HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009"

Transcription

1 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Upstream signal (ft) vc, conflicting volume vcu, unblocked vol tc, single (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 NB 1 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS C A A Approach Delay (s) Approach LOS C Average Delay 3.5 Intersection Capacity Utilization 40.8% ICU Level of Service A LC 111 Corridor Study 5/26/2009 AM Existing

2 HCM Signalized Intersection Capacity Analysis 3: 271st Street & LC 111 5/26/2009 Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Perm pm+pt Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C B A B B B Approach Delay (s) Approach LOS C A B B HCM Average Control Delay 16.1 HCM Level of Service B HCM Volume to Capacity ratio 0.62 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 66.7% ICU Level of Service C c Critical Lane Group LC 111 Corridor Study 5/26/2009 AM Existing

3 12: First Street & LC 111 5/26/2009 Sign Control Stop Stop Stop Stop Volume (vph) Peak Hour Factor Hourly flow rate (vph) Direction, Lane # EB 1 EB 2 WB 1 NB 1 SB 1 Volume Total (vph) Volume Left (vph) Volume Right (vph) Hadj (s) Departure Headway (s) Degree Utilization, x Capacity (veh/h) Control Delay (s) Approach Delay (s) Approach LOS B A B B Delay 12.0 HCM Level of Service B Intersection Capacity Utilization 52.4% ICU Level of Service A LC 111 Corridor Study 5/26/2009 PM Existing

4 9: Kevin Drive & LC 111 5/26/2009 Volume (veh/h) Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Upstream signal (ft) 1173 vc, conflicting volume vcu, unblocked vol tc, single (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS C B A A Approach Delay (s) Approach LOS C B Average Delay 2.5 Intersection Capacity Utilization 39.6% ICU Level of Service A LC 111 Corridor Study 5/26/2009 PM Existing

5 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Upstream signal (ft) vc, conflicting volume vcu, unblocked vol tc, single (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 NB 1 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS C B A Approach Delay (s) Approach LOS C Average Delay 2.6 Intersection Capacity Utilization 55.6% ICU Level of Service B LC 111 Corridor Study 5/26/2009 PM Existing

6 HCM Signalized Intersection Capacity Analysis 3: 271st Street & LC 111 5/26/2009 Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Perm pm+pt Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm 0.11 c c0.14 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C B A B B C Approach Delay (s) Approach LOS C B B C HCM Average Control Delay 15.0 HCM Level of Service B HCM Volume to Capacity ratio 0.63 Actuated Cycle Length (s) 60.0 Sum of lost time (s) 8.0 Intersection Capacity Utilization 63.7% ICU Level of Service B c Critical Lane Group LC 111 Corridor Study 5/26/2009 PM Existing

7 12: First Street & LC 111 6/4/2009 Sign Control Stop Stop Stop Stop Volume (vph) Peak Hour Factor Hourly flow rate (vph) Direction, Lane # EB 1 EB 2 WB 1 NB 1 SB 1 Volume Total (vph) Volume Left (vph) Volume Right (vph) Hadj (s) Departure Headway (s) Degree Utilization, x Capacity (veh/h) Control Delay (s) Approach Delay (s) Approach LOS B B C C Delay 16.2 HCM Level of Service C Intersection Capacity Utilization 60.1% ICU Level of Service B LC 111 Corridor Study 5/26/2009 AM 2035, no improvements

8 9: Kevin Drive & LC 111 6/4/2009 Volume (veh/h) Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Upstream signal (ft) vc, conflicting volume vcu, unblocked vol tc, single (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS D B A A Approach Delay (s) Approach LOS D B Average Delay 4.5 Intersection Capacity Utilization 52.9% ICU Level of Service A LC 111 Corridor Study 5/26/2009 AM 2035, no improvements

9 6: Brian Street & LC 111 6/4/2009 Volume (veh/h) Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Upstream signal (ft) vc, conflicting volume vcu, unblocked vol tc, single (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS F C D B A A Approach Delay (s) Approach LOS F C Average Delay 47.3 Intersection Capacity Utilization 74.6% ICU Level of Service D LC 111 Corridor Study 5/26/2009 AM 2035, no improvements

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants TJKM Transportation Consultants Draft Report Traffic Impact Study for the Residential Development at 4659 Proctor

More information

Mobilia Centre Merivale Road and 530/540 West Hunt Club Road Transportation Overview and Parking Study

Mobilia Centre Merivale Road and 530/540 West Hunt Club Road Transportation Overview and Parking Study Final Report Mobilia Centre - 1872 Merivale Road and 530/540 West Hunt Club Road Transportation Overview and Parking Study Prepared for CPD Developments by IBI Group August 13, 2014 IBI GROUP FINAL REPORT

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

Municipality of Anchorage Traffic Department

Municipality of Anchorage Traffic Department Lake Otis Parkway & 20 th Avenue Signal Evaluation Prepared for: Municipality of Anchorage Department Prepared by: Hattenburg Dilley & Linnell 3335 Arctic Boulevard Suite 100 Anchorage, AK 99503 Table

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

P07033 US 50 EB Weaving Analysis between El Dorado Hills and Silva Valley Ramp Metering Analysis for US 50 EB On-Ramp at Latrobe Road

P07033 US 50 EB Weaving Analysis between El Dorado Hills and Silva Valley Ramp Metering Analysis for US 50 EB On-Ramp at Latrobe Road 180 Grand Avenue, Suite 250 428 J Street, Suite 500 Oakland, CA 94612 Sacramento, CA 95814 510.839.1742 916.266.2190 510.839.0871 fax 916.266.2195 Dowling Associates, Inc. www.dowlinginc.com traffic@dowlinginc.com

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

Transportation Review

Transportation Review 1445-1455 West Georgia Street Transportation Review Draft Report Prepared for BCG Developments Date November 10, 2016 Project No. 4608.12 November 10, 2016 4608.12 Dawn Guspie James KM Cheng Architects

More information

Two Lane Highways Procedures from 2000 Highway Capacity Manual

Two Lane Highways Procedures from 2000 Highway Capacity Manual Two Lane Highways Procedures from 2000 Highway Capacity Manual Two lane-1 Maximum flow rates on two-way streets: 1700 cars/hour in one direction and 3200 in both directions Level of Service is based on:

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by:

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by: State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report Prepared for: City of Morro Bay Prepared by: (Caltrans Project No. 0515000104, EA 0F670) State Route 1/State Route

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro

Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro Outline Background Predictive Priority Algorithm Simulation Analysis Measure of Effectives (MOE)

More information

Chester Road PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Chester Road PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management Transportation Impact Analysis Chester Road PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for Raydient + Places, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc. Landmark

More information

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES)

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) 0 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) C O TRANSPORTATION ANALYSIS STUDY March th, 0 APPLICANT: Alexandria City Public Schools Educational Facilities Department Operational & Maintenance

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Capacity and Level of Service for Highway Segments (I)

Capacity and Level of Service for Highway Segments (I) Capacity and Level of Service for Highway Segments (I) 1 Learn how to use the HCM procedures to determine the level of service (LOS) Become familiar with highway design capacity terminology Apply the equations

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

Capital Metro Downtown Multimodal Station

Capital Metro Downtown Multimodal Station Capital Metro Downtown Multimodal Station Stakeholder Briefing December 11, 2015 Agenda 1 2 3 4 5 Project Summary Downtown Station Concept Evaluation 4 th Street Traffic Analysis 5 th Street Traffic Analysis

More information

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways.

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways. 4.7 Transportation and Circulation This report documents the results of a study of the potential traffic impacts created by the Whittier Main Oil Field Development Project. The study is included as Appendix

More information

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm PUBLIC MEETING Bear Creek Park Community Center January 24, 2017 5:30 pm to 7:30 pm PURPOSE OF THE MEETING This is an open House No formal presentation Introduce the project to the public Present existing

More information

City-Wide Major Traffic Study. Study Report

City-Wide Major Traffic Study. Study Report FINAL REPORT Prepared for: CITY OF CORONADO Prepared by: PARSONS BRINCKERHOFF QUADE & DOUGLAS, INC. In cooperation with: WILBUR SMITH ASSOCIATES March 15, 2005 TABLE OF CONTENTS 1.0 Introduction...1 2.0

More information

Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS)

Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS) Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS) Chen-Fu Liao Department of Civil, Environmental, and Geo- Engineering University

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Performance Measure Summary - Seattle WA. Performance Measures and Definition of Terms

Performance Measure Summary - Seattle WA. Performance Measures and Definition of Terms Performance Measure Summary - Seattle WA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Charlotte NC-SC. Performance Measures and Definition of Terms

Performance Measure Summary - Charlotte NC-SC. Performance Measures and Definition of Terms Performance Measure Summary - Charlotte NC-SC There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Corpus Christi TX. Performance Measures and Definition of Terms

Performance Measure Summary - Corpus Christi TX. Performance Measures and Definition of Terms Performance Measure Summary - Corpus Christi TX There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

FHWA/IN/JTRP-2000/5. Final Report. Eric Nelson Montasir Abbas Gary Shoup Darcy Bullock Ryan Gallagher

FHWA/IN/JTRP-2000/5. Final Report. Eric Nelson Montasir Abbas Gary Shoup Darcy Bullock Ryan Gallagher FHWA/IN/JTRP-2000/5 Final Report DEVELOPMENT OF CLOSED LOOP SYSTEM EVALUATION PROCEDURES Eric Nelson Montasir Abbas Gary Shoup Darcy Bullock Ryan Gallagher December 2000 Draft Final Report FHWA/IN/JTRP-2000/5

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Performance Measure Summary - Boston MA-NH-RI. Performance Measures and Definition of Terms

Performance Measure Summary - Boston MA-NH-RI. Performance Measures and Definition of Terms Performance Measure Summary - Boston MA-NH-RI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

BARRABOOL HILLS SHOPPING CENTRE

BARRABOOL HILLS SHOPPING CENTRE BARRABOOL HILLS SHOPPING CENTRE PROVINCE BOULEVARD, HIGHTON Traffic Engineering Assessment Prepared for LASCORP DEVELOPMENT GROUP (AUST) PTY LTD MARCH 2012 OUR REFERENCE: 12073R7221FINAL BARRABOOL HILLS

More information

Final Traffic Technical Memorandum

Final Traffic Technical Memorandum SR 54 Project Development and Environment (PD&E) Study From CR 577 (Curley Road) to CR 579/CR 54 (Morris Bridge Road) Final Traffic Technical Memorandum WPI Segment No: 416561-1 Pasco County Prepared for

More information

Calibration of Work Zone Impact Analysis Software for Missouri

Calibration of Work Zone Impact Analysis Software for Missouri Calibration of Work Zone Impact Analysis Software for Missouri Prepared By Praveen Edara, Ph.D., P.E., PTOE Carlos Sun, Ph.D., P.E., JD Zhongyuan (Eric) Zhu University of Missouri-Columbia Department of

More information

8150 Sunset Bl Valet on Crescent Heights Bl 4 messages

8150 Sunset Bl Valet on Crescent Heights Bl 4 messages Eileen Hunt 8150 Sunset Bl Valet on Crescent Heights Bl 4 messages Eileen Hunt To: Jeannie Shen Thu, Jan 30, 2014 at 11:11 AM

More information

Traffic Study for Highway 107 Phase 1 Burnside to Sackville

Traffic Study for Highway 107 Phase 1 Burnside to Sackville FINAL REPORT Traffic Study for Highway 107 Phase 1 Burnside to Sackville Presented To: Nova Scotia Department of Transportation and Infrastructure Renewal February 2011 Project No. DA10095 www.genivar.com

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

R.M.N.T. Sirisoma a Doug Morgan b S.C. Wirasinghe a

R.M.N.T. Sirisoma a Doug Morgan b S.C. Wirasinghe a R.M.N.T. Sirisoma a Doug Morgan b S.C. Wirasinghe a a Dept. of Civil Engineering, Schulich School of Engineering, University of Calgary b Calgary Transit, Calgary, Canada Introduction Study Area Availability

More information

4.4 Transportation and Circulation

4.4 Transportation and Circulation 4.4.1 Introduction This section evaluates the potential for construction traffic and operational impacts to result from implementation of the proposed project. This includes the potential for the project

More information

Intersection Analysis for US 92/International Speedway Blvd. at Garfield Ave.

