1 Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 Prepared for: FS Industries Limited April 2015

2 April 22, 2015 Mr. Rick Cecchetto FS Industries Limited PO Box Main Street Oxford, NS B0M 1P0 Dear Mr. Cecchetto: RE: Traffic Impact Study for the proposed changes to the Rockingham Ridge Plaza - DRAFT The GRIFFIN transportation group inc. is pleased to present the results of the enclosed traffic impact study carried out in support of the planning approval process for the proposed addition of commercial floor space to the Rockingham Ridge Plaza, located in the southwest quadrant of the Dunbrack Street / Farnham Gate Road intersection in Clayton Park, Halifax Regional Municipality. It is understood the proposed addition to the plaza will be comprised of a new two-storey building with ground floor retail businesses and general office space on the second floor. The results flowing from this study indicate the forecast site-generated trips associated with the proposed building will have a marginal traffic operational impact on the study area streets. The study area intersections have considerable residual capacity to accommodate traffic growth well beyond the 2020 planning horizon and no new roadway infrastructure is required to accommodate the forecast site-generated trips. It has been a pleasure working with the project team in completing this study. Feel free to contact the undersigned anytime to further discuss the details of this project. Yours truly, Original Signed James J. Copeland, P.Eng. Managing Principal GRIFFIN transportation group inc.

3 GRIFFIN transportation group inc. This document and the information contained within has been prepared exclusively for the Client identified on the cover of this report for the purpose for which it has been prepared. The GRIFFIN transportation group inc. undertakes no duty to or accepts any responsibility to any third party who may rely upon this document. This document may not be used for any purpose other than that provided in the contract between the Owner/Client and the Engineer nor may any section or element of this document be removed, reproduced, electronically stored or transmitted in any form without the express written consent of the GRIFFIN transportation group inc. Rockingham Ridge Plaza Commercial Development Traffic Impact Study P a g e i

4 TABLE OF CONTENTS TABLE OF CONTENTS LIST OF FIGURES LIST OF TABLES II IV IV 1. INTRODUCTION Background Context 1 2. EXISTING CONDITIONS The Study Area Road Network Overview Dunbrack Street Farnham Gate Road Site Accesses Traffic Data Existing Conditions Operational Analysis 6 3. FUTURE BACKGROUND CONDITIONS Overview Traffic Growth Assumptions Future Adjacent Development Planned Road Network Changes Summary of Future Background Volumes Future Background 2020 Operational Analysis THE PROPOSED DEVELOPMENT Overview of Existing Site 13 Rockingham Ridge Plaza Commercial Development Traffic Impact Study P a g e ii

5 4.2 The Trip Generation Survey An Addition to the Rockingham Ridge Plaza Site Trip Generation Overview Summary of Site Trip Generation Volumes Distribution of Trips to the Road Network FUTURE TOTAL CONDITIONS Overview Total 2020 Operational Analysis Results Overview of Results The Site Accesses CONCLUSIONS AND RECOMMENDATIONS Conclusions Recommendations 21 Rockingham Ridge Plaza Commercial Development Traffic Impact Study P a g e iii

6 LIST OF FIGURES Figure 1: Key Map and Site Location 2 Figure 2: Study Area and Site Context 5 Figure 3: Existing 2015 Peak Hour Volumes 8 Figure 4: Future Background 2020 Peak Hour Volumes 12 Figure 5: Proposed Site Plan 14 Figure 6: Site-Generated Peak Hour Volumes 17 Figure 7: Future Total 2020 Peak Hour Volumes 19 LIST OF TABLES Table 1: Plaza Access Available Sight Lines 4 Table 2: Existing 2015 Operational Analysis Results Critical Movements 7 Table 3: Future Background 2020 Operational Analysis Results Critical Movements 11 Table 4: Trip Generation Survey Results (49,169 ft 2 ) 13 Table 5: Summary of Proposed Development Land Use Types 15 Table 6: AM Peak Hour Site-Generated Trips (vph) 15 Table 7: PM Peak Hour Site-Generated Trips (vph) 16 Table 8: Forecast Residential Trip Distribution 16 Table 9: Future Total 2020 Operational Analysis Results Critical Movements 20 Rockingham Ridge Plaza Commercial Development Traffic Impact Study P a g e iv

7 1. INTRODUCTION 1.1 Background The GRIFFIN transportation group has been retained by FS Industries Limited (FS Industries) to carry out a traffic impact study (TIS) in support of the planning approval process for a proposed addition to the Rockingham Ridge Plaza located in the southwest quadrant of the Dunbrack Street / Farnham Gate Road intersection in Clayton Park, Halifax Regional Municipality (HRM). The subject property (PID ) measures about 4 acres in size and contains two buildings with a total floor area of 49,169 ft 2. This development is bounded by Dunbrack Street to the east, Farnham Gate Road to the north, and existing residential development to the south and west. A key map showing the general location of the site is shown in Figure 1. Based on discussions with representatives of FS Industries, it is understood that a new twostorey detached building will be located in the northeast corner of the property. The new building will contain ground floor retail businesses (8,000 ft 2 ) and general office space on the second floor (8,000 ft 2 ). Vehicular access will continue to be provided by the two existing accesses connecting to Farnham Gate Road and no new accesses are being proposed. 1.2 Context It is understood that the approval agency for the traffic impact study process is the HRM. As such, the general assumptions of the TIS process were discussed with HRM Traffic Services. The terms of reference for this impact study were developed based on the following: The HRM s guidelines for conducting traffic impact studies. A conceptual site plan drawing provided by FS Industries. A meeting with HRM representatives held on March 4 th, 2015 to establish the general scope and approach of the TIS A site review carried out in April 2015 The approach and technical findings of this traffic impact study are discussed in the following sections of this report. Rockingham Ridge Plaza Commercial Development P a g e 1 Traffic Impact Study

