STAFF REPORT # CHANGE OF ZONING

Size: px
Start display at page:

Download "STAFF REPORT # CHANGE OF ZONING"

Transcription

1 STAFF REPORT # CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application submitted by The Elko County School District requesting a public hearing for changes in zoning on two (2) parcels of land to facilitate the construction and operation of a public elementary school for a maximum student attendance of 750 (Spring Creek Elementary School #3) in the Spring Creek Subdivision. Parcel No , a change of zoning from Commercial 1 (C1) to Public (P). Parcel No , a change of zoning from Open Space (OS) to Public (P). 2. LOCATION: Parcel No. 1, APN , Lot 1, Block 2, Tract 106-D as shown on the Reversion To Acreage Map, recorded on November 29, 2007, in the Office of the Elko County Recorder as Map No. 2741, Document #585098, being an acre parcel; and Parcel No. 2, APN , Parcel A, Tract 106-D as shown on that certain Subdivision Map of Spring Creek Corporation, recorded on December 7, 1972, in the Office of the Elko County Recorder as Map No , being a 3.460± acre parcel. Page 1 of 53

2 3. BACKGROUND INFORMATION: Assessor Parcel Numbers & Owner(s) of Record: Spring Creek Association Current Zoning: , Commercial 1 (C1) , Open Space (OS) Previous Applications on Property: , Nov. 2007, Map of Reversion , None Size of Property: , Acres , 3.46 Acres Access: Parkchester Drive, Direct Master Plan: Spring Creek Lamoille Master Plan, Plan Area 3 R3 Overlay District: N/A FEMA: CPN 32007C 6125E, Flood Zone X, No Requirements Water Basin: 048, Dixie Creek-Tenmile Creek Area Water service: Spring Creek Utilities, Great Basin Water Sewer Service: Spring Creek Utilities, Great Basin Water Comments: Attached or Incorporated as Received 4. PROJECT IMPACTS: A. AFFECT UPON THE EXISTING LAND USE PATTERN IN THE AREA: 1) Parcels to the north are zoned Commercial 2 (C) and Commercial 3 (C3). 2) Parcels to the south are zoned Residential 2 (R2). 3) Parcels to the east are Agricultural Residential (AR). The (AR) parcels rear yards are in near proximity of the Commercial 1 (C1) parcel in this request. Four of the five total parcels are developed with homes. 4) Parcels to the west are zoned Commercial 2 (C2). 5) The area uses are generally commercial in nature. The proposed will bring additional traffic to area businesses. 6) Uses to the east and adjacent to the proposed are Agricultural Residential use with the rear property lines abutting the project area. There are Residential 2 (R2) uses abutting the southern boundary of the project area. Page 2 of 53

3 7) The proposed Spring Creek Elementary School #3 will include the construction of an elementary school containing a maximum of 750 students. Project access will be provided from two locations on Parkchester Drive. Page 3 of 53

4 B. AFFECT UPON THE HEALTH, SAFETY AND GENERAL WELFARE OF THE AREA: ACCESS: There are two primary ingress / egress points being Parkchester Drive to the south and north of the project site. Parkchester Drive is a paved road with a paved travel width of approximately twenty-six feet (26 ) within an eighty-foot (80 ) ROW. Parkchester Drive is substandard in construction. Parkchester Drive fronts the applicants parcel. The second primary access is Parkchester Way to the west being a paved roadway of less than twenty feet (20 ) within a sixty-foot (60 ) ROW. The proposed Spring Creek Elementary School #3 development will be located east of Parkchester Drive, north of Country Club Parkway, and south of Spring Creek Parkway. The project site is currently undeveloped land. The project's impact will affect the adjacent street network. Page 4 of 53

