KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

Size: px
Start display at page:

Download "KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266"

Transcription

1 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA JANUARY 23, 2014 OA PROJECT NO

2 TABLE OF CONTENTS 1.0 INTRODUCTION AND OBJECTIVE DATA COLLECTION PEAK HOUR TURNING MOVEMENT COUNTS BACKGROUND TRAFFIC NETWORK CHARACTERISTICS EXISTING CONDITIONS CAPACITY ANALYSIS SITE CHARACTERISTICS TRIP GENERATION TRIP DISTRIBUTION TURN LANE ANALYSIS EXISTING PLUS SITE CONDITIONS ANALYSIS EXISTING PLUS SITE CONDITIONS CAPACITY ANALYSIS BACKGROUND CONDITIONS ANALYSIS BACKGROUND VOLUMES BACKGROUND CONDITIONS CAPACITY ANALYSIS PLUS SITE CONDITIONS ANALYSIS PLUS SITE CONDITIONS CAPACITY ANALYSIS RECOMMENDED IMPROVEMENTS EXISTING PLUS SITE CONDITIONS BACKGROUND CONDITIONS PLUS SITE CONDITIONS LIST OF TABLES TABLE 1: EXISTING NETWORK SUMMARY... 4 TABLE 2: INTERSECTION LOS CRITERIA... 4 TABLE 3: ITE TRIP GENERATION... 9 Kum & Go #300 Pecos Street & 88 th Avenue Thornton, Colorado i

3 LIST OF FIGURES FIGURE 1. VICINITY MAP... 2 FIGURE 2. EXISTING PEAK HOUR VOLUMES... 3 FIGURE 3. EXISTING LANE CONFIGURATIONS & TRAFFIC CONTROL... 5 FIGURE 4. EXISTING CONDITIONS CAPACITY ANALYSIS SUMMARY... 6 FIGURE 5. SITE PLAN... 8 FIGURE 6. TRIP DISTRIBUTION FIGURE 7. PRIMARY PEAK HOUR SITE TRIPS FIGURE 8. PASS-BY AND DIVERGED PEAK HOUR SITE TRIPS FIGURE 9. EXISTING PLUS SITE PEAK HOUR VOLUMES FIGURE 10. EXISTING PLUS SITE CONDITIONS CAPACITY ANALYSIS SUMMARY FIGURE BACKGROUND PEAK HOUR VOLUMES FIGURE BACKGROUND CONDITIONS CAPACITY ANALYSIS SUMMARY FIGURE PLUS SITE PEAK HOUR VOLUMES FIGURE PLUS SITE CONDITIONS CAPACITY ANALYSIS SUMMARY LIST OF APPENDICIES APPENDIX A... COUNT DATA APPENDIX B... EXISTING CONDITIONS CAPACITY ANALYSIS RESULTS APPENDIX C... TURN LANE WARRANT ANALYIS APPENDIX D... EXISTING PLUS SITE CONDITIONS CAPACITY ANALYSIS RESULTS APPENDIX E BACKGROUND CONDITIONS CAPACITY ANALYSIS RESUTLS APPENDIX F PLUS SITE CONDITIONS CAPACITY ANALYSIS RESULTS Kum & Go #300 Pecos Street & 88 th Avenue Thornton, Colorado ii

4 1.0 INTRODUCTION AND OBJECTIVE This report documents the results of traffic analyses conducted for a proposed redevelopment of the northeast quadrant of the Pecos Street & West 88 th Avenue intersection in Thornton, Colorado to a Kum & Go fueling station and convenience market, a fast food restaurant, and general retail space. A map showing the general location of the proposed Kum & Go site is illustrated in Figure 1. This traffic study was conducted to identify the expected trips that would be generated by the development and to determine the effects of proposed site on the surrounding roadway network. Specific recommendations are included at the end of this report that help mitigate the traffic impacts. The current site plan shows two new access points being utilized for site traffic, one on Pecos Street and one on West 88 th Avenue. In addition, an existing access serving an apartment complex to the east of the site will be widened to accommodate a shared access between the sites. 2.0 DATA COLLECTION The data collection effort included conducting peak hour turning movement counts, average daily traffic (ADT) counts, and documentation of current roadway geometrics and traffic control. 2.1 Peak Hour Turning Movement Counts Intersection turning movement counts were conducted on Tuesday August 27 th, 2013 at the intersection of Pecos Street & West 88 th Avenue. The counts were conducted during the AM and PM peak periods of traffic flow (7:00am 9:00am and 4:00pm 6:00pm, respectively). Without existing turning movement counts at shared access Drive 3, background turning movement volumes were derived in a separate trip generation for the apartment complex east of the site and applied to the roadway network for Existing conditions. As the review process progressed, the City of Thornton requested a potential traffic increase factor due to the difference in traffic volumes when a nearby water park (Water World) is open with local schools closed versus when the water park is open and school is in session. Twentyfour hour counts along Pecos Street near Water World were provided by the City to help address this issue. These twenty-four hour counts were taken during June 2010 when schools in the area were not in session. Those counts indicated higher PM peak hour volumes than was documented in August It was determined that Water World s peak hours would occur during the opening and closing times of the waterpark, 10:00am and 6:00pm, respectively. The Water World AM peak hour would not coincide with Kum & Go s AM peak hour site traffic. Although the Water World PM peak hour is close to that of Kum & Go, trips to Kum & Go are based on rates (Section 4.1), not background traffic. Through the preliminary analysis process, it was identified that recommendations that the developer may be responsible for would be dictated by site turning traffic, not background volumes. Following communication with the City, it was agreed that analysis of higher background PM volumes would not be required for this study. Existing Peak Hour Volumes are shown on Figure 2. Count data collected for this study and provided by the City can be found in Appendix A. Kum & Go #300 Pecos Street & 88 th Avenue Thornton, Colorado 1

5 Kum & Go #300 Thornton, CO LEGEND - Study Intersection I nt er st at e 25 Hur on St. Site W. 88th Ave. Osage St. Pecos St. - Site 9:28:31 AM 12/20/2013 F:\Projects\ \_TRFC\dgn\Figures.dgn W. 84th Ave. FIGURE Vicinity Map 2 1

6 (9) 0 (446) 227 (384) (9) 360 (185) 170 (138) 18 (10) 10 (5) Kum & Go #300 Thornton, CO LEGEND AM (PM) - Peak Hour Volume [ XX,XXX ] ADT Drive 3 [ 12,560 ] Pecos St. 172 (234) 1 (3) 383 (284) [ 10,350 ] 4 (10) 538 (511) (12) 4 (9) 0 (14) 0 (18) 3 (513) 358 W 88th Ave F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:32 AM Osage St. * Existing Peak Hour Volumes *Traffic counts were not obtained at the intersection of Osage St & W 88th Ave FIGURE 2 3

7 3.0 BACKGROUND TRAFFIC Year 2013 traffic conditions were evaluated to identify any existing deficiencies and to provide a baseline for comparison purposes. 3.1 Network Characteristics There are two major roadways within the study area, Pecos Street and West 88 th Avenue. Current network characteristics are summarized in Table 1 below. Data in this table was acquired from aerial photography and the City of Thornton Transportation Plan. TABLE 1: EXISTING NETWORK SUMMARY Roadway Section Posted Functional Speed Classification Pecos Street 4-Lane 35 mph Minor Arterial West 88 th Avenue 4-Lane 35 mph Minor Arterial The intersection of Pecos Street & West 88 th Avenue is a signalized intersection with sidewalk access to all legs except the west side approach. Existing lane configurations and traffic control for the study network are illustrated in Figure Existing Conditions Capacity Analysis Capacity analyses were performed for all of the study intersections utilizing the existing lane configurations and traffic control. Analyses were conducted using Synchro, Version 8.0 which is based on the Highway Capacity Manual 2010 delay methodologies. For simplicity, the amount of control delay is equated to a grade or Level of Service (LOS) based on thresholds of driver acceptance. The amount of delay is assigned a letter grade A through F, LOS A representing little or no delay and LOS F representing very high delay. Table 2 shows the delays associated with each LOS grade for unsignalized and signalized intersections, respectively. Level-of-Service TABLE 2: INTERSECTION LOS CRITERIA Signalized Average Control Delay Unsignalized A < 10 < 10 B > > C > > D > > E > > F > 80 > 50 Highway Capacity Manual (HCM 2010) Results of the analyses indicate that all individual movements at the study intersection operate at LOS C or better during AM and PM peak periods of traffic. The 95 th percentile queue lengths for all movements do not exceed available storage in both peak hours. The Existing Conditions capacity analysis summary is illustrated in Figure 4. Detailed results may be found in Appendix B. Kum & Go #300 Pecos Street & 88 th Avenue Thornton, Colorado 4

8 (TW LTL) (TW LTL) Kum & Go #300 Thornton, CO LEGEND XXX S - Lane Configuration & Approximate Storage Length - Stop Controlled Intersection - Stop Sign - Signalized Intersection 200 Drive 3 Pecos St. 320 (TWLTL) 60 TWLTL S W 88th Ave FREE RIGHT F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:32 AM Existing Lane Configurations and Traffic Control FIGURE 3 5

9 (A) B (A) B (A) B A (A) A (A) B (B) Kum & Go #300 Thornton, CO LEGEND AM (PM) - Peak Hour LOS S - Stop Controlled Intersection - Stop Sign AM (PM) - Signalized Intersection LOS Drive 3 Pecos St. B (B) C (C) C (C) (B) B (B) B (B) B B (B) (A) A S W 88th Ave F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:33 AM Existing Conditions Peak Hour Capacity Analysis Summary FIGURE 4 6

