Transportation Land Development Environmental S e r v i c e s
|
|
- Kristian Allen
- 5 years ago
- Views:
Transcription
1 Transportation Land Development Environmental S e r v i c e s Memorandum To: Ms. Kristin E. Kassner Planning Director Town Hall Annex 25 Center Street Burlington, MA Date: September 23, 2013 Project No.: Walnut Street P. O. Box 9151 Watertown, MA FAX From: Vinod Kalikiri, PE, PTOE Re: Proposed Cinema Renovations and Outparcel Restaurant Burlington, Massachusetts TRIP GENERATION SUMMARY On behalf of the Applicant, ND Burlington South Avenue LLC (National Development), Vanasse Hangen Brustlin, Inc. (VHB) has prepared this memorandum to summarize the trip generation analysis prepared in support of the proposed renovations to the existing AMC multiplex cinema and the construction of a new outparcel restaurant on South Avenue (the Project). PROJECT DESCRIPTION The existing cinema is located at 20 South Avenue on an approximately 6.2-acre parcel of land. The parcel is generally bounded by Middlesex Turnpike to the east, South Avenue to the south and west and an extended stay hotel to the north. The cinema has approximately 2,400 seats and 10 screens. In addition to 332 parking spaces immediately surrounding the cinema building, additional parking for the cinema patrons is accommodated in a 316-space overflow parking lot located on a separate, 3.4- acre parcel of land located to the south of South Avenue (at 15 South Avenue). Between the two parcels, total existing parking supply for the cinema is 648 spaces. 20 South Avenue has two stopcontrolled curb cuts, one on each leg of South Avenue. 15 South Avenue has two stop-controlled curb cuts on the south side of South Avenue. The Applicant proposes to renovate the cinema and reduce the seat count to 1,008 seats with 10 screens, which represents a 58-percent reduction in the number of seats. The existing perpendicular parking to the north of the cinema building will be slightly reconfigured to result in a total of 337 parking spaces for the cinema patrons at 20 South Avenue. The two existing curb cuts for the cinema parcel will be maintained in their current configuration. After the proposed seat reduction at the cinema and reconfiguration of its parking at 20 South Avenue, overflow parking at 15 South Avenue will no longer be needed for the cinema patrons. The Applicant therefore proposes to construct an 8,650± square-foot (sf), 294-seat restaurant at 15 South Avenue. The total restaurant seat count includes 192 indoor seats and 102 outdoor seats on a covered patio. The restaurant size noted above includes approximately 6,900± sf of indoor seating, a 1,200 ± sf covered patio and a 550± sf trash enclosure. A total of 145 parking spaces will be provided for the restaurant patrons at 15 South Avenue. The easterly existing curb cut for 15 South Avenue will be \\vhb\proj\wat-ld\ \docs\memos\traffic\ trafficmemo-final.doc
2 Date: September 23, 2013 Project No.: closed and the westerly curb cut will be reconfigured to serve the restaurant traffic. Pedestrian sidewalk and crosswalk improvements are proposed as part of the Project to improve pedestrian flow between the two uses. Under current conditions, traffic exiting the cinema after each show is directed to travel in a clockwise movement via South Avenue and Second Avenue to Middlesex Turnpike in order to minimize conflicts with vehicles entering the cinema via the South Avenue/Middlesex Turnpike intersection. As part of an on-going and unrelated adjacent project (Keurig), the existing one-way restriction on South Avenue adjacent to the Site will be removed which will allow two-way traffic operations along the full length of South Avenue in the future. Thus, traffic arriving at the cinema and the proposed restaurant will have the option of either using the South Avenue/Middlesex Turnpike intersection or the Second Avenue/ Middlesex Turnpike intersection. The improvements proposed on South Avenue by the Keurig project have been taken into consideration when developing the access/circulation patterns for the Project. TRIP GENERATION COMPARISON As noted previously, the Project includes a 58-percent reduction in the seat count at the cinema. Since the number of screens will not change and movie start/end times will generally remain consistent with the current operations, it can be expected that the reduction in the seat count represents a direct reduction in the trip generation estimates for the cinema. The purpose of the trip generation analysis presented in this document is to compare the cinema trip reduction with the increase in traffic associated with the proposed restaurant use, which ultimately determines whether the Project will