION LOCATIONS

24 Draft Supplemental Transportation Analysis Page 7 Santa Clara - Alum Rock Transit Corridor Item 0, Page 3-30, Section 3.5.3, Table 3-3 Table 3-3 Bus Stop Location Existing Bus Stop Modifications LRT (Remove or Relocate To) BRT (Remove or Relocate To) WB San Fernando at SR 87 Remove (Option A only) - 63, 65 Affected Routes or stops EB Santa Clara St. at Almaden Ave. Relocate to far side of San Pedro St. Same as LRT WB Santa Clara St. at Almaden Ave. Remove Same as LRT 22, 64, 68 and 522 EB Santa Clara St. at Fourth St. Remove Same as LRT 22 and 64 WB Santa Clara St. at Fourth St. Remove Same as LRT 22 and 64 EB Santa Clara St. at Seventh St. Added to combined Bus/ LRT Stop at Sixth Street Same as LRT WB Santa Clara St. at Seventh St. Added to combined Bus/ LRT Stop at Sixth Street Same as LRT WB Santa Clara St. at th St. - Relocate to nearside to th Street EB Santa Clara St. at 5 th St. Remove Same as LRT 22 and 64 EB Santa Clara St. at 7 th St. WB Santa Clara St. at 7 th St. WB Santa Clara St. at 9 th St. - Added to combined Bus/ LRT Stop at 6 th Street Added to combined Bus/ LRT Stop at 6 th Street Relocate nearer to 6 th StreetAdded to combined Bus / BRT Station at 7 th Street Relocate to farside of 6 th StreetAdded to combined Bus / BRT Station at 7 th Street Added to combined Bus/ LRT Stop at 2st Street- WB Santa Clara St. between 22 nd & 23 rd Remove Same as LRT 22 and 64 EB Santa Clara St. at 24 th St - Added to combined Bus / BRT Station at 24 th Street WB Santa Clara St. at 24 th St - Added to combined Bus / BRT Station at 24 th Street WB Santa Clara St. at 26 th St. Remove Same as LRT 22 and 64 WB Santa Clara at 28 th Added to combined Bus/ LRT Stop at 28 th Street Same as LRT- 522 EB Alum Rock Ave. at 34th St. - Remove 22 and 64 WB Alum Rock Ave. at 34 th St. - Remove 22 and 64 EB Alum Rock Ave at King Road - Remove 64 and 522 WB Alum Rock Ave at King Road - Remove 64 and 522 EB Alum Rock Ave at McCreery Ave - Remove 64 WB Alum Rock Ave at McCreery Ave - Remove 64 EB Alum Rock Ave at Jose Figueres - Remove 64 WB Alum Rock Ave at Jose Figueres - Remove 64

25 Draft Supplemental Transportation Analysis Page 8 Santa Clara - Alum Rock Transit Corridor Bus Stop Location LRT (Remove or Relocate To) BRT (Remove or Relocate To) WB Alum Rock at Scharff Remove Same as LRT 64 Affected Routes or stops EB Alum Rock at Jackson - Remove 64 and 522 WB Alum Rock at Jackson - Remove 64 and 522 WB Alum Rock Ave at Alexander Ave - Remove 64 Item, Page 3-33, Section 3.5.4, Figure 3-5

26 ALMADEN S THE Diridon Station THE ALAMEDA BIRD AV MONTGOMERY CAHILL COLEMAN ARENA DELMAS MONTGOMERY AUTUMN AUTUMN AV 36 AV W. PARK W. SANTA CLARA 8 SAN AV FERNANDO SAN CARLO S MARKET N ND RD TH HEDDING TAYLOR TH SAN JOSE ATE UNIVERSITY 85 0TH TH E. JULIAN E.. JAME S OAKLAND RD TH E. 6TH N. 9TH SANTA CLARA SAN BARRYESSA E. ANTONIO RD 0 N. 24THAV 2 36 MABURY 62 RD KING RD 8 36 McKEE RD ALUM ROCK Local Bus Routes Limited Stop Bus Routes Express Bus Routes Rapid 522 Light Rail Line Future Light Rail Line Highway 7 Express Bus Route Light Rail Station BRT Station Both Light Rail and BRT Station 70 8 JACKSON AV CAPITOL AV CAPITOL AV McLAUGHLIN Guadalupe Light Rail Line WILLOW 87 Existing Transit with stations.cdr 25 AV MONTEREY RD KEYES ORY 72 RD ORY SANTA CLARA / ALUM ROCK TRANSIT CORRIDOR Figure 3-5 EXIING TRANSIT NETWORK With Proposed Stations for Light Rail and BRT RD EXPRESSWAY

