1 Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: N 56 th Street # 201 Tampa, FL Ph: (813) Fax: (813)

2 Morgan Road Commerce Park Access Management Summary Report PROFESSIONAL ENGINEER CERTIFICATE I hereby certify that I am a registered professional engineer in the State of Florida practicing with Florida Transportation Engineering, Inc., a consulting firm in the State of Florida and that I have supervised the preparation and approve the evaluation, findings, opinions, conclusions, and technical advice hereby reported for: PROJECT: LOCATION: COUNTY: STATE: Morgan Road Commerce Park Northwest Corner of US 41 and Morgan Road Pasco Florida This report includes a summary of trip generation, trip distribution, capacity analyses, turn lane analyses, and recommendations for Morgan Road Commerce Park Development. I acknowledge that the procedures and references used to develop the results contained in this report are standard to the professional practice of transportation engineering and planning as applied through professional judgment and experience. SIGNATURE: DATE: Venkat Vattikuti, P.E., PTOE Florida P.E. No C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc ii

3 Morgan Road Commerce Park Access Management Summary Report TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY INTRODUCTION TRIP GENERATION TRIP DISTRIBUTION PROJECT TRIPS DETERMINATION OF NECESSARY ANALYSIS EXISTING AND FUTURE CONDITIONS ANALYSIS AT IMPACTED INTERSECTIONS TURN LANE ANALYSIS ACCESS POINTS AND STORAGE LENGTHS SUBSTANDARD ROAD REVIEW RAILROAD CROSSING CONCLUSION 20 LIST OF FIGURES 1 SITE LOCATION 3 2 PROJECT SITE PLAN 4 3 TRIP DISTRIBUTION 8 4 FUTURE BACKGROUND TRAFFIC (AM PEAK) 9 5 TOTAL PROJECT TRAFFIC (AM PEAK) 10 6 FUTURE BACKGROUND PLUS PROJECT TRAFFIC (AMPEAK) 11 7 TRAFFIC CIRCULATION PLAN 18 LIST OF TABLES 1 TRIP GENERATION 5 2 ADJUSTED TRIP GENERATION 5 3 DETERMINATION OF NECESSARY ANALYSIS 12 3 INTERSECTION LEVEL OF SERVICE SUMMARY 14 4 SUMMARY OF RIGHT-TURN LANE ANALYSIS 15 5A SUMMARY OF ACCESS POINTS 17 5B STORAGE LENGTH CALCULATIONS 17 APPENDIX A ITE TRIP GENERATION WORKSHEETS, SYNCHRO RESULTS, TRAFFIC COUNTS C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc iii

4 Morgan Road Commerce Park Access Management Summary Report 1.0 EXECUTIVE SUMMARY Morgan Road Commerce Park is a proposed Office/Professional development with approved specific uses (School and Professional Offices) on Morgan Road. The anticipated build-out year is The proposed development is located at the northwest corner of US 41 and Morgan Road. A location map and general site plan are shown in Figures 1 and 2, respectively. Trip Generation was performed using the ITE Trip Generation Manual, 7 th Edition for the proposed development of Public Charter School with a final capacity of 728 students along with 25,000 square feet of medical offices. The proposed development would generate 395 trips during the AM peak hour and 301 trips during the PM peak hour of generator and/or adjacent street traffic. The project trips from the development were distributed and assigned to the adjacent roadway network using surrounding land use patterns. Per the Pasco County the traffic study requirements, proposed access points and the intersection of US 41 and Morgan Road were analyzed for background and project plus conditions in order to ascertain the expected queues from the development. With the proposed on-site traffic circulation plan, there will be no queue spill-over from the school parking lot on to Morgan Road during the drop-off and pick-up times. Also, the analysis results shows that the intersection of US 41 and Morgan Road will only operate with acceptable level of service with the installation of traffic signal and adding exclusive turn lanes to service southbound right turns and eastbound left and right turns. A proportionate share of xxx,xxxx towards the installation of traffic signal and southbound right turn lane at the intersection of US 1 and Morgan Road will be contributed by the development. C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 1