5 The Parkchester Drive intersections with Country Club Parkway, Parkchester Way, and the South Project Access and the Country Club Drive / Parkchester Way intersection have been identified for AM and PM peak hour capacity analysis for the existing and existing plus project scenarios. Project access will be provided from two locations on Parkchester Drive. The project is anticipated to generate 968 average daily trips with 338 trips occurring during the AM peak hour and 210 trips occurring during the PM peak hour. EXISTING AND PROPOSED ROADWAYS AND INTERSECTIONS: Country Club Drive is a two-lane roadway with one through lane in each direction in the vicinity of the site. The speed limit is posted for 35 miles per hour near the site. Roadway improvements generally include paved travel lanes with a striped centerline and graded shoulders. Parkchester Drive is a narrow, two-lane roadway with one through lane in each direction in the vicinity of the site. The speed limit is not posted adjacent to the site. Roadway improvements generally include paved travel lanes with graded shoulders. Parkchester Way is a narrow, two-lane roadway with one through lane in each direction in the vicinity of the site. The speed limit is not posted. Roadway improvements generally include paved travel lanes with graded shoulders. The Parkchester Drive/Parkchester Way Intersection is an unsignalized threeleg intersection with stop sign control at the west approach, all approaches contain single lanes from which all traffic movements are made. With development of the project, the intersection will be improved as a four-leg intersection with stop sign control at the east and west approaches. The site plan indicates that the east approach will contain single ingress and egress lanes. The Parkchester Drive/South Access Intersection does not currently exist but is anticipated to be constructed as an unsignalized three-leg intersection with stop sign control at the east approach. It is anticipated that the north and south approaches will contain single lanes from which all traffic movements are made. The site plan indicates that the east approach will contain separate left and right turn lanes. The Country Club Parkway/Parkchester Drive Intersection is an unsignalized four-leg intersection with stop sign control at the north and south approaches. All approaches contain single lanes from which all traffic movements are made. Page 5 of 53

6 The Country Club Parkway/Parkchester Way Intersection is an unsignalized three-leg intersection with stop sign control at the north approach. All approaches contain single lanes from which all traffic movements are made. EXISTING VEHICLE TRIP COUNTS: Page 6 of 53

7 ESTIMATED TRIP GENERATION TOTALS: In order to assess the magnitude of traffic impacts of the proposed project at the key intersections, trip generation rates and peak hours had to be determined. Trip generation rates were obtained from the Ninth Edition of ITE Trip Generation (2012) for Land Use 520 Elementary School". Trips generated by the project were calculated for an average weekday and the weekday peak hours occurring between 7:00 AM and 9:00 AM and 2:00 PM and 4:00 PM, which correspond to the peak hours of the school. Table 1 shows a summary of the average daily traffic (ADT) and peak hour and peak volumes generated by the proposed school. (next page) Page 7 of 53

8 TRIP DISTRIBUTION AND ASSIGNMENT: The distribution of the project traffic to the key intersection was estimated based on the proposed school attendance zone. Figure 2 shows the anticipated trip distribution. Page 8 of 53

9 PEAK HOUR TRIPS: The peak hour trips shown in Table I were subsequently assigned to the key intersections based on the trip distribution percentages. Figure 3 shows the trip assignment at the key intersections for the AM and PM peak hours. Page 9 of 53

10 EXISTING PLUS PROJECT TRAFFIC VOLUMES: Page 10 of 53

11 INTERSECTION CAPACITY ANALYSIS: The key intersections were analyzed for capacity based on procedures presented in the Highway Capacity Manual (6th Edition), prepared by the Transportation Research Board, for unsignalized intersections. The latest computer version of the Highway Capacity Software, prepared by the McTrans Center, University of Florida, was used to analyze the intersections. The result of capacity analysis is a level of service (LOS) rating for each unsignalized intersection minor movement. Level of service is a qualitative measure of traffic operating conditions where a letter grade "A" through "F", corresponding to progressively worsening traffic operation, is assigned to the intersection or minor movement. The Highway Capacity Manual defines level of service for two-way stop controlled intersections in terms of computed or measured control delay for each minor movement. Level of service is not defined for the two-way stop controlled intersection as a whole. The level of service criteria for unsignalized intersections is shown in Table 2. (next page) Page 11 of 53

12 Table 3 shows a summary of the key intersections for the existing worksheets are attached. AM and PM peak and existing plus hour level of service and delay results at the project scenarios. Country Club Parkway / Parkchester Drive Intersection: The Country Club Parkway / Parkchester Drive intersection was analyzed as an unsignalized fourleg intersection with stop sign control at the north and south approaches for all scenarios. The intersection minor movements currently operate at LOS A during the AM and PM peak hours. For the existing plus project traffic volumes, the Page 12 of 53

13 intersection minor movements are anticipated to operate at LOS B or better during the AM and PM peak hours. The intersection was analyzed with the existing approach lanes for all scenarios. No improvements are recommended at the existing Country Club Parkway / Parkchester Drive intersection. Country Club Parkway / Parkchester Way Intersection: The Country Club Parkway / Parkchester Way intersection was analyzed as an unsignalized three-leg intersection with stop sign control at the north approach for all scenarios. The intersection minor movements currently operate at LOS A during the AM and PM peak hours. For the existing plus project traffic volumes the intersection minor movements are anticipated to continue to operate at LOS A during the AM and PM peak hours. The intersection was analyzed with the existing approach lanes for all scenarios. No improvements are recommended at the existing Country Club Parkway / Parkchester Way intersection. Parkchester Drive / Parkchester Way /North Access Intersection: The Parkchester Drive / Parkchester Way / North Access intersection was analyzed, as an unsignalized three-leg intersection with stop sign control at the west approach for the existing scenario and as an unsignalized four-leg intersection with stop sign control at the east and west approaches for the existing plus project scenario. The intersection minor movements currently operate at LOS A during the AM and PM peak hours. For the existing plus project traffic volumes, the intersection minor movements are anticipated to operate at LOS B or better during the AM and PM peak hours. The intersection was analyzed with the existing approach lanes for the existing scenario and with single lanes at all four approaches for the existing plus project scenario. It is recommended that the Parkchester Drive / Parkchester Way intersection be improved as a four-leg intersection with stop sign control at the east and west approaches. Parkchester Drive / Parkchester Way /South Access Intersection: The Parkchester Drive/South Access intersection was analyzed as an unsignalized three-leg intersection with stop sign control at the east approach for the existing plus project scenario. The intersection minor movements are anticipated to operate at LOS B or better during the AM and PM peak hours. The intersection was analyzed with single lanes at the north and south approaches and separate left and right turn lanes at the east approach. It is recommended that the Parkchester Drive / South Access intersection be constructed as a three-leg intersection with stop sign control at the east approach. Site Plan Review: A copy of the conceptual site plan for the Spring Creek Elementary School #3 development is included within the Traffic Study submittal attached at the end of this report. The site plan indicates that project access will Page 13 of 53

14 be provided from two accesses on Parkchester Drive. The north access aligns with Parkchester Way and will provide access to a small staff parking lot. The north access will also serve school buses. School buses will enter the north access, stack along the interior roadways south curb to load/unload students, and ultimately use a cul-de-sac to depart the site using the same access. The south access will be located approximately 250 feet south of the north access and will provide access to a larger visitor parking lot. The south access will also provide access to a curb lane for parent drop-off and pick-up stacking. An on-site roadway will run around the perimeter of the visitor parking lot and will allow parents to circulate in a counter-clockwise direction to access the drop-off/pick-up area. The project accesses, interior lanes, parking lots, and bus and parent dropoff / pick-up areas are anticipated to provide good access and internal circulation. It is recommended that the project accesses, parking lots, interior lanes, and culde-sac be designed per Elko County standards. RECOMMENDATION OF TRAFFIC STUDY: It is recommended that any required signing, striping or traffic control improvements comply with Elko County requirements. It is recommended that the Parkchester Drive / Parkchester Way/ North Access intersection be improved as a four-leg intersection with stop sign control at the east and west approaches. It is recommended that the Parkchester Drive/South Access intersection be constructed as a three-leg intersection with stop sign control at the east approach. It is recommended that the project accesses, parking lots, interior lanes, and culde-sac be designed per Elko County standards. ELKO COUNTY CODE TITLE 5 REQUIREMENTS: Average Daily Traffic (ADT) is estimated by the attached traffic study to be 968 vehicle trips per day generated by the school. The following standards are to be applied per Elko County Code Title (B) 5. Commercial Districts (minimum parcel size between 6,000 sq. ft. and 10,000 sq. ft.): (b) Access Roads: (1) Minimum - 50' wide paved urban commercial standard. (Exceeds 500 vehicle trips per day) Page 14 of 53

15 (2) If the estimated daily traffic count exceeds the capacity of the standard section, or based upon other factors such as specific use, location, proximity to cross streets, or traffic channelling and controls, the County may require a wider road section such as a 56' paved urban arterial, 70' paved major arterial or other standard. (3) Additional requirements including but not limited to controlled access, intersection control devices, bike lanes, pedestrian facilities, turn lane, on-street parking may be required based upon the results of the independent traffic study or applicable master plan. Road Construction Requirements: The public district zoning requested falls within a commercial area requiring a 50' wide paved urban commercial standard with curb, gutter and sidewalk. It is important to place pedestrian facilities, sidewalk, curb and gutter, across the full frontage of these properties to tie in future commercial uses on the same street. The applicant may request alternate compliance through the Elko County Board of Commissioners. The Spring Creek area has not been developed with sidewalk curb and gutter construction. It is important to place pedestrian facilities, sidewalk, curb and gutter, across the full frontage of these properties to tie in future commercial uses on the same street. Staff will support alternate compliance to a 34 Rural Paved Collector with a 9 minimum aggregate base and 2 ½ minimum asphalt overlay with sidewalk, curb and gutter. This roadway standard will accommodate future business applications. Staff recommends adoption of the following road construction recommendations as outlined in the applicant s traffic study and as listed within this report below: It is recommended that any required signing, striping or traffic control improvements comply with Elko County requirements. It is recommended that the Parkchester Drive / Parkchester Way/ North Access intersection be improved as a four-leg intersection with stop sign control at the east and west approaches. It is recommended that the Parkchester Drive/South Access intersection be constructed as a three-leg intersection with stop sign control at the east approach. Page 15 of 53

16 It is recommended that the project accesses, parking lots, interior lanes, and cul-de-sac be designed per Elko County standards. C. NOISE: This is a commercial area. Additional traffic noise and children at play is to be similar to that found in the area near the Country Club and Spring Creek Parkway intersection. D. WATER: A will serve letter is required from Great Basin Water Co. E. SEWERAGE: A will serve letter is required from Great Basin Water Co. for use of the commercial septic service. 5. CONSISTENCY WITH EXISTING ZONING AND MASTER PLAN: The Spring Creek Lamoille Master Plan, Plan Area 3 depicts parcel as Commercial 1 (C1) zoning with the same designation. APN is depicted as Open Space (OS) zoning with an Open Space (OS). A designation of Public is required for the public elementary school. The request is compatible with area uses. The Spring Creek Lamoille Master Plan was reviewed by the Planning Commission on November 16, 2017 with a recommendation of approval forwarded to the Elko County Commission to apply a zoning designation of Public on this parcel. The request is compatible with area uses. A. COMPATIBILITY OF PROPOSED ZONING WITH EXISTING ZONING AND DEVELOPED USAGE IN THE AREA: 1) APN was planned as a commercial subdivision and is zoned Commercial 1, (C1). The parcel was reverted to acreage in November of 2007 to make the parcel marketable. 2) APN is a part of the Spring Creek Green Belt properties and is zoned Open Space (OS). Both parcels make up the proposed site of a new elementary school. The proposed is compatible with developed area uses. Page 16 of 53

17 B. ZONING INFORMATION: APN is currently zoned Commercial 1 (C1) per the Spring Creek Declaration of Reservations and per Elko County code (C1). APN is a part of the Spring Creek Green Belt properties and is zoned Open Space (OS). 1. The Spring Creek Association is guided by a Declaration of Reservations document which contains zoning districts somewhat dissimilar from the Elko County zoning districts. 2. The Spring Creek Association fits schools into several of their zoning districts with Open Space zoning coupled with a conditional use for a school being the most proper. (Spring Creek Declaration of Reservations) OS Open Space District 3. Conditional Uses: c. School, attendance at which satisfies the requirements of the compulsory education laws of the State. 3. Spring Creek will review a change in zoning from Commercial 1 (C 1) to Open Space (OS) with a conditional use per their Declaration of Reservations requirements on October 10, The Spring Creek hearing will satisfy the requirements of their Declaration of Reservations requirements for placement of the elementary school. 4. The Spring Creek hearing does not fulfill the requirements of Elko County Code for changes in zoning but instead is internal to their organization. Page 17 of 53

18 5. Following the Spring Creek hearing, if approved, the Elko County Planning Commission will review two (2) changes of zoning to facilitate the new grammar school. APN Commercial 1 (C-1) to Public zoning. APN Open Space to Public zoning. B. CONFORMS TO THE EXISTING MASTER PLAN OF THE AREA: Yes, the designated zoning of Public was applied to APN APN on December 6, STAFF COMMENTS: A. AFFECT UPON THE EXISTING LAND USE PATTERN IN THE AREA: The request is compatible with area uses. B. AFFECT UPON THE HEALTH, SAFETY AND GENERAL WELFARE OF THE AREA: The parcel is served with water and sewerage. Area roads are adequate. C. COMPATIBILITY OF PROPOSED ZONING WITH EXISTING ZONING AND DEVELOPED USAGE IN THE AREA: The request is compatible. D. CONFORMS TO THE EXISTING MASTER PLAN OF THE AREA: Yes, designated as Public. E. Prior to the completion of this report comments may or may not have been received from the following agencies listed below. Those received will be incorporated or attached to this report. Elko County Sheriff s Office Elko County Building & Safety Elko County Public Works Elko County Highway Department Elko County Manager Office Elko County Fire District Nevada Department of Transportation NV Division of Forestry NV Division of State Health State of Nevada, DOT Frontier Communications NV Energy Spring Creek Association Elko County School District Great Basin Water Co. Spring Creek Utilities Co. Page 18 of 53

19 F. In accordance with NRS Chapter 278, the 30 closest property owners were notified at least 10 days prior to this public hearing. The list is attached to this report. 7. STAFF RECOMMENDATIONS, FINDINGS AND CONDITIONS: Based upon the above stated analysis and findings, staff recommends Approval with the following conditions and restrictions. A) The change of zoning on APN from Commercial 1 (C-1) to Public (P) and the change of zoning on APN from Open Space to Public is dependent upon approval by the Elko County Commission for changes of designation on both parcels of land within the Spring Creek Lamoille Master Plan. B) At the time of any development, the developer shall comply with all Federal, State, and local building and development requirements and all applicable provisions of N.R.S. and Elko County Code for development. C) If said property is sold in whole or otherwise conveyed to a new owner or owners, the deed of conveyance shall contain verbiage that identifies and adopts the recommendations, findings, conditions and requirements of approval of this specific zone change or property, pertaining to any development. D) Parkchester Drive / Parkchester Way North intersection is to be improved as a fourleg intersection with stop sign control at the east and west approaches. E) Parkchester Drive / South Access intersection be constructed as a three-leg intersection with stop sign control at the east approach. F) The project accesses, interior lanes, parking lots, and bus and parent drop-off / pick-up areas are anticipated to provide good access and internal circulation. The project accesses, parking lots, interior lanes, and cul-de-sac are to be designed per Elko County standards. G) Any required signing, striping or traffic control improvements shall comply with Elko County requirements. H) (Primary Access) Per ECC (B)-5 (b) (1), A 50' wide paved urban commercial standard is to be applied to the entirety of Parkchester drive. Sidewalk, curb and gutter are be constructed along the parcels frontages with Parkchester Drive to tie in future commercial uses on the same street. I) (Primary Access) Per ECC (B)-5 (b) (1), A 50' wide paved urban commercial standard is to be applied to the entirety of Parkchester Way. Page 19 of 53

20 Basis for recommendation: There is a need for the area Grammar school. The site lies within the Great Basin Water Co. service area for water and sewerage. Primary and secondary access are available. The proposed is a good fit for the area zoning districts and existing uses. Note: The recommendations of this report are based on the fact that prior to the completion of this report staff had not received any negative or adverse comments to the proposed. Should testimony from the public arise before or during the public hearing opposed to the proposed or providing adverse or contradictory information, staff may withdraw its recommendations. John W. Kingwell Supervisor, Elko County Planning and Zoning Division (30 Closest Notification List) Page 20 of 53

21 Page 21 of 53

22 Page 22 of 53

23 Page 23 of 53

24 Page 24 of 53

25 Page 25 of 53

26 Page 26 of 53

27 Page 27 of 53

28 Page 28 of 53

29 Page 29 of 53

30 Page 30 of 53

31 Page 31 of 53

32 Page 32 of 53

33 Page 33 of 53

34 Page 34 of 53

35 Page 35 of 53

36 Page 36 of 53

37 Page 37 of 53

38 Page 38 of 53

39 Page 39 of 53

40 Page 40 of 53

41 Page 41 of 53

42 Page 42 of 53

43 Page 43 of 53

44 Page 44 of 53

45 Page 45 of 53

46 Page 46 of 53

47 Page 47 of 53

48 Page 48 of 53

49 Page 49 of 53

50 Page 50 of 53

51 Page 51 of 53

52 Page 52 of 53

53 Page 53 of 53

/ Planning and Zoning Staff Report Lonestar Land, LLC. - Rezone, RZ

/ Planning and Zoning Staff Report Lonestar Land, LLC. - Rezone, RZ / Planning and Zoning Staff Report Lonestar Land, LLC. - Rezone, RZ2018-0019 Hearing Date: October 18, 2018 Development Services Department Applicant: Lonestar Land, LLC. Representative: Lance Warnick

