Date: December 20, Project #:

Size: px
Start display at page:

Download "Date: December 20, Project #:"

Transcription

1 To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: Re: Burlington Mall Proposed Long s Jewelers Trip Generation Evaluation VHB has conducted a transportation analysis for the proposed relocation of Long s Jewelers (the Project ) to the Burlington Mall located on Middlesex Turnpike in Burlington, Massachusetts (the Site ). Specifically, the Proponent is proposing to build a new 18,400 square foot (sf) Long s Jewelers store at the westerly end of the Site between the main signalized mall driveway on Middlesex Turnpike and the right-in/right-out driveway to the north. VHB s current analysis builds upon a previously conducted study 1 for the recently-approved repositioning of the existing Sears space at the Burlington Mall. This study also considers the operation of the access driveways currently serving the Burlington Mall. The following memorandum summarizes the potential changes in traffic generation associated with the current Project, and the expected operation of the Burlington Mall driveways with and without the Project in place. Existing Conditions A redevelopment project recently was approved for the Burlington Mall involving the repositioning of building space previously occupied by Sears, and a Sears TBA outparcel building. With that approved project, 1,571,333 sf of physical building space will be provided within the Site as compared to the former 1,591,024 sf mall size. There also will be an even greater reduction (48,803 sf) in the amount of leasable area within the Site due to newly created corridors, common areas, etc., within the former Sears space, which now will be occupied by multiple tenants. Proposed Project The currently proposed Project will involve the relocation of Long s Jewelers from its current location at 60 South Street to a new 18,400 sf building to be constructed within the Site. The new building will be located between the Middlesex Turnpike signalized Site driveway and the right-in/right-out driveway to the north. No changes in the overall Site access plan are planned. Table 1 provides an overall summary of the recently-approved changes, along with the addition of the proposed Long s Jewelers building (with the associated overall building area changes to the Burlington Mall highlighted in yellow). 1 Burlington Mall Retail Collection Transportation Evaluation; VHB, (Watertown, Massachusetts) April 3, 2018 (revised May 15, 2018). \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

2 Ref: December 20, 2018 Page 2 Table 1 Burlington Mall Development Program Existing total Mall leasable space (GLA): Retail Approved New Restaurant Automotive 1,328,821 sf - Sears TBA -48,216 sf Existing Mall Retail/restaurant space (GLA): 1,280,605 sf Building Area Sears TBA redevelopment Existing TBA demolition Existing TBA storage demolition Proposed TBA retail 21,831 sf Proposed TBA restaurant 11,337 sf 316 (+157 patio) Seats -28,460 sf -19,756 sf Sears TBA subtotal +21,831 sf +11,337 sf 316 (+157 patio) -48,216 sf Sears repositioning 1 st floor/sears to be modified -147,540 sf Proposed new/remaining retail 74,774 sf Change in GLA: Retail conversion to common area -22,988 sf Retail conversion to misc. -4,292 sf Building demolition -5,365 sf Existing compactor removal -1,110 sf Retail conversion to restaurant -39,011 sf 39,011 sf 1,107 (+335 patio) Change in GLA subtotal -72,766 sf +39,011 sf 1,107 (+335 patio) Net change -50,935 sf +50,348 sf 1,423 seats (+492 patio) -48,216 sf Total Retail (inc. existing restaurants) 1,229,670 sf +50,348 sf 1,423 seats (+492 patio) 0 sf Total Retail & existing/new restaurants Proposed Long s Jewelers Total Retail (inc. existing restaurants) Total Retail & existing/new restaurants 1,280,018 sf 18,400 sf 1,248,070 sf 1,298,418 sf Total Building Area (GSF) a Total Leasable Area (GLA) Existing Burlington Mall 1,591,024 sf 1,328,821 sf Approved Burlington Mall 1,571,333 sf 1,280,018 sf Net change: -19,691 sf -48,803 sf Proposed Long s Jewelers +18,400 sf +18,400 sf Net change: -1,291 sf -30,403 sf GSF = Gross Square Footage. GLA = Gross Leasable Area. a Total building area includes gross leasable tenant space and additional non-leasable area (offices, common areas, mechanical rooms, etc.) \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

3 Ref: December 20, 2018 Page 3 As shown in Table 1, even with the new Long s Jewelers, there still will be a 1,291-sf reduction in the total physical building area at the Burlington Mall compared to its former condition. Furthermore, the 1,298,418 sf of resulting total mall leasable space still will be approximately 30,403 sf lower than the previous mall total of 1,328,821 sf of leasable area. The following sections discuss how traffic generation was estimated for the Project considering this reduction, as well as the new Long s Jewelers use proposed within the Site. Trip Generation As with the recently-prepared study for the approved mall redevelopment, trip generation was estimated using standard Institute of Transportation Engineers (ITE) data 2, considering the difference between the existing and proposed Burlington Mall building area and uses. The associated methodology is the same as that used in VHB s April 3, 2018 study (revised May 15, 2018). As the current proposal involves only the addition of retail space and not any change in restaurant area, this currently evaluation focusses on the ITE shopping center methodology discussed below. ITE Shopping Center VHB estimated traffic based on the change in total mall leasable area using ITE Shopping Center data. The results of this comparison, including the additional 18,400 sf Long s Jewelers component, are summarized in Table 2. 2 Trip Generation Manual (10 th edition), Institute of Transportation Engineers, Washington DC, \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

4 Ref: December 20, 2018 Page 4 Table 2 Trip Generation Summary Shopping Center Proposed Approved Burlington Mall Burlington Mall (with Long s Existing Total Retail/ Redevelopment a Long s Jewelers b Jewelers) TBA c Change 1,280,018 sf 18,400 sf = 1,298,418 sf 1,328,821 sf -30,403 sf Weekday Daily Enter 17, ,184 17, Exit 17, ,184 17, Total 34, ,368 35, Weekday Evening Enter 1, ,739 1, Exit 1, ,884 1, Total 3, ,623 3, Saturday Daily Enter 21, ,842 22, Exit 21, ,842 22, Total 43, ,684 44, Saturday Midday Enter 2, ,439 2, Exit 2, ,252 2, Total 4, ,691 4, a Source: Trip Generation Manual 10 th Edition, Institute of Transportation Engineers (ITE), Washington D.C. (2017). Land Use Code 820 b (Shopping Center). Estimates based on 1,280,018 sf of approved retail/restaurant GLA. Source: Ibid. Land Use Code 820 (Shopping Center). Estimates based on difference between proposed overall 1,298,418 sf of retail/restaurant GLA and currently approved 1,280,018 sf of approved retail/restaurant GLA. c Source: Ibid. Estimates based on Land Use Code 820 (Shopping Center) for 1,280,605 sf of retail/restaurant space and Land Use Code 942 (Automobile Care Center) for 48,216 sf of TBA building area. As shown in Table 2, the proposed Long s Jewelers building is estimated to generate 38 and 52 vehicle trips during the respective weekday evening and Saturday midday peak hours. However, even with the addition of Long s Jewelers, there still will be an overall 30,403-sf reduction in tenant leasable area compared to the former Burlington Mall. Accordingly, the overall mall should experience a corresponding decrease of 91 and 77 vehicle trips during the critical weekday evening and Saturday midday peak hours, respectively, compared to its former fully-occupied condition. \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

5 Ref: December 20, 2018 Page 5 Build Condition Volumes As discussed above, even with the addition of Long s Jewelers there still should be a reduction in the volume of peakhour traffic generated by the mall compared to its former fully-occupied condition. This is due to both the reduced total leasable area, as well as the nature of the recently approved new restaurant space in the mall, which may experience peak times different from those of the rest of the mall. Accordingly, with a reduction in peak-hour traffic compared to that former full-occupancy condition, a full traffic analysis should not be necessary. However, to evaluate the expected operation of the Burlington Mall site driveways VHB reviewed and analyzed traffic counts previously conducted in this area. Specifically, VHB used traffic volumes from the traffic study 3 prepared for the nearby New England Executive Park project. While these counts are now five years old, they still are useful as they were conducted when the Sears and Sears TBA uses both still were fully active. Accordingly, these counts still should provide a reasonable estimation of the vehicular turning movements in and out of the mall at its former fully occupied state. Based on the preceding trip generation analysis, the actual peak-hour volumes in the future should be lower due to the recently approved changes. To isolate the current Project s potential impacts, the Long s Jeweler s volumes were added directly to the previously conducted counts and were used as the 2018 Build condition peak-hour traffic volumes. The Project traffic was assigned to the Site driveways based on their previously observed use, with additional consideration of the location of the proposed Project. This analysis focused primarily on the volume of traffic entering and exiting the mall, along with the existing street traffic at the time of the counts. While the street volumes likely have increased due ongoing growth in the area, the mall traffic likely soon will be decreasing as noted above. Other nearby potential or planned development projects were not incorporated into this analysis. With this methodology, any Project impacts can be more readily identified without being influenced by traffic growth associated with other projects or regular regional traffic growth. Adding the expected Long s Jeweler s traffic to the counts from the former fully-occupied mall condition results in an overly conservative analysis. While that assumes the addition of 38 and 52 trips during the weekday evening and Saturday midday peak hours, respectively, the overall mall volumes actually should be decreasing by 91 and 77 trips during the respective peak hours. Analysis of site access driveway normally is not conducted for conditions where volumes are expected to be lower than the former condition. Regardless, the potential impacts of adding additional Long s Jeweler s traffic to the Site were evaluated under this worst-case scenario as discussed in the following section. Traffic Operations Analysis To assess quality of flow, intersection capacity analyses were conducted with respect to 2018 Existing and 2018 Build traffic volume conditions. Capacity analyses provide an indication of how well the roadway facilities and intersections 3 Draft Environmental Impact Report (EEA No ) New England Executive Park (NEEP) Renovations and Expansion, Vanasse Hangen Brustlin, Inc. (VHB) (Watertown, Massachusetts) June \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

