Chevy Chase Lake. Preliminary Plan # B TRAFFIC STATEMENT. Prepared for: Chevy Chase Land Company & Bozzuto Development Company
|
|
- Lee Glenn
- 5 years ago
- Views:
Transcription
1 Chevy Chase Lake Preliminary Plan # B TRAFFIC STATEMENT Prepared for: Chevy Chase Land Company & Bozzuto Development Company Montgomery County, Maryland Prepared by: SSSTS Consulting (410) July 9, 2016
2 July 9, 2016 Mr. Matthew Folden, Planner/Coordinator, Area 1 Montgomery County Planning Department M-NCPPC 8787 Georgia Avenue Silver Spring, MD Re: Traffic Statement Proposed Chevy Chase Lake Redevelopment, Preliminary Plan Amendment# B - Block B Chevy Chase, MD This Traffic Statement presents the transportation review requirements in order to amend the previously Approved Preliminary Plan application for redevelopment of Chevy Chase Lake East shopping center located on the east side of Connecticut Avenue (MD 185) in Chevy Chase, Maryland and referred to as Block B. The redevelopment of Phase One: Block B meets preliminary Adequate Public Facilities ( APF ) requirements as previously approved in Preliminary Plan No A through an approved conversion mechanism that is described in full below. Figure 1. Chevy Chase Lake Redevelopment Location Map As shown in Figure 1, the proposes site for redevelopment of the Chevy Chase Lake East Shopping Center is located at 8505, 8507, 8519 and 8551 Connecticut Avenue (collectively, referred to hereinafter as the "Property" or "Chevy Chase Lake East Shopping Center"). The Applicant is requesting approval to redevelop the Block B with a mixed-use development containing a maximum of 792,284 gross square feet in total, including up to a maximum of 668,371 square feet of residential (534 units) and up to 109,270 square feet of non-residential development (the "Project"). The residential component of the Project will include multifamily housing, both rental and for-sale. 1
3 Discussion On October 17, 2002 and thereafter, a subsequent amendment on September 29, 2005, the Montgomery County Planning Board approved a Preliminary Plan for 174,016 square feet of commercial retail and 74,356 square feet of office use for a total of 248,372 square feet of new buildings for The Chevy Chase Lake East site located on the east side of Connecticut Avenue (now Block B). The Applicant requested and the Planning Board approved an extension of the Preliminary Plan and APF validity periods for Preliminary Plan No A both until November Since that time, the County Council has approved multiple automatic extensions for Preliminary Plan validity periods and APF determinations (the most recent extension was SRA 15-01) thus extending the approval until Figure 2. Site Plan The County Council adopted a new Sector Plan for the Chevy Chase Lake area on July 30, 2013 (Resolution # ). In approving the Sector Plan, the Council concluded that the Chevy Chase Land Company would be able to move forward with a Pre-Purple Line development on Block B without requiring a new Adequate Public Facilities (APF) test, if the proposed development did not generate additional trips beyond those previously approved in Preliminary Plan No A (i.e., no more than 503 Total AM Peak Hour Trips and 1051 Total PM Peak Hour Trips). Block B will not exceed these trip caps and is therefore, exempt from new APF testing. TRIP GENERATION The Project is projected to generate a net 392 AM and 706 PM weekday peak hour trips, significantly under the trip credit. The remaining trip credit of 111 AM and 345 PM weekday peak hour trips that be reserved for future development. Projected site generated trips are shown in Table 1. 2
4 Land use Block B 1 Table 1. Trip Generation Phase 1-Block B Density AM PM In Out Total In Out total Residential 534 High Rise Retail 109,270 Sq. Ft ,059 Pass-By Trip Reduction 40% (PM Only) Total Trips Block B1,B2,B Internal Capture Rate 9% 9% 9% 15% 15% 15% Net Total Trip PREVIOUSLY APPROVED ,051 TRIP CREDIT REMAINING TRIP CREDIT Local Area Transportation Review (LATR) According to the LATR/TPAR Guidelines, any new development that generates more than 30 weekday peak hour trips must be tested for transportation Adequate Public Facilities. The proposed development satisfied this requirement during the approval process for Preliminary Plan No A. The Project will maintain the traffic level well below the previously approved plan and, therefore, the preliminary plan for this portion of the development is exempt from a new LATR test. This Traffic Statement with a summary of site trip generation as shown in Table 1 and assigning the trips to the access points satisfies the LATR requirements of the APF review for Preliminary Plan application purposes. Transportation Policy Area Review (TPAR) The applicant is exempt from TPAR payment because the projected trips is well below the trip cap as shown in Table 1. This Traffic Statement satisfies the TPAR requirements of the APF review for Preliminary Plan application purposes. Site Access and Circulation The future Purple Line serves the property and runs along the southern boundary of Block B, where the Chevy Chase Lake station will be located on the east side of Connecticut Avenue. A planned private road running parallel to and on the east side of Connecticut Avenue connects Manor Road and Chevy Chase Lake Drive. This road provides for safe and efficient local vehicular, pedestrian and bicycle traffic without the need to travel on Connecticut Avenue. The Project will have convenient access to the Purple Line connecting Bethesda to Silver Spring, two legs of the Red Line Metrorail. The access points will remain at the same approximate locations without any change. The Project provides sufficient parking spaces with safe and efficient access from the internal road network. Access from both external and internal roadways has been evaluated for both safety and efficiency and they are adequate. The new circulation plan for the Project provides safe and efficient connectivity for vehicular as well as pedestrian and bicycle traffic. Figure 3 and 4 shows Circulation Plan and Bicylce and Pedestrian Plans respectively. 3
5 Figure 3. Circulation Plan Adequate sidewalks and bicycle facilities will be provided along the adjacent roads according to the Sector Plan recommendations as well as within the site. Lead-in sidewalks connecting the buildings to the existing sidewalks along the periphery of the site and connecting to the Purple Line Station will be adequate, easy to use and safe. The signalized intersections proximate to the site are provided with pedestrian signals for safe and easy crossing of major roads. Adequate crosswalk markings are provided at all nearby intersections. 4
6 Figure 4. Bicycle and Pedestrain Plan Conclusion This traffic statement illustrates that the Project is well within the approved trip credit with excess trips from the credit available for future development. Thus, the Traffic Statement confirms that the transportation requirements for the proposed Preliminary Plan Amendment are satisfied as the Project does not exceed 503 AM and 1,051 PM weekday peak hour trips. The traffic statement also confirms that the proposed site access and circulation for the Project provides safe and efficient connectivity for vehicular, pedestrian and bicycle users. The Project includes a new private road that will assist in making a meaningful new connection between Manor Road and Chevy Chase Lake Drive. The Project also focuses on its relationship to the Purple Line so that transit is maximized at this strategically important location. Should you have any question regarding this traffic statement, please call me at (410) cc: Miti Figueredo Hilary Goldfarb Steve Robins Josh Sloan Michael Swartz Steve Knight 5
7359 WISCONSIN AVENUE MONTGOMERY COUNTY, MARYLAND
7359 WISCONSIN MONTGOMERY COUNTY, MARYLAND September 1, 2017 7359 Wisconsin Avenue September 2017 7359 WISCONSIN Local Area Transportation Review Montgomery County, Maryland September 1, 2017 Prepared
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationappendix 4: Parking Management Study, Phase II
appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.
More informationRE: 67/71 Marquette Avenue Redevelopment Transportation Overview
1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com April 23, 2014 OUR REF: TO3157TOA00 BY EMAIL: mark.larose@urbanrisedevelopment.com Urban Rise
More informationBi-County Transitway/ Bethesda Station Access Demand Analysis
Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction
More informationDEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS
DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY NOVEMBER 30, 2017 SUBMITTED BY: LYDON LYNCH ARCHITECTS TABLE OF CONTENTS LETTER OF INTRODUCTION PROJECT
More informationANDERSON PROPERTY SITE ANALYSIS
ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion
More informationDulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17, 2013 1 On March 19, 2013 the Fairfax County Board of Supervisors asked FCDOT staff
More informationRE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2
1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial
More informationTRANSPORTATION REVIEW
TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE
More information4/2/18 MP NORTHPOINT MALL GENERAL GROWTH PROPERTIES
PHOTOGRAPH OF PIONEER PLACE, PORTLAND, OREGON APPLICATION FOR MASTER PLAN AMENDMENT CITY OF ALPHARETTA, GEORGIA Photograph of Pioneer Place, Portland, Oregon, showing exterior of a leasable office use
More informationUnited Therapeutics Phase 3 Silver Spring, MD
Traffic Impact Study United Therapeutics Phase 3 Silver Spring, MD Prepared for: United Therapeutics Corporation April 1, 2013 Kimley-Horn & Associates, Inc. 2013 This document, together with the concepts
More informationTIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:
TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive
More informationCraig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject
TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022
More informationRe: 233 Armstrong Street Residential Condominium Traffic Brief
1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,
More informationTraffic Impact Study Speedway Gas Station Redevelopment
Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...
More informationTRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA
TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)
More informationAPPENDIX VMT Evaluation
APPENDIX 2.7-2 VMT Evaluation MEMORANDUM To: From: Mr. Jonathan Frankel New Urban West, Incorporated Chris Mendiara LLG, Engineers Date: May 19, 2017 LLG Ref: 3-16-2614 Subject: Villages VMT Evaluation
More informationARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS
ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET
More informationVIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016
MANASSAS PARK STATION PARKING EXPANSION Site Evaluation & Recommendation October 18, 2016 1 INFORMATION ITEM Project Overview Parking Demand Site Evaluation VRE Recommended Preferred Alternative Next Steps
More informationCitizens Committee for Facilities
Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 5 Date: 3/2/17 Smart Kids Bilingual Learning Day Care LLC, Conditional Use No. CU 2017-10
More informationLEED v4 Building Design and Construction Quiz #3 LT
LEED v4 Building Design and Construction Quiz #3 LT 1. How are walking and bicycling distance measured? A. Straight-line radius from a main building entrance B. Straight-line radius from any building entrance
More informationTransportation & Traffic Engineering
Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family
More informationRequests Conditional Use Permit (Open Air Market) Staff Recommendation Approval. Staff Planner Kristine Gay
Applicant Property Owner Runnymede Corp. Public Hearing April 12, 2017 City Council Election District Beach Agenda Item 10 Requests Conditional Use Permit (Open Air Market) Staff Recommendation Approval
More informationAPPENDIX C-2. Traffic Study Supplemental Analysis Memo
APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised
More informationConstruction Realty Co.
MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:
More informationEXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.
EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and
More informationTraffic Impact Statement (TIS)
Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205
More informationTECHNICAL MEMORANDUM. Part A: Introduction
TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,
More informationTable 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out
October 24, 218 Mr. Justin D. Bridges, AIA, LEED AP Davidson A+E 431 Indian Creek Parkway Overland Park, KS 6627 RE: Dear Mr. Bridges, Trip Generation Overland Park, Kansas As requested, Priority Engineers,
More informationGASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:
GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May
More informationMANHATTAN VILLAGE ENHANCEMENT PROJECT
MANHATTAN VILLAGE ENHANCEMENT PROJECT Traffic & Parking Analysis Manhattan Beach City Council September 2013 Study Area and Analyzed Intersections Intersection LOS Results Project Improvements Dedicate