8 Kearney Lake Rd Site Location Dunbrack St 102 Lacewood Dr Source: Explore HRM GIS Key Map Figure 1

9 2. EXISTING CONDITIONS This chapter describes the roadway network, traffic volumes, operational analysis results and other notable characteristics under the baseline conditions. 2.1 The Study Area Road Network Overview The proposed additional development on the Rockingham Ridge Plaza site is to be generally located in the northeast corner of the property. The site will continue to be served by the two existing accesses connecting to Farnham Gate Road. Both the Farnham Gate Road and Dunbrack Street corridors are key streets in HRM s roadway network and carry commuter traffic during the peak times of a typical weekday. As such, the following intersections were explicitly evaluated as part of this study: Dunbrack Street / Farnham Gate Road; Farnham Gate Road / Plaza East Access; and Farnham Gate Road / Plaza West Access. The immediate study area and site context are illustrated in Figure Dunbrack Street Dunbrack Street is aligned in a north-south direction and functions as an arterial roadway through the Fairview and Clayton Park neighbourhoods of HRM. This corridor provides an important transportation link between Kearney Lake Road to the north and the community of Spryfield to the south. This street has a full urban cross-section with two core lanes in each direction, a raised centre median, and additional widening at intersections. This is also an important public transit route and bus stops are located at the signalized intersection with Farnham Gate Road Farnham Gate Road Farnham Gate Road has a curvilinear alignment but is generally aligned in an east-west direction. It functions as a collector street serving the predominantly residential neighbourhood. The street has a full urban cross-section with one travel lane in each direction and an exclusive left turn lane provided at the signalized intersection with Dunbrack Street. This corridor also serves as a key route for Metro Transit and the posted speed limit is 50 km/h Site Accesses The Rockingham Ridge Plaza has two site driveways connecting to Farnham Gate Road, referred to in this report as the east access and the west access. Both driveways are 7 m wide with one inbound lane and one outbound lane. No exclusive turn lanes are provided along Farnham Gate Road. Rockingham Ridge Plaza Commercial Development P a g e 3 Traffic Impact Study

10 A sight line review was undertaken at both site accesses as they are located on the inside of a horizontal curve of the Farnham Gate Road alignment. The posted speed limit on Farnham Gate Road is 50 km/h and the critical approach was identified to be the eastbound travel direction. Vehicle operating speeds were recorded in the eastbound direction using a handheld radar unit and speeds were generally in compliance with the posted speed limit. This may be due in part to the fact that Farnham Gate Road terminates immediately east of the site accesses at Dunbrack Street Using Transportation Association of Canada (TAC) guidelines, the minimum stopping sight distance (SSD) for drivers traveling at 50 km/h is 65 m. A summary of the available sight lines at each driveway is contained in Table 1. Table 1: Plaza Access Available Sight Lines East Access West Access TAC minimum SSD (50km/h) 65 m 80 m Available sight line 65 m 65 m Based on the field review, minimum SSD values are available at both driveways for a 50 km/h operating speed. Minimum design values are associated with increased road safety risk. Therefore, it is important to ensure that appropriate daylighting triangles are provided and maintained at the intersection of these accesses with Farnham Gate Road to ensure drivers are provided with as much sight distance as possible. Rockingham Ridge Plaza Commercial Development P a g e 4 Traffic Impact Study

11 Metro Transit Bus Stops Fanham Gate Rd Lansdowne Dr West Access East Access Rockingham Ridge Plaza Dunbrack St Source: Bing Maps wwww.griffininc.ca Study Area and Site Context Figure 2

12 2.2 Traffic Data In order to assess the existing traffic operations a set of baseline traffic volumes is typically assembled for the study analyses. Recent historical traffic volume data were provided by HRM that was collected as part of a traffic impact study process for the adjacent Rockingham South development. These volumes were collected at the Dunbrack Street / Farnham Gate Road intersection in These data were supplemented by intersection turning movement counts gathered by the GRIFFIN transportation group in April 2015 at the same intersection as well as the two Rockingham Ridge Plaza accesses. All of the traffic volume data were reviewed to identify any trends or patterns between 2010 and The results indicate there was very little change in volume at the Dunbrack Street / Farnham Gate Road intersection over this 5-year time period. As such, the current 2015 observed volumes were used for analysis purposes in this study. Given that the proposed development is located on two key commuter routes, the weekday AM and PM peak hours have been selected for this analysis. The specific peak hours were determined using the recently recorded hourly traffic counts in the study area. A summary of the Existing 2015 peak hour traffic volumes applied to the study analyses are illustrated in Figure Existing Conditions Operational Analysis A capacity analysis process was carried out using the Existing 2015 traffic volumes (Figure 3) as well as the existing lane configurations and traffic control at the study area intersections. The analysis process used the methodologies contained in Trafficware s Synchro 8 software tool. The results of the existing conditions peak hour analysis are provided in Table 1 below. Following HRM guidelines, the measures of effectiveness used to describe the operational performance included the average vehicle delay, volume-to-capacity ratio (v/c ratio) and 95 th percentile queue length (metres) for the critical movement at each of the study area intersections. The capacity analysis process used the existing intersection lane configurations as well as the observed traffic signal phasing sequence at the Dunbrack Street / Farnham Gate Road intersection. The results in Table 2 indicate the following: The critical movements at the study area intersections, during both peak hours, operate with average delays of 28 seconds and v/c ratios of 0.25, or better. This suggests there is residual capacity to accommodate traffic growth into the future. There is sufficient queue storage capacity between the signalized intersection and the east plaza access. The eastbound 95 th percentile vehicle queue lengths at the signalized intersection were calculated to be about 25m and not expected to encroach into the functional area of the east plaza access. Rockingham Ridge Plaza Commercial Development P a g e 6 Traffic Impact Study

13 Table 2: Existing 2015 Operational Analysis Results Critical Movements 1. Dunbrack St / Farnham Gate Rd (signalized) AM Peak Hour PM Peak Hour Critical Move: Delay V/C Queue A Critical Move: Delay V/C Queue A Existing 2015 B EB Left: 25.8s m EB Left: 28.0s m 2. Farnham Gate Rd / East Access (unsignalized) AM Peak Hour PM Peak Hour Critical Move: Delay V/C Queue A Critical Move: Delay V/C Queue A Existing 2015 NB L-R: 10.5s 0.05 <10m NB L-R: 10.7s 0.15 <10m 3. Farnham Gate Rd / West Access (unsignalized) AM Peak Hour PM Peak Hour Critical Move: Delay V/C Queue A Critical Move: Delay V/C Queue A Existing 2015 NB L-R: 10.6s 0.04 <10m NB L-R: 10.8s 0.12 <10m A Queue represents the calculated vehicle queue length in metres occurring 95% of the time (95 th percentile). B The signal phase sequence observed in the field was applied to the analysis. The general findings of the existing conditions analysis were consistent with the observations made during the field review. Detailed summaries of the Existing 2015 operational analysis results are provided in Appendix I. Rockingham Ridge Plaza Commercial Development P a g e 7 Traffic Impact Study

14 Farnham Gate Rd (85) 243 (27) 16 STOP 12 (42) 10 (33) 58 (219) 30 (48) (119) 250 (8) 5 STOP 20 (76) 10 (29) 78 (238) 45 (73) (69) 36 (126) 234 (354) 801 (59) (511) 75 (252) Future Access to Rockingham South Legend Traffic Signals STOP Stop Control 12 AM Peak Hour Volumes (21) PM Peak Hour Volumes Dunbrack St wwww.griffininc.ca Existing 2015 Peak Hour Volumes Figure 3

15 3. FUTURE BACKGROUND CONDITIONS This chapter summarizes the assumptions used to develop future year traffic volumes as well as the operational analysis results for the background traffic scenario. 3.1 Overview The future planning horizon chosen for a traffic impact study represents a milestone in the development process. It is assumed the future planning horizon year used in the analysis for this type of development will occur 5 years beyond the baseline planning horizon of Therefore, the future planning horizon year selected for this study was Developing the future background traffic volumes excludes the forecast traffic explicitly associated with the proposed development under study but considers other contributing factors to traffic volume increases including: General traffic growth that is typically associated with population and employment increases in the area; Traffic volumes explicitly associated with any adjacent planned developments; and Traffic volume and travel pattern changes associated with any planned roadway network changes in the vicinity of the study area. Each of these contributing factors is discussed in the following Sections. 3.2 Traffic Growth Assumptions In order to account for general population and employment increases in the study area, from the baseline year to the future planning horizon, a background traffic growth rate is typically applied. Using historical traffic volume information contained in the 2010 Rockingham South TIS, and in order to be consistent with this earlier study, an average traffic growth rate of 1.6% per year (compounding) was applied. 3.3 Future Adjacent Development It is understood that a large mixed-use development is being proposed east of the Dunbrack Street / Farnham Gate Road intersection, referred to as Rockingham South. This development is proposed to include a mix of residential and commercial land uses. Three vehicle access points are planned as part of this development, one of which will connect to Dunbrack Street opposite Farnham Gate Road. At the request of HRM, the forecast site-generated trips associated with this development were explicitly evaluated as part of this study. The weekday AM and PM peak hour volumes were referenced from the Rockingham South Mixed Use Development Traffic Impact Study report, submitted to HRM in May Rockingham Ridge Plaza Commercial Development P a g e 9 Traffic Impact Study