6 Ref: December 20, 2018 Page 6 serve the traffic demands placed upon them. Roadway operating conditions are classified by calculated levels-ofservice. The evaluation criteria used to analyze area intersections and roadways in this traffic study are based on the 2010 Highway Capacity Manual (HCM) 4. Level of-service (LOS) is the term used to denote the different operating conditions that occur on a given roadway segment under various traffic volume loads. It is a qualitative measure that considers a number of factors including roadway geometry, speed, travel delay, freedom to maneuver, and safety. Level-of-service provides an index to operational qualities of a roadway segment or an intersection. Level-of-service designations range from A to F, with LOS A representing the best operating conditions and LOS F representing the worst operating conditions. The level-of-service designation is reported differently for signalized intersections and unsignalized intersections. For signalized intersections, the analysis considers the operation of all traffic entering the intersection and the level-ofservice designation is for overall conditions at the intersection. For unsignalized intersections, however, the analysis assumes that traffic on the mainline is not affected by traffic on the side streets. Thus, the level-of-service designation is for the critical movement entering or exiting the side street, which is generally the left-turn out of the side street. Intersection Capacity Analysis Capacity analyses were conducted for the 2018 Existing and 2018 Build conditions for the study area intersections. Table 3 summarizes the capacity analysis results for the signalized study area intersections. The capacity analyses worksheets are included in the Attachments to this evaluation. 4 Highway Capacity Manual, Transportation Research Board, Washington D.C., \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

7 Ref: December 20, 2018 Page 7 Table 3 Signalized Intersection Capacity Analysis Location / Movement 2018 Existing Conditions a 2018 Existing Conditions with added Longs Jewelers Traffic b v/c c Del d LOS e 50 Q f 95 Q g v/c Del LOS 50 Q 95 Q Middlesex Turnpike at Burlington Mall Main Driveway / South Avenue Weekday Evening South Avenue EB L C C South Avenue EB R A A 0 0 Burlington Mall WB L D D Burlington Mall WB R A A 0 0 Middlesex Turnpike NB L E 62 m E 63 m63 Middlesex Turnpike NB T/R A 14 m A 15 m18 Middlesex Turnpike SB L D 31 m D 34 m39 Middlesex Turnpike SB T/R C 267 m C 273 m274 Overall 21 C 21 C Saturday Midday South Avenue EB L C C South Avenue EB R A A 0 0 Burlington Mall WB L D D Burlington Mall WB R A A 0 0 Middlesex Turnpike NB L D 108 m D 108 m109 Middlesex Turnpike NB T/R A 38 m A 42 m39 Middlesex Turnpike SB L D D Middlesex Turnpike SB T/R C C Overall 24 C 24 C Burlington Mall Road at West Burlington Mall Driveway / Meadow Road Weekday Evening Burlington Mall Road EB L D D Burlington Mall Road EB T/R B B Burlington Mall Road WB L D D Burlington Mall Road WB T/R C C Burlington Mall NB L/T D D Burlington Mall NB R A A 0 32 Meadow Road SB L/T D D Meadow Road SB R A A 0 12 Overall 25 C 26 C Saturday Midday Burlington Mall Road EB L D D Burlington Mall Road EB T/R C C Burlington Mall Road WB L D D Burlington Mall Road WB T/R C C Burlington Mall NB L/T D D Burlington Mall NB R B B 0 53 Meadow Road SB L/T D D Meadow Road SB R A A 0 37 Overall 27 C 27 C \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

8 Ref: December 20, 2018 Page 8 Table 3 Signalized Intersection Capacity Analysis Location / Movement 2018 Existing Conditions a 2018 Existing Conditions with added Longs Jewelers Traffic b v/c c Del d LOS e 50 Q f 95 Q g v/c Del LOS 50 Q 95 Q Burlington Mall Road at East Burlington Mall Driveway / Lexington Street Weekday Evening Burlington Mall Road EB L C C Burlington Mall Road EB T/R C C Burlington Mall Road WB L C C Burlington Mall Road WB T/R B B Burlington Mall NB L C C Burlington Mall NB T C C Burlington Mall NB R A A 0 0 Lexington Street SB L/T C C Lexington Street SB R A A 0 0 Overall 21 C 21 C Saturday Midday Burlington Mall Road EB L D D Burlington Mall Road EB T/R D D Burlington Mall Road WB L D 277 # D 281 #398 Burlington Mall Road WB T/R B B Burlington Mall NB L E 124 # E 126 #252 Burlington Mall NB T C C Burlington Mall NB R A A 0 0 Lexington Street SB L/T C C Lexington Street SB R A A 0 0 Overall 28 C 28 C a Source: Volumes from the New England Executive Park (NEEP) DEIR (EEA No ), dated June Signal timings optimized in Synchro to represent adaptive signal control now in place. b Projected traffic associated with Longs Jewelers added to the 2018 existing conditions traffic volumes; signals optimized in Synchro to represent adaptive signal control. c Volume to capacity ratio. b Average total delay, in seconds per vehicle. e Level-of-service. f 50th percentile queue, in feet. g 95th percentile queue, in feet. ~ Volume exceeds capacity, queue is theoretically infinite. # 95th percentile volume exceeds capacity, queue may be longer. As shown in Table 3, the addition of the 38- and 52- peak-hour trips associated with Long s Jewelers will have a negligible impact on the operation of the signalized driveways serving the mall. While some particular intersection movements may currently experience lengthy delays, or be affected by other nearby locations, the additional Projectgenerated traffic by itself will have a negligible impact. \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