Intersection Analysis for US 92/International Speedway Blvd. at Garfield Ave. FinalReport IntersectionAnalysisfor US92/InternationalSpeedwayBlvd. atgarfieldave. April2017 Preparedfor: RivertoSeaTransportationPlanningOrganization (R2CTPO) 2570W.InternationalSpeedwayBlvd.,Suite100

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet March 2017 PROJECT OVERVIEW Environmental Impact Statement (EIS) Project divided into 3 Segments Segment 1: Beltway 8

More information

Florida International University Parking Garage No. 6 Traffic Study

Florida International University Parking Garage No. 6 Traffic Study Florida International University Parking Garage No. 6 raffic Study Prepared By: December 12, 212 12-163 Florida International University Parking Garage No. 6 ABE OF CONENS Introduction 2 Executive Summary.

More information

3.8 TRANSPORTATION, CIRCULATION AND PARKING

3.8 TRANSPORTATION, CIRCULATION AND PARKING 3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed

More information

4.1 Traffic, Circulation, and Parking

4.1 Traffic, Circulation, and Parking 4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project

More information

Measurement along a Length of Road

Measurement along a Length of Road . Measurement along a Length of Road Chapter Measurement along a Length of Road. Overview This is normally used to obtain variations in speed over a stretch of road. Usually the stretch will be having

More information

DRAFT. Kanata Mews Development 329 March Road, City of Ottawa. Transportation Brief. Prepared for:

DRAFT. Kanata Mews Development 329 March Road, City of Ottawa. Transportation Brief. Prepared for: Kanata Mews Development Prepared for: Bascorp Management 1611 Ortona Avenue Ottawa, ON K2C 1W4 DRAFT Prepared by: McIntosh Perry Consulting Engineers Ltd. 115 Walgreen Road Carp, ON K0A 1L0 August 19,

More information

Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois

Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois N 83 rd Street Janes Avenue Soccer Fields Janes Avenue Shopping Plaza Cypress Cove Family

More information

Purple Line Extension, Section 2 Southern California Edison, Phase I

Purple Line Extension, Section 2 Southern California Edison, Phase I Purple Line Extension, Section 2 Southern California Edison, Phase I 1 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work: 10am-6pm Left

More information

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA Tube Counts Type of report: Tube Count - Volume Data LOCATION: Scotts Valley Dr QC JOB #: 245667 SPECIFIC LOCATION: ft from Tabor St DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA DATE: Mar 2 24 - Mar

More information

Civil Engineering and Environmental, Gadjah Mada University TRIP ASSIGNMENT. Introduction to Transportation Planning

Civil Engineering and Environmental, Gadjah Mada University TRIP ASSIGNMENT. Introduction to Transportation Planning Civil Engineering and Environmental, Gadjah Mada University TRIP ASSIGNMENT Introduction to Transportation Planning Dr.Eng. Muhammad Zudhy Irawan, S.T., M.T. INTRODUCTION Travelers try to find the best

More information

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR III. CORRECTIONS AND ADDITIONS TO THE DRAT EIR DRAT EIR I. INTRODUCTION/SUMMARY In response to Comment No. 2.1 on the Draft EIR, the following mitigation measure is added to Table I- 1, Summary of Environmental

More information

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description

More information

UTC Case Studies Turin, Rome

UTC Case Studies Turin, Rome UTC Case Studies Turin, Rome Quantifying the Effect of Intelligent Transport Systems on CO2 Emissions from Road Transportation Giorgio Magra, CNH-IVECO Giacomo Tuffanelli, RMA The process Data Collection

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Transportation Impact Study. MIT Kendall Square. Cambridge, Massachusetts. / Massachusetts Institute of Technology (MIT)