5 Morgan Road Commerce Park Access Management Summary Report 2.0 INTRODUCTION Morgan Road Commerce Park is a proposed Office/Professional development with approved specific uses (School and professional Offices) on Morgan Road. The anticipated build-out year is The proposed development is located at the northwest corner of US 41 and Morgan Road. A location map and general site plan are shown in Figures 1 and 2, respectively. As shown in Figure 2, the proposed project has two access points on Morgan Road with one being used for entering traffic and the other one for exiting traffic during the peak hours to provide a better on-site traffic circulation. C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 2

6 FIGURE 1 Site Location Project Site

7 Morgan Road Commerce Park Access Management Summary Report FIGURE 2 - Site Plan C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 4

8 Morgan Road Commerce Park Access Management Summary Report 3.0 TRIP GENERATION Trip Generation was performed using the Institute of Transportation Engineers (ITE) Trip Generation, 7 th Edition for the proposed development. Table 1 summarizes the trip generation calculations. The appropriate Land Use Code Worksheets from the ITE Manual are provided in Appendix A. TABLE 1 Trip Generation Development (Trip Type) Elementary School (Public - Charter) # of Students/ Sq. Ft. LUC* ADT AM Peak Hour Trip Ends Enter/Exit (%) (%) 111 / 91 55% / 45% PM Peak Hour (Gen) Trip Ends Enter/Exit (%) (%) 60 / 74 45% / 55% Middle School (Public - Charter) / 59 55% / 45% 33 / 41 45% / 55% Medical/ Dental Offices 25, / 13 79% / 21% 25 / 68 27% / 73% Total n/a n/a 1, / / 183 As shown in Table 1, the proposed development would generate 395 raw trips during the AM peak hour of adjacent street traffic and 301 raw trips during the PM peak hour of generator and/or PM peak Hour of adjacent street traffic. Based on the proposed land use type (as shown in Table 1), there will be no pass-by trips from this development and there will be no adjustment to the raw trips. The resulting traffic is shown in Table 2. TABLE 2 - Adjusted Trip Generation Development (Trip Type) AM Peak Hour Trip Ends Enter (%)/Exit (%) PM Peak Hour (Gen) Trip Ends Enter (%)/Exit (%) Charter School/ Prof. Offices 232/ / 183 Less Pass-by Trips <0/0> <0/0> Adjusted Total 232/ /183 C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 5

9 Morgan Road Commerce Park Access Management Summary Report 4.0 TRIP DISTRIBUTION The distribution of project trips is distributed primarily based on the surrounding land use patterns associated with the local knowledge and suggestions from the County staff. The resulting distribution indicates an initial project split of 50% from US 41 North, 50% from US 41 South, with further split of 20% from SR 54 East and 20% from SR 54 West and 10% from US 41 south of SR 54. These assumed distributions are shown in Figure 3. The resulting trips from the assumed trip distribution percentages are assigned to the two project access points and on to the surrounding road network. Figure 4 shows the future background traffic at the study intersections; Figure 5 shows the total project trips. Background Traffic PM peak hour turning movement count data was collected at the intersections of US 41 & Morgan Road, SR 54 & Hunts Road and SR 54 & US 41. Currently there is one approved development on Morgan Road at the Southwest corner of Morgan Road and US 41. This development is being treated as vested and the trips information provided in the traffic report submitted by the vested development was included in the background traffic to forecast the background traffic at the build-out year of Figure 6 shows the resulting final future background plus project traffic. The data shown in Figures 4 thru 6 are used in the subsequent analysis. C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 6

10 Morgan Road Commerce Park Access Management Summary Report 5.0 PROJECT TRIPS Based on the nature of the development and trips information included in the earlier tables, AM Peak Hour period is selected for further analysis to assess the traffic impact on the surrounding roadway network and intersections along with the access management issues. Based on the Trip Generation and Trip Distribution, the project trips were calculated and assigned to the roadway links and intersections. The project trips are shown in Figures 4 thru 6. C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 7