16 3.4 Planned Road Network Changes Through discussions with HRM representatives it is understood that the only road network change in the vicinity of the study area is the new street connection to the Rockingham South development. As such, the analysis of the future planning horizons in this study included a fourth leg at the Dunbrack Street / Farnham Gate Road signalized intersection. It should be noted that the existing vehicle travel patterns are not expected to change as a result of the new street connection. 3.5 Summary of Future Background Volumes The information presented in the previous Sections was used to develop a set of peak hour traffic volumes for the future Background 2020 planning horizon. The development of these volumes was comprised of the following: Existing 2015 weekday peak hour traffic volumes (Figure 3); plus A 1.6% per year background traffic growth factor (1.083) to account for population and employment increases in the vicinity of the study area; plus Weekday peak hour traffic volumes associated with the proposed Rockingham South development. A summary of the future Background 2020 peak hour traffic volumes used in the analysis are illustrated in Figure Future Background 2020 Operational Analysis A capacity analysis effort was carried out for the study area intersections using the future Background 2020 forecast traffic volumes. The analysis process used Trafficware s Synchro 8 software tool. The results for the critical movements at the study area intersections are contained in Table 3. Rockingham Ridge Plaza Commercial Development P a g e 10 Traffic Impact Study

17 Table 3: Future Background 2020 Operational Analysis Results Critical Movements 1. Dunbrack St / Farnham Gate Rd (signalized) AM Peak Hour PM Peak Hour Critical Move: Delay V/C Queue A Critical Move: Delay V/C Queue A Existing 2015 B EB Left: 25.8s m EB Left: 28.0s m Background 2020 WB Left: 29.8s m EB Left: 31.2s m 2. Farnham Gate Rd / East Access (unsignalized) AM Peak Hour PM Peak Hour Critical Move: Delay V/C Queue A Critical Move: Delay V/C Queue A Existing 2015 NB L-R: 10.5s 0.05 <10m NB L-R: 10.7s 0.15 <10m Background 2020 NB L-R: 10.8s 0.06 <10m NB L-R: 11.3s 0.18 <10m 3. Farnham Gate Rd / West Access (unsignalized) AM Peak Hour PM Peak Hour Critical Move: Delay V/C Queue A Critical Move: Delay V/C Queue A Existing 2015 NB L-R: 10.6s 0.04 <10m NB L-R: 10.8s 0.12 <10m Background 2020 NB L-R: 11.1s 0.04 <10m NB L-R: 11.6s 0.14 <10m A Queue represents the calculated vehicle queue length in metres occurring 95% of the time (95 th percentile). B The signal phase sequence observed in the field was applied to the analysis. The capacity analysis results for the future Background 2020 conditions suggest that the study area intersections will continue to operate with acceptable measures of effectiveness and are all forecast to have residual capacity to accommodate growth. Detailed summaries of the Background 2020 operational analysis are provided in Appendix I. Rockingham Ridge Plaza Commercial Development P a g e 11 Traffic Impact Study

18 Farnham Gate Rd (123) 277 (29) 17 STOP 13 (45) 11 (36) 89 (261) 32 (52) (159) 285 (9) 5 STOP 22 (82) 11 (31) 110 (282) 49 (79) (75) 39 (30) 14 (136) 254 (27) 12 (383) 867 (64) (26) 280 (553) 81 (273) 23 (21) 26 (24) 24 (21) Legend Traffic Signals STOP Stop Control 12 AM Peak Hour Volumes (21) PM Peak Hour Volumes Dunbrack St wwww.griffininc.ca Future Background 2020 Peak Hour Volumes Figure 4

19 4. THE PROPOSED DEVELOPMENT This chapter describes the existing site, proposed changes to the buildings/operations, and the development of the site generated traffic. 4.1 Overview of Existing Site The existing Rockingham Ridge Plaza is located on PID which measures about 4 acres in size. It is located in the Halifax Mainland By-law Area and contains businesses that are of a commercial nature. According to HRM documentation the property currently has a K zoning designation. There are two buildings located on the property, a 48,169 ft 2 plaza building and a 1,000 ft 2 convenience store / gas station. The larger plaza building contains a variety of businesses including a Post Office, Dooly s pool hall, a tanning business, two sit-down restaurants, a pharmacy, a medical clinic, a dental clinic and so forth. 4.2 The Trip Generation Survey In order to understand the traffic volume generating characteristics of the existing plaza the GRIFFIN transportation group carried out a trip generation survey at the existing Rockingham Ridge plaza accesses during typical weekday peak period conditions. The results of this process identified how many patrons drive their vehicles to the site, expressed as a basis of the overall floor area (i.e. trips per 1,000 ft 2 ). The findings of this process are shown in Table 4. Table 4: Trip Generation Survey Results (49,169 ft 2 ) Inbound Trips (vehicles/hour) Outbound Trips (vehicles/hour) Total Trips (vehicles/hour) Trip Rate (Trips/1,000ft 2 ) AM Peak Hour % 35% 100% PM Peak Hour % 54% 100% The vehicle trip rates for the Rockingham Ridge Plaza were calculated to be 3.0 trips/1,000 ft 2 and 6.6 trips/1,000 ft 2 for the weekday AM and PM peaks, respectively. A review of the Institute of Transportation Engineer s (ITE) published trip rates suggest these calculated values are similar to the ITE land use 820 Shopping Centre. It was concluded that these trip rates were representative for this type of land use, and were therefore, appropriate for use in the calculation of new trips associated with the proposed development changes on-site. 4.3 An Addition to the Rockingham Ridge Plaza FS Industries is proposing to construct a new detached building in the northeast corner of the property. It will be a two-storey building with ground floor retail businesses and general office space on the second floor. Each floor will have a useable area measuring 8,000 ft 2. The site plan layout showing the existing and proposed buildings is contained in Figure 5. Rockingham Ridge Plaza Commercial Development P a g e 13 Traffic Impact Study

20 Existing Building Proposed 2-Storey Building Existing Plaza Building Source: FS Industries Limited Proposed Site Plan Figure 5

21 4.4 Site Trip Generation Overview Typically, traffic engineers use vehicle generation rates for new developments that are published by the Institute of Transportation Engineers (ITE), if deemed appropriate and suitable for the land use(s) under study. Discussions were held with FS Industries to better understand the types of tenants that are likely to operate within the new building and it is understood that the ground floor retail space will contain similar businesses to those that operate out of the existing plaza building. As such, the existing traffic generating characteristics would apply. However, the second floor will be marketed as general office area and it was determined that the ITE land use 710 General Office trip rates were appropriate for this space. A summary of the land use type and trip generation source used in this study is provided in Table 5. Table 5: Summary of Proposed Development Land Use Types Zoning Type Land Use Type Area / Size Trip Generation Source Commercial Retail Shops (1 st floor) 8,000 ft 2 Trip Generation Survey Office space (2 nd floor) 8,000 ft 2 ITE LU 710 General Office A A Taken from ITE s Trip Generation, 9 th Edition document Summary of Site Trip Generation Volumes A summary of the AM and PM peak hour site trip generation results is provided in Tables 6 and 7, respectively. The volume of new traffic attracted to the study area streets for each peak hour is forecast to be: AM Peak: Forecast to be 37 new two-way trips during the AM peak hour including 27 inbound and 10 outbound from the site. PM Peak: Forecast to be 65 new two-way trips during the PM peak hour including 26 inbound and 39 outbound from the site. Table 6: AM Peak Hour Site-Generated Trips (vph) Total Trips (In / Out) Pass-by Trips (Rate) On-Site Linked Trips (Rate) New Trips (vph) Trip Rate Commercial Land Uses Retail Shops (65%/35%) 0 (0%) 0 (0%) 24 Office space (88%/12%) 0 (0%) 0 (0%) 13 Sub-Total AM Peak Hour Summary (vph) In Out Total Rockingham Ridge Plaza Commercial Development P a g e 15 Traffic Impact Study

22 Table 7: PM Peak Hour Site-Generated Trips (vph) Total Trips (In / Out) Pass-by Trips (Rate) On-Site Linked Trips (Rate) New Trips (vph) Trip Rate Commercial Land Uses Retail Shops (65%/35%) 0 (0%) 0 (0%) 53 Office space (17%/83%) 0 (0%) 0 (0%) 12 Sub-Total PM Peak Hour Summary (vph) In Out Total Commercial retail businesses are known to attract patrons from the background traffic stream on adjacent roadways. This phenomenon is known as pass-by traffic. In addition, commercial plaza developments have a mix of businesses that create shared trip-making and patrons will drive to the site and some visit multiple stores. Given the low number of additional sitegenerated trips forecast for the new building, and to remain conservative (i.e. use of higher volumes) in the analysis, it was assumed that no pass-by and shared trips occurred. Therefore, the total site-generated trips were all assumed to be new trips traveling on the study area streets. 4.5 Distribution of Trips to the Road Network A review of the observed traffic volumes and travel patterns at the Dunbrack Street / Farnham Gate Road intersection and study area gateways was carried out to establish the future distribution pattern of the site-generated trips. It was assumed that these trips would generally follow the same travel patterns that exist today on the study area roads. The proposed trip distribution to/from each of the study area gateways is contained in Table 8. Table 8: Forecast Residential Trip Distribution AM Peak PM Peak Direction Via Inbound Outbound Inbound Outbound North Dunbrack St. 56% 21% 31% 41% East Farnham Gate Rd. 4% 2% 4% 5% South Dunbrack St. 22% 71% 55% 34% West Farnham Gate Rd. 18% 6% 10% 19% Total 100% 100% 100% 100% All of the site-generated trips contained in Tables 5 and 6 were assigned to the study area roadways and intersections. These peak hour site-generated volumes are illustrated in Figure 6. Rockingham Ridge Plaza Commercial Development P a g e 16 Traffic Impact Study

23 Farnham Gate Rd (0) 1 (2) 4 STOP 2 (8) 0 (4) 0 (3) 9 (10) (8) 2 (0) 1 STOP 8 (24) 0 (3) 9 (10) 13 (14) (16) 3 (3) 0 (13) 7 (0) 0 (0) 0 (8) 15 0 (0) 0 (0) 6 (15) 0 (0) 1 (1) 0 (0) Legend Traffic Signals STOP Stop Control 12 AM Peak Hour Volumes (21) PM Peak Hour Volumes Dunbrack St wwww.griffininc.ca Site-Generated Peak Hour Volumes Figure 6

24 5. FUTURE TOTAL CONDITIONS This chapter summarizes the assumptions used to develop future year traffic volumes and summarize the operational analysis results. 5.1 Overview The future total traffic conditions represent a combination of general traffic growth out to the 2020 planning horizon with the new site-generated traffic associated with the proposed building on the Rockingham Ridge Plaza property. The assembly of future Total 2020 AM and PM peak hour traffic volumes was based on the following: Existing 2015 weekday peak hour traffic volumes (Figure 3); plus A 1.6% per year background traffic growth factor (1.083) to account for population and employment increases in the vicinity of the study area; plus Weekday peak hour traffic volumes associated with the proposed Rockingham South development. Site-generated traffic associated with the proposed building. The set of future year traffic volumes for the 2020 planning horizon used in the analyses are illustrated in Figure Total 2020 Operational Analysis Results Overview of Results A capacity analysis procedure was carried out for the future Total 2020 traffic conditions. The analysis process used Trafficware s Synchro 8 software tool following the Transportation Research Board s Highway Capacity Manual (HCM) methodology. The operational analysis results for the critical movements at the study area intersections are contained in Table 9. The comparison of results contained in Table 9 for the Background 2020 and Total 2020 traffic conditions indicate the relative change in operations associated with the addition of new sitegenerated traffic. The results suggest these relatively low volumes will have very little impact on the operations of the study area streets and intersections. A more detailed comparison among results can be made from the detailed summaries of the future operational analysis results contained in Appendix I The Site Accesses The analysis results at the proposed site accesses to Farnham Gate Road indicate the forecast site-generated volumes will have little to no operational impact on the existing site driveways. These accesses have sufficient residual capacity to accommodate increases in traffic well beyond the 2020 planning horizon. As such, there are no infrastructure changes required and the existing number of lanes entering/exiting the site can remain. Rockingham Ridge Plaza Commercial Development P a g e 18 Traffic Impact Study

25 Farnham Gate Rd (123) 278 (31) 21 STOP 15 (53) 11 (40) 89 (264) 41 (62) (167) 287 (9) 6 STOP 30 (106) 11 (34) 119 (292) 62 (93) (91) 42 (33) 14 (149) 261 (27) 12 (383) 867 (72) (26) 280 (553) 87 (288) 23 (21) 27 (25) 24 (21) Legend Traffic Signals STOP Stop Control 12 AM Peak Hour Volumes (21) PM Peak Hour Volumes Dunbrack St wwww.griffininc.ca Future Total 2020 Peak Hour Volumes Figure 7

26 Table 9: Future Total 2020 Operational Analysis Results Critical Movements 1. Dunbrack St / Farnham Gate Rd (signalized) AM Peak Hour PM Peak Hour Critical Move: Delay V/C Queue A Critical Move: Delay V/C Queue A Existing 2015 B EB Left: 25.8s m EB Left: 28.0s m Background 2020 WB Left: 29.8s m EB Left: 31.2s m Total 2020 WB Left: 30.0s m EB Left: 32.8s m 2. Farnham Gate Rd / East Access (unsignalized) AM Peak Hour PM Peak Hour Critical Move: Delay V/C Queue A Critical Move: Delay V/C Queue A Existing 2015 NB L-R: 10.5s 0.05 <10m NB L-R: 10.7s 0.15 <10m Background 2020 NB L-R: 10.8s 0.06 <10m NB L-R: 11.3s 0.18 <10m Total 2020 NB L-R: 10.8s 0.07 <10m NB L-R: 11.7s 0.22 <10m 3. Farnham Gate Rd / West Access (unsignalized) AM Peak Hour PM Peak Hour Critical Move: Delay V/C Queue A Critical Move: Delay V/C Queue A Existing 2015 NB L-R: 10.6s 0.04 <10m NB L-R: 10.8s 0.12 <10m Background 2020 NB L-R: 11.1s 0.04 <10m NB L-R: 11.6s 0.14 <10m Total 2020 NB L-R: 11.1s 0.05 <10m NB L-R: 11.9s 0.16 <10m A Queue represents the calculated vehicle queue length in metres occurring 95% of the time (95 th percentile). B The signal phase sequence observed in the field was applied to the analysis. Rockingham Ridge Plaza Commercial Development P a g e 20 Traffic Impact Study

27 6. CONCLUSIONS AND RECOMMENDATIONS This chapter summarizes the salient findings of the analysis and identifies any necessary changes to the transportation infrastructure. 6.1 Conclusions The following conclusions were gleaned from the traffic impact assessment of the proposed development: FS Industries has proposed a new two-storey building in the northeast corner of the Rockingham Ridge Plaza property, located on the corner of the Dunbrack Street / Farnham Gate Road intersection. The operational assessment of the existing study area intersections indicates there is residual capacity to accommodate future traffic growth and there are no vehicle queue issues between these intersections. The proposed new building is expected to comprise of ground floor retail businesses (8,000 ft 2 ) similar to those that currently exist in the plaza, and second floor general office space (8,000 ft 2 ) The new site-generated vehicle trips for this development are forecast to include: o Weekday AM peak: 37 two-way trips including 27 inbound and 10 outbound. o Weekday PM peak: 65 two-way trips including 26 inbound and 39 outbound. The future Total 2020 analysis results suggest that the proposed development will have a minimal and acceptable level of traffic operational impact on the study area streets and intersections and there is residual capacity in the network beyond the 2020 planning horizon. In addition, the existing site accesses can accommodate the future vehicle demand and no additional turn lanes are required. However, sight lines to the west along Farnham Gate Road should be maintained on an on-going basis. 6.2 Recommendations The following recommendations are required to accommodate future traffic volumes on the road network: That the required daylighting triangles be maintained at both site accesses where they intersect with Farnham Gate Road. This could include the relocation of any signage or removal of vegetation located with the daylighting triangle area to ensure that drivers are provided with maximized sight lines to/from the west. Rockingham Ridge Plaza Commercial Development P a g e 21 Traffic Impact Study

28 APPENDIX I Intersection operational analyses

29 Existing Conditions Results

30 Lanes, Volumes, Timings 1: Dunbrack & Farnham Exist AM Pk Hr Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 2 2 Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Perm Perm Perm NA NA Protected Phases 2 6 Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 32.5% 32.5% 67.5% 67.5% 67.5% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C B A A A Approach Delay Approach LOS C A A Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

31 Lanes, Volumes, Timings 1: Dunbrack & Farnham Exist AM Pk Hr Lane Group EBL EBR NBL NBT SBT SBR Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 74.3 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.65 Intersection Signal Delay: 8.8 Intersection Capacity Utilization 56.6% Analysis Period (min) 15 Intersection LOS: A ICU Level of Service B Splits and Phases: 1: Dunbrack & Farnham Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

32 Lanes, Volumes, Timings 1: Dunbrack & Farnham Exist PM Pk Hr Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Satd. Flow (RTOR) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 2 2 Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Perm Perm pm+pt NA NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 32.5% 32.5% 15.0% 67.5% 52.5% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Recall Mode None None None Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C A A A A Approach Delay Approach LOS B A A Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

33 Lanes, Volumes, Timings 1: Dunbrack & Farnham Exist PM Pk Hr Lane Group EBL EBR NBL NBT SBT SBR Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 68.8 Natural Cycle: 65 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.43 Intersection Signal Delay: 8.4 Intersection Capacity Utilization 55.2% Analysis Period (min) 15 Intersection LOS: A ICU Level of Service B Splits and Phases: 1: Dunbrack & Farnham Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

34 HCM 2010 TWSC 2: East Dwy & Farnham Exist AM Pk Hr Intersection Int Delay, s/veh 1.6 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB NB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS B - - A A HCM 95th %tile Q(veh) Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

35 HCM 2010 TWSC 2: East Dwy & Farnham Exist PM Pk Hr Intersection Int Delay, s/veh 3.1 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB NB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS B - - A A HCM 95th %tile Q(veh) Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

36 HCM 2010 TWSC 3: West Dwy & Farnham Exist AM Pk Hr Intersection Int Delay, s/veh 1.3 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB NB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS B - - A A HCM 95th %tile Q(veh) Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

37 HCM 2010 TWSC 3: West Dwy & Farnham Exist PM Pk Hr Intersection Int Delay, s/veh 2.6 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB NB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS B - - A A HCM 95th %tile Q(veh) Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

38 Background 2020 Results

39 Lanes, Volumes, Timings 1: Dunbrack & Farnham Bkgd AM Pk Hr Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 32.5% 32.5% 32.5% 32.5% 67.5% 67.5% 67.5% 67.5% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None None Max Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C C C B A A A A Approach Delay Approach LOS C C A A Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

40 Lanes, Volumes, Timings 1: Dunbrack & Farnham Bkgd AM Pk Hr Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 74.6 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.73 Intersection Signal Delay: 11.1 Intersection Capacity Utilization 68.9% Analysis Period (min) 15 Intersection LOS: B ICU Level of Service C Splits and Phases: 1: Dunbrack & Farnham Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

41 Lanes, Volumes, Timings 1: Dunbrack & Farnham Bkgd PM Pk Hr Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Perm NA Perm NA pm+pt NA Perm NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 32.5% 32.5% 32.5% 32.5% 15.0% 67.5% 52.5% 52.5% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C B C B A A B B Approach Delay Approach LOS B C A B Rockingham Plaza TIS Synchro 8 Light Report 22/04/2015

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Date: December 20, Project #:

Date: December 20, Project #: To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017 Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A7 519-591-0426 November 8, 2017 Revised December 20, 2017 Laurie Wills, PEng Deputy Director of Public Works Town of Cobourg 740 Division

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 March 2015 Prepared for Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 JRL consulting JRL consulting TABLE OF CONTENTS 1 INTRODUCTION... 2 1.1 BACKGROUND... 2 2 EXISTING

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes. Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 SCREENING... 1 1.1

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) APPENDICES Appendix T No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) 661 Bear Valley Parkway EIR March 2017 APPENDICES This page intentionally left blank 661 Bear Valley

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM TO: Merrimack Valley Metropolitan Planning Organization FROM: James Terlizzi, P.E., Transportation Planning Engineer DATE: March 6, 2017 SUBJECT: Further analysis of the recommendations

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

Appendix B: Traffic Reports

Appendix B: Traffic Reports Appendix B: Traffic Reports 407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION Report Markham Road Station Traffic Study Prepared for Ministry of Transportation, Ontario

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) 116 20 8 405 137 56 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.81 0.81 0.67 0.67 0.89 0.89 Hourly flow

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

(A) Project Manager, Infrastructure Approvals

(A) Project Manager, Infrastructure Approvals February 14th, 2014 BY E-MAIL: wally.dubyk@ottawa.ca City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor, Ottawa, Ontario K1P 1J1 Attention: Wally Dubyk, C.E.T (A) Project

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information

APPENDIX G. Traffic Data

APPENDIX G. Traffic Data APPENDIX G Traffic Data HCM Signalized Intersection Capacity Analysis 2: Duanesburg Road & I-88 Ramps 10/7/2004 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl)

More information

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE Roadway Segment Level of Service Definitions LOS V/C Congestion/Delay Traffic Description (Used for surface streets,

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

MEMORANDUM November 19, 2012

MEMORANDUM November 19, 2012 COUNCIL OF GOVERNMENTS CENTRAL NAUGATUCK VALLEY 60 NORTH MAIN ST 3RD Floor WATERBURY, CT 06702-1403 (203)757-0535 Web Site: www.cogcnv.org E-Mail: cogcnv@cogcnv.org November 19, 2012 MEMORANDUM 111912

More information

1140 Wellington Street West Transportation Brief

1140 Wellington Street West Transportation Brief 1140 Wellington Street West Transportation Brief October 2013 Study 1140 Wellington Type Street West October 2013 Study Transportation Name Brief February 2011 TB Check List TIS / TB/ CTS Check List prepared

More information

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Market Street Road Diet Wilmington, NC 2016 Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Wilmington, NC Parsons Brinckerhoff January 2016 FINAL TECHNICAL REPORT US 17 Corridor

More information

Wellington Street West

Wellington Street West Transportation Brief prepared for: 185 Davenport Road Suite 300 Toronto, ON M5R 1J1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 November 5, 2013 TO3131TOH Transportation Brief November

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

267 O Connor Street Residential Development

267 O Connor Street Residential Development M a y 2014 267 O Connor Street Residential Development Transportation Brief Google 2014 Bing 2014 Prepared for: MASTERCRAFT STARWOOD Prepared by: Study 267 O'Connor Type Street May 2014 Study Residential

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by:

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by: 700 Hunt Club Road Transportation Impact Study - Addendum #1 Submitted by: 14 June 2013 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com 14 June 2013

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey Traffic Impact Study Residences at Bancroft Block 14, Lot 2 April 30, 2018 REVISED: JANUARY 17, 2019 Prepared For 2 Hopkins Lane, LLC 2701 Renaissance Boulevard King of Prussia, PA 19406 Prepared By Maser

More information

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings TECHNICAL MEMORANDUM Summary of Findings Date: June 17, 2014 Project #: 17121.15 To: Si Lau, P.E.; City of Oakland, CA From: Erin Ferguson, P.E.; Aaron Elias, P.E.; Daphne Dethier; and Mark Bowman, P.E.;

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 TO: FROM: Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 RE: Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street,

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. CastleGlenn Consultants Inc. Engineers, Project Managers & Planners March 11 th, 2013 Domenic Idone, P. Eng Planning Manager R.W. Tomlinson Ltd. 5597 Power Road Ottawa, Ontario K1G 3N4 Dear Mr. Idone:

More information

C. iv) Analysis/Results

C. iv) Analysis/Results The Pettengill Road project is located outside the borders of the model in an external zone. As a result, inserting all Pettengill Road trip generation assumptions into the NRPC model and running a new

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure MMM Group Limited Traffic Study CASA MIA Community Care Facility Vancouver, BC Communities Transportation Buildings Infrastructure February 2013 5011001-033 STANDARD LIMITATIONS This report was prepared

More information

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment MEMORANDUM Date: June 22, 2018 Project #: 21562 To: Colin McArthur, AICP From: Project: Subject: Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT 11897-05 TIA Report.docx Prescott Plaza Traffic Impact Analysis This page is intentionally left blank 11897-05

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012 BOSTON REGION METROPOLITAN PLANNING ORGANIZATION State Transportation Building Ten Park Plaza, Suite 2150 Boston, MA 02116-3968 Tel. (617) 973-7100 Fax (617) 973-8855 TTY (617) 973-7089 www.bostonmpo.org

More information

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS 1 FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction... 3 II. Project Description... 3 III. Existing Conditions... 6 IV. Future Traffic Demand... 10 V. Conclusions and Mitigation...

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc.

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc. TRANSPORTATION ANALYSIS Wawa US 441 and Morningside Drive Prepared for: Brightwork Real Estate, Inc. TABLE OF CONTENTS Introduction... 1 Project Description... 1 Estimated Daily Project Traffic... 3 Estimated

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Interstate 80 Corridor Study

Interstate 80 Corridor Study Interstate 80 Corridor Study Final Technical Memorandum 5: Traffic Volumes, Accident Locations and Operational Deficiencies West Verdi (SR 425) Interchange to West McCarran Boulevard (SR 651) and East

More information

Minto Mahogany Stage 2

Minto Mahogany Stage 2 Minto Mahogany Stage 2 Transportation Impact Study prepared for: Minto Developments Inc 200-180 Kent Street Ottawa, ON K1P 0B6 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 June 27, 2017

More information

CitiGate Retail Development

CitiGate Retail Development CitiGate Retail Development Transportation Impact Study prepared for: Trinity Development Group Inc. Sun Life Financial Centre, East Tower 3250 Bloor Street West, Suite 1000 Toronto, ON M8X 2X9 prepared

More information