1 Traffic Impact Study Residences at Bancroft Block 14, Lot 2 April 30, 2018 REVISED: JANUARY 17, 2019 Prepared For 2 Hopkins Lane, LLC 2701 Renaissance Boulevard King of Prussia, PA Prepared By Maser Consulting P.A Midlantic Drive, Suite 100 Mt. Laurel, NJ Jeffrey M. Fiore, P.E. N.J.P.E. License No Nicholas D. Aiello, P.E., PTOE, PTP N.J.P.E. License No MC Project No B

2 TABLE OF CONTENTS Residences at Bancroft MC Project No.: B Table of Contents I. INTRODUCTION... 1 II. EXISTING ROADWAY CONDITIONS... 2 III. EXISTING TRAFFIC CONDITIONS... 3 IV. TRIP GENERATION & DISTRIBUTION... 4 V. FUTURE TRAFFIC CONDITIONS... 6 VI. HCM CAPACITY ANALYSIS... 8 VII. GAP ANALYSIS VIII. PARKING ASSESSMENT IX. SUMMARY AND CONCLUSIONS TABLES Table 1 Data Collection Efforts and Established Peak Hours... 3 Table 2 Site Generated Trips... 4 Table 3 HCM: Unsignalized LOS/Delay Criteria... 8 Table 4 Level of Service Summary... 9 Table 5 Kings Highway (Route 41) & Hopkins Lane Intersection Volume Comparison Table 6 Kings Highway (Route 41) & Hopkins Lane Queue Lengths Table 7 Gap Analysis Table 8 RSIS Parking Calculations APPENDICES Appendix A... Traffic Figures Appendix B... Existing Data Appendix C... Trip Generation Appendix D... Capacity Analysis Appendix E... Gap Analysis

3 Residences at Bancroft MC Project No.: B Page 1 of 15 I. INTRODUCTION This Traffic Impact Study has been prepared in association with a proposal to develop a residential subdivision within the. The Project Site has frontage along Hopkins Lane to the west. The Project Site is bound by Kings Highway (Route 41) to the south and wooded areas to the north and east. The Project Site is designated as Block 14, Lot 2 and is located within the Bancroft Site Redevelopment Plan Area. A site location map is included as Figure 1 in Appendix A. The site is currently developed with the existing Bancroft School. The Applicant proposes to raze the existing buildings and develop a residential development consisting of 80 townhomes and 10 affordable units. Site access is proposed via four (4) full-movement driveways along Hopkins Lane. The proposed Site Plan is provided as Figure 2 in Appendix A. This study presents an evaluation of the current and future traffic conditions in the vicinity of the site. Specific elements included in this study are: An inventory of the roadway facilities in the vicinity of the project, including the existing physical and traffic operating characteristics; Determination of the Existing Conditions; Site Generated Trips described in the ITE Trip Generation Manual, 10 th Edition; Trip Distribution and Assignment; Forecast of 2020 No-Build Traffic Volumes; Forecast of the 2020 Build Traffic Volumes; Peak Hour Capacity Analysis for the 2020 No-Build and Build Conditions; Parking Assessment; and Summary and Conclusions.

4 II. EXISTING ROADWAY CONDITIONS Residences at Bancroft MC Project No.: B Page 2 of 15 A field investigation was conducted adjacent to the project site to obtain an inventory of existing roadway conditions, posted traffic controls, adjacent land uses, lane configurations, and existing vehicular/pedestrian traffic patterns. Roadways Hopkins Lane is a northwest-southeast oriented local roadway under the jurisdiction of the Borough of Haddonfield. However, for the purposes of this study, Hopkins Lane will be referenced as north-south. The roadway provides one travel lane in each direction. The posted speed limit is 25 MPH. Kings Highway (Route 41) is a northeast-southwest oriented urban minor arterial under the jurisdiction of Camden County. However, for the purposes of this study, Kings Highway (Route 41) will be referenced as east-west. Within the project vicinity, the roadway provides one travel lane in each direction. Shoulders with on-street parking, where permitted, are provided on both sides of the roadway. The posted speed limit is 25 MPH. Intersections Kings Highway (Route 41) and Hopkins Lane is an unsignalized T-intersection with stop control on the Hopkins Lane southbound approach. Kings Highway (Route 41) represents the eastbound and westbound approaches. Hopkins Lane represents the southbound approach. The eastbound approach provides a shared left-turn/through lane. The westbound approach provides a shared through/right-turn lane. The southbound approach provides a shared left-turn/right-turn approach. Mass Transit New Jersey Transit Bus Routes 455 and 457 have a bus stop along Kings Highway (Route 41) in the vicinity of Hopkins Lane.

5 Residences at Bancroft MC Project No.: B Page 3 of 15 III. EXISTING TRAFFIC CONDITIONS Traffic data was collected within the study area to gain an understanding of the existing roadway conditions and operations. The following subsections summarize the data collection efforts. MioVision Video Camera Installations MioVision traffic video cameras were installed and collected intersection turning movement count data on Wednesday, February 23, 2016 from 7:00 AM to 9:00 AM and from 2:00 PM to 6:00 PM. MioVision traffic video cameras were installed at the following intersection: Kings Highway (Route 41) and Hopkins Lane. The data collection occurred while local schools were on a normal schedule and not on any major holidays. The data collection efforts and the network peak hours are detailed in Table 1. The processed manual count data is provided in Appendix B. Table 1 Data Collection Efforts and Established Peak Hours Traffic Count Established Peak Period Date Collected Time Frame Peak Hour Morning (AM) Peak Period 7:00 AM 9:00 AM 7:45 AM 8:45 AM Wednesday, February 23, 2016 Evening (PM) Peak Period 2:00 PM 6:00 PM 4:45 PM 5:45 PM Existing Traffic Conditions A Volume Flow Diagram illustrating the 2016 Existing Traffic Volumes is provided as Figure 3 in Appendix A.

6 Residences at Bancroft MC Project No.: B Page 4 of 15 IV. TRIP GENERATION & DISTRIBUTION Trip Generation The peak hour trips generated by the proposed development were estimated based upon the Institute of Transportation Engineers (ITE), Trip Generation Manual, 10 th Edition. ITE Land Use Code 220 Multifamily Housing (Low-Rise) was used to estimate the site generated trips for the proposed development. The site generated trip estimates are detailed in Table 2. The comprehensive trip generation worksheets are provided in Appendix C. ITE Land Use Code 220 Multifamily Housing (Low-Rise) Table 2 Site Generated Trips AM Peak Hour PM Peak Hour Size Enter Exit Total Enter Exit Total 90 Units Based upon state and national standards, a proposed site generating less than 100 peak hour trips is not considered significant. The New Jersey State Highway Access Code defines a study area location as an: Access point location or those other locations on the State highway system exceeding both 100 new half-trips during the critical peak hour(s) and 10 percent of the anticipated daily site traffic which are analyzed in a traffic study. The ITE elaborates further within Section 1.3 of the Manual on Transportation Engineering Studies by stating: 100 vehicles per hour are of a magnitude that can change the LOS of an existing intersection approach. However, to perform a conservative study, a capacity analysis was performed at the proposed site driveways and at the intersection of Kings Highway (Route 41) and Hopkins Lane. Trip Distribution Trip distribution methodology is developed based on a variety of factors. These factors include the existing travel patterns within the adjacent roadway network, adjacent land uses, proposed land use, development locations, driveway locations and the proximity of major arterials within the project vicinity. The following trip distribution patterns were established upon a review of the existing roadway volumes and proximity of major arterials: To/from Kings Highway (Route 41) (West of Site) 40%; To/from Kings Highway (Route 41) (East of Site) 40%; and To/from Hopkins Lane (North of Site) 20%.

7 Residences at Bancroft MC Project No.: B Page 5 of 15 Driveway Assignment The driveway assignment of the site generated trips was established based upon the internal layout of the site and location of driveways. The trip distribution work sheet is provided as Figure 4 in Appendix A. The site generated trips distributed into the roadway network are provided as Figure 5 in Appendix A.

8 V. FUTURE TRAFFIC CONDITIONS 2020 No-Build Traffic Volumes Residences at Bancroft MC Project No.: B Page 6 of 15 An estimation of the traffic operational characteristics at the build date, without the construction of the project (or No-Build condition) is made to determine the traffic impact of the development. The existing volumes are forecasted to the build year of Adjacent Developments The Haddonfield Borough Planning Department was contacted to determine if any developments in the vicinity would increase adjacent street traffic volumes. Based upon this discussion, there are no planned or approved developments in the immediate area that would increase adjacent street traffic volumes. Background Growth A general background growth rate was applied to the transient traffic volumes along Kings Highway (Route 41) and Hopkins Lane to account for general increases in traffic due to regional population and employment growth by the build year. The 2020 No-Build traffic volumes were forecasted by applying a background growth rate from the NJDOT Annual Background Growth Rate Table. The background growth rate is 1.00% for urban local roadways and urban minor arterials in Camden County. A Volume Flow Diagram illustrating the 2020 No-Build traffic volumes is provided as Figure 6 in Appendix A Build Traffic Volumes Bancroft School The 2020 Build traffic volumes include the traffic volumes from the existing Bancroft School. The Bancroft School will be razed and the traffic associated with the site will no longer be in the study area in the 2020 Build condition. However, the capacity analysis conducted does not include the removal of these trips. Therefore, the 2020 Build capacity analysis is considered conservative. The site generated trips were added to the 2020 No-Build traffic volumes to simulate the 2020 Build traffic conditions. A Volume Flow Diagram illustrating the 2020 Build traffic volumes is provided as Figure 7 in Appendix A.

9 Proposed Improvements Residences at Bancroft MC Project No.: B Page 7 of 15 In association with the proposed development, improvements are proposed at the intersection of Kings Highway (Route 41) & Hopkins Lane. Proposed improvements include minor widening and restriping of Kings Highway (Route 41) to provide a 75 long Eastbound dedicated left-turn lane and a 75 long Westbound dedicated right-turn lane at Hopkins Lane. The improvements will provide dedicated capacity for vehicles to turn onto Hopkins Lane from Kings Highway (Route 41) outside of the thoroughfare traffic lanes. The Roadway Improvement Plan is provided as Figure 8 in Appendix A.

10 Residences at Bancroft MC Project No.: B Page 8 of 15 VI. HCM CAPACITY ANALYSIS The peak hour traffic operations within the project vicinity were evaluated at the study intersections. The analyses were performed using the latest version of Synchro Trafficware; a traffic analysis and simulation program. The results of these analyses provide Levels of Service (LOS), volume/capacity descriptions and average seconds of delay for the intersection movements. The efficiency with which an intersection operates is a function of volume and capacity. The capacity of an intersection is the volume of vehicles it can accommodate during a given time period. LOS is a qualitative measure describing operational conditions within a traffic stream in terms of traffic characteristics such as freedom to maneuver, traffic interruption, comfort and convenience. Six LOS are defined for each type of facility with analysis procedures available. Levels of Service range from "A" through "F", with "A" representing excellent conditions with no delays and failure and deficient operations denoted by Level "F". The HCM LOS criteria for unsignalized intersections are summarized in Table 3. Table 3 HCM: Unsignalized LOS/Delay Criteria Level of Service Average Control Delay (sec/veh) A < 10 B > C > D > E > F > 50 The levels of service for the 2020 No-Build and 2020 Build conditions are detailed in Table 4.

11 Residences at Bancroft MC Project No.: B Page 9 of 15 Table 4 Level of Service Summary 2020 No-Build 2020 Build Intersection Lane Group AM Peak PM Peak AM Peak PM Peak LOS Delay LOS Delay LOS Delay LOS Delay Kings Highway (Route 41) EB L A 8.8 A 8.8 A 8.8 A 8.9 (EB/WB) & Hopkins Lane (SB)* SB LR F 74.3 C 21.1 F 71.7 C 22.0 Alley D (WB) & Hopkins Lane WB LR B 11.5 A 9.4 (NB/SB) SB L A 7.6 A 7.4 Road B (WB) & Hopkins Lane WB LR B 11.3 A 9.6 (NB/SB) SB L A 7.6 A 7.5 Road A (WB) & Hopkins Lane WB LR B 12.6 B 10.0 (NB/SB) SB L A 7.6 A 7.5 Alley C (WB) & Hopkins Lane WB LR B 11.4 A 9.8 (NB/SB) SB L A 7.6 A 7.5 *Improvements are proposed at the intersection of Kings Highway (Route 41) & Hopkins Lane. Proposed improvements include minor widening and restriping of Kings Highway (Route 41) to provide a 75 long Eastbound dedicated left-turn lane and a 75 long Westbound dedicated right-turn lane at Hopkins Lane. All capacity analysis calculation worksheets provided in Appendix C. The following subsections summarize the findings for each study intersection. Kings Highway (Route 41) & Hopkins Lane 2020 No-Build Analysis Under the No-Build conditions, the Kings Highway (Route 41) eastbound left-turn movement will operate at a LOS A during both peak hours studied. The Hopkins Lane southbound approach will operate at an LOS F and C during the AM and PM peak hours, respectively Build Analysis In association with the proposed development, improvements are proposed at the intersection of Kings Highway (Route 41) & Hopkins Lane. Proposed improvements include minor widening and restriping of Kings Highway (Route 41) to provide a 75 long Eastbound dedicated left-turn lane and a 75 long Westbound dedicated right-turn lane at Hopkins Lane. The improvements will provide dedicated capacity for vehicles to turn onto Hopkins Lane from Kings Highway (Route 41) outside of the thoroughfare traffic lanes. Volume Comparison Under the Build conditions, all movements at the intersection of Kings Highway (Route 41) and Hopkins Lane will operate at or near No-Build levels of service. A volume comparison displaying the percentage increase in volume at the intersection of Kings Highway (Route 41) and Hopkins Lane is shown in Table 5.

12 Residences at Bancroft MC Project No.: B Page 10 of 15 Table 5 Kings Highway (Route 41) & Hopkins Lane Intersection Volume Comparison Peak Hour 2020 No-Build Volumes Site Generated Trips Percent Increase AM Peak 1, % PM Peak 1, % As shown, the site generated trips account for less than 3% and 4% of the trips at the intersection during the AM and PM peak hours, respectively. 95 th Percentile Queue Length Comparison The 95 th percentile peak hour queue lengths at the intersection of Kings Highway (Route 41) and Hopkins Lane is provided in the below table for the No-Build and Build Conditions. Table 6 Kings Highway (Route 41) & Hopkins Lane Queue Lengths Lane 2020 No-Build Conditions 2020 Build Conditions Proposed Turn Bay AM Peak PM Peak AM Peak PM Peak Storage Length Kings Highway (Route 41) EBL < 1 veh. < 1 veh. < 1 veh. < 1 veh. 75 (3 veh.) Kings Highway (Route 41) WBR < 1 veh. < 1 veh. < 1 veh. < 1 veh. 75 (3 veh.) Hopkins Lane SBLR 11 veh. 1.7 veh veh. 2 veh. - As detailed above, the proposed 75 long left-turn and right-turn lanes on Kings Highway (Route 41) exceed the 95 th percentile queue lengths in the Build condition during the AM and PM peak hours. Hopkins Lane & Alley D 2020 Build Analysis Under the Build conditions, all movements at the intersection of Hopkins Lane and Alley D will operate at an LOS B or better during both peak hours studied. The Proposed Site Driveway westbound approach 95 th percentile queue length will be one vehicle or less during both peak hours studied, which can be accommodated within the internal layout of the Project Site. Hopkins Lane & Road B 2020 Build Analysis Under the Build conditions, all movements at the intersection of Hopkins Lane and Road B will operate at an LOS B or better during both peak hours studied. The Proposed Site Driveway westbound approach 95 th percentile queue length will be one vehicle or less during both peak hours studied, which can be accommodated within the internal layout of the Project Site.

13 Hopkins Lane & Road A Residences at Bancroft MC Project No.: B Page 11 of Build Analysis Under the Build conditions, all movements at the intersection of Hopkins Lane and Road A will operate at an LOS B or better during both peak hours studied. The westbound Proposed Site Driveway approach 95 th percentile queue length will be one vehicle or less during both peak hours studied, which can be accommodated within the internal layout of the Project Site. Hopkins Lane & Alley C 2020 Build Analysis Under the Build conditions, all movements at the intersection of Hopkins Lane and Alley C will operate at an LOS B or better during both peak hours studied. The westbound Proposed Site Driveway approach 95 th percentile queue length will be one vehicle or less during both peak hours studied, which can be accommodated within the internal layout of the Project Site.

14 Residences at Bancroft MC Project No.: B Page 12 of 15 VII. GAP ANALYSIS A gap analysis was conducted along Kings Highway (Route 41) at Hopkins Lane. Gap counts were conducted on January 3, 2019 from 7:00AM to 9:00AM and 2:00PM to 6:00PM along Kings Highway (Route 41) at Hopkins Lane. The following table details the number of acceptable gaps along Kings Highway (Route 41) for Hopkins Lane SB left-turns and right-turns and compares them to the build traffic volumes during the morning and evening peak hours. Time Period Weekday Morning Weekday Evening Turning Movement Table 7 Gap Analysis Acceptable Gaps Build Traffic Volume Difference Acceptable Gaps exceed Traffic Volumes Hopkins Lane SB Left YES Hopkins Lane SB Right YES Hopkins Lane SB Left YES Hopkins Lane SB Right YES The number of acceptable gaps along Kings Highway (Route 41) significantly exceeds the number of build traffic volumes making a left-turn and right-turn from Hopkins Lane SB onto Kings Highway (Route 41). The gap analysis calculations are provided in Appendix E.

15 Residences at Bancroft MC Project No.: B Page 13 of 15 VIII. PARKING ASSESSMENT The New Jersey Residential Site Improvement Standards ( RSIS ) were used to assess the required number of off-street parking stalls for residential uses. The Residential Site Improvement Standards establish Statewide parking requirements for residential uses based on dwelling type. Table 8 below summarizes the off-street municipal parking requirement based upon RSIS. Dwelling Type Table 8 RSIS Parking Calculations RSIS Parking Requirement Number of Units Parking Requirement 2 Bedroom Affordable 2.3 parking spaces per unit 8 19 parking spaces 3 Bedroom Affordable 2.4 parking spaces per unit 2 5 parking spaces The proposed parking supply of 344 parking spaces exceeds the RSIS standards. Proposed Parking Supply 24 parking spaces 3 Bedroom Townhouse 2.4 parking spaces per unit parking spaces 320 parking spaces Total parking spaces 344 parking spaces

16 Residences at Bancroft MC Project No.: B Page 14 of 15 IX. SUMMARY AND CONCLUSIONS This Traffic Impact Study evaluated a proposed residential development in the Borough of Haddonfield, Camden County, New Jersey. The findings are summarized as follows: 1. The Applicant proposes to develop a residential subdivision consisting of 80 townhomes and 10 affordable units. 2. Access to the site is proposed via four (4) full-movement driveways along Hopkins Lane. 3. As the site is not anticipated to generate more than 100 trips, it is not considered a significant impact as per state and national standards. 4. The 2020 Build traffic volumes include the traffic volumes from the existing Bancroft School. The Bancroft School will be razed and the traffic associated with the site will no longer be in the study area. However, the analysis conducted does not include this reduction. Therefore, the analysis conducted is conservative. 5. Improvements are proposed at the intersection of Kings Highway (Route 41) & Hopkins Lane. Proposed improvements include minor widening and restriping of Kings Highway (Route 41) to provide a 75 long Eastbound dedicated left-turn lane and a 75 long Westbound dedicated right-turn lane at Hopkins Lane. Under the Build conditions, all movements at the intersection of Kings Highway (Route 41) & Hopkins Lane will operate at or near No-Build levels of service. The proposed 75 long left-turn and rightturn lanes on Kings Highway (Route 41) exceed the 95th percentile queue lengths in the Build condition during the AM and PM peak hours. The site generated trips account for less than 3% and 4% of the intersection volumes during the AM and PM peak hours, respectively. 6. The number of acceptable AM and PM peak hour gaps along Kings Highway (Route 41) significantly exceeds the number of build traffic volumes making a left-turn and rightturn from Hopkins Lane SB onto Kings Highway (Route 41). 7. Under the Build conditions, all movements at the intersection of Hopkins Lane and Alley D will operate at a LOS B or better during both peak hours studied. The Proposed Site Driveway westbound approach 95 th percentile queue length will be one vehicle or less during both peak hours studied, which can be accommodated within the internal layout of the Project Site. 8. Under the Build conditions, all movements at the intersection of Hopkins Lane and Road B will operate at a LOS B or better during both peak hours studied. The Proposed Site Driveway westbound approach 95 th percentile queue length will be one vehicle or less during both peak hours studied, which can be accommodated within the internal layout of the Project Site.

17 Residences at Bancroft MC Project No.: B Page 15 of Under the Build conditions, all movements at the intersection of Hopkins Lane and Road A will operate at a LOS B or better during both peak hours studied. The Proposed Site Driveway westbound approach 95 th percentile queue length will be one vehicle or less during both peak hours studied, which can be accommodated within the internal layout of the Project Site. 10. Under the Build conditions, all movements at the intersection of Hopkins Lane and Alley C will operate at a LOS B or better during both peak hours studied. The Proposed Site Driveway westbound approach 95 th percentile queue length will be one vehicle or less during both peak hours studied, which can be accommodated within the internal layout of the Project Site. 11. The proposed parking supply of 344 parking spaces exceeds the RSIS requirement. R:\AllOffices\MtLaurel\Projects\2015\ B\Reports\Traffic\Docs\190117_kam_Bancroft_TIS.docx

18 Residences at Bancroft MC Project No.: A Appendix RESIDENCES AT BANCROFT TRAFFIC IMPACT STUDY APPENDIX A TRAFFIC FIGURES

19 PROJECT SITE BLOCK 14, LOT B RESIDENCES AT BANCROFT FIGURE 1 HADDONFIELD BOROUGH, CAMDEN COUNTY, NEW JERSEY SITE LOCATION MAP

20 FIGURE 2

21 Hopkins Lane 322 (122) Alley D 322 (122) 322 (122) 178 (98) 178 (98) 178 Road B Road A Alley C (74) (48) (98) (122) (98) Kings Highway (Route 41) 236 (32) 75 (406) (66) 324 (452) Kings Highway (Route 41) Residences at Bancroft Legend Figure 3 AM Peak: XXX Thru Movement: MC Project No B PM Peak: (XXX) Turning Movement: 2016 Counted Volumes AM & PM Peak Hours

22 Hopkins Lane 70% 5% 10% 5% 15% Alley C 40% 40% 10% 70% 10% 70% 5% 5% 55% 15% 5% 5% 5% 15% 5% 5% 5% 5% 5% 5% Alley D 5% 5% 10% 10% Road B 5% 10% 5% 10% 5% 5% 10% 5% 5% 55% 55% Road A 15% 55% 15% 15% 5% 5% 5% 10% 10% 40% 40% 40% 40% Kings Highway (Route 41) 40% 40% Kings Highway (Route 41) Residences at Bancroft Legend Figure 4 AM Peak: XXX Thru Movement: MC Project No B PM Peak: (XXX) Turning Movement: Trip Distribution AM & PM Peak Hours

23 Hopkins Lane Alley D (1) 3 (2) (1) 18 (11) Road A 23 0 Alley C 13 (8) (8) (25) 13 (3) 7 1 (14) (1) (7) (19) 3 6 (4) (2) (3) (3) 6 0 (5) (1) (1) 2 (1) Road B (4) (2) (5) (3) (1) 3 (2) 4 (14) Kings Highway (Route 41) (14) 4 Kings Highway (Route 41) PEAK HOUR ENTER EXIT TOTAL AM PM Residences at Bancroft Legend Figure 5 AM Peak: XXX Thru Movement: MC Project No B PM Peak: (XXX) Turning Movement: Site Generated Trips AM & PM Peak Hours

24 Hopkins Lane Alley D (127) 335 (127) 335 (102) 185 (102) 185 Alley C (77) (50) (102) (127) (102) (127) Road B Road A Kings Highway (Route 41) 246 (33) 78 (422) (69) 337 (470) Kings Highway (Route 41) BUILD-YEAR GROWTH RATE GROWTH RATE: 1.00% YEARS: GROWTH FACTOR: Residences at Bancroft Legend Figure 6 AM Peak: XXX Thru Movement: MC Project No B PM Peak: (XXX) Turning Movement: 2020 No-Build Volumes AM & PM Peak Hours

25 Hopkins Lane Alley D (1) 3 (2) (1) 18 (11) Road A Alley C (85) (58) (127) (3) (141) (1) (109) (19) (131) (2) (105) (3) (132) (1) 0 1 (1) 2 (1) Road B (131) (2) (107) (3) (1) 3 (2) Kings Highway (Route 41) 259 (47) 82 (422) (83) 337 (470) Kings Highway (Route 41) Residences at Bancroft Legend Figure 7 AM Peak: XXX Thru Movement: MC Project No B PM Peak: (XXX) Turning Movement: 2020 Build Volumes AM & PM Peak Hours

26 R Copyright Maser Consulting P.A. All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of Maser Consulting, P.A ENGINEER - LICENSE NUMBER: GE SCALE : 1" = 30' PROTECT YOURSELF 2015\ B\Transportation\Concept\R-PL01-CNPT.dwg\CNPT By: VJORGE ALL STATES REQUIRE NOTIFICATION OF EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN ANY STATE FOR STATE SPECIFIC DIRECT PHONE NUMBERS VISIT: REV DATE DRAWN DESCRIPTION BY Customer Loyalty through Client Satisfaction w w w. m a s e r c o n s u l t i n g. c o m Engineers Planners Surveyors Landscape Architects Environmental Scientists Office Locations: Red Bank, NJ Mt. Laurel, NJ Newburgh, NY Clinton, NJ Sterling, VA Westchester, NY Hamilton, NJ Albuquerque, NM Bethlehem, PA Marmora, NJ Albany, NY Exton, PA Mt. Arlington, NJ Chestnut Ridge, NY Tampa, FL State of N.J. Certificate of Authorization: 24GA HAMILTON OFFICE 1000 Waterview Drive, Suite 201 Hamilton, NJ Phone: Fax: solutions@maserconsulting.com CONCEPT PLAN INTERSECTION IMPROVEMENTS KINGS HIGHWAY (C.R. 573) AND HOPKINS LANE HADDONFIELD BOROUGH, CAMDEN COUNTY, NEW JERSEY SCALE: DATE: DRAWN BY: CHECKED BY: DANIEL S. FRANK NEW JERSEY PROFESSIONAL 1"=30' 01/10/19 VEJ DSF PROJECT NUMBER: B SHEET NUMBER: 1 DRAWING NAME: R-PL01-CNPT OF FIGURE 8 3

