1 Traffic Impact Study LCPS Valley Service Center Loudoun County, Virginia November 4, 2015 Prepared For: Loudoun County Public Schools Education Court Ashburn, VA 20148

2 Prepared by: 1140 Connecticut Avenue Suite 600 Washington, DC Tel: Fax: Centreville Road Suite 330 Chantilly, VA Tel: Fax: Washington Street Suite 316 Haymarket, VA Tel: Fax: This document, together with the concepts and designs presented herein, as an instrument of services, is intended for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization by Gorove/Slade Associates, Inc., shall be without liability to Gorove/Slade Associates, Inc.

3 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates TABLE OF CONTENTS List of Figures... ii List of Tables... ii Introduction and Summary... 1 Purpose of Report and Study Objectives... 1 Executive Summary... 2 Site Location and Study Area... 2 Description of the Proposed Development... 2 Principal Findings, Conclusions and Recommendations... 2 Background Information... 5 Description of Geometric Scope and Limits of the Study Area... 5 Existing Roadway Network... 5 Analysis of Existing Conditions (2015)... 7 Existing Traffic Volumes... 7 Hazardous Locations... 7 Historical Crash Data... 7 Existing Conditions Capacity Analysis... 9 Analysis of Future Conditions without Development (2017) Planned Improvements Inherent Growth Future Conditions without Development Capacity Analysis (2017) Trip Generation and Site Traffic (2017) Site Description and Site Access Site Generated Volumes Direction of Approach and Future Conditions (2017) Volumes Analysis of Future Conditions with Development (2017) Future Conditions with Development (2017) Traffic Volumes Future Conditions with Development (2017) Capacity Analysis Preliminary Signal Warrant Analysis Bicycle & Pedestrian Accommodations Conclusions November 4, 2015 i

4 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates LIST OF FIGURES Figure 1: Area Map and Site Location... 4 Figure 2: Existing Lane Use and Traffic Control Devices (2015)... 5 Figure 3: Concept Plan... 6 Figure 4: Existing Traffic Volumes (2015)... 8 Figure 5: Existing Conditions (2015) Levels of Service Figure 6: Future Conditions (2017) without Development Traffic Volumes Figure 7: Future Conditions without Development (2017) Levels of Service Figure 8: Future with Development Conditions (2017) Lane Use Figure 9: Site Generated Trips (2017) Figure 10: Site Pass-by Trips (2017) Figure 11: Future with Development (2017) Traffic Volumes Figure 12: Future Conditions with Development (2017) Levels of Service Figure 13: Aerial Image of Existing Sidewalk Figure 14: Excerpt from the Loudoun County: Proposed Bicycle and Pedestrian Network LIST OF TABLES Table 1: Summary of Historical Crash Data (October 2012 to September 2015)... 7 Table 2: Existing Conditions Capacity Analysis (2015) Table 3: Future Conditions without Development (2017) Intersection Capacity Analysis Table 4: Proposed Development Trip Generation Table 5: Direction of Approach (2017) Table 6: Future Conditions with Development (2017) Capacity Analysis November 4, 2015 ii

5 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives The following report presents the findings of a traffic impact analysis for the proposed LCPS Valley Service Center development in Loudoun County, Virginia. The proposed site is located south of W. Colonial Highway (Route 7 Business) and east of Francis Farm Place in Loudoun County, Virginia. The site is approximately 8.35 acres, is currently split-zoned Rural Commercial (R-C 6.52 acres) and Joint Land Management Area (JLMA acres) comprising three parcels (MCPI , , and ). The site is currently leased by the Loudoun County School Board. The current uses on the site include LCPS bus parking and maintenance, a County impoundment lot and vehicle parking, fleet fueling for buses and County vehicles serving western Loudoun, a recycling center, and indoor storage of Parks and Recreation and LCPS materials and maintenance equipment. A rezoning application is being pursued to convert the JLMA-3 portion to RC and allow additional bus/car parking and/or additional storage buildings on the site. The proposed development is anticipated to be complete by Figure 1 shows the study location. The following tasks were completed as part of this study: A scoping meeting was held on October 6, 2015 with representatives from Loudoun County, which included discussions about the parameters of the study and relevant background information. A copy of the signed scoping letter confirming the parameters and assumptions used in the traffic impact study is included in Appendix A. Field reconnaissance in the vicinity of the site was performed to collect information related to existing traffic controls, roadway geometry, and traffic flow characteristics. In order to determine the weekday and school peak hour turning movement traffic volumes, traffic counts were conducted on Wednesday, May 27, 2015 from 6:30 to 9:30 AM and 2:00-7:00 PM. The data is included in Appendix B. Future traffic conditions were estimated based on the regional growth and the proposed development plan. Traffic volumes for the proposed development were estimated from the traffic volumes observed at the existing service center during the peak hours. Intersection capacity analyses were performed for existing conditions (2015), future conditions (2017) without development, and future conditions (2017) with development, during weekday AM, PM School, and PM Commuter peak hours. Sources of data for this study include Institute of Transportation Engineers (ITE), Loudoun County s Department of Transportation and Capital Infrastructure, the Virginia Department of Transportation (VDOT), and the office files and field reconnaissance efforts by Gorove/Slade Associates, Inc. November 4,

6 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates EXECUTIVE SUMMARY Site Location and Study Area The proposed site is located south of W. Colonial Highway (Rt 7 Business) and east of Francis Farm Place, in Loudoun County, VA. The site is approximately 8.35 acres, is currently split-zoned Rural Commercial (R-C 6.52 acres) and Joint Land Management Area (JLMA acres), comprising three parcels. Figure 1 shows the site location. Description of the Proposed Development The site is currently split-zoned Rural Commercial (R-C 6.52 acres) and Joint Land Management Area (JLMA acres), comprising three parcels. The current uses on the site consist of: LCPS bus maintenance and bus parking (for 45 buses and 45 car spaces) LCPS and County Fleet fueling County recycling center County impoundment lot LCPS and County materials and equipment storage A rezoning is being pursued for the JLMA-3 portion to RC and would allow additional bus/car parking and/or additional storage buildings, similar to the existing use on the site. The site currently has two access points along W Colonial Highway. The eastern access is directly across from the Harmony Middle School/Kenneth W. Culbert Elementary School entrance. As part of the proposed rezoning, the two access points will be consolidated and the eastern access will be the only access to the site. The development is anticipated to be built by Principal Findings, Conclusions and Recommendations The traffic impact analysis supports the following major conclusions: Existing (2015) and Future without Development (2017) Conditions: o o o o o The main line (W Colonial Highway) operates at acceptable levels of service under the existing and future without development conditions during the AM, PM School, and PM Commuter peak hours. The queues on the main line are accommodated in the existing turn lanes. A 2% annual inherent growth rate was applied to existing thru volumes on W Colonial Highway to account for regional growth. The western access of the service center operates at unacceptable level of service conditions (LOS E) in the AM peak hour in the existing conditions. However, the anticipated queuing is only approximately 1 car length and is maintained within the throat length of the site entrance. The eastern access of the service center in combination with the access to the Harmony Middle School/Kenneth W. Culbert Elementary School operates at unacceptable level of service. Two alternatives were evaluated for the intersection of the W Colonial Highway and School/Eastern Service Center Entrance: November 4,

7 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Unsignalized (As is today) The Harmony Middle School/Kenneth W. Culbert Elementary School entrance (southbound approach) operates at an unacceptable level of service in the AM peak hour, with a volume/capacity (v/c) ratio of more than However, the northbound approach which serves the existing service center operates at acceptable level of service. Signalized (Addition of a signal) The installation of a traffic signal at the intersection mitigates the failing condition of the southbound approach (School entrance). With the traffic signal in place, all the approaches at the intersection operate at an acceptable level of service. Moreover, none of the queues would exceed the existing storage lengths and there would be no blocking of any of the turn lanes. Future with Development (2017) Conditions: o o o o Full build out of the proposed development is anticipated to be complete by It will generate approximately 28 new AM peak hour trips, approximately 24 new PM School peak hour trips, and approximately 24 new PM Commuter peak hour trips. In addition to the above new trips generated, the proposed development will also generate approximately 9 pass-by trips during the AM peak hour, approximately 7 pass-by trips in the PM School peak hour, and approximately 8 pass-by trips in the PM Commuter Peak hour. The site currently has two access points along W Colonial Highway. The eastern access is directly across from the Harmony Middle School/Kenneth W. Culbert Elementary School entrance. To reduce the conflict points along W Colonial Highway, the two access points will be consolidated and the eastern access will be the only access to the site. In addition, a separate 100 foot eastbound right turn storage bay with a 200 foot taper will be constructed along W Colonial Highway to serve the site entrance. The eastern access of the service center in combination with the access to the Harmony Middle School/Kenneth W. Culbert Elementary School operates at unacceptable level of service Two alternatives were evaluated for the intersection of the W Colonial Highway and School/Eastern Service Center Entrance: Unsignalized (As is today) The main line (W Colonial Highway) operates at acceptable levels of service during the AM, PM School, and PM Commuter peak hours. The queues on the main line are accommodated in the existing turn lanes The Harmony Middle School/Kenneth W. Culbert Elementary School entrance (southbound approach) continues to operate at an unacceptable level of service in the AM peak hour. The service center entrance (northbound approach) is also anticipated to operate at an unacceptable level of service in the AM peak hour. However, the anticipated queuing is only approximately 3 car lengths, which would be maintained in the throat length on the site entrance. Moreover, the v/c ratio for the site entrance is anticipated to be significantly less than 1.00 (0.63). November 4,

8 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Signalized (Addition of a signal) With the traffic signal in place, all the approaches at the intersection operate at an acceptable level of service. Moreover, none of the queues would exceed the existing or the proposed storage lengths. In addition, there would be no blocking of any of the turn lanes. o Please note that the proposed development will have a negligible impact on the surrounding roadway network. The net increase in trips with the proposed development will result in an increase of only 1.9% of traffic along W Colonial Highway. Figure 1: Area Map and Site Location November 4,

9 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates BACKGROUND INFORMATION Description of Geometric Scope and Limits of the Study Area The following intersections were identified for inclusion in this study (Please see signed scope in Appendix A): 1. W Colonial Highway and Western Service Center Entrance 2. W Colonial Highway and Eastern Service Center Entrance/Harmony Middle School Entrance Existing Roadway Network A description of the major roadways within the immediate vicinity of the site is presented below: W Colonial Highway is a two-lane undivided east-west major collector. The posted speed limit on this roadway is 35 mph in the vicinity of the site. The existing lane configuration and traffic controls for the study intersections are shown in Figure 2. Figure 2: Existing Lane Use and Traffic Control Devices (2015) November 4,

10 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Figure 3: Concept Plan Obtained from Bowman Consulting (shown here for illustrative purposes only) November 4,

11 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates ANALYSIS OF EXISTING CONDITIONS (2015) Existing Traffic Volumes In order to determine the weekday peak hour turning movement traffic volumes, traffic counts were conducted on Wednesday, May 27, 2015 during the AM, PM School, and PM Commuter peak periods (6:30 AM 9:30 AM and 2:00 PM 7:00 PM). Analysis of the existing traffic data determined the following peak hours: AM Peak Hour: PM School Peak Hour: 7:30 AM to 8:30 AM 2:45 PM to 3:45 PM PM Commuter Peak Hour: 5:00 PM to 6:00 PM The existing weekday AM, PM School, and PM Commuter peak hour traffic volumes for the intersections in the study area are shown in Figure 4. The estimated average daily traffic data for different roadways are also shown in the same graphic. A k-factor of 0.167, obtained from the VDOT Traffic Data website, was used to estimate daily traffic volumes from the AM peak hour for W Colonial Highway. The ADT for the Harmony Middle School entrance was determined from the total number of trips generated in an entire weekday by the elementary school and the middle school, as per the ITE Trip Generation Manual, 9 th Edition. The existing turning movement count data is included in the Technical Appendix B. Hazardous Locations No hazardous locations have been identified within the study area. Historical Crash Data Historical crash data was obtained from VDOT and Loudoun County Sheriff s Office for the existing study intersections for a three year period, from October 1, 2012 to September 30, The crash data is summarized in Table 1. Table 1: Summary of Historical Crash Data (October 2012 to September 2015) Total Crashes Property Damage Crash Injury Crash Intersection W Colonial Highway and Service Center Entrance (West) W Colonial Highway and Service Center Entrance (East)/Harmony Middle School Entrance Fatal Crash Based on the available data, over the past three years, there was one (1) accident that occurred at the intersection of W Colonial Highway and Service Center Entrance (West). The crash resulted from a deer crossing the path of the vehicle. No crashes were reported at the intersection of W Colonial Highway and Service Center Entrance (East)/Harmony Middle School / Kenneth W. Culbert Elementary School entrance. Hence, there are no safety related issues at the study intersections. The crash data from VDOT and Loudoun County is provided in Technical Appendix C. November 4,

12 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Figure 4: Existing Traffic Volumes (2015) November 4,

13 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Existing Conditions Capacity Analysis Capacity analyses were performed at the intersections contained within the study area during the weekday AM, PM School, and PM Commuter peak hours under the existing conditions. Intersection capacity analyses were performed using Synchro version 8.0 based on the Highway Capacity Manual (HCM 2000) data and methodology. A minimum peak hour factor of 0.85 was used. The results of the intersection capacity analyses for the existing conditions are summarized in Table 2. The description of the different LOS and delay and the detailed analysis worksheets for the existing conditions are included in the Technical Appendix D and Appendix E respectively. November 4,

