1 West Georgia Street Transportation Review Draft Report Prepared for BCG Developments Date November 10, 2016 Project No

2

3 November 10, Dawn Guspie James KM Cheng Architects Suite West 8 th Avenue Vancouver, BC V5Y 1M8 Dear Dawn: Re: West Georgia Street Draft Transportation Review At the request of James KM Cheng Architects, on behalf of BCG Developments, we have completed the attached Draft Transportation Review, required as part of the rezoning application for West Georgia Street, in Vancouver BC. The attached report documents the estimated number of vehicle trips from the proposed development and the anticipated effect of the development traffic on the adjacent street system. We trust information provided in this report will be of assistance to you and your team. Yours truly, Bunt & Associates Christephen Cheng, P.Eng. Senior Transportation Engineer Dominic Lao, EIT Transportation Analyst West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

4

5 CORPORATE AUTHORIZATION Prepared By: Dominic Lao, EIT Bunt & Associates Engineering (BC) Ltd. Christephen Cheng, P.Eng West Pender Street Vancouver, BC V6E 3S7 Canada Reviewed By: Christephen Cheng, P.Eng. Telephone: Senior Transportation Engineer Facsimile: Date: Project No Status: Draft This document was prepared by Bunt & Associates for the benefit of the Client to whom it is addressed. The copyright and ownership of the report rests with Bunt & Associates. The information and data in the report reflects Bunt & Associates best professional judgment in light of the knowledge and information available to Bunt & Associates at the time of preparation. Except as required by law, this report and the information and data contained are to be treated as confidential and may be used and relied upon only by the client, its officers and employees. Any use which a third party makes of this report, or any reliance on or decisions made based on it, are the responsibilities of such third parties. Bunt & Associates accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this report West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

6

7 TABLE OF CONTENTS 1. INTRODUCTION Study Purpose Study Scope & Objectives Organization of Report Proposed Development EXISTING CONDITIONS Land Use Existing Transportation Network Road Network Transit Network Cycling & Pedestrian Networks Traffic Volumes Data Collection Program Peak Hour Traffic Volumes Existing Site Vehicle Trip Generation Existing Operations Performance Thresholds Operational Analysis Results FUTURE TRAFFIC CONDITIONS Traffic Forecasts Background Traffic Forecasts Site Traffic Total Traffic Traffic Operations Background Traffic Operations Total Traffic Operations Summary of Traffic Impacts Sensitivity Analysis SITE PLAN DESIGN REVIEW Site Access Design Parking Supply Vehicle Parking Bicycle Parking Service Vehicle and Parking Access Review CONCLUSIONS & RECOMMENDATIONS West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

8 APPENDIX A Terms of Reference APPENDIX B Traffic Data APPENDIX C Synchro Reports EXHIBITS Exhibit 1.1: Site Location... 2 Exhibit 1.2: Study Area... 3 Exhibit 1.3: Site Plan... 4 Exhibit 2.1: Existing Peak Hour Vehicle Traffic Volumes... 8 Exhibit 3.1: Opening Day Background Traffic Forecasts Exhibit 3.2: Site Traffic Forecasts Exhibit 3.3: Opening Day Total Traffic Forecasts Exhibit 3.4: Potential Vehicle Re-routing Exhibit 4.1: Loading AutoTURN Analysis Exhibit 4.2: Passenger Vehicle Circulation TABLES Table 1.1: Proposed Development Contents... 1 Table 2.1: Existing Street Characteristics... 5 Table 2.2: Nearest Transit Stops from the Development Site... 5 Table 2.3: Summary of Available and Counted Traffic Data... 6 Table 2.4: Existing Peak Hour Roadway Link Volumes... 7 Table 2.5: Existing Site Trip Generation... 7 Table 2.6: Intersection Level of Service Thresholds... 9 Table 2.7: Existing Traffic Operations Table 3.1 Trip Generation (Net Added Trips) from Other Developments in the Study Area Table 3.1: Peak Hour Vehicle Trip Rates Table 3.2: Estimated Peak Hour Site Vehicle Trips Table 3.3: Estimated Trip Distribution Table 3.4: Net Change in Future Intersection Vehicle Volumes with New Site Trips Table 3.5: Opening Day Background Vehicle Operations Table 3.6: Opening Day Total Vehicle Operations Table 4.1: Vehicle Parking Supply Requirement & Provision Table 4.2: Bicycle Parking Supply Requirement Table 4.3: Loading Bylaw Rates West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

9 1. INTRODUCTION 1.1 Study Purpose James KM Cheng Architects Inc (JKMC), on behalf of BCG Developments (BCG), is submitting a rezoning application for a proposed residential condominium located at West Georgia Street in Vancouver, BC. The site is currently occupied by two office buildings, both of which are proposed to be demolished in order to construct a 46-storey building with 101 residential condominium units. Exhibit 1.1 shows the site location in the context of the surrounding area along with key bicycle routes and transit stops. 1.2 Study Scope & Objectives A study scope has been agreed with the City of Vancouver Engineering Department covering a number of studied intersections in the vicinity of the development site for the Weekday AM and PM Peak Hour periods. Exhibit 1.2 shows the study area. 1.3 Organization of Report This report is structured in the following manner: Section 2 describes the existing conditions, including the review of the transportation system for all travel modes, and the traffic operations of the study network. Section 3 assesses the future traffic condition taking into account of background traffic growth along with the development site traffic. Section 4 presents a review of various transportation elements for the site design including parking, loading, and bicycle provisions along with AutoTurn analysis for various design vehicles. Section 5 presents the conclusion and recommendations based on the findings of this review. 1.4 Proposed Development Table 1.1 presents the proposed development contents for the site, while Exhibit 1.3 shows the site plan for the development. The project is expected to be completed by Table 1.1: Proposed Development Contents FSR FLOOR AREA FSR FLOOR AREA LAND USE UNITS (SQUARE FEET) (SQUARE METRES) Residential Units 262,597 24, West Georgia Street Transportation Review November 10, S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

10 Scale: NTS T T ro St e d ar C T T Site T on bs Ro la St St st H ast T co ing ss es W i N We T We st P St St Painted Bike Lane Shared Bike Lane o Br er t St on T t h ug T end ia St rg i rn eo be tg Al S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\Graphics N Local Street Bikeway T T Transit Stop Exhibit 1.1 Site Location West Georgia Residential Development Transportation Review November &

11 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\Graphics N Scale: NTS * ro St e rd a ol Ca St ic N We st H ast on bs Ro Site St n to * We St st P gh u ro er ss t St B be Al * es Study Intersections Pedestrian Signal ia rg eo tg Traffic Signal St No left-turn Weekdays between 3:00 pm - 6:00 pm No Left-turn Weekdays between 7:00 am - 9:30 am Bus Lane/HOV Lane Reversible Lane Eastbound W Georgia St to W Pender St (AM) Reversible Lane Westbound W Pender St and Westbound W Georgia St (PM) * Unsignalized W t is rn *Note: *Note: *Note: *Note: *Note: end ing Exhibit 1.2 Study Area West Georgia Residential Development Transportation Review November &

12

13 2. EXISTING CONDITIONS 2.1 Land Use The development site is currently occupied by two office buildings. Parking and loading accesses for both buildings are located off West Pender Street, resulting in four driveway openings along the south side of West Pender Street. 2.2 Existing Transportation Network Road Network Table 2.1 provides a description of a number of streets within the Study Area. Table 2.1: Existing Street Characteristics STREET NUMBER OF TRAVEL LANES POSTED SPEED PARKING FACILITIES West Georgia Street 6/7* 50 km/hr South side: No Stopping between 7am to 9:30am; No Parking between 9:30am to 6pm, Monday to Friday. North side: Metered Parking, No Stopping between 3pm to 7pm. West Pender Street 4 50 km/hr South side: n/a, No Stopping between 7am to 9:30am. North side: Metered Parking, No Stopping between 3pm to 6pm Nicola Street 1 50 km/hr n/a Broughton Street 2 50 km/hr West side: Metered Parking East side: n/a *Includes one westbound HOV Lane and a reversible lane Transit Network Currently there are bus stops located on both the West Georgia Street and West Pender Street frontages of the development site. Table 2.2 provides the details of transit stops along the development site s frontages. Table 2.2: Nearest Transit Stops from the Development Site STOP LOCATION DIRECTION STOP # AMENITY ROUTES SERVICED W Georgia St Far Side Broughton St W Pender St Far Side Nicola St W Georgia St Far Side Broughton St W Pender St Far Side Broughton St Westbound Bus Shelter 240, 241, 242, 246, 247, 250, 253, 254, N24 WALKING DISTANCE 50 m Eastbound n/a 19 0 m Eastbound Bus Shelter 240, 241, 242, 246, 247, 250, 253, 254, N m Westbound Bus Shelter m West Georgia Street Transportation Review November 10, S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

14 Both West Georgia Street and West Pender Street are part of TransLink s Frequent Transit Network (FTN), where transit services are provide at every 15 minutes or better, during at least all of the following times: Monday to Friday: 6:00 21:00 Saturdays: 7:00 21:00 Sundays and holidays: 8:00 21:00 In addition to frequent bus services, the Burrard SkyTrain Station is located within 800m (10-minute walk) from the development site Cycling & Pedestrian Networks Sidewalks are available along all the site frontages. Marked crosswalks and pedestrian walk countdown times are provided at a number of the signalized intersections within the study area. The development site has a Walk Score of 96 out of 100, demonstrating this location is easily accessible by foot without relying the use of a vehicle. The site is also well positioned to have close access to the city s east-west and north-south bikeway network. The section of Nicola Street in front of the development site is part of the City s Local Street Bikeway. There Painted Bike Lanes on both side of West Georgia Street west of Nicola Street. West Pender Street is also marked as a shared bike routes. The site is also in close proximity to the AAA bike network on the Seawall. Considering the excellent connectivity to surrounding bicycle facilities (such as the Cardero Street Bikeway) and popular destinations (such as the SeaWall, Marina Square Park, Devonian Harbour Park, and Stanley Park), the site earns a commendable Bike Score of 84 out of 100. This score demonstrates the site is biking is convenient for most trips. 2.3 Traffic Volumes Data Collection Program Intersection counts were conducted by Bunt & Associates for the Study Area in Table 2.3 provides a summary of the traffic count data. Table 2.3: Summary of Available and Counted Traffic Data INTERSECTION DATE OF COUNT PEAK HOURS AM PM West Pender Street & West Georgia Street February 2, :45 AM 5:00 PM West Georgia Street & Nicola Street February 2, :15 AM 5:00 PM West Georgia Street & Broughton Street November 2, :15 AM 4:30 PM West Pender Street & Nicola Street February 2, :45 AM 5:00 PM West Pender Street & Broughton Street November 2, :00 AM 4:30 PM OVERALL STUDY AREA PEAK HOUR 7:45 AM 5:00 PM West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

15 2.3.2 Peak Hour Traffic Volumes Table 2.4 summarizes the two-way peak-hour vehicle movements for the streets in the study area. Existing Peak Hour Vehicle Traffic Volumes are presented in Exhibit 2.1. Table 2.4: Existing Peak Hour Roadway Link Volumes ROAD LINK PEAK LINK VOLUMES (VEH/HR) AM PM West Pender Street 1, West Georgia Street 2,070 2,315 Nicola Street Broughton Street Existing Site Vehicle Trip Generation Table 2.5 summarizes the vehicle trip generation from the existing site. Table 2.5: Existing Site Trip Generation AM PEAK HOUR PM PEAK HOUR LAND USE IN OUT TOTAL IN OUT TOTAL Office Existing Operations Performance Thresholds The existing operations of study area intersections and access points were assessed using the methods outlined in the 2000 Highway Capacity Manual (HCM), using the Synchro 9 analysis software. The traffic operations were assessed using the performance measures of Level of Service (LOS) and volume-tocapacity (V/C) ratio. The LOS rating is based on average vehicle delay and ranges from A to F based on the quality of operation at the intersection. LOS A represents optimal, minimal delay conditions while a LOS F represents an over-capacity condition with considerable congestion and/or delay. Delay is calculated in seconds and is based on the average intersection delay per vehicle. Table 2.6 summarizes the LOS thresholds for the five Levels of Service, for both signalized and unsignalized intersections West Georgia Street Transportation Review November 10, S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

16 (35) 15 s St (255) 1,155 (755) 1, (10) g astin th Wes (25) (5) 10 5 (15) 85 (275) 1,005 (5) 5 5 (5) 15 (25) Scale: NTS 15 (40) r St t Wes e Pend Site Broughton St 550 (1,560) (20) 30 (245) 1,090 Nicola St (645) 235 Cardero St S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\Graphics (90) (20) 220 (545) N 10 (20) 250 (455) 5 (20) (50) (125) 20 (5) 5 5 (10) 0 (910) 1,530 (200) (15) 515 (1,140) 15 (5) 5 (25) (15) (50) West Georgia St 10 (5) 550 (1,550) 5 (0) (725) 1,485 (30) 25 Note: Restricted weekdays between 3:00 pm - 6:00 pm Note: Restricted weekdays between 7:00 am - 9:30 am Study Intersections Unsignalized Pedestrian Signal Traffic Signal 10 (35) 000 (000) AM PM Intersection Volumes Exhibit 2.1 Existing Peak Hour Vehicle Traffic Volumes West Georgia Residential Development Transportation Review November &

17 Table 2.6: Intersection Level of Service Thresholds LEVEL OF SERVICE AVERAGE CONTROL DELAY PER VEHICLE (SECONDS) SIGNALIZED UNSIGNALIZED A B >10 and 20 >10 and 15 C >20 and 35 >15 and 25 D >35 and 55 >25 and 35 E >55 and 80 >35 and 50 F >80 >50 Source: Highway Capacity Manual The volume to capacity (V/C) ratio of an intersection represents ratio between the demand volume and the available capacity. A V/C ratio less than 0.85 indicates that there is sufficient capacity to accommodate demands and generally represents reasonable traffic conditions in suburban settings. A V/C value between 0.85 and 0.95 indicates an intersection is approaching practical capacity; a V/C ratio over 0.95 indicates that traffic demands are close to exceeding the available capacity, resulting in saturated conditions. A V/C ratio over 1.0 indicates a very congested intersection where drivers may have to wait through several signal cycles. In downtown and Town Centre contexts, during peak demand periods, V/C ratios over 0.90 and even 1.0 are common. Typically, the performance thresholds that were used to trigger consideration of roadway or traffic control improvements to support roadway or traffic control improvements employed in this study are listed below: Signalized Intersections: Overall intersection Level of Service = LOS D or better; Overall intersection V/C ratio = 0.85 or less; Individual movement Level of Service = LOS E or better; and, Individual movement V/C ratio = 0.90 or less. Unsignalized Intersections and Roundabouts: Individual movement Level of Service = LOS E or better, unless the volume is very low in which case LOS F is acceptable. In interpreting of the analysis results, note that the HCM methodology reports performance differently for various types of intersection traffic control. In this report, the performance reporting convention is as follows: For signalized intersections: HCM 2000 output for overall LOS and V/C as well as individual movement LOS and V/C is reported. 95th Percentile Queues are reported as estimated by Synchro; West Georgia Street Transportation Review November 10, S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

18 For unsignalized two-way stop controlled intersections: HCM 2000 LOS and V/C output is reported just for individual lanes as the HCM methodology does not report overall performance. For unsignalized All-way Stop controlled intersections: HCM 2000 unsignalized LOS is reported for the overall intersection as well as by intersection approach LOS. The HCM 2000 methodology does not report an overall V/C ratio for All Way Stop controlled intersections. Degree of Utilization calculated with the HCM 2000 methodology is reported for individual movements in place of V/C, which is not part of the HCM 2000 report; For roundabouts: HCM 2010 Roundabout analysis output is reported since as HCM 2000 does not calculate LOS for roundabouts. Overall LOS, and LOS and V/C by movement are provided for roundabouts but no overall V/C ratio is provided for roundabouts in the HCM 2010 methodology. The performance reporting conventions noted above have been consistently applied throughout this document and the detailed outputs are provided in Appendix C Operational Analysis Results Table 2.7 presents a summary of the existing traffic operations. Table 2.7: Existing Traffic Operations INTERSECTION/ TRAFFIC CONTROL West Pender Street & West Georgia Street MOVEMENT LOS AM v/c 95th Q (m) LOS PM v/c 95th Q (m) OVERALL A B EBL (AM) B EBT (AM) EBT/L (PM) A A WBT A A SWR C F OVERALL A - - A - - West Pender Street & Nicola Street EBT/L (PM) A NBR B A SBR B C OVERALL B B West Pender Street & Broughton Street EBT/R (AM) EBT/L (PM) WBT/L (AM) EBR (PM) WBR (AM) WBT/R (PM) B A A A A A NBT/R/L B B SBT/R/L B B West Georgia Street & Nicola Street OVERALL B B EBT/R B A West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

19 INTERSECTION/ TRAFFIC CONTROL West Georgia Street & Broughton Street MOVEMENT LOS AM v/c 95th Q (m) LOS PM v/c 95th Q (m) WBT/R/L A B NBR C C OVERALL A A EBT/R (AM) EBT/R/L (PM) WBT/R/L (AM) WBT/R (PM) A A A A NBT/R/L C C SBT/R/L C C As the summary table indicates, the westbound right-turn from West Pender Street to West Georgia Street currently operates at LOS F with V/C ratio > 1 during the Weekday PM Peak Hour period. During the Weekday AM Peak Hour, the only movement that experiences extensive vehicle queue is the eastbound through movement on West Georgia Street from Nicola Street extending west past Cardero Street West Georgia Street Transportation Review November 10, S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

20 3. FUTURE TRAFFIC CONDITIONS 3.1 Traffic Forecasts Background Traffic Forecasts Background traffic is traffic that would be present on the road network if the site did not redevelop. In order to appropriately estimate the future traffic volumes for this area of Downtown Vancouver, Bunt has coordinated with City staff to obtain direction on which other projects/developments (currently being considered by the City) should be explicitly considered as background growth (i.e. cumulative traffic contributor). Based on Bunt s coordination with City staff, three other proposed developments have been identified. These future developments are listed below: 1575 West Georgia: Residential = 184 suites; Retail = 5,000 square feet; and, Office = 45,500 square feet Alberni Street: This site is currently occupied and already generates existing traffic to the study area. As such, only the net added traffic (as a result of this [1550 Alberni Street] development) has been considered in the traffic analysis. Residential = 188 suites; and, Retail = 7,000 square feet West Georgia: Residential = 217 suites; Retail = 3,000 square feet The trips anticipated to be generated from these proposed developments were added to the study network as background volumes, as summarized in Table 3.1. Table 3.1 Trip Generation (Net Added Trips) from Other Developments in the Study Area ADDRESS NET CHANGE IN VEHICLE TRIPS Weekday AM Peak Weekday PM Peak IN OUT TOTAL IN OUT TOTAL 1575 W Georgia Street Alberni Street W Georgia Street TOTAL West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

21 Also, for the purpose of this transportation assessment and as agreed with the City a background traffic growth rate of 1% per annum (linear) was applied to the existing peak hour volumes to account for generalized, unspecified growth in traffic in the study area. The resulting Background (2022 Without Project) traffic volumes are shown in Exhibit Site Traffic Trip Generation Vehicle trip rates for proposed development are estimated based on Bunt observations from an existing residential building nearby at 1500 Alberni Street. Table 3.1 summarizes the peak hour vehicle trip rates. Table 3.1: Peak Hour Vehicle Trip Rates AM PEAK HOUR PM PEAK HOUR LAND USE UNITS IN OUT TOTAL IN OUT TOTAL Residential Unit Table 3.2 summarizes the anticipated future site generated vehicle trips for the proposed development based on the above rates. Table 3.2: Estimated Peak Hour Site Vehicle Trips LAND USE AM PEAK HOUR PM PEAK HOUR IN OUT TOTAL IN OUT TOTAL Residential Units Existing Office NET CHANGE As Table 3.2 indicates, the development is expected to generate 18 to 24 vehicle trips per hour during the Weekday AM and PM Peak Hour periods. When taking into consideration of the existing vehicle trip generation, the net increase of vehicle traffic associated with the development would be in the range of 1 to 10 additional vehicle trips per hour in the Weekday AM and PM Peak Hour periods West Georgia Street Transportation Review November 10, S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

22 (35) 15 s St (275) 1,240 (815) 1, (10) g astin th Wes (25) (5) 10 5 (20) 90 (295) 1,075 (5) 5 5 (5) 15 (25) Scale: NTS 20 (40) r St t Wes e Pend Site Broughton St 590 (1,665) (25) 30 (270) 1,170 Nicola St (690) 255 Cardero St S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\Graphics (95) (20) 235 (575) N 15 (20) 270 (485) 5 (25) (55) (135) 20 (5) 5 5 (10) 0 (980) 1,655 (20) (15) 550 (1,215) 15 (5) 5 (25) (15) (55) West Georgia St 10 (5) 590 (1,655) 10 (0) (780) 1,590 (35) 40 Note: Restricted weekdays between 3:00 pm - 6:00 pm Note: Restricted weekdays between 7:00 am - 9:30 am Study Intersections Unsignalized Pedestrian Signal Traffic Signal 30 (40) 000 (000) AM PM Intersection Volumes Exhibit 3.1 Opening Day Background Traffic Forecasts West Georgia Residential Development Transportation Review November &

23 Trip Distribution & Assignment The estimated vehicle trip distribution proportions are presented in Table 3.3 taking into consideration of the existing turning restrictions within the study street network. The site traffic forecast is presented in Exhibit 3.2 Table 3.3: Estimated Trip Distribution ORGIN/DESTINATION AM PEAK HOUR PM PEAK HOUR IN (%) OUT (%) IN (%) OUT (%) Nicola Street (North) 1% 2% 3% 1% Broughton Street (North) 1% 4% 2% 2% Nicola Street (South) 0% 1% 1% 1% Broughton Street (South) 1% 3% 3% 2% West Georgia Street (West) 74% 27% 34% 60% West Georgia Street (East) 15% 53% 39% 26% West Pender Street (East) 8% 11% 17% 9% TOTAL 100% 100% 100% 100% In the context of the Study Area, vehicle trips from the development site are expected to be modest. Table 3.4 summarizes the net change in vehicle volumes at each of the study intersections. Table 3.4: Net Change in Future Intersection Vehicle Volumes with New Site Trips INTERSECTION West Pender Street & West Georgia Street West Georgia Street & Nicola Street West Georgia Street & Broughton Street West Pender Street & Nicola Street West Pender Street & Broughton Street AM PEAK HOUR VOLUMES PM PEAK HOUR VOLUMES Background Site % Change Background Site % Change 3,712 7 <1% 3, <1% 2, % 2, % 2,325 9 <1% 2,544 8 <1% 1,492 7 <1% % 1, <1% % As Table 3.4 shows, site vehicle trips from the development are expected to have no material impact to the study road network Total Traffic The total traffic forecasts are formulated by superimposing the site traffic volumes with the background traffic volumes. Exhibit 3.3 shows the Opening Day Traffic Forecasts West Georgia Street Transportation Review November 10, S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

24 (0) 0 s St 0 (0) (5) 3 (0) 0 1 (10) g astin th Wes (0) 0 (0) 0 (0) 1 (1) 1 (3) 9 0 (0) 0 (0) Scale: NTS 0 (0) r St t Wes e Pend Site Broughton St (0) 0 (5) 3 Nicola St (6) 4 Cardero St S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\Graphics (0) 0 0 (0) 4 (6) N 0 (0) 0 (0) 0 (3) (3) 0 (0) 1 (2) 8 (0) 0 0 (0) 1 (6) 0 (0) 0 (1) (0) 0 0 (0) 0 (0) (0) 0 West Georgia St 1 (10) 0 (0) 0 (0) (0) 0 (0) 0 Note: Restricted weekdays between 3:00 pm - 6:00 pm Note: Restricted weekdays between 7:00 am - 9:30 am Study Intersections Unsignalized Pedestrian Signal Traffic Signal 0 (0) 000 (000) AM PM Intersection Volumes Exhibit 3.2 Site Traffic Forecasts West Georgia Residential Development Transportation Review November &

25 (35) 15 s St (280) 1,240 (815) 1, (20) g astin th Wes (25) (5) 10 5 (20) 90 (300) 1,080 (10) 15 5 (5) 15 (25) Scale: NTS 20 (40) r St t Wes e Pend Site Broughton St 590 (1,665) (25) 30 (275) 1,170 Nicola St (695) 255 Cardero St S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\Graphics (95) (20) 240 (580) N 15 (20) 270 (485) 5 (25) (55) (135) 20 (10) 5 10 (10) 0 (980) 1,655 (20) (15) 550 (1,258) 15 (5) 5 (25) (15) (55) West Georgia St 10 (15) 590 (1,655) 10 (0) (780) 1,590 (40) 40 Note: Restricted weekdays between 3:00 pm - 6:00 pm Note: Restricted weekdays between 7:00 am - 9:30 am Study Intersections Unsignalized Pedestrian Signal Traffic Signal 30 (40) 000 (000) AM PM Intersection Volumes Exhibit 3.3 Opening Day Total Traffic Forecasts West Georgia Residential Development Transportation Review November &

26 3.2 Traffic Operations Background Traffic Operations Table 3.5 presents the traffic operation summary for the Opening Day Background Conditions Table 3.5: Opening Day Background Vehicle Operations INTERSECTION/ TRAFFIC CONTROL West Pender Street & West Georgia Street West Pender Street & Nicola Street West Pender Street & Broughton Street West Georgia Street & Nicola Street West Georgia Street & Broughton Street MOVEMENT LOS AM v/c 95th Q (m) OVERALL A C EBL B EBT (AM) EBT/L (PM) LOS PM v/c 95th Q (m) A A WBT A A SWR C F OVERALL A - - A - - EBT/L (PM) A NBR B A SBR B C OVERALL B B EBT/R (AM) EBT/L (PM) WBT/L (AM) EBR (PM) WBR (AM) WBT/R (PM) A B A A A A NBT/R/L B B SBT/R/L B B OVERALL B B EBT/R B A WBT/R/L A B NBR C C OVERALL A A EBT/R (AM) EBT/R/L (PM) WBT/R/L (AM) WBT/R (PM) A A A A NBT/R/L C C SBT/R/L C D Total Traffic Operations Table 3.6 presents the traffic operation summary for the Opening Day Total Conditions West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

27 Table 3.6: Opening Day Total Vehicle Operations INTERSECTION/ TRAFFIC CONTROL West Pender Street & West Georgia Street West Pender Street & Nicola Street MOVEMENT LOS AM V/C 95TH Q (M) LOS PM V/C 95TH Q (M) OVERALL A C EBL B EBT (AM) EBT/L (PM) A A WBT A A SWR C F OVERALL A - - A - - EBT/L (PM) A NBR B A SBR B C OVERALL B B EBT/R (AM) EBT/L (PM) A B West Pender Street & Broughton Street West Georgia Street & Nicola Street West Georgia Street & Broughton Street WBT/L (AM) EBR (PM) WBR (AM) WBT/R (PM) A A A A NBT/R/L B B SBT/R/L B B OVERALL B B EBT/R B A WBT/R/L A B NBR C C OVERALL A A EBT/R (AM) EBT/R/L (PM) WBT/R/L (AM) WBT/R (PM) A A A A NBT/R/L C C SBT/R/L C D Summary of Traffic Impacts Comparing to the Opening Day Background Traffic Conditions, the effects of the development traffic are considered minimal. The westbound movement at West Pender Street & West Georgia Street is expected to continue to operate at poor Level of Service with long vehicle queues in the Weekday PM Peak Hour period West Georgia Street Transportation Review November 10, S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

28 3.3 Sensitivity Analysis As part of the study requirements, the City of Vancouver Engineering Department requested that a brief analysis to be provided to look at the potential impact on vehicle routing and associated volumes of site traffic on other streets if the section of Nicola Street were closed to vehicles. As indicated in Exhibit 3.2, approximately 1 (10) site vehicle trips are expected to turn right from westbound West Georgia Street to northbound Nicola Street in order to get to the site. In addition, the development immediately east of the site would also rely on this route to access its parkade. Exhibit 3.4 shows the potential vehicle routing for the site and the adjacent building if the section of Nicola Street fronting the development site were to be closed. As it indicates, the alternative route is about 3.5 times longer than the existing route, and that vehicles would have to travel through three additional signalized intersections, along with cutting through the nearby residential neighbourhood. It is therefore essential that the right-turn movement from westbound West Georgia Street to northbound Nicola Street (and eastbound West Pender Street) be maintained to minimize the circuitous routing for the site and the adjacent building West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

29 t tree Coal Harbour Quay S ngs i ast WH Scale: NTS t tree rs nde e Bute Street Jervis Street WP SITE W Georgia Street 3pm-6pm Broughton Street Nicola Street 3pm-6pm Cardero Street S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\Graphics N Alberni Street Existing Route (250m) Potential Route (900m) Exhibit 3.4 Potential Vehicle Re-routing West Georgia Residential Development Transportation Review November &

30 4. SITE PLAN DESIGN REVIEW 4.1 Site Access Design The development plans to provide parking and loading access off West Pender Street. The proposed site plan would reduce the number of driveways along the West Pender Street site frontage. 4.2 Parking Supply Vehicle Parking The City of Vancouver s (CoV) Parking Bylaw outlines the minimum parking requirements for various uses related to new development. A breakdown of the site s parking requirements and proposed supply is summarised in Table 4.1. Table 4.1: Vehicle Parking Supply Requirement & Provision LAND USE BYLAW RATE BYLAW MINIMUM REQUIREMENT PROVIDED Residential The lower of 1 per Visitors 140m 2, or 1 per unit 7 TOTAL A total of 212 parking stalls are provided, exceeding the City of Vancouver s minimum requirement Bicycle Parking Well managed, secure, accessible and covered bicycle parking will be provided as part of the development plan. The development will supply at least 126 Class A spaces and 6 Class B spaces. Table 4.2: Bicycle Parking Supply Requirement LAND USE BYLAW RATE BYLAW SUPPLY REQUIREMENT Residential 1.25 per unit West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

31 4.3 Service Vehicle and Parking Access Review Table 4.3 summarizes the loading requirements based on the City of Vancouver Parking By-law requirements. Table 4.3: Loading Bylaw Rates LAND USE Residential (101 units) At least one space for 100 to 299 dwelling units BYLAW SUPPLY REQUIREMENT PROVIDED DIFFERENCE Exhibit 4.1 shows the swept path of a SU9 design vehicle accessing the loading on-site, while Exhibit 4.2 shows the passenger vehicle accessing the parkade entrance West Georgia Street Transportation Review November 10, S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

32

33

34 5. CONCLUSIONS & RECOMMENDATIONS 1. The existing conditions Synchro analysis indicates the westbound right-turn from West Pender Street to West Georgia Street currently operates over capacity during the Weekday PM Peak Hour period. Additionally, during the Weekday AM Peak Hour, the only movement that experiences extensive vehicle queue is the eastbound through movement on West Georgia Street from Nicola Street. 2. Based on the City s Parking Bylaw, a minimum of 101 parking stalls would be required with the development proposing to provide 212 stalls, exceeding the minimum requirements. 3. The AutoTURN analysis conducted by Bunt indicates the vehicle access is feasible for the planned design vehicles. 4. A total of 18 vehicle trips (3 inbound, 15 outbound) was forecasted to be generated by the site development at build-out during the Weekday AM peak hour and a total of 24 vehicle trips (15 inbound, 9 outbound) was forecasted during the Weekday PM peak hour. 5. Comparing to the Opening Day Background Traffic Conditions, the effects of the development traffic are considered minimal. The westbound movement at West Pender Street & West Georgia Street is expected to continue to operate at poor Level of Service with long vehicle queues in the Weekday PM Peak Hour period. 6. It is essential that the right-turn movement from westbound West Georgia Street to northbound Nicola Street (and eastbound West Pender Street) be maintained to minimize the circuitous routing for the site and the adjacent building West Georgia Street Transportation Review November 10, 2016 S:\PROJECTS\CC\ West Georgia St\5.0 Deliverables\Draft Report\ _ _Draft_TIA_RPT_V02.docx

35 APPENDIX A Terms of Reference

36

37 From: Grottenberg, John Sent: Wednesday, September 28, :24 AM To: Dawn Guspie Cc: Dallas Buchannon Subject: RE: West Georgia Proposed Scope for TAMS Study Hi Dawn, Please note the following response from Alina re: Transportation Study: The scope as defined below is acceptable. In terms of the road network, they should assume that the roadways will remain in their current form. They should also provide a brief analysis of the routing and associated volumes of site traffic on other streets if Nicola St were closed to vehicles. Also, I am still waiting to hear back re: street tree species for W Georgia and Pender Streets. Regards, John Grottenberg Planner Downtown Division Planning, Urban Design & Sustainability City of Vancouver T: From: Dawn Guspie [mailto:dguspie@jamescheng.com] Sent: Friday, September 09, :47 AM To: Grottenberg, John Cc: Dallas Buchannon Subject: FW: West Georgia - Proposed Scope for TAMS Study John This is the Traffic Study scope outline prepared by Bunt, for Engineering s review & concurrence. Thanks Dawn Hi Dawn, As discussed, please see below the proposed study scope for the TAMS study for the proposed development at West Georgia Street: Site Location Context Existing Conditions (2016) o Study intersections: W Georgia & W Pender, W Georgia and Nicola, W Georgia and Broughton, W Pender and Broughton (AM & PM peak hour period)

38 o Existing intersections, indicating type of control, lane configurations, and turning restrictions o Assessment of existing intersection and roadway operations (V/C, LOS) Demand Forecasting o General background traffic growth (1% linear growth per year, plus development traffic flow from neighboring development at 1575 West Georgia, 1550 Alberni Street, 1500 West Georgia consistent with previous direction from the City for other projects nearby) o Horizon years (Opening Day only with and without development) o Future intersection and roadway operations (V/C, LOS, queue lengths) o Trip generation rates o Trip distribution and assignment Impact Analysis o Assessment of intersection and roadway operations (V/C, LOS, queue lengths) for this task, please confirm which intersection configurations should we be modeling for the intersection at West Georgia & West Pender; o Site access location assessment; o On site circulation and design; o Potential for neighbourhood impacts; and o Potential for impacts on existing and planned cycling infrastructure. Mitigation Measures and Site Design Characteristics o Requirements for left turn lanes and in some cases right turn lanes o Operational changes (e.g. turn restrictions) Operational Analysis o Un signalized intersections Level of service (LOS) and capacity based on gap analysis Queuing Capacity and Delay Parking, Loading, and TDM review Christephen Cheng, P.Eng., M.Eng. Senior Transportation Engineer Bunt & Associates Engineering (BC) Ltd. Suite West Pender Street, Vancouver, BC, Canada V6E 3S7 p Ext 232 f Please consider the environment before printing this .

39 APPENDIX B Traffic Data

40

41 Nicola W. Pender St Project #: Peak Hour: Overall PHF: Notes: Date: Feb 2, :45 08:45 Weather: Cloudy 0.90 Road Cond: Dry 0 Traffic Movements Pedestrians Time Intervals NB LT NB TH NB RT SB LT SB TH SB RT EB LT EB TH EB RT WB LT WB TH WB RT N S E W 07:00-07: :15-07: :30-07: :45-08: :00-08: :15-08: :30-08: :45-09: N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A Peak V 15min PHF SB Heavy Vehicle Percentages WB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 0% 0% 0% 4% 0% SB Turn Percentages WB Turn Percentages LT TH RT LT TH RT 0% 0% 100% 1% 91% 8% 0 0 Nicola St N W. Pender St 15 W E 23 W. Pender St S EB Heavy Vehicle Percentages NB Heavy Vehicle Percentages LT TH RT LT TH RT 3% 1% 0% 0% 0% 0% Nicola St EB Turn Percentages NB Turn Percentages LT TH RT LT TH RT 3% 97% 0% 0% 12% 88%

42 Nicola W. Pender St Project #: Peak Hour: Overall PHF: Notes: Date: Feb 2, :00 18:00 Weather: Cloudy 0.93 Road Cond: Dry 0 Traffic Movements Pedestrians Time Intervals NB LT NB TH NB RT SB LT SB TH SB RT EB LT EB TH EB RT WB LT WB TH WB RT N S E W 15:00-15: :15-15: :30-15: :45-16: :00-16: :15-16: :30-16: :45-17: :00-17: :15-17: :30-17: :45-18: N/A - N/A N/A - N/A N/A - N/A N/A - N/A Peak V 15min PHF SB Heavy Vehicle Percentages WB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 0% 0% 0% 1% 5% Nicola St SB Turn Percentages WB Turn Percentages LT TH RT LT TH RT 3% 2% 95% 0% 96% 3% N W. Pender St 21 W E 24 W. Pender St S EB Heavy Vehicle Percentages NB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 4% 0% 0% 0% 0% EB Turn Percentages NB Turn Percentages LT TH RT LT TH RT 8% 92% 0% 0% 20% 80% 4 Nicola St

43 Broughton W. Georgia St Project #: Peak Hour: Overall PHF: Notes: Date: Nov 2, :15 08:15 Weather: Rain 0.97 Road Cond: Wet 0 Traffic Movements Pedestrians Time Intervals NB LT NB TH NB RT SB LT SB TH SB RT EB LT EB TH EB RT WB LT WB TH WB RT N S E W 07:00-07: :15-07: :30-07: :45-08: :00-08: :15-08: :30-08: :45-09: N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A Peak V 15min PHF SB Heavy Vehicle Percentages WB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 0% 17% 0% 5% 0% Broughton St SB Turn Percentages WB Turn Percentages LT TH RT LT TH RT 26% 48% 26% 1% 98% 1% N W. Georgia St 47 W E 42 W. Georgia St S EB Heavy Vehicle Percentages NB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 3% 0% 0% 0% 0% EB Turn Percentages NB Turn Percentages LT TH RT LT TH RT 0% 99% 1% 17% 39% 44% 34 Broughton St

44 Broughton W. Georgia St Project #: Peak Hour: Overall PHF: Notes: Date: Nov 2, :30 17:30 Weather: Rain 0.98 Road Cond: Wet 0 Traffic Movements Pedestrians Time Intervals NB LT NB TH NB RT SB LT SB TH SB RT EB LT EB TH EB RT WB LT WB TH WB RT N S E W 15:00-15: :15-15: :30-15: :45-16: :00-16: :15-16: :30-16: :45-17: :00-17: :15-17: :30-17: :45-18: N/A - N/A N/A - N/A N/A - N/A N/A - N/A Peak V 15min PHF SB Heavy Vehicle Percentages WB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 0% 0% 0% 3% 0% Broughton St SB Turn Percentages WB Turn Percentages LT TH RT LT TH RT 3% 25% 72% 0% 99% 1% N W. Georgia St 74 W E 78 W. Georgia St S EB Heavy Vehicle Percentages NB Heavy Vehicle Percentages LT TH RT LT TH RT 28% 5% 0% 0% 0% 0% EB Turn Percentages NB Turn Percentages LT TH RT LT TH RT 2% 97% 1% 26% 52% 22% 51 Broughton St

45 Broughton W. Pender St Project #: Peak Hour: Overall PHF: Notes: Date: Nov 2, :00 09:00 Weather: Rain 0.95 Road Cond: Wet 0 Traffic Movements Pedestrians Time Intervals NB LT NB TH NB RT SB LT SB TH SB RT EB LT EB TH EB RT WB LT WB TH WB RT N S E W 07:00-07: :15-07: :30-07: :45-08: :00-08: :15-08: :30-08: :45-09: N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A Peak V 15min PHF SB Heavy Vehicle Percentages WB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 5% 0% 0% 7% 0% SB Turn Percentages WB Turn Percentages LT TH RT LT TH RT 9% 54% 37% 3% 93% 4% 3 Broughton St N W. Pender St 63 W E 65 W. Pender St S EB Heavy Vehicle Percentages NB Heavy Vehicle Percentages LT TH RT LT TH RT 3% 1% 0% 0% 0% 0% Broughton St EB Turn Percentages NB Turn Percentages LT TH RT LT TH RT 9% 90% 1% 7% 38% 55%

46 Broughton W. Pender St Project #: Peak Hour: Overall PHF: Notes: Date: Nov 2, :30 17:30 Weather: Rain 0.91 Road Cond: Wet 0 Traffic Movements Pedestrians Time Intervals NB LT NB TH NB RT SB LT SB TH SB RT EB LT EB TH EB RT WB LT WB TH WB RT N S E W 15:00-15: :15-15: :30-15: :45-16: :00-16: :15-16: :30-16: :45-17: :00-17: :15-17: :30-17: :45-18: N/A - N/A N/A - N/A N/A - N/A N/A - N/A Peak V 15min PHF SB Heavy Vehicle Percentages WB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 0% 0% 0% 1% 0% SB Turn Percentages WB Turn Percentages LT TH RT LT TH RT 7% 24% 70% 2% 95% 2% 3 Broughton St N W. Pender St 52 W E 51 W. Pender St S EB Heavy Vehicle Percentages NB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 3% 0% 0% 0% 0% Broughton St EB Turn Percentages NB Turn Percentages LT TH RT LT TH RT 6% 92% 2% 13% 46% 41%

47 Nicola W. Georgia St Project #: Peak Hour: Overall PHF: Notes: Date: Feb 2, :00 18:00 Weather: Cloudy 0.93 Road Cond: Dry 0 Traffic Movements Pedestrians Time Intervals NB LT NB TH NB RT SB LT SB TH SB RT EB LT EB TH EB RT WB LT WB TH WB RT N S E W 15:00-15: :15-15: :30-15: :45-16: :00-16: :15-16: :30-16: :45-17: :00-17: :15-17: :30-17: :45-18: N/A - N/A N/A - N/A N/A - N/A N/A - N/A Peak V 15min PHF SB Heavy Vehicle Percentages WB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 0% 0% 0% 2% 0% Nicola St SB Turn Percentages WB Turn Percentages LT TH RT LT TH RT 0% 67% 33% 0% 100% 0% N W. Georgia St 77 W E 106 W. Georgia St S EB Heavy Vehicle Percentages NB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 5% 3% 0% 0% 0% EB Turn Percentages NB Turn Percentages LT TH RT LT TH RT 0% 96% 4% 18% 20% 62% 38 Nicola St

48 Nicola W. Georgia St Project #: Peak Hour: Overall PHF: Notes: Date: Feb 2, :15 08:15 Weather: Cloudy 0.91 Road Cond: Dry 0 Traffic Movements Pedestrians Time Intervals NB LT NB TH NB RT SB LT SB TH SB RT EB LT EB TH EB RT WB LT WB TH WB RT N S E W 07:00-07: :15-07: :30-07: :45-08: :00-08: :15-08: :30-08: :45-09: N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A N/A - N/A Peak V 15min PHF SB Heavy Vehicle Percentages WB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 0% 0% 0% 6% 0% Nicola St SB Turn Percentages WB Turn Percentages LT TH RT LT TH RT 0% 100% 0% 0% 99% 1% N W. Georgia St 37 W E 67 W. Georgia St S EB Heavy Vehicle Percentages NB Heavy Vehicle Percentages LT TH RT LT TH RT 0% 2% 3% 0% 0% 0% EB Turn Percentages NB Turn Percentages LT TH RT LT TH RT 1% 97% 2% 3% 57% 40% 39 Nicola St

1133 Melville Street Office Building Development REZONING APPLICATION SUBMISSION

1133 Melville Street Office Building Development REZONING APPLICATION SUBMISSION 1133 Melville Office Building Development REZONING APPLICATION SUBMISSION MAY 22, 215 TRANSPORTATION IMPACT STUDY BUNT & ASSOCIATES - TRANSPORTATION PLANNERS AND ENGINEERS oxford properties group kohn

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

MEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply

MEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply MEMO DATE: March 22, 2016 PROJECT O: 4241-44 PROJECT: 1550 Alberni Street SUBJECT: Transportation Design Rationale for Rezoning Application (Update with Design Package) TO: Dave Leung, 1550 Alberni Limited

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development Solmar Development Corp. 144&176 John St. and 2 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development TRANSPORTATION IMPACT STUDY 18145 November 217 LEA Consulting Ltd. Consulting

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Traffic Impact Assessment

Traffic Impact Assessment Delta Mixed-Use Tower Traffic Impact Assessment Final V3 Prepared for Hari Homes, Inc. Date August 23, 2017 Project No. 6180.01 August 23, 2017 6180.01 Mr. Aloke Chowdhury Hari Homes, Inc. 206-8434 120th

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA. Section 1 INTRODUCTION 1

GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA. Section 1 INTRODUCTION 1 GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA TABLE OF CONTENTS Page Section 1 INTRODUCTION 1 Section 2 BACKGROUND INFORMATION 6 Public Road Network... 6 Non Auto Facilities and Services...

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure MMM Group Limited Traffic Study CASA MIA Community Care Facility Vancouver, BC Communities Transportation Buildings Infrastructure February 2013 5011001-033 STANDARD LIMITATIONS This report was prepared

More information

Wellington Street West

Wellington Street West Transportation Brief prepared for: 185 Davenport Road Suite 300 Toronto, ON M5R 1J1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 November 5, 2013 TO3131TOH Transportation Brief November

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

November

November November 13 2008 4509.04 Mr. Rob Siddoo Siddoo Holdings 105 2277 West 2 nd Avenue Vancouver BC V6K 1H8 Dear Mr. Siddoo: Re: Transportation Assessment: 1030 Denman Street, Residential Conversion, Vancouver

More information

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO P.O. 61992 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION SEPTEMBER 5, 218 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Prepared By: 332 Lorne Avenue East Stratford ON N5A 6S4 Prepared for: Paul Kemper, President

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Secured Market Rental 100 Project at 3070 Kingsway, Vancouver, BC Letter Report

Secured Market Rental 100 Project at 3070 Kingsway, Vancouver, BC Letter Report ovember 10, 2017 6085.02 Tamara Rowland Conwest Development Consultants 250-1311 Kootenay Street Vancouver, BC V5K 4YR VIA E-MAIL Tamara.Rowland@conwest.com Dear Tamara Re Secured Market Rental 100 Project

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes. Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 SCREENING... 1 1.1

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com April 23, 2014 OUR REF: TO3157TOA00 BY EMAIL: mark.larose@urbanrisedevelopment.com Urban Rise

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study 354 Carling Avenue Community Transportation Study/ Transportation Impact Study prepared for: Holloway Lodging Corporation 69 Quinpool Road, th Floor Halifax, NS B3K 5J7 prepared by: 223 Michael Street

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

TRAFFIC IMPACT STUDY 3171 LAKESHORE ROAD WEST RESIDENTIAL DEVELOPMENT TOWN OF OAKVILLE, REGIONAL MUNICIