HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009
|
|
- Stephany Blair
- 11 months ago
- Views:
Transcription
1 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Upstream signal (ft) vc, conflicting volume vcu, unblocked vol tc, single (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 NB 1 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS C A A Approach Delay (s) Approach LOS C Average Delay 3.5 Intersection Capacity Utilization 40.8% ICU Level of Service A LC 111 Corridor Study 5/26/2009 AM Existing
2 HCM Signalized Intersection Capacity Analysis 3: 271st Street & LC 111 5/26/2009 Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Perm pm+pt Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C B A B B B Approach Delay (s) Approach LOS C A B B HCM Average Control Delay 16.1 HCM Level of Service B HCM Volume to Capacity ratio 0.62 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 66.7% ICU Level of Service C c Critical Lane Group LC 111 Corridor Study 5/26/2009 AM Existing
3 12: First Street & LC 111 5/26/2009 Sign Control Stop Stop Stop Stop Volume (vph) Peak Hour Factor Hourly flow rate (vph) Direction, Lane # EB 1 EB 2 WB 1 NB 1 SB 1 Volume Total (vph) Volume Left (vph) Volume Right (vph) Hadj (s) Departure Headway (s) Degree Utilization, x Capacity (veh/h) Control Delay (s) Approach Delay (s) Approach LOS B A B B Delay 12.0 HCM Level of Service B Intersection Capacity Utilization 52.4% ICU Level of Service A LC 111 Corridor Study 5/26/2009 PM Existing
4 9: Kevin Drive & LC 111 5/26/2009 Volume (veh/h) Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Upstream signal (ft) 1173 vc, conflicting volume vcu, unblocked vol tc, single (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS C B A A Approach Delay (s) Approach LOS C B Average Delay 2.5 Intersection Capacity Utilization 39.6% ICU Level of Service A LC 111 Corridor Study 5/26/2009 PM Existing
5 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Upstream signal (ft) vc, conflicting volume vcu, unblocked vol tc, single (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 NB 1 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS C B A Approach Delay (s) Approach LOS C Average Delay 2.6 Intersection Capacity Utilization 55.6% ICU Level of Service B LC 111 Corridor Study 5/26/2009 PM Existing
6 HCM Signalized Intersection Capacity Analysis 3: 271st Street & LC 111 5/26/2009 Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Perm pm+pt Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm 0.11 c c0.14 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C B A B B C Approach Delay (s) Approach LOS C B B C HCM Average Control Delay 15.0 HCM Level of Service B HCM Volume to Capacity ratio 0.63 Actuated Cycle Length (s) 60.0 Sum of lost time (s) 8.0 Intersection Capacity Utilization 63.7% ICU Level of Service B c Critical Lane Group LC 111 Corridor Study 5/26/2009 PM Existing
7 12: First Street & LC 111 6/4/2009 Sign Control Stop Stop Stop Stop Volume (vph) Peak Hour Factor Hourly flow rate (vph) Direction, Lane # EB 1 EB 2 WB 1 NB 1 SB 1 Volume Total (vph) Volume Left (vph) Volume Right (vph) Hadj (s) Departure Headway (s) Degree Utilization, x Capacity (veh/h) Control Delay (s) Approach Delay (s) Approach LOS B B C C Delay 16.2 HCM Level of Service C Intersection Capacity Utilization 60.1% ICU Level of Service B LC 111 Corridor Study 5/26/2009 AM 2035, no improvements
8 9: Kevin Drive & LC 111 6/4/2009 Volume (veh/h) Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Upstream signal (ft) vc, conflicting volume vcu, unblocked vol tc, single (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS D B A A Approach Delay (s) Approach LOS D B Average Delay 4.5 Intersection Capacity Utilization 52.9% ICU Level of Service A LC 111 Corridor Study 5/26/2009 AM 2035, no improvements
9 6: Brian Street & LC 111 6/4/2009 Volume (veh/h) Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Upstream signal (ft) vc, conflicting volume vcu, unblocked vol tc, single (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS F C D B A A Approach Delay (s) Approach LOS F C Average Delay 47.3 Intersection Capacity Utilization 74.6% ICU Level of Service D LC 111 Corridor Study 5/26/2009 AM 2035, no improvements
LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI
LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department
Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida
Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road
Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID
Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS
June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903
LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,
Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants
Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants TJKM Transportation Consultants Draft Report Traffic Impact Study for the Residential Development at 4659 Proctor
Mobilia Centre Merivale Road and 530/540 West Hunt Club Road Transportation Overview and Parking Study
Final Report Mobilia Centre - 1872 Merivale Road and 530/540 West Hunt Club Road Transportation Overview and Parking Study Prepared for CPD Developments by IBI Group August 13, 2014 IBI GROUP FINAL REPORT
830 Main Street Halifax Regional Municipality
830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared
Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee
To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette
Municipality of Anchorage Traffic Department
Lake Otis Parkway & 20 th Avenue Signal Evaluation Prepared for: Municipality of Anchorage Department Prepared by: Hattenburg Dilley & Linnell 3335 Arctic Boulevard Suite 100 Anchorage, AK 99503 Table
DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.
DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation
P07033 US 50 EB Weaving Analysis between El Dorado Hills and Silva Valley Ramp Metering Analysis for US 50 EB On-Ramp at Latrobe Road
180 Grand Avenue, Suite 250 428 J Street, Suite 500 Oakland, CA 94612 Sacramento, CA 95814 510.839.1742 916.266.2190 510.839.0871 fax 916.266.2195 Dowling Associates, Inc. www.dowlinginc.com traffic@dowlinginc.com
Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)
Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline
Transportation Review
1445-1455 West Georgia Street Transportation Review Draft Report Prepared for BCG Developments Date November 10, 2016 Project No. 4608.12 November 10, 2016 4608.12 Dawn Guspie James KM Cheng Architects
Two Lane Highways Procedures from 2000 Highway Capacity Manual
Two Lane Highways Procedures from 2000 Highway Capacity Manual Two lane-1 Maximum flow rates on two-way streets: 1700 cars/hour in one direction and 3200 in both directions Level of Service is based on:
Existing Traffic Conditions
May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California
State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by:
State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report Prepared for: City of Morro Bay Prepared by: (Caltrans Project No. 0515000104, EA 0F670) State Route 1/State Route
Traffic Impact Analysis for 2171 Rosecrans Avenue
Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017
Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro
Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro Outline Background Predictive Priority Algorithm Simulation Analysis Measure of Effectives (MOE)
Chester Road PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management
Transportation Impact Analysis Chester Road PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for Raydient + Places, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc. Landmark
1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES)
0 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) C O TRANSPORTATION ANALYSIS STUDY March th, 0 APPLICANT: Alexandria City Public Schools Educational Facilities Department Operational & Maintenance
Traffic Impact Statement (TIS)
Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205
Capacity and Level of Service for Highway Segments (I)
Capacity and Level of Service for Highway Segments (I) 1 Learn how to use the HCM procedures to determine the level of service (LOS) Become familiar with highway design capacity terminology Apply the equations
Diablo Vista Pumping Plant Replacement
Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation
Capital Metro Downtown Multimodal Station
Capital Metro Downtown Multimodal Station Stakeholder Briefing December 11, 2015 Agenda 1 2 3 4 5 Project Summary Downtown Station Concept Evaluation 4 th Street Traffic Analysis 5 th Street Traffic Analysis
Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways.