More information

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman # 5 ) UN-15-17 LA SIERRA AUTO SALES SPECIAL USE PERMIT VEHICLE SALES PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: April 12, 2017 Item: UN-15-17 Prepared by: Robert Eastman GENERAL

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

Purpose: General Provisions:

Purpose: General Provisions: 10-19-1 Purpose: The purpose of off-street parking requirements is to promote traffic/pedestrian safety and efficiency and to minimize hard surfaced areas to reduce storm water run-off and visual impacts

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

Access Management Standards

Access Management Standards Access Management Standards This section replaces Access Control Standards on Page number 300-4 of the Engineering Standards passed February 11, 2002 and is an abridged version of the Access Management

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

ELMORE COUNTY HIGHWAY DEPARTMENT

ELMORE COUNTY HIGHWAY DEPARTMENT Adopted 11/27/06 Effective 2/1/07 Amended 4/10/08 ELMORE COUNTY HIGHWAY DEPARTMENT 155 County Shop Road Wetumpka, Alabama 36092 Phone (334) 567-1162 Fax (334) 567-1100 Access Management Policy The Elmore

More information

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II TRAFFIC IMPACT ANALYSIS LOTUS RANCH El Centro, California July 31, 2015February 12, 2016 LLG Ref. 3-14-2392 Prepared by: KC Yellapu, P.E Senior Transportation Engineer & Charlene Sadiarin Transportation

More information

SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS

SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS City of Panama City, Florida Public Works Department 9 Harrison Avenue Panama City, Florida 32401 Phone: (850) 872-3015 Effective 1/22/08 Table of

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS Executive Summary... 2 Project Background... 2 Conditions... 2 Findings... 3 Recommendations... 4 Introduction... 6

More information

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62: 1365 S. Camino del Rio Durango, CO 81303 970-382-6363 DRIVEWAY STANDARDS Resolution 2014-40 EXHIBIT A The following definition shall replace the definition of driveway in Section 62: Driveway means a roadway,

More information

TRANSPORTATION TECHNICAL REPORT

TRANSPORTATION TECHNICAL REPORT TRANSPORTATION TECHNICAL REPORT for Sunrise Elementary School Replacement PREPARED FOR: Puyallup School District PREPARED BY: 6544 NE 61 st Street, Seattle, WA 98115 ph: (26) 523-3939 fx: (26) 523-4949

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 07-5424 AN ORDINANCE OF THE CITY OF BILLINGS, PROVIDING THAT THE BILLINGS, MONTANA CITY CODE BE AMENDED BY REVISING SECTION 6-1208; PROVIDING CHANGES TO CERTAIN CURB CUT LENGTHS AND REGULATIONS.

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview 2 March 2015 OUR REF: TO3205TOB00 Conseil des écoles catholiques du Centre-Est (CECCE) 4000 rue Labelle Ottawa, Ontario K1J 1A1 Attention: Maguy Eustache Dear Maguy: Re: Sainte-Geneviève Elementary School

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

CHAPTER 2 ZONING AND DEVELOPMENT

CHAPTER 2 ZONING AND DEVELOPMENT 2.200 GENERAL DEVELOPMENT STANDARDS CHAPTER 2 ZONING AND DEVELOPMENT Section 2.201 GENERAL PROVISIONS... 2.2-1 Section 2.202 FENCES AND VISIONS CLEARANCE... 2.2-2 2.202.01 Fences... 2.2-2 2.202.02 Vision

More information

Subchapter 20 Transportation

Subchapter 20 Transportation Subchapter 20 Transportation Sections: 35.20.1 Purpose. 35.20.2 Street Standards. 35.20.3 Pedestrian / Bicycle Facility Standards. 35.20.4 Driveway Standards. 35.20.5 Public Transit Standards. 35.20.1

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Parking and Loading. Page 1 of 7

Parking and Loading. Page 1 of 7 Parking and Loading 21.03.020 Off-street parking and loading. A. Purpose. The purpose of this section is to ensure that sufficient off-street parking and loading areas are provided and properly designed

More information

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

STAFF REPORT FOR THE PLANNING COMMISSION MEETING OF JULY 29, 2009 FILE NO: ZCA AGENDA ITEM: H-4

STAFF REPORT FOR THE PLANNING COMMISSION MEETING OF JULY 29, 2009 FILE NO: ZCA AGENDA ITEM: H-4 STAFF REPORT FOR THE PLANNING COMMISSION MEETING OF JULY 29, 2009 FILE NO: ZCA-09-057 AGENDA ITEM: H-4 STAFF AUTHOR: Lee Plemel, Planning Director APPLICANT: Carson City Planning Division SUBJECT: Action

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EMERGENCY APPARATUS ACCESS WAYS STANDARD #B-003 EFFECTIVE 05-05-2009 PURPOSE To establish a consistent guideline for fire access roadways required by

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

DESIGN STANDARDS SECTION DS 3 STREETS

DESIGN STANDARDS SECTION DS 3 STREETS DESIGN STANDARDS SECTION DS 3 STREETS DS 3-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of public streets. These standards are intended to

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Dixie Transportation Planning Office

Dixie Transportation Planning Office A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation

More information

11 October 12, 2011 Public Hearing APPLICANT:

11 October 12, 2011 Public Hearing APPLICANT: 11 October 12, 2011 Public Hearing APPLICANT: CARING TRANSITIONS PROPERTY OWNER: HARDEE REALTY CORPORATION REQUEST: Conditional Use Permit (motor vehicle rental) STAFF PLANNER: Leslie Bonilla ADDRESS /

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

LCPS Valley Service Center

LCPS Valley Service Center Traffic Impact Study LCPS Valley Service Center Loudoun County, Virginia November 4, 2015 Prepared For: Loudoun County Public Schools 21000 Education Court Ashburn, VA 20148 Prepared by: 1140 Connecticut

More information

Street Lighting Policy. Revision

Street Lighting Policy. Revision Street Lighting Policy Revision 5-2017 Grand Chute Street Lighting Policy - 1 - May 2, 2017 Intent: The intent of this policy is to outline the Town of Grand Chute s standards for the installation and

More information

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:

More information

COUNTY ROAD SPEED LIMITS. Policy 817 i

COUNTY ROAD SPEED LIMITS. Policy 817 i Table of Contents COUNTY ROAD SPEED LIMITS Policy 817.1 PURPOSE... 1.2 APPLICABILITY... 1.3 DEFINITIONS... 1.4 STATE ENABLING LEGISLATION... 2.5 SPEED LIMITS ON COUNTY ROADS (CCC 11.04)... 2.6 ESTABLISHING

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS MCHENRY COUNTY DIVISION OF TRANSPORTATION 16111 NELSON ROAD WOODSTOCK, IL 60098

More information

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic

More information

Characterization of Combined Use of County Road Segment

Characterization of Combined Use of County Road Segment Department of Public Works Inyo County, California Characterization of Combined Use of County Road Segment Segment Name: _Lone Pine No. 1_ Purpose: Which of the following does the combined-use segment

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

APPENDIX D- TRAFFIC STUDY

APPENDIX D- TRAFFIC STUDY APPENDIX D- TRAFFIC STUDY TRANSPORTATION IMPACT ANALYSIS IMPERIAL COUNTY OFFICE OF EDUCATION County of Imperial, California March 06, 2018 LLG Ref. 3-17-2831 Prepared by: Jose R. Nunez Transportation Planner

More information

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS ENGINEERING DEPARTMENT RESIDENTIAL DRIVEWAY SPECIFICATIONS

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS ENGINEERING DEPARTMENT RESIDENTIAL DRIVEWAY SPECIFICATIONS HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS ENGINEERING DEPARTMENT RESIDENTIAL DRIVEWAY SPECIFICATIONS THERE MAY ONLY BE ONE DRIVEWAY PER BUILDING PARCEL. CORNER LOTS MUST CONSTRUCT THE ONE DRIVEWAY

More information

Fire Apparatus Access Roads in Marysville

Fire Apparatus Access Roads in Marysville Fire Apparatus Access Roads in Marysville 1094 Cedar Avenue, Marysville, Washington 98270 Phone (360) 363-8500 Fax (360) 659-1382 These documents all address various requirements for Fire Apparatus Access

More information

Lake County Building Department

Lake County Building Department Lake County Building Department P.O. Box 513 505 Harrison Avenue Leadville, CO 80461 (719) 486-2875 Fax (719) 486-4179 Driveway Permit (Resolutions 98-15 and 98-35) PERMIT: To connect a driveway or parking

