1 King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28

2

3 Project Summary Project Number 822 April 28 Client RISE Commercial Developments Lakeshore Road Kelowna, British Columbia VW V3 Client Contact Greg Appelt King Street & Wyman Road Transportation Impact Study and Transportation Demand Management Report List of Revisions Version Date Description March 28 Draft for Comment 2 April 28 Final for Submission Signatures Consultant Project Team Jim Mallett, M.A.Sc., P.Eng., PTOE Rajan Philips, M.Sc., P.Eng. Adam Morrison, EIT Signature Engineer s Seal Disclaimer Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo ON N2J N8 p: This document has been prepared for the titled project or named part thereof (the project ) and except for approval and commenting municipalities and agencies in their review and approval of this project, should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authorization of Paradigm Transportation Solutions Limited being obtained. Paradigm Transportation Solutions Limited accepts no responsibility or liability for the consequence of this document being used for a purpose other than the project for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm their agreement to indemnify Paradigm Transportation Solutions Limited for all loss or damage resulting there from. Paradigm Transportation Solutions Limited accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned and the approval and commenting municipalities and agencies for the project. To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited accepts no liability for any loss or damage suffered by the client, whether through contract or tort, stemming from any conclusions based on data supplied by parties other than Paradigm Transportation Solutions Limited and used by Paradigm Transportation Solutions Limited in preparing this report. Paradigm Transportation Solutions Limited

4

5 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 Executive Summary Content RISE Commercial Developments has retained Paradigm Transportation Solutions Limited (Paradigm) to conduct this Transportation Impact Study (TIS) and Transportation Demand Management (TDM) Report for a proposed mixed-use development located at 65 Colby Drive in Waterloo, Ontario. This report analyses existing traffic conditions, describes the proposed development, forecasts traffic to five years from full build-out, and recommends potential improvements as required to accommodate future traffic volumes. This report also includes recommended TDM measures and strategies to reduce the number of single occupancy vehicles to and from the site. Development Concept The development proposes the conversion of an existing 2,9 square feet office building into a medical building, and the construction two new smaller buildings for a combined,9 square feet of commercial uses. Access to the development will be provided via an existing all-movement access to Wyman Road and a proposed new right-in/right-out access on King Street North. The Region of Waterloo has confirmed that the rightin/right-out access on King Street as shown in the site plan will be permitted. The development is anticipated to be built out in 22. Conclusions Transportation Impact Study Based on the investigations carried out, it is concluded that: Existing Traffic Operations: Currently, all intersections within the study area operate at acceptable levels of service during the AM and PM peak hours, with no problem movements; The development is forecast to generate 77 and 67 new trips during the AM and PM peak hours, respectively. 226 Background Traffic Operations: All intersections within the study area are forecast to operate with acceptable levels of service, with no problem movements; 226 Total Traffic Operations: All intersections within the study area are forecast to operate with acceptable levels of service similarly to the background conditions, with no problem movements. Paradigm Transportation Solutions Limited Page i

6 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 Transportation Demand Management The location of the site is conducive to encouraging the use of transit, given its proximity to six existing bus routes and the ION Rapid Transit system that is expected to start operation in 28. Active transportation infrastructure is not well developed around the site. There are no bike lanes on the surrounding roads, and there is sidewalk only on Wyman Road, on the south side abutting the subject site. King Street has sidewalk only on the east side which is the far side to the subject site. The Site Plans provides for onsite pedestrian mobility and includes a parking area for bicycles. 23 bicycle parking spaces will be required under the City s Zoning By-Law. The site currently accommodates 99 parking spaces, and a total of 2 spaces are proposed with redevelopment. A number of post-development or occupancy TDM strategies are feasible on this site and should be considered for implementation. They include: promoting the Travelwise TDM program offered by the Region of Waterloo; providing onsite transit support; and creating a TDM Co-ordinator for the development. Recommendations Based on the findings of this study, there is no requirement for off-site road improvements to accommodate the proposed development. It is recommended that the development be considered for approval. Active transportation infrastructure could be enhanced by adding a second sidewalk on King Street, on the west side. A number of development specific TDM measures are also feasible, including: Travelwise TDM program; onsite transit support; and a designated TDM Co-ordinator. Paradigm Transportation Solutions Limited Page ii

7 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 Contents Introduction.... Overview... 2 Existing Conditions Road Network Transit Network Cycling & Pedestrian Facilities Traffic Volumes Traffic Operations Development Concept Development Description Development Trip Generation Development Trip Distribution and Assignment... 4 Evaluation of Future Traffic Conditions Horizon Background Traffic Growth Background Traffic Conditions Total Traffic Operations Remedial Measures Transportation Demand Management Transportation Demand Management Techniques Pre-Occupancy Strategies Transit Support Cycling Support Post-Occupancy Strategies Travelwise Membership On-Site Transit Support TDM Coordinator TDM Checklist Assessment Conclusions and Recommendations Conclusions Recommendations Paradigm Transportation Solutions Limited Page iii

8 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 Appendices Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Existing Turning Movement Counts Base Year Traffic Operations Reports Internal Capture Calculations 226 Background Traffic Operations Reports 226 Total Traffic Operations Reports City of Waterloo TDM Worksheet Figures Figure.: Study Area and Subject Development Location... 2 Figure 2.: Base Year Peak Hour Traffic Volumes... 6 Figure 3.: Development Concept Site Plan... 9 Figure 3.2: Peak Hour Development Traffic Forecasts... 2 Figure 4.: 226 Peak Hour Background Traffic Forecasts... 4 Figure 4.2: 226 Peak Hour Total Traffic Forecasts... 7 Tables Table 2.: Base Year Peak Hour Traffic Operations... 7 Table 3.: Trip Generation... Table 4.: 226 Background Operations Summary... 5 Table 4.2: 226 Total Traffic Operations... 8 Paradigm Transportation Solutions Limited Page iv

9 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 Introduction. Overview RISE Commercial Developments has retained Paradigm Transportation Solutions Limited (Paradigm) to conduct this Transportation Impact Study (TIS) and Transportation Demand Management (TDM) Report for a proposed mixed-use development located at 65 Colby Drive in Waterloo, Ontario. The development is anticipated to be built out in 22. This report analyses existing traffic conditions, describes the proposed development, forecasts traffic to five years from full build-out (i.e. 226, with buildout in 22), and recommends potential improvements as required to accommodate future traffic volumes. This report also includes recommended TDM measures and strategies to reduce the number of single occupancy vehicles to and from the site. The development proposes the conversion of an existing 2,9 square feet office building into a medical building, and the construction two new smaller buildings for a combined,9 square feet of commercial uses. Access to the development will be provided via an existing all-movement access to Wyman Road and a proposed new right-in/right-out access on King Street North. The Region of Waterloo has confirmed that the rightin/right-out access on King Street as shown in the site plan will be permitted. Figure. details the location of the subject development. The study scope developed in consultation with the Region of Waterloo and City of Waterloo via in March 28, includes: Determination and assessment of the current traffic and conditions near the existing site; Forecast additional development-generated traffic; Operational analyses under future traffic conditions (with and without the subject development at a five-year post buildout horizon) at: King Street North & Wyman Road/ Northland Road; Wyman Road & Colby Drive; Development access (Driveway North) to Wyman Road; and Development access (Driveway South) to King Street North Recommendations, as required, to address the identified traffic impacts in a satisfactory manner. Paradigm Transportation Solutions Limited Page

10 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 Figure.: Study Area and Subject Development Location Study Area Development Location Denotes studied intersection King Street and Wyman Road 822 Study Area and Subject Development Location Figure. Paradigm Transportation Solutions Limited Page 2

11 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 2 Existing Conditions This section describes study area road system, transit service and active transportation network. It summarizes current traffic conditions, operational deficiencies, and capacity constraints at the intersections within the study area. The operational deficiencies and constraints identified at this stage will be fundamental to identifying potential remedial measures as may be required. 2. Road Network The study-area roadways include one Regional Road (King Street North) and two City of Waterloo Roads (Wyman Road and Colby Drive): King Street North has a 4-lane cross-section and a posted speed limit of 6 km/hr. There is sidewalk only on the east side and there are no bike lanes. Wyman Road has a 2-lane cross-section within the study area and a posted speed limit of 5 km/hr. There is sidewalk only on the south side and there are no bike lanes. Colby Drive has a 2-lane cross-section within the study area and a posted speed limit of 5 km/hr. There are no sidewalks or bike lanes. The study area is primarily bordered by industrial developments with several commercial developments as well. 2.2 Transit Network Grand River Transit operates six routes in the study area. The two routes closest to the development are: Route #4 services Waterloo through the northern industrial areas along multiple roads, with a major stop at Conestoga Mall. This route operates on 3-minute headways from Monday-Friday starting at 6:23 AM and concluding service at :3 PM. Saturday, Sunday and Holiday services are not provided. Route #2 services Waterloo and St. Jacobs through the northern industrial areas along King Street North, with major stops at Conestoga Mall and the St. Jacobs Market. This route operates on 3-minute on peak and -hour off peak headways from Monday- Friday starting at 6:9 AM and concluding service at 7:34 PM. Saturday service operates on 3-minute headways starting at 6:52 AM and concluding at 4:49 PM. This route does not operate on Sundays/Holidays. Paradigm Transportation Solutions Limited Page 3