9 Ref: December 20, 2018 Page 9 The capacity analysis results for Middlesex Turnpike s unsignalized intersection with the Burlington Mall right-in/rightout driveway are provided in Table 4. Table 4 Unsignalized Intersection Capacity Analysis Location / Movement 2013 Existing Conditions a 2013 Existing Conditions with added Longs Jewelers Traffic b D c v/c d Del e LOS f 95 Q g D v/c Del LOS 95 Q Middlesex Turnpike at North Burlington Mall Driveway (Right-In/Right-Out) Weekday Evening Burling ton Mall WB R B B 18 Saturday Midday Burlington Mall WB R B B 33 a Source: Volumes from the New England Executive Park (NEEP) DEIR (EEA No ), dated June b Projected traffic associated with Longs Jewelers added to the 2018 existing traffic volumes. c Demand d Volume to capacity ratio. e Average total delay, in seconds per vehicle. f Level-of-service. g 95th percentile queue, in feet. # 95th percentile volume exceeds capacity, queue may be longer. As shown in Table 4, the existing right-in/right-out driveway on Middlesex Turnpike currently operates at LOS B and will continue to do so with the addition of Project traffic. Conclusion VHB has evaluated the potential changes in traffic generation resulting from the addition of an 18,400 sf Long s Jewelers store to the recently approved Burlington Mall redevelopment site. Following the same methodology used in the prior study for the mall redevelopment, the current analysis indicates that Long s Jewelers will generate 38 and 52 vehicle trips during the respective weekday evening and Saturday midday peak hours. However, the Burlington Mall still will have 30,403 sf less tenant leasable area than existed with the former fully-occupied mall. With that reduced building space, there will be 91 and 77 fewer vehicle trips during the weekday evening and Saturday midday peak hours, respectively, compared to that baseline condition. With the new Long s Jewelers traffic being distributed across the multiple driveways serving the Site, there should not be a noticeable impact. Regardless, these Site access driveways were analyzed under a worst-case condition of the Long s Jeweler s traffic being added to the formerly fully-occupied mall volumes. Instead of the expected decrease in peak-hour volumes, this assumes an increase in Site traffic associated with the Long s Jeweler s traffic. Even under these conservative assumptions, the analysis indicates that this current Project will have a negligible impact on the operation of the Site access driveways All of the signalized Burlington Mall access driveways are part of a recently-installed adaptive signal system along the Middlesex Turnpike and Burlington Mall Road corridors. This system responds to actual traffic conditions on a cycle-by-cycle basis without strictly relying on more rigid pre-established timing plans. Accordingly, the existing \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

10 Ref: December 20, 2018 Page 10 transportation infrastructure surrounding the Site should readily be able to accommodate any changes in traffic patterns which may occur throughout the day, even with the overall reduction in peak-hour volume compared to the former fully-occupied mall. \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

11 ATTACHMENTS Trip Generation Traffic Volume Networks Capacity Analysis \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx 101 Walnut Street PO Box 9151 Watertown, MA P

12 Ref: December 20, 2018 Page 12 Trip Generation \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

13 Proposed: proposed mall GLA retail 1,229,671 proposed Long's Jewelers 18,400 proposed mall GLA restaurant 50,348 4% new restaurants represent this percent increase in total Burlington Mall leasable area total mall GLA 1,298,419 Existing: existing mall GLA 1,280,605 existing TBA 48,216 Total existing mall GLA + TBA 1,328,821-30,402 Existing Burlington Mall Approved Burlington Mall Redevelopment Proposed Existing Difference Difference Retail/Restaurant Retail Auto Total Retail LUC SIZE 1,298,419 1,280,605 48,216 1,328,821 1,280,019 Weekday Daily Enter 17,184 17, , , Exit 17,184 17, , , Total 34,367 34,046 1,144 35, , Weekday Morning Peak Hour Enter Exit Total Weekday Evening Peak Hour Enter 1,739 1, , , Exit 1,884 1, , , Total 3,623 3, , , Saturday Daily Enter 21,842 21, , , Exit 21,842 21, , , Total 43,683 43,311 1,144 44, , Saturday Midday Peak Hour Enter 2,439 2, , , Exit 2,252 2, , , Total 4,691 4, , , Trip generation estimate based on ITE LUC. \\MAWALD\pr\ _Longs-Burlington\Correspondence\traffic\Trip Generation Method 1 - mall 10/28/2018

14 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Shopping Center LANDUSE CODE: 820 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY ,510 50% 50% AM PEAK OF GENERATOR ,320 54% 46% PM PEAK OF GENERATOR ,320 50% 50% AM PEAK (ADJACENT ST) ,510 62% 38% PM PEAK (ADJACENT ST) ,200 48% 52% TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY 49,015 24,508 24,508 34,367 17,184 17,184 AM PEAK (ADJACENT ST) 1, PM PEAK (ADJACENT ST) 4,947 2,375 2,572 3,623 1,739 1,884 SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY ,510 50% 50% PEAK OF GENERATOR ,510 52% 48% TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY 59,883 29,942 29,942 43,683 21,842 21,842 PEAK OF GENERATOR 5,843 3,038 2,805 4,691 2,439 2,252 SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY ,510 50% 50% PEAK OF GENERATOR ,268 49% 51% TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY 27,397 13,698 13,698 N/A N/A N/A PEAK OF GENERATOR 3,623 1,775 1,848 N/A N/A N/A \\MAWALD\pr\ _Longs-Burlington\Correspondence\traffic\Trip Generation 820_Pr_Method_1 10/26/2018

15 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Shopping Center LANDUSE CODE: 820 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY ,510 50% 50% AM PEAK OF GENERATOR ,320 54% 46% PM PEAK OF GENERATOR ,320 50% 50% AM PEAK (ADJACENT ST) ,510 62% 38% PM PEAK (ADJACENT ST) ,200 48% 52% TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY 48,321 24,160 24,160 34,035 17,018 17,018 AM PEAK (ADJACENT ST) 1, PM PEAK (ADJACENT ST) 4,877 2,341 2,536 3,585 1,721 1,864 SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY ,510 50% 50% PEAK OF GENERATOR ,510 52% 48% TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY 59,034 29,517 29,517 43,298 21,649 21,649 PEAK OF GENERATOR 5,760 2,995 2,765 4,639 2,412 2,227 SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY ,510 50% 50% PEAK OF GENERATOR ,268 49% 51% TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY 27,008 13,504 13,504 N/A N/A N/A PEAK OF GENERATOR 3,571 1,750 1,821 N/A N/A N/A \\MAWALD\pr\ _Longs-Burlington\Correspondence\traffic\Trip Generation 820_Approved_Method_1 10/28/2018

16 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Shopping Center LANDUSE CODE: 820 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY ,510 50% 50% AM PEAK OF GENERATOR ,320 54% 46% PM PEAK OF GENERATOR ,320 50% 50% AM PEAK (ADJACENT ST) ,510 62% 38% PM PEAK (ADJACENT ST) ,200 48% 52% TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY 48,343 24,171 24,171 34,046 17,023 17,023 AM PEAK (ADJACENT ST) 1, PM PEAK (ADJACENT ST) 4,879 2,342 2,537 3,586 1,721 1,865 SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY ,510 50% 50% PEAK OF GENERATOR ,510 52% 48% TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY 59,062 29,531 29,531 43,311 21,655 21,655 PEAK OF GENERATOR 5,763 2,997 2,766 4,640 2,413 2,227 SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY ,510 50% 50% PEAK OF GENERATOR ,268 49% 51% TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY 27,021 13,510 13,510 N/A N/A N/A PEAK OF GENERATOR 3,573 1,751 1,822 N/A N/A N/A \\MAWALD\pr\ _Longs-Burlington\Correspondence\traffic\Trip Generation 820_Ex_Method_1 10/26/2018

17 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Automobile Care Center LANDUSE CODE: 942 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY AM PEAK OF GENERATOR % 44% PM PEAK OF GENERATOR % 51% AM PEAK (ADJACENT ST) % 34% PM PEAK (ADJACENT ST) % 52% TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY N/A N/A N/A N/A N/A N/A AM PEAK OF GENERATOR PM PEAK OF GENERATOR AM PEAK (ADJACENT ST) N/A N/A N/A PM PEAK (ADJACENT ST) SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY % 50% PEAK OF GENERATOR TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY 1, N/A N/A N/A PEAK OF GENERATOR N/A N/A N/A N/A N/A N/A SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies R^2 Average Low High Average Low High Enter Exit DAILY % 50% PEAK OF GENERATOR TRIPS: BY AVERAGE BY REGRESSION Total Enter Exit Total Enter Exit DAILY N/A N/A N/A PEAK OF GENERATOR N/A N/A N/A N/A N/A N/A \\MAWALD\pr\ _Longs-Burlington\Correspondence\traffic\Trip GenerationAutomobile_Service_Center_942 10/26/2018

