1 Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation th Avenue, Suite 1400 Seattle, WA Mirai Transportation Planning & Engineering NE 122nd Way, Suite 320 Kirkland, WA Prepared by:

2 Table of Contents Executive Summary... 1 Introduction... 3 Existing Conditions... 3 Traffic Conditions... 3 Level of Service Traffic Operations... 4 Level of Service Traffic Operations... 5 Existing Level of Service... 5 Parking Supply... 6 Parking Demand Summer Conditions... 8 Parking Demand School Conditions Parking Demand Event Conditions Future Conditions: Impact of the Proposed Project Analysis Assumptions Future Traffic Conditions Future Level of Service Parking Demand Future Conditions Mitigation List of Tables Table 1. Summary of Proposed Parking Supply... 1 Table 2. Comparison of Parking Demand and Supply for School Day and Peak Events... 2 Table 3. Summary of Peak Hour Traffic Conditions... 2 Table 4. Level of Service Definitions... 5 Table 5. Existing (2007) LOS Results (School Year)... 6 Table 6. Summary of Changes to Parking Areas Table 7. Estimate of Future Peak Hour Trips Generated for 1,400 Students Table 8. Intersection Level of Service with Proposed Project Table 9. Estimate of Future Parking Demand and Supply at 1,400 Students Table 10. Estimate of Event Parking Demand and Supply at 1,400 Students Page i

3 List of Figures Figure 1. Existing Traffic Volumes... 4 Figure 2. Parking Supply at and Vicinity... 7 Figure 3. Summer Parking Utilization...9 Figure 4. School Year Parking Utilization Figure 5. Non-Event Parking Utilization (Friday Evening) Figure 6. Event Parking Utilization Football Game Figure 7. Proposed Site Plan for Figure 8. Future Peak Hour Traffic with 1400 Students Page ii

4 EXECUTIVE SUMMARY Mirai Transportation Planning and Engineering reviewed the parking and traffic impacts associated with the planned increase of the student population from 1,200 to 1,400 Ingraham High School. The following highlights the major findings of the study. Parking Supply The proposed project site plan would change the number of parking spaces on-site (within the campus parking lots) and off-site (along the school s frontage). Table 1 summarizes the proposed parking supply. The proposed project would provide 160 parking spaces on-campus, a net increase of 43 spaces. The project would also add 70 spaces along the school s frontage on Ashworth Avenue N and N 135th Street. Under an existing agreement with the Parks Department, up to 165 spaces are available in an adjoining lot along the northeast portion of the driveway. The school uses approximately 82 of these spaces on an average school day. As part of the proposed project, this parking would no longer be used by the school and the supply of this lot would be reduced to 131 spaces. Comparing the existing and the proposed parking supply, there would be a net gain of 31 spaces available for school parking. Table 1. Summary of Proposed Parking Supply Existing Proposed Change On-site Parking Frontage Parking Off-site Parking (Parks Department) Total School Parking Supply Parking Demand Field counts during the school year were used to determine the parking demand for the existing student population. During the school year, there are 184 spaces used by students, teachers and staff. is planning for a possible future increase from 1,200 to 1,400 students. The Institute for Transportation Engineer s Parking Generation (3rd edition) peak parking rate was used to estimate the impact of the additional students on parking demand. Table 2 compares the parking demand and supply for a typical school day and during a peak event such as a football game. Page 1

5 With the increase in students from 1,200 to 1,400 the typical school parking demand would increase by 56 spaces to 240 spaces. Thus, the effect of the proposed project and the increased student population increase is a net deficit of 10 parking spaces. During events, such as football games, the 1,400 student population would increase the parking demand by 41 spaces to a total of 287 spaces, creating a net deficit of 57 spaces. Table 2. Comparison of Parking Demand and Supply for School Day and Peak Events Existing (1200 Students) Proposed (1400 Students) Change School Day Parking Demand Available Supply School Day Surplus/Deficit Peak Event Parking Demand Available Supply Peak Event Surplus/Deficit Peak Hour Traffic s student population is expected to increase from 1,200 to 1,400 students in the future. The following summarizes the impact of the additional students on the school driveways and intersections during the school s afternoon peak hour. Table 3 summarizes the total, entering and exiting trips during the peak hour of a typical school day. Traffic at adjacent study intersections would continue to operate at acceptable conditions (LOS B or better) with the 1,400 student population. The proposed project would add 56 additional trips during the peak hour. The changes to the site plan would redistribute trips to the driveway serving the South parking lot on Ashworth Avenue N. Table 3. Summary of Peak Hour Traffic Conditions Existing (1200 Students) Proposed (1400 Students) Change Peak Hour Trips Entering Trips Exiting Trips Page 2

6 Parking and Traffic Impact Analysis INTRODUCTION Mirai Transportation Planning and Engineering reviewed the parking and traffic impacts associated with development of and the planned increase of the student population from 1,200 to 1,400. Mirai reviewed existing conditions and estimated the future impacts with the proposed improvements. This project provides a supplement of previous analysis completed for the Building Excellence (BEX) II Draft and Final EIS. EXISTING CONDITIONS Mirai documented the existing traffic and parking conditions to understand the high school s impact on the surrounding street system and neighborhoods. Traffic counts were conducted at area intersections and school driveways during the school year. Parking data were collected prior to and after the beginning of the school year to identify differences in area parking demand. Traffic Conditions Traffic counts were collected by TC2.com, on Thursday, September 20, All traffic counts were conducted between 2 and 4 pm to capture the peak period of school activity. Traffic counts were collected at the following locations: West Driveway/Ashworth Avenue N N 135th Street/Burke Avenue N (North driveways - counted together) N 135th Street/Meridian Avenue N East Driveway/Meridian Avenue N Of the driveways measured, 108 school-related trips were recorded either entering or exiting the site during the peak hour. Traffic was not focused on a single driveway with about 44 percent of the traffic using the northern driveway onto N 135th Street, 33 percent using Meridian Avenue N (via the Parks Department lot) and 23 percent using the west driveway on Ashworth Avenue N. Figure 1 shows the traffic volumes during the school s afternoon peak hour. Page 3

7 Figure 1. Existing Traffic Volumes Page 4

8 Level of Service Traffic Operations Level of Service (LOS) is a measure of the quality of traffic operations at an intersection. LOS is described using an A to F scale, with LOS A representing minimal traffic delays and LOS F representing severe congestion and long delays. The LOS is determined by measuring the average control delay per vehicle. For all-way stops, an overall intersection LOS and delay is reported. For intersections with stop controls only on the minor streets, the LOS and delay reported reflects the worst individual movement of the study intersection. Table 4 describes the LOS for unsignalized intersections. Table 4. Level of Service Definitions Unsignalized Delay per Vehicle LOS Description (sec/veh) A Few or no delays 0-10 B Short traffic delays >10-15 C Average traffic delays >15-25 D Long traffic delays >25-35 E Very long traffic delays >35-50 F Extreme traffic delays with intersection capacity exceeded >50 Source: Highway Capacity Manual (HCM 2000, Transportation Research Board) Existing Level of Service The LOS calculations reflect the worst or peak volumes during the school day, approximately between 2 PM and 3 PM in the afternoon on a standard school day. The collected traffic data were entered into a Synchro (Version 6, Build 614) intersection analysis program to calculate the existing delay and LOS. The Synchro program uses a variety of traffic data to calculate the operation of an intersection, including: traffic counts, lane configurations, pedestrian volumes and type of intersection controls. Intersections operate at LOS A or B during the afternoon peak hour of the school day. Table 5 shows the results of the LOS analysis. The Synchro LOS analysis reports are found in the Appendix to this document. Page 5