10 4.0 SITE CHARACTERISTICS To determine the impact of potential site traffic on the roadway network, trips expected to be associated with the site were generated and applied to the study network. The study assumes that access to the site is provided at full movement drives along each abutting public street and a RIRO on 88 th Avenue as shown in the current site plan. A site plan can be found in Figure Trip Generation Based on the Institute of Transportation Engineers (ITE) Trip Generation Manual (9 th Edition), trip generation characteristics were developed for the proposed site. The proposed site plan includes a Gasoline/Service Station with Convenience Market (ITE Trip Generation Manual, 9 th Edition code 945, page 1992) with a 4,991 square foot convenience store, a Specialty Retail Center (code 826, page 1579), and a Fast-Food Restaurant with Drive-Through Window (code 934, page 1912). The fueling station will host 20 fueling positions. Trip generation was calculated using vehicle fueling positions as the independent variable. The proposed land-use is expected to generate 346 AM peak hour trips, 398 PM peak hour trips, and 5,219 daily trips. A summary of the expected number of daily, AM peak hour, and PM peak hour trips are shown in Table Trip Distribution The market sector for a new gasoline/service station with convenience market, as is being proposed for this site, is primarily existing trips on the adjacent roadways. Accordingly, external trip distributions for this type of land use are generally estimated to be proportional to the existing traffic volumes on the surrounding roadway network. Therefore, existing turning movement counts collected as part of this study were used to calculate the distribution of traffic at external nodes. Using these external distributions, primarily site trips were assigned to the study network. The trip distribution for the proposed site is shown in Figure 6. Primary and Pass-by Peak Hour Site trips for the proposed site are shown in Figure 7 and Figure Turn Lane Analysis Both Pecos Street and 88 th Avenue are classified as minor arterial roadways. Drive 1 is located along Pecos Street approximately 505 feet north of the intersection of Pecos Street & 88 th Avenue. Drive 2 is approximately 210 feet east and Drive 3 is approximately 470 feet east of Pecos Street along 88 th Avenue. Based on NCHRP 457 methodologies, major roadway northbound right-turn lane analysis was performed at Drive 1 and westbound right-turn lane analyses were performed at Drive 2 and Drive 3. Results of the analyses indicate a northbound right-turn lane is warranted in 2035 plus Site conditions in PM peak hours and not warranted in Existing plus Site conditions in both peak hours; however, the City of Thornton municipal code requires that a left-turn lane and right-turn lane be constructed for private access drives along arterial roadways. This applies to Drive 2 and Drive 3 as well. For Existing plus Site and 2035 plus Site analyses, a northbound right-turn lane at Drive 1, and a continuous westbound right-turn lane at Drive 2 and Drive 3 were assumed. Detailed results of the warrant analysis can be found in Appendix C. Kum & Go #300 Pecos Street & 88 th Avenue Thornton, Colorado 7

11 CV E E E LPPP TS TS LPPP LPPP LPPP LPPP T T TS TS GR DPMU DPMU DPMU DPMU DPMU DPMU PMUE PMUE V DPMU DPMU 3,150 SF RESTAURANT W/ DRIVE THRU REQ D PRKG 21 STALLS PROVIDED PRKG 21 STALLS F LPPP F 2 F T P V 9 15 FP 3 6 LPPP 5K - B - L SQ. FT. GR T LTP GR T BU 20 T 9,035 SF GENERAL RETAIL ~25 HIGH REQ D PRKG 37 STALLS PROVIDED PRKG 50 STALLS GR BU T LPPP CV T S Kum & Go #300 Thornton, CO Drive Pecos St. VAN 20K UNLEADED U F 12K DIESEL D V 12K MID G RADE M V 8K PREMIUM 8K E-85 E F V F:\Projects\ \_TRFC\dgn\Figures.dgn Drive 2 12/20/2013 Drive 3 9:28:33 AM TP TS 210 Osage St 470 Site Plan W 88th Ave FIGURE 5 8

12 Table 3 ITE TRIP GENERATION Pecos Street & 88th Avenue TRAFFIC IMPACT STUDY THORNTON, COLORADO Daily Trip Generation ITE Trip Gen. Daily Trip Distribution Total Daily Trips Code/Page Land Use Size Avg. Rate/Eq. Trips Enter Exit Enter Exit 945/1992 Gasoline/Service Station with Convenience Market 20 Vehicle Fueling Positions ,256 50% 50% 1,628 1, /1579 Specialty Retail Center 9,035 SF % 50% /1912 Fast-Food Restaurant with Drive-Through Window 3,150 SF ,563 50% 50% Total 5,219 2,585 2,585 AM Peak Hour Trips ITE Trip Gen. AM Peak Trip Distribution Total AM Trips Pass-by Pass-by Trips Primary Trips Code/Page Land Use Size Avg. Rate/Eq. Trips Enter Exit Enter Exit Reduction Enter Exit Enter Exit 945/1993 Gasoline/Service Station with Convenience Market 20 Vehicle Fueling Positions % 50% % /NA Specialty Retail Center 9,035 SF /1913 Fast-Food Restaurant with Drive-Through Window 3,150 SF % 50% % Total PM Peak Hour Trips ITE Trip Gen. PM Peak Trip Distribution Total PM Trips Pass-by Pass-by Trips Primary Trips Code/Page Land Use Size Avg. Rate/Eq. Peak Trips Enter Exit Enter Exit Reduction Enter Exit Enter Exit 945/1994 Gasoline/Service Station with Convenience Market 20 Vehicle Fueling Positions % 50% % /1580 Specialty Retail Center 9,035 SF % 56% % /1914 Fast-Food Restaurant with Drive-Through Window 3,150 SF % 50% % Total Kum & Go #300 Pecos Street & 88th Avenue Thornton, CO 9

13 30% 10% 30% 10% 10% 25% 40% 25% Kum & Go #300 Thornton, CO LEGEND AM% (PM%) AM% (PM%) - Entering Trip Distribution - Exiting Trip Distribution XX% - External Distribution 25% 25% 40% Drive 1 Drive 2 Drive 3 Pecos St. 10% 10% 20% 10% 10% 10% 5% 30% W 88th Ave 35% F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:33 AM 40% Trip Distribution FIGURE 6 10

14 (26) 26 (8) 8 26 (26) 8 (8) 4 (5) 4 (4) 21 (21) (34) (21) Kum & Go #300 Thornton, CO LEGEND AM (PM) - Entering Trips AM (PM) - Exiting Trips 21 (21) 34 (55) Drive 1 Drive 2 Drive 3 Pecos St. 8 (8) 8 (9) 18 (18) 8 (8) 4 (4) 4 (4) 26 (26) (8) 8 (8) 8 W 88th Ave F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:33 AM Primary Peak Hour Site Trips FIGURE 7 11

15 (17) 0 (-17) 0 (-29) -22 (46) (-29) 0 (17) 22 (29) 27 (17) 18 (22) Kum & Go #300 Thornton, CO LEGEND AM (PM) - Entering Trips AM (PM) - Exiting Trips Pecos St. 22 (29) 22 (46) Drive 1 Drive 2 Drive 3 22 (17) -26 (-17) 5 (5) -5 (-5) (17) 17 (-17) -17 W 88th Ave F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:33 AM Pass-by and Diverged Peak Hour Site Trips FIGURE 8 12

16 5.0 EXISTING PLUS SITE CONDITIONS ANALYSIS Existing traffic volumes were combined with the proposed site trips to develop the Existing plus Site volumes for capacity analysis purposes. Under existing plus site conditions, Drive 1 is analyzed as full-movement access, Drive 2 as a right-in right-out access, and Drive 3 as a shared full-movement access. 5.1 Existing plus Site Conditions Capacity Analysis Existing traffic volumes were combined with the proposed site trips to develop the Existing plus Site volumes for capacity analysis purposes. Results of the capacity analysis indicate that all movements at the signalized intersection are expected to operate at LOS C or better during both peak hours. Turning movements at site drives are expected to operate at LOS C or better in both peak hours. The 95 th percentile queue lengths for vehicles exiting the site are expected to be no more than two vehicles at Drive 1 and no more than one vehicle at Drive 2 and Drive 3 in both peak hours. Existing plus Site peak hour volumes are illustrated in Figure 9. The Existing plus Site Capacity Analysis Summary is shown in Figure 10. Detailed results are found in Appendix D BACKGROUND CONDITIONS ANALYSIS Year 2035 Background conditions were evaluated to identify any background deficiencies and to provide a baseline for comparison purposes. The year 2035 was chosen as the horizon year as future ADT projections from the City of Thornton were projected for Background Volumes To evaluate the 2035 plus Site conditions, it was necessary to establish background peak hour volumes for year The City of Thornton s 2035 transportation plan contains information regarding 2035 ADT projections throughout the city. Existing and 2035 ADTs were used to find growth near Pecos Street & 88 th Avenue. The program Turns32, which is based on methodologies described in NCHRP 255, was used to find future turning movement volumes using existing traffic counts that take directional distribution and future year ADTs into consideration. Using the volumes derived from Turns32, a 2035 Background Conditions analysis was conducted. The 2035 Background Peak Hour Volumes are illustrated in Figure 11. Kum & Go #300 Pecos Street & 88 th Avenue Thornton, Colorado 13

17 (9) 0 (489) 253 (375) (9) 386 (194) 178 (164) 31 (21) 22 (14) 49 (48) (664) 381 (79) (287) 43 (50) Kum & Go #300 Thornton, CO LEGEND AM (PM) - Peak Hour Volume Pecos St. 32 (50) 56 (80) Drive 1 Drive 2 Drive (242) 0 (3) 391 (293) 39 (34) 540 (517) 13 (19) 557 (537) (12) 4 (9) 0 (14) 0 (548) 377 (44) 28 (504) 349 W 88th Ave F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:34 AM Existing plus Site Peak Hour Volumes FIGURE 9 14

18 (A) B (B) B (B) B A (A) A (A) B (B) B (C) A (A) Kum & Go #300 Thornton, CO LEGEND AM (PM) - Peak Hour LOS S - Stop Controlled Intersection - Stop Sign AM (PM) - Signalized Intersection LOS Pecos St. B (C) S Drive 1 Drive 2 Drive 3 B (B) C (C) C (C) (B) B (B) B (B) B B (B) S (A) A S W 88th Ave F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:34 AM Existing plus Site Capacity Analysis Summary FIGURE 10 15