represent a net increase or decrease in traffic on area roadways in the future. Trip estimates for the existing and proposed uses are based on guidelines in the Institute of Transportation Engineers (ITE) Trip Generation 1 manual. Specifically, trip rates for ITE Land Use Codes (LUC) 445 (multiplex cinema) and LUC 932 (high turnover sit-down restaurant) were used in the analysis. Peak traffic for uses such as cinemas and restaurants generally does not occur at the same time as the roadway peak hours (i.e., during the commuter peak hours on weekdays and retail peak hour during Saturday midday). Therefore, trip generation estimates for the Project were developed for both the roadway peak hours as well as the site peak hours to ensure that all potential peak times are covered. Table 1 summarizes the trip generation analysis. Detailed calculation worksheets are included in the attachment to this memorandum. It should be noted that the presence of two compatible and complimentary uses such as a cinema and a restaurant, across from each other and with well defined vehicular and pedestrian connections, will result in some degree sharing of trips between the two uses. For example, a cinema patron may choose to visit the restaurant before/after the movie. Similarly, a customer at the restaurant may decide to watch a movie after dining at the restaurant. This sharing of trips between compatible land uses is known as internal capture of trips as it does not represent additional traffic on the area roadway system. As part of the trip generation analysis for the Project, internal trip capture between the cinema and the restaurant was estimated based on the methodology outlined in the ITE Trip Generation Handbook. The estimated internal capture trips were subtracted from the gross trip estimates for the two uses to develop the net trip generation for the future conditions. The internal capture results are included in Table 1 and the corresponding calculation worksheets are included in the attachment to this memorandum. 1 Trip Generation; Ninth Edition; Institute of Transportation Engineers; Washington, D.C.; 2012 \\vhb\proj\wat-ld\ \docs\memos\traffic\ trafficmemo-final.doc
3 Date: September 23, 2013 Project No.: Table 1: Peak Hour Trip Generation Summary Evening Peak Hour - Roadway Peak Existing Cinema Future Cinema Future Restaurant Internal Capture Total Future Trips Change in Trips from the Existing Conditions Enter Exit Total Evening Peak Hour - Generator Peak Enter Exit Total Saturday Peak Hour - Roadway Peak Enter Exit Total Saturday Peak Hour - Generator Peak Enter Exit Total A Negative trip estimate represents a reduction in trips when compared to the existing condition Note: see detailed worksheets in the attachment to this memorandum for the analysis inputs and assumptions that formed the basis of the above summary A review of the trip generation analysis summary in Table 1 leads to the following findings. During the roadway peak hours (i.e., during the commuter peak hours on weekdays and retail peak hour during the midday on Saturdays), the combination of the smaller cinema and the new restaurant would generate approximately the same level of traffic as the existing 2,400-seat cinema. i.e., traffic operations on area roadways can be expected to be minimally affected by the Project during the times when the roadway traffic peaks. Conservatively assuming that the individual site peak hours of the cinema and the restaurant occur at the same time (worst case assumption), the sum of the traffic generated during the site peaks represents an approximately 29 to 39 percent reduction in traffic, when compared to the corresponding peak hour of the existing cinema use. Alternately, if the peaks of the uses occur at different times, comparison to the existing cinema site peak would represent an even bigger trip reduction than the percentages suggested above. Overall, the Project represents no noticeable change in trip generation during the roadway peak hours and a significant reduction in trip generation during the site peak hours, when compared to the existing conditions. ATTACHMENTS: Trip generation worksheets Internal trip calculation worksheets \\vhb\proj\wat-ld\ \docs\memos\traffic\ trafficmemo-final.doc
4 Project Information Project Name: AMC / EXISTING No: Date: 9/16/2013 City: Burlington State/Province: MA Zip/Postal Code: Country: Client Name: ND Analyst's Name: VK Edition: 9th Land Use Size PM roadway peak hour PM Generator peak Saturday midday roadway peak hour Saturday generator peak hour Entry Exit Entry Exit Entry Exit Entry Exit 445 Multiplex Movie Theater 2400 Seats Reduction Internal Pass by Non pass by Total Total Reduction Total Internal Total Pass by Total Non pass by