9 Table 5. Existing (2007) LOS Results (School Year) # Intersection Level of Service/Average Delay School Peak Hour (2:00 to 3:00 PM) 1 West Driveway/Ashworth Avenue N A / N 135th Street/Burke Avenue N (North driveway) A / N 135th Street/Meridian Avenue N B / East Driveway/Meridian Avenue N B / 10.2 Parking Supply Mirai conducted a count of parking spaces within the school campus and within the walking distance of campus along neighboring streets. Figure 2 identifies the number of legal parking spaces and parking controls along each block face. On-Campus There are three parking areas on campus. The east parking area is located to the east of the school and is served by a driveway on N 135th Street. There is also a lot to the south of the tennis courts and a five-space lot to the west with access on Ashworth Avenue N. The total parking supply on-campus is 117 parking spaces: East parking lot There are approximately 65 parking spaces within the school s property. South parking lot This parking area has 47 spaces. Auto Shop parking lot There are approximately 5 spaces located in this service lot just north of the school driveway on Ashworth Avenue N. Off-Campus The Parks Department has a 165 space lot parking area to the east of the campus property line. The School District and Parks Department currently have a shared-use agreement to allow high school parking on the lot. On average, 82 school vehicles are parked in this lot. This agreement is not assumed to continue and the parking analysis assumes loss of this area for both daily and special event use. Page 6

10 Figure 2. Parking Supply at and Vicinity Page 7

11 Neighboring Streets Mirai completed a parking supply analysis of streets within approximately 0.2 miles of the school entrance. The study area is bounded by NE 137th Street to the north, Ashworth Avenue NE to the east, NE 130th Street to the south and Bagley Avenue NE to the west. The intent of the parking supply analysis is to determine the number of spaces available and provide a base to determine parking occupancy rates. The parking supply follows the City of Seattle methodology used by the Department of Planning and Development (Client Assistance Memo #117). The analysis measures the length of the street edge available for parking; deducts from the measurement distances required from features such as driveways, intersections and fire hydrants; and then determines the number of legal parking spaces based on the remaining street lengths. Adjacent to the campus, on-street parking is not allowed along the east side of Ashworth Avenue N. A school bus loading zone extends along the south side of N 135th Street. Parking is allowed in the bus loading zone outside of the 7-9 AM and 1-3 PM restrictions. Parking along the north side of N 135th Street and the west side of Ashworth Avenue is restricted during school days between 8 AM and 5 PM. In the adjacent neighborhoods, parking is largely undefined. As a result, in some areas, vehicles may park completely off the edge of the paved road, while in other areas vehicles may park partially on the paved roadway. Parking control signs are sporadic and seem to respond to streets where issues have arisen. In other locations, there are private parking areas where the parking or driveways for private buildings eliminate the possibility of parking along the roadway s edge. Parking Demand Summer Conditions Parking demand is the number of spaces needed to serve a particular use. One measure that relates the parking demand to the supply is Parking Utilization. Parking utilization indicates how full parking is along a particular street or within a parking lot. The measure is calculated by dividing the number of occupied spaces by the parking supply. Parking demand can exceed the legal parking supply and parking utilization rates may exceed 100 percent in areas where parking is in high demand. Generally, parking utilization levels above 80 percent for on-street and above 95 percent for parking lots are considered fully-occupied. Mirai counted the number of parked vehicles during the early afternoon (1 to 2 pm) during the last week of August to indicate a baseline of parking demand during summer conditions when school is not in session. Figure 3 shows the parking utilization during summer conditions. On-Campus On-campus parking lots were not counted during the summer, but were assumed to be lightly used. Page 8

12 Figure 3. Summer Parking Utilization Page 9

13 Neighboring Streets Parking in the neighborhood areas surrounding the school was generally light during the summer. Parking on the streets immediately adjacent to the school was generally light with between 0 and 35 percent of spaces occupied. Streets where the parking utilization was 50 percent or more include: The south side of N 130th Street east of Meridian Avenue N The south side of N 133rd Street west of Meridian Avenue N Parking Demand School Conditions A second parking demand count was conducted during the third week of school in the early afternoon (1 to 2 pm). This count identified the parking demand during the school year within the campus parking lots and on neighboring streets. The on-campus lots were counted during subsequent field visits to confirm the results. Figure 4 identifies the parking utilization during the school year. On-Campus Overall, parking in the school lots is approximately 157 percent of capacity (184/117) during the school year. Observed parking on the campus varied between 65 percent utilization of spaces in the east parking area to more than 100 percent utilization around the auto shop (west parking area). Approximately 82 vehicles park in spaces owned by the Parks Department in the adjoining lot. The south parking area was 97 percent utilized with 46 out of the 47 spaces occupied. We observed that many of the vehicles were not parked in the paved and striped parking area, with drivers preferring to park along access roads or unpaved areas closer to their destinations. The west parking area was 280 percent utilized, with most of the 14 vehicles parked in non-designated areas. Overall, 184 parking spaces were used by students and staff. Based on an existing population of 1,200 students, this translates to a peak parking demand of 0.15 spaces per student (184/1,200). Page 10

14 Figure 4. School Year Parking Utilization Page 11

15 Neighboring Streets Parking demand during a typical school day seems to be largely handled on campus and has only a minimal impact on adjacent neighborhood areas. Compared with the summer parking conditions, our analysis of school conditions in the neighborhood areas found: A small increase (from approximately 10 percent to 33 percent) in parking utilization on N 131st Street and the southern portion of Ashworth Avenue N. An increase from 37 to 50 percent utilization along Meridian Avenue N. The results indicate that the campus parking lots accommodate the school s parking demand during the typical day with little impact to adjacent neighborhood streets. Parking Demand Event Conditions Parking during high school events, such as football games, could overwhelm the parking provided on a high school s campus resulting in impacts to adjacent neighborhoods. Mirai collected parking data on two Friday evenings, a non-football game night September 21, 2007 and the homecoming football game on September 28, 2007 to assess the potential parking impact on adjacent neighborhoods caused by events. On the non-game night, there are few parking spaces occupied on-campus. In the surrounding neighborhoods, the parking utilization is 0 to 50 percent, mainly due to residential parking needs. Figure 5 shows the non-game Friday evening parking utilization for the high school and the surrounding neighborhoods. On the football night, parking availability becomes tighter, with the parking closest to the football fields being the highest. In the south parking area, the parking area is overflowing, with vehicles informally parked on grass areas, along access roads and next to buildings not usually used for parking. All on-campus parking areas are nearly fully occupied. Neighborhood areas appear not to be impacted with the exceptions noted below. Figure 6 shows parking utilization for the high school and the surrounding neighborhoods during a Friday evening football game. Areas with high utilization include: The south and auto shop parking areas are well over 100 percent utilized. Parking in the east lot is nearly 100 percent utilized. The school bus loading zone along N 135th Street is about 60 percent utilized. Parking along the west side of Ashworth Avenue N is 100 percent utilized. Parking along the north side of N 133rd Street, west of Meridian Avenue N is 81 percent utilized. Page 12

16 Figure 5. Non-Event Parking Utilization (Friday Evening) Page 13

17 Figure 6. Event Parking Utilization Football Game Page 14

18 FUTURE CONDITIONS: IMPACT OF THE PROPOSED PROJECT as currently configured could accommodate 1,400 students within the school site. The proposed project, part of the District s Building Excellence program, would replace 9 classrooms and formalizes the site s layout, including parking areas. Figure 7 shows the proposed site plan. Table 6 summarizes proposed changes to the parking areas: A total of 160 parking spaces would be provided in the campus parking lots. South parking lot This parking area would have 138 spaces for students and staff.. East parking area This parking area would have 22 spaces reserved for staff and parent pick-up. Auto Shop parking area This area would be gated and fenced. Ashworth Avenue N frontage parking 26 on-street parking spaces would be striped along Ashworth Avenue. N 135th Street frontage parking Currently, this is restricted parking during school hours to provide a school bus loading zone. The project would convert the loading zone to 44 spaces along N 135th Street. Overall, the project would provide 160 on-site and 70 on-street parking spaces. A total of 113 new spaces would be created by this project. Deducting for the loss of the 82 parking spaces on the Parks Department property, there is a net gain of 31 spaces. Table 6. Summary of Changes to Parking Areas Existing Proposed Change South Parking East Parking Auto Shop Parking Total On-Campus Ashworth Ave N Frontage N 135th St Frontage School Parking including Frontage Parks Department Spaces Total Parking Page 15

19 Figure 7. Proposed Site Plan for Page 16

20 Analysis Assumptions Mirai investigated how these changes in parking would meet the anticipated student and staff demand and would affect the traffic operations at the study intersections. To estimate future traffic and parking demand, the study included the following assumptions: The existing (1,200 students) population would retain the current demand profile for parking facilities and for automobile trips. We do not anticipate a change in the commuting habits of this population. The existing trip rate is 0.10 trips per student during the peak hour of school activity. The peak school trip generation rate for suburban high schools in the Institute for Transportation Engineers (ITE) Trip Generation Manual (2003) is 0.28 trips per student. The trips associated with the 200 additional students are assumed at the ITE Trip Generation rates. This will provide a conservative estimate of the future travel demand at the school. Daily trips are based on the ITE Trip Generation Manual. A 1.0 percent growth rate on area roadways to reflect traffic increases. Review of City traffic data indicates that recent annual traffic growth in the area is approximately 0.7 percent annually. Growth rates were applied to non-school related traffic volumes for two years to reflect the near-term future traffic conditions. No roadway or intersection improvements are assumed. Future Traffic Conditions Future traffic conditions assume that area traffic growth increases at an average of 1 percent per year and 200 new students will be added to the population of. Table 7 shows the estimated peak hour and daily trips for the future student population. Table 7. Estimate of Future Peak Hour Trips Generated for 1,400 Students Entering Trips Exiting Trips Students Trip Rate Total Trips Afternoon Peak Hour Existing Conditions 1, Additional Students/Staff Future Conditions 1, Daily Existing Conditions 1, ,052 1,026 1,026 Additional Students/Staff Future Conditions 1, ,394 1,197 1,197 The additional student trips were assigned to the study intersections based on the location of future parking and current trip patterns. Figure 8 shows the future traffic volumes. The future volumes were calculated by multiplying the 1 percent growth factor to the existing Page 17

21 traffic volumes for two years (non-school related) and then adding the new trips generated by the additional student population. Future Level of Service The future traffic operations at the study intersections are acceptable, with all driveways operating at LOS B or better. Table 8 compares the existing and future with project LOS for each of the study intersections. The future distribution of traffic to the site would change to reflect the location and size of the parking facilities. The East Driveway/Meridian Avenue N intersection (currently accessible to the campus through the Parks Department parking area) is assumed to be gated during school hours and would no longer serve school trips. The existing trips at this location were reassigned to the North and West driveways based on the number of parking spaces and the location of pick-up/drop-off area. Table 8. Intersection Level of Service with Proposed Project Intersection Existing Level of Service/Average Delay (1200 students) Future Level of Service/Average Delay (1400 students) West Driveway/Ashworth Avenue N A / 9.0 B / 10.2 N 135th Street/Burke Avenue N (north driveway) A / 9.6 A / 10.0 N 135th Street/Meridian Avenue N B / 12.5 B / 13.6 East Driveway/Meridian Avenue N B / Parking Demand Future Conditions The estimate of future parking demand followed the methodology used in the traffic analysis. Mirai estimated the future parking demand based on the increase in the student population at. The evaluation looks at the parking demand during a typical school day and for an event, such as a football game. School Day Parking Demand The parking demand for the existing student population was assumed to be captured in the field results (184 spaces). The parking demand for the additional 200 students was estimated using the ITE Parking Generation (3rd Edition) average demand rates for suburban schools. The analysis showed that 56 additional parking spaces would be required to meet the future peak parking demand. For the future population of 1,400 students, the peak parking demand would be 240 spaces (184+56). Table 9 summarizes the peak parking demand calculation for the proposed student population. Page 18

22 Figure 8. Future Peak Hour Traffic with 1400 Students Page 19

23 Table 9. Estimate of Future Parking Demand and Supply at 1,400 Students Students Peak Demand Rate Peak Parking Demand Existing Peak Demand Additional Student/Staff Demand Total Future Demand The proposed project would provide 160 on-site spaces and an additional 70 spaces along the school s frontage on Ashworth Avenue N and N 135th Street, a total of 230 spaces, resulting in a deficit of ten (-10) parking spaces. Event Parking Demand For events, such as football games, the parking demand would likely increase by a proportionate amount with the addition of 200 students. Based on the parking survey, the parking demand related to a football game is 246 vehicles. At 1,400 students, the demand would be expected to increase to 287 vehicles, an increased demand for 41 spaces. Table 10 provides an estimate of event parking demand with the additional students. Table 10. Estimate of Event Parking Demand and Supply at 1,400 Students Students Event Parking Demand Parking Supply Existing Event Increase Total Future As it is today, the demand for football parking would not be distributed evenly, with parking utilization rates above 100% in areas closest to the athletic fields. Nearby on-street parking would likely be used, as well as portions of the parking created along Ashworth Avenue N and N 135th Street. Other events, such as activities in the school s auditorium, may have higher parking demand in the north lot and along N 135th Street. Mitigation The proposed project would expand the amount of parking provided on-campus and provide additional on-street parking along the school s frontage. The proposed project would increase the number of on-campus parking spaces from 117 to 160 spaces and would add 70 on-street parking spaces along the N 135th Street and Ashworth Avenue N frontages. With a 1,400 student population, there would be a deficit of 10 parking spaces during a typical school day. There is adequate parking within walking distance (less than 50 Page 20

24 percent occupied) along adjacent streets to accommodate this overflow. To offset this on-site deficit the following mitigation is proposed. Promote transportation and parking management strategies to promote student use of public transit, ridesharing, walking and bicycling and to control off-site parking impacts. If daily parking needs are not met, investigate the potential for shared parking with nearby uses. Work with the neighborhoods to identify student parking impacts on residential streets. Coordinate with the City of Seattle to control and enforce on-street parking impacts in the adjacent neighborhoods as required. Page 21

25 APPENDIX

26 Ingraham HS Existing counts INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR West Dvwy/Ashworth North Dvwy/135th N 135th/Meridian Av East Dvwy/Meridian Av Existing school trips INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR West Dvwy/Ashworth North Dvwy/135th N 135th/Meridian Av East Dvwy/Meridian Av Existing without NHHS trips INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR West Dvwy/Ashworth North Dvwy/135th N 135th/Meridian Av East Dvwy/Meridian Av Background growth Years 2 Growth factor 1.0% INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR West Dvwy/Ashworth North Dvwy/135th N 135th/Meridian Av East Dvwy/Meridian Av Additional students INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR West Dvwy/Ashworth North Dvwy/135th N 135th/Meridian Av East Dvwy/Meridian Av Total students INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR West Dvwy/Ashworth North Dvwy/135th N 135th/Meridian Av East Dvwy/Meridian Av Total School 1400 students+a3 INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR West Dvwy/Ashworth North Dvwy/135th N 135th/Meridian Av East Dvwy/Meridian Av Assignment of Future Trips to School Driveways Change in Parking Current Assumed Future Avail Future Area Parking Utilztn Supply Spaces Trips Entering Exiting West/Main % North % East 73 20% Frontage Total Trip Assignment-Volumes for 1400 students.xls

27 Prepared for: Mirai TP&E Traffic Count Consultants, Inc. Intersection: Ashworth Ave Ingram HS Dwy Location: Ingram HS, Seattle Phone: (425) FAX: (425) TC2inc@aol.com WBE/DBE Date of Count: Thurs 9/20/07 Checked By: LBP Time Interval Ending at 2:15 P 2:30 P 2:45 P 3:00 P 3:15 P 3:30 P 3:45 P 4:00 P 4:15 P 4:30 P 4:45 P 5:00 P From North on (SB) Ashworth Ave N From South on (NB) Ashworth Ave N From East on (WB) Ingram HS Dwy From West on (EB) Ingram HS Dwy Interval Total T L S R T L S R T L S R T L S R Total Survey Peak Hour: 2:00 PM to 3:00 PM Total Approach %HV 5.1% 1.8% n/a n/a 3.1% PHF n/a 0.75 Ashworth Ave N Bike Ingram HS Dwy Ped Ingram HS Dwy 11 0 Ped 0 28 Bike Bike 0 2:00 PM to 3:00 PM 3 Ped 8 PEDs across N S E W Ped PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT EB n/a n/a INT Check WB 0.70 n/a INT In: 162 NB % INT Out: 162 SB % INT Ashworth Ave N Intersection % INT Bicycles From: N S E W BUS N BUS S BUS E BUS W INT INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT INT 11 0 INT INT 12 0 INT INT 06 0 INT 07 0 INT TM40p07162

28 Prepared for: Mirai TP&E Traffic Count Consultants, Inc. Phone: (425) FAX: (425) Intersection: North Dwys / Burke Ave N 135th St Location: Ingram High School, Seattle TC2inc@aol.com WBE/DBE Date of Count: Thur 9/20/07 Checked By: LBP Time Interval Ending at 2:15 P 2:30 P 2:45 P 3:00 P 3:15 P 3:30 P 3:45 P 4:00 P 4:15 P 4:30 P 4:45 P 5:00 P From North on (SB) Burke Ave N From South on (NB) HS Dwys From East on (WB) N 135th St From West on (EB) N 135th St Interval Total T L S R T L S R T L S R T L S R Total Survey Peak Hour: 2:00 PM to 3:00 PM Total Approach %HV n/a n/a n/a 37.2% 15.0% PHF Burke Ave N Bike N 135th St Ped N 135th St 0 32 Ped Bike Bike :00 PM to 3:00 PM 0 Ped 56 3 PEDs across N S E W Ped PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT EB % INT Check WB 0.48 n/a INT 04 0 In: 107 NB 0.49 n/a INT Out: 107 SB 0.50 n/a INT HS Dwys Intersection % INT 07 0 Bicycles From: N S E W BUS N BUS S BUS E BUS W INT 08 0 INT INT 09 0 INT INT 10 0 INT INT 11 0 INT INT 12 0 INT INT 06 0 Buses & some autos were parked along N 2:00 INT peds boarded a bus across the street intv'l 2 INT Cross country Runners intv'l TM20p07162

29 Prepared for: Mirai TP&E Traffic Count Consultants, Inc. Intersection: N 135th Meridian Ave N Location: Ingram HS, Seattle Phone: (425) FAX: (425) TC2inc@aol.com WBE/DBE Date of Count: Thurs 9/20/07 Checked By: LBP Time Interval Ending at 2:15 P 2:30 P 2:45 P 3:00 P 3:15 P 3:30 P 3:45 P 4:00 P 4:15 P 4:30 P 4:45 P 5:00 P From North on (SB) Meridian Ave N From South on (NB) Meridian Ave N From East on (WB) N 135th St From West on (EB) N 135th St Interval Total T L S R T L S R T L S R T L S R Total Survey Peak Hour: 3:00 PM to 4:00 PM Total Approach %HV 3.0% 2.6% 13.3% n/a 2.8% PHF Meridian Ave N Bike N 135th St Ped N 135th St 2 25 Ped Bike Bike :00 PM to 4:00 PM 1 Ped PEDs across N S E W Ped PHF Peak Hour Volume INT 01 0 Bike 1 PHF %HV INT 02 0 EB 0.71 n/a INT Check WB % INT 04 0 In: 400 NB % INT Out: 400 SB % INT Meridian Ave N Intersection % INT Bicycles From: N S E W BUS N BUS S BUS E BUS W INT INT INT 09 0 INT INT 10 0 INT INT 11 0 INT INT 12 0 INT INT INT INT TM10p07162

30 Prepared for: Mirai TP&E Traffic Count Consultants, Inc. Intersection: Meridian Ave N Location: Ingram HS, Seattle Phone: (425) FAX: (425) TC2inc@aol.com WBE/DBE Date of Count: Thur 9/20/07 Checked By: LBP Time Interval Ending at 2:15 P 2:30 P 2:45 P 3:00 P 3:15 P 3:30 P 3:45 P 4:00 P 4:15 P 4:30 P 4:45 P 5:00 P From North on (SB) Meridian Ave N From South on (NB) Meridian Ave N From East on (WB) Private Dwy From West on (EB) Ingram Dwy Interval Total T L S R T L S R T L S R T L S R Total Survey Peak Hour: 3:00 PM to 4:00 PM Total Approach %HV 3.2% 2.5% n/a n/a 2.7% PHF n/a Meridian Ave N Bike Ingram Dwy Ped Private Dwy 0 16 Ped Bike Bike 9 0 3:00 PM to 4:00 PM 0 Ped 0 7 PEDs across N S E W Ped PHF Peak Hour Volume INT Bike 1 PHF %HV INT 02 0 EB 0.56 n/a INT Check WB n/a n/a INT In: 371 NB % INT Out: 371 SB % INT Meridian Ave N Intersection % INT Bicycles From: N S E W BUS N BUS S BUS E BUS W INT INT INT 09 0 INT INT 10 0 INT INT 11 0 INT 04 0 INT 12 0 INT INT INT INT TM30p07162