27 Draft Supplemental Transportation Analysis Page 0 Santa Clara - Alum Rock Transit Corridor Item 2, Page 3-37, Section 3., Table 3-8 Table 3-8 Segment Block Face Changes in Driveway Access Proposed Existing Impact Driveway Driveway LRT BRT LRT BRT 6th to 7th Southside 0-7th to 8th Northside - th to 2th Northside Southside rd to 24th Northside th to 28th Southside 0 0 Jackson Avenue to Alexander / Muirfield Southside One drive-way needs be removed to accommo-date LRT stop driveway needs to be removed for - the construction of bus stop One driveway must be removed to accommodate BRT stop One driveway must be relocated to accommodate BRT stop One driveway must be removed to accommodate BRT stop one driveways must be removed to accommodate BRT stop Two driveways must be removed to accommodate BRT stop One driveway needs be removed to accommodate BRT stop Comment This driveway provides access to a parking lot for a shopping area. Three additional accesses to the parking lot are available: two from 6 th Street and one from 7 th Street. Therefore, the impact is not considered adverse. This driveway is relocated to the east within the same block. Therefore, the impact is not considered adverse. Narrow driveway provides access to the parking lot in the rear, but is usually gated. Closing this driveway will not cause significant operational change as the parking lot has access via th Street. This driveway provides access to the Vallero gas station. By removing one driveway, the station can still function properly. Therefore, the impact is not considered adverse. The east driveway provides access to a parking lot for miscellaneous retail. The lot is served by another driveway located on 24 th Street. The parking lot can function with one driveway; however, access will be more difficult. The west driveway (under a building s second story overhang) provides access to a back parking lot. Two additional accesses to the back parking lot are available: one from 24 th Street and one from Santa Clara Street, next to the adjacent building to the west. Therefore, the impact is not considered adverse. Currently this parcel is owned by Empire Lumber. This site is being redeveloped and no access is planned on Santa Clara Street. Therefore the impact is not considered adverse. A driveway serving the Bank of America needs to be removed. There is another access about 50 east will serve as the only driveway for the whole parcel. As the businesses can still function with one driveway, the impact is therefore not considered adverse.

28 Draft Supplemental Transportation Analysis Page Santa Clara - Alum Rock Transit Corridor Segment Alexander / Muirfield to Capitol Avenue Proposed Block Existing Impact Driveway Face Driveway LRT BRT LRT BRT One driveway needs to be Southside removed to accommodate bus stop Comment One driveway will be affected by the proposed station location and needs to be removed. However, the complex is still being served by 2 other driveways. Therefore the impact is not considered adverse. Item 3, Page 3-40, Section 3.2.0, Paragraph New Traffic Signal and Crosswalks at Santa Clara Street and 6th Street For the BRT alternative, additional pedestrian activity will occur at the intersection of Santa Clara Street and 6th Street because of the proposed passenger platform. A new traffic signal will be installed at the intersection as part of the project. Crosswalks will be added to the east and west legs of the intersection. Pedestrian signal heads will be included in the signal design with countdown indicators. With these improvements the impact to pedestrians is not adverse. Item 4, Page 3-40, Section 3.2., Paragraph 3.2. New Crosswalk at Santa Clara Street and 27th Street For the BRT alternative, additional pedestrian activity is expected in an east/west direction along Santa Clara Street at 27 th Street because of the passenger platform located one block to the east. Currently the north leg of the intersection does not have a striped crosswalk. To maintain pedestrian safety, a crosswalk will be added to the north leg of the intersection. With this improvement the impact to pedestrians is not adverse. Item 5, Page 4-, Section 4., Insert new section 4..x 4..x Santa Clara Street and 24 th Avenue The BRT Alternative results in an adverse impact at the intersection of Santa Clara Street and 24 th Street. Mitigation: Mitigation of this impact would require changing the northbound approach geometry from a shared left-through-right lane to a shared left-through lane and a right-turn lane. This modification can be made within the existing roadway width.

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

Bay Terrace Apartments

Bay Terrace Apartments Bay Terrace Apartments Traffic Impact Analysis Prepared for: City of San Mateo September 16, 2011 Hexagon Office: 111 W. St. John Street, Suite 850 San Jose, CA 95113 Hexagon Job Number: 10MH08 Phone:

More information

Santa Clara-Alum Rock Bus Rapid Transit (BRT) Project. Project Update July 2014

Santa Clara-Alum Rock Bus Rapid Transit (BRT) Project. Project Update July 2014 Santa Clara-Alum Rock Bus Rapid Transit (BRT) Project Project Update July 2014 Today Overview of Santa Clara-Alum Rock Bus Rapid Transit and update on Construction Shelter Design Updates Construction Mitigation

More information

3.15 SAFETY AND SECURITY

3.15 SAFETY AND SECURITY 3.15 SAFETY AND SECURITY Introduction This section describes the environmental setting and potential effects of the alternatives analyzed in this EIR with regard to safety and security in the SantaClara-Alum