4.7 Transportation and Circulation This report documents the results of a study of the potential traffic impacts created by the Whittier Main Oil Field Development Project. The study is included as Appendix
PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm
PUBLIC MEETING Bear Creek Park Community Center January 24, 2017 5:30 pm to 7:30 pm PURPOSE OF THE MEETING This is an open House No formal presentation Introduce the project to the public Present existing
City-Wide Major Traffic Study. Study Report
FINAL REPORT Prepared for: CITY OF CORONADO Prepared by: PARSONS BRINCKERHOFF QUADE & DOUGLAS, INC. In cooperation with: WILBUR SMITH ASSOCIATES March 15, 2005 TABLE OF CONTENTS 1.0 Introduction...1 2.0
Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS)
Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS) Chen-Fu Liao Department of Civil, Environmental, and Geo- Engineering University
TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii
TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description
TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE
TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE
Proposed Inn at Bellefield Traffic Impact Assessment
Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017
Performance Measure Summary - Seattle WA. Performance Measures and Definition of Terms
Performance Measure Summary - Seattle WA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance
Performance Measure Summary - Charlotte NC-SC. Performance Measures and Definition of Terms
Performance Measure Summary - Charlotte NC-SC There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance
Performance Measure Summary - Corpus Christi TX. Performance Measures and Definition of Terms
Performance Measure Summary - Corpus Christi TX There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance
FHWA/IN/JTRP-2000/5. Final Report. Eric Nelson Montasir Abbas Gary Shoup Darcy Bullock Ryan Gallagher
FHWA/IN/JTRP-2000/5 Final Report DEVELOPMENT OF CLOSED LOOP SYSTEM EVALUATION PROCEDURES Eric Nelson Montasir Abbas Gary Shoup Darcy Bullock Ryan Gallagher December 2000 Draft Final Report FHWA/IN/JTRP-2000/5
APPENDIX B Traffic Analysis
APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,
Performance Measure Summary - Boston MA-NH-RI. Performance Measures and Definition of Terms
Performance Measure Summary - Boston MA-NH-RI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance
Traffic Impact Study for Proposed Olive Boulevard Development
Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141
BARRABOOL HILLS SHOPPING CENTRE
BARRABOOL HILLS SHOPPING CENTRE PROVINCE BOULEVARD, HIGHTON Traffic Engineering Assessment Prepared for LASCORP DEVELOPMENT GROUP (AUST) PTY LTD MARCH 2012 OUR REFERENCE: 12073R7221FINAL BARRABOOL HILLS
Final Traffic Technical Memorandum
SR 54 Project Development and Environment (PD&E) Study From CR 577 (Curley Road) to CR 579/CR 54 (Morris Bridge Road) Final Traffic Technical Memorandum WPI Segment No: 416561-1 Pasco County Prepared for
Calibration of Work Zone Impact Analysis Software for Missouri
Calibration of Work Zone Impact Analysis Software for Missouri Prepared By Praveen Edara, Ph.D., P.E., PTOE Carlos Sun, Ph.D., P.E., JD Zhongyuan (Eric) Zhu University of Missouri-Columbia Department of
8150 Sunset Bl Valet on Crescent Heights Bl 4 messages
Eileen Hunt 8150 Sunset Bl Valet on Crescent Heights Bl 4 messages Eileen Hunt To: Jeannie Shen Thu, Jan 30, 2014 at 11:11 AM
Traffic Study for Highway 107 Phase 1 Burnside to Sackville
FINAL REPORT Traffic Study for Highway 107 Phase 1 Burnside to Sackville Presented To: Nova Scotia Department of Transportation and Infrastructure Renewal February 2011 Project No. DA10095 www.genivar.com
IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION
IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared
R.M.N.T. Sirisoma a Doug Morgan b S.C. Wirasinghe a
R.M.N.T. Sirisoma a Doug Morgan b S.C. Wirasinghe a a Dept. of Civil Engineering, Schulich School of Engineering, University of Calgary b Calgary Transit, Calgary, Canada Introduction Study Area Availability
4.4 Transportation and Circulation
4.4.1 Introduction This section evaluates the potential for construction traffic and operational impacts to result from implementation of the proposed project. This includes the potential for the project
Intersection Analysis for US 92/International Speedway Blvd. at Garfield Ave.
FinalReport IntersectionAnalysisfor US92/InternationalSpeedwayBlvd. atgarfieldave. April2017 Preparedfor: RivertoSeaTransportationPlanningOrganization (R2CTPO) 2570W.InternationalSpeedwayBlvd.,Suite100
Section 5.8 Transportation and Traffic
Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet March 2017 PROJECT OVERVIEW Environmental Impact Statement (EIS) Project divided into 3 Segments Segment 1: Beltway 8
Florida International University Parking Garage No. 6 Traffic Study
Florida International University Parking Garage No. 6 raffic Study Prepared By: December 12, 212 12-163 Florida International University Parking Garage No. 6 ABE OF CONENS Introduction 2 Executive Summary.
