1 TRAFFIC IMPACT ANALYSIS FOR RESIDENCE INN PROJECT Davis, CA Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA Prepared By: KD Anderson & Associates, Inc Taylor Road, Suite G Loomis, California (916) July 21, Residence Inn Davis TIA.rpt Transportation Engineers

2 RESIDENCE INN PROJECT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS EXECUTIVE SUMMARY... i INTRODUCTION... 1 Study Purpose and Objectives... 1 Project Description... 1 EXISTING SETTING... 4 Study Area... 4 Level of Service Analysis... 5 Existing Traffic Conditions... 7 Non-Automobile Transportation... 9 PROJECT IMPACTS Project Characteristics Existing Plus Project Level of Service Impacts IMPACT SUMMARY / MITIGATION MEASURES Existing Conditions Existing Plus Project Conditions REFERENCES APPENDIX... 18

3 RESIDENCE INN PROJECT TRAFFIC IMPACT ANALYSIS EXECUTIVE SUMMARY Project Description. This study evaluates the traffic impacts associated with the proposed Residence Inn Project in the Mace Ranch area of east Davis. The project will be constructed on an existing 2.69 ± acre site at 4647/4652 Fermi Place. This is located in the Mace Ranch area of Davis, in the southwest quadrant of the Mace Blvd / 2 nd Avenue intersection. The proposed project is a 120-room four-story extended stay hotel. The hotel will include studios and one-bedroom rooms with kitchens. Hotel guest amenities will be located on the ground floor and include the lobby, host stand, kitchen, pool, fitness center, gathering room and business center. Access to the project will be through two driveways along Fermi Place. Primary access will be from Mace Blvd to 2 nd Street to Fermi Place. The project is expected to generate approximately 872 new daily trips. 70 new trips are projected during the a.m. peak hour and 74 new trips will be generated in the p.m. peak hour. Existing Setting. Levels of Service were evaluated for seven intersections in the area of the proposed project. The analysis considered both a.m. and p.m. traffic. The existing intersections operate at acceptable Levels of Service, at LOS D or better. Existing Plus Project Specific Impacts. The existing intersection operating Levels of Service will be maintained with the addition of project traffic. All locations will operate at LOS E or better. Thus, the project s impact is not significant based on this criterion. Standard City of Davis conditions of approval will require payment of current MPFP fees as mitigation for city-wide impacts. Traffic Impact Analysis for Residence Inn, Davis, CA (July 21, 2016) Page i

4 RESIDENCE INN PROJECT TRAFFIC IMPACT ANALYSIS INTRODUCTION Study Purpose and Objectives This study evaluates the traffic impacts associated with the proposed Residence Inn Project in the Mace Ranch area of east Davis. The project is located at 4647/4652 Fermi Place, in the southwest quadrant of the Mace Blvd / 2 nd Street intersection. The project consists of a 120-unit extended stay hotel. Access to the site will be along Fermi Place via 2 nd Street. Based on direction received from the City of Davis, the study addresses the following scenarios and the study parameters are consistent with City of Davis guidelines: 1. Existing A.M. and P.M. Peak Hour Traffic Conditions; 2. Existing Plus Project A.M. and P.M. Peak Hour Traffic Conditions; The objective of this study is to identify what effects the projects will have on the area roadway network and local intersections in the near term. Project Description The Residence Inn project is a 120-room four-story hotel to be located in the Mace Ranch area of east Davis. The proposed project is a 120-room four-story extended stay hotel. The hotel will include studios and one-bedroom rooms with kitchens. Hotel guest amenities will be located on the ground floor and include the lobby, host stand, kitchen, pool, fitness center, gathering room and business center. Access to the project will be through two driveways along Fermi Place. Primary access will be from Mace Blvd to 2 nd Street to Fermi Place. The location of the project is illustrated in Figure 1. Figure 2 presents the proposed site plan for the project. Traffic Impact Analysis for Page 1 Residence Inn, Davis, CA (July 21, 2016)