18 Ref: December 20, 2018 Page 13 Traffic Volume Networks \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

19 Figure 1 \\vhb\proj\wat-ld\ \graphics\figures\traffic\networks.dwg S Signalized Intersection neg = Negilible +XX = Long's Jewelers Traffic Middlesex Turnpike (+3) Burlington Mall North Driveway Meadow Road S Burlington Mall West Driveway neg S Burlington Mall East Driveway Lexington Street (+10) South Avenue Burlington Mall S Main Driveway (+7) +6 (+1) (+6) +1 Not to Scale Weekday Evening Peak Hour 2018 Existing Traffic Volumes Longs Jewelers at Burlington Mall Burlington, Massachusetts

20 neg +8 Figure 2 \\vhb\proj\wat-ld\ \graphics\figures\traffic\networks.dwg S Signalized Intersection neg = Negilible +XX = Long's Jewelers Traffic Middlesex Turnpike (+4) Burlington Mall North Driveway Burlington Mall West Driveway Meadow Road S Burlington Mall East Driveway Lexington Street 875 (+13) South Avenue Burlington Mall S Main Driveway (+9) S (+1) (+8) neg Not to Scale Saturday Midday Peak Hour 2018 Existing Traffic Volumes Longs Jewelers at Burlington Mall Burlington, Massachusetts

21 Ref: December 20, 2018 Page 14 Capacity Analysis \\MAWALD\ld\ \docs\memos\Traffic Memo\Transportation evaluation.docx

22 :: Longs Jewelers at Burlington Mall 2013 Existing Conditions 1: Middlesex Turnpike & South Avenue/Burlington Mall Main Driveway Timing Plan: Weekday Evening Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Prot Perm Prot Free Prot NA Prot NA Protected Phases Permitted Phases 8 Free Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 31.0% 31.0% 31.0% 17.0% 56.0% 13.0% 52.0% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None None C-Max None Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C A D A E A D C Approach Delay Approach LOS B D A C Queue Length 50th (ft) Queue Length 95th (ft) m63 m17 m35 m268 Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 36 (36%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 21.0 Intersection LOS: C Intersection Capacity Utilization 62.4% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 1: Middlesex Turnpike & South Avenue/Burlington Mall Main Driveway Lanes, Volumes, Timings \\vhb\proj\wat-ld\ \tech\synchro\ex-pm.syn VHB/MSD 12/19/2018

23 :: Longs Jewelers at Burlington Mall 2013 Existing Conditions 2: Middlesex Turnpike & North Burlington Mall Driveway Timing Plan: Weekday Evening Intersection Int Delay, s/veh 0.5 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - Yield - Free - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % - - Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT WBLn1 SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - B - HCM 95th %tile Q(veh) HCM 2010 TWSC \\vhb\proj\wat-ld\ \tech\synchro\ex-pm.syn VHB/MSD 12/19/2018

24 :: Longs Jewelers at Burlington Mall 2013 Existing Conditions 3: West Burlington Mall Driveway/Meadow Road & Burlington Mall Road Timing Plan: Weekday Evening Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) 1% 1% 1% 2% 2% 2% 1% 1% 1% 1% 1% 1% Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Prot NA Prot NA Split NA Prot Split NA Prot Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 11.0% 46.0% 13.0% 48.0% 11.0% 11.0% 11.0% 30.0% 30.0% 30.0% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lead Lag Lead Lead Lead Lag Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None None None None None None Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D B D C D A D A Approach Delay Approach LOS C C C C Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 80.7 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 25.4 Intersection Capacity Utilization 69.8% Analysis Period (min) 15 Intersection LOS: C ICU Level of Service C Splits and Phases: 3: West Burlington Mall Driveway/Meadow Road & Burlington Mall Road Lanes, Volumes, Timings \\vhb\proj\wat-ld\ \tech\synchro\ex-pm.syn VHB/MSD 12/19/2018

25 :: Longs Jewelers at Burlington Mall 2013 Existing Conditions 4: East Burlington Mall Driveway/Lexington Street & Burlington Mall Road Timing Plan: Weekday Evening Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 1% 1% 1% 1% 1% 1% Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Prot NA Prot NA Perm NA Free Perm NA Free Protected Phases Permitted Phases 4 Free 8 Free Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 23.6% 42.7% 34.5% 53.6% 22.7% 22.7% 22.7% 22.7% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None Min None Min None None None None Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C C C B C C A C A Approach Delay Approach LOS C C B B Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Other Cycle Length: 110 Actuated Cycle Length: 67.1 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 20.8 Intersection Capacity Utilization 62.2% Analysis Period (min) 15 Intersection LOS: C ICU Level of Service B Splits and Phases: 4: East Burlington Mall Driveway/Lexington Street & Burlington Mall Road Lanes, Volumes, Timings \\vhb\proj\wat-ld\ \tech\synchro\ex-pm.syn VHB/MSD 12/19/2018

26 :: Longs Jewelers at Burlington Mall 2013 Existing Conditions 1: Middlesex Turnpike & South Avenue/Burlington Mall Main Driveway Timing Plan: Saturday Midday Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Prot Perm Prot Free Prot NA Prot NA Protected Phases Permitted Phases 8 Free Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 41.1% 41.1% 41.1% 26.7% 43.3% 15.6% 32.2% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None None C-Max None Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C A D A D A D C Approach Delay Approach LOS B D B C Queue Length 50th (ft) Queue Length 95th (ft) m109 m Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 45 (50%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.86 Intersection Signal Delay: 24.1 Intersection LOS: C Intersection Capacity Utilization 70.7% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 1: Middlesex Turnpike & South Avenue/Burlington Mall Main Driveway Lanes, Volumes, Timings \\vhb\proj\wat-ld\ \tech\synchro\ex-sat.syn VHB/MSD 12/19/2018

27 :: Longs Jewelers at Burlington Mall 2013 Existing Conditions 2: Middlesex Turnpike & North Burlington Mall Driveway Timing Plan: Saturday Midday Intersection Int Delay, s/veh 1.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - Yield - Free - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % - - Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT WBLn1 SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - B - HCM 95th %tile Q(veh) HCM 2010 TWSC \\vhb\proj\wat-ld\ \tech\synchro\ex-sat.syn VHB/MSD 12/19/2018

28 :: Longs Jewelers at Burlington Mall 2013 Existing Conditions 3: West Burlington Mall Driveway/Meadow Road & Burlington Mall Road Timing Plan: Saturday Midday Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) 1% 1% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Prot NA Prot NA Split NA Prot Split NA Prot Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 15.6% 34.4% 17.8% 36.7% 17.8% 17.8% 17.8% 30.0% 30.0% 30.0% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lead Lag Lead Lead Lead Lag Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None None None None None None Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D C D C D B D A Approach Delay Approach LOS C C C C Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 74.1 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.70 Intersection Signal Delay: 26.7 Intersection Capacity Utilization 56.5% Analysis Period (min) 15 Intersection LOS: C ICU Level of Service B Splits and Phases: 3: West Burlington Mall Driveway/Meadow Road & Burlington Mall Road Lanes, Volumes, Timings \\vhb\proj\wat-ld\ \tech\synchro\ex-sat.syn VHB/MSD 12/19/2018

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) APPENDICES Appendix T No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) 661 Bear Valley Parkway EIR March 2017 APPENDICES This page intentionally left blank 661 Bear Valley

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 March 2015 Prepared for Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 JRL consulting JRL consulting TABLE OF CONTENTS 1 INTRODUCTION... 2 1.1 BACKGROUND... 2 2 EXISTING

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM TO: Merrimack Valley Metropolitan Planning Organization FROM: James Terlizzi, P.E., Transportation Planning Engineer DATE: March 6, 2017 SUBJECT: Further analysis of the recommendations

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017 Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A7 519-591-0426 November 8, 2017 Revised December 20, 2017 Laurie Wills, PEng Deputy Director of Public Works Town of Cobourg 740 Division

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Transportation Land Development Environmental S e r v i c e s

Transportation Land Development Environmental S e r v i c e s Transportation Land Development Environmental S e r v i c e s Memorandum To: Ms. Kristin E. Kassner Planning Director Town Hall Annex 25 Center Street Burlington, MA 01803 Date: September 23, 2013 Project

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) 116 20 8 405 137 56 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.81 0.81 0.67 0.67 0.89 0.89 Hourly flow

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE Roadway Segment Level of Service Definitions LOS V/C Congestion/Delay Traffic Description (Used for surface streets,

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

MEMORANDUM November 19, 2012

MEMORANDUM November 19, 2012 COUNCIL OF GOVERNMENTS CENTRAL NAUGATUCK VALLEY 60 NORTH MAIN ST 3RD Floor WATERBURY, CT 06702-1403 (203)757-0535 Web Site: www.cogcnv.org E-Mail: cogcnv@cogcnv.org November 19, 2012 MEMORANDUM 111912

More information

Appendix B: Traffic Reports

Appendix B: Traffic Reports Appendix B: Traffic Reports 407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION Report Markham Road Station Traffic Study Prepared for Ministry of Transportation, Ontario

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings TECHNICAL MEMORANDUM Summary of Findings Date: June 17, 2014 Project #: 17121.15 To: Si Lau, P.E.; City of Oakland, CA From: Erin Ferguson, P.E.; Aaron Elias, P.E.; Daphne Dethier; and Mark Bowman, P.E.;

More information

(A) Project Manager, Infrastructure Approvals

(A) Project Manager, Infrastructure Approvals February 14th, 2014 BY E-MAIL: wally.dubyk@ottawa.ca City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor, Ottawa, Ontario K1P 1J1 Attention: Wally Dubyk, C.E.T (A) Project

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

APPENDIX G. Traffic Data

APPENDIX G. Traffic Data APPENDIX G Traffic Data HCM Signalized Intersection Capacity Analysis 2: Duanesburg Road & I-88 Ramps 10/7/2004 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl)

More information

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Market Street Road Diet Wilmington, NC 2016 Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Wilmington, NC Parsons Brinckerhoff January 2016 FINAL TECHNICAL REPORT US 17 Corridor

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Wellington Street West

Wellington Street West Transportation Brief prepared for: 185 Davenport Road Suite 300 Toronto, ON M5R 1J1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 November 5, 2013 TO3131TOH Transportation Brief November

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

267 O Connor Street Residential Development

267 O Connor Street Residential Development M a y 2014 267 O Connor Street Residential Development Transportation Brief Google 2014 Bing 2014 Prepared for: MASTERCRAFT STARWOOD Prepared by: Study 267 O'Connor Type Street May 2014 Study Residential

More information

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes. Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 SCREENING... 1 1.1

More information

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by:

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by: 700 Hunt Club Road Transportation Impact Study - Addendum #1 Submitted by: 14 June 2013 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com 14 June 2013

More information

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc.

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc. TRANSPORTATION ANALYSIS Wawa US 441 and Morningside Drive Prepared for: Brightwork Real Estate, Inc. TABLE OF CONTENTS Introduction... 1 Project Description... 1 Estimated Daily Project Traffic... 3 Estimated

More information

C. iv) Analysis/Results

C. iv) Analysis/Results The Pettengill Road project is located outside the borders of the model in an external zone. As a result, inserting all Pettengill Road trip generation assumptions into the NRPC model and running a new

More information

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated)

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated) MEMORANDUM Date: May 26, 2016 To: From: Subject: Debbie Bent and Kris Overleese, City of Kenmore Kendra Breiland and Sarah Keenan, Fehr & Peers Saint Edward Ballfields Traffic and Parking Analysis (Updated)

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 TO: FROM: Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 RE: Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street,

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure MMM Group Limited Traffic Study CASA MIA Community Care Facility Vancouver, BC Communities Transportation Buildings Infrastructure February 2013 5011001-033 STANDARD LIMITATIONS This report was prepared

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

1140 Wellington Street West Transportation Brief

1140 Wellington Street West Transportation Brief 1140 Wellington Street West Transportation Brief October 2013 Study 1140 Wellington Type Street West October 2013 Study Transportation Name Brief February 2011 TB Check List TIS / TB/ CTS Check List prepared

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012 BOSTON REGION METROPOLITAN PLANNING ORGANIZATION State Transportation Building Ten Park Plaza, Suite 2150 Boston, MA 02116-3968 Tel. (617) 973-7100 Fax (617) 973-8855 TTY (617) 973-7089 www.bostonmpo.org

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

Interstate 80 Corridor Study

Interstate 80 Corridor Study Interstate 80 Corridor Study Final Technical Memorandum 5: Traffic Volumes, Accident Locations and Operational Deficiencies West Verdi (SR 425) Interchange to West McCarran Boulevard (SR 651) and East

More information

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT 11897-05 TIA Report.docx Prescott Plaza Traffic Impact Analysis This page is intentionally left blank 11897-05

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis Congregate Care Facility Billerica, Massachusetts Prepared For: Hawthorn Development, LLC 35 Kettle Court Salem, OR 973 Prepared By: Sebago Technics, Inc. 75 John Roberts Road,

More information

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA (St. Tammany Parish Mandeville, LA) Prepared For The Pittman Companies Michael N Pittman, MD 328 East Boston St Covington, LA 70433

More information

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS 1 FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction... 3 II. Project Description... 3 III. Existing Conditions... 6 IV. Future Traffic Demand... 10 V. Conclusions and Mitigation...

More information

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey Traffic Impact Study Residences at Bancroft Block 14, Lot 2 April 30, 2018 REVISED: JANUARY 17, 2019 Prepared For 2 Hopkins Lane, LLC 2701 Renaissance Boulevard King of Prussia, PA 19406 Prepared By Maser

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Intersection LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5

Intersection LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5 Intersection No- LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5 Ü Intersection No- LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive S C 32.6 D 43.0 Intersection No- LOS Delay

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Appendix E: Emission Reduction Calculations

Appendix E: Emission Reduction Calculations Derr Road and Home Road Conversion Feasibility Study Springfield, OH Appendix E: Emission Reduction Calculations Derr Road and Home Road Conversion Feasibility Study Springfield, OH Emission Reduction

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

CitiGate Retail Development

CitiGate Retail Development CitiGate Retail Development Transportation Impact Study prepared for: Trinity Development Group Inc. Sun Life Financial Centre, East Tower 3250 Bloor Street West, Suite 1000 Toronto, ON M8X 2X9 prepared

More information