14 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Table 2: Existing Conditions Capacity Analysis (2015) No. Intersection (Movement) Storage Lengths (ft) LOS Delay (s/veh) AM Peak PM School Peak PM Commuter Peak 95 th Queue (ft) v/c LOS Delay (s/veh) 95 th Queue (ft) v/c LOS Delay (s/veh) 1 W Colonial Highway and Service Center Entrance (West) Overall Intersection (Unsignalized) Westbound Approach A 1.2 A 0.2 A 0.4 Westbound Left A A A Northbound Approach E 36.6 C 17.2 C 22.5 Northbound Left/Right E C C W Colonial Highway and Service Center Entrance (East)/Harmony Middle School Entrance Overall Intersection (Unsignalized) Eastbound Approach A 3.2 A 3.2 A 1.7 Eastbound Left 350 A A A Westbound Approach A 0.1 A 0.1 A 0.1 Westbound Left 300 B A A Northbound Approach D 26.7 C 23.0 C 20.8 Northbound Left/Thru/Right 100 D C C Southbound Approach F C 19.1 C 18.2 Southbound Left/Thru/Right 150 F C C W Colonial Highway and Service Center Entrance (East)/Harmony Middle School Entrance (Mitigation: Install a Traffic Signal) Overall Intersection (Signalized) B 12.2 B 14.5 B 11.7 Eastbound Approach A 8.0 A 6.6 A 7.4 Eastbound Left 350 A A A Eastbound Thru/Right A A A Westbound Approach B 13.5 B 15.6 B 12.7 Westbound Left 300 B B A Westbound Thru B B B Westbound Right 400 B B A Northbound Approach C 23.6 C 23.4 C 21.5 Northbound Left/Thru/Right C C C Southbound Approach C 25.2 C 24.3 C 21.8 Southbound Left/Thru C 27.4 # C C Southbound Right 150 C 24.5 # C C # - 95 th percentile volume exceeds capacity, queue may be longer. 95 th Queue (ft) v/c November 4,

15 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Based on Loudoun County s level of service (LOS) criteria, it is desirable to achieve a level of service (LOS) D or better for each approach at an intersection. The following observations can be made from Table 2: The main line (W Colonial Highway) operates at acceptable levels of service under the existing conditions during the AM, PM School, and PM Commuter peak hours. The queues on the main line are accommodated in the existing turn lanes. The western access of the service center operates at unacceptable level of service conditions (LOS E) in the AM peak hour. However, the anticipated queuing is only approximately 1 car length and is maintained within the throat length of the site entrance. The eastern access of the service center in combination with the access to the Harmony Middle School/Kenneth W. Culbert Elementary School operates at unacceptable level of service Two alternatives were evaluated for the intersection of the W Colonial Highway and School/Eastern Service Center Entrance: o Unsignalized (As is today) The Harmony Middle School/Kenneth W. Culbert Elementary School entrance (southbound approach) operates at an unacceptable level of service in the AM peak hour, with a v/c ratio of more than However, the northbound approach which serves the existing service center operates at acceptable level of service. o Signalized (Addition of a signal) The installation of a traffic signal at the intersection mitigates the failing condition of the southbound approach (School entrance). With the traffic signal in place, all the approaches at the intersection operate at an acceptable level of service. Moreover, none of the queues would exceed the existing storage lengths and there would be no blocking of any of the turn lanes. The existing levels of service are shown graphically in Figure 5. November 4,

16 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Figure 5: Existing Conditions (2015) Levels of Service November 4,

17 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates ANALYSIS OF FUTURE CONDITIONS WITHOUT DEVELOPMENT (2017) Planned Improvements Currently, there are no planned or proposed roadway/transportation improvements in the vicinity of the site. Inherent Growth As agreed upon at the scoping meeting, an inherent growth rate of 2% per year was assumed for the thru traffic on W Colonial Highway in order to account for the regional growth. The future without development (2017) traffic volumes are shown in Figure 6. Figure 6: Future Conditions (2017) without Development Traffic Volumes November 4,

18 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Future Conditions without Development Capacity Analysis (2017) Capacity analyses were performed at the intersections contained within the study area during the weekday AM, PM School, and PM Commuter peak hours, under the future without development conditions for Intersection capacity analyses were performed using Synchro Version 8.0 based on the Highway Capacity Manual (HCM 2000) data and methodology. A minimum peak hour factor of 0.92 by approach was used for the study intersections. The results of the intersection capacity analyses for the future without development conditions are summarized in Table 3. The description of the different LOS and delay and the detailed analysis worksheets for the future conditions without development are included in Technical Appendix D and Appendix F. November 4,

19 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Table 3: Future Conditions without Development (2017) Intersection Capacity Analysis Storage AM Peak PM School Peak PM Commuter Peak No. Intersection (Movement) Lengths 95 Delay 95 Delay 95 Delay (ft) LOS Queue v/c LOS Queue v/c LOS Queue (s/veh) (s/veh) (s/veh) (ft) (ft) (ft) v/c 1 W Colonial Highway and Service Center Entrance (West) Overall Intersection (Unsignalized) Westbound Approach A 1.1 A 0.2 A 0.4 Westbound Left A A A Northbound Approach D 34.0 C 16.2 C 21.3 Northbound Left/Right D C C W Colonial Highway and Service Center Entrance (East)/Harmony Middle School Entrance Overall Intersection (Unsignalized) Eastbound Approach A 3.1 A 3.2 A 1.6 Eastbound Left 350 A A A Westbound Approach A 0.1 A 0.1 A 0.0 Westbound Left 300 B A A Northbound Approach D 26.5 C 21.8 C 19.8 Northbound Left/Thru/Right 100 D C C Southbound Approach F C 18.2 C 17.7 Southbound Left/Thru/Right 150 F C C W Colonial Highway and Service Center Entrance (East)/Harmony Middle School Entrance (Mitigation: Install a Traffic Signal) Overall Intersection (Signalized) B 12.2 B 13.6 B 11.7 Eastbound Approach A 8.5 A 6.9 A 7.3 Eastbound Left 350 A A A Eastbound Thru/Right B A A Westbound Approach B 13.2 B 14.5 B 12.9 Westbound Left 300 B A A Westbound Thru B B B Westbound Right 400 B B A Northbound Approach C 23.5 C 21.6 C 21.3 Northbound Left/Thru/Right C C C Southbound Approach C 24.9 C 22.3 C 21.5 Southbound Left/Thru C 26.8 # C C Southbound Right 150 C 24.3 # C C # - 95 th percentile volume exceeds capacity, queue may be longer November 4,

