1 Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA Prepared by: TENW Transportation Engineering NorthWest SE 8 th Street, Suite 200 Bellevue, WA Office: (425) Fax: (425)

2 Transportation Impact Analysis Residential Table of Contents EXECUTIVE SUMMARY... 1 INTRODUCTION... 3 Project Description... 3 Project Approach... 3 Primary Data and Information Sources... 4 BACKGROUND INFORMATION... 7 Roadway Network... 7 Existing Traffic Volumes... 7 Transit Service... 7 Collision History... 9 TRAFFIC GENERATION AND DISTRIBUTION Trip Generation Trip Distribution & Assignment FUTURE TRAFFIC CONDITIONS Planned Transportation Improvements Future Traffic Volumes TRAFFIC OPERATIONS ANALYSIS Level of Service Existing LOS Future Level of Service Site Access Analysis Frontage Improvements MITIGATION Frontage Improvements Off-Site Improvements Transportation Impact Fees TENW January 23, 2017 Page i

3 Transportation Impact Analysis Residential Appendices Appendix A Existing PM Peak Hour Traffic Count Data Appendix B Detailed Trip Generation Calculations Appendix C City of Gig Harbor Traffic Model Distribution Appendix D Level of Service Worksheets Figures Figure 1 Project Site Vicinity... 5 Figure 2 Preliminary Site Plan... 6 Figure Existing Traffic Volumes... 8 Figure 4 Project Trip Assignment (Senior Housing) Figure 5 Project Trip Assignment (Condos) Figure 6 Future 2018 Without-Project Traffic Volumes Figure 7 Future 2018 With-Project Traffic Volumes (Senior Housing) Figure 8 Future 2018 With-Project Traffic Volumes (Condos) Tables Table 1 Collision History at Study Intersections, January 1, 2013 to December 31, Table 2 Collision History on Road Segments, January 1, 2013 to December 31, Table 3 Residential Trip Generation Summary Table 4 LOS Criteria for Signalized and Stop-Controlled Intersections Table Existing PM Peak Hour LOS Summary Table Future With and Without-Project PM Peak Hour LOS Summary (Senior Housing) Table Future With and Without-Project PM Peak Hour LOS Summary (Condos) Table PM Peak Hour Site Access LOS and Queuing TENW January 23, 2017 Page ii

4 Transportation Impact Analysis Residential EXECUTIVE SUMMARY This Transportation Impact Analysis (TIA) documents the traffic impacts associated with the proposed One Harbor Point residential development. Project Proposal. The proposed development includes two separate land use scenarios: (1) includes 35 senior housing detached units, and (2) includes 35 residential condominium units. Both land use scenarios were evaluated in this comprehensive TIA. The project is anticipated to be completed and occupied in Trip Generation. Land use scenario 1 (senior housing) is anticipated to generate 186 new weekday daily trips with 36 new trips occurring during the weekday AM peak hour and 20 new trips during the weekday PM peak hour. Land use scenario 2 (Condos) is anticipated to generate 258 new weekday daily trips with 22 new trips during the weekday AM peak hour and 25 new trips during the weekday PM peak hour. Intersection LOS Analysis. Intersection level of service (LOS) analyses were conducted at four offsite study intersections during the weekday PM peak hour. The results showed that all movements at the study intersections are estimated to operate at LOS D or better in the year 2018 without or with the project for both land use scenarios, which meets the CityÊs adopted LOS standards. Site Access Analysis. The site access to Soundview Drive will intersect at the Judson Street intersection as an exit-only driveway. All entering site trips will access the site on Harborview Drive. All turn movements at the site access driveways on Soundview Drive and Harborview Drive are expected to operate at acceptable levels (LOS B or better) with minimal vehicle queues during the weekday PM peak hour for both land use scenarios. Safety. There are no known high accident locations in the project vicinity. The proposed frontage improvements and realignment at the Soundview/Harborview intersection are expected to enhance traffic and pedestrian safety with better sight lines and reduce crosswalk width. Mitigation. The following measures are proposed to mitigate the transportation impacts of the One Harbor Point residential project. Frontage Improvements Frontage improvements and right-of-way dedication will be provided along the entire property limits along Harborview Drive and Soundview Drive. Frontage improvements along Soundview Drive include roadway widening, new wider sidewalks, new street and sidewalk lighting, and the addition of on-street public parking. Frontage improvements on Harborview Drive include wider sidewalks, new street and sidewalk lightning, and on-street public parking. Some of the existing parking along Harborview Drive will be replaced with new public street parking on Soundview Drive. The net effect is no loss of public on-street parking. TENW January 23, 2017 Page 1

5 Transportation Impact Analysis Residential Off-Site Improvements A new roadway alignment and lane channelization enhancements will be implemented at the Soundview Drive / Harborview Drive public intersection to enhance traffic and pedestrian safety with better sight lines and reduce crosswalk width. A public road turnaround will also be created at the eastern end of eês frontage so that public traffic need not continue to the end of the dead-end street to turn around. Transportation Impact Fees The City collects transportation impact fees to help fund needed transportation improvements by the City. The currently adopted transportation impact fee rate of $2,124 per residential unit was used (City of Gig Harbor Municipal Code 19.12). The preliminary transportation impact fee estimate for the proposed project is $74,340 ($2,214 X 35 residential units). TENW January 23, 2017 Page 2

6 Transportation Impact Analysis Residential INTRODUCTION This traffic impact analysis has been prepared for the proposed residential development located on the southeast corner of the Soundview Drive and Harborview Drive intersection in Gig Harbor as shown in the Figure 1 site vicinity map. Project Description The proposed development includes two separate land use scenarios: (1) includes 35 senior housing detached units, and (2) includes 35 residential condominium units. Both land use scenarios were evaluated in this TIA. The existing site is vacant. Vehicle access is proposed at 6 driveway locations: two new driveways on Soundview Drive (one aligned with the existing Judson St) and four driveways on Harborview Drive. The project is anticipated to be completed and occupied in A preliminary site plan is provided in Figure 2. Project Approach The specific scope items used in the evaluation of traffic impacts were defined in an provided by the City of Gig Harbor dated November 8, To analyze the traffic impacts from the One Harbor Point residential project, the following tasks were undertaken: Assessed existing conditions through field reconnaissance and reviewed existing planning documents. Described existing roads, pedestrian facilities, and transit facilities in the project vicinity. Documented 3-year traffic collision history in the study area. Documented existing traffic volumes and intersection levels of service (LOS) at four offsite study intersections during the weekday PM peak hour. Documented future City planned roadway improvements in the project vicinity. Developed weekday daily, AM and PM peak hour trip generation estimates. Distributed and assigned weekday PM peak hour project-generated trips based on the City of Gig HarborÊs model distribution. Analyzed weekday PM peak hour LOS for the 2018 conditions without and with the project at the following study intersections: 1. Pioneer Way / Harborview Drive 2. Soundview Drive / Harborview Drive 3. Soundview Drive / Judson Street 4. Soundview Drive / Grandview Street TENW January 23, 2017 Page 3

7 Transportation Impact Analysis Residential Evaluated LOS and queues at the site access driveways on Soundview Drive and Harborview Drive. Proposed traffic improvements to mitigate project impacts. Identified frontage improvements along Soundview Drive and Harborview Drive that enhance traffic flow and safety for pedestrians, and creates additional public street parking. Primary Data and Information Sources Institute of Transportation Engineers (ITE), Trip Generation Manual, 9 th Edition, WSDOT collision data, January 1, 2013 to December 31, weekday PM peak period traffic counts, Traffic Count Consultants. Highway Capacity Manual (HCM), Pierce Transit website, January City of Gig Harbor Comprehensive Plan Transportation Element, dated August WSDOT TIP. City of Gig Harbor Ordinance 1044 (Concurrency and Standardized Format for Traffic Impact Analysis). TENW January 23, 2017 Page 4

8 Transportation Impact Analysis Residential Figure 1 Project Site Vicinity TENW January 23, 2017 Page 5

9 Transportation Impact Analysis Residential Figure 2 Preliminary Site Plan TENW January 23, 2017 Page 6

10 Transportation Impact Analysis Residential BACKGROUND INFORMATION Roadway Network The study area for evaluating impacts of the project was defined by the City of Gig Harbor and includes the following roadways: Harborview Drive from Pioneer Way to Soundview Drive. Soundview Drive from Harborview Drive to Grandview Street. Harborview Drive is a two-lane east-west minor arterial. Curb, gutter, and sidewalks exist on both sides of the street. Street parking exists on both sides of the street. The posted speed limit on Harborview Drive is 25 mph. Soundview Drive is a two lane north-south minor arterial in the study area. Curb, gutter, and sidewalk exists on the west side of the street. The posted speed limit on Soundview Drive is 25 mph. Existing Traffic Volumes Existing weekday PM peak hour traffic volumes at the study intersections were based on 2016 counts collected by TCC on Thursday, November 10, Average daily traffic (ADT) on the streets in the project vicinity were estimated using a K-factor = Figure 3 illustrates the existing 2016 PM peak hour traffic volumes at the study intersections. Appendix A includes the existing PM peak hour turning movement data at the study intersections. Transit Service Local public transit service in the project vicinity is provided by Pierce Transit. The nearest public transit stops are located on Judson Street (just west of Soundview Drive) and provide access to Pierce Transit route 100. Route 100 provides transit service to and from the TCC Transit Center and Purdy Park & Ride. The current schedule for Route 100 includes 60 minute headways throughout a typical weekday. TENW January 23, 2017 Page 7

11 Transportation Impact Analysis Residential Figure Existing Traffic Volumes TENW January 23, 2017 Page 8

12 Transportation Impact Analysis Residential Collision History Collision records in the study area were reviewed for the three-year period from January 1, 2013 to December 31, 2015 (the most recent 3-year period as provided by WSDOT). Collision data and rate calculations were summarized by TENW at intersections and mid-block segments in the project study area. Summaries of the total, severity, collision type, collisions per million entering vehicles (MEV), and collisions per million vehicle miles (MVM) are provided in Tables 1 and 2. Table 1 Collision History at Study Intersections, January 1, 2013 to December 31, 2015 Collision Type Location 3-Year Total Collisions Possibly Injury Related Collisions per MEV 1 Harborview Dr / Pioneer Way Soundview Dr / Harborview Dr Soundview Dr / Judson St Soundview Dr / Grandview St MEV = Million Entering Vehicles. Angle Rear-End Sideswipe Approach Turn Ped/Cycle Other Table 2 Collision History on Road Segments, January 1, 2013 to December 31, 2015 Collision Type Location Harborview Dr between 3-Year Total Collisions Injury Related Collisions per MVM 1 Pioneer Way and Soundview Drive Soundview Dr between Harborview Dr and Judson St Judson St and Grandview St MVM = Million Vehicle Miles. Angle Rear-End Sideswipe Approach Turn Ped/Cycle Other Only 1 traffic collision was reported at the Soundview Drive / Harborview Drive intersection over the 3-year period. TENW January 23, 2017 Page 9

13 Transportation Impact Analysis Residential TRAFFIC GENERATION AND DISTRIBUTION Trip Generation Trip generation estimates for weekday daily, AM and PM peak hour for both land use scenarios were calculated consistent with the trip generation methodology provided in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9 th edition. Table 3 summarizes the net trip generation for both land use scenarios for the proposed Residential development. A detailed trip generation estimate is included in Appendix B. Table 3 Residential Trip Generation Summary Trips Generated Time Period In Out Total Scenario 1 (35 Senior Housing Units): Weekday Daily Weekday AM Peak Hour Weekday PM Peak Hour Scenario 2 (Market Rate Condo Units): Weekday Daily Weekday AM Peak Hour Weekday PM Peak Hour As shown in Table 3, Scenario 1 (35 senior adult housing detached units) is estimated to generate 186 new daily trips with 36 occurring during the AM peak hour and 20 during the PM peak hour. Scenario 2 (35 condominiums) is estimated to generate 258 new daily trips with 22 occurring during the AM peak hour and 25 during the PM peak hour. The traffic impacts of both scenarios are evaluated in this TIA. Trip Distribution & Assignment The City of Gig HarborÊs distribution model was used to distribute the PM peak hour project trips to the local road network for both land use scenarios. The modelês trip distribution was provided by the City and is included in Appendix C. The distribution and assignment of PM peak hour project trips for both land use scenarios are shown graphically in Figures 4 and 5. TENW January 23, 2017 Page 10

14 Transportation Impact Analysis Residential Figure 4 Project Trip Assignment (Senior Housing) TENW January 23, 2017 Page 11

15 Transportation Impact Analysis Residential Figure 5 Project Trip Assignment (Condos) TENW January 23, 2017 Page 12

16 Transportation Impact Analysis Residential FUTURE TRAFFIC CONDITIONS Planned Transportation Improvements This section documents the planned transportation improvements in the study area. Based on the WSDOT Transportation Improvement Program (TIP), there are 2 projects in the study area: TIP #19: Harborview Drive / Pioneer Way: This project includes intersection improvements to increase non-motorized user safety. The total estimated project cost is $130,000. TIP #29: Grandview Phase 2: This project includes road, stormwater, and lighting improvements. The total estimated cost is $1.2M. Future Traffic Volumes Year 2018 No Action (without project) traffic volumes were estimated at the study intersections by applying a 4 percent annual growth rate to the existing volumes. This approach was directed by the City to account for future background traffic volumes and pipeline development. The resulting future 2018 No Action PM peak hour volumes at the four study intersections and future 2018 No Action daily (ADT) volumes on the nearby roadway segments are shown in Figure 6. The 2018 With-Project traffic volumes were determined by adding the trip assignment from both land use scenarios (shown in Figures 4 and 5) to the future 2018 No Action traffic volumes (shown in Figure 6). The resulting total With-Project PM peak hour traffic volumes at the study intersections and site access driveways for both land use scenarios are shown in Figures 7 and 8 as well as the future with-project daily (ADT) volumes on nearby roadway segments. TENW January 23, 2017 Page 13

17 Transportation Impact Analysis Residential Figure 6 Future 2018 Without-Project Traffic Volumes TENW January 23, 2017 Page 14

18 Transportation Impact Analysis Residential Figure 7 Future 2018 With-Project Traffic Volumes (Senior Housing) TENW January 23, 2017 Page 15

19 Transportation Impact Analysis Residential Figure 8 Future 2018 With-Project Traffic Volumes (Condos) TENW January 23, 2017 Page 16

20 Transportation Impact Analysis Residential TRAFFIC OPERATIONS ANALYSIS Level of Service Based on our traffic scoping with the City of Gig Harbor, weekday PM peak hour level of service (LOS) analyses were conducted at the following study intersections: 1. Pioneer Way / Harborview Drive 2. Soundview Drive / Harborview Drive 3. Soundview Drive / Judson Street 4. Soundview Drive / Grandview Street LOS generally refers to the degree of congestion on a roadway or intersection. It is a measure of vehicle operating speed, travel time, travel delays, and driving comfort. A letter scale from A to F generally describes intersection LOS. At signalized intersections, LOS A represents free-flow conditions (motorists experience little or no delays), and LOS F represents forced-flow conditions where motorists experience an average delay in excess of 80 seconds per vehicle. The LOS reported at stop-controlled intersections is based on the average control delay and can be reported for each controlled minor approach, controlled minor lane group, and controlled majorstreet movement (and for the overall intersection at all-way stop controlled intersections. Additional v/c ratio criteria apply to lane group or movement LOS only). Table 4 outlines the current HCM 2010 LOS criteria for signalized and stop-controlled intersections based on these methodologies. Table 4 LOS Criteria for Signalized and Stop-Controlled Intersections 1 SIGNALIZED INTERSECTIONS LOS by Volume-to Capacity (V/C) Ratio 2 Control Delay (sec/veh) 1.0 > 1.0 STOP-CONTROLLED INTERSECTIONS LOS by Volume-to Capacity (V/C) Ratio 3 Control Delay (sec/veh) 1.0 > A F 10 A F > 10 to 20 B F > 10 to 15 B F > 20 to 35 C F > 15 to 25 C F > 35 to 55 D F > 25 to 35 D F > 55 to 80 E F > 35 to 50 E F > 80 F F > 50 F F 1 Source: HCM2010 Highway Capacity Manual, Transportation Research Board, For approach-based and intersection-wide assessments at signals, LOS is defined solely by control delay. 3 For two-way stop controlled intersections, the LOS criteria apply to each lane on a given approach and to each approach on the minor street. LOS is not calculated for major-street approaches or for the intersection as a whole at two-way stop controlled intersections. For approach-based and intersection-wide assessments at all-way stop controlled intersections, LOS is solely defined by control delay. Level of service calculations for intersections were based on methodology and procedures outlined in the 2010 Highway Capacity Manual, Transportation Research Board (HCM 2010) using Synchro 8.0 traffic analysis software. TENW January 23, 2017 Page 17

21 Transportation Impact Analysis Residential Existing LOS The 2016 existing weekday PM peak hour LOS analysis results for the study intersections are summarized in Table 5, with the detailed LOS worksheets included in Appendix D. Table Existing PM Peak Hour LOS Summary Study Intersection (movement) LOS 1 Delay (sec) 1. Harborview Drive / Pioneer Way (all-way stop) B Soundview Drive / Harborview Drive 3. Soundview Drive / Judson Street Westbound Shared Left-Right B Soundview Drive / Grandview Street 1. LOS = Level of Service. Southbound Left-Turn A 8.3 Northbound Left-Turn A 8.2 Eastbound Shared Left-Right B 14.7 Northbound Left-Turn A 8.3 Eastbound Shared Left-Thru-Right B 13.2 Westbound Shared Left-Thru-Right D 28.3 Southbound Left-Turn A 8.6 The City of Gig HarborÊs adopted LOS standard is LOS D based on the CityÊs Comprehensive Plan Transportation Element. As shown in Table 5, all individual lane groups at the stop-controlled study intersections operate at LOS D or better under 2016 existing conditions during the weekday PM peak hour. Future Level of Service Future 2018 Level of Service (LOS) analyses were conducted at the study intersections for weekday PM peak hour No Action (without project) conditions and for future with-project conditions for both land use scenarios. The future 2018 analysis was conducted using the existing roadway geometry as there are no funded TIP Improvements in the study area. The future 2018 weekday PM peak hour LOS results at the study intersections without and with the proposed residential project for both land use scenarios are summarized in Tables 6 and 7. The LOS worksheets are included in Appendix D. As shown in Tables 6 and 7, the results show that the individual lane groups at the stop-controlled study intersection are estimated to operate at LOS D or better in the year 2018 without or with the project for both land use scenarios, which meets the City of Port Gig HarborÊs LOS standards. The Soundview Drive / Judson Street / Site Access intersection was evaluated with the east and west approaches stop controlled and the north and south approaches running free. Consideration may be given to converting this to an all-way stop controlled intersection to enhance pedestrian safety. The resulting LOS as an all-way stop would be LOS C during the PM peak hour. TENW January 23, 2017 Page 18

22 Transportation Impact Analysis Residential Table Future With and Without-Project PM Peak Hour LOS Summary (Senior Housing) Year 2018 Without- Project Delay Study Intersection (approach movement) LOS 1 (sec) Year 2018 With- Project Delay LOS (sec) 1. Harborview Drive / Pioneer Way B 14.2 B Soundview Drive / Harborview Drive 3. Soundview Drive / Judson Street 4. Soundview Drive / Grandview Street 1. LOS = Level of Service. Westbound Shared Left-Right B 14.3 B 14.6 Southbound Left-Turn A 8.4 A 8.4 Northbound Left-Turn A 8.3 A 8.3 Eastbound Shared Left-Right C 16.1 C 17.5 Westbound Shared Left-Right - - D 26.7 Northbound Left-Turn A 8.4 A 8.4 Eastbound Shared Left-Thru-Right B 13.8 C 15.2 Westbound Shared Left-Thru-Right D 32.3 D 32.6 Southbound Left-Turn A 8.8 A 8.8 Table Future With and Without-Project PM Peak Hour LOS Summary (Condos) Year 2018 Without- Project Delay Study Intersection (approach movement) LOS 1 (sec) Year 2018 With- Project Delay LOS (sec) 1. Harborview Drive / Pioneer Way B 14.2 B Soundview Drive / Harborview Drive 3. Soundview Drive / Judson Street 4. Soundview Drive / Grandview Street 1. LOS = Level of Service. Westbound Shared Left-Right B 14.3 B 14.7 Southbound Left-Turn A 8.4 A 8.4 Northbound Left-Turn A 8.3 A 8.3 Eastbound Shared Left-Right C 16.1 C 17.6 Westbound Shared Left-Right - - D 26.9 Northbound Left-Turn A 8.4 A 8.4 Eastbound Shared Left-Thru-Right B 13.8 C 15.6 Westbound Shared Left-Thru-Right D 32.3 D 32.8 Southbound Left-Turn A 8.8 A 8.8 TENW January 23, 2017 Page 19

23 Transportation Impact Analysis Residential Site Access Analysis Weekday PM peak hour LOS and queue analyses were evaluated at the site access driveways based on the methodology outlined in the HCM 2010 Highway Capacity Manual. Table 8 below summarizes the calculated LOS and the 95 th percentile queues at the site access driveways during the PM peak hour. Detailed LOS and queue calculation worksheets are included in Appendix D. Table PM Peak Hour Site Access LOS and Queuing Site Access and Movement LOS 1 3. Soundview Dr / Judson St / Site Dwy Scenario 1 (Senior Housing) Delay (sec/veh) 2 95 th Percentile Queue (ft) 3 LOS 1 Scenario 2 (Condos) Delay (sec/veh) 2 95 th Percentile Queue (ft) 3 Westbound Shared Left-Right D 26.7 < 25 D 26.9 < 25 A. Harborview Dr / North Dwy Northbound Left-Turn A A Eastbound Shared Left-Right A A B. Harborview Dr / North Middle Dwy Northbound Left-Turn A A Eastbound Shared Left-Right A A C. Harborview Dr / South Middle Dwy Northbound Left-Turn A A Eastbound Shared Left-Right A A D. Harborview Dr / South Dwy Northbound Left-Turn A A Eastbound Shared Left-Right A A E. Soundview Dr / South Dwy Northbound Left-Turn B B Westbound Shared Left-Right A A LOS = Level of Service As shown in Table 8, all turn movements at the site access driveways on Harborview Drive are expected to operate at LOS A during the PM peak hour. At the site access on Soundview Drive aligned with Judson Street, only exiting site trips will be allowed; the LOS for exit turns is expected to be LOS D during the PM peak hour. Minimal queuing is anticipated at all site access driveways for both land use scenarios during the PM peak hour. TENW January 23, 2017 Page 20

24 Transportation Impact Analysis Residential Frontage Improvements The proposed residential development will provide frontage improvements and right-of-way dedication along the entire property limits along Harborview Drive and Soundview Drive. Frontage improvements along Soundview Drive include roadway widening, new wider sidewalks, new street and sidewalk lighting, and the addition of on-street public parking. Frontage improvements on Harborview Drive include wider sidewalks, new street and sidewalk lightning, and on-street public parking. Some of the existing parking along Harborview Drive will be replaced with new public street parking on Soundview Drive. The net effect is no loss of public onstreet parking. A public road turnaround will also be created at the eastern end of eês frontage so that public traffic need not continue to the end of the dead-end street to turn around. A new roadway alignment and lane channelization enhancements will also be implemented at the Soundview Drive / Harborview Drive public intersection as shown in the snip below. The revised alignment will enhance traffic and pedestrian safety with better sight lines and reduce crosswalk width, and also preserve on-street public parking. TENW January 23, 2017 Page 21

25 Transportation Impact Analysis Residential MITIGATION To mitigate transportation impacts of the proposed One Harbor Residential development, the following improvements and impact fees are proposed. Frontage Improvements Frontage improvements and right-of-way dedication will be provided along the entire property limits along Harborview Drive and Soundview Drive. Frontage improvements along Soundview Drive include roadway widening, new wider sidewalks, new street and sidewalk lighting, and the addition of on-street public parking. Frontage improvements on Harborview Drive include wider sidewalks, new street and sidewalk lightning, and on-street public parking. Some of the existing parking along Harborview Drive will be replaced with new public street parking on Soundview Drive. The net effect is no loss of public on-street parking. Off-Site Improvements A new roadway alignment and lane channelization enhancements will be implemented at the Soundview Drive / Harborview Drive public intersection to enhance traffic and pedestrian safety with better sight lines and reduce crosswalk width. A public road turnaround will also be created at the eastern end of eês frontage so that public traffic need not continue to the end of the dead-end street to turn around. Transportation Impact Fees The City collects transportation impact fees to help fund needed transportation improvements by the City. The currently adopted transportation impact fee rate of $2,124 per residential unit was used (City of Gig Harbor Municipal Code 19.12). The preliminary transportation impact fee estimate for the proposed project is $74,340 ($2,214 X 35 residential units). TENW January 23, 2017 Page 22