19 (10) 1 (518) 279 (761) (10) 426 (209) 367 (290) 31 (21) 22 (14) 49 (48) (865) 505 (79) (429) 43 (50) Kum & Go #300 Thornton, CO LEGEND AM (PM) - Peak Hour Volume Pecos St. 32 (50) 56 (80) Drive 1 Drive 2 Drive (411) 1 (20) 608 (433) 39 (34) 855 (843) 13 (19) 872 (863) (15) 5 (20) 5 (15) 5 (1071) 769 (44) 28 (1027) 741 W 88th Ave F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:34 AM 2035 plus Site Peak Hour Volumes FIGURE 13 19

20 Background Conditions Capacity Analysis The 2035 Background Capacity analysis results show that all movements at the intersection of Pecos Street & 88 th Avenue are expected to operate at LOS C or better during both peak hours with the exception of westbound right-turning and northbound right-turning movements, which are expected to operate at LOS F in the PM peak hour. The average delays for the westbound and northbound right-turning movements in the PM peak hour are expected to be 130 seconds and 87 seconds, respectively. An analysis was conducted with dual northbound right-turn lanes at this intersection to mitigate delay. With dual northbound right-turn lanes utilizing protective phasing, northbound right-turning movements are expected to operate at LOS B. The 2035 Background Capacity Analysis Summary is illustrated in Figure 12. Detailed results may be found in Appendix E PLUS SITE CONDITIONS ANALYSIS Year 2035 Background traffic volumes were combined with the proposed site trips for both alternatives to develop the 2035 Background plus Site peak hour volumes for capacity analysis purposes plus Site Conditions Capacity Analysis Results of the capacity analysis indicate that all movements are expected to operate at LOS D or better during both peak hours, with the exception of westbound right-turning and northbound right-turning movements, which are expected to operate at LOS F in the PM peak hour. Like 2035 Background conditions, heavy delay is expected for northbound and westbound rightturning vehicles. With dual northbound right-turn lanes, northbound right-turning movements are expected to operate at LOS B. The 2035 plus Site peak hour volumes are illustrated in Figure 13. The 2035 plus Site Capacity Analysis Summary is shown in Figure 14. Detailed results may be found in Appendix F. Kum & Go #300 Pecos Street & 88 th Avenue Thornton, Colorado 17

21 (B) B (B) B (B) B A (A) A (A) B (B) C (C) A (B) Kum & Go #300 Thornton, CO LEGEND AM (PM) - Peak Hour LOS S - Stop Controlled Intersection - Stop Sign AM (PM) - Signalized Intersection LOS Pecos St. C (C) S Drive 1 Drive 2 Drive 3 B (B) D (C) C (C) (B) B (B) B (B) B B (B) S (B) B S W 88th Ave F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:34 AM 2035 plus Site Capacity Analysis Summary FIGURE 14 20

22 (10) 1 (516) 250 (749) (10) 400 (215) 359 (303) 18 (10) 10 (5) Kum & Go #300 Thornton, CO LEGEND AM (PM) - Peak Hour Volume [ XX,XXX ] ADT Drive 3 [ 14,000 ] Pecos St. 269 (403) 1 (20) 600 (429) [ 21,000] 4 (10) 852 (842) (15) 5 (20) 5 (15) 5 (18) 3 (1024) 750 W 88th Ave F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:34 AM 2035 Background Peak Hour Volumes FIGURE 11 16

23 (B) B (B) B (B) B A (A) A (A) C (C) Kum & Go #300 Thornton, CO LEGEND AM (PM) - Peak Hour LOS S - Stop Controlled Intersection - Stop Sign AM (PM) - Signalized Intersection LOS Drive 3 Pecos St. B (B) C (D) C (C) (B) B (B) B (B) B B (B) (B) A S W 88th Ave F:\Projects\ \_TRFC\dgn\Figures.dgn 12/20/2013 9:28:34 AM 2035 Background Peak Hour Capacity Analysis Summary FIGURE 12 18

24 8.0 RECOMMENDED IMPROVEMENTS Based on existing and projected traffic conditions and traffic analysis results, improvements to the existing roadway network have been identified for Existing plus Site and 2035 conditions. 8.1 Existing plus Site Conditions Based on projected traffic conditions and traffic analysis results, improvements to the existing roadway network have been identified: Pecos Street & Drive 1 Although not warranted by this analysis, the City has requested that the developer construct a northbound right-turn deceleration lane with 150 feet of storage and 100 feet of taper length. 88 th Avenue & Drive 2 Through the review process, it has been determined that this access will not be pursued at this time. 88 th Avenue & Drive 3 Maintain this existing full-movement access. All site drives should be constructed at locations shown in the current site plan with the exception of Drive 2. Based on comments provided by the City of Thornton throughout the review process, Drive 2 shall not be granted. Although the study reflects operations based on a RIRO at this site drive, it is not expected that the shift in entering/exiting site traffic from Drive 2 to Drive 3 will have substantial impacts in intersection operations. This is because Drive 3 shows sufficient capacity to accept additional westbound and southbound right-turning vehicles. Therefore, an additional analysis was not performed at Drive Background Conditions Based on projected traffic conditions and traffic analysis results, improvements to the existing roadway network have been identified: Pecos Street & 88 th Avenue Construct an additional northbound right-turn lane with appropriate storage and taper lengths plus Site Conditions With the improvements outlined for previous conditions, it is expected that operations will be acceptable for 2035 plus Site conditions. F:\Projects\ \_TRFC\doc\Final Report.docx Kum & Go #300 Pecos Street & 88 th Avenue Thornton, Colorado 21