20 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Based on the Loudoun County level of service (LOS) criteria, it is desirable to achieve a level of service (LOS) D or better for each approach at an intersection. The following observations can be made from Table 3: The main line (W Colonial Highway) operates at acceptable levels of service under the future without development conditions during the AM, PM School, and PM Commuter peak hours. The queues on the main line are accommodated in the existing turn lanes. The western access of the service center operates at an acceptable level of service (LOS D). Moreover, the anticipated queuing is only approximately 1 car length and is maintained within the throat length of the site entrance. The eastern access of the service center in combination with the access to the Harmony Middle School/Kenneth W. Culbert Elementary School operates at unacceptable level of service. Two alternatives were evaluated for the intersection of the W Colonial Highway and School/Eastern Service Center Entrance: o Unsignalized (As is today) The Harmony Middle School/Kenneth W. Culbert Elementary School entrance (southbound approach) operates at an unacceptable level of service in the AM peak hour, with a v/c ratio of more than However, the northbound approach which serves the existing service center operates at acceptable level of service. o Signalized (Addition of a signal) The installation of a traffic signal at the intersection mitigates the failing condition of the southbound approach (School entrance). With the traffic signal in place, all the approaches at the intersection operate at an acceptable level of service. Moreover, none of the queues would exceed the existing storage lengths and there would be no blocking of any of the turn lanes. The levels of service are shown graphically in Figure 7. November 4,

21 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Figure 7: Future Conditions without Development (2017) Levels of Service November 4,

22 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates TRIP GENERATION AND SITE TRAFFIC (2017) Site Description and Site Access The site is currently split-zoned Rural Commercial (R-C 6.52 acres) and Joint Land Management Area (JLMA acres), comprising three parcels. The current uses on the site consist of: LCPS bus maintenance and bus parking (for 45 buses and 45 car spaces) LCPS and County Fleet fueling County recycling center County impoundment lot LCPS and County materials and equipment storage A rezoning is being pursued for the JLMA-3 portion to RC and would allow additional bus/car parking and/or additional storage buildings, similar to the existing use on the site. The County impoundment lot and storage facility will be removed. The site currently has two access points along W Colonial Highway. The eastern access is directly across from the Harmony Middle School/ Kenneth W. Culbert Elementary School entrance. To reduce the conflict points along W Colonial Highway, the two access points will be consolidated and the eastern access will be the only access to the site. In addition, a separate 100 foot eastbound right turn storage bay with a 200 foot taper will be constructed along W Colonial Highway to serve the site entrance. The lane configuration in the future with development conditions (2017) is shown in Figure 8. The development is anticipated to be built by November 4,

23 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Figure 8: Future with Development Conditions (2017) Lane Use Site Generated Volumes The turning movement counts in the existing conditions were used to determine the trips into and out of the study site for the weekday AM, PM School and PM Commuter peak hours. As noted earlier, the rezoning is being pursued for the JLMA-3 portion of the site which would allow additional bus/car parking and/or additional storage buildings, similar to the existing use on the site. It is anticipated that with the proposed rezoning and the revised layout for the site, approximately 42 additional spaces will be created. Hence, the number of bus/car spaces was used as the trip generator unit for the site. Please note that although the trip rates were evaluated based on the number of bus/car spaces, the trip generation from those rates includes the trips generated by other facilities on the site that are not measured in bus/car spaces. Table 4 shows the proposed use trip generation calculations with reductions. As agreed in the scoping meeting, a pass by reduction of 25% was used for the gas station in the peak direction. Please note that although the pass-by percentage is 25%, the reduction in trips associated with that is not more than 9 trips. November 4,

24 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Table 4: Proposed Development Trip Generation PM School Peak PM Commuter AM Peak Hour Daily Land Use Size Hour Peak Hour In Out Total In Out Total In Out Total Total Existing Trip Generation 1 Existing Traffic Counts 90 bus/car spaces Computed Rates Proposed Use Additional Trips 42 bus/car spaces Pass By Reduction (Fueling Station) 2 25% Total New Trips Total Site Trips without Reductions (Including Existing) The existing trip generation is based on existing peak hour counts conducted at the site, conducted on May 27, Based on existing counts at the site entrance, the following pass by trips were estimated: approximately 50% of the eastbound site traffic in the AM peak; and approximately 50% of the westbound site traffic in the PM peak. This translates to an overall hourly trip reduction of 25% As shown in Table 4, the proposed additional spaces will generate approximately 28 new trips during the AM peak hour, approximately 24 new trips during the PM School peak hour, and approximately 24 new trips during the PM Commuter peak hour. In addition to the above new trips generated, the proposed development will also generate approximately 9 pass-by trips during the AM peak hour, approximately 7 pass-by trips in the PM School peak hour, and approximately 8 pass-by trips in the PM Commuter Peak hour. Direction of Approach and Future Conditions (2017) Volumes The direction of approach for the proposed trips was evaluated based on the existing travel pattern and a general engineering judgment. The direction of approach for 2017 conditions is summarized in Table 5. Table 5: Direction of Approach (2017) Road Name and Direction Direction of Approach To and from the west along W Colonial Highway 50% To and from the east along W Colonial Highway 50% Total 100% The inbound and outbound trips calculated for the weekday AM, PM School, and PM Commuter peak hours were routed based on the distribution provided above. The site trips are shown in Figure 9 and pass by trips are shown in Figure 10. It should be noted that the pass-by trips were only assumed in the peak direction during the corresponding peak hours (eastbound for the AM peak and westbound for the PM commuter peak). For the PM school peak hour, a 50%/50% split was used for the pass-by trips for the eastbound/westbound directions. November 4,

25 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates ANALYSIS OF FUTURE CONDITIONS WITH DEVELOPMENT (2017) Future Conditions with Development (2017) Traffic Volumes The proposed site trips and pass by trips were added to the future without development (2017) volumes in order to establish the future with development (2017) volumes, as shown in Figure 11. Figure 9: Site Generated Trips (2017) November 4,

26 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Figure 10: Site Pass-by Trips (2017) Note: As observed from the existing count data on the site, the pass-by trips were only applied to the eastbound traffic in the AM peak hour, both eastbound and westbound traffic in the school PM peak hour, and only the westbound traffic in the Commuter PM peak hour. November 4,

27 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Figure 11: Future with Development (2017) Traffic Volumes November 4,

28 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Future Conditions with Development (2017) Capacity Analysis Capacity analyses were performed at the study intersection contained within the study area during the weekday AM, PM School, and PM Commuter peak hours under the future with development conditions. Intersection capacity analyses were performed using Synchro Version 8.0 based on the Highway Capacity Manual (HCM 2000) data and methodology. A minimum peak hour factor of 0.92 by approach was used for the study intersection. The results of the intersection capacity analyses for the future with development (2017) conditions are summarized in Table 6 and graphically in Figure 12. The description of the different LOS and delay and the detailed analysis worksheets for the future conditions with development (2017) scenario are included in Appendix D and Appendix G, respectively. November 4,

29 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Table 6: Future Conditions with Development (2017) Capacity Analysis Storage AM Peak PM School Peak PM Commuter Peak No. Intersection (Movement) Lengths 95 Delay 95 Delay 95 Delay (ft) LOS Queue v/c LOS Queue v/c LOS Queue (s/veh) (s/veh) (s/veh) (ft) (ft) (ft) v/c 2 W Colonial Highway and Service Center Entrance/Harmony Middle School Entrance Overall Intersection (Unsignalized) Eastbound Approach A 3.1 A 3.1 A 1.6 Eastbound Left 350 A A A Westbound Approach A 0.6 A 0.3 A 0.3 Westbound Left 300 B A A Northbound Approach F 82.3 D 31.8 D 30.4 Northbound Left/Thru/Right 100 F D D Southbound Approach F C 18.5 C 17.8 Southbound Left/Thru/Right 150 F C C W Colonial Highway and Service Center Entrance/Harmony Middle School Entrance (Mitigation: Install a Traffic Signal) Overall Intersection (Signalized) B 12.0 B 13.9 B 12.1 Eastbound Approach A 7.9 A 6.9 A 7.6 Eastbound Left 350 A A A Eastbound Thru A A A Eastbound Right 100 A A A Westbound Approach B 13.2 B 14.4 B 12.7 Westbound Left 300 B A A Westbound Thru B B B Westbound Right 400 B B A Northbound Approach C 23.3 C 21.7 C 21.5 Northbound Left/Thru C C C Northbound Right 100 C C C Southbound Approach C 24.4 C 21.9 C 21.0 Southbound Left/Thru C 26.2 # C C Southbound Right 150 C 23.9 # C C # - 95 th percentile volume exceeds capacity, queue may be longer November 4,

30 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates As previously mentioned, it is desirable to achieve a level of service (LOS) D or better per approach at each intersection. The following observations can be made from Table 6: o o The eastern access of the service center in combination with the access to the Harmony Middle School/Kenneth W. Culbert Elementary School operates at unacceptable level of service Two alternatives were evaluated for the intersection of the W Colonial Highway and School/Eastern Service Center Entrance: Unsignalized (As is today) The main line (W Colonial Highway) operates at acceptable levels of service during the AM, PM School, and PM Commuter peak hours. The queues on the main line are accommodated in the existing turn lanes The Harmony Middle School/Kenneth W. Culbert Elementary School entrance (southbound approach) continues to operate at an unacceptable level of service in the AM peak hour. The service center entrance (northbound approach) is also anticipated to operate at an unacceptable level of service in the AM peak hour. However, the anticipated queuing is only approximately 3 car lengths, which would be maintained in the throat length on the site entrance. Moreover, the v/c ratio for the site entrance is anticipated to be significantly less than 1.00 (0.63). Signalized (Addition of a signal) With the traffic signal in place, all the approaches at the intersection operate at an acceptable level of service. Moreover, none of the queues would exceed the existing or the proposed storage lengths. In addition, there would be no blocking of any of the turn lanes. The level of service for both the unmitigated and the mitigated scenarios for the future conditions with development are shown in Figure 12. November 4,

31 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Figure 12: Future Conditions with Development (2017) Levels of Service November 4,

32 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates PRELIMINARY SIGNAL WARRANT ANALYSIS A preliminary signal warrant analysis was conducted for the intersection of W Colonial Highway and Harmony Middle School Entrance/Service Center Access (East) for the existing conditions (2015). The Manual on Traffic Signal Design (MTSD) was referenced to evaluate the traffic signal warrant based on the ADTs on the different approaches at the intersection. The preliminary analysis revealed that a traffic signal is warranted at the intersection based on the traffic volumes in the existing conditions (2015). The detailed worksheet for the traffic signal warrant evaluation is included in Appendix H. Please note that a full-fledged warrant study will be required to be performed to confirm the need for a signal at this intersection, subject to VDOT approval. November 4,

33 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates BICYCLE & PEDESTRIAN ACCOMMODATIONS Currently, an approximately 8-foot wide sidewalk exists on the north side of W Colonial Highway in the vicinity of the site. Please note that there are no walk zones for either Harmony Middle School or Kenneth Culbert Elementary School. Figure 13 shows the existing sidewalk on an aerial image of the area in the vicinity of the site. Figure 13: Aerial Image of Existing Sidewalk Figure 14 shows an excerpt from the Loudoun County s Bicycle/Pedestrian Map illustrates the Bicycle and Pedestrian Mobility Plan near the proposed site. The highlights of the Loudoun County Pedestrian and Bicycle Plan for the area are: The site is located in a pedestrian improvement area (PIA) The recommended bicycle and pedestrian facilities in the area are on-road bicycle accommodation and a 6 foot wide sidewalk The planned bicycle and pedestrian levels of service for the region is LOS B A 5 foot wide paved shoulder on W Colonial Highway within a 0.75 mile radius of the school As part of the application, the applicant proposes to reserve a shared path on the south side of W Colonial Highway for bicycle and pedestrian accommodation. November 4,

34 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates Figure 14: Excerpt from the Loudoun County: Proposed Bicycle and Pedestrian Network November 4,

35 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates CONCLUSIONS This report presents the findings of a traffic impact analysis for the proposed rezoning on the existing LCPS Valley Service Center development located in Loudoun County, Virginia. The analysis presented in this report supports following major conclusions: Existing (2015) and Future without Development (2017) Conditions: o o o o o The main line (W Colonial Highway) operates at acceptable levels of service under the existing and future without development conditions during the AM, PM School, and PM Commuter peak hours. The queues on the main line are accommodated in the existing turn lanes. A 2% annual inherent growth rate was applied to existing thru volumes on W Colonial Highway to account for regional growth. The western access of the service center operates at unacceptable level of service conditions (LOS E) in the AM peak hour in the existing conditions. However, the anticipated queuing is only approximately 1 car length and is maintained within the throat length of the site entrance. The eastern access of the service center in combination with the access to the Harmony Middle School/Kenneth W. Culbert Elementary School operates at unacceptable level of service. Two alternatives were evaluated for the intersection of the W Colonial Highway and School/Eastern Service Center Entrance: Unsignalized (As is today) The Harmony Middle School/Kenneth W. Culbert Elementary School entrance (southbound approach) operates at an unacceptable level of service in the AM peak hour, with a volume/capacity (v/c) ratio of more than However, the northbound approach which serves the existing service center operates at acceptable level of service. Signalized (Addition of a signal) The installation of a traffic signal at the intersection mitigates the failing condition of the southbound approach (School entrance). With the traffic signal in place, all the approaches at the intersection operate at an acceptable level of service. Moreover, none of the queues would exceed the existing storage lengths and there would be no blocking of any of the turn lanes. Future with Development (2017) Conditions: o o Full build out of the proposed development is anticipated to be complete by It will generate approximately 28 new AM peak hour trips, approximately 24 new PM School peak hour trips, and approximately 24 new PM Commuter peak hour trips. In addition to the above new trips generated, the proposed development will also generate approximately 9 pass-by trips during the AM peak hour, approximately 7 pass-by trips in the PM School peak hour, and approximately 8 pass-by trips in the PM Commuter Peak hour. The site currently has two access points along W Colonial Highway. The eastern access is directly across from the Harmony Middle School/Kenneth W. Culbert Elementary School entrance. To reduce the conflict points along W Colonial Highway, the two access points will be consolidated and the eastern access will be the only November 4,

36 Traffic Impact Study LCPS Valley Service Center Gorove/Slade Associates access to the site. In addition, a separate 100 foot eastbound right turn storage bay with a 200 foot taper will be constructed along W Colonial Highway to serve the site entrance. o o The eastern access of the service center in combination with the access to the Harmony Middle School/Kenneth W. Culbert Elementary School operates at unacceptable level of service Two alternatives were evaluated for the intersection of the W Colonial Highway and School/Eastern Service Center Entrance: Unsignalized (As is today) The main line (W Colonial Highway) operates at acceptable levels of service during the AM, PM School, and PM Commuter peak hours. The queues on the main line are accommodated in the existing turn lanes The Harmony Middle School/Kenneth W. Culbert Elementary School entrance (southbound approach) continues to operate at an unacceptable level of service in the AM peak hour. The service center entrance (northbound approach) is also anticipated to operate at an unacceptable level of service in the AM peak hour. However, the anticipated queuing is only approximately 3 car lengths, which would be maintained in the throat length on the site entrance. Moreover, the v/c ratio for the site entrance is anticipated to be significantly less than 1.00 (0.63). Signalized (Addition of a signal) With the traffic signal in place, all the approaches at the intersection operate at an acceptable level of service. Moreover, none of the queues would exceed the existing or the proposed storage lengths. In addition, there would be no blocking of any of the turn lanes. o Please note that the proposed development will have a negligible impact on the surrounding roadway network. The net increase in trips with the proposed development will result in an increase of only 1.9% of traffic along W Colonial Highway. November 4,

37 Traffic Impact Analysis - LCPS Valley Service Center Gorove/Slade Associates TECHNICAL APPENDIX

38 Traffic Impact Analysis - LCPS Valley Service Center Gorove/Slade Associates TECHNICAL APPENDIX TABLE OF CONTENTS APPENDIX A Scoping Document APPENDIX B Turning Movement Count Sheets APPENDIX C Crash Data APPENDIX D Level of Service Definitions APPENDIX E Intersection Capacity Analysis Results Existing Conditions (2015) APPENDIX F Intersection Capacity Analysis Results Future Conditions (2017) without Development APPENDIX G Intersection Capacity Analysis Results Future Conditions (2017) with Development APPENDIX H Preliminary Signal Warrant Analysis Worksheet

39 Traffic Impact Analysis - LCPS Valley Service Center Gorove/Slade Associates APPENDIX A Scoping Document

40 F.S.M. Traffic Study Scoping Agreement (07/2013) Loudoun County Department of Transportation and Capital Infrastructure (DTCI) Page 1 of 10 Pre-Application Number: PRAP Meeting Date: 10/6/2015 Application Name: LCPS Valley Service Center (ZMAP) Attendees: Bob Brown, Rory Toth (Loudoun Co.) Tushar Awar, Erin Steel (Gorove/Slade) Sara Howard-O brien (LCPS) Project Description: A description of the existing and proposed uses, as well as the size of the proposed development (i.e., square footage, acreage, etc.), shall be included in the traffic study. Additionally, the type of application (i.e., ZMAP, SPEX, ZCPA, etc.), relevant previous site approvals, relevant previously approved proffers, and proposed project phasing shall be discussed. The proposed development program analyzed in the traffic study shall match the land development application being proposed at time of submittal, or as agreed to at the traffic scoping meeting. Additional Guidance: All study graphics should show the locations of the proposed site driveways and an outline of the project site location. The study should include a description of all roadways in the study area including speed limits, VDOT route numbers, number of lanes, CTP classification, CTP ultimate conditions, bike/ped facilities, and transit stops. Include a graphic depicting the existing lane configurations and traffic control devices for all roadways/intersections in the study area. Comments: The proposed site is located south of W. Colonial Highway (Rt 7 Business) and east of Francis Farm Place, in Loudoun County, VA. The property is currently split-zoned Rural Commercial (R-C 6.52 acres) and Joint Land Management Area (JLMA acres), comprising three parcels. The current uses on the site consist of: LCPS bus maintenance and bus parking (for 45 buses and 45 car spaces) LCPS and County Fleet fueling County recycling center County impoundment lot LCPS and County Equipment Storage The uses listed above are by-right uses on the RC portion of the site. A rezoning is being pursued for the JLMA-3 portion to RC and would allow additional bus/car parking and/or additional storage buildings on the site. The same uses listed above will continue with an estimated 64 buses and 58 car spaces. (1) Study Area and Traffic Count Locations: Roadways internal or adjacent to the development site shall be included in the traffic study. The study area should be defined at the scoping meeting and as a guideline traffic count locations should include intersections adjacent to the project s frontage and other external roads to the extent that the project's generated traffic is anticipated to exceed 10 percent of the road's current/existing traffic volumes (at the time of application). Comments: Turning movement traffic counts will be conducted at the following intersections: 1. W Colonial Highway and Western Service Center Entrance 2. W Colonial Highway and Eastern Service Center Entrance/Harmony MS Entrance.