3.8 TRANSPORTATION, CIRCULATION AND PARKING
3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed
4.1 Traffic, Circulation, and Parking
4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project
Measurement along a Length of Road
. Measurement along a Length of Road Chapter Measurement along a Length of Road. Overview This is normally used to obtain variations in speed over a stretch of road. Usually the stretch will be having
DRAFT. Kanata Mews Development 329 March Road, City of Ottawa. Transportation Brief. Prepared for:
Kanata Mews Development Prepared for: Bascorp Management 1611 Ortona Avenue Ottawa, ON K2C 1W4 DRAFT Prepared by: McIntosh Perry Consulting Engineers Ltd. 115 Walgreen Road Carp, ON K0A 1L0 August 19,
Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois
Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois N 83 rd Street Janes Avenue Soccer Fields Janes Avenue Shopping Plaza Cypress Cove Family
Purple Line Extension, Section 2 Southern California Edison, Phase I
Purple Line Extension, Section 2 Southern California Edison, Phase I 1 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work: 10am-6pm Left
Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA
Tube Counts Type of report: Tube Count - Volume Data LOCATION: Scotts Valley Dr QC JOB #: 245667 SPECIFIC LOCATION: ft from Tabor St DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA DATE: Mar 2 24 - Mar
Civil Engineering and Environmental, Gadjah Mada University TRIP ASSIGNMENT. Introduction to Transportation Planning
Civil Engineering and Environmental, Gadjah Mada University TRIP ASSIGNMENT Introduction to Transportation Planning Dr.Eng. Muhammad Zudhy Irawan, S.T., M.T. INTRODUCTION Travelers try to find the best
III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR
III. CORRECTIONS AND ADDITIONS TO THE DRAT EIR DRAT EIR I. INTRODUCTION/SUMMARY In response to Comment No. 2.1 on the Draft EIR, the following mitigation measure is added to Table I- 1, Summary of Environmental
Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description
UTC Case Studies Turin, Rome
UTC Case Studies Turin, Rome Quantifying the Effect of Intelligent Transport Systems on CO2 Emissions from Road Transportation Giorgio Magra, CNH-IVECO Giacomo Tuffanelli, RMA The process Data Collection
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition
Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212
Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT
Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite
Transportation Impact Study. MIT Kendall Square. Cambridge, Massachusetts. / Massachusetts Institute of Technology (MIT)
Transportation Impact Study MIT Kendall Square Cambridge, Massachusetts PREPARED FOR / Massachusetts Institute of Technology (MIT) PREPARED BY 99 High Street Boston, MA 02110 617.728.7777 June 22, 2015
Micro Traffic Simulation Approach to the Evaluation of Vehicle Emissions on One way vs. Two way Streets: A Case Study in Houston Downtown
Wang, Yu and Qiao 0 0 Micro Traffic Simulation Approach to the Evaluation of Vehicle Emissions on One way vs. Two way Streets: A Case Study in Houston Downtown By Jinghui Wang, Graduate Research Assistant
Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1):
2709 McGraw Drive Bloomington, Illinois 61704 p 309.663.8435 f 309.663.1571 www.f-w.com www.greennavigation.com November 4, 2016 Mr. Kevin Kothe, PE City Engineer City of Bloomington Public Works Department
Public Meeting. June 15, :30 7:30 p.m.
