Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Size: px
Start display at page:

Download "Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering"

Transcription

1 Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands Ranch, CO Professional Traffic Operations Engineer Tele: American Institute of Certified Planners Fax: Mobile: June 17, 2015 Mr. Rob Berry Cadence Capital Investments, LLC 8480 E. Orchard Road Suite 4350 Greenwood Village, CO Re: Traffic Impact Study NEC 136 th / Holly, Thornton, CO Dear Mr. Berry: Aldridge Transportation Consultants (ATC) is pleased to present this traffic impact study regarding the proposed development of the northeast corner of 136 th Ave. and Holly St. in Thornton, Colorado. ATC is professional service firm specializing in traffic engineering and transportation planning. ATC s principal, John M.W. Aldridge, is a Colorado licensed professional engineer and a certified professional traffic operations engineer (PTOE). In the past 20 years, ATC has prepared over 1,000 traffic impact studies, designed over 100 traffic signals, and has provided expert witness testimony on engineering design and access issues on multi-million dollar interchange and highway projects in Kansas and Colorado. We acknowledge that the City of Thornton s review of this study is only for general performance with submittal requirements, current design criteria, and standard engineering principles and practice. We are also aware of the provisions of Section 18 of the City Code of the City of Thornton. ATC appreciates the opportunity to be of service. Please call if you have any questions. We can be reached at Respectfully submitted, Aldridge Transportation Consultants, LLC John M.W. Aldridge, PE, PTOE, AICP Principal

2 Aldridge Transportation Consultants, LLC Page 2 of 12 BACKGROUND INFORMATION This traffic impact study provides an analysis of the traffic impact occasioned by the development of the northeast corner of 136 th and Holly in Thornton, Colorado. The development plan proposes construction of a 3,000 square foot 7-11 store and a future 5,000 square foot retail building on the adjacent property directly to the east. Figure 1 shows the location of the site, adjacent streets and intersection, proposed access locations and type, proposed street improvements including a potential new southbound right turn lane, and restriping to accommodate the access locations. Figure 1 Location and Site Plan

3 Aldridge Transportation Consultants, LLC Page 3 of 12 In compliance with the City of the Thornton Traffic Impact and Access Study Guidelines, Figure 2 presents the 2035 volume forecasts from the City of Thornton Transportation Plan A black arrow on the graphic shows the project location. The volume forecasts for 2035 are 13,000 ADT on Holly St. north and south of 136 th Ave. and 9,000 ADT on the west leg of 136 th Ave. and 11,000 on the east leg. The COT plan indicates that 136 th Ave. will remain a four-lane facility as shown on Figure 13 in the COT plan for the 2035 scenario and that Holly St. will be improved to four-lanes as shown on Figure 13 (in the COT plan) and six-lanes as shown on Figure 15 (in the COT plan) in the ultimate section. Figure 2 - COT Transportation Plan 2035 Volume Forecasts

4 Aldridge Transportation Consultants, LLC Page 4 of 12 GENERAL EXISTING CONDITIONS 136 th Ave. and Holly St. are Major Arterials per the City of Thornton Transportation Plan th Ave. is a four-lane roadway with a painted center median. Holly St. is currently an undivided, two-lane roadway. All approaches include auxiliary turn lanes except on the southbound approach where only a short paved section of approximately 25 feet functions marginally as a right turn lane. The left turn lane on the southbound approach includes 200 feet of storage and a 100-foot taper. Both the left turn lanes on the eastbound and westbound approaches include 275 feet of storage and a 100-foot taper. Both also have an outside left turn lane that is currently striped out that could become a future dual left turn lane. The right turn lane on the eastbound approach is 200 feet long with a 100-foot taper. The right turn lane on the westbound approach is 450 feet long with a 100- foot taper. On the northbound approach, the inside through lane terminates as a left turn lane. The right turn lane is 150 feet long with a 100-foot taper. On the south leg of Holly St., the fullmovement intersection of E. 135 th Pl. is approximately 400 feet south of 136 th Ave. To the east, 136 th Ave. terminates now at Monaco St. but an extension to Quebec St. is under construction and should be open this year. According to 24-hour counts taken on May 6, 2015, on the west leg of 136 th Ave. the current daily volume is 12,283 ADT and 2,179 ADT on the east leg. On the north leg of Holly St., the current daily volume is 8,389 ADT and 11,024 ADT on the south leg. The 24-hour counts are included in the appendix. The intersection of 136 th and Holly was counted for the AM and PM peak hour turning movements also on May 6, Of note, Horizon High School was in session the day the counts were taken. The counts are provided in the appendix. The intersection is traffic signal controlled with protected/permitted left turn phasing on all approaches. The HCM 2010 analysis indicates that the intersection operates at LOS C/C in the AM/PM peak hours, respectively. Pedestrian crossing push buttons and countdown signal heads are located on the signal pole on each corner. These actuate the signal timing to allow a pedestrian time to cross at 3.5 feet per second. Pedestrian crossings are low with one (1) crossing southbound Holly, one (1) crossing northbound Holly, one (1) crossing eastbound 136 th, and two (2) crossing westbound 136 th in the AM peak hour. Similarly, in the PM peak hour, one (1) crossed over northbound Holly and two (2) crossed southbound Holly. Each corner is ADA compliant. In a quarter-mile radius, there are three street intersections, and three high school access points. Two are entry only from 136 th Ave. and there is a access to a parking lot from Holly St. Figure 3 shows the accesses within the quarter mile. The surrounding land use is primarily residential. Horizon High School is west of the site and a regional park is in the southwest quadrant.

5 Aldridge Transportation Consultants, LLC Page 5 of 12 SFD SFD HS student parking lot access Horizon High School Regional Park SFD Figure 3 Adjacent Land Use and Accesses within 1/4 mile DEVELOPMENT SITE CHARACTERISTICS The following table presents the estimated trip generation based on the rates and values in the 9 th Edition of the ITE Trip Generation Manual. The proposed use is a convenience store with gas pumps, ITE Code 853, and general retail, ITE Code 820. The table shows the ADT and the AM and PM peak-hour trip generation.

6 Aldridge Transportation Consultants, LLC Page 6 of 12 Table 1 Trip Generation Trip Generation Worksheet AM PM ITE Code Land Use Unit Quantity ADT In Out In Out 853 Convenience Store KSF with Gasoline Pumps Retail KSF Total Trips The site plan proposes two access locations. On Holly St., a 3/4 movement access is proposed at approximately 330 feet north of 136 th Ave. This study also examines the potential for a fullmovement access at this location. On 136 th Ave., a right in/right out access is proposed approximately 300 feet east of Holly St. Figure 1 shows the location of the accesses and a fully functional right turn lane on the southbound approach Holly St. As included in the analysis of a full-movement on Holly, a right turn lane will be required to be designed and constructed with this development only if the full-movement access is approved. The site trip distribution is based on an assessment of the reasonable origin/destination trip paths to/from the adjacent residential areas and assumes the extension of 136 th Ave. is open. The trip distribution is set at 35 percent to/from the north, 30 percent to/from the south, 20 percent to/from the east, and 15 percent to/from the west. The trip distribution does not change with the 3/4 movement or full-movement access on Holly. The traffic assignment however will change as depicted in Figures 4 & 5. TRAFFIC ASSIGNMENTS AND OFF-SITE TRAFFIC ANALYSIS The following figures show the AM/PM trip assignments for the 2015 and 2035 AM and PM analysis periods. The trip distribution and assignment is the same in both horizons. Generally, for a 7-11, the assignments assume that the majority of traffic will enter and exit in the same direction, left in and left out or right in and right out, (aka a pass-by trip) and that others will return to their origin. With a 3/4 movement on Holly St., to go east, south, or west requires traffic to exit westbound at the right in/right out movement on 136 th Ave. In addition, to go east on 136 th Ave. requires a U-turn at the intersection. Figures 4 and 5 shows the trip distribution and assignment for the full-movement and 3/4 movement scenarios in the 2015 and 2035 AM and PM peak hours.