25 APPENDIX A Count Data

26 All Traffic Data Services,Inc. Wheat Ridge, CO File Name : #1 PECOS&88THAM Site Code : Start Date : 8/27/2013 Page No : 1 Groups Printed- Class 1 PECOS ST Southbound 88TH AVE Westbound PECOS ST Northbound 88TH AVE Eastbound Start Time Rght Thru Left Other Rght Thru Left Other Rght Thru Left Other Rght Thru Left Other Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total Grand Total Apprch % Total % PECOS ST Out In Total Rght 615 Thru 261 Left 5 Other 88TH AVE Out In Total Thru Left 3 Rght 4 Other 8/27/ :00 AM 8/27/ :45 AM Class 1 North Rght Thru Left Other Out In Total TH AVE Left 0 Thru 478 Rght 382 Other Out In Total PECOS ST

27 All Traffic Data Services,Inc. Wheat Ridge, CO File Name : #1 PECOS&88THAM Site Code : Start Date : 8/27/2013 Page No : 2 PECOS ST Southbound 88TH AVE Westbound PECOS ST Northbound 88TH AVE Eastbound Start Time Rght Thru Left Other App. Total Rght Thru Left Other App. Total Rght Thru Left Other App. Total Rght Thru Left Other App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 AM 07:00 AM :15 AM :30 AM :45 AM Total Volume % App. Total PHF PECOS ST Out In Total Rght 360 Thru 170 Left 1 Other Peak Hour Data 88TH AVE Out In Total Thru Left 0 Rght 3 Other Peak Hour Begins at 07:00 AM Class 1 North Rght Thru Left Other Out In Total TH AVE Left 0 Thru 227 Rght 191 Other Out In Total PECOS ST

28 All Traffic Data Services,Inc. Wheat Ridge, CO File Name : #1 PECOS&88THPM Site Code : Start Date : 8/27/2013 Page No : 1 Groups Printed- Class 1 PECOS ST Southbound 88TH AVE Westbound PECOS ST Northbound 88TH AVE Eastbound Start Time Rght Thru Left Other Rght Thru Left Other Rght Thru Left Other Rght Thru Left Other Int. Total 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % PECOS ST Out In Total Rght 366 Thru 270 Left 9 Other 88TH AVE Out In Total Left 13 Thru 24 Rght 6 Other 8/27/ :00 PM 8/27/ :45 PM Class 1 North Rght Thru Left Other Out In Total TH AVE Left 15 Thru 850 Rght 748 Other Out In Total PECOS ST

29 All Traffic Data Services,Inc. Wheat Ridge, CO File Name : #1 PECOS&88THPM Site Code : Start Date : 8/27/2013 Page No : 2 PECOS ST Southbound 88TH AVE Westbound PECOS ST Northbound 88TH AVE Eastbound Start Time Rght Thru Left Other App. Total Rght Thru Left Other App. Total Rght Thru Left Other App. Total Rght Thru Left Other App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF PECOS ST Out In Total Rght 185 Thru 138 Left 9 Other Peak Hour Data 88TH AVE Out In Total Left 9 Thru 14 Rght 5 Other Peak Hour Begins at 04:30 PM Class 1 North Rght Thru Left Other Out In Total TH AVE Left 9 Thru 446 Rght 384 Other Out In Total PECOS ST

30 All Traffic Data Services, Inc 9660 W 44th Ave Wheat Ridge,CO Page 1 Site Code: 3 Station ID: 3 88TH AVE E/O PECOS ST Start 27-Aug-13 Time Tue EB WB Total 12:00 AM : : : : : : : : : : : :00 PM : : : : : : : : : : : Total Percent 46.6% 53.4% AM Peak 07:00 07:00 07:00 Vol PM Peak 17:00 16:00 17:00 Vol Total Percent 46.6% 53.4% ADT ADT 10,348 AADT 10,348

31 All Traffic Data Services, Inc 9660 W 44th Ave Wheat Ridge,CO Page 1 Site Code: 2 Station ID: 2 PECOS ST N/O 88TH AVE Start 27-Aug-13 Time Tue NB SB Total 12:00 AM : : : : : : : : : : : :00 PM : : : : : : : : : : : Total Percent 56.7% 43.3% AM Peak 07:00 07:00 07:00 Vol PM Peak 17:00 18:00 17:00 Vol Total Percent 56.7% 43.3% ADT ADT 12,559 AADT 12,559