27 Residences at Bancroft MC Project No.: A Appendix RESIDENCES AT BANCROFT TRAFFIC IMPACT STUDY APPENDIX B COUNT DATA

28 Maser Consulting 1000 Waterview Drive, Suite 201 Hamilton, New Jersey E/W: Kings Highway East N/S: Hopkins Lane Haddonfield Boro., Camden Co., NJ MC Job #: B File Name : VJ0223-1HNJ Site Code : Start Date : 2/23/2016 Page No : 1 Groups Printed- Cars - Heavy Vehicles East Kings Hwy From East East Kings Hwy From West Hopkins Ln From North Start Time Thru Right Peds App. Total Left Thru Peds App. Total Left Right Peds App. Total Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % Cars % Cars Heavy Vehicles % Heavy Vehicles

29 Maser Consulting 1000 Waterview Drive, Suite 201 Hamilton, New Jersey E/W: Kings Highway East N/S: Hopkins Lane Haddonfield Boro., Camden Co., NJ MC Job #: B File Name : VJ0223-1HNJ Site Code : Start Date : 2/23/2016 Page No : 2 East Kings Hwy From East East Kings Hwy From West Hopkins Ln From North Start Time Thru Right Peds App. Total Left Thru Peds App. Total Left Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM :00 AM :15 AM :30 AM Total Volume % App. Total PHF Cars % Cars Heavy Vehicles % Heavy Vehicles Peak Hour Analysis From 02:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM :00 PM :15 PM :30 PM Total Volume % App. Total PHF Cars % Cars Heavy Vehicles % Heavy Vehicles

30 Residences at Bancroft MC Project No.: A Appendix RESIDENCES AT BANCROFT TRAFFIC IMPACT STUDY APPENDIX C TRIP GENERATION

31 ! "# $24 %43 & 6# '(!68) *6( 1 5 +!, ) & 1.3 / 6! # 362 % : <= >?6@A9BC D EFGH 567H <= IJ9KALG MLA?BC NOO IA:9P?A<LQK IAB?:A86?A<LC RS 9L?9:ALGT UUS 9VA?ALG $24 %43 EF9:QG9 WQ?9 WQLG9 <= WQ?9B >?QL@Q:@ I9FAQ?A<L HDX HNY Z HUD HN $636 *23 6! [1634 R \ ] \:A^ _L@B N z{ zg 0d D X ` ] 56789: <= IJ9KALG MLA?B -31!8-43 a43! b1" [1634# c d10e f d1eg a43! b1" +"6 63 hc d10d ijkl nopojqrksp tqpuqvwn?x _@A?A<L ylb?a?6?9 <= \:QLB^<:?Q?A<L _LGAL99:B

32 ! "# $24 %43 & 6# '(!68) *6( 1 5 +!, ) & 1.3 / 6! # 362 % : <= >?6@A9BC D EFGH 567H <= IJ9KALG MLA?BC NOP IA:9Q?A<LRK IAB?:A86?A<LC STU 9L?9:ALGV TPU 9WA?ALG $24 %43 EF9:RG9 XR?9 XRLG9 <= XR?9B >?RL@R:@ I9FAR?A<L HDS HNO Y NHD HNS $636 *23 6! Z1634 D z [ \ [:A] ^L@B T N {/ {c ec z S _ \ 56789: <= IJ9KALG MLA?B -31!8-43 `43! a1" Z1634# b c1de f c1cg `43! a1" +"6 63 hb c1d0 ijkl nopojqrksp tqpuqvwn?x ^@A?A<L ylb?a?6?9 <= [:RLB]<:?R?A<L ^LGAL99:B

33 Residences at Bancroft MC Project No.: A Appendix RESIDENCES AT BANCROFT TRAFFIC IMPACT STUDY APPENDIX D CAPACITY ANALYSIS

34 B - Bancroft 2020 No-Build Conditions 1: Kings Highway (NJSH Route 41) & Hopkins Lane AM Peak Hour Intersection Int Delay, s/veh 17.7 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS F Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A A - - F HCM 95th %tile Q(veh) NBAM.syn KAM Synchro 9 Report

35 B - Bancroft 2020 No-Build Conditions 1: Kings Highway (NJSH Route 41) & Hopkins Lane PM Peak Hour Intersection Int Delay, s/veh 2.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A A - - C HCM 95th %tile Q(veh) NBPM.syn KAM Synchro 9 Report

36 B - Bancroft 2020 Build Conditions 1: Kings Highway (NJSH Route 41) & Hopkins Lane AM Peak Hour Intersection Int Delay, s/veh 18 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS F Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A F HCM 95th %tile Q(veh) BAM.syn KAM Synchro 9 Report