11 US 41 50% Morgan Road 50% 20% 20% SR 54 10% FIGURE 3 Trip Distribution

12 US Morgan Road SR 54 FIGURE 4 Future Background Traffic (AM Peak Hour)

13 US Morgan Road SR 54 FIGURE 5 Project Traffic (AM Peak Hour)

14 US Morgan Road SR 54 FIGURE 6 Future Background Plus Project Traffic (AM Peak Hour)

15 Morgan Road Commerce Park Access Management Summary Report 6.0 DETERMINATION OF NECESSARY ANALYSIS Based on Pasco County s Administrative code and Guidelines and Review Fees for Traffic Impact Studies (TIS) and Substandard Roads, the appropriate analyses were determined. By definition, each of the two project access points on to Morgan Road is considered impacted. Also by definition, the segment of the Major Roadway Network on which the project traffic makes its first connection (US Highway 41) is considered impacted as well as the associated intersection (US 41 and Morgan Road). Any other Major Road facilities on which the two-way peakhour project traffic consumes five percent or more of the existing two-way peak hour service volumes are considered impacted The details of the analysis are included in the next section of the report. TABLE 3 Determinations of Impacted Roadway Segments On Road From Road To Road Configuratio n/ Classification Maximum Allowable Service Volume Two-Way Peak Hour Primary Project Traffic Project Traffic % of Service Volume SR 54 Oakstead Blvd US 41 4-lane Divided Arterial % SR 54 US 41 US 41 US 41 North Seg. Morgan Road US 41 SR 54 Livingston Ave Morgan Road SR 54 County Line Road 4-lane Divided Arterial 6-lane Divided Arterial 6-lane Divided Arterial 6-lane Divided Arterial % % % % Morgan Road US 41 Project Entrance 2-lane % Morgan Road Project Entrance Hunts Road 2-lane % C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 12

16 Morgan Road Commerce Park Access Management Summary Report 7.0 EXISTING AND FUTURE CONDITIONS ANALYSIS AT IMPACTED INTERSECTIONS As mentioned in the earlier section, an intersection analysis was performed at the following impacted intersections (both off-site and on-site) using the SYNCHRO software: US 41 & Morgan Road Morgan Road & Driveway 1 and Morgan Road & Driveway 2 Based on the nature of the development (Elementary School with a start time of 8:00 AM, Middle School with a start time of 9:00 AM and Medical Offices), the AM peak hour period will be from 7:30 to 9:30 AM. The peak hour factor from the existing traffic counts is about 0.95; however due to the nature of the proposed development, a peak hour factor of 0.66 was to used in the intersection analysis for the key movements associated with the development. Based on the amount of traffic volumes generated by the vested developments along with the proposed development, it is anticipated that the intersection of US 41 and Morgan Road, which is an un-signalized intersection, will experience severe delays (LOS F). For the safety of public (traffic) traversing thru the intersection, traffic signal was assumed and intersection was analyzed for background and background plus project conditions. Based on the expected volumes at this intersection at the project plus conditions, signal warrant analysis was performed and results of the analysis are included in the next section of this report. Intersection analysis was performed for background and project plus conditions with signalization option and the results from the analysis are shown in Table 4 for all approach movements as well as for the intersection (with signalized conditions). The intersection analysis and signal warrant analysis worksheets are provided in Appendix A. C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 13

17 Morgan Road Commerce Park Access Management Summary Report TABLE 4 Intersection Name US 41 & Morgan Road Morgan & East Drwy. Intersection Level of Service Summary Approach NB SB EB WB Overall AM Peak Hour Period Background Conditions w/ Proj. Traffic Conditions LOS Grade LOS Grade A B B C B Overall A A C D C C C Morgan & West Drwy. SBL Overall B B B B 8.0 TURN LANE ANALYSIS Currently, US 41 (Major Street) has left turn lanes at the intersection of Morgan Road. Based on the trip generation and trip distribution, project trips were determined at this intersection and on Morgan Road at the driveway entrances. The results of the intersection analysis (SYNCHRO results included in the Appendix A) show that the expected queue length for the Northbound Left turns at project plus conditions is about 136 ft. The current stack length available is about 100 ft. So the existing turn lane is not adequate to serve the background plus project traffic conditions and extension of turn lane by additional 40 feet is recommended. Also, the results of the intersection analysis show that the expected queue length for eastbound left turns at the intersection of US 41 and Morgan Road is about 91 feet. Table 5 summarizes the storage lengths of turn lanes at this intersection. C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 14

18 Morgan Road Commerce Park Access Management Summary Report Southbound Right Turn Lane at the Intersection of US 41 and Morgan Road and at the intersection of Morgan Road and Driveways The Right Turn Lane Warrant Study was performed based on the article Exclusive Right Turn Lanes at Un-signalized Intersections, When We Should Require Them? The Statewide Access Management Team of the Florida Department of Transportation (FDOT) published this article (included in Appendix A). The posted speed limit on US 41 is 55 MPH in the Project vicinity. The article identifies the threshold of right turns requiring a turn lane as 110 vph for a facility with a posted speed limit 45 MPH or less and 30 vph for a facility with a posted speed limit of greater than 45 MPH. The right turn lane warrant analysis is summarized below: Table 5 - Summary of Right Turn Lane Analysis Location Morgan Road & East Drwy. Morgan West Drwy. US Morgan Road Movement Rights (vph) Threshold of Right Turns Warranted WB RT Yes WB RT NO SB RT Yes As shown in Table 4, right turn lane on US 41 at the intersection of Morgan Road is warranted and how ever due to the presence of CSX Railway line along US 41 on West side, currently there is not enough right-of-way to accommodate the warranted right-turn lane. However, by coordinating with CSX and FDOT, a right-turn lane can be constructed to safely accommodate the expected right-turns at this intersection. Also, based on the results documented in Table 4, a right-turn lane on Morgan Road at the intersection of East Driveway (Entering Traffic during peak hours) is recommended to avoid the spill-over of queues onto Morgan Road during pick-up and drop-off hours. The following section shows the expected queue during the school peak hours at the project access points and on Morgan Road at US 41. C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 15

19 Morgan Road Commerce Park Access Management Summary Report Based on the trip generation shown in Table 2 in the earlier section of the report, there will be a total of 395 trips (232 trips entering and 163 exiting). Out these trips, a total of 333 trips (183 trips entering and 150 trips exiting) will be generated by the Elementary and Middle Schools. Based on the information given by the Developer, there will be a minimum of two busses (with a capacity of 55 students per bus) with two trips per bus during the AM peak hour will reduce the net resulting passenger car traffic during the AM Peak Hour. Also, based on the enrollment information provided by the similar school in another county, there is a considerable amount of siblings attending the school and hence reduces the overall trip generation of these types of schools. Regardless of these scenarios, expected queue analysis was performed for the worst case scenario and details of queue calculations are given below: Estimated Cars entering the development during AM Peak Hour: 232 (183 cars (122 from elementary and 61 from middle school) from School over a period of two hours (staggered school hours for elementary and middle) and 49 cars from Medical office over one hour period) Expected Peak Hour: 7:00 to 9:00 AM (school) and 8:00 to 9:00 AM (offices) Expected worst peak traffic entering the site: 122 (from elementary school) Expected Peak Hour Factor: 0.66 (due to 2:1 split of elementary and middle school enrollment in the total enrollment of 728 students) Worst expected exiting rate from the site during AM peak Hour: 4 veh/min Maximum Expected drop-off and/or pick-up queue during peak hours: 31vehicles (122/4) On-site storage from the traffic circulation plan: 96 cars Based on the information and/or calculations given above, the expected queue from the pick-up and/or drop-off is less than the provided on-site storage and the probability for the queue spill on to Morgan Road from the development is very low. C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 16

20 Morgan Road Commerce Park Access Management Summary Report 9.0 ACCESS POINTS AND STORAGE LENGTHS Based on the trip generation and trip distribution, project trips at the driveway and off-site intersections, using the Pasco County s Land Development Code, Section 618, Access management Regulations, the following tables shows the access details and storage lengths at the project access points. Table 5A - Summary of Access Points Project Ent. and/ or Intersection Morgan East Drwy. Morgan West Drwy. Min. Space Needed (ft) Existing Spacing (ft) Comments Entering Traffic Only n/a n/a Exiting Traffic Only Intersection Details Morgan Road & East Drwy. US 41 & Morgan Road Mvmt. Details Table 5B - Storage Lengths Calculations Queue Length (ft) Decel./ Taper Length (ft) Turn Lane Length (ft) Existing/ Proposed Length (ft) WBR NBL SBR Comments Sufficient Provided Not Sufficient, add 160 ft of turn lane Add Right Turn lane (265 ft including taper) EBL Need to Provide EBR Need to Provide C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 17

21 Morgan Road Commerce Park Access Management Summary Report Insert Figure 7 Traffic Circulation Plan C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 18

22 Morgan Road Commerce Park Access Management Summary Report 10.0 SUBSTANDARD ROAD REVIEW In the case of this development, project traffic immediately accesses fully developed roadways (One is a state road and the other one is a county road). As such, no substandard road review is necessary according to Pasco County guidelines RAILROAD CROSSING Based on the information collected during the field data collection, the train service frequency on week days is two times a day and the details of the service are: Northbound between 12 noon and 1 PM and Southbound between 4 and 5 PM. Based on the train service information collected in the field, it is understood that the train service is not during the development peak traffic hours, however due the requirement of additional turn lanes on Morgan Road at the intersection of US 41, approval from FDOT and CSX may be required. The current crossing is not sufficient to accommodate all required lanes. Based on the intersection analysis, an exclusive turn lanes are needed at the intersection of US 41 and Morgan Road. Hence, to accommodate these turn lanes at the crossing, minor modifications are needed at the Railway Crossing. C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 19

23 Morgan Road Commerce Park Access Management Summary Report 12.0 CONCLUSION Based on the anticipated volumes at this intersection, some of the signal warrants were met. With the assumption of installing a signal, intersection analysis was performed for background and project plus conditions and intersection will be operating at acceptable level of service. Also, per the intersection analysis results, turn lanes are needed on Morgan Road at the intersection of Morgan Road and US 41 and to accommodate these turn lanes, minor modifications to the existing railway crossing are needed with FDOT and CSX approval along with some additional right-of-way. A proportionate share of $xxx,xxx towards the installation of traffic signal exclusive southbound right turn at the intersection US 41 and Morgan Road will be required from the developer. C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 20

24 Morgan Road Commerce Park Access Management Summary Report Appendix A C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Traffic Impact Study_ doc 21

25 TRAFFIC VOLUME GENERATION WORKSHEET INTERSECTION: US 41 & Morgan Road Peak Hour : 7:30-8:30 AM PHF: 0.95 CONDITION Value Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Peak Hour Existing (base) Volume x Seasonal Adjustment Factor Final Base Volume: Total Heavy Trucks % Heavy Trucks Background Traffic: Existing Base Volume: Vested Trips (from MorganR Office Dev) Annual Growth Rate (%) Growth Factor to May Total Future Background Traffic: Proposed Project Components: Net Primary Pass-by Trips Project Component Total TOTAL VOLUME: C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Final_Traffic_AM_Peak 6/3/2008

26 TRAFFIC VOLUME GENERATION WORKSHEET INTERSECTION: Morgan Road & East Drivway Peak Hour : 7:30-8:30 AM PHF: 0.95 CONDITION Value Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Peak Hour Existing (base) Volume - May x Seasonal Adjustment Factor Final Base Volume: Total Heavy Trucks % Heavy Trucks Background Traffic: Existing Base Volume: Vested Trips (from MorganR Office Dev) Annual Growth Rate (%) Growth Factor to May Total Future Background Traffic: Proposed Project Components: Net Primary Pass-by Trips Project Component Total TOTAL VOLUME: C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Final_Traffic_AM_Peak 6/3/2008

27 TRAFFIC VOLUME GENERATION WORKSHEET INTERSECTION: Morgan Road & West Drivway Peak Hour : 7:30-8:30 AM PHF: 0.95 CONDITION Value Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Peak Hour Existing (base) Volume - May x Seasonal Adjustment Factor Final Base Volume: Total Heavy Trucks % Heavy Trucks Background Traffic: Existing Base Volume: Vested Trips (from MorganR Office Dev) Annual Growth Rate (%) Growth Factor to May Total Future Background Traffic: Proposed Project Components: Net Primary Pass-by Trips Project Component Total TOTAL VOLUME: C:\VV_FTE1\Projects\ Charter School Morgan Road in Pasco\Final Phase\Final_Traffic_AM_Peak 6/3/2008

28 Lanes, Volumes, Timings Background Conditions 6: Morgan Road & US 41 6/2/2008 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Left Thru Right Left Thru Left Thru Left Thru Right Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) Turn Type Perm Perm Perm Prot Prot Perm Protected Phases Permitted Phases Detector Phase Project Plus AM Peak Period 5/10/2008 Synchro 7 - Report %user_name% Page 1

29 Lanes, Volumes, Timings Background Conditions 6: Morgan Road & US 41 6/2/2008 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 22.2% 22.2% 22.2% 22.2% 22.2% 0.0% 28.9% 68.9% 0.0% 8.9% 48.9% 48.9% Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) Recall Mode None None None None None Min Min None Min Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C B C D A D B A Approach Delay Approach LOS B C A B Queue Length 50th (ft) Queue Length 95th (ft) # Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 73.2 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 14.4 Intersection LOS: B Intersection Capacity Utilization 66.5% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles Project Plus AM Peak Period 5/10/2008 Synchro 7 - Report %user_name% Page 2

30 Lanes, Volumes, Timings Background Conditions 6: Morgan Road & US 41 6/2/2008 Splits and Phases: 6: Morgan Road & US Project Plus AM Peak Period 5/10/2008 Synchro 7 - Report %user_name% Page 3

31 Lanes, Volumes, Timings Project Plus Conditions 6: Morgan Road & US 41 6/2/2008 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Left Thru Right Left Thru Left Thru Left Thru Right Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) Turn Type Perm Perm Perm Prot Prot Perm Protected Phases Permitted Phases Detector Phase Project Plus AM Peak Period 5/10/2008 Synchro 7 - Report %user_name% Page 1

32 Lanes, Volumes, Timings Project Plus Conditions 6: Morgan Road & US 41 6/2/2008 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 22.2% 22.2% 22.2% 22.2% 22.2% 0.0% 28.9% 68.9% 0.0% 8.9% 48.9% 48.9% Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) Recall Mode None None None None None Min Min None Min Min Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D B C E A D D A Approach Delay Approach LOS C C C D Queue Length 50th (ft) Queue Length 95th (ft) # # Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 85.7 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.99 Intersection Signal Delay: 29.5 Intersection LOS: C Intersection Capacity Utilization 74.5% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles Project Plus AM Peak Period 5/10/2008 Synchro 7 - Report %user_name% Page 2

33 Lanes, Volumes, Timings Project Plus Conditions 6: Morgan Road & US 41 6/2/2008 Splits and Phases: 6: Morgan Road & US Project Plus AM Peak Period 5/10/2008 Synchro 7 - Report %user_name% Page 3