More information

APPENDIX I TRAFFIC IMPACT ANALYSIS

APPENDIX I TRAFFIC IMPACT ANALYSIS I NITIAL S TUDY/MITIGATED NEGATIVE D ECLARATION NO. 1844 15 M ARCH 2018 K ILLEFER SQUARE A PARTMENTS C ITY OF ORANGE, COUNTY OF ORANGE, CALIFORNIA APPENDIX I TRAFFIC IMPACT ANALYSIS P:\WSH1601\March 2018\Killefer

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Section 2 Project Description

Section 2 Project Description Section 2 Project Description 2.1 INTRODUCTION The Santa Clara Valley Transportation Authority (VTA) is considering alternatives for improving direct transit service in the Santa Clara-Alum Rock Corridor

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

700 University Avenue Mixed-Use Development. Traffic Impact Analysis

700 University Avenue Mixed-Use Development. Traffic Impact Analysis 700 University Avenue Mixed-Use Development Traffic Impact Analysis January 20, 2006 Prepared by 700 UNIVERSITY AVENUE MIXED- USE DEVELOPMENT TRAFFIC IMPACT STUDY Table of Contents 1.0 Executive Summary...

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Task 5.1: Existing Conditions Review and Analysis

Task 5.1: Existing Conditions Review and Analysis City of Oceanside Coast Highway Corridor Task 5.1: Existing Conditions Review and Analysis Technical Memorandum August 2014 DOCUMENT CONTROL Client: Project Name: Report Title: City of Oceanside City of

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study 354 Carling Avenue Community Transportation Study/ Transportation Impact Study prepared for: Holloway Lodging Corporation 69 Quinpool Road, th Floor Halifax, NS B3K 5J7 prepared by: 223 Michael Street

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

Future of VTA Light Rail

Future of VTA Light Rail Future of VTA Light Rail SPUR Presentation 11/12/2014 Light Rail System: Guadalupe & Almaden Guadalupe Opening: 1987-1991 19.6 miles 29 stations Almaden Opening: 1991 1.1 miles 2 stations Light Rail System:

More information

Los Gatos Creek Bridge Replacement/ South Terminal Phase III Project. Traffic Technical Report

Los Gatos Creek Bridge Replacement/ South Terminal Phase III Project. Traffic Technical Report Contract# 10-PCJPB-P-44A Work Directive #6851 Los Gatos Creek Bridge Replacement/ South Terminal Phase III Project Traffic Technical Report San Jose, California December 2013 Prepared for: Peninsula Corridor

More information

ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE

ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE NATE LARSON HDR SEATTLE, WA ABHISHEK DAYAL VALLEY METRO PHOENIX, AZ ITE WESTERN DISTRICT ANNUAL MEETING JULY 16, 2013 Presentation

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

Draft Report: West Berkeley Bowl Project

Draft Report: West Berkeley Bowl Project Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley 1031-1925 F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA 94549 925-284-3200 Fax:

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

4.1 Traffic, Circulation, and Parking

4.1 Traffic, Circulation, and Parking 4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

Sound Transit East Link: Bus/LRT System Integration Study

Sound Transit East Link: Bus/LRT System Integration Study Sound Transit East Link: Bus/LRT System Integration Study Prepared For: Sound Transit King County Metro Mercer Island WSDOT Prepared By: CH2M HILL July, 2014 1 SOUND TRANSIT EAST LINK: BUS/LRT SYSTEMES

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Crenshaw-Prairie Transit Corridor Study Public Meetings

Crenshaw-Prairie Transit Corridor Study Public Meetings Crenshaw-Prairie Transit Corridor Study Public Meetings Darby Park: Wednesday, February 20, 2008 6:30 8:00 PM US Bank Community Room: Thursday, February 21, 2008 6:30 8:00 PM Nate Holden Performing Arts

More information

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by:

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by: State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report Prepared for: City of Morro Bay Prepared by: (Caltrans Project No. 0515000104, EA 0F670) State Route 1/State Route

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

Mineola Village Green

Mineola Village Green Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Sepulveda Pass Corridor Systems Planning Study

Sepulveda Pass Corridor Systems Planning Study Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Streets and Freeways Subcommittee January 17, 2013 1 Sepulveda Pass Study Corridor Extends for 30

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Corridor Analysis. For COUNTY LINE ROAD (S.R. 1001) CORRIDOR. located in. File No March 2019

Corridor Analysis. For COUNTY LINE ROAD (S.R. 1001) CORRIDOR. located in. File No March 2019 Corridor Analysis For COUNTY LINE ROAD (S.R. 1001) CORRIDOR located in Radnor Township Delaware County Lower Merion Township Montgomery County File No. 16-11060-02 March 2019 Prepared For: Radnor Township

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013 East San Fernando Valley Transit Corridor TAC Briefing December 4, 2013 Overview Measure R Project Long Range Transportation Plan Reserves $170.1 Million 2018 Revenue Operations Date Coordination with

More information