12 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 Within a short walk of the site (~45 m), there is access to a major transfer point in the ION Rapid Transit System (Northfield Terminal) that provides links to all major routes serving the Kitchener-Waterloo area. 2.3 Cycling & Pedestrian Facilities King Street North and Wyman Road within the study area provide sidewalks on one side of the street, the west side and south side respectively. There is no sidewalk provided on Colby Drive. There are no dedicated cycling facilities within the study area. 2.4 Traffic Volumes In February 28, Paradigm collected weekday area AM and PM peak hour and mid-day turning movement counts at the study area intersections using Miovision cameras. Figure 2. summarizes the existing weekday AM and PM peak hour traffic volumes. Appendix A contains the existing count data. 2.5 Traffic Operations The operations of intersections in the study area were evaluated with the existing turning movement volumes using Synchro 9. Intersection level of service (LOS) is a recognized method of quantifying the average delay experienced by drivers at intersections. It is based on the delay experienced by individual vehicles executing the various movements. The delay is related to the number of vehicles desiring to make a particular movement, compared to the estimated capacity for that movement. The capacity is based on several criteria related to the opposing traffic flows and intersection geometry. The highest possible rating is LOS A, under which the average total delay is equal or less than. seconds per vehicle. When the average delay exceeds 8 seconds for signalized intersections, 5 seconds for unsignalized intersections or when the volume to capacity ratio is greater than., the movement is classified as LOS F and remedial measures are usually implemented, if they are feasible. LOS E is usually used as a guideline for the determination of road improvement needs on through lanes, while LOS F may be acceptable for left-turn movements at peak times, depending on delays. The intersection analyses considered three separate measures of performance: LOS for each movement and the entire intersection; The volume to capacity (v/c) ratio for each movement and the entire intersection; and Paradigm Transportation Solutions Limited Page 4

13 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 The estimated 95 th percentile queue length for each movement. Table 2. summarizes the existing intersection operations indicating the existing levels of service (LOS), volume to capacity ratios (V/C) and 95th percentile queues experienced within the study area, for the AM and PM peak hours. Appendix B contains the detailed Synchro reports. The analyses indicate that all intersections and individual movements within the study area are currently operating overall at acceptable levels of services, with no problem movements. Paradigm Transportation Solutions Limited Page 5

14 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April Figure 2.: Base Year Peak Hour Traffic Volumes AM PEAK Northland Wyman Road 59 Road Colby Drive King Street North 6 7 PM PEAK Northland Wyman Road 7 9 Road Colby Drive King Street 27 North 88 King Street and Wyman Road 822 Base Year Peak Hour Traffic Volumes Figure 2. Paradigm Transportation Solutions Limited Page 6

15 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 TABLE 2.: BASE YEAR PEAK HOUR TRAFFIC OPERATIONS Analysis Period Intersection Control Type MOE Left Direction / Movement / Approach Eastbound Westbound Northbound Southbound Through Right Approach Left Through Right Approach Left Through Right Approach Left Through Right Approach Overall LOS B B B B B A A B A A A A A A A A A King Street North & Delay Wyman TCS V/C Road/Northland Road Q LOS B B B B B B B B A A A A A A A A Colby Drive & Wyman Delay TWSC Road/Driveway V/C Q LOS C B B C B A A B C B B B B B B B B King Street North & Delay Wyman TCS V/C Road/Northland Road Q LOS B B B B B B B B A A A A A A A A Colby Drive & Wyman Delay TWSC Road/Driveway V/C Q MOE - Measure of Effectiveness Q - 95th Percentile Queue Length TCS - Traffic Control Signal RBT - Roundabout LOS - Level of Service Ex. - Existing Available Storage TWSC - Two-Way Stop Control Delay - Average Delay per Vehicle in Seconds Avail. - Available Storage AWSC - All-Way Stop Control AM Peak Hour PM Peak Hour Paradigm Transportation Solutions Limited Page 7

16 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 3 Development Concept 3. Development Description The development proposes the conversion of an existing 2,9 square feet office building into a medical building, and the construction of two new smaller buildings for a combined,9 square feet of commercial uses. The development is anticipated to be built out in 22. Access to the development will be provided via an existing all-movement access to Wyman Road and a proposed new right-in/right-out access on King Street North. The Region of Waterloo has confirmed that the rightin/right-out access on King Street as shown in the site plan will be permitted. The site currently accommodates 99 parking spaces, and a total of 2 spaces are proposed with redevelopment. The Site Plans provides for onsite pedestrian mobility and includes a parking area for bicycles. Paradigm Transportation Solutions Limited Page 8

17 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 Figure 3.: Development Concept Site Plan King Street and Wyman Road 822 Development Concept Site Plan Figure 3. Paradigm Transportation Solutions Limited Page 9

18 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April Development Trip Generation The Institute of Transportation Engineers (ITE) Trip Generation rates and equations were used to estimate the weekday AM and PM peak hour sitegenerate traffic volumes, corresponding to Land Use Codes (LUC) 72 (Medical-Dental Office Building), 63 (Clinic), and 82 (Shopping Center). This results in 23 and 38 trips generated in the AM and PM peak hours, respectively. However, as there is an existing office building in the development area that is to be repurposed for the new medical offices and clinic, trips generated by the existing development was discounted from the redevelopment traffic. The discounted trips are 9 and 7 trips in the AM and PM peak hours, respectively. ITE Internal Capture calculations were used to determine the internal capture rates between all uses and a mode share reduction was applied. The internal capture calculations are included in Appendix C. For transit and active transportation modal shares we have conservatively used a total of 8% based on current average Regionwide transit (5%) and active transportation (3%) shares. The total of these reductions resulted in 77 and 67 trips during the AM and PM peak hours, respectively. The total (net) trip generation for the site including the above described reductions is shown in Table 3.. Trip Generation Manual, th Edition, Institute of Transportation Engineers, 27. Paradigm Transportation Solutions Limited Page

19 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 TABLE 3.: TRIP GENERATION Land Use Code Units AM Peak Hour PM Peak Hour Rate IN OUT Total Rate IN OUT Total New Development 82: Shopping Center.8 Sq Internal Capture Non-AutomotiveMode Share (Transit 5% + Active 3%) 8% 2 3 8% Passby n/a 34% Net Total : Medical-Dental Office Building.9 Sq Internal Capture Non-AutomotiveMode Share (Transit 5% + Active 3%) 8% 2 3 8% 2 3 Net Total : Clinic.9 Sq Non-AutomotiveMode Share (Transit 5% + Active 3%) 8% % Net Total Existing Development 7: General Office Building 2.9 Sq Non-AutomotiveMode Share (Transit 5% + Active 3%) 8% 2 2 8% 2 2 Net Total Net Total Trips Development Trip Distribution and Assignment Existing traffic patterns at nearby intersections and the surrounding properties were used to determine the directional distribution of development traffic, and the assignment on King Street, Wyman Road and Colby Drive. Figure 3.2 illustrates the peak hour development trip assignment. Paradigm Transportation Solutions Limited Page

20 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 8 Figure 3.2: Peak Hour Development Traffic Forecasts 8 Wyman Road Northland 3 Road Colby Drive Driveway North AM PEAK 8 Driveway South King Street North 2 Wyman Road Northland 2 Road PM PEAK 4 3 Driveway South Colby Drive Driveway North King Street North King Street and Wyman Road 822 Peak Hour Development Traffic Forecasts Figure 3.2 Paradigm Transportation Solutions Limited Page 2

21 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 4 Evaluation of Future Traffic Conditions Future traffic conditions analysed include future background traffic volumes and total traffic volumes for the 226 horizon. The future traffic volumes near the subject development consist of increased non-site traffic volumes (background traffic) and the traffic forecast to be generated by the proposed development Horizon Background Traffic Growth The growth rate for the generalized traffic near the site was determined to be 2%. This growth rate was established in consultation with the City of Waterloo. Figure 4.illustrates the resulting 226 background traffic volumes Background Traffic Conditions Based on the forecast 226 background traffic volumes, operational analyses were carried out using Synchro 9 for AM and PM peak hour conditions for the intersections within the study area. Table 4. summarizes the 226 background traffic operations. Based on the analyses, the intersection operations under 226 background traffic conditions are forecast to be similar to those under the existing traffic conditions, with all movements anticipated to operate at acceptable levels of service and with no problem movements. Appendix C contains the supporting Synchro 9 reports. Paradigm Transportation Solutions Limited Page 3

22 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April Figure 4.: 226 Peak Hour Background Traffic Forecasts AM PEAK Wyman Road 6 Northland 2 69 Road Colby Drive King Street North PM PEAK Wyman Road 3 Northland 8 7 Road Colby Drive King Street North King Street and Wyman Road Peak Hour Background Traffic Forecasts Figure 4. Paradigm Transportation Solutions Limited Page 4

23 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 TABLE 4.: 226 BACKGROUND OPERATIONS SUMMARY Analysis Period Intersection Control Type MOE Left Direction / Movement / Approach Eastbound Westbound Northbound Southbound Through Right Approach Left Through Right Approach Left Through Right Approach Left Through Right Approach Overall AM Peak Hour PM Peak Hour King Street North & Wyman Road/Northland Road Colby Drive & Wyman Road/Driveway King Street North & Wyman Road/Northland Road Colby Drive & Wyman Road/Driveway TCS TWSC TCS TWSC LOS B B B B C B B B A A A A A A A A A Delay V/C Q LOS B B B B B B B B A A A A A A A A Delay V/C Q LOS D C C C B B B B C B B B B B B B B Delay V/C Q LOS B B B B B B B B A A A A A A A A Delay V/C Q MOE - Measure of Effectiveness Q - 95th Percentile Queue Length TCS - Traffic Control Signal RBT - Roundabout LOS - Level of Service Ex. - Existing Available Storage TWSC - Two-Way Stop Control Delay - Average Delay per Vehicle in Seconds Avail. - Available Storage AWSC - All-Way Stop Control Paradigm Transportation Solutions Limited Page 5