Transportation Impact Study. MIT Kendall Square. Cambridge, Massachusetts. / Massachusetts Institute of Technology (MIT) Transportation Impact Study MIT Kendall Square Cambridge, Massachusetts PREPARED FOR / Massachusetts Institute of Technology (MIT) PREPARED BY 99 High Street Boston, MA 02110 617.728.7777 June 22, 2015

More information

Micro Traffic Simulation Approach to the Evaluation of Vehicle Emissions on One way vs. Two way Streets: A Case Study in Houston Downtown

Micro Traffic Simulation Approach to the Evaluation of Vehicle Emissions on One way vs. Two way Streets: A Case Study in Houston Downtown Wang, Yu and Qiao 0 0 Micro Traffic Simulation Approach to the Evaluation of Vehicle Emissions on One way vs. Two way Streets: A Case Study in Houston Downtown By Jinghui Wang, Graduate Research Assistant

More information

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1):

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1): 2709 McGraw Drive Bloomington, Illinois 61704 p 309.663.8435 f 309.663.1571 www.f-w.com www.greennavigation.com November 4, 2016 Mr. Kevin Kothe, PE City Engineer City of Bloomington Public Works Department

More information

Public Meeting. June 15, :30 7:30 p.m.

Public Meeting. June 15, :30 7:30 p.m. Public Meeting June 15, 2017 5:30 7:30 p.m. Welcome 2015 Naval Station Norfolk Transit Extension Study 2015 Naval Station Norfolk Transit Extension Study 2017 Norfolk Westside Transit Study HRT and the

More information

Ann Arbor SCOOT Mobility Study

Ann Arbor SCOOT Mobility Study Ann Arbor SCOOT Mobility Study Evaluating the SCOOT Adaptive Signal Control Technology Through the Use of Big Data Abstract: Adaptive traffic signal control systems offer cities and local governments a

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

IEC fuse holders & fuse disconnectors: CMS 14

IEC fuse holders & fuse disconnectors: CMS 14 Modulostar CMS14, CMS22 Modulostar IEC fuse holders & fuse disconnectors: CMS 14 IEC fuse holders: CMS 14: Fuse holder compliant with IEC 60269-1 & 2, and tested in accordance with IEC 60947-1 & 3 for

More information

ROAD SAFETY AUDIT. Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover. March 29, 2017

ROAD SAFETY AUDIT. Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover. March 29, 2017 ROAD SAFETY AUDIT Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover March 29, 2017 Prepared For: Massachusetts Department of Transportation Town of Andover, Massachusetts Prepared By: TEC,

More information

GUIDELINES FOR SELECTION OF APPROPRIATE PEDESTRIAN CROSSING FACILITY AT MID-BLOCK SECTIONS

GUIDELINES FOR SELECTION OF APPROPRIATE PEDESTRIAN CROSSING FACILITY AT MID-BLOCK SECTIONS GUIDELINES FOR SELECTION OF APPROPRIATE PEDESTRIAN CROSSING FACILITY AT MID-BLOCK SECTIONS Udit Jain Research Scholar Indian Institute of Technology Roorkee Need of the Study Pedestrian fatalities highest

More information

PROGRESSIVE BLOCK DISTRIBUTOR BVA-N

PROGRESSIVE BLOCK DISTRIBUTOR BVA-N PROGRESSIVE BLOCK DISTRIBUTOR BVA-N APPLICATION The BVA-N progressive block distributors are lubricating elements of central grease and oil lubricating systems. BVA-N series is made of stainless steel

More information

Capacity Analysis of the Union Station Rail Corridor using Integrated Rail and Pedestrian Simulation

Capacity Analysis of the Union Station Rail Corridor using Integrated Rail and Pedestrian Simulation Capacity Analysis of the Union Station Rail Corridor using Integrated Rail and Pedestrian Simulation Yishu Pu MASc Student Department of Civil Engineering University of Toronto Presentation Outline Introduction

More information

Sepulveda Pass Corridor Systems Planning Study

Sepulveda Pass Corridor Systems Planning Study Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Streets and Freeways Subcommittee January 17, 2013 1 Sepulveda Pass Study Corridor Extends for 30

More information

EFFECT OF MOTORCYCLES TRAVEL BEHAVIOUR ON SATURATION FLOW RATES AT SIGNALIZED INTERSECTIONS IN MALAYSIA

EFFECT OF MOTORCYCLES TRAVEL BEHAVIOUR ON SATURATION FLOW RATES AT SIGNALIZED INTERSECTIONS IN MALAYSIA EFFECT OF MOTORCYCLES TRAVEL BEHAVIOUR ON SATURATION FLOW RATES AT SIGNALIZED INTERSECTIONS IN MALAYSIA Leong Lee Vien, Universiti Sains Malaysia, Malaysia Wan Hashim Wan Ibrahim, Universiti Sarawak Malaysia,

More information

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Re: 233 Armstrong Street Residential Condominium Traffic Brief 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,

More information

Link Light Rail Operations and Maintenance Satellite Facility

Link Light Rail Operations and Maintenance Satellite Facility September 2015 Link Light Rail Operations and Maintenance Satellite Facility TRANSPORTATION TECHNICAL REPORT Appendix E1 Central Puget Sound Regional Transit Authority Appendix E.1 TABLE OF CONTENTS PROJECT

More information

Traffic Impact Study. Chicago, Illinois. May 2017 RETAIL UPPER N COLUMBUS US DRIVE. Parcel O, LLC. Prepared for: EXISTING SIDEWALK EXISTING PLA

Traffic Impact Study. Chicago, Illinois. May 2017 RETAIL UPPER N COLUMBUS US DRIVE. Parcel O, LLC. Prepared for: EXISTING SIDEWALK EXISTING PLA 0F 0E LAKESHORE EAST PARCEL O Traffic Impact Study EXISTING SIDEWALK EXISTING PLA Chicago, Illinois May 2017 NEW PLANTER NEW PLANTERS Prepared for: Parcel O, LLC UPPER N COLUMBUS US DRIVE RETAIL NEW PLANTERS

More information

I-225 Rail Line Iliff and Florida Stations Information Meeting

I-225 Rail Line Iliff and Florida Stations Information Meeting I-225 Rail Line Iliff and Florida Stations Information Meeting May 15, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager Chris Hinton I-225 Rail Line Deputy Project

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

ENVIRONMENTAL IMPACT ANALYSIS J. TRAFFIC, CIRCULATION AND ACCESS

ENVIRONMENTAL IMPACT ANALYSIS J. TRAFFIC, CIRCULATION AND ACCESS IV. ENVIRONMENTAL IMPACT ANALYSIS A traffic study was prepared for the Proposed Project by Linscott, Law & Greenspan, Engineers, dated August 5, 2008 (see Appendix I: Traffic Study). The traffic study

More information

SERVICE DESIGN GUIDELINES

SERVICE DESIGN GUIDELINES VTA TRANSIT SUSTAINABILITY POLICY: APPENDIX A SERVICE DESIGN GUIDELINES Adopted February 2007 COMMUNITYBUS LOCALBUS EXPRESSBUS BUSRAPIDTRANSIT LIGHTRAILTRANSIT STATIONAREAS S A N T A C L A R A Valley Transportation

More information

APPENDIX B. Speed Flow Curves

APPENDIX B. Speed Flow Curves APPENDIX B Speed Flow Curves 5048375 / LD / 0902 B -1 5048375 / LD / 0902 B -2 B.Speed Flow Curves INTRODUCTION B.1 This appendix describes the implementation of speed flow curves within a SATURN model.

More information

Toll Plazas at the Bosphorus Bridge

Toll Plazas at the Bosphorus Bridge 6th International Congress on Advances in Civil Engineering, 6-8 October 4 Bogazici University, Istanbul, Turkey Toll Plazas at the Bosphorus Bridge K.S. Öüt stanbul Technical University, Civil Engineering

More information

Railroad Impact Study

Railroad Impact Study Railroad Impact Study Ryan Huebschman, PE, PTOE Jason O Neill November 21, 2016 Study Impetus CSXT to lease and improve rail line between Louisville and Indianapolis Rail improvements will allow CSXT to

More information

Appendix A. Transportation Assessment

Appendix A. Transportation Assessment Appendix A Transportation Assessment MEMORANDUM Date: January 22, 2014 To: From: Subject: Dennis Dornan, Perkins + Will Kathrin Tellez and Kristen arnarius, Fehr and Peers Transportation Assessment W13-3010

More information

FULLY AUTONOMOUS VEHICLES: ANALYZING TRANSPORTATION NETWORK PERFORMANCE AND OPERATING SCENARIOS IN THE GREATER TORONTO AREA, CANADA

FULLY AUTONOMOUS VEHICLES: ANALYZING TRANSPORTATION NETWORK PERFORMANCE AND OPERATING SCENARIOS IN THE GREATER TORONTO AREA, CANADA 0 FULLY AUTONOMOUS VEHICLES: ANALYZING TRANSPORTATION NETWORK PERFORMANCE AND OPERATING SCENARIOS IN THE GREATER TORONTO AREA, CANADA Bradley Kloostra, Corresponding Author Division of Engineering Science

More information

4.12 TRAFFIC AND CIRCULATION Introduction

4.12 TRAFFIC AND CIRCULATION Introduction 4.12 TRAFFIC AND CIRCULATION 4.12.1 Introduction This section of the EIR describes the existing transportation and traffic conditions on roadways surrounding the project area, and analyzes the potential

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

Buffalo Drive Road Safety Audit

Buffalo Drive Road Safety Audit UPWP Task 6410-11 Contract No: 11-050 Buffalo Drive Road Safety Audit CC 215 to Blue Diamond Road (SR 160) PRE CONSTRUCTION PHASE AUDIT Prepared for: Regional Transportation Commission of Southern Nevada

More information

Stittsville OC Transpo Services

Stittsville OC Transpo Services Stittsville OC Transpo Services Transportation Services Department March 22, 2018 0 Ottawa s Transit Challenge 1 1 What s Coming in 2018 O-Train Network 2 2 Confederation Line - Alignment 3 3 VEHICLE AND

More information

Simulation Modeling of Electronic Screening at Weigh Stations. Alireza Kamyab Tom Maze Mark Nelson Bill McCall

Simulation Modeling of Electronic Screening at Weigh Stations. Alireza Kamyab Tom Maze Mark Nelson Bill McCall Paper No. 980746 Simulation Modeling of Electronic Screening at Weigh Stations Alireza Kamyab Tom Maze Mark Nelson Bill McCall Center for Transportation Research and Education Iowa State University ISU

More information

Charter Bus Staging and Pick-Up

Charter Bus Staging and Pick-Up W Area Dr Charter Bus Staging and Pick-Up Event Charter Bus Loading Zone AirTrain Domestic Terminals: Level 1 (Arrivals) Designated spaces in Courtyards 1, 3, or 4 Terminal 2 International Terminal: Level

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

3.3 TRAFFIC AND CIRCULATION Introduction Environmental Setting

3.3 TRAFFIC AND CIRCULATION Introduction Environmental Setting 3.3.1 Introduction 3.3 TRAFFIC AND CIRCULATION This section describes existing conditions and applicable regulations for transportation related to the proposed project, the impacts on transportation that

More information

LCV Operating Conditions & Routes (August 2017) Page 1 of 5

LCV Operating Conditions & Routes (August 2017) Page 1 of 5 Page 1 of 5 APPROVED ROUTES & CONDITIONS FOR LONG COMBINATION VEHICLES (LCV S) CVSE Permits are valid in British Columbia on highways under the jurisdiction of the Ministry of Transportation and Infrastructure

More information

RAILROAD PREEMPTION FORMS. Mark Johnson, P.E.

RAILROAD PREEMPTION FORMS. Mark Johnson, P.E. RAILROAD PREEMPTION FORMS Mark Johnson, P.E. October 12, 2016 The Basic Problem Vehicles stop on tracks Need to interconnect traffic signal with railroad cabinet 2 Preemption Process: ROW Transfer 1 st

More information