Public Meeting June 15, 2017 5:30 7:30 p.m. Welcome 2015 Naval Station Norfolk Transit Extension Study 2015 Naval Station Norfolk Transit Extension Study 2017 Norfolk Westside Transit Study HRT and the
Ann Arbor SCOOT Mobility Study
Ann Arbor SCOOT Mobility Study Evaluating the SCOOT Adaptive Signal Control Technology Through the Use of Big Data Abstract: Adaptive traffic signal control systems offer cities and local governments a
Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily
5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation
IEC fuse holders & fuse disconnectors: CMS 14
Modulostar CMS14, CMS22 Modulostar IEC fuse holders & fuse disconnectors: CMS 14 IEC fuse holders: CMS 14: Fuse holder compliant with IEC 60269-1 & 2, and tested in accordance with IEC 60947-1 & 3 for
ROAD SAFETY AUDIT. Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover. March 29, 2017
ROAD SAFETY AUDIT Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover March 29, 2017 Prepared For: Massachusetts Department of Transportation Town of Andover, Massachusetts Prepared By: TEC,
GUIDELINES FOR SELECTION OF APPROPRIATE PEDESTRIAN CROSSING FACILITY AT MID-BLOCK SECTIONS
GUIDELINES FOR SELECTION OF APPROPRIATE PEDESTRIAN CROSSING FACILITY AT MID-BLOCK SECTIONS Udit Jain Research Scholar Indian Institute of Technology Roorkee Need of the Study Pedestrian fatalities highest
PROGRESSIVE BLOCK DISTRIBUTOR BVA-N
PROGRESSIVE BLOCK DISTRIBUTOR BVA-N APPLICATION The BVA-N progressive block distributors are lubricating elements of central grease and oil lubricating systems. BVA-N series is made of stainless steel
Capacity Analysis of the Union Station Rail Corridor using Integrated Rail and Pedestrian Simulation
Capacity Analysis of the Union Station Rail Corridor using Integrated Rail and Pedestrian Simulation Yishu Pu MASc Student Department of Civil Engineering University of Toronto Presentation Outline Introduction
Sepulveda Pass Corridor Systems Planning Study
Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Streets and Freeways Subcommittee January 17, 2013 1 Sepulveda Pass Study Corridor Extends for 30
EFFECT OF MOTORCYCLES TRAVEL BEHAVIOUR ON SATURATION FLOW RATES AT SIGNALIZED INTERSECTIONS IN MALAYSIA
EFFECT OF MOTORCYCLES TRAVEL BEHAVIOUR ON SATURATION FLOW RATES AT SIGNALIZED INTERSECTIONS IN MALAYSIA Leong Lee Vien, Universiti Sains Malaysia, Malaysia Wan Hashim Wan Ibrahim, Universiti Sarawak Malaysia,
Re: 233 Armstrong Street Residential Condominium Traffic Brief
1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,
Link Light Rail Operations and Maintenance Satellite Facility
September 2015 Link Light Rail Operations and Maintenance Satellite Facility TRANSPORTATION TECHNICAL REPORT Appendix E1 Central Puget Sound Regional Transit Authority Appendix E.1 TABLE OF CONTENTS PROJECT
Traffic Impact Study. Chicago, Illinois. May 2017 RETAIL UPPER N COLUMBUS US DRIVE. Parcel O, LLC. Prepared for: EXISTING SIDEWALK EXISTING PLA
0F 0E LAKESHORE EAST PARCEL O Traffic Impact Study EXISTING SIDEWALK EXISTING PLA Chicago, Illinois May 2017 NEW PLANTER NEW PLANTERS Prepared for: Parcel O, LLC UPPER N COLUMBUS US DRIVE RETAIL NEW PLANTERS
I-225 Rail Line Iliff and Florida Stations Information Meeting
I-225 Rail Line Iliff and Florida Stations Information Meeting May 15, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager Chris Hinton I-225 Rail Line Deputy Project
Section 3.12 Traffic and Transportation
Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An
ENVIRONMENTAL IMPACT ANALYSIS J. TRAFFIC, CIRCULATION AND ACCESS
IV. ENVIRONMENTAL IMPACT ANALYSIS A traffic study was prepared for the Proposed Project by Linscott, Law & Greenspan, Engineers, dated August 5, 2008 (see Appendix I: Traffic Study). The traffic study
SERVICE DESIGN GUIDELINES
VTA TRANSIT SUSTAINABILITY POLICY: APPENDIX A SERVICE DESIGN GUIDELINES Adopted February 2007 COMMUNITYBUS LOCALBUS EXPRESSBUS BUSRAPIDTRANSIT LIGHTRAILTRANSIT STATIONAREAS S A N T A C L A R A Valley Transportation
APPENDIX B. Speed Flow Curves
APPENDIX B Speed Flow Curves 5048375 / LD / 0902 B -1 5048375 / LD / 0902 B -2 B.Speed Flow Curves INTRODUCTION B.1 This appendix describes the implementation of speed flow curves within a SATURN model.