34 Two-Way Stop Control file://c:\documents and Settings\Floridate\Local Settings\Temp\u2k6D.tmp Page 1 of 2 6/3/2008 General Information Analyst VRV Agency/Co. FTE Date Performed 6/3/2008 Analysis Time Period AM Peak Hour TWO-WAY STOP CONTROL SUMMARY Site Information Intersection Morgan Road & East Drieway Jurisdiction Pasco County Analysis Year 2009 Project Description Morgan Road Commerce Park East/West Street: Morgan Road North/South Street: East Driveway Intersection Orientation: East-West Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement L T R L T R Volume (veh/h) Peak-hour factor, PHF Hourly Flow Rate (veh/h) Proportion of heavy vehicles, P HV Median type Undivided RT Channelized? 0 0 Lanes Configuration TR L T R Upstream Signal 0 0 Minor Street Northbound Southbound Movement L T R L T R Volume (veh/h) Peak-hour factor, PHF Hourly Flow Rate (veh/h) Proportion of heavy vehicles, P HV Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes Configuration LTR LTR Control Delay, Queue Length, Level of Service Approach EB WB Northbound Southbound Movement Lane Configuration L LTR LTR Volume, v (vph) Capacity, c m (vph) v/c ratio Queue length (95%)

35 Two-Way Stop Control file://c:\documents and Settings\Floridate\Local Settings\Temp\u2k6D.tmp Page 2 of 2 6/3/2008 Control Delay (s/veh) LOS A A Approach delay (s/veh) Approach LOS A HCS2000 TM Copyright 2003 University of Florida, All Rights Reserved Version 4.1f

36 Two-Way Stop Control file://c:\documents and Settings\Floridate\Local Settings\Temp\u2k7B.tmp Page 1 of 2 6/3/2008 General Information Analyst VRV Agency/Co. FTE Date Performed 6/3/2008 Analysis Time Period AM Peak Hour TWO-WAY STOP CONTROL SUMMARY Site Information Intersection Morgan Road & West Drieway Jurisdiction Pasco County Analysis Year 2009 Project Description Morgan Road Commerce Park East/West Street: Morgan Road North/South Street: West Driveway Intersection Orientation: East-West Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement L T R L T R Volume (veh/h) Peak-hour factor, PHF Hourly Flow Rate (veh/h) Proportion of heavy vehicles, P HV Median type Undivided RT Channelized? 0 0 Lanes Configuration TR T Upstream Signal 0 0 Minor Street Northbound Southbound Movement L T R L T R Volume (veh/h) Peak-hour factor, PHF Hourly Flow Rate (veh/h) Proportion of heavy vehicles, P HV Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes Configuration LR LTR Control Delay, Queue Length, Level of Service Approach EB WB Northbound Southbound Movement Lane Configuration LR LTR Volume, v (vph) Capacity, c m (vph) 902 v/c ratio 0.36 Queue length (95%) 1.66

37 Two-Way Stop Control file://c:\documents and Settings\Floridate\Local Settings\Temp\u2k7B.tmp Page 2 of 2 6/3/2008 Control Delay (s/veh) 11.2 LOS B Approach delay (s/veh) Approach LOS B HCS2000 TM Copyright 2003 University of Florida, All Rights Reserved Version 4.1f

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017 Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A7 519-591-0426 November 8, 2017 Revised December 20, 2017 Laurie Wills, PEng Deputy Director of Public Works Town of Cobourg 740 Division

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 March 2015 Prepared for Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 JRL consulting JRL consulting TABLE OF CONTENTS 1 INTRODUCTION... 2 1.1 BACKGROUND... 2 2 EXISTING

More information

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Market Street Road Diet Wilmington, NC 2016 Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Wilmington, NC Parsons Brinckerhoff January 2016 FINAL TECHNICAL REPORT US 17 Corridor

More information

MEMORANDUM November 19, 2012

MEMORANDUM November 19, 2012 COUNCIL OF GOVERNMENTS CENTRAL NAUGATUCK VALLEY 60 NORTH MAIN ST 3RD Floor WATERBURY, CT 06702-1403 (203)757-0535 Web Site: www.cogcnv.org E-Mail: cogcnv@cogcnv.org November 19, 2012 MEMORANDUM 111912

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Date: December 20, Project #:

Date: December 20, Project #: To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

C. iv) Analysis/Results

C. iv) Analysis/Results The Pettengill Road project is located outside the borders of the model in an external zone. As a result, inserting all Pettengill Road trip generation assumptions into the NRPC model and running a new

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) 116 20 8 405 137 56 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.81 0.81 0.67 0.67 0.89 0.89 Hourly flow

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc.