32

33

34

35

36 APPENDIX B Existing Conditions Capacity Analysis Results

37 Queues 3: 88th Ave & Pecos St 12/18/2013 Lane Group EBL WBL WBT WBR NBT NBR SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Kum & Go #300 Thornton, CO Synchro 8 Report Existing AM Page 1

38 HCM Signalized Intersection Capacity Analysis 3: 88th Ave & Pecos St 12/18/2013 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Perm Perm Perm NA Perm pm+pt NA Perm pm+pt NA Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot 0.07 c v/s Ratio Perm c c0.13 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service B C C B B B A A Approach Delay (s) Approach LOS B C B A Intersection Summary HCM 2000 Control Delay 13.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.40 Actuated Cycle Length (s) 60.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 43.0% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group Kum & Go #300 Thornton, CO Synchro 8 Report Existing AM Page 2

39 HCM 2010 TWSC 6: 88th Ave & Drive 3 12/18/2013 Intersection Intersection Delay, s/veh 0.4 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Follow-up Headway Pot Capacity-1 Maneuver Stage Stage Time blocked-platoon, % Mov Capacity-1 Maneuver Mov Capacity-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS B Minor Lane / Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A B HCM 95th %tile Q(veh) Notes ~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined Kum & Go #300 Thornton, CO Synchro 8 Report Existing AM Page 4

40 Queues 3: 88th Ave & Pecos St 12/18/2013 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Kum & Go #300 Thornton, CO Synchro 8 Report Existing PM Page 1

41 HCM Signalized Intersection Capacity Analysis 3: 88th Ave & Pecos St 12/18/2013 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Perm NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c c0.14 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service B B B C C B A A A A A Approach Delay (s) Approach LOS B C A A Intersection Summary HCM 2000 Control Delay 12.5 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.36 Actuated Cycle Length (s) 60.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 44.8% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group Kum & Go #300 Thornton, CO Synchro 8 Report Existing PM Page 2

42 HCM 2010 TWSC 6: 88th Ave & Drive 3 12/18/2013 Intersection Intersection Delay, s/veh 0.3 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Follow-up Headway Pot Capacity-1 Maneuver Stage Stage Time blocked-platoon, % Mov Capacity-1 Maneuver Mov Capacity-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS B Minor Lane / Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A B HCM 95th %tile Q(veh) Notes ~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined Kum & Go #300 Thornton, CO Synchro 8 Report Existing PM Page 4

43 APPENDIX C Turn Lane Warrant Analysis

44 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 664 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

45 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 148 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

46 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 328 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

47 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Add right-turn bay. 4-lane roadw ay Value Value 75 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

48 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 300 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

49 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 345 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

50 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 88 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

51 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 93 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

52 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 313 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

53 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 346 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

54 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 90 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

55 Figure 2-6. Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection. INPUT Roadway geometry: Variable Major-road speed, mph: Major-road volume (one direction), veh/h: Right-turn volume, veh/h: OUTPUT Variable Limiting right-turn volume, veh/h: Guidance for determining the need for a major-road right-turn bay for a 4-lane roadway: Do NOT add right-turn bay. 4-lane roadw ay Value Value 91 Right-Turn Volume, veh/h 140 Add right - turn bay Major-Road Volume (one direction), veh/h

56 APPENDIX D Existing plus Site Conditions Capacity Analysis Results

57 Queues 3: 88th Ave & Pecos St 12/18/2013 Lane Group EBL WBL WBT WBR NBT NBR SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Kum & Go #300 Thornton, CO Synchro 8 Report Existing plus Site AM Page 1

58 HCM Signalized Intersection Capacity Analysis 3: 88th Ave & Pecos St 12/18/2013 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Perm Perm Perm NA Perm pm+pt NA Perm pm+pt NA Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot 0.08 c v/s Ratio Perm c c0.14 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service B C C B B B A A Approach Delay (s) Approach LOS B C B A Intersection Summary HCM 2000 Control Delay 13.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.41 Actuated Cycle Length (s) 60.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 44.4% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group Kum & Go #300 Thornton, CO Synchro 8 Report Existing plus Site AM Page 2

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) 116 20 8 405 137 56 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.81 0.81 0.67 0.67 0.89 0.89 Hourly flow

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

Date: December 20, Project #:

Date: December 20, Project #: To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

APPENDIX G. Traffic Data

APPENDIX G. Traffic Data APPENDIX G Traffic Data HCM Signalized Intersection Capacity Analysis 2: Duanesburg Road & I-88 Ramps 10/7/2004 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl)

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

Appendix B: Traffic Reports

Appendix B: Traffic Reports Appendix B: Traffic Reports 407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION Report Markham Road Station Traffic Study Prepared for Ministry of Transportation, Ontario

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

(A) Project Manager, Infrastructure Approvals

(A) Project Manager, Infrastructure Approvals February 14th, 2014 BY E-MAIL: wally.dubyk@ottawa.ca City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor, Ottawa, Ontario K1P 1J1 Attention: Wally Dubyk, C.E.T (A) Project