7 Aldridge Transportation Consultants, LLC Page 7 of 12 Figure 4 Full-Movement 2015 & 2035 AM Peak Hour Assignment Figure 5 3/4 Movement 2015 & 2035 PM Peak Hour Assignment Two future scenarios were examined. The first is an opening day 2015 scenario with the extension of 136 th Ave. to Quebec St. and a fully developed site. The 2015 scenario assumes that the volume on 136 th Ave. east of Holly St. will triple when the extension is complete and operating. The tripling was determined by a review of the traffic shed from developing areas in the southeast quadrant of Monaco St. and 136 th, and on the northeast and southeast quadrants of Quebec St. and 136 th. These

8 Aldridge Transportation Consultants, LLC Page 8 of 12 developments exhibit the same pattern of development currently on the north and south sides of 136 th west of Monaco St. The existing turning movement volumes have been adjusted accordingly to balance the in and out from the east leg of 136 th Ave. Figure 6 illustrates the methodology used to determine the growth factor of three times. Figure 6 Illustration of Methodology to Determine ADT on East Leg of 136 th Ave. The 2035 projected volumes in the Thornton Transportation Plan 2009 indicate that Holly will carry 13,000 ADT both the north and south legs. The volumes show 9,000 ADT on 136 th Ave. west of Holly and 11,000 ADT on the leg east of Holly. However, the west leg on 136 th currently carries 12,283 ADT, which is greater than the plan s 2035 projected volume of 9,000 ADT. Initially, ATC attempted to match the COT forecasts by increasing the applicable PM peak hour turning movement volumes as needed so that the departing movements and the receiving movements on each leg would compute to 10 percent of the COT forecasts. This is Method 1 and is described in more detail on a worksheet in the appendix. The City staff, however, believes that the COT plan 2035 traffic forecasts are too low and directed ATC to use a three percent per annum growth rate. Method 2 determined the 2035 ADT by simply

9 Aldridge Transportation Consultants, LLC Page 9 of 12 applying the three percent per annum growth rate, a 20-year growth factor of 1.8, to each movement in the intersection. This method as described in more detail in the appendix failed to provide credible data. In Method 3, the City staff directed ATC to increase the existing ADT by 3 percent per annum (20- year growth factor of 1.8) on legs with COT plan projections that are lower than those with the 1.8 factor applied. Only the east leg of 136 th Ave. did not require an adjustment. The other three were adjusted accordingly. For the 2035 analysis, the PM peak-hour turning movements were incrementally increased to match as close as possible approximately 10 percent of the daily volume projections. In the figure, the 1.8 GF number is the target volume for the 10 percent determination of the PM peak hour lane volumes, and the Model volumes is the ADT as determined by the lane volumes. Method 3 is described in the appendix and in Figure 7.This method is reasonable and provided credible results. The reported roadway LOS is based on Table 4 in the Thornton Transportation Plan Figure 7 provides a comprehensive depiction of the projected 24-hour volumes (ADT) on each leg. ADT - West Leg 136th Existing 12,283 LOS A COT ,000 LOS A 1.8 GF 22,109 LOS A Model 22,000 LOS A Holly ADT - North Leg Holly Existing 8,389 LOS B COT ,000 LOS A 1.8 GF 15,100 LOS A Model 15,000 LOS A 136th ADT South Leg - Holly Existing 11,024 LOS D COT ,000 LOS A 1.8 GF 19,900 LOS A Model 19,500 LOS A ADT - East Leg 136th Existing 2,179 LOS A COT ,000 LOS A Model 11,000 LOS A Figure 7 Analysis of ADT Based on Method 3 The Thornton Transportation Plan 2009 projects Holly as a four-lane roadway in This was programmed in the analysis, which also assumed some changes to the intersection configuration with dual left turn lanes, and protected left turn signal phasing. OPERATIONS ANALYSIS ATC uses Synchro v.9 for operations analyses. The Synchro methodology is based on the Highway Capacity Manual 2010 (HCM). The Synchro HCM reports are attached for reference. The chart summarizes the existing and forecast LOS (level of service). LOS is letter rating from A to F. LOS A indicates free-flow traffic conditions and no delay at intersections. LOS F is heavy traffic

10 Aldridge Transportation Consultants, LLC Page 10 of 12 congestion with significant delay. LOS is provided for the overall operations at signalized intersections. LOS D is generally the benchmark for acceptable signalized intersection operations during the weekday peak hours. The LOS rating for unsignalized intersections is provided by the critical movement - not the overall - which is generally a left turn from the minor approach. Caution must be used when evaluating the LOS at unsignalized intersections particularly when LOS F is shown. In this case of an LOS F, the HCM 1 suggests that other evaluation measures should be considered such as the volume over capacity ratio and 95 th percentile queue length to make the most effective traffic control decision. LOS F at unsignalized intersections is generally normal for the weekday peak hour when the v/c ratio and the 95 th percentile queue length are acceptable. Table 2 shows the AM/PM peak hour LOS and vehicles seconds of delay for the Existing, Site Generated, and the long-term 2035 AM/PM peak hours. The City staff provided ATC with the controller settings for the signal timing and phasing at the 136 th /Holly intersection. This is a fully actuated signal with protected/permissive left turn phasing on all approaches. The input data to Synchro from the controller settings included the minimum split (min. green, yellow, and red clear), cycle length, observed gap, and passage time. ATC also conformed to the COT requirements such as the protected phase leading, no lead/lag optimization, and walking speed of 3.5 feet per second.. These are typical settings for fully actuated signals and signals with protected/permissive left turn phasing. The City staff, however, requested that the controller settings be adjusted to a minimum split of 15 seconds on the protected left turn phases. The LOS and seconds of delay reflect the 15 second minimum split. Note that the 2035 scenarios are protected only (no permissive) left turn phasing. The Synchro graphics and reports are provided in the appendix. Table 2 LOS Analysis Level of Service Analysis Existing Intersection AM PM AM PM AM PM 136th/Holly - Signalized Background C/26.9 C/25.1 D/36.9 C/25.7 C/31.4 D/ th/Holly - Signalized w/full-movement n/a n/a C/27.3 C/25.5 D/45.3 D/ th/Holly - Signalized w/3/4-movement n/a n/a D/40.3 C/27.9 C/33.6 E/78.7 Holly Access Full- Movement n/a n/a C/16.1 B/13.3 B/12.6 E/43.8 Holly Access 3/4 Movement n/a n/a B/10.4 B/10.0 B/10.2 B/ th RI/RO Access w/full-movement n/a n/a A/9.7 A/8.9 B/10.1 A/ th RI/RO Access w/3/4-movement n/a n/a B/10.0 A/9.1 B/10.4 B/10.1 The HCM analysis shows that the recommended access locations will operate at a high level of service with virtually no multiple vehicular queuing on the left turn out from the Holly St. fullmovement access location. The signalized intersection at 136 th /Holly will operate at an acceptable level of service in the 2015 condition and in 2035 with the expected improvements including the widening of Holly to four-lanes. 1 Highway Capacity Manual 2010 page 19-40

11 Aldridge Transportation Consultants, LLC Page 11 of 12 Neither of the accesses will generate sufficient traffic to consider a traffic signal warrant. Based on Warrant #3 Peak Hour, the left turn out movement would have to be at least 100 vehicles per hour. The highest left turn out volume on the Holly St. access is projected to be 50 vehicles per hour. QUEUING ANALYSIS The following Table 3 presents the 95 th percentile queue lengths in feet (for vehicles divide by 25) for the AM and PM for each of the analysis periods. 2 The queue lengths are from the Synchro model. The lengths shown represent the back of the queue. The blank spaces in the table indicate no or zero queuing. Table 3 95th Percentile Queue Lengths 95th Percentile Queue Summary 136th/Holly Distance from 136th to Holly Access Eastbound Westbound Northbound Southbound Left Thru Right Left Thru Right Left Thru Right Left Thru Right 330 Existing AM Peak Hour Existing PM Peak Hour AM Peak Hour Background # PM Peak Hour Background AM Peak Hour Full Movement PM Peak Hour Full Movement AM Peak Hour 3/4 Movement # # PM Peak Hour 3/4 Movement AM Peak Hour Background PM Peak Hour Background AM Peak Hour Full Movement PM Peak Hour Full Movement AM Peak Hour 3/4 Movement # # PM Peak Hour 3/4 Movement # # Holly Access 2015 AM Peak Hour Full Movement PM Peak Hour Full Movement AM Peak Hour 3/4 Movement PM Peak Hour 3/4 Movement AM Peak Hour Full Movement PM Peak Hour Full Movement AM Peak Hour 3/4 Movement PM Peak Hour 3/4 Movement th RI/RO Access 2015 AM Peak Hour Full Movement PM Peak Hour Full Movement AM Peak Hour 3/4 Movement PM Peak Hour 3/4 Movement AM Peak Hour Full Movement PM Peak Hour Full Movement AM Peak Hour 3/4 Movement PM Peak Hour 3/4 Movement The queue analysis indicates that the left turn out from the Holly St. full-movement access would not have to break into the 95 th percentile queue. The access is 330 feet from 136 th Ave. and the maximum-recorded 95 th percentile queue length on the southbound approach is 204 feet in the 2035 AM peak hour with the new right turn lane. In the 2015 condition, the highest is 196 feet in the PM peak hour. All other queue lengths are well contained within the available and future turn lane storage length. 2 In Synchro, the 95 th percentile queue length is a calculated value after two cycles and may never be observed. It is used primarily to determine the storage length of turn lanes.

12 Aldridge Transportation Consultants, LLC Page 12 of 12 SUMMARY OF REPORT FINDINGS AND RECOMMENDATIONS The analysis herein demonstrates that the proposed access locations and type will function safely and efficiently and within acceptable traffic engineering parameters. The recommendations for access and intersection improvements by the developer are as follows: 1. A 3/4 or full movement access on Holly St. located at approximately 330 feet north of 136 th Ave. This access would include a 250-foot right turn lane (100 foot taper and 150 feet of storage). A similar length left turn in storage lane would be included on the southbound approach. 2. If a full-movement access on Holly St. is permitted, then on the southbound approach to 136 th Ave., the developer (not the City) will construct an exclusive right turn lane with 200 feet of storage and a 100-foot taper. This would be constructed concurrently with the access. 3. A right in / right out on 136 th Ave. approximately 300 feet east of Holly St. The existing tangent section on the right turn lane at Holly extends back from the access approximately 200 feet to a 125 foot taper. No further improvement to this lane is necessary. 4. When Holly St. is widened to four-lanes (by others), dual left turn lanes should be added to all approaches. In addition, the left turn phasing should be protected only on all approaches. 5. The westbound left turn at the full-movement access on Holly St. will operate at LOS E (43.8 seconds of delay) in the 2035 PM peak hour. However, the 95 th percentile queue length is less than one full vehicle. Under these circumstances, this a considered normal in an urban environment and there is no practical way to improve the delay. In conclusion, this study finds that the site-generated traffic from the site will blend harmoniously with the existing and future traffic on the adjacent streets and intersection provided the above recommendations on access, and future intersection improvements are deployed. We appreciate the opportunity to be of service. Should you have any questions or concerns, please call me at Respectfully submitted, Aldridge Transportation Consultants, LLC John M.W. Aldridge, PE, PTOE, AICP Principal

13 Three methods to determine 2035 ADT and PM Peak Hour Movement Volumes Method One - Used the 2035 COT forecast volumes on north, south, and east legs. Revised west leg to be consistent. SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL PM EX. #/LANE % Growth 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% # YRS SITE GENERATED LANE VOLUME #/LEG TOTAL 3111 % APPROACH 27% 65% 8% 10% 56% 34% 18% 43% 39% 47% 32% 21% % (LEG/TOTAL) Lane Vol. x % % % % Approach Leg Approach Vol. NORTH 6750 EAST 4440 SOUTH WEST 9060 ADT on Leg Existing Target TBD Results are not credible and inconsistent with staff's direction Method Two - ADT computed by a 3% per annum increase of each 2015 PM turning volume SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL PM EX. #/LANE % Growth 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% # YRS SITE GENERATED LANE VOLUME #/LEG TOTAL 3347 % APPROACH 51% 40% 9% 6% 42% 52% 27% 18% 55% 57% 23% 20% % (LEG/TOTAL) Lane Vol. x % % % % Approach Leg Approach Vol. NORTH 5178 EAST 5122 SOUTH WEST ADT on Leg Results are not credible - unbalanced. Method Three ADT first determined by increasing the existing ADT by a growth factor of 1.8. If the forecast volume exceeds the 2035 COT then it was used. If not, then the COT projection was used. SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL PM EX. #/LANE % Growth 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% # YRS SITE GENERATED LANE VOLUME #/LEG TOTAL 3375 % APPROACH 43% 43% 14% 22% 44% 33% 18% 37% 45% 43% 29% 27% % (LEG/TOTAL) Lane Vol. x % % % % Approach Leg Approach Vol. NORTH 8000 EAST 4750 SOUTH WEST ADT on Leg Existing Target Results are credible and consistent with staff's direction.

14 136th/Holly Existing AM Peak Hour th Holly JMWA 5/22/2015 Aldridge Transportation Consultants, LLC

15 136/Holly Existing AM Peak Hour 3: Holly & 136th 6/14/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ATC Synchro 9 jmwa Page 1

16 136/Holly Existing AM Peak Hour 3: Holly & 136th 6/14/2015 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS C C D C C C C B B C C Approach Vol, veh/h Approach Delay, s/veh Approach LOS D C B C Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 26.9 HCM 2010 LOS C ATC Synchro 9 jmwa Page 2

17 136/Holly Existing AM Peak Hour 3: Holly & 136th 6/14/2015 Phase Number Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None None None None None None None None Maximum Split (s) Maximum Split (%) 7.8% 24.3% 38.3% 29.6% 7.8% 24.3% 7.8% 60.0% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max No No No No No No No No Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 115 Control Type Actuated-Uncoordinated Natural Cycle 75 Splits and Phases: 3: Holly & 136th ATC Synchro 9 jmwa Page 3

18 Holly 136th/Holly Existing PM Peak Hour th JMWA 5/22/2015 Aldridge Transportation Consultants, LLC

19 136/Holly Existing PM Peak Hour 3: Holly & 136th 6/14/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ATC Synchro 8 Light Report jmwa Page 1

20 136/Holly Existing PM Peak Hour 3: Holly & 136th 6/14/2015 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS B B D B B B B B B C C Approach Vol, veh/h Approach Delay, s/veh Approach LOS C B B C Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 25.1 HCM 2010 LOS C ATC Synchro 8 Light Report jmwa Page 2

21 136/Holly Existing PM Peak Hour 3: Holly & 136th 6/14/2015 Phase Number Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None Min None None None Min None None Maximum Split (s) Maximum Split (%) 8.2% 39.1% 30.9% 21.8% 9.1% 38.2% 8.2% 44.5% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max No No No No No No No No Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 110 Control Type Actuated-Uncoordinated Natural Cycle 60 Splits and Phases: 3: Holly & 136th ATC Synchro 8 Light Report jmwa Page 3

22 136th/Holly 2015 AM Background th Holly JMWA 5/24/2015 Aldridge Transportation Consultants, LLC

23 136/Holly 2015 AM Peak Hour Background 3: Holly & 136th 6/17/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) #329 Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ATC Synchro 9 jmwa Page 1

24 136/Holly 2015 AM Peak Hour Background 3: Holly & 136th 6/17/2015 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS C C E C C C C B B C D Approach Vol, veh/h Approach Delay, s/veh Approach LOS E C C D Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 36.9 HCM 2010 LOS D ATC Synchro 9 jmwa Page 2

25 136/Holly 2015 AM Peak Hour Background 3: Holly & 136th 6/17/2015 Phase Number Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None None None None None None None None Maximum Split (s) Maximum Split (%) 13.0% 21.7% 37.4% 27.8% 13.0% 21.7% 13.0% 52.2% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max No No No No No No No No Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 115 Control Type Actuated-Uncoordinated Natural Cycle 90 Splits and Phases: 3: Holly & 136th ATC Synchro 9 jmwa Page 3

26 136th/Holly 2015 AM Peak Hour 3/4 Movement Holly Holly FM th Holly JMWA 5/22/2015 Aldridge Transportation Consultants, LLC

27 136th/Holly 2015 AM Peak Hour w 3/4 Movement 3: Holly & 136th 6/17/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) # #356 Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ATC Queues jmwa Page 1

28 136th/Holly 2015 AM Peak Hour w 3/4 Movement 3: Holly & 136th 6/17/2015 Movement EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS C C F C C C D B B C Approach Vol, veh/h Approach Delay, s/veh Approach LOS E C C D Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 40.3 HCM 2010 LOS D Notes ATC HCM 2010 Signalized Intersection Summary jmwa Page 2

29 136th/Holly 2015 AM Peak Hour w 3/4 Movement 3: Holly & 136th 6/17/2015 Movement SBR Lane Configurations Traffic Volume (veh/h) 129 Future Volume (veh/h) 129 Number 14 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Adj Sat Flow, veh/h/ln 1900 Adj Flow Rate, veh/h 140 Adj No. of Lanes 0 Peak Hour Factor 0.92 Percent Heavy Veh, % 2 Cap, veh/h 162 Arrive On Green 0.23 Sat Flow, veh/h 692 Grp Volume(v), veh/h 352 Grp Sat Flow(s),veh/h/ln 1739 Q Serve(g_s), s 19.4 Cycle Q Clear(g_c), s 19.4 Prop In Lane 0.40 Lane Grp Cap(c), veh/h 408 V/C Ratio(X) 0.86 Avail Cap(c_a), veh/h 488 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 36.6 Incr Delay (d2), s/veh 12.8 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(50%),veh/ln 10.7 LnGrp Delay(d),s/veh 49.4 LnGrp LOS D Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer ATC HCM 2010 Signalized Intersection Summary jmwa Page 3

30 136th/Holly 2015 AM Peak Hour w 3/4 Movement 3: Holly & 136th 6/17/2015 Phase Number Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None None None None None None None None Maximum Split (s) Maximum Split (%) 13.0% 21.7% 36.5% 28.7% 13.0% 21.7% 13.0% 52.2% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max No No No No No No No No Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 115 Control Type Actuated-Uncoordinated Natural Cycle 90 Splits and Phases: 3: Holly & 136th ATC Timing Report, Sorted By Phase jmwa Page 6

31 136th/Holly 2015 AM Peak Hour w 3/4 Movement 6: Holly FM & Holly 6/17/2015 Intersection Int Delay, s/veh 0.5 Movement WBL WBR NBT NBR SBL SBT Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A - HCM 95th %tile Q(veh) ATC HCM 2010 TWSC jmwa Page 7

32 136th/Holly 2015 AM Peak Hour w 3/4 Movement 8: 136th RI/RO 6/17/2015 Intersection Int Delay, s/veh 0.8 Movement EBL EBT WBT WBR SBL SBR Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A B HCM 95th %tile Q(veh) ATC HCM 2010 TWSC jmwa Page 8

33 136th/Holly 2015 AM Peak Hour Full-Movement Holly Holly FM th Holly JMWA 5/22/2015 Aldridge Transportation Consultants, LLC

34 136th/Holly 2015 AM Peak Hour w Full-Movement 3: Holly & 136th 6/17/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ATC Synchro 9.1 jmwa Page 1

35 136th/Holly 2015 AM Peak Hour w Full-Movement 3: Holly & 136th 6/17/2015 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS C C D C C C C B B C D C Approach Vol, veh/h Approach Delay, s/veh Approach LOS D C C C Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 27.3 HCM 2010 LOS C ATC Synchro 9.1 jmwa Page 2

36 136th/Holly 2015 AM Peak Hour w Full-Movement 3: Holly & 136th 6/17/2015 Phase Number Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None None None None None None None None Maximum Split (s) Maximum Split (%) 13.0% 25.2% 38.3% 23.5% 13.0% 25.2% 13.0% 48.7% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max No No No No No No No No Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 115 Control Type Actuated-Uncoordinated Natural Cycle 80 Splits and Phases: 3: Holly & 136th ATC Synchro 9.1 jmwa Page 4

37 136th/Holly 2015 AM Peak Hour w Full-Movement 6: Holly FM & Holly 6/17/2015 Intersection Int Delay, s/veh 1.7 Movement WBL WBR NBT NBR SBL SBT Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - C B A - HCM 95th %tile Q(veh) ATC Synchro 9.1 jmwa Page 5

38 136th/Holly 2015 AM Peak Hour w Full-Movement 8: 136th RI/RO 6/17/2015 Intersection Int Delay, s/veh 0.2 Movement EBL EBT WBT WBR SBL SBR Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A A HCM 95th %tile Q(veh) ATC Synchro 9.1 jmwa Page 6

39 Holly 136th/Holly 2015 PM Peak Hour Background th JMWA 5/24/2015 Aldridge Transportation Consultants, LLC

40 136/Holly 2015 PM Peak Hour Background 3: Holly & 136th 6/17/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ATC Synchro 9.1 jmwa Page 1

41 136/Holly 2015 PM Peak Hour Background 3: Holly & 136th 6/17/2015 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS B B D B C B C B B C C Approach Vol, veh/h Approach Delay, s/veh Approach LOS C B C C Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 25.7 HCM 2010 LOS C ATC Synchro 9.1 jmwa Page 2

42 136/Holly 2015 PM Peak Hour Background 3: Holly & 136th 6/17/2015 Phase Number Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None None None None None None None None Maximum Split (s) Maximum Split (%) 13.0% 37.4% 29.6% 20.0% 13.0% 37.4% 13.0% 36.5% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max No No No No No No No No Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 115 Control Type Actuated-Uncoordinated Natural Cycle 75 Splits and Phases: 3: Holly & 136th ATC Synchro 9.1 jmwa Page 3

43 136th/Holly 2015 PM Peak Hour 3/4 Movement Holly Holly FM th Holly JMWA 5/22/2015 Aldridge Transportation Consultants, LLC

44 136th/Holly 2015 PM Peak Hour w 3/4 Movement 3: Holly & 136th 6/17/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ATC Synchro 9.1 jmwa Page 1

45 136th/Holly 2015 PM Peak Hour w 3/4 Movement 3: Holly & 136th 6/17/2015 Movement EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS B C D B C C C B C C Approach Vol, veh/h Approach Delay, s/veh Approach LOS C B C D Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 27.9 HCM 2010 LOS C Notes ATC Synchro 9.1 jmwa Page 2

46 136th/Holly 2015 PM Peak Hour w 3/4 Movement 3: Holly & 136th 6/17/2015 Movement SBR Lane Configurations Traffic Volume (veh/h) 104 Future Volume (veh/h) 104 Number 14 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Adj Sat Flow, veh/h/ln 1900 Adj Flow Rate, veh/h 113 Adj No. of Lanes 0 Peak Hour Factor 0.92 Percent Heavy Veh, % 2 Cap, veh/h 155 Arrive On Green 0.17 Sat Flow, veh/h 906 Grp Volume(v), veh/h 212 Grp Sat Flow(s),veh/h/ln 1699 Q Serve(g_s), s 10.3 Cycle Q Clear(g_c), s 10.3 Prop In Lane 0.53 Lane Grp Cap(c), veh/h 291 V/C Ratio(X) 0.73 Avail Cap(c_a), veh/h 408 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 34.3 Incr Delay (d2), s/veh 3.9 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(50%),veh/ln 5.1 LnGrp Delay(d),s/veh 38.2 LnGrp LOS D Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer ATC Synchro 9.1 jmwa Page 3

47 136th/Holly 2015 PM Peak Hour w 3/4 Movement 3: Holly & 136th 6/17/2015 Phase Number Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None None None None None None None None Maximum Split (s) Maximum Split (%) 13.0% 34.8% 29.6% 22.6% 13.0% 34.8% 13.0% 39.1% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max No No No No No No No No Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 115 Control Type Actuated-Uncoordinated Natural Cycle 75 Splits and Phases: 3: Holly & 136th ATC Synchro 9.1 jmwa Page 6

48 136th/Holly 2015 PM Peak Hour w 3/4 Movement 6: Holly FM & Holly 6/17/2015 Intersection Int Delay, s/veh 1.1 Movement WBL WBR NBT NBR SBL SBT Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A - HCM 95th %tile Q(veh) ATC Synchro 9.1 jmwa Page 7

49 136th/Holly 2015 PM Peak Hour w 3/4 Movement 8: 136th RI/RO 6/17/2015 Intersection Int Delay, s/veh 0.8 Movement EBL EBT WBT WBR SBL SBR Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A A HCM 95th %tile Q(veh) ATC Synchro 9.1 jmwa Page 8

50 136th/Holly 2015 PM Peak Hour Full Movement Holly Holly FM th Holly JMWA 5/23/2015 Aldridge Transportation Consultants, LLC

51 136th/Holly 2015 PM Peak Hour w Full-Movement 3: Holly & 136th 6/17/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ATC Synchro 9.1 jmwa Page 1

52 136th/Holly 2015 PM Peak Hour w Full-Movement 3: Holly & 136th 6/17/2015 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS B B D B C C C B C C C C Approach Vol, veh/h Approach Delay, s/veh Approach LOS C B C C Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 25.5 HCM 2010 LOS C ATC Synchro 9.1 jmwa Page 2

53 136th/Holly 2015 PM Peak Hour w Full-Movement 3: Holly & 136th 6/17/2015 Phase Number Movement WBL EBTL NBL SBTL EBL WBTL SBL NBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None None None None None None None None Maximum Split (s) Maximum Split (%) 13.0% 38.3% 30.4% 18.3% 13.0% 38.3% 13.0% 35.7% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max No No No No No No No No Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 115 Control Type Actuated-Uncoordinated Natural Cycle 75 Splits and Phases: 3: Holly & 136th ATC Synchro 9.1 jmwa Page 4

54 136th/Holly 2015 PM Peak Hour w Full-Movement 6: Holly FM & Holly 6/17/2015 Intersection Int Delay, s/veh 2.3 Movement WBL WBR NBT NBR SBL SBT Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A A - HCM 95th %tile Q(veh) ATC Synchro 9.1 jmwa Page 5

55 136th/Holly 2015 PM Peak Hour w Full-Movement 8: 136th RI/RO 6/17/2015 Intersection Int Delay, s/veh 0.2 Movement EBL EBT WBT WBR SBL SBR Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A A HCM 95th %tile Q(veh) ATC Synchro 9.1 jmwa Page 6

56 136th/Holly 2035 AM Peak Hour Background th 136th Holly Holly JMWA 5/24/2015 Aldridge Transportation Consultants, LLC

57 136/Holly 2035 AM Peak Hour Background 3: Holly & 136th 6/14/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ATC Syncrho 9.1 jmwa Page 1

58 136/Holly 2035 AM Peak Hour Background 3: Holly & 136th 6/14/2015 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS E C C E C C D C C E D E Approach Vol, veh/h Approach Delay, s/veh Approach LOS D D D E Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 44.1 HCM 2010 LOS D ATC Syncrho 9.1 jmwa Page 2

59 136th/Holly 2035 AM Peak Hour w/ 3/4 Movement Holly 530 Holly Holly 3/4 136th JMWA 6/14/2015 Aldridge Transportation Consultants, LLC

60 136/Holly 2035 AM Peak Hour w/ 3/4 Movement 3: Holly & 136th 6/14/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) ~ Queue Length 95th (ft) # # Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ATC Synchro 9 jmwa Page 1

61 136/Holly 2035 AM Peak Hour w/ 3/4 Movement 3: Holly & 136th 6/14/2015 Phase Number Movement WBL EBT NBL SBT EBL WBT SBL NBT Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None C-Max None None None C-Max None None Maximum Split (s) Maximum Split (%) 39.2% 21.3% 21.7% 17.8% 15.8% 44.7% 9.2% 30.3% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max No No No No No No No No Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 65 Offset: 47 (39%), Referenced to phase 2:EBT and 6:WBT, Start of Green Splits and Phases: 3: Holly & 136th ATC Synchro 9 jmwa Page 4

62 136/Holly 2035 AM Peak Hour w/ 3/4 Movement 6: Holly 3/4 & Holly 6/14/2015 Intersection Int Delay, s/veh 0.3 Movement WBL WBR NBT NBR SBL SBT Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A - HCM 95th %tile Q(veh) ATC Synchro 9 jmwa Page 5

63 136/Holly 2035 AM Peak Hour w/ 3/4 Movement 8: 136th RI/RO 6/14/2015 Intersection Int Delay, s/veh 0.6 Movement EBL EBT WBT WBR SBL SBR Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A B HCM 95th %tile Q(veh) ATC Synchro 9 jmwa Page 6

64 136th/Holly 2035 AM Peak Hour w/ Full Movement Holly Holly FM 136th 136th Holly Holly JMWA 6/14/2015 Aldridge Transportation Consultants, LLC

65 136/Holly 2035 AM Peak Hour w/ Full Movement 3: Holly & 136th 6/14/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ATC Syncrho 9.1 jmwa Page 1

66 136/Holly 2035 AM Peak Hour w/ Full Movement 3: Holly & 136th 6/14/2015 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS E C C E C C D C C E D E Approach Vol, veh/h Approach Delay, s/veh Approach LOS D D D E Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 45.3 HCM 2010 LOS D ATC Syncrho 9.1 jmwa Page 2

67 136/Holly 2035 AM Peak Hour w/ Full Movement 3: Holly & 136th 6/14/2015 Phase Number Movement WBL EBT NBL SBT EBL WBT SBL NBT Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None C-Max None None None C-Max None None Maximum Split (s) Maximum Split (%) 11.7% 34.2% 29.2% 25.0% 16.7% 29.2% 9.2% 45.0% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max No No No No No No No No Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 65 Offset: 20 (17%), Referenced to phase 2:EBT and 6:WBT, Start of Green Splits and Phases: 3: Holly & 136th ATC Syncrho 9.1 jmwa Page 4

68 136/Holly 2035 AM Peak Hour w/ Full Movement 6: Holly FM & Holly 6/14/2015 Intersection Int Delay, s/veh 1.3 Movement WBL WBR NBT NBR SBL SBT Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - C B A - HCM 95th %tile Q(veh) ATC Syncrho 9.1 jmwa Page 5

69 136/Holly 2035 AM Peak Hour w/ Full Movement 8: 136th RI/RO 6/14/2015 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A B HCM 95th %tile Q(veh) ATC Syncrho 9.1 jmwa Page 6

70 136th/Holly 2035 PM Peak Background Holly th Holly JMWA 5/24/2015 Aldridge Transportation Consultants, LLC

71 136/Holly 2035 PM Peak Hour Background 3: Holly & 136th 6/14/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ATC Synchro 9.1 jmwa Page 1

72 136/Holly 2035 PM Peak Hour Background 3: Holly & 136th 6/14/2015 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS E C D E C C E C C E D F Approach Vol, veh/h Approach Delay, s/veh Approach LOS D D D E Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 48.1 HCM 2010 LOS D Notes ATC Synchro 9.1 jmwa Page 2

73 136th/Holly 2035 PM Peak Hour w/ 3/4 Movement Holly 760 Holly Holly 3/4 136th JMWA 6/14/2015 Aldridge Transportation Consultants, LLC

74 136/Holly 2035 PM Peak Hour w 3/4 Movement 3: Holly & 136th 6/14/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) ~ ~ Queue Length 95th (ft) # # Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ATC Synchro 9.1 jmwa Page 1

75 136/Holly 2035 PM Peak Hour w 3/4 Movement 3: Holly & 136th 6/14/2015 Movement EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS E B C E B B F D D E E Approach Vol, veh/h Approach Delay, s/veh Approach LOS C C F F Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 78.7 HCM 2010 LOS E Notes ATC Synchro 9.1 jmwa Page 2

76 136/Holly 2035 PM Peak Hour w 3/4 Movement 3: Holly & 136th 6/14/2015 Movement SBR Lane Configurations Traffic Volume (veh/h) 300 Future Volume (veh/h) 300 Number 14 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Adj Sat Flow, veh/h/ln 1863 Adj Flow Rate, veh/h 326 Adj No. of Lanes 1 Peak Hour Factor 0.92 Percent Heavy Veh, % 2 Cap, veh/h 205 Arrive On Green 0.13 Sat Flow, veh/h 1583 Grp Volume(v), veh/h 326 Grp Sat Flow(s),veh/h/ln 1583 Q Serve(g_s), s 15.5 Cycle Q Clear(g_c), s 15.5 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 205 V/C Ratio(X) 1.59 Avail Cap(c_a), veh/h 205 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 52.3 Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(50%),veh/ln 23.2 LnGrp Delay(d),s/veh LnGrp LOS F Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer ATC Synchro 9.1 jmwa Page 3

77 136/Holly 2035 PM Peak Hour w 3/4 Movement 3: Holly & 136th 6/14/2015 Phase Number Movement WBL EBT NBL SBT EBL WBT SBL NBT Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None C-Max None None None C-Max None None Maximum Split (s) Maximum Split (%) 42.5% 25.4% 15.0% 17.1% 20.0% 47.9% 9.2% 22.9% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 75 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Splits and Phases: 3: Holly & 136th ATC Synchro 9.1 jmwa Page 6

78 136/Holly 2035 PM Peak Hour w 3/4 Movement 6: Holly 3/4 & Holly 6/14/2015 Intersection Int Delay, s/veh 0.4 Movement WBL WBR NBT NBR SBL SBT Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A - HCM 95th %tile Q(veh) ATC Synchro 9.1 jmwa Page 7

79 136/Holly 2035 PM Peak Hour w 3/4 Movement 8: 136th RI/RO 6/14/2015 Intersection Int Delay, s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A B HCM 95th %tile Q(veh) ATC Synchro 9.1 jmwa Page 8

80 136th/Holly 2035 PM Peak Hour w/ Full Movement Holly 760 Holly Holly FM 136th JMWA 6/14/2015 Aldridge Transportation Consultants, LLC

81 136/Holly 2035 PM Peak Hour w Full Movement 3: Holly & 136th 6/14/2015 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary ATC Synchro 9.1 jmwa Page 1

82 136/Holly 2035 PM Peak Hour w Full Movement 3: Holly & 136th 6/14/2015 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(50%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS E C D E C C E C C E D F Approach Vol, veh/h Approach Delay, s/veh Approach LOS D D D E Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 2010 Ctrl Delay 49.8 HCM 2010 LOS D Notes ATC Synchro 9.1 jmwa Page 2

83 136/Holly 2035 PM Peak Hour w Full Movement 3: Holly & 136th 6/14/2015 Phase Number Movement WBL EBT NBL SBT EBL WBT SBL NBT Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None C-Max None None None C-Max None None Maximum Split (s) Maximum Split (%) 11.7% 42.3% 22.5% 23.5% 20.0% 34.0% 10.0% 36.0% Minimum Split (s) Yellow Time (s) All-Red Time (s) Minimum Initial (s) Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Walk Time (s) Flash Dont Walk (s) Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) End Time (s) Yield/Force Off (s) Yield/Force Off 170(s) Local Start Time (s) Local Yield (s) Local Yield 170(s) Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 70 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Splits and Phases: 3: Holly & 136th ATC Synchro 9.1 jmwa Page 5

84 136/Holly 2035 PM Peak Hour w Full Movement 6: Holly FM & Holly 6/14/2015 Intersection Int Delay, s/veh 1.1 Movement WBL WBR NBT NBR SBL SBT Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - C B A - HCM 95th %tile Q(veh) ATC Synchro 9.1 jmwa Page 6

85 136/Holly 2035 PM Peak Hour w Full Movement 8: 136th RI/RO 6/14/2015 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A A HCM 95th %tile Q(veh) ATC Synchro 9.1 jmwa Page 7

86 All Traffic Data Services,Inc W 44th Ave Wheat Ridge,CO File Name : #1 HOLLY&136THAM Site Code : Start Date : 10/29/2014 Page No : 1 HOLLY ST Southbound 136TH AVE Westbound Groups Printed- Class 1 HOLLY ST Northbound 136TH AVE Eastbound Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total Grand Total Apprch % Total % HOLLY ST Out In Total Right 391 Thru 6 Left 7 Peds 136TH AVE Out In Total Left 39 Thru 434 Right 6 Peds 10/29/ :00 AM 10/29/ :45 AM Class 1 North Right Thru Left Peds Out In Total TH AVE Left 712 Thru 440 Right 52 Peds Out In Total HOLLY ST

87 All Traffic Data Services,Inc W 44th Ave Wheat Ridge,CO HOLLY ST Southbound 136TH AVE Westbound HOLLY ST Northbound File Name : #1 HOLLY&136THAM Site Code : Start Date : 10/29/2014 Page No : 2 136TH AVE Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 AM 07:00 AM :15 AM :30 AM :45 AM Total Volume % App. Total PHF HOLLY ST Out In Total Right 225 Thru 3 Left 2 Peds Peak Hour Data 136TH AVE Out In Total Left 15 Thru 264 Right 4 Peds Peak Hour Begins at 07:00 AM Class 1 North Right Thru Left Peds Out In Total TH AVE Left 472 Thru 289 Right 23 Peds Out In Total HOLLY ST

88 All Traffic Data Services,Inc W 44th Ave Wheat Ridge,CO File Name : #1 HOLLY&136THPM Site Code : Start Date : 10/29/2014 Page No : 1 HOLLY ST Southbound 136TH AVE Westbound Groups Printed- Class 1 HOLLY ST Northbound 136TH AVE Eastbound Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % HOLLY ST Out In Total Right 413 Thru 13 Left 4 Peds 136TH AVE Out In Total Left 152 Thru 899 Right 5 Peds 10/29/ :00 PM 10/29/ :45 PM Class 1 North Right Thru Left Peds Out In Total TH AVE Left 734 Thru 352 Right 102 Peds Out In Total HOLLY ST

89 All Traffic Data Services,Inc W 44th Ave Wheat Ridge,CO HOLLY ST Southbound 136TH AVE Westbound HOLLY ST Northbound File Name : #1 HOLLY&136THPM Site Code : Start Date : 10/29/2014 Page No : 2 136TH AVE Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF HOLLY ST Out In Total Right 216 Thru 5 Left 4 Peds Peak Hour Data 136TH AVE Out In Total Left 82 Thru 518 Right 3 Peds Peak Hour Begins at 05:00 PM Class 1 North Right Thru Left Peds Out In Total TH AVE Left 377 Thru 185 Right 57 Peds Out In Total HOLLY ST

90 All Traffic Data Services, Inc 9660 W 44th Ave Wheat Ridge,CO Page 1 Site Code: 1 Station ID: 1 HOLLY N/O 136TH Start 06-May-1 Time Wed NB SB Total 12:00 AM : : : : : : : : : : : :00 PM : : : : : : : : : : : Total Percent 52.2% 47.8% AM Peak - 07:00 07: :00 Vol PM Peak - 15:00 17: :00 Vol Grand Total Percent 52.2% 47.8% ADT ADT 8,389 AADT 8,389

91 All Traffic Data Services, Inc 9660 W 44th Ave Wheat Ridge,CO Page 1 Site Code: 2 Station ID: 2 136TH E/O HOLLY Start 06-May-1 Time Wed EB WB Total 12:00 AM : : : : : : : : : : : :00 PM : : : : : : : : : : : Total Percent 50.1% 49.9% AM Peak - 08:00 07: :00 Vol PM Peak - 17:00 14: :00 Vol Grand Total Percent 50.1% 49.9% ADT ADT 2,179 AADT 2,179

92 All Traffic Data Services, Inc 9660 W 44th Ave Wheat Ridge,CO Page 1 Site Code: 3 Station ID: 3 HOLLY S/O 136TH Start 06-May-1 Time Wed NB SB Total 12:00 AM : : : : : : : : : : : :00 PM : : : : : : : : : : : Total Percent 50.3% 49.7% AM Peak - 07:00 07: :00 Vol PM Peak - 17:00 15: :00 Vol Grand Total Percent 50.3% 49.7% ADT ADT 11,024 AADT 11,024

93 All Traffic Data Services, Inc 9660 W 44th Ave Wheat Ridge,CO Page 1 Site Code: 4 Station ID: 4 136TH W/O HOLLY Start 06-May-1 Time Wed WB EB Total 12:00 AM : : : : : : : : : : : :00 PM : : : : : : : : : : : Total Percent 50.7% 49.3% AM Peak - 07:00 07: :00 Vol PM Peak - 17:00 18: :00 Vol Grand Total Percent 50.7% 49.3% ADT ADT 12,283 AADT 12,283

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated)

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated) MEMORANDUM Date: May 26, 2016 To: From: Subject: Debbie Bent and Kris Overleese, City of Kenmore Kendra Breiland and Sarah Keenan, Fehr & Peers Saint Edward Ballfields Traffic and Parking Analysis (Updated)

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE Roadway Segment Level of Service Definitions LOS V/C Congestion/Delay Traffic Description (Used for surface streets,

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM TO: Merrimack Valley Metropolitan Planning Organization FROM: James Terlizzi, P.E., Transportation Planning Engineer DATE: March 6, 2017 SUBJECT: Further analysis of the recommendations

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA (St. Tammany Parish Mandeville, LA) Prepared For The Pittman Companies Michael N Pittman, MD 328 East Boston St Covington, LA 70433

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation Background and Project Needs SR 104 is functionally classified as a rural-principal arterial. It is a limited

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

1 st Street Intersection Study

1 st Street Intersection Study TRAFFIC ENGINEERING ASSISTANCE PROGRAM 1 st Street Intersection Study Prepared for: City of Independence In Cooperation With: Iowa Department of Transportation & Iowa Department of Public Safety Governor

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825 TRAFFIC IMPACT ANALYSIS FOR RESIDENCE INN PROJECT Davis, CA Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825 Prepared By: KD Anderson & Associates, Inc. 3853 Taylor Road,

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Date: December 20, Project #:

Date: December 20, Project #: To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

Appendix E: Emission Reduction Calculations

Appendix E: Emission Reduction Calculations Derr Road and Home Road Conversion Feasibility Study Springfield, OH Appendix E: Emission Reduction Calculations Derr Road and Home Road Conversion Feasibility Study Springfield, OH Emission Reduction

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) APPENDICES Appendix T No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) 661 Bear Valley Parkway EIR March 2017 APPENDICES This page intentionally left blank 661 Bear Valley

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT 11897-05 TIA Report.docx Prescott Plaza Traffic Impact Analysis This page is intentionally left blank 11897-05

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

HONDA DEALERSHIP LAKE ELSINORE, CALIFORNIA. Prepared by:

HONDA DEALERSHIP LAKE ELSINORE, CALIFORNIA. Prepared by: LOS ANGELES 21 S. Figueroa St, Suite 24 Los Angeles, CA 912 213.337.368 Fax :213.337.3679 ONTARIO 4141 E. Inland Empire Blvd, Suite 25 Ontario, CA 91764 99.481.575 Fax :99.481.5757 SAN DIEGO 6 B St, Suite

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

FORT MYERS CITY COUNCIL OSCAR M. CORBIN, JR. CITY HALL, 2200 SECOND STREET FORT MYERS, FLORIDA

FORT MYERS CITY COUNCIL OSCAR M. CORBIN, JR. CITY HALL, 2200 SECOND STREET FORT MYERS, FLORIDA Agenda City Council Special Mee ng March 18, 2019 1:00 PM Historic Preserva on Commission Appeal - Virginia Avenue/ McGregor Boulevard Roundabout MAYOR Randall P. Henderson, Jr. Ward 1 Teresa Watkins Brown

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes. Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 SCREENING... 1 1.1

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 March 2015 Prepared for Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 JRL consulting JRL consulting TABLE OF CONTENTS 1 INTRODUCTION... 2 1.1 BACKGROUND... 2 2 EXISTING

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017 Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A7 519-591-0426 November 8, 2017 Revised December 20, 2017 Laurie Wills, PEng Deputy Director of Public Works Town of Cobourg 740 Division

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

Wellington Street West

Wellington Street West Transportation Brief prepared for: 185 Davenport Road Suite 300 Toronto, ON M5R 1J1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 November 5, 2013 TO3131TOH Transportation Brief November

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey Traffic Impact Study Residences at Bancroft Block 14, Lot 2 April 30, 2018 REVISED: JANUARY 17, 2019 Prepared For 2 Hopkins Lane, LLC 2701 Renaissance Boulevard King of Prussia, PA 19406 Prepared By Maser

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

JMC. November 7, Chairman John P. Ewasutyn and Members of the Planning Board Town of Newburgh Town Hall 308 Gardnertown Road Newburgh, NY 12550

JMC. November 7, Chairman John P. Ewasutyn and Members of the Planning Board Town of Newburgh Town Hall 308 Gardnertown Road Newburgh, NY 12550 JMC JOHN MEYER CONSULTING, PC Site Planning n Civil Engineering n Landscape Architecture Land Surveying n Transportation Engineering n Environmental Studies n Permitting n Construction Services November

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

267 O Connor Street Residential Development

267 O Connor Street Residential Development M a y 2014 267 O Connor Street Residential Development Transportation Brief Google 2014 Bing 2014 Prepared for: MASTERCRAFT STARWOOD Prepared by: Study 267 O'Connor Type Street May 2014 Study Residential

More information

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B Memorandum DATE: AUGUST 1, 2013 TO: PAUL TILTON, P.E., SANDWICH DPW DIRECTOR/TOWN ENGINEER FROM: LEV MALAKHOFF, SR. TRANSPORTATION ENGINEER RE: ROUTE 130/QUAKER MEETINGHOUSE ROAD INTERSECTION Paul: Per

More information

Appendix B: Traffic Reports

Appendix B: Traffic Reports Appendix B: Traffic Reports 407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION Report Markham Road Station Traffic Study Prepared for Ministry of Transportation, Ontario

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Market Street Road Diet Wilmington, NC 2016 Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Wilmington, NC Parsons Brinckerhoff January 2016 FINAL TECHNICAL REPORT US 17 Corridor

More information

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012 BOSTON REGION METROPOLITAN PLANNING ORGANIZATION State Transportation Building Ten Park Plaza, Suite 2150 Boston, MA 02116-3968 Tel. (617) 973-7100 Fax (617) 973-8855 TTY (617) 973-7089 www.bostonmpo.org

More information

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings TECHNICAL MEMORANDUM Summary of Findings Date: June 17, 2014 Project #: 17121.15 To: Si Lau, P.E.; City of Oakland, CA From: Erin Ferguson, P.E.; Aaron Elias, P.E.; Daphne Dethier; and Mark Bowman, P.E.;

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

(A) Project Manager, Infrastructure Approvals

(A) Project Manager, Infrastructure Approvals February 14th, 2014 BY E-MAIL: wally.dubyk@ottawa.ca City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor, Ottawa, Ontario K1P 1J1 Attention: Wally Dubyk, C.E.T (A) Project

More information

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS 1 FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction... 3 II. Project Description... 3 III. Existing Conditions... 6 IV. Future Traffic Demand... 10 V. Conclusions and Mitigation...

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by:

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by: 700 Hunt Club Road Transportation Impact Study - Addendum #1 Submitted by: 14 June 2013 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com 14 June 2013

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT SUMMARY OF FINDINGS. May 9, 2016

SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT SUMMARY OF FINDINGS. May 9, 2016 May 9, 2016 Mr. Jesus "Freddie" Olmos ECORP CONSULTING, INC. 215 North 5 th Street Redlands, CA 92374 SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT Dear Mr. Jesus "Freddie" Olmos:

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

1140 Wellington Street West Transportation Brief

1140 Wellington Street West Transportation Brief 1140 Wellington Street West Transportation Brief October 2013 Study 1140 Wellington Type Street West October 2013 Study Transportation Name Brief February 2011 TB Check List TIS / TB/ CTS Check List prepared

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. CastleGlenn Consultants Inc. Engineers, Project Managers & Planners March 11 th, 2013 Domenic Idone, P. Eng Planning Manager R.W. Tomlinson Ltd. 5597 Power Road Ottawa, Ontario K1G 3N4 Dear Mr. Idone:

More information