31

32

33

34

35

36

37

38

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview 2 March 2015 OUR REF: TO3205TOB00 Conseil des écoles catholiques du Centre-Est (CECCE) 4000 rue Labelle Ottawa, Ontario K1J 1A1 Attention: Maguy Eustache Dear Maguy: Re: Sainte-Geneviève Elementary School

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

This letter summarizes our observations, anticipated traffic changes, and conclusions.

This letter summarizes our observations, anticipated traffic changes, and conclusions. Mr. David Jorschumb Project Manager Boulder Valley School District Re: Review of proposed school access improvements at the Foothills Elementary School in Boulder Dear Mr. Jorschumb, At your request, the

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated)

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated) MEMORANDUM Date: May 26, 2016 To: From: Subject: Debbie Bent and Kris Overleese, City of Kenmore Kendra Breiland and Sarah Keenan, Fehr & Peers Saint Edward Ballfields Traffic and Parking Analysis (Updated)

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES)

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) 0 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) C O TRANSPORTATION ANALYSIS STUDY March th, 0 APPLICANT: Alexandria City Public Schools Educational Facilities Department Operational & Maintenance

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Bay Terrace Apartments

Bay Terrace Apartments Bay Terrace Apartments Traffic Impact Analysis Prepared for: City of San Mateo September 16, 2011 Hexagon Office: 111 W. St. John Street, Suite 850 San Jose, CA 95113 Hexagon Job Number: 10MH08 Phone:

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

TRANSPORTATION TECHNICAL REPORT

TRANSPORTATION TECHNICAL REPORT TRANSPORTATION TECHNICAL REPORT for Sunrise Elementary School Replacement PREPARED FOR: Puyallup School District PREPARED BY: 6544 NE 61 st Street, Seattle, WA 98115 ph: (26) 523-3939 fx: (26) 523-4949

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study 19 May 2015 BY EMAIL: asaggarwal@gmail.com Manor Park Management 231 Brittany Drive, Suite D Ottawa, ON K1K 0R8 Attention: Mr. Anand Aggarwal RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

CENTRAL VIRGINIA LONG RANGE TRANSPORTATION PLAN. Appendix F

CENTRAL VIRGINIA LONG RANGE TRANSPORTATION PLAN. Appendix F Data Collection Traffic turning movement data were obtained from the Virginia Department of Transportation (VDOT) Southwestern Region Lynchburg District Traffic Engineering Section. However, 12-hour traffic

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA (St. Tammany Parish Mandeville, LA) Prepared For The Pittman Companies Michael N Pittman, MD 328 East Boston St Covington, LA 70433

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station

Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station Final Report 2013 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter at

More information

GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA. Section 1 INTRODUCTION 1

GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA. Section 1 INTRODUCTION 1 GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA TABLE OF CONTENTS Page Section 1 INTRODUCTION 1 Section 2 BACKGROUND INFORMATION 6 Public Road Network... 6 Non Auto Facilities and Services...

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO P.O. 61992 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION SEPTEMBER 5, 218 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

3.8 TRANSPORTATION, CIRCULATION AND PARKING

3.8 TRANSPORTATION, CIRCULATION AND PARKING 3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

APPENDIX G. Traffic Data

APPENDIX G. Traffic Data APPENDIX G Traffic Data HCM Signalized Intersection Capacity Analysis 2: Duanesburg Road & I-88 Ramps 10/7/2004 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl)

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Final Report 2011 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter

More information

Date: December 20, Project #:

Date: December 20, Project #: To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information