Toll Plazas at the Bosphorus Bridge
6th International Congress on Advances in Civil Engineering, 6-8 October 4 Bogazici University, Istanbul, Turkey Toll Plazas at the Bosphorus Bridge K.S. Öüt stanbul Technical University, Civil Engineering
Railroad Impact Study
Railroad Impact Study Ryan Huebschman, PE, PTOE Jason O Neill November 21, 2016 Study Impetus CSXT to lease and improve rail line between Louisville and Indianapolis Rail improvements will allow CSXT to
Appendix A. Transportation Assessment
Appendix A Transportation Assessment MEMORANDUM Date: January 22, 2014 To: From: Subject: Dennis Dornan, Perkins + Will Kathrin Tellez and Kristen arnarius, Fehr and Peers Transportation Assessment W13-3010
FULLY AUTONOMOUS VEHICLES: ANALYZING TRANSPORTATION NETWORK PERFORMANCE AND OPERATING SCENARIOS IN THE GREATER TORONTO AREA, CANADA
0 FULLY AUTONOMOUS VEHICLES: ANALYZING TRANSPORTATION NETWORK PERFORMANCE AND OPERATING SCENARIOS IN THE GREATER TORONTO AREA, CANADA Bradley Kloostra, Corresponding Author Division of Engineering Science
4.12 TRAFFIC AND CIRCULATION Introduction
4.12 TRAFFIC AND CIRCULATION 4.12.1 Introduction This section of the EIR describes the existing transportation and traffic conditions on roadways surrounding the project area, and analyzes the potential
US 81 Bypass of Chickasha Environmental Assessment Public Meeting
US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments
MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015
5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers
Buffalo Drive Road Safety Audit
UPWP Task 6410-11 Contract No: 11-050 Buffalo Drive Road Safety Audit CC 215 to Blue Diamond Road (SR 160) PRE CONSTRUCTION PHASE AUDIT Prepared for: Regional Transportation Commission of Southern Nevada
Stittsville OC Transpo Services
Stittsville OC Transpo Services Transportation Services Department March 22, 2018 0 Ottawa s Transit Challenge 1 1 What s Coming in 2018 O-Train Network 2 2 Confederation Line - Alignment 3 3 VEHICLE AND
Simulation Modeling of Electronic Screening at Weigh Stations. Alireza Kamyab Tom Maze Mark Nelson Bill McCall
Paper No. 980746 Simulation Modeling of Electronic Screening at Weigh Stations Alireza Kamyab Tom Maze Mark Nelson Bill McCall Center for Transportation Research and Education Iowa State University ISU
Charter Bus Staging and Pick-Up
W Area Dr Charter Bus Staging and Pick-Up Event Charter Bus Loading Zone AirTrain Domestic Terminals: Level 1 (Arrivals) Designated spaces in Courtyards 1, 3, or 4 Terminal 2 International Terminal: Level
Madison BRT Transit Corridor Study Proposed BRT Operations Plans
Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is
3.3 TRAFFIC AND CIRCULATION Introduction Environmental Setting
3.3.1 Introduction 3.3 TRAFFIC AND CIRCULATION This section describes existing conditions and applicable regulations for transportation related to the proposed project, the impacts on transportation that
LCV Operating Conditions & Routes (August 2017) Page 1 of 5
Page 1 of 5 APPROVED ROUTES & CONDITIONS FOR LONG COMBINATION VEHICLES (LCV S) CVSE Permits are valid in British Columbia on highways under the jurisdiction of the Ministry of Transportation and Infrastructure
RAILROAD PREEMPTION FORMS. Mark Johnson, P.E.
RAILROAD PREEMPTION FORMS Mark Johnson, P.E. October 12, 2016 The Basic Problem Vehicles stop on tracks Need to interconnect traffic signal with railroad cabinet 2 Preemption Process: ROW Transfer 1 st