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 March 2015 Prepared for Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 JRL consulting JRL consulting TABLE OF CONTENTS 1 INTRODUCTION... 2 1.1 BACKGROUND... 2 2 EXISTING

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings TECHNICAL MEMORANDUM Summary of Findings Date: June 17, 2014 Project #: 17121.15 To: Si Lau, P.E.; City of Oakland, CA From: Erin Ferguson, P.E.; Aaron Elias, P.E.; Daphne Dethier; and Mark Bowman, P.E.;

More information

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE Roadway Segment Level of Service Definitions LOS V/C Congestion/Delay Traffic Description (Used for surface streets,

More information

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) APPENDICES Appendix T No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) 661 Bear Valley Parkway EIR March 2017 APPENDICES This page intentionally left blank 661 Bear Valley

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017 Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A7 519-591-0426 November 8, 2017 Revised December 20, 2017 Laurie Wills, PEng Deputy Director of Public Works Town of Cobourg 740 Division

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM TO: Merrimack Valley Metropolitan Planning Organization FROM: James Terlizzi, P.E., Transportation Planning Engineer DATE: March 6, 2017 SUBJECT: Further analysis of the recommendations

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Market Street Road Diet Wilmington, NC 2016 Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Wilmington, NC Parsons Brinckerhoff January 2016 FINAL TECHNICAL REPORT US 17 Corridor

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information

Interstate 80 Corridor Study

Interstate 80 Corridor Study Interstate 80 Corridor Study Final Technical Memorandum 5: Traffic Volumes, Accident Locations and Operational Deficiencies West Verdi (SR 425) Interchange to West McCarran Boulevard (SR 651) and East

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

MEMORANDUM November 19, 2012

MEMORANDUM November 19, 2012 COUNCIL OF GOVERNMENTS CENTRAL NAUGATUCK VALLEY 60 NORTH MAIN ST 3RD Floor WATERBURY, CT 06702-1403 (203)757-0535 Web Site: www.cogcnv.org E-Mail: cogcnv@cogcnv.org November 19, 2012 MEMORANDUM 111912

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes. Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 SCREENING... 1 1.1

More information

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment MEMORANDUM Date: June 22, 2018 Project #: 21562 To: Colin McArthur, AICP From: Project: Subject: Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit

More information

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA (St. Tammany Parish Mandeville, LA) Prepared For The Pittman Companies Michael N Pittman, MD 328 East Boston St Covington, LA 70433

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

1140 Wellington Street West Transportation Brief

1140 Wellington Street West Transportation Brief 1140 Wellington Street West Transportation Brief October 2013 Study 1140 Wellington Type Street West October 2013 Study Transportation Name Brief February 2011 TB Check List TIS / TB/ CTS Check List prepared

More information

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS 1 FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction... 3 II. Project Description... 3 III. Existing Conditions... 6 IV. Future Traffic Demand... 10 V. Conclusions and Mitigation...

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

Wellington Street West

Wellington Street West Transportation Brief prepared for: 185 Davenport Road Suite 300 Toronto, ON M5R 1J1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 November 5, 2013 TO3131TOH Transportation Brief November

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey Traffic Impact Study Residences at Bancroft Block 14, Lot 2 April 30, 2018 REVISED: JANUARY 17, 2019 Prepared For 2 Hopkins Lane, LLC 2701 Renaissance Boulevard King of Prussia, PA 19406 Prepared By Maser

More information

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT 11897-05 TIA Report.docx Prescott Plaza Traffic Impact Analysis This page is intentionally left blank 11897-05

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

1 st Street Intersection Study

1 st Street Intersection Study TRAFFIC ENGINEERING ASSISTANCE PROGRAM 1 st Street Intersection Study Prepared for: City of Independence In Cooperation With: Iowa Department of Transportation & Iowa Department of Public Safety Governor

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

267 O Connor Street Residential Development

267 O Connor Street Residential Development M a y 2014 267 O Connor Street Residential Development Transportation Brief Google 2014 Bing 2014 Prepared for: MASTERCRAFT STARWOOD Prepared by: Study 267 O'Connor Type Street May 2014 Study Residential

More information

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc.

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc. TRANSPORTATION ANALYSIS Wawa US 441 and Morningside Drive Prepared for: Brightwork Real Estate, Inc. TABLE OF CONTENTS Introduction... 1 Project Description... 1 Estimated Daily Project Traffic... 3 Estimated

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated)

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated) MEMORANDUM Date: May 26, 2016 To: From: Subject: Debbie Bent and Kris Overleese, City of Kenmore Kendra Breiland and Sarah Keenan, Fehr & Peers Saint Edward Ballfields Traffic and Parking Analysis (Updated)

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation Background and Project Needs SR 104 is functionally classified as a rural-principal arterial. It is a limited

More information

C. iv) Analysis/Results

C. iv) Analysis/Results The Pettengill Road project is located outside the borders of the model in an external zone. As a result, inserting all Pettengill Road trip generation assumptions into the NRPC model and running a new

More information