5 Project Information Project Name: AMC / Proposed Cinema No: Date: 9/16/2013 City: Burlington State/Province: MA Zip/Postal Code: Country: Client Name: ND Analyst's Name: VK Edition: 9th Land Use Size PM roadway peak hour PM Generator Peak Hour Saturday Generator Peak Hour Saturday Midday roadway peak hour Entry Exit Entry Exit Entry Exit Entry Exit 445 Multiplex Movie Theater 1008 Seats Reduction Internal Pass by Non pass by Total Total Reduction Total Internal Total Pass by Total Non pass by
6 Project Information Project Name: AMC / Restaurant use Seats No: Date: 9/17/2013 City: Burlington State/Province: MA Zip/Postal Code: Country: Client Name: ND Analyst's Name: VK Edition: 9th Land Use Size Weekday daily PM Roadway peak hour PM generator peak hour Saturday daily Saturday Generator peak hour Entry Exit Entry Exit Entry Exit Entry Exit Entry Exit 932 High Turnover (Sit Down) Restaurant 294 Seats Reduction Internal Pass by Non pass by Total Total Reduction Total Internal Total Pass by Total Non pass by
7 ITE Internal Capture Rate Calculation Job Name: AMC Job Number: Analyst: VK Date: 9/17/2013 Land Use A Time Period: Wkday PM - Roadway Peak ITE LUC Size: 1,008 Cinema Seats Exit to External Total Internal External 50 Enter Exit Enter from External Total % 100% 8% 92% 31% 16 32% Balanced Balanced Balanced Balanced 3% 2 8% Land Use B Land Use C ITE LUC Size: 294 Seats Demand Balanced Demand ITE LUC Size: Restaurant Exit to External Total Internal External Total Internal External Enter from External 48 Enter Enter Exit Exit Enter from External Total Demand Balanced Demand Total Exit to External % 100% 5% 95% % 100% #DIV/0! #DIV/0! Net External Trips for Multi-Use Development Land Use A Land Use B Land Use C Total Enter Exit Total Internal Capture Rate Single-Use Trip Gen. Est % DIFFERENCE 6 6 \\mawald\ld\08167\ssheets\summary.xlsx Shared PM Rdway Pk last updated: 09/15/03
8 ITE Internal Capture Rate Calculation Job Name: AMC Job Number: Analyst: VK Date: 9/17/2013 Land Use A Time Period: Wkday PM - Generator Peak ITE LUC Size: 1,008 Cinema Seats Exit to External Total Internal External 135 Enter Exit Enter from External Total % 100% 4% 96% 31% 43 32% Balanced Balanced Balanced Balanced 3% 3 8% Land Use B Land Use C ITE LUC Size: 294 Seats Demand Balanced Demand ITE LUC Size: Restaurant Exit to External Total Internal External Total Internal External Enter from External 94 Enter Enter Exit Exit Enter from External Total Demand Balanced Demand Total Exit to External % 100% 5% 95% % 100% #DIV/0! #DIV/0! Net External Trips for Multi-Use Development Land Use A Land Use B Land Use C Total Enter Exit Total Internal Capture Rate Single-Use Trip Gen. Est % DIFFERENCE \\mawald\ld\08167\ssheets\summary.xlsx Shared PM Gen Pk last updated: 09/15/03
9 ITE Internal Capture Rate Calculation Job Name: AMC Job Number: Analyst: VK Date: 9/17/2013 Land Use A Time Period: Saturday - Roadway Peak ITE LUC Size: 1,008 Cinema Seats Exit to External Total Internal External 23 Enter Exit Enter from External Total % 100% 9% 91% 31% 8 32% Balanced Balanced Balanced Balanced 3% 2 8% Land Use B Land Use C ITE LUC Size: 294 Seats Demand Balanced Demand ITE LUC Size: Restaurant Exit to External Total Internal External Total Internal External Enter from External 67 Enter Enter Exit Exit Enter from External Total Demand Balanced Demand Total Exit to External % 100% 5% 95% % 100% #DIV/0! #DIV/0! Net External Trips for Multi-Use Development Land Use A Land Use B Land Use C Total Enter Exit Total Internal Capture Rate Single-Use Trip Gen. Est % DIFFERENCE 8 8 \\mawald\ld\08167\ssheets\summary.xlsx Shared Sat Rdway Pk last updated: 09/15/03
10 ITE Internal Capture Rate Calculation Job Name: AMC Job Number: Analyst: VK Date: 9/17/2013 Land Use A Time Period: Saturday generator peak ITE LUC Size: 1,008 Cinema Seats Exit to External Total Internal External 143 Enter Exit Enter from External Total % 100% 3% 97% 31% 45 32% Balanced Balanced Balanced Balanced 3% 2 8% Land Use B Land Use C ITE LUC Size: 294 Seats Demand Balanced Demand ITE LUC Size: Restaurant Exit to External Total Internal External Total Internal External Enter from External 67 Enter Enter Exit Exit Enter from External Total Demand Balanced Demand Total Exit to External % 100% 5% 95% % 100% #DIV/0! #DIV/0! Net External Trips for Multi-Use Development Land Use A Land Use B Land Use C Total Enter Exit Total Internal Capture Rate Single-Use Trip Gen. Est % DIFFERENCE 8 8 \\mawald\ld\08167\ssheets\summary.xlsx Shared Sat Gen Pk last updated: 09/15/03
Date: December 20, Project #:
To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long
More informationConstruction Realty Co.
MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:
More informationTrip Generation Study: Provo Assisted Living Facility Land Use Code: 254
Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationKing Soopers #116 Thornton, Colorado
Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company
More informationCostco Gasoline Fuel Station Transportation Characteristics
Exhibit A MEMORANDUM Date: May 23, 2013 Project #: I-10 To: Jennifer Murillo, Costco Wholesale Terry Odle, Mulvanny G2 Architecture From: Sonia Hennum, PTOE Project: Subject: Signal Hill Costco Gasoline
More informationTable 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out
October 24, 218 Mr. Justin D. Bridges, AIA, LEED AP Davidson A+E 431 Indian Creek Parkway Overland Park, KS 6627 RE: Dear Mr. Bridges, Trip Generation Overland Park, Kansas As requested, Priority Engineers,
More information4/2/18 MP NORTHPOINT MALL GENERAL GROWTH PROPERTIES
PHOTOGRAPH OF PIONEER PLACE, PORTLAND, OREGON APPLICATION FOR MASTER PLAN AMENDMENT CITY OF ALPHARETTA, GEORGIA Photograph of Pioneer Place, Portland, Oregon, showing exterior of a leasable office use
More informationTRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA
TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)
More informationappendix 4: Parking Management Study, Phase II
appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.
More informationProposed Inn at Bellefield Traffic Impact Assessment
Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017
More informationTraffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois
Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,
More informationProposed CVS/pharmacy
Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts
More informationTraffic Feasibility Study
Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,
More informationTraffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)
Associates Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508) 885-5121 Ms. Teri Ford, Associate 800 Boylston Street, Suite 1570 Boston, MA July
More informationCraig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject
TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022
More informationHeartland Town Square
Attachment TRA- Assignment of Other Developments Hamlet of Brentwood Town of Islip Suffolk County, New York Prepared by: 0 Joshua s Path Suite 00 Hauppauge, New York.. May 0 Planned Development Project
More informationVolume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.
Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared
More informationProposed Hotel and Restaurant Development
Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering
More informationTraffic Impact Study for Proposed Olive Boulevard Development
Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141
More informationEXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.
EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and
More informationTraffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:
Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed
More informationTRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald
More informationTraffic Generation November 28, Mr. Todd Baker Baker Properties, LLC 953 Islington Street Suite 23D Portsmouth, NH 03801
28-1932-03 November 28, 2016 Mr. Todd Baker Baker Properties, LLC 953 Islington Street Suite 23D Portsmouth, NH 03801 Re: Traffic Impact Evaluation The Rose Farm Residential Development Exeter, New Hampshire
More information11 October 12, 2011 Public Hearing APPLICANT:
11 October 12, 2011 Public Hearing APPLICANT: CARING TRANSITIONS PROPERTY OWNER: HARDEE REALTY CORPORATION REQUEST: Conditional Use Permit (motor vehicle rental) STAFF PLANNER: Leslie Bonilla ADDRESS /
More information1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON
CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently
More informationDEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS
DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY NOVEMBER 30, 2017 SUBMITTED BY: LYDON LYNCH ARCHITECTS TABLE OF CONTENTS LETTER OF INTRODUCTION PROJECT
More informationTHE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO
THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,
More informationTraffic Impact Statement (TIS)
Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205
More informationParks and Transportation System Development Charge Methodology
City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update
More informationAppendix S. Shared Parking Analysis
Appendix S Shared Parking Analysis PARKING DEMAND ANALYSIS 2 ND + PCH PROJECT Long Beach, California April 10, 2017 April 10, 2017 Mr. Stephanie Eyestone-Jones Eyestone Environmental 6701 Center Drive
More informationTRANSPORTATION REVIEW
TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE
More informationAppendix 3. Transportation Narrative and Supplements
Appendix 3. Transportation Narrative and Supplements TRANSPORTATION Vanasse & Associates, Inc. (VAI) has completed a Transportation Impact Assessment (TIA) in support of this Application pursuant to Section
More informationDowntown Lee s Summit Parking Study
Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis
More informationWest Hills Shopping Centre Lowe s Expansion Traffic Impact Study
West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8
More informationTrip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014
Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation
More informationMEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:
MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed
More informationRE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2
1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial
More informationAPPENDIX TR-1 PARKING AND QUEUING ASSESSMENT
APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach,
More informationTraffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.
Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis
More informationProposed Lowe s Home Improvement Center
Traffic Impact and Access Study Proposed Lowe s Home Improvement Center Dennis, Massachusetts Prepared for Prepared by Lowe s Home Centers, Inc. 1605 Curtis Bridge Road Wilkesboro, North Carolina 28697
More informationHUMC/Mountainside Hospital Redevelopment Plan
Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900
More informationTABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2
TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3
More informationTrip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair
Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Final Report 2011 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter
More informationAppendix C Transportation. C-1: Chelsea Market Survey Results C-2: Transportation Demand Factors Memo C-3: Proposed Safety Improvements
Appendix C Transportation C-1: Chelsea Market Survey Results C-2: Transportation Demand Factors Memo C-3: Proposed Safety Improvements Appendix C-1 Chelsea Market Survey Results CHELSEA MARKET SURVEY
More informationTransportation & Traffic Engineering
Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family
More informationRE: A Traffic Impact Statement for a proposed development on Quinpool Road
James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront
More informationIngraham High School Parking and Traffic Analysis
Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,
More informationMineola Village Green
Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared
More informationTRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site
TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734
More informationAddress Land Use Approximate GSF
M E M O R A N D U M To: Kara Brewton, From: Nelson\Nygaard Date: March 26, 2014 Subject: Brookline Place Shared Parking Analysis- Final Memo This memorandum presents a comparative analysis of expected
More information105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited
105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318
More informationEXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i
EXECUTIVE SUMMARY MacKenzie Engineering and Planning, Inc. performed an analysis of the traffic impacts resulting from the proposed project site located at 25 SE 4th Avenue, Delray Beach, Florida (PCN
More informationTRANSPORTATION TECHNICAL REPORT
TRANSPORTATION TECHNICAL REPORT for Sunrise Elementary School Replacement PREPARED FOR: Puyallup School District PREPARED BY: 6544 NE 61 st Street, Seattle, WA 98115 ph: (26) 523-3939 fx: (26) 523-4949
More informationKing County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.
King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...
More informationAPPENDIX C-2. Traffic Study Supplemental Analysis Memo
APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised
More informationTECHNICAL MEMORANDUM. Part A: Introduction
TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,
More informationMILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND
MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,
More informationThis letter summarizes our observations, anticipated traffic changes, and conclusions.
Mr. David Jorschumb Project Manager Boulder Valley School District Re: Review of proposed school access improvements at the Foothills Elementary School in Boulder Dear Mr. Jorschumb, At your request, the
More informationMERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1
MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny
More informationMEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply
MEMO DATE: March 22, 2016 PROJECT O: 4241-44 PROJECT: 1550 Alberni Street SUBJECT: Transportation Design Rationale for Rezoning Application (Update with Design Package) TO: Dave Leung, 1550 Alberni Limited
More informationEast Stockton Boulevard (South Sacramento) Costco Gasoline Expansion Fuel Station Expansion Trip Generation Estimate
MEMORANDUM Date: February 7, 2013 Project #: 13270.0 To: From: Matt Cyr, Barghausen Consulting Engineers Sonia Hennum, PTOE & Alex Kiheri Project: Subject: cc: East Stockton Boulevard (South Sacramento)
More informationTraffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois
Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois N 83 rd Street Janes Avenue Soccer Fields Janes Avenue Shopping Plaza Cypress Cove Family
More informationAPPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS
APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix
More informationV. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION
V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION The following Section presents a summary of the Traffic Study for the Proposed Civic Center/Metlox Development Project in the City of Manhattan
More informationTransportation Impact Analysis for the Carolina North Development Executive Summary
DRAFT Transportation Impact Analysis for the Carolina North Development Executive Summary SUBMITTED TO Town of Chapel Hill, North Carolina SUBMITTED BY Vanasse Hangen Brustlin, Inc. May 1, 2009 vhb/proj/silver/37984.00_cov...
More informationAPPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM
APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation
More informationD. J. Halpenny & Associates Ltd. Consulting Transportation Engineers
D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers August 24, 2015 File: 115-622 Mr. R. Baumann, President The RGB Group 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 RE: RESIDENTIAL DEVELOPMENT
More informationRe: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario
April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:
More informationAppendix C. Traffic Study
Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian
More informationDELICETO, LLC PALM BEACH COUNTY, FL
COMPREHENSIVE PLAN AMENDMENT TRAFFIC ANALYSIS DELICETO, LLC PALM BEACH COUNTY, FL PREPARED FOR: DELICETO, LLC Project #042787007 April 18, 2018 Revised May 29, 2018 CA 00000696 Kimley-Horn and Associates,
More informationSPECIAL USE CRITERIA
SPECIAL USE CRITERIA Panera Bread at Deerbrook Mall Retail F 385 Lake Cook Road, Deerfield, IL 60015 Does it meet the standards for a Special Use? A Special Use shall be authorized only when the Plan Commission
More informationMercer Island Center for the Arts Parking Management Plan
Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including
More informationBennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017
Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC
IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed
More informationColston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN
as Trustee for C & B Unit Trust ABN 27 623 918 759 Our Ref: 20 July, 2017 TR/10419/jj Transport Planning Traffic Studies Parking Studies Frasers Property Australia PO Box 4148 SHELLHARBOUR NSW 2529 Attention:
More informationDEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.
DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation
More informationAPPENDIX VMT Evaluation
APPENDIX 2.7-2 VMT Evaluation MEMORANDUM To: From: Mr. Jonathan Frankel New Urban West, Incorporated Chris Mendiara LLG, Engineers Date: May 19, 2017 LLG Ref: 3-16-2614 Subject: Villages VMT Evaluation
More informationOakbrook Village Plaza City of Laguna Hills
Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna
More informationEscondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT
Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite
More informationRevised Strategy for Downtown Parking
Revised Strategy for Downtown Parking December 4, 2017 Council Workshop Presented by Jennifer McCoy, P.E., City Traffic Engineer City-Owned Parking Today 3,500 metered parking spaces Parking meters charge
More informationLacey Gateway Residential Phase 1
Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West
More informationSTAFF REPORT # CHANGE OF ZONING
STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application
More informationTRAFFIC IMPACT ANALYSIS. for MILTON SQUARE
TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE
More informationARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS
ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt
More information700 University Avenue Mixed-Use Development. Traffic Impact Analysis
700 University Avenue Mixed-Use Development Traffic Impact Analysis January 20, 2006 Prepared by 700 UNIVERSITY AVENUE MIXED- USE DEVELOPMENT TRAFFIC IMPACT STUDY Table of Contents 1.0 Executive Summary...
More informationChevy Chase Lake. Preliminary Plan # B TRAFFIC STATEMENT. Prepared for: Chevy Chase Land Company & Bozzuto Development Company
Chevy Chase Lake Preliminary Plan # 12002020B TRAFFIC STATEMENT Prepared for: Chevy Chase Land Company & Bozzuto Development Company Montgomery County, Maryland Prepared by: SSSTS Consulting (410) 718-8660
More informationPer Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS
January 2, 2018 Mr. Paul DeBotton Marple Associates, L.P. 1604 Walnut Street, 4 th Floor Philadelphia, PA 19103 RE: Langford Run Road Traffic Analysis Proposed Mid County Shopping Center Marple Township,
More informationTraffic Impact Study Speedway Gas Station Redevelopment
Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...
More informationTable 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period
8. Operating Plans The following Section presents the operating plans for the Short-List Alternatives. The modern streetcar operating plans are presented for Alternatives 2 and 3, followed by bus rapid
More informationCitizens Committee for Facilities
Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on
More informationTrip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station
Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station Final Report 2013 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter at
More informationTRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:
TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:
More informationNEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis
Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle
More informationTrip Generation and Parking Study New Californian Apartments, Berkeley
Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter
More informationTRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT
DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899
More informationSite Traffic Studies:
Site Traffic Studies: Top Pitfalls and their solutions Florida Department of Transportation Office of Intermodal Systems Development Systems Planning Office Access Management Tallahassee, Florida Opening
More informationTRAFFIC AND PARKING ASSESSMENT FOR PROPOSED MIXED USE DEVELOPMENT 2250 COMMERCIAL DRIVE, VANCOUVER
The City of Vancouver TRAFFIC AND PARKING ASSESSMENT FOR PROPOSED MIXED USE DEVELOPMENT 2250 COMMERCIAL DRIVE, VANCOUVER July 2009 ISSUED FOR USE EBA File: V31201348 ward consulting group A DIVISION OF
More informationApril 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435
Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:
More informationTraffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT
Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main
More information