More information

2005 City of Santa Paula Potable Water System Master Plan Amendment

2005 City of Santa Paula Potable Water System Master Plan Amendment 2005 City of Santa Paula Potable Water System Master Plan Amendment City of Santa Paula Project Engineer Randy Toedter, PE Brian Yanez June, 2012 970 Ventura Street Santa Paula, CA 93060 PURPOSE OF THE

More information

TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH

TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH, California November 11, 2016 LLG Ref. 3-14-2334 EXECUTIVE SUMMARY The Project proposes the development of 550 luxury residential dwelling units, public trails,

More information

COUNTY ROAD SPEED LIMITS. Policy 817 i

COUNTY ROAD SPEED LIMITS. Policy 817 i Table of Contents COUNTY ROAD SPEED LIMITS Policy 817.1 PURPOSE... 2.2 APPLICABILITY... 2.3 DEFINITIONS... 2.4 STATE ENABLING LEGISLATION... 3.5 SPEED LIMITS ON COUNTY ROADS (CCC 11.04)... 3.6 ESTABLISHING

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Table of Contents PRIME INDUSTRIAL LAND. Arrowhead Drive /- acres Carson City, Nevada. For Sale $3.95 / SF

Table of Contents PRIME INDUSTRIAL LAND. Arrowhead Drive /- acres Carson City, Nevada. For Sale $3.95 / SF Arrowhead Dr., Carson City, NV Table of Contents Property Description...2 Lot Information...3 Lot Area Maps...4 Parcel Map...5 Powerline Map...6 Site Vicinity...7 Water & Sewer Lines...8 Test Pit Location...9

More information

The minimum number of accessory off-street parking spaces. shall conform to the requirements of the Table of General

The minimum number of accessory off-street parking spaces. shall conform to the requirements of the Table of General ARTICLE VII Parking and Loading 1. Conformity with Use Table; exceptions. The minimum number of accessory off-street parking spaces shall conform to the requirements of the Table of General Use Regulations,

More information

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1. Traffic Engineering.

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1. Traffic Engineering. ORANGE COUNTY TRAFFIC COMMITTEE SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INITIATED BY: INVESTIGATOR: REQUEST: Speed Limit Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1 Traffic Engineering

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

Article 6: Off Street Parking and Loading Standards. Table of Contents. page

Article 6: Off Street Parking and Loading Standards. Table of Contents. page Article 6: Off Street Parking and Loading Standards Table of Contents page Sec. 601 Purpose of Article 6.... 6-1 Sec. 602 Off-street parking; when required.... 6-1 Sec. 603 Number of parking spaces required....

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Issued: Monday, Site Tour: Friday, January 30, 2015 at 10:00 a.m. Submittal Deadline: 5:00 p.m. on Friday,

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Citizens Committee for Facilities

Citizens Committee for Facilities Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

MOTOR VEHICLE ORIENTED BUSINESSES.

MOTOR VEHICLE ORIENTED BUSINESSES. ARTICLE 23. MOTOR VEHICLE ORIENTED BUSINESSES. Sec. 25-23.1. Conditional Use. Motor vehicle oriented businesses (MVOB) shall require a Conditional Use Permit in all districts as indicated in Appendix B,

More information

This letter summarizes our observations, anticipated traffic changes, and conclusions.

This letter summarizes our observations, anticipated traffic changes, and conclusions. Mr. David Jorschumb Project Manager Boulder Valley School District Re: Review of proposed school access improvements at the Foothills Elementary School in Boulder Dear Mr. Jorschumb, At your request, the

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

Traffic Impact Analysis. Yelm East Gateway Planned Action

Traffic Impact Analysis. Yelm East Gateway Planned Action Traffic Impact Analysis Planned Action Yelm, Washington November 2014 Traffic Impact Analysis Project Information Project: Prepared for: Evergreen Pacific Fund, LLC Steve Guidinger 2724 Alki Avenue SW,

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B... Speed Hump Program CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 1. GENERAL... 3 2. ELIGIBILITY REQUIREMENTS... 3 A. PETITION... 3 B. OPERATIONAL AND GEOMETRIC CHARACTERISTICS OF

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016 # 2 HOLDOVER Revised ZON2016-01992 BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016 CASE NUMBER 6065 APPLICANT NAME LOCATION VARIANCE REQUEST ZONING ORDINANCE REQUIREMENT ZONING AREA OF PROPERTY

More information