37 B - Bancroft 2020 Build Conditions 2: Hopkins Lane & Alley D AM Peak Hour Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A A HCM 95th %tile Q(veh) BAM.syn KAM Synchro 9 Report

38 B - Bancroft 2020 Build Conditions 3: Hopkins Lane & Road B AM Peak Hour Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A A HCM 95th %tile Q(veh) BAM.syn KAM Synchro 9 Report

39 B - Bancroft 2020 Build Conditions 4: Hopkins Lane & Road A AM Peak Hour Intersection Int Delay, s/veh 0.5 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A A HCM 95th %tile Q(veh) BAM.syn KAM Synchro 9 Report

40 B - Bancroft 2020 Build Conditions 5: Hopkins Lane & Alley C AM Peak Hour Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A A HCM 95th %tile Q(veh) BAM.syn KAM Synchro 9 Report

41 B - Bancroft 2020 Build Conditions 1: Kings Highway (NJSH Route 41) & Hopkins Lane PM Peak Hour Intersection Int Delay, s/veh 3.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach EB WB SB HCM Control Delay, s HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A C HCM 95th %tile Q(veh) BPM.syn KAM Synchro 9 Report

42 B - Bancroft 2020 Build Conditions 2: Hopkins Lane & Alley D PM Peak Hour Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - A A A HCM 95th %tile Q(veh) BPM.syn KAM Synchro 9 Report

43 B - Bancroft 2020 Build Conditions 3: Hopkins Lane & Road B PM Peak Hour Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - A A A HCM 95th %tile Q(veh) BPM.syn KAM Synchro 9 Report

44 B - Bancroft 2020 Build Conditions 4: Hopkins Lane & Road A PM Peak Hour Intersection Int Delay, s/veh 0.5 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B A A HCM 95th %tile Q(veh) BPM.syn KAM Synchro 9 Report

45 B - Bancroft 2020 Build Conditions 5: Hopkins Lane & Alley C PM Peak Hour Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach WB NB SB HCM Control Delay, s HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - A A A HCM 95th %tile Q(veh) BPM.syn KAM Synchro 9 Report

46 Residences at Bancroft MC Project No.: A Appendix RESIDENCES AT BANCROFT TRAFFIC IMPACT STUDY APPENDIX E GAP ANALYSIS

47 GAP ANALYSIS - COUNT DATA Project: Residences at Bancroft Sheet 1 of 2 Count Date: 1/3/2019 Location: Kings Highway & Hopkins Lane Start Time 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:00 PM 3:15 PM 3:30 PM 3:45 PM 4:00 PM 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM HOPKINS LANE LEFT TURN AVAILABLE GAPS >28.0 Acceptable Gaps :00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:00 PM 3:15 PM 3:30 PM 3:45 PM 4:00 PM 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM HOPKINS LANE RIGHT TURN AVAILABLE GAPS >28.0 Acceptable Gaps Start Time

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) APPENDICES Appendix T No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) 661 Bear Valley Parkway EIR March 2017 APPENDICES This page intentionally left blank 661 Bear Valley

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE Roadway Segment Level of Service Definitions LOS V/C Congestion/Delay Traffic Description (Used for surface streets,

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes. Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 SCREENING... 1 1.1

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Date: December 20, Project #:

Date: December 20, Project #: To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS 1 FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction... 3 II. Project Description... 3 III. Existing Conditions... 6 IV. Future Traffic Demand... 10 V. Conclusions and Mitigation...

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis Congregate Care Facility Billerica, Massachusetts Prepared For: Hawthorn Development, LLC 35 Kettle Court Salem, OR 973 Prepared By: Sebago Technics, Inc. 75 John Roberts Road,

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

Tijuana River Valley Regional Park Campground and Education Center

Tijuana River Valley Regional Park Campground and Education Center Tijuana River Valley Regional Park Campground and Education Center Draft Report September 2018 Prepared for: County of San Diego 5500 Overland Avenue, Suite 410 San Diego, CA 92123 Prepared by: 3900 Fifth

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B Memorandum DATE: AUGUST 1, 2013 TO: PAUL TILTON, P.E., SANDWICH DPW DIRECTOR/TOWN ENGINEER FROM: LEV MALAKHOFF, SR. TRANSPORTATION ENGINEER RE: ROUTE 130/QUAKER MEETINGHOUSE ROAD INTERSECTION Paul: Per

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Mineola Village Green

Mineola Village Green Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA (St. Tammany Parish Mandeville, LA) Prepared For The Pittman Companies Michael N Pittman, MD 328 East Boston St Covington, LA 70433

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information