5 PROJECT LOCATION KD Anderson & Associates, Inc. Transportation Engineers LT 7/21/2016 VICINITY MAP figure 1

6 KD Anderson & Associates, Inc. Transportation Engineers LT 7/21/2016 SITE PLAN figure 2

7 EXISTING SETTING Study Area This study addresses traffic conditions on the adjacent roadways that will be used to access the site and a review of the site plan. The quality of traffic flow is often governed by the operation of the local intersections. For this study seven intersections were identified for evaluation. The study locations include: The Mace Blvd / Alhambra Drive intersection is a signal controlled tee intersection. The northbound approach provides a 250 ± left turn lane with protected left phasing. Free right turns exist for the southbound and eastbound approaches. For both movements, the vehicles departing the intersection are not required to yield to through movement vehicles as they enter their own lane as the turn is completed. The 2 nd Street / Fermi Place Target intersection is a signal controlled intersection. This intersection will provide access to the project site. Eastbound 2 nd Street consists of a left turn lane, a through lane and a through-right lane while the westbound approach includes left, through and right turn lanes; the right lane is a trap lane from the westbound departure of the 2 nd Street / Mace Blvd intersection. The north leg of the intersection provides the primary access into the target Center while the south leg is Fermi Place providing access to the project site. Both legs include left turn lanes and through-right lanes. The signal includes protected left turns on all approaches. Bicycle lanes exist along 2 nd Street. The Mace Blvd / 2 nd Street intersection is a signal controlled intersection with protected left turn phasing. The northbound approach includes a 300 ± left turn lane, a through lane and a through-right lane. The southbound approach includes a 200 ± left turn lane, two through lanes and a right turn lane. The eastbound approach incudes a 250 ± left turn lane, a through lane and a right turn lane; the right turn lane is a trap lane from the eastbound departure of the 2 nd Street / Fermi Place - Target intersection. For both right turn movements vehicles are required to yield to through movement vehicles. Bicycle lanes are present along all approaches. The Mace Blvd / I-80 Westbound Ramps intersection is a signal controlled intersection south of the project site. The intersection serves westbound I-80 off-ramp and on-ramp traffic in an L- 1 diamond configuration. The northbound approach includes two 260 ± left turn lanes and two through lanes. The southbound approach includes two through lanes and a 275 ± right turn lane. The westbound off-ramp is a two-lane off-ramp and feed to a right turn lane and a leftthrough lane. The westbound off-ramp also includes a 685 ± left turn lane. The westbound right turn lane has a dedicated accepting lane north of the intersection. This third lane merges into the two through lanes about 325 north of the ramp intersection. Bicycle lanes are present along Mace Blvd. The Mace Blvd / I-80 eastbound On-Ramps intersection provides way access to eastbound I-80 for both northbound and southbound Mace Blvd. The southbound ramp is a loop ramp while the northbound ramp is directional. Both ramp entrances are movements. Traffic Impact Analysis for Page 4 Residence Inn, Davis, CA (July 21, 2016)

8 The Chiles Road / I-80 Eastbound Off-Ramp intersection is a signal controlled intersection south of I-80. The intersection has three legs. The eastbound approach includes a single through lane while the westbound approach includes two through lanes that merge into a single lane west of the intersection. The eastbound hook off-ramp includes a dual lane off-ramp that widens prior to the intersection to provide two left turn lanes and one right turn lane. Bicycle lanes are present along on the west leg of Chiles Road. The Mace Blvd / Chiles Road intersection is a four-way signal controlled intersection east of the project site. The eastbound approach includes two, a through lane and a right turn lane. All four lanes are about 325, and extend to the I-80 eastbound off-ramp intersection. The westbound approach includes left, through and right turn lanes, with the turn lanes each about 150. The northbound Mace Blvd approach includes a 125 left turn lane, a through lane and a through-right lane. The outside lane includes a short one-car right turn lane. The southbound approach includes a 300 ± left turn lane, two through lanes and a 150 ± right turn lane. The signal phasing includes protected left turns on all approaches. Level of Service Analysis Methodology. Level of Service Analysis has been employed to provide a basis for describing existing traffic conditions and for evaluating the significance of project traffic impacts. Level of Service measures the quality of traffic flow and is represented by letter designations from "A" to "F", with a grade of "A" referring to the best conditions, and "F" representing the worst conditions. Table 1 presents typical Level of Service characteristics. Local agencies adopt minimum Level of Service standards for their facilities. The City of Davis identifies LOS E as the acceptable Level of Service within the City during the peak hour while LOS F is acceptable for the Core Area and the Richards Blvd / Olive Drive area. The 2010 Highway Capacity Manual was used to provide a basis for describing existing traffic conditions and for evaluating the significance of project traffic impacts. Synchro 9.1 / SimTraffic micro-simulation software was used to analyze the Mace Blvd corridor, from the I-80 Eastbound Off-ramp intersection at Chiles Road to the Mace Blvd / Alhambra Drive intersection. The 2 nd Street / Fermi Place Target intersection was analyzed using Synchro 9.1. This approach was consistent with the Mace Ranch Innovation Center (MRIC) DEIR. Levels of Service at the intersections analyzed using SimTraffic were based upon the average results of the SimTraffic output. The SimTraffic software is a stochastic model, i.e. randomness is present when running the simulations. The results will vary within each scenario and between scenarios. This may result in intersections having lower delays or queues in the Plus Project scenario than in the No Project scenario. The simulation results contained in this report reflect the average of the mean 10 one-hour simulation runs selected from a 20 run sample. SimTraffic evaluates overall systems, providing operational Levels of Service for individual intersections and segments. Although the operations at individual intersections and along segments are reported it is more meaningful to look at SimTraffic results as a whole system, rather than as individual intersections. This is a particular strength of SimTraffic as it considers Traffic Impact Analysis for Page 5 Residence Inn, Davis, CA (July 21, 2016)