26 Transportation Impact Study Residential Appendix A Existing PM Peak Hour Traffic Count Data

27 Prepared for: TENW Traffic Count Consultants, Inc. Phone: (253) FAX: (253) WBE/DBE Intersection: Harborview Dr/Soundview Dr & Harborview Dr Date of Count: Thurs 11/10/2016 Location: Gig Harbor, Washington Checked By: Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Harborview Dr Soundview Dr Harborview Dr 0 Total Ending at T L S R T L S R T L S R T L S R 4:15 P :30 P :45 P :00 P :15 P :30 P :45 P :00 P :15 P :30 P :45 P :00 P Total Survey Peak Hour: 4:30 PM to 5:30 PM Total Approach %HV 1.7% 1.3% n/a n/a 1.4% PHF n/a 0.94 Harborview Dr Bike Ped Harborview Dr 12 0 Ped Bike Bike 0 0 4:30 PM to 5:30 PM 7 Ped 32 0 PEDs Across: N S E W Ped PHF Peak Hour Volume INT Bike 0 PHF %HV INT EB n/a n/a INT Check WB 0.71 n/a INT In: 643 NB % INT Out: 643 SB % INT Soundview Dr T Int % INT Bicycles From: N S E W Conditions: INT INT 01 0 INT 09 0 INT INT 10 0 INT INT 11 0 INT INT 12 0 INT INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT TENW16124M_01p

28 Prepared for: TENW Traffic Count Consultants, Inc. Phone: (253) FAX: (253) WBE/DBE Intersection: Soundview Dr & Judson St Date of Count: Thurs 11/10/2016 Location: Gig Harbor, Washington Checked By: Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Soundview Dr Soundview Dr 0 Judson St Total Ending at T L S R T L S R T L S R T L S R 4:15 P :30 P :45 P :00 P :15 P :30 P :45 P :00 P :15 P :30 P :45 P :00 P Total Survey Peak Hour: 4:30 PM to 5:30 PM Total Approach %HV 1.7% 0.2% n/a 3.3% 1.2% PHF n/a Soundview Dr Bike Judson St Ped Ped Bike Bike :30 PM to 5:30 PM 0 Ped PEDs Across: N S E W Ped PHF Peak Hour Volume INT Bike 0 PHF %HV INT EB % INT Check WB n/a n/a INT In: 857 NB % INT Out: 857 SB % INT Soundview Dr T Int % INT Bicycles From: N S E W Conditions: INT INT 01 0 INT 09 0 INT INT 10 0 INT INT 11 0 INT INT 12 0 INT INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT TENW16124M_02p

29 Prepared for: TENW Traffic Count Consultants, Inc. Phone: (253) FAX: (253) WBE/DBE Intersection: Soundview Dr & Grandview St Date of Count: Thurs 11/10/2016 Location: Gig Harbor, Washington Checked By: Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Soundview Dr Soundview Dr Grandview St Grandview St Total Ending at T L S R T L S R T L S R T L S R 4:15 P :30 P :45 P :00 P :15 P :30 P :45 P :00 P :15 P :30 P :45 P :00 P Total Survey Peak Hour: 4:30 PM to 5:30 PM Total Approach %HV 0.6% 0.2% n/a n/a 0.3% PHF Soundview Dr Bike Grandview St Ped Grandview St 0 98 Ped Bike Bike :30 PM to 5:30 PM 2 Ped 6 71 PEDs Across: N S E W Ped PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT 02 0 EB 0.78 n/a INT Check WB 0.38 n/a INT In: 1002 NB % INT Out: 1002 SB % INT Soundview Dr T Int % INT 07 0 Bicycles From: N S E W Conditions: INT INT 01 0 INT 09 0 INT INT 10 0 INT INT 11 0 INT INT 12 0 INT INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT TENW16124M_03p

30 Prepared for: TENW Traffic Count Consultants, Inc. Phone: (253) FAX: (253) WBE/DBE Intersection: Harborview Dr & Pioneer Way Date of Count: Thurs 11/10/2016 Location: Gig Harbor, Washington Checked By: Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Harborview Dr Harborview Dr 0 Pioneer Way Total Ending at T L S R T L S R T L S R T L S R 4:15 P :30 P :45 P :00 P :15 P :30 P :45 P :00 P :15 P :30 P :45 P :00 P Total Survey Peak Hour: 4:00 PM to 5:00 PM Total Approach %HV 2.1% 2.2% n/a 0.4% 1.8% PHF n/a Harborview Dr Bike Pioneer Way Ped Ped Bike Bike :00 PM to 5:00 PM 0 Ped 0 49 PEDs Across: N S E W Ped PHF Peak Hour Volume INT Bike 0 PHF %HV INT EB % INT Check WB n/a n/a INT In: 913 NB % INT Out: 913 SB % INT Harborview Dr T Int % INT Bicycles From: N S E W Conditions: INT INT 01 0 INT 09 0 INT INT 10 0 INT INT 11 0 INT 04 0 INT 12 0 INT INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT TENW16124M_04p

31 Transportation Impact Study Residential Appendix B Trip Generation Calculations

32 DAILY Residential - Trip Generation ITE Directional Split 2 Trip Rate 2 Trips Generated Land Use Size Units 1 LUC 2 In Out In Out Total Scenario 1: Senior Adult Housing - Detached 35 DU % 50% eqn Scenario 2: Residential Condominium 35 DU % 50% eqn AM PEAK HOUR Scenario 1: Senior Adult Housing - Detached 35 DU % 65% eqn Scenario 2: Residential Condominium 35 DU % 83% eqn PM PEAK HOUR Scenario 1: Senior Adult Housing - Detached 35 DU % 39% eqn Scenario 2: Residential Condominium 35 DU % 33% eqn Notes: 1. DU = Dwelling Units 2. Land Use Code, trip rates, and entering/exiting splits based on ITE Trip Generat ion Manual, 9th Edition, /19/2016

33 Transportation Impact Study Residential Appendix C City of Gig Harbor Traffic Model Distribution

34 Emily Appleton, P.E. October 27, 2016 Page 4 Figure 1. Site Trip Distribution Citywide

35 Emily Appleton, P.E. October 27, 2016 Page 5 Figure 2. Site Trip Distribution Near Project Site

36 Transportation Impact Study Residential Appendix D Level of Service (LOS) Calculations at Study Intersections

37 2016 Existing Transportation Impact Study Residential

38 Lanes, Volumes, Timings 1: Harborview Dr & Pioneer Way 1/9/2017 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) 1% 1% 2% 2% 2% 2% Shared Lane Traffic (%) Sign Control Stop Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized 2016 Existing - PM Peak Hour

39 HCM 2010 AWSC 1: Harborview Dr & Pioneer Way 1/9/2017 Intersection Intersection Delay, s/veh 12.8 Intersection LOS B Movement EBU EBL EBR NBU NBL NBT SBU SBT SBR Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes Approach EB NB SB Opposing Approach SB NB Opposing Lanes Conflicting Approach Left SB EB Conflicting Lanes Left Conflicting Approach Right NB EB Conflicting Lanes Right HCM Control Delay HCM LOS B B B Lane NBLn1 EBLn1 SBLn1 Vol Left, % 9% 79% 0% Vol Thru, % 91% 0% 52% Vol Right, % 0% 21% 48% Sign Control Stop Stop Stop Traffic Vol by Lane LT Vol Through Vol RT Vol Lane Flow Rate Geometry Grp Degree of Util (X) Departure Headway (Hd) Convergence, Y/N Yes Yes Yes Cap Service Time HCM Lane V/C Ratio HCM Control Delay HCM Lane LOS B B B HCM 95th-tile Q Existing - PM Peak Hour

40 Lanes, Volumes, Timings 2: Soundview Dr & Harborview Dr 1/9/2017 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) Ideal Flow (vphpl) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) 0% 0% 1% 1% 2% 2% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized 2016 Existing - PM Peak Hour

41 HCM 2010 TWSC 2: Soundview Dr & Harborview Dr 1/9/2017 Intersection Int Delay, s/veh 0.9 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A A HCM 95th %tile Q(veh) Existing - PM Peak Hour

42 Lanes, Volumes, Timings 3: Soundview Dr & Judson St 1/9/2017 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) 3% 3% 1% 1% 2% 2% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized 2016 Existing - PM Peak Hour

43 HCM 2010 TWSC 3: Soundview Dr & Judson St 1/9/2017 Intersection Int Delay, s/veh 3.5 Movement EBL EBR NBL NBT SBT SBR Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A - B - - HCM 95th %tile Q(veh) Existing - PM Peak Hour

44 Lanes, Volumes, Timings 4: Soundview Dr & Grandview St 1/9/2017 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 1% 1% 1% 1% 1% 1% Shared Lane Traffic (%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized 2016 Existing - PM Peak Hour

45 HCM 2010 TWSC 4: Soundview Dr & Grandview St 1/9/2017 Intersection Int Delay, s/veh 1.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB NB SB HCM Control Delay, s HCM LOS B D Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A - - B D A A - HCM 95th %tile Q(veh) Existing - PM Peak Hour

46 2018 Future No Action Transportation Impact Study Residential

47 Lanes, Volumes, Timings 1: Harborview Dr & Pioneer Way 1/9/2017 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) 1% 1% 2% 2% 2% 2% Shared Lane Traffic (%) Sign Control Stop Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized 2018 Baseline - PM Peak Hour

48 HCM 2010 AWSC 1: Harborview Dr & Pioneer Way 1/9/2017 Intersection Intersection Delay, s/veh 14.2 Intersection LOS B Movement EBU EBL EBR NBU NBL NBT SBU SBT SBR Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes Approach EB NB SB Opposing Approach SB NB Opposing Lanes Conflicting Approach Left SB EB Conflicting Lanes Left Conflicting Approach Right NB EB Conflicting Lanes Right HCM Control Delay HCM LOS B C B Lane NBLn1 EBLn1 SBLn1 Vol Left, % 9% 79% 0% Vol Thru, % 91% 0% 52% Vol Right, % 0% 21% 48% Sign Control Stop Stop Stop Traffic Vol by Lane LT Vol Through Vol RT Vol Lane Flow Rate Geometry Grp Degree of Util (X) Departure Headway (Hd) Convergence, Y/N Yes Yes Yes Cap Service Time HCM Lane V/C Ratio HCM Control Delay HCM Lane LOS C B B HCM 95th-tile Q Baseline - PM Peak Hour

49 Lanes, Volumes, Timings 2: Soundview Dr & Harborview Dr 1/9/2017 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) Ideal Flow (vphpl) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) 0% 0% 1% 1% 2% 2% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized 2018 Baseline - PM Peak Hour