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc. TRANSPORTATION ANALYSIS Wawa US 441 and Morningside Drive Prepared for: Brightwork Real Estate, Inc. TABLE OF CONTENTS Introduction... 1 Project Description... 1 Estimated Daily Project Traffic... 3 Estimated

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Appendix B: Traffic Reports

Appendix B: Traffic Reports Appendix B: Traffic Reports 407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION Report Markham Road Station Traffic Study Prepared for Ministry of Transportation, Ontario

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

APPENDIX G. Traffic Data

APPENDIX G. Traffic Data APPENDIX G Traffic Data HCM Signalized Intersection Capacity Analysis 2: Duanesburg Road & I-88 Ramps 10/7/2004 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl)

More information

Intersection LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5

Intersection LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5 Intersection No- LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5 Ü Intersection No- LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive S C 32.6 D 43.0 Intersection No- LOS Delay

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings TECHNICAL MEMORANDUM Summary of Findings Date: June 17, 2014 Project #: 17121.15 To: Si Lau, P.E.; City of Oakland, CA From: Erin Ferguson, P.E.; Aaron Elias, P.E.; Daphne Dethier; and Mark Bowman, P.E.;

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information

267 O Connor Street Residential Development

267 O Connor Street Residential Development M a y 2014 267 O Connor Street Residential Development Transportation Brief Google 2014 Bing 2014 Prepared for: MASTERCRAFT STARWOOD Prepared by: Study 267 O'Connor Type Street May 2014 Study Residential

More information

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012 BOSTON REGION METROPOLITAN PLANNING ORGANIZATION State Transportation Building Ten Park Plaza, Suite 2150 Boston, MA 02116-3968 Tel. (617) 973-7100 Fax (617) 973-8855 TTY (617) 973-7089 www.bostonmpo.org

More information

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B Memorandum DATE: AUGUST 1, 2013 TO: PAUL TILTON, P.E., SANDWICH DPW DIRECTOR/TOWN ENGINEER FROM: LEV MALAKHOFF, SR. TRANSPORTATION ENGINEER RE: ROUTE 130/QUAKER MEETINGHOUSE ROAD INTERSECTION Paul: Per

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Wellington Street West

Wellington Street West Transportation Brief prepared for: 185 Davenport Road Suite 300 Toronto, ON M5R 1J1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 November 5, 2013 TO3131TOH Transportation Brief November

More information

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment MEMORANDUM Date: June 22, 2018 Project #: 21562 To: Colin McArthur, AICP From: Project: Subject: Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

(A) Project Manager, Infrastructure Approvals

(A) Project Manager, Infrastructure Approvals February 14th, 2014 BY E-MAIL: wally.dubyk@ottawa.ca City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor, Ottawa, Ontario K1P 1J1 Attention: Wally Dubyk, C.E.T (A) Project

More information

1140 Wellington Street West Transportation Brief

1140 Wellington Street West Transportation Brief 1140 Wellington Street West Transportation Brief October 2013 Study 1140 Wellington Type Street West October 2013 Study Transportation Name Brief February 2011 TB Check List TIS / TB/ CTS Check List prepared

More information

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS Executive Summary... 2 Project Background... 2 Conditions... 2 Findings... 3 Recommendations... 4 Introduction... 6

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by:

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by: 700 Hunt Club Road Transportation Impact Study - Addendum #1 Submitted by: 14 June 2013 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com 14 June 2013

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM TO: Merrimack Valley Metropolitan Planning Organization FROM: James Terlizzi, P.E., Transportation Planning Engineer DATE: March 6, 2017 SUBJECT: Further analysis of the recommendations

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure MMM Group Limited Traffic Study CASA MIA Community Care Facility Vancouver, BC Communities Transportation Buildings Infrastructure February 2013 5011001-033 STANDARD LIMITATIONS This report was prepared

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES)

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) 0 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) C O TRANSPORTATION ANALYSIS STUDY March th, 0 APPLICANT: Alexandria City Public Schools Educational Facilities Department Operational & Maintenance

More information