9 interaction between intersections. For this study, significance is defined as the overall condition of the network; for example, if only one intersection operates below the LOS threshold in one scenario and a different intersection operates below the threshold in a plus Project scenario this is not considered significant as the network overall is still operating with a single intersection below the LOS threshold. Implementation of a mitigation measure at one intersection could affect a different intersection in the network, creating a cascading effect of mitigation measures. The identification of maintaining a single intersection in the network operating below the LOS threshold indicates that traffic is dynamic under a coordinated system. This analysis method and the significance thresholds are responding to this systemic approach. TABLE 1 LEVEL OF SERVICE DEFINITIONS Level of Service Signalized Intersection Unsignalized Intersection Roadway (Daily) "A" Uncongested operations, all queues Little or no delay. Completely flow. clear in a single-signal cycle. Delay < 10 sec/veh Delay < 10.0 sec "B" "C" "D" "E" Uncongested operations, all queues clear in a single cycle. Delay > 10.0 sec and < 20.0 sec Light congestion, occasional backups on critical approaches. Delay > 20.0 sec and < 35.0 sec Significant congestion of critical approaches but intersection functional. Cars required to wait through more than one cycle during short peaks. No long queues formed. Delay > 35.0 sec and < 55.0 sec Severe congestion with some long standing queues on critical approaches. Blockage of intersection may occur if traffic signal does not provide for protected turning movements. Traffic queue may block nearby intersection(s) upstream of critical approach(es). Delay > 55.0 sec and < 80.0 sec "F" Total breakdown, stop-and-go operation. Delay > 80.0 sec Short traffic delays. Delay > 10 sec/veh and < 15 sec/veh Average traffic delays. Delay > 15 sec/veh and < 25 sec/veh Long traffic delays. Delay > 25 sec/veh and < 35 sec/veh Very long traffic delays, failure, extreme congestion. Delay > 35 sec/veh and < 50 sec/veh Intersection blocked by external causes. Delay > 50 sec/veh Sources: 2010 Highway Capacity Manual, Transportation Research Board (TRB). Free flow, presence of other vehicles noticeable. Ability to maneuver and select operating speed affected. Unstable flow, speeds and ability to maneuver restricted. At or near capacity, flow quite unstable. Forced flow, breakdown. Significance Thresholds. Intersections: Significant traffic impacts at intersections within the City of Davis jurisdiction are defined when the addition of proposed project traffic causes any of the following: Traffic Impact Analysis for Page 6 Residence Inn, Davis, CA (July 21, 2016)

10 a) For signalized intersections outside the Core Area or the Richards Blvd / Olive Drive area, causes overall intersection operations to deteriorate from an acceptable level (LOS E or better in the a.m. or p.m. peak hour) to an unacceptable level (LOS F in the a.m. or p.m. peak hour); b) For signalized intersections outside the Core Area or the Richards Blvd / Olive Drive area, exacerbate unacceptable (LOS F) operations by increasing an intersection s average delay by five seconds or more; c) For unsignalized intersections outside the Core Area or the Richards Blvd / Olive Drive area, causes the worst-case movement (or average of all movements for all-way stopcontrolled intersections) to deteriorate from an acceptable level (LOS E or better in the a.m. or p.m. peak hour) to an unacceptable level (LOS F in the a.m. or p.m. peak hour) and meet the California Manual on Uniform Traffic Control Devices (MUTCD) peak hour signal warrant; d) For unsignalized intersections outside the Core Area or the Richards Blvd / Olive Drive area that operate unacceptably (LOS F in the a.m. or p.m. peak hour) and meet MUTCD s peak hour signal warrant without the project, exacerbate operations by increasing the overall intersection s volume by more than one percent; or e) For unsignalized intersections that operate unacceptably, but do not meet MUTCD s peak hour signal warrant without the project, add sufficient volume to meet the MUTCD peak hour signal warrant. Existing Traffic Conditions Existing a.m. and p.m. traffic volumes were obtained from the recently completed traffic impact study for the Mace Ranch Innovation Center. Existing volumes are shown in Figure 3. Intersection Levels of Service. The Level of Service for signalized and unsignalized intersections is based on and measured in terms of control delay for the peak fifteen-minute analysis period. Table 2 summarizes current Levels of Service at the study area intersections during the a.m. and p.m. peak hour. All intersections currently operate at acceptable Levels of Service, at LOS D or better. Location TABLE 2 EXISTING PEAK HOUR LEVELS OF SERVICE AT INTERSECTIONS Control AM Peak Hour PM Peak Hour Peak Hour Average Average Warrants LOS Delay (secs) LOS Delay (secs) Met? 1. Mace Blvd /Alhambra Drive Signal A 8 A 9 N/A 2. 2 nd Street / Fermi Place - Target Signal B 11 B 15 N/A 3. Mace Blvd / 2 nd Street Signal D 45 C 29 N/A 4. Mace Blvd / I-80 WB Ramps Signal C 24 B 18 N/A 5. Mace Blvd / I-80 EB On-Ramps Uncontrolled A 5 A 4 N/A 6. Chiles Rd / I-80 EB Off-Ramp Signal A 7 A 8 N/A 7. Mace Blvd/Chiles Rd Signal C 26 C 24 N/A Traffic Impact Analysis for Page 7 Residence Inn, Davis, CA (July 21, 2016)