50 HCM 2010 TWSC 2: Soundview Dr & Harborview Dr 1/9/2017 Intersection Int Delay, s/veh 1 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A A HCM 95th %tile Q(veh) Baseline - PM Peak Hour

51 Lanes, Volumes, Timings 3: Soundview Dr & Judson St 1/9/2017 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) 3% 3% 1% 1% 2% 2% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized 2018 Baseline - PM Peak Hour

52 HCM 2010 TWSC 3: Soundview Dr & Judson St 1/9/2017 Intersection Int Delay, s/veh 3.8 Movement EBL EBR NBL NBT SBT SBR Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB NB SB HCM Control Delay, s HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A - C - - HCM 95th %tile Q(veh) Baseline - PM Peak Hour

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) APPENDICES Appendix T No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) 661 Bear Valley Parkway EIR March 2017 APPENDICES This page intentionally left blank 661 Bear Valley

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes. Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 SCREENING... 1 1.1

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE Roadway Segment Level of Service Definitions LOS V/C Congestion/Delay Traffic Description (Used for surface streets,

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

Date: December 20, Project #:

Date: December 20, Project #: To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS 1 FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction... 3 II. Project Description... 3 III. Existing Conditions... 6 IV. Future Traffic Demand... 10 V. Conclusions and Mitigation...

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey Traffic Impact Study Residences at Bancroft Block 14, Lot 2 April 30, 2018 REVISED: JANUARY 17, 2019 Prepared For 2 Hopkins Lane, LLC 2701 Renaissance Boulevard King of Prussia, PA 19406 Prepared By Maser

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

Tijuana River Valley Regional Park Campground and Education Center

Tijuana River Valley Regional Park Campground and Education Center Tijuana River Valley Regional Park Campground and Education Center Draft Report September 2018 Prepared for: County of San Diego 5500 Overland Avenue, Suite 410 San Diego, CA 92123 Prepared by: 3900 Fifth

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 TO: FROM: Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 RE: Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street,

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

MEMORANDUM November 19, 2012

MEMORANDUM November 19, 2012 COUNCIL OF GOVERNMENTS CENTRAL NAUGATUCK VALLEY 60 NORTH MAIN ST 3RD Floor WATERBURY, CT 06702-1403 (203)757-0535 Web Site: www.cogcnv.org E-Mail: cogcnv@cogcnv.org November 19, 2012 MEMORANDUM 111912

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings TECHNICAL MEMORANDUM Summary of Findings Date: June 17, 2014 Project #: 17121.15 To: Si Lau, P.E.; City of Oakland, CA From: Erin Ferguson, P.E.; Aaron Elias, P.E.; Daphne Dethier; and Mark Bowman, P.E.;

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis Congregate Care Facility Billerica, Massachusetts Prepared For: Hawthorn Development, LLC 35 Kettle Court Salem, OR 973 Prepared By: Sebago Technics, Inc. 75 John Roberts Road,

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation Background and Project Needs SR 104 is functionally classified as a rural-principal arterial. It is a limited

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT 11897-05 TIA Report.docx Prescott Plaza Traffic Impact Analysis This page is intentionally left blank 11897-05

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM TO: Merrimack Valley Metropolitan Planning Organization FROM: James Terlizzi, P.E., Transportation Planning Engineer DATE: March 6, 2017 SUBJECT: Further analysis of the recommendations

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825 TRAFFIC IMPACT ANALYSIS FOR RESIDENCE INN PROJECT Davis, CA Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825 Prepared By: KD Anderson & Associates, Inc. 3853 Taylor Road,

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

HONDA DEALERSHIP LAKE ELSINORE, CALIFORNIA. Prepared by:

HONDA DEALERSHIP LAKE ELSINORE, CALIFORNIA. Prepared by: LOS ANGELES 21 S. Figueroa St, Suite 24 Los Angeles, CA 912 213.337.368 Fax :213.337.3679 ONTARIO 4141 E. Inland Empire Blvd, Suite 25 Ontario, CA 91764 99.481.575 Fax :99.481.5757 SAN DIEGO 6 B St, Suite

More information

Bay Terrace Apartments

Bay Terrace Apartments Bay Terrace Apartments Traffic Impact Analysis Prepared for: City of San Mateo September 16, 2011 Hexagon Office: 111 W. St. John Street, Suite 850 San Jose, CA 95113 Hexagon Job Number: 10MH08 Phone:

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. CastleGlenn Consultants Inc. Engineers, Project Managers & Planners March 11 th, 2013 Domenic Idone, P. Eng Planning Manager R.W. Tomlinson Ltd. 5597 Power Road Ottawa, Ontario K1G 3N4 Dear Mr. Idone:

More information

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure MMM Group Limited Traffic Study CASA MIA Community Care Facility Vancouver, BC Communities Transportation Buildings Infrastructure February 2013 5011001-033 STANDARD LIMITATIONS This report was prepared

More information

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Market Street Road Diet Wilmington, NC 2016 Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Wilmington, NC Parsons Brinckerhoff January 2016 FINAL TECHNICAL REPORT US 17 Corridor

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS Executive Summary... 2 Project Background... 2 Conditions... 2 Findings... 3 Recommendations... 4 Introduction... 6

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information