More informationApril 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435
Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:
More informationMEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply
MEMO DATE: March 22, 2016 PROJECT O: 4241-44 PROJECT: 1550 Alberni Street SUBJECT: Transportation Design Rationale for Rezoning Application (Update with Design Package) TO: Dave Leung, 1550 Alberni Limited
More information4 Circulation & Transportation
4.1 Mobility Network The mobility network at the new St. Paul s hospital and health campus is comprised of an interconnected system of sidewalks, cycle paths, transit routes and roadways. Figure 4-1: Indicative
More information2. ELIGIBILITY REQUIREMENTS
Speed Hump Policy 1. GENERAL The purpose of this policy is to provide guidelines for the application of speed humps. A "speed hump" is a gradual rise and fall of pavement surface across the width of the
More informationORIGINAL AND REVISED DEVELOPMENT CONCEPTS
Reference No.: 141-24579 Mr. Tyson Simms, MCIP, LPP Planner II Rural Policy and Applications Current Planning Planning and Development P.O. Box 1749 Halifax, NS B3J 3A5 Re: : (WSP Canada Inc, March 2015)
More informationThe Re:Queen and Sparks Traffic Brief - Addendum #2
June 11, 2015 Ashcroft Homes 18 Antares Drive Ottawa, ON K2E 1A9 EMAIL: mpham@ashcrofthomes.com Attention: May Pham Development Planner Dear May, Re: The Re:Queen and Sparks Traffic Brief - Addendum #2
More information1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON
CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently
More informationPROPOSED LAND USE ORDINANCE NO. 834 Individual and General Notice June 15, 2018
PROPOSED LAND USE ORDINANCE NO. 834 Individual and General Notice 2018-05 June 15, 2018 The Washington County Planning Commission and Board of Commissioners (Board) will soon consider proposed. Listed
More informationSTH 60 Northern Reliever Route Feasibility Study Report
#233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development
More informationTRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site
TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734
More informationTransportation Land Development Environmental S e r v i c e s
Transportation Land Development Environmental S e r v i c e s Memorandum To: Ms. Kristin E. Kassner Planning Director Town Hall Annex 25 Center Street Burlington, MA 01803 Date: September 23, 2013 Project
More informationMILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND
MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationSoutheastern Wisconsin Regional Freeway System Reconstruction Study
Southeastern Wisconsin Regional Freeway System Reconstruction Study July 26, 2001 1 Agenda Item 3 Presentation of Projected Traffic Impacts of the Possible New Freeway Segment Connecting IH 43 and USH
More informationConstruction Staging Area 4 Avenue Road
REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationProject Status Update January 2017
Project Status Update January 2017 1 What is the Purple Line? A new 16 mile east-west light rail line Operates mostly on the surface with 21 stations Connects New Carrollton in Prince George s County and
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING
IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,
More informationCountywide Transit Corridors Functional Master Plan. Appendix 13 BRT Station Typology
Countywide Transit Corridors Functional Master Plan Appendix 13 BRT Station Typology Tower 1, 10 th Floor 100 S. Charles Street Baltimore, MD 21201-2727 (410) 727-5050 Memorandum To: Larry Cole, M-NCPPC
More informationone parking space for each 145 m² of gross floor area; and (b) maximum of one parking space for each
Parking and Loading Strategy April 26 th, 2017 4241.56 Lon LaClaire & Eric Mital City of Vancouver Engineering Services 507 W Broadway Vancouver, BC, V5Z 0B4 Dear Lon and Eric Re: 400 W Georgia Office
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 24, 2018
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of February 24, 2018 DATE: February 20, 2018 SUBJECT: Request to authorize advertisement of a public hearing to consider an amendment to Section
More informationSTAFF REPORT # CHANGE OF ZONING
STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application
More informationTraffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)
Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Prepared By: 332 Lorne Avenue East Stratford ON N5A 6S4 Prepared for: Paul Kemper, President
More informationTable 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1
Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:
More informationORDINANCE NO
ORDINANCE NO. 07-5424 AN ORDINANCE OF THE CITY OF BILLINGS, PROVIDING THAT THE BILLINGS, MONTANA CITY CODE BE AMENDED BY REVISING SECTION 6-1208; PROVIDING CHANGES TO CERTAIN CURB CUT LENGTHS AND REGULATIONS.
More informationCORE AREA SPECIFIC PLAN
only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is
More informationTechnical Memorandum
To: Copy: From: Wally Dubyk Jennifer Murray André Sponder/Christopher Gordon, P.Eng. Re: Southminster Church 1040 Bank Street Residential Development Parking Review Technical Memorandum Date: Project:
More informationArticle 6: Off Street Parking and Loading Standards. Table of Contents. page
Article 6: Off Street Parking and Loading Standards Table of Contents page Sec. 601 Purpose of Article 6.... 6-1 Sec. 602 Off-street parking; when required.... 6-1 Sec. 603 Number of parking spaces required....
More informationAttachment 5 Eglinton West LRT Planning and Technical Update
Eglinton West LRT Planning and Technical Update 1. Introduction In July 2016, City Council approved an Eglinton West LRT with between 8 and 12 stops between Mount Dennis and Renforth Gateway, and up to
More information2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN
2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: Resolution: Yes No TITLE: LRT and Streetcar Interoperability Study PURPOSE: To brief the
More informationRe: Amend Sections and File No ZA Marcus Lotson, Development Services Planner
Page 1 To: From: The Planning Commission MPC Staff Date: April 5, 2016 Subject: Re: Amend Sections 8-3082 and 8-3090 Marcus Lotson, Development Services Planner Issue: Proposed amendments to the zoning
More informationPlanned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY
Planned Development Application 1450 Sherman Avenue Evanston, IL 60201 14 TRAFFIC CIRCULATION IMPACT STUDY Traffic Impact Study 1454 Sherman Mixed-Use Development Evanston, Illinois Prepared for Prepared
More informationCONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...
Speed Hump Program CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 1. GENERAL... 3 2. ELIGIBILITY REQUIREMENTS... 3 A. PETITION... 3 B. OPERATIONAL AND GEOMETRIC CHARACTERISTICS OF
More information11 October 12, 2011 Public Hearing APPLICANT:
11 October 12, 2011 Public Hearing APPLICANT: CARING TRANSITIONS PROPERTY OWNER: HARDEE REALTY CORPORATION REQUEST: Conditional Use Permit (motor vehicle rental) STAFF PLANNER: Leslie Bonilla ADDRESS /
More informationDowntown Lee s Summit Parking Study
Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis
More information370 Queen Elizabeth Drive Transportation Overview
December 8, 2014 OUR REF: TO3193TOA BY EMAIL: Ashley@rocahomes.ca 2253644 Ontario Inc. c/o BassCon 24 George Street West Ottawa, ON K1S 3J2 Attention: Ashley Lepine Dear Ashley: Re: 370 Queen Elizabeth
More informationAppendix C. Traffic Study
Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian
More informationKing Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited
King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial
More informationTRAFFIC PARKING ANALYSIS
TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,
More informationAddress Land Use Approximate GSF
M E M O R A N D U M To: Kara Brewton, From: Nelson\Nygaard Date: March 26, 2014 Subject: Brookline Place Shared Parking Analysis- Final Memo This memorandum presents a comparative analysis of expected
More informationD. J. Halpenny & Associates Ltd. Consulting Transportation Engineers
D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers August 24, 2015 File: 115-622 Mr. R. Baumann, President The RGB Group 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 RE: RESIDENTIAL DEVELOPMENT
More informationPublic Works and Infrastructure Committee. General Manager, Transportation Services and Treasurer. P:\2015\Internal Services\rev\pw15018rev (AFS20761)
Increases to Parking Ticket Set Fines STAFF REPORT ACTION REQUIRED Date: September 14, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More informationColston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN
as Trustee for C & B Unit Trust ABN 27 623 918 759 Our Ref: 20 July, 2017 TR/10419/jj Transport Planning Traffic Studies Parking Studies Frasers Property Australia PO Box 4148 SHELLHARBOUR NSW 2529 Attention:
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:
More informationNovember 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS
161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for
More informationRE: A Traffic Impact Statement for a proposed development on Quinpool Road
James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront
More informationCapital Metro Downtown Multimodal Station
Capital Metro Downtown Multimodal Station Stakeholder Briefing December 11, 2015 Agenda 1 2 3 4 5 Project Summary Downtown Station Concept Evaluation 4 th Street Traffic Analysis 5 th Street Traffic Analysis
More informationEscondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT
Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite
More informationLacey Gateway Residential Phase 1
Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West
More informationSan Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors
Transportation Committee November 17, 2016 Agenda Item No. 5, Update on the San Rafael Transit Center Relocation San Rafael Transit Center Relocation Study Update 11/17/16 Golden Gate Bridge, Highway &
More informationTRAFFIC CALMING PROGRAM
TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic
More informationCounty Engineers of Maryland. William Parks Michael D. Madden Maryland Transit Administration
County Engineers of Maryland William Parks Michael D. Madden Maryland Transit Administration May 25, 2017 1 Project Description 16 mile east-west light rail line between Bethesda in Montgomery County and
More informationTraffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois
Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,
More informationDATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC
PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION DATE: March 21, 2017 REPORT NO. PW2017-022 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager
More informationDOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009
DOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009 Prepared for: Manhard Consulting, Ltd. 900 Woodlands Parkway Vernon Hills, Illinois 60061 Prepared
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS
More informationSANDAG 3D Visualization Howard Blackson 6:15. Sub Area A Coalition Massing/Phasing - Mike Labarre 6:30
Agenda Grantville Master Plan Stakeholders Committee Meeting April 13, 2009 SANDAG 3D Visualization Howard Blackson 6:15 Sub Area A Coalition Massing/Phasing - Mike Labarre 6:30 Land Use and Street Alternatives
More informationT-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)
A: 2014 SFMTA TRANSIT SERVICE INFORMATION B: SFMTA TRAFFIC COUNT DATA C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS) E: LAND USE AND VALUE
More informationVista Municipal Code
Section 16.57.050 Private streets prohibited in certain zones. No lots zoned for multi-family, commercial, or industrial uses may be created using private street easements for access, except as provided
More informationDowntown Parking/Wayfinding Study. Review of Recommendations to City Council: January 16, 2018
Downtown Parking/Wayfinding Study Review of Recommendations to City Council: January 16, 2018 Tonight s Focus Objectives & Timeline Recap Study Findings Present Staff Recommendations 2018 Action items
More informationEast Stockton Boulevard (South Sacramento) Costco Gasoline Expansion Fuel Station Expansion Trip Generation Estimate
MEMORANDUM Date: February 7, 2013 Project #: 13270.0 To: From: Matt Cyr, Barghausen Consulting Engineers Sonia Hennum, PTOE & Alex Kiheri Project: Subject: cc: East Stockton Boulevard (South Sacramento)
More information1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization...
Table of Contents SUMMARY PAGE S.1 Project Location and Project Characteristics... S-1 S.2 Project Objectives... S-9 S.3 Project Approvals... S-11 S.4 Impacts and Mitigation Measures... S-12 S.5 Alternatives...
More informationCITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits
CITY CLERK Clause embodied in Report No. 9 of the, as adopted by the Council of the City of Toronto at its Special Meeting held on July 30, 31 and August 1, 2002. 10 Warrants for All-Way Stop Sign Control
More informationLAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS
LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...
More informationRequest Modification of Conditions (Motor Vehicle Rentals) Staff Recommendation Approval. Staff Planner Jonathan Sanders
Applicant & Owner Public Hearing March 14, 2018 City Council Election District Centerville Agenda Item 4 Request Modification of Conditions (Motor Vehicle Rentals) Staff Recommendation Approval Staff Planner
More informationMemorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017
Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: Sue Polka, City Engineer, City of Arden Hills From:
More informationPurple Line Functional Master Plan Advisory Group (MPAG)
Purple Line Functional Master Plan Advisory Group (MPAG) Tonight s Agenda Schedule Update MTA Additional Studies Comments On Functional Plan Format County Zoning Code Re-Write Takoma Langley Crossroads
More information