11 1 3 1 (455) 588 (10) 16 (9) 11 (176) (695) 150 (297) Mace Blvd / Alhambra Dr 2 (185) 54 (7) 2 (63) (29) 42 (320) 492 (147) 84 2 nd St / Fermi Pl / Target (85) 37 (521) 846 (83) 66 5 (6) 243 (634) 24 (97) 9 (27) 1 (6) 7 (11) 11 (40) 48 (26) 14 (42) (930) 623 (470) 642 Mace Blvd / EB I-80 Ramps (346) 241 (105) (259) 865 (801) 356 (357) (144) 34 (141) 14 (596) Mace Blvd / 2 nd Street (950) 941 (201) (50) 497 (803) 567 (460) 537 (781) 1 (1) 294 (465) (441) 394 Chiles Rd / I-80 EB Off-Ramps 7 (185) 133 (473) 236 (317) (206) 61 (26) 21 (34) XX (XX) R1-1 Legend AM Peak Hour Volume PM Peak Hour Volume Stop Sign 539 (526) 372 (249) (460) 433 (158) 101 (148) (78) 552 (378) 26 (28) Signalized Intersection Mace Blvd / WB I-80 Ramps Mace Blvd / Chiles Rd KD Anderson & Associates, Inc. Transportation Engineers LT 7/21/2016 EXISTING TRAFFIC VOLUMES AND LANE CONFIGURATIONS figure 3

12 Non-Automobile Transportation Public Transit. Unitrans and Yolo Bus provide public transit service in Davis. The facilities serving the area of the proposed project include: 1. Unitrans. This is operated by the University of California. There are five routes that operate past the site, along Mace Blvd and/or 2 nd Street. These include the A, O, P, Q and Z routes. The A and Z routes run midweek while the O route only runs on the weekend. The P and Q routes operate every day. Currently, Unitrans is operating their summer schedule with the new 2016/2017 schedule effective August 1. According to Unitrans most of the changes are in weekend service. The A route begins at The Silo terminal on the UCD campus and proceeds through downtown Davis to L Street where it then continues along 5 th Street, into Mace Ranch, along Mace Blvd to South Davis where it turns and heads back to the UCD campus. The route operates in the midweek on about 30 minute headways, departing The Silo between 7:00 a.m. and 9:00 p.m. and then on an hourly schedule Monday through Thursday until 10:10 p.m. The A line does not operate weekend service. The Z line operates from the Memorial Union and proceeds through downtown along 3 rd Street where it continues onto 5 th Street via L Street. The route then loops around Mace Ranch via Alhambra Drive, Mace Blvd, Second Street and Pena Drive to Fifth Street where it heads back to the Memorial Union. The route operates in the midweek on ½ hour headways, departing the Memorial Union between 7:15 a.m. and 5:55 p.m. The P and Q routes provide citywide service and passes near the site. The P route provides counterclockwise service around the City and the Q route provides clockwise service. Both routes travel along Mace Blvd and stop at the 2 nd Street intersection. The P and the Q routes operate from 6:30 a.m. to 11:00 p.m. Monday through Thursday; Friday service operates from 6:30 a.m. to 9:00 p.m. Weekend service is provided for both routes from 8:24 a.m. to 7:00 p.m. The routes operate at 30 minute headways during the midweek with headways extending to one hour after 6:00 p.m. while weekend service operates at about one hour headways. The O Line operates only on weekends. The route begins at the Memorial Union Terminal and proceeds through downtown Davis to 5 th Street. The route passes the project site at Mace Blvd / 2 nd Street intersection to Target where it continues to Pena Street and back to 5 th Street. The route continues through downtown and into west Davis and back to the Memorial Union. The route operates on 75-minute headways from about 9:00 a.m. to 6:45 p.m. 2. Yolo Bus. Yolo Bus provides service in the project vicinity with four routes, 42A and 42B, 43 and 232. Route 42A provides clockwise service between Davis, Woodland, Sacramento Airport and downtown Sacramento. Route 42B provides counterclockwise service between Davis, Woodland, Sacramento Airport and downtown Sacramento. Both Traffic Impact Analysis for Page 9 Residence Inn, Davis, CA (July 21, 2016)

13 routes have stops at the Mace Blvd / 2 nd Street intersection. Service begins at this location with the first bus on the 42A route departing at 4:37 a.m. Monday through Friday. The last bus arrives at 11:02 p.m. Service is generally hourly with an additional run at 5:35 a.m. Weekend service begins at 7:08 a.m. from the Mace Blvd / 2 nd Street intersection and operates about hourly until 9:08 p.m. The first bus departing along the 42B route leaves at 5:51 a.m. Monday through Friday and operates on about a one hour headway. The last bus arrives at 10:21 p.m. Weekend service begins at 7:43 a.m. from the Mace Blvd / 2 nd Street intersection and operates hourly until 10:21 p.m. Route 43 operates Monday through Friday with five runs into Sacramento in the a.m. and four runs from Sacramento in the p.m. The route passes the Mace Blvd / 2 nd Street intersection. The morning runs pass this intersection beginning at about 6:30 with the fifth run arriving about 8:00 a.m. In the evening the first bus arrives at the intersection at about 4:45 with the fourth bus arriving about 5:45. This route does not operate on weekends. Route 242 operates only during the midweek with a single run on the morning leaving the Mace Blvd / 2 nd Street intersection at about 6:51 a.m. The return trip arrives from Sacramento at about 6:20 p.m. Bicycle and Pedestrian Facilities. Bicycle and pedestrian facilities are available throughout the City of Davis. The City has developed an extensive bicycle system extending into the University and Yolo County. On-street and off-street facilities are available in the project area with marked bike lanes along Mace Blvd, 2 nd Street and Fermi Place. In addition to the bike lanes bike paths are available along Mace Blvd and Alhambra Drive, and within Mace Ranch, accessible from behind the Target Shopping Center. Sidewalks are present along Fermi Place, along 2 nd Street from the Target Shopping Center to Mace Blvd, along the west side of Mace Blvd north of 2 nd Street and within the Target Center where access to the multipurpose path can be reached. Traffic Impact Analysis for Page 10 Residence Inn, Davis, CA (July 21, 2016)

14 PROJECT IMPACTS Project Characteristics The development of this project will attract additional traffic to the project site. The amount of additional traffic on a particular section of the street network is dependent upon two factors: I. Trip Generation, the number of new trips generated by the project, and II. Trip Distribution and Assignment, the specific routes that the new traffic takes. Trip Generation. Trip generation is determined by identifying the type and size of land use being developed. Recognized sources of trip generation data may then be used to calculate the total number of trip ends. The trip generation of the project was computed using rates published in Trip Generation (Institute of Transportation Engineers, 9th Edition, 2013) based on the projected use. The project consists of a 120 room extended stay hotel. Two alternative hotel types were considered, Land Use 310, Hotel. This land use is described as places of lodging that provide sleeping accommodations and supporting facilities such as restaurants, cocktail lounges, meeting and banquet rooms or convention facilities, limited recreational facilities (pool, fitness room), and/or other retail and service shops. Land Use 312, Business Hotel, was also considered in describing the project. ITE describes a Business Hotel as places of lodging aimed toward the business traveler. These hotels provide sleeping accommodations and other limited facilities, such as a breakfast buffet bar and afternoon beverage bar (no lunch or dinner is served and no meeting facilities are provided). Based on the extended stay hotel description Land Use 312 was used for trip generation. Table 3 displays the daily, a.m. and p.m. peak hour trip generation for the site. The proposed project is expected to generate 872 daily trips with 70 a.m. and 74 p.m. peak hour trips. Land Use Amount Daily TABLE 3 PROJECT TRIP GENERATION Trip Rate AM Peak Hour PM Peak Hour Daily Trips AM Peak Hour PM Peak Hour Business Hotel 120 room Note - numbers may not equal due to rounding New Trips In Out In Out In Out In Out 59% 41% 60% 40% Net New Trips Traffic Impact Analysis for Page 11 Residence Inn, Davis, CA (July 21, 2016)

15 Trip Distribution. The distribution of project traffic was determined based on knowledge of the project area, existing hotels within Davis and existing and future travel patterns in the area. Table 4 displays the trip distribution assumptions used for the proposed project. Trip Assignment. Traffic generated by the project was added to existing peak hour volumes based on the projected distribution percentages. Figure 4 displays the project generated traffic based on the project access to the surrounding roadways. Figure 5 displays the resulting a.m. and p.m. peak hour volumes at the study intersections for the Existing plus Project condition. TABLE 4 PROJECT TRIP DISTRIBUTION Route % of Total AM Trips % of Total PM Trips To / From I-80 westbound 40% 30% To / From I-80 eastbound 30% 30% West on 2 nd Street 10% 15% North/West on Mace Blvd / Covell Blvd 10% 15% East on CR 32A 5% 5% South on Mace Blvd 5% 5% Total 100% 100% Existing Plus Project Level of Service Impacts Intersection Levels of Service. Table 5 displays the a.m. and p.m. peak period Level of Service at each study intersection with the proposed project. All intersections will continue to operate within the City s Level of Service threshold, at LOS C or better. The all-way stop controlled intersection at Cowell Blvd / Drummond Avenue / Chiles Road operates acceptably and will not meet the peak hour signal warrant. Thus, the project s traffic impacts are not significant from the standpoint of City LOS policy. Traffic Impact Analysis for Page 12 Residence Inn, Davis, CA (July 21, 2016)

16 1 (7) 4 3 (5) 2 (37) 37 4 (7) 26 (26) 3 (5) 5 (2) 1 (9) 9 18 (15) 1 Mace Blvd / Alhambra Dr 2 nd St / Fermi Pl / Target 3 6 Mace Blvd / EB I-80 Ramps 3 (7) 4 2 (2) (13) (5) 3 (2) 1 (20) 22 Mace Blvd / 2 nd Street (11) 10 (9) (29) 12 (13) Chiles Rd / I-80 EB Off-Ramps 7 (2) 1 XX (XX) R1-1 Legend AM Peak Hour Volume PM Peak Hour Volume Stop Sign 18 (15) (13) 16 2 (2) Signalized Intersection Mace Blvd / WB I-80 Ramps Mace Blvd / Chiles Rd KD Anderson & Associates, Inc. Transportation Engineers LT 7/21/2016 PROJECT ONLY TRAFFIC VOLUMES AND LANE CONFIGURATIONS figure 4

17 1 3 1 (462) 592 (10) 16 (9) 11 (176) (700) 150 (297) Mace Blvd / Alhambra Dr 2 (185) 54 (7) 2 (63) (66) 79 (320) 492 (147) 84 2 nd St / Fermi Pl / Target (85) 37 (521) 846 (90) 70 9 (13) 243 (634) 24 (97) 35 (53) 1 (6) 10 (16) 11 (40) 50 (28) 14 (42) (932) 624 (479) 651 Mace Blvd / EB I-80 Ramps (359) 257 (105) (259) 883 (816) 356 (357) (149) 37 (143) 15 (616) Mace Blvd / 2 nd Street (961) 951 (210) (50) 497 (803) 598 (489) 549 (794) 1 (1) 294 (465) (441) 394 Chiles Rd / I-80 EB Off-Ramps 7 (185) 133 (475) 237 (317) (206) 61 (26) 21 (34) XX (XX) R1-1 Legend AM Peak Hour Volume PM Peak Hour Volume Stop Sign 557 (541) 372 (249) (473) 449 (158) 101 (148) (78) 554 (380) 26 (28) Signalized Intersection Mace Blvd / WB I-80 Ramps Mace Blvd / Chiles Rd KD Anderson & Associates, Inc. Transportation Engineers LT 7/21/2016 EXISTING PLUS PROJECT TRAFFIC VOLUMES AND LANE CONFIGURATIONS figure 5

18 Location TABLE 5 EXISTING PLUS PROJECT PEAK HOUR INTERSECTION LEVELS OF SERVICE Control Existing AM Peak Hour Average LOS Delay (secs) Existing PM Peak Hour Average LOS Delay (secs) Existing plus Project Existing plus Project AM Peak Hour PM Peak Hour Average Average LOS Delay (secs) LOS Delay (secs) 1. Mace Blvd /Alhambra Drive Signal A 8 A 9 A 7 A nd Street / Fermi Place - Target Signal B 11 B 15 B 13 B Mace Blvd / 2 nd Street Signal D 45 C 29 E 55 C Mace Blvd / I-80 EB Ramps Signal C 24 B 18 C 30 B Mace Blvd / I-80 EB On-Ramps Uncontrolled A 5 A 4 A 5 A 4 6. Chiles Rd / I-80 EB Off-Ramp Signal A 7 A 8 A 8 A 8 7. Mace Blvd/Chiles Rd Signal C 26 C 24 C 27 C 25 Traffic Impact Analysis for Page 15 Residence Inn, Davis, CA (July 21, 2016)

19 IMPACT SUMMARY / MITIGATION MEASURES The preceding analysis has identified project impacts that may occur without mitigation. The text that follows identifies a strategy for mitigating the impacts of the proposed project. Recommendations are identified for facilities that require mitigation but are not a result of the proposed project. If the project causes a significant impact, mitigations are identified for the facility. Existing Conditions Recommendations. No recommendations for improvements for existing conditions have been made as the study intersections and roadway segments all operate at acceptable Levels of Service, at LOS C or better. Existing Plus Project Conditions Adequate operating Level of Service at each intersection will be maintained with the addition of project traffic, and the City s minimum Level of Service standards will be met. In addition, the all roadway segments will continue to operate at LOS D or better. Thus the project s impact is not significant based on this criteria and no mitigation is required. Standard City of Davis conditions of approval will require payment of current MPFP fees as mitigation for city-wide impacts. Traffic Impact Analysis for Page 16 Residence Inn, Davis, CA (July 21, 2016)

20 REFERENCES 1. ITE Trip Generation, 9 th Edition, California Manual of Uniform Traffic Control Devices, November, Transportation Research Board, Special Report 209, Highway Capacity Manual, Mace Ranch Innovation Center Draft Environmental Impact Report, Raney Planning and Management, August Telephone and correspondence, Roxanne Namazi and Ike Njoku, City of Davis, April through June, 2016 Traffic Impact Analysis for Page 17 Residence Inn, Davis, CA (July 21, 2016)

21 APPENDIX Traffic Impact Analysis for Page 18 Residence Inn, Davis, CA (July 21, 2016)

22 SimTraffic Performance Report Exist AM Baseline 7/14/2016 1: Mace Blvd & Alhambra Dr Performance by approach Approach EB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & 2nd St/CR 32A Performance by approach Approach EB WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & I-80 WB Ramp Performance by approach Approach WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : I-80 EB Ramp & Mace Blvd Performance by approach Approach NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Chiles Rd & I-80 EB Off-Ramp Performance by approach Approach EB WB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & Chiles Rd Performance by approach Approach EB WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) Total Zone Performance Denied Del/Veh (s) 1.3 Total Del/Veh (s) SimTraffic Report Page 1

23 HCM 2010 Signalized Intersection Summary Exist AM 2: 2nd St & Target/Fermi Pl 7/14/2016 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS C B D B C A A C A A Approach Vol, veh/h Approach Delay, s/veh Approach LOS C C A B Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 11.2 HCM 2010 LOS B Notes 11/13/2014 Baseline Synchro 8 Report Page 1

24 HCM 2010 Signalized Intersection Summary Exist AM 2: 2nd St & Target/Fermi Pl 7/14/2016 User approved pedestrian interval to be less than phase max green. 11/13/2014 Baseline Synchro 8 Report Page 2

25 SimTraffic Performance Report Exist PM Baseline 7/18/2016 1: Mace Blvd & Alhambra Dr Performance by approach Approach EB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & 2nd St/CR 32A Performance by approach Approach EB WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & I-80 WB Ramp Performance by approach Approach WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : I-80 EB Ramp & Mace Blvd Performance by approach Approach NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Chiles Rd & I-80 EB Off-Ramp Performance by approach Approach EB WB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & Chiles Rd Performance by approach Approach EB WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) Total Zone Performance Denied Del/Veh (s) 0.8 Total Del/Veh (s) SimTraffic Report Page 1

26 HCM 2010 Signalized Intersection Summary Exist PM 2: 2nd St & Target/Fermi Pl 7/18/2016 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS C B D C C B B C B B Approach Vol, veh/h Approach Delay, s/veh Approach LOS C C B B Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 15.3 HCM 2010 LOS B 2 Exist PM syn Synchro 8 Report Page 1

27 SimTraffic Performance Report Exist plus Project AM Baseline 7/18/2016 1: Mace Blvd & Alhambra Dr Performance by approach Approach EB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & 2nd St/CR 32A Performance by approach Approach EB WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & I-80 WB Ramp Performance by approach Approach WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : I-80 EB Ramp & Mace Blvd Performance by approach Approach NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Chiles Rd & I-80 EB Off-Ramp Performance by approach Approach EB WB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & Chiles Rd Performance by approach Approach EB WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) Total Zone Performance Denied Del/Veh (s) 1.5 Total Del/Veh (s) SimTraffic Report Page 1

28 HCM 2010 Signalized Intersection Summary Exist plus Project AM 2: 2nd St & Target/Fermi Pl 7/18/2016 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS C B D B C A A C B A Approach Vol, veh/h Approach Delay, s/veh Approach LOS C C A B Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 12.5 HCM 2010 LOS B Notes 11/13/2014 Baseline Synchro 8 Report Page 1

29 HCM 2010 Signalized Intersection Summary Exist plus Project AM 2: 2nd St & Target/Fermi Pl 7/18/2016 User approved pedestrian interval to be less than phase max green. 11/13/2014 Baseline Synchro 8 Report Page 2

30 SimTraffic Performance Report Exist plus Project PM Baseline 7/18/2016 1: Mace Blvd & Alhambra Dr Performance by approach Approach EB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & 2nd St/CR 32A Performance by approach Approach EB WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & I-80 WB Ramp Performance by approach Approach WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) : I-80 EB Ramp & Mace Blvd Performance by approach Approach NB SB All Denied Del/Veh (s) Total Del/Veh (s) : Chiles Rd & I-80 EB Off-Ramp Performance by approach Approach EB WB SB All Denied Del/Veh (s) Total Del/Veh (s) : Mace Blvd & Chiles Rd Performance by approach Approach EB WB NB SB All Denied Del/Veh (s) Total Del/Veh (s) Total Zone Performance Denied Del/Veh (s) 0.8 Total Del/Veh (s) SimTraffic Report Page 1

31 HCM 2010 Signalized Intersection Summary Exist plus Project PM 2: 2nd St & Target/Fermi Pl 7/18/2016 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS C B D C C B B D B B Approach Vol, veh/h Approach Delay, s/veh Approach LOS C C B B Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 16.7 HCM 2010 LOS B 4 EPP PM syn Synchro 8 Report Page 1

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA (St. Tammany Parish Mandeville, LA) Prepared For The Pittman Companies Michael N Pittman, MD 328 East Boston St Covington, LA 70433

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated)

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated) MEMORANDUM Date: May 26, 2016 To: From: Subject: Debbie Bent and Kris Overleese, City of Kenmore Kendra Breiland and Sarah Keenan, Fehr & Peers Saint Edward Ballfields Traffic and Parking Analysis (Updated)

More information

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation Background and Project Needs SR 104 is functionally classified as a rural-principal arterial. It is a limited

More information

1 st Street Intersection Study

1 st Street Intersection Study TRAFFIC ENGINEERING ASSISTANCE PROGRAM 1 st Street Intersection Study Prepared for: City of Independence In Cooperation With: Iowa Department of Transportation & Iowa Department of Public Safety Governor

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

TRAFFIC IMPACT ANALYSIS FOR. STERLING FIFTH STREET APARTMENTS PROJECT Davis, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. STERLING FIFTH STREET APARTMENTS PROJECT Davis, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR STERLING FIFTH STREET APARTMENTS PROJECT Davis, CA Prepared For: Din/Cal 3, Inc. 3411 Richmond Avenue, Suite 200 Houston, Texas 77046 Prepared By: KD Anderson & Associates,

More information

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By:

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By: TRAFFIC IMPACT ANALYSIS FOR STERLING 5 th STREET APARTMENTS PROJECT Davis, CA Prepared For: Din/Cal 3, Inc. 3411 Richmond Avenue, Suite 200 Houston, Texas 77046 Prepared By: KD Anderson & Associates, Inc.