41 F.S.M. Traffic Study Scoping Agreement (07/2013) Loudoun County Department of Transportation and Capital Infrastructure (DTCI) Page 2 of 10 (2) Data Collection: The AM/PM peak period traffic counts shall not be more than twelve (12) months old at the time of the application submission. Twenty-four hour weekday traffic counts or estimates (based on the application of historical VDOT k factors to peak hour traffic volumes) are also required for roadway segments. Additional Guidance: Traffic counts should be collected from 6:30 to 9:30 AM and 4:00 to 7:00 PM, unless otherwise agreed upon, on Tuesdays, Wednesdays, or Thursdays during the school year (early September through early June), excluding federal holidays and the remainder of the week surrounding the holiday. Traffic counts on Saturdays and Sundays should generally be collected between 11:00 AM and 1:00 PM, unless otherwise discussed and agreed upon due to the specifics of a land development proposal. Pedestrian, bicycle, and truck counts should be collected at the same time as vehicular counts. Pedestrians and bicycles should be included in the analysis but not be treated as vehicles. Existing traffic count worksheets should be including the appendix. Comments: Turning movement traffic counts will be conducted from 6:30 to 9:30 AM and 2:00 to 7:00 PM during a typical weekday. (3) Trip Generation: As a general guide to vehicle trip generation, rates or equations published in the latest editions of the Institute of Transportation Engineer's (I.T.E.) Trip Generation Manual and Trip Generation Handbook shall be used. If the applicant chooses to use an alternate trip generation methodology or if the County requests that the applicant conduct a local trip generation count at a similar facility, it shall be documented and agreed to prior to usage in the traffic analysis. Primary trip reductions associated with pass-by trips and methodologies for trip reductions associated with pass-by trips shall be discussed and agreed upon at the scoping meeting. Refer to VDOT traffic study regulations and the ITE Trip Generation Handbook for appropriate trip generation and pass-by reduction methodologies. The traffic study shall include a comparison of trip generation for existing and approved uses with trips generated by the proposed development program. Additional Guidance: The study should clearly state whether rates, equations, observed counts, local rates, or other sources were used to determine trip generation. Comments: Observed trip generation rates will be used based on actual traffic counts on the site. Table 1 shows the existing use and proposed use trip generation. (4) Traffic Volume Projections: The traffic study shall provide existing and projected traffic volumes, with and without the subject project, for Average Daily Traffic, as well as AM and PM peak hours and weekend peak periods, if necessary, for the agreed upon phasing program and build out years. Projections shall also be made for date of completion plus six (6) years or to an agreed upon forecast year, for planning purposes only. The peak hour of the project/individual land use(s) (as given in the ITE Trip Generation Manual) should be added to the corresponding AM/PM existing peak hour of the adjacent roadway traffic volumes to show the worst case scenario. The existing peak hour of traffic on the roads adjacent to the subject project site shall be identified. These traffic volumes shall be provided at roadway intersections and commercial or private accessways/entrances within the study area.

42 F.S.M. Traffic Study Scoping Agreement (07/2013) Loudoun County Department of Transportation and Capital Infrastructure (DTCI) Page 3 of 10 Comments: Will provide existing (2015), future conditions without development (2017), and future conditions with development (2017) for the AM peak hour, PM School Peak Hour, and PM Commuter peak hour. (5) LOS Analyses: Level of Service (LOS) calculations for existing and projected conditions, with and without the subject project, for highway segments, intersection legs, and entrances shall be provided. Calculations shall be in accordance with the latest edition of the Highway Capacity Manual (HCM) and/or the Highway Capacity Software (HCS), Synchro, SIDRA, VISSIM, CORSIM, or as may be agreed at the scoping meeting. Traffic volumes and level of service information shall be provided for each phase of development, to include conditions at date of project completion. Traffic counts and LOS worksheets and projected traffic volume LOS analyses, using agreed upon analysis techniques, including existing AM/PM peak hour signal timing, shall be included as a part of the traffic study. Electronic files associated with the LOS worksheets shall be provided to the County with traffic study submission. Additional Guidance: Default software inputs should be used unless otherwise discussed and agreed upon. A minimum peak hour factor (PHF) of 0.85 should be used for existing conditions (unless it is the average of three counts). For future conditions, the minimum PHF may be adjusted up to No other adjustments should be made to PHFs in the analysis unless discussed and agreed upon. Document the reason if a software package other than Synchro was used. Also include a PDF of the traffic study on the disc containing capacity analysis printouts. Comments: Will provide existing (2015), future conditions without development (2017), and future conditions with development (2017) (6) Minimum Roadway/Intersection LOS Standards: Recommendations for phased improvements to the road network links in order to maintain an acceptable level of service (minimum LOS "D") shall be provided. For each phase up to and including build-out, a minimum approach and overall LOS "D" at intersections shall apply. Levels of service at study intersections shall be presented by lane group in traffic study tables and graphics. Comments: The FSM LOS D policy at intersections will be followed and will be stated in the study. The level of service will be reported by lane group in the tables and figures of the report. (7) Background Traffic and Roadway Assumptions: Assumptions which determine projected background traffic, including through traffic growth rate to be applied on roadway links, shall be confirmed at the scoping meeting. The sources for determining future traffic projections will include one or more of the following: Loudoun County Demographic Estimates & Forecasts or similar documents from Loudoun County. The Loudoun County transportation model which incorporates COG's Cooperative Forecasts for Loudoun County. Historical daily traffic counts published annually by VDOT or compiled through other approved traffic studies and sources. Approved developments in the vicinity of the proposed development.

43 F.S.M. Traffic Study Scoping Agreement (07/2013) Loudoun County Department of Transportation and Capital Infrastructure (DTCI) Page 4 of 10 Specific other approved development names and respective development square footage or residential units used in the study shall be provided. Assumptions for the anticipated roadway network at each phase of development shall be discussed and agreed upon at the scoping meeting. Additional Guidance: Include a graphic showing the locations of background developments. Include graphics that show the distribution of trips for each background development or the rerouting of trips based on roadway network/land use changes. Generally, growth rates above 2% should not be used unless otherwise discussed and agreed upon. Growth rates should be compounded annually and applied to all movements, not just through volumes, unless otherwise discussed and agreed upon. Provide clear justification for inclusion of background roadway improvements (i.e., County CIP, VDOT SYIP, proffered improvement). Comments: An annual growth rate of 2% per year will be applied to W. Colonial Highway. Traffic/Trip Distribution: Directional trip distribution information shall be provided for project entrances and collector and arterial intersections within the study area for the phases and categories (e.g., residential, office, retail, industrial and institutional) of development. Additional Guidance: Percentage distribution graphics should be included in the study and depict percentages of site traffic turning at each intersection and site driveway. Separate graphics should be provided for primary and pass-by trips distributed throughout the study area. Some mixed-use land development proposals may require multiple distributions for each land use and peak hour period. Generally, each study should take a fresh look at the distribution of trips based on population, employment, and retail centers, as well as the existing and future transportation network. Existing traffic patterns and assumptions from previously analyzed nearby developments should help aid in the development of a distribution but should not be the only factors considered. Comments: The trip distribution is shown in Figure 3. (8) Safety Locations: Road safety hazards as identified at the scoping meeting, within the study area, shall be analyzed for all roadway links and intersections in the traffic study. Analyses requested by the County in the traffic study could include discussion of sight distances, three-year summary of accident data at potential problem intersections, vertical and horizontal roadway alignments, signal warrants, turn lane warrants, speed studies, and/or queuing studies. Additional Guidance: Accident data should be obtained from the Loudoun County Sheriff s Office for the most recent three year period. Queuing analyses should include a side-by-side comparison of 50% and 95% queue and storage lengths in table format (ideally in a single table for all study scenarios). Traffic signal and turn-lane warrant worksheets should be included in the appendix of the study. Include discussion of traffic calming, design of internal streets, and cut-through traffic for residential rezonings and applications for other development proposals in established neighborhoods. Include discussion of a transportation operations and parking plan (TOPP) for proposals that generate a significant amount of traffic on an irregular basis (e.g., baseball stadium).

44 F.S.M. Traffic Study Scoping Agreement (07/2013) Loudoun County Department of Transportation and Capital Infrastructure (DTCI) Page 5 of 10 Comments: Will provide 3 years of historical accident data at existing study intersections. (9) Trip Reduction Factors: If trip reduction factors are used in the study, such as TDM, internal capture, and mode share reductions, measures necessary at each phase of development to implement the reduction must be specified, with supporting documentation (e.g., COG model, WMATA, VDOT, USDOT, ULI, etc.). Refer to the VDOT traffic study regulations and the ITE Trip Generation Handbook for guidance regarding use of trip reductions. Additional Guidance: Internal capture diagrams and other sources of information for trip reductions assumed should be included in the appendix of the study. Comments: A pass by trip reduction of 25% will be used for the proposed trip generation. The pass by trips will be applied to eastbound Colonial Highway in the AM peak, split among the eastbound and westbound Colonial Highway in the PM School peak, and applied to westbound Colonial Highway in the PM Commuter peak. (10) Bicycle and Pedestrian Facilities: When bicycle and pedestrian accommodations are used to reduce anticipated traffic volume, a description of the physical and functional characteristics of the existing and proposed bicycle and pedestrian facilities shall be provided. If such separate bicycle accommodations (e.g., striped lanes or multi-purpose trails) are anticipated, they shall also be identified. A description of the functional characteristics shall be provided to identify the transportation options that these accommodations provide (e.g., pedestrian access to retail center, safe bicycle route to elementary school, inter-parcel connections to adjacent neighborhoods, access to W&OD trail, etc.) Comments: Will provide description of existing and future bicycle and pedestrian facilities. (11) Connectivity: VDOT connectivity requirements, including access management, inter-parcel connections, and internal circulation shall be considered, as necessary, in the traffic study. Comments: N/A (12) Additional Discussion / Concerns / Assumptions / Considerations: Comments: Existing western access point will be eliminated.

45

46 F.S.M. Traffic Study Scoping Agreement (07/2013) Loudoun County Department of Transportation and Capital Infrastructure (DTCI) Page 7 of 10 Figure 1: Location Map SITE

47 F.S.M. Traffic Study Scoping Agreement (07/2013) Loudoun County Department of Transportation and Capital Infrastructure (DTCI) Page 8 of 10 Figure 2: Tax Map SITE

48 F.S.M. Traffic Study Scoping Agreement (07/2013) Loudoun County Department of Transportation and Capital Infrastructure (DTCI) Page 9 of 10 Table 1: Trip Generation (Existing Use and Proposed Use) Proposed Use is subject to change based on final concept plan PM School Peak PM Commuter Peak Land Use ITE Code Size AM Peak Hour Daily Hour Hour In Out Total In Out Total In Out Total Total Existing Trip Generation 1 Existing Traffic Counts N/A 90 bus/car spaces Computed Rate: Proposed Use Additional Trips N/A 32 bus/car spaces Pass By Reduction (Fueling Station) 2 25% Total New Trips Total Site Trips without Reductions (Including Existing) The existing trip generation is based on existing peak hour counts conducted at the site, conducted on May 27, Based on existing counts at the site entrance, the following pass by trips were estimated: approximately 50% of the eastbound site traffic in the AM peak; and approximately 50% of the westbound site traffic in the PM peak. This translates to an overall hourly trip reduction of 25% Table 2: Inherent Growth Based on VDOT Historical AADT Data ADT Growth Roadway Segment From To Average Colonial Hwy ECL Purcellville WCL Hamilton 9,000 9,700 9,600 9,500 10, % 1.0% 1.0% 5.3% 2.7%

49 F.S.M. Traffic Study Scoping Agreement (07/2013) Loudoun County Department of Transportation and Capital Infrastructure (DTCI) Page 10 of 10 Figure 3: Study Intersections and Direction of Approach % 50% Legend # X% Study Intersection Site Trip Distribution

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

West Rosslyn Development

West Rosslyn Development Traffic Impact Study and Transportation Management Plan West Rosslyn Development Arlington County, VA Revised: January 11, 2017 May 10, 2016 Prepared for: Penzance 2400 N Street, NW, Suite 600 Washington,

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

4131 Chain Bridge Road

4131 Chain Bridge Road Traffic Impact Study 4131 Chain Bridge Road City of Fairfax, VA 05/04/16 May 4, 2016 Prepared for: Paradigm 1415 North Taft Street Suite 100 Arlington, VA 22201 This report is printed on environmentally

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

TRANSPORTATION TECHNICAL REPORT

TRANSPORTATION TECHNICAL REPORT TRANSPORTATION TECHNICAL REPORT for Sunrise Elementary School Replacement PREPARED FOR: Puyallup School District PREPARED BY: 6544 NE 61 st Street, Seattle, WA 98115 ph: (26) 523-3939 fx: (26) 523-4949

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2 TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS Executive Summary... 2 Project Background... 2 Conditions... 2 Findings... 3 Recommendations... 4 Introduction... 6

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

STAFF REPORT # CHANGE OF ZONING

STAFF REPORT # CHANGE OF ZONING STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017 Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: Sue Polka, City Engineer, City of Arden Hills From:

More information

Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study )

Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study ) Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study ) D-bar-A Project Traffic Impact Study November 3 rd, 2015 1427

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

COMPREHENSIVE TRANSPORTATION REVIEW SHEPHERD PARK PUD WASHINGTON, DC

COMPREHENSIVE TRANSPORTATION REVIEW SHEPHERD PARK PUD WASHINGTON, DC COMPREHENSIVE TRANSPORTATION REVIEW SHEPHERD PARK PUD WASHINGTON, DC May 31, 2016 Prepared by: 1140 Connecticut Avenue NW Suite 600 Washington, DC 20036 Tel: 202.296.8625 Fax: 202.785.1276 3914 Centreville

More information

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Prepared By: 332 Lorne Avenue East Stratford ON N5A 6S4 Prepared for: Paul Kemper, President

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA. Section 1 INTRODUCTION 1

GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA. Section 1 INTRODUCTION 1 GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA TABLE OF CONTENTS Page Section 1 INTRODUCTION 1 Section 2 BACKGROUND INFORMATION 6 Public Road Network... 6 Non Auto Facilities and Services...

More information

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information