24 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April Total Traffic Operations Figure 4.2 details the AM and PM peak hour 226 total traffic volumes which are the combination of the forecast background traffic volumes and the forecast development traffic volumes. Table 4.2 provides a summary of the forecast 226 total traffic LOS conditions. Appendix D contains in the supporting detailed Synchro reports. Based on the analyses it is concluded that the intersections are forecast to operate similar to the 226 forecast background traffic conditions. Paradigm Transportation Solutions Limited Page 6

25 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April Figure 4.2: 226 Peak Hour Total Traffic Forecasts 52 Wyman Road 6 Northland Road Colby Drive AM PEAK 8 Driveway South Driveway North King Street North Wyman Road 3 Northland Road PM PEAK 4 3 Driveway South Colby Drive Driveway North King Street North King Street and Wyman Road Peak Hour Total Traffic Forecasts Figure 4.2 Paradigm Transportation Solutions Limited Page 7

26 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 TABLE 4.2: 226 TOTAL TRAFFIC OPERATIONS Analysis Period Intersection Control Type MOE Left Direction / Movement / Approach Eastbound Westbound Northbound Southbound Through Right Approach Left Through Right Approach Left Through Right Approach Left Through Right Approach Overall PM Peak Hour AM Peak Hour King Street North & Wyman Road/Northland Road Colby Drive & Wyman Road/Driveway King Street North & Driveway South Wyman Road & Driveway North King Street North & Wyman Road/Northland Road Colby Drive & Wyman Road/Driveway King Street North & Driveway South Wyman Road & Driveway North TCS TWSC TWSC TWSC TCS TWSC TWSC TWSC LOS B B B B C B B B A A A A A A A A A Delay V/C Q LOS B B B B B B B B A A A A A A A A Delay V/C Q LOS A A A A A A A Delay 9 9 V/C Q LOS A A A A A A B B B Delay V/C Q LOS D C C C C B B B C B B B B B B B B Delay V/C Q LOS B B B B B B B B A A A A A A A A Delay V/C Q LOS B B A A A A A Delay V/C Q LOS A A A A A A B B B Delay V/C Q MOE - Measure of Effectiveness Q - 95th Percentile Queue Length TCS - Traffic Control Signal RBT - Roundabout LOS - Level of Service Ex. - Existing Available Storage TWSC - Two-Way Stop Control Delay - Average Delay per Vehicle in Seconds Avail. - Available Storage AWSC - All-Way Stop Control Paradigm Transportation Solutions Limited Page 8

27 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 5 Remedial Measures As all intersections within the study area operate at an acceptable level, LOS C and above, during each of the observed study periods no remedial measures are considered necessary. The existing road system, including King Street North, Wyman Road and Colby Drive, is adequate to accommodate the expected increase in vehicular traffic generated by the proposed development. Paradigm Transportation Solutions Limited Page 9

28 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 6 Transportation Demand Management 6. Transportation Demand Management Techniques Transportation Demand Management (TDM) refers to ways of making the capacity of our roads more efficient by reducing vehicle demand. TDM approaches consider how people s choices of travel mode are affected by land use patterns, development design, parking availability, parking cost, and the relative cost, convenience and availability of alternative modes of travel. Various TDM strategies are used to influence those factors so that the alternative modes are more competitive with driving alone and potentially reduce reliance on motor vehicles. TDM strategies at a development can be divided into two basic categories: Pre-occupancy: things that need to be done while a development is being designed and built; and Post-occupancy: things that can be done once people are using the development. The pre-occupancy actions are critical as they are most likely to determine how attractive, convenient, and safe alternative modes of travel will be once the site is occupied. Before a site is occupied, it can be designed to be convenient and safe for pedestrians and cyclists, and vehicle parking can be provided to meet but not exceed demand. After the development is built, incentives can be offered, but those incentives will not work as well if the site and its surroundings are oriented to cars. The incentives generally include subsidies to use transit, access to rideshare programs, and information about where and how to use alternative modes. 6.2 Pre-Occupancy Strategies 6.2. Transit Support The location of the site is conducive to encouraging the use of transit, given its proximity to six existing bus routes and the ION Rapid Transit system that is expected to start operation in Cycling Support Active transportation infrastructure is not well developed around the site. There are no bike lanes on the surrounding roads, and there is sidewalk only on Wyman Road, on the south side abutting the subject site. King Street has sidewalk only on the east side which is the far side to the subject site. Paradigm Transportation Solutions Limited Page 2