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

HONDA DEALERSHIP LAKE ELSINORE, CALIFORNIA. Prepared by:

HONDA DEALERSHIP LAKE ELSINORE, CALIFORNIA. Prepared by: LOS ANGELES 21 S. Figueroa St, Suite 24 Los Angeles, CA 912 213.337.368 Fax :213.337.3679 ONTARIO 4141 E. Inland Empire Blvd, Suite 25 Ontario, CA 91764 99.481.575 Fax :99.481.5757 SAN DIEGO 6 B St, Suite

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE Roadway Segment Level of Service Definitions LOS V/C Congestion/Delay Traffic Description (Used for surface streets,

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM TO: Merrimack Valley Metropolitan Planning Organization FROM: James Terlizzi, P.E., Transportation Planning Engineer DATE: March 6, 2017 SUBJECT: Further analysis of the recommendations

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Appendix E: Emission Reduction Calculations

Appendix E: Emission Reduction Calculations Derr Road and Home Road Conversion Feasibility Study Springfield, OH Appendix E: Emission Reduction Calculations Derr Road and Home Road Conversion Feasibility Study Springfield, OH Emission Reduction

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B Memorandum DATE: AUGUST 1, 2013 TO: PAUL TILTON, P.E., SANDWICH DPW DIRECTOR/TOWN ENGINEER FROM: LEV MALAKHOFF, SR. TRANSPORTATION ENGINEER RE: ROUTE 130/QUAKER MEETINGHOUSE ROAD INTERSECTION Paul: Per

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

JMC. November 7, Chairman John P. Ewasutyn and Members of the Planning Board Town of Newburgh Town Hall 308 Gardnertown Road Newburgh, NY 12550

JMC. November 7, Chairman John P. Ewasutyn and Members of the Planning Board Town of Newburgh Town Hall 308 Gardnertown Road Newburgh, NY 12550 JMC JOHN MEYER CONSULTING, PC Site Planning n Civil Engineering n Landscape Architecture Land Surveying n Transportation Engineering n Environmental Studies n Permitting n Construction Services November

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT SUMMARY OF FINDINGS. May 9, 2016

SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT SUMMARY OF FINDINGS. May 9, 2016 May 9, 2016 Mr. Jesus "Freddie" Olmos ECORP CONSULTING, INC. 215 North 5 th Street Redlands, CA 92374 SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT Dear Mr. Jesus "Freddie" Olmos:

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT 11897-05 TIA Report.docx Prescott Plaza Traffic Impact Analysis This page is intentionally left blank 11897-05

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

FORT MYERS CITY COUNCIL OSCAR M. CORBIN, JR. CITY HALL, 2200 SECOND STREET FORT MYERS, FLORIDA

FORT MYERS CITY COUNCIL OSCAR M. CORBIN, JR. CITY HALL, 2200 SECOND STREET FORT MYERS, FLORIDA Agenda City Council Special Mee ng March 18, 2019 1:00 PM Historic Preserva on Commission Appeal - Virginia Avenue/ McGregor Boulevard Roundabout MAYOR Randall P. Henderson, Jr. Ward 1 Teresa Watkins Brown

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

D R A F T TRAFFIC IMPACT ANALYSIS FOR. DARK HORSE GOLF RESORT EXPANSION Nevada County, CA. Prepared For:

D R A F T TRAFFIC IMPACT ANALYSIS FOR. DARK HORSE GOLF RESORT EXPANSION Nevada County, CA. Prepared For: D R A F T TRAFFIC IMPACT ANALYSIS FOR DARK HORSE GOLF RESORT EXPANSION Nevada County, CA Prepared For: ASIAN PACIFIC GROUP 18000 Van Karman Avenue, Suite 500 Irvine, CA 92612 Prepared By: KD Anderson &

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

Freeway Weaving and Ramp Junction Analysis

Freeway Weaving and Ramp Junction Analysis TEXAS TECH UNIVERSITY Freeway Weaving and Ramp Junction Analysis Along IH 27 at Plainview, TX Hao Xu, Jared A. Squyres, Wesley Kumfer, and Hongchao Liu 7/15/2011 Table of Contents Project Description...

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

(A) Project Manager, Infrastructure Approvals

(A) Project Manager, Infrastructure Approvals February 14th, 2014 BY E-MAIL: wally.dubyk@ottawa.ca City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor, Ottawa, Ontario K1P 1J1 Attention: Wally Dubyk, C.E.T (A) Project

More information

TRAFFIC IMPACT STUDY FOR

TRAFFIC IMPACT STUDY FOR TRAFFIC IMPACT STUDY FOR YUBA CROSSINGS MIXED USE DEVELOPMENT Yuba City, CA Prepared For: Yuba Crossings LLC 1825 Del Paso Blvd Sacramento, CA 95815 Prepared By: KDAnderson & Associates, Inc. 3853 Taylor

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information