29 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 The Site Plans provides for onsite pedestrian mobility and includes a parking area for bicycles. 23 bicycle parking spaces will be required under the City s Zoning By-Law, Section Post-Occupancy Strategies 6.3. Travelwise Membership The future occupants of the development may be encouraged to consider becoming members of the Travelwise program, offered by the Region of Waterloo. The Travelwise program is usually offered to companies to coordinate TDM services for employees. Services include: ride matching for carpoolers, emergency rides home, and Grand River Transit corporate pass. The details of how the occupants could join the Travelwise membership program and the benefits they will receive would need to be worked out with the Region of Waterloo. Additionally, the companies established within the commercial component of the development could look to join Travelwise as part of the same application as the medical office-clinic component of the development providing added benefit to their employees On-Site Transit Support The owner should investigate the feasibility of providing access to real-time transit information for study area transit routes, including the future ION Rapid Transit system and that this information is readily available in public areas of the development TDM Coordinator Implementing TDM measures could be enhanced by creating a TDM Coordinator for the development. The TDM coordinator will handle the membership in Travelwise, provide information for the Community Car Share program, and administer access to the secured bicycle parking. It is expected that a representative of the City of Waterloo or Region of Waterloo will be available to assist the TDM coordinator to help get the programs started during the early stages of operations. The building/business owners could identify an interested individual employee or identify the property manager to act as TDM Co-ordinator to facilitate the implementation of the proposed TDM measures. 6.4 TDM Checklist Assessment The site has been designed to be supportive of the TDM objectives of the City and the Region by providing and incorporating them as design objectives in the Master Plan document for the site development. Most important of these is flexibility of the plan to evolve over time to increase development density and reduce parking. 2 Draft Zoning By-Law 26-, Sec 6.27, Table 6H, City of Waterloo, Paradigm Transportation Solutions Limited Page 2

30 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 The City of Waterloo has developed a TDM Checklist as part of their Transportation Impact Study Guidelines. Appendix E contains the City of Waterloo TDM Checklist. Under these guidelines, the development would appear to be eligible for a parking reduction based on the mixed-use nature of the site. However, parking reduction is only applicable if all parking spaces are to be shared with no reservations between user groups. Additionally, the development, based upon identifiable TDM features would seem eligible for a two-star rating. The main feature on the City s Checklist that is applicable to the proposed development is that it is a mixed-use development. Other features on the Checklist require confirmation, and include: The building owner/occupant will make available car sharing services (e.g. Community CarShare); Reduced cost parking and/or priority parking locations for users of car/van pool, bicycle, moped/motorcycle spaces; Provision of subsidized transit passes for all occupants; The future occupants agree to join Travelwise that provides many of the services listed above; and Information regarding public transit routes, schedules and fares are provided in accessible and visible location on-site. Paradigm Transportation Solutions Limited Page 22

31 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 7 Conclusions and Recommendations 7. Conclusions Transportation Impact Study Based on the investigations carried out, it is concluded that: Existing Traffic Operations: Currently, all intersections within the study area operate at acceptable levels of service during the AM and PM peak hours, with no problem movements; The development is forecast to generate 77 and 67 new trips during the AM and PM peak hours, respectively. 226 Background Traffic Operations: All intersections within the study area are forecast to operate within acceptable levels of service, with no problem movements; 226 Total Traffic Operations: All intersections within the study area are forecast to operate within acceptable levels of service, with no problem movements. Transportation Demand Management The location of the site is conducive to encouraging the use of transit, given its proximity to six existing bus routes and the ION Rapid Transit system that is expected to start operation in 28. Active transportation infrastructure is not well developed around the site. There are no bike lanes on the surrounding roads, and there is sidewalk only on Wyman Road, on the south side abutting the subject site. King Street has sidewalk only on the east side which is the far side to the subject site. The Site Plans provides for onsite pedestrian mobility and includes a parking area for bicycles. 23 bicycle parking spaces will be required under the City s Zoning By-Law, Section 6 3. The site currently accommodates 99 parking spaces, and a total of 2 spaces are proposed with redevelopment. A number of post-development or occupancy TDM strategies are feasible on this site and should be encouraged to be considered for implementation. They include: promoting the Travelwise TDM program offered by the Region of Waterloo; providing onsite transit support; and creating a TDM Co-ordinator for the development. 3 Draft Zoning By-Law 26-, Sec 6.27, Table 6H, City of Waterloo, Paradigm Transportation Solutions Limited Page 23

32 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April Recommendations Based on the findings of this study, there is no requirement for off-site road improvements to accommodate the proposed development. It is recommended that the development be considered for approval. Active transportation infrastructure could be enhanced by adding a second sidewalk on King Street, on the west side. Several developments specific TDM measures are also feasible, including: Travelwise TDM program; onsite transit support; and a designated TDM Co-ordinator.. Paradigm Transportation Solutions Limited Page 24

33 King Street and Wyman Road Transportation Impact Study & TDM Report 822 April 28 Appendix A Existing Turning Movement Counts Paradigm Transportation Solutions Limited Appendices

34

35 Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo, Ontario, Canada N2J N cbowness@ptsl.com Count Name: King Street N & Wyman Road Site Code: Start Date: 2/8/28 Page No: Start Time Turning Movement Data Wyman Road Northland Road King Street N King Street N Eastbound Westbound Northbound Southbound Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds 7: AM :5 AM :3 AM :45 AM Hourly Total : AM :5 AM :3 AM :45 AM Hourly Total : AM :5 AM :3 AM :45 AM Hourly Total *** BREAK *** : PM :5 PM :3 PM :45 PM Hourly Total : PM :5 PM :3 PM :45 PM Hourly Total *** BREAK *** : PM :5 PM :3 PM :45 PM Hourly Total : PM :5 PM :3 PM :45 PM Hourly Total App. Total Int. Total

36 5: PM :5 PM :3 PM :45 PM Hourly Total Grand Total Approach % Total % Lights % Lights Mediums % Mediums Articulated Trucks % Articulated Trucks Pedestrians % Pedestrians

37 Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo, Ontario, Canada N2J N cbowness@ptsl.com Count Name: King Street N & Wyman Road Site Code: Start Date: 2/8/28 Page No: 3 King Street N [N] Out In Total R T L U P U R Wyman Road [W] Total In Out L T R 2/8/28 7: AM Ending At 2/8/28 6: PM Lights Mediums Articulated Trucks Pedestrians T L U Out In Total Northland Road [E] 3 3 P 3 3 P U L T R P Out In Total King Street N [S] Turning Movement Data Plot

38 Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo, Ontario, Canada N2J N cbowness@ptsl.com Count Name: King Street N & Wyman Road Site Code: Start Date: 2/8/28 Page No: 4 Start Time Turning Movement Peak Hour Data (7:45 AM) Wyman Road Northland Road King Street N King Street N Eastbound Westbound Northbound Southbound Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds 7:45 AM : AM :5 AM :3 AM Total Approach % Total % PHF Lights % Lights Mediums % Mediums Articulated Trucks % Articulated Trucks Pedestrians % Pedestrians App. Total Int. Total

39 Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo, Ontario, Canada N2J N cbowness@ptsl.com Count Name: King Street N & Wyman Road Site Code: Start Date: 2/8/28 Page No: 5 King Street N [N] Out In Total R T L U P U R Wyman Road [W] Total In 98 2 Out L T R Peak Hour Data 2/8/28 7:45 AM Ending At 2/8/28 8:45 AM Lights Mediums Articulated Trucks Pedestrians T L U Out In Total Northland Road [E] P P U L T R P Out In Total King Street N [S] Turning Movement Peak Hour Data Plot (7:45 AM)

40 Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo, Ontario, Canada N2J N cbowness@ptsl.com Count Name: King Street N & Wyman Road Site Code: Start Date: 2/8/28 Page No: 6 Start Time Turning Movement Peak Hour Data (2: PM) Wyman Road Northland Road King Street N King Street N Eastbound Westbound Northbound Southbound Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds 2: PM :5 PM :3 PM :45 PM Total Approach % Total % PHF Lights % Lights Mediums % Mediums Articulated Trucks % Articulated Trucks Pedestrians % Pedestrians App. Total Int. Total

41 Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo, Ontario, Canada N2J N cbowness@ptsl.com Count Name: King Street N & Wyman Road Site Code: Start Date: 2/8/28 Page No: 7 King Street N [N] Out In Total R T L U P U R Wyman Road [W] Total In Out L T R Peak Hour Data 2/8/28 2: PM Ending At 2/8/28 : PM Lights Mediums Articulated Trucks Pedestrians T L U Out In Total Northland Road [E] P 3 3 P U L T R P Out In Total King Street N [S] Turning Movement Peak Hour Data Plot (2: PM)

42 Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo, Ontario, Canada N2J N cbowness@ptsl.com Count Name: King Street N & Wyman Road Site Code: Start Date: 2/8/28 Page No: 8 Start Time Turning Movement Peak Hour Data (4:3 PM) Wyman Road Northland Road King Street N King Street N Eastbound Westbound Northbound Southbound Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds 4:3 PM :45 PM : PM :5 PM Total Approach % Total % PHF Lights % Lights Mediums % Mediums Articulated Trucks % Articulated Trucks Pedestrians % Pedestrians App. Total Int. Total

43 Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo, Ontario, Canada N2J N cbowness@ptsl.com Count Name: King Street N & Wyman Road Site Code: Start Date: 2/8/28 Page No: 9 King Street N [N] Out In Total R T L U P U R Wyman Road [W] Total In Out L T 9 9 R Peak Hour Data 2/8/28 4:3 PM Ending At 2/8/28 5:3 PM Lights Mediums Articulated Trucks Pedestrians T L U Out In Total Northland Road [E] P P U L T R P Out In Total King Street N [S] Turning Movement Peak Hour Data Plot (4:3 PM)

44 Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo, Ontario, Canada N2J N cbowness@ptsl.com Count Name: King Street N & Wyman Road Site Code: Start Date: 2/8/28 Page No:

45 Paradigm Transportation Solutions Limited 22 King Street South, Suite 3 Waterloo, Ontario, Canada N2J N cbowness@ptsl.com Count Name: Wyman Road & Colby Drive Site Code: Start Date: 2/8/28 Page No: Start Time Turning Movement Data Driveway Wyman Road Colby Drive Colby Drive Eastbound Westbound Northbound Southbound Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds App. Total Left Thru Right U-Turn Peds 7: AM :5 AM :3 AM :45 AM Hourly Total : AM :5 AM :3 AM :45 AM Hourly Total : AM :5 AM :3 AM :45 AM Hourly Total *** BREAK *** : PM :5 PM :3 PM :45 PM Hourly Total : PM :5 PM :3 PM :45 PM Hourly Total *** BREAK *** : PM :5 PM :3 PM :45 PM Hourly Total : PM :5 PM :3 PM :45 PM Hourly Total App. Total Int. Total

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

195 Hespeler Road Transportation Demand Management and Parking Justification Report. Paradigm Transportation Solutions Limited

195 Hespeler Road Transportation Demand Management and Parking Justification Report. Paradigm Transportation Solutions Limited 195 Hespeler Road Transportation Demand Management and Parking Justification Report Paradigm Transportation Solutions Limited March 2018 Project Summary Project Number 170339 March 2018 Client NHDG (Hespeler)

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Prepared By: 332 Lorne Avenue East Stratford ON N5A 6S4 Prepared for: Paul Kemper, President

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes. Prepared By: Stantec Consulting Ltd. Version 2

2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes. Prepared By: Stantec Consulting Ltd. Version 2 2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes Prepared By: Stantec Consulting Ltd. Version 2 April 2014 Stantec Consulting Ltd. 400-1331 Clyde Avenue, Ottawa ON K2C

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

LCPS Valley Service Center

LCPS Valley Service Center Traffic Impact Study LCPS Valley Service Center Loudoun County, Virginia November 4, 2015 Prepared For: Loudoun County Public Schools 21000 Education Court Ashburn, VA 20148 Prepared by: 1140 Connecticut

More information

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO P.O. 61992 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION SEPTEMBER 5, 218 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Capability City of Mississauga Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga,

More information

Mineola Village Green

Mineola Village Green Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared

More information

TRAFFIC IMPACT STUDY 3171 LAKESHORE ROAD WEST RESIDENTIAL DEVELOPMENT TOWN OF OAKVILLE, REGIONAL MUNICIPALITY OF HALTON

TRAFFIC IMPACT STUDY 3171 LAKESHORE ROAD WEST RESIDENTIAL DEVELOPMENT TOWN OF OAKVILLE, REGIONAL MUNICIPALITY OF HALTON TRAFFIC IMPACT STUDY 3171 LAKESHORE ROAD WEST RESIDENTIAL DEVELOPMENT TOWN OF OAKVILLE, REGIONAL MUNICIPALITY OF HALTON PREPARED FOR: VOGUE WYCLIFFE (OAKVILLE) LIMITED PREPARED BY: C.F. CROZIER & ASSOCIATES

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Transportation Review

Transportation Review 1445-1455 West Georgia Street Transportation Review Draft Report Prepared for BCG Developments Date November 10, 2016 Project No. 4608.12 November 10, 2016 4608.12 Dawn Guspie James KM Cheng Architects

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Trip Generation and Parking Study New Californian Apartments, Berkeley

Trip Generation and Parking Study New Californian Apartments, Berkeley Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Craigieburn Employment Precinct North and English Street

Craigieburn Employment Precinct North and English Street Craigieburn Employment Precinct North and English Street METROPOLITAN PLANNING AUTHORITY Intersection Analyses 7 February 2014 Intersection Analyses Craigieburn Employment Precinct North and English Street

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes. Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 SCREENING... 1 1.1

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS Executive Summary... 2 Project Background... 2 Conditions... 2 Findings... 3 Recommendations... 4 Introduction... 6

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

Environmental Assessment Derry Road and Argentia Road Intersection

Environmental Assessment Derry Road and Argentia Road Intersection Air and Noise Study Environmental Assessment Derry Road and Argentia Road Intersection Project 11-4295 City of Mississauga, Region of Peel October 17, 2014 1 Region of Peel Environmental Assessment for

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 Presentation Outline Context t of Mississauga i City Centre Implementing Paid Parking and TDM

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Early Scoping Meeting for Alternatives Analysis (AA) May 17, 2011 Introduction Key players Local lead agency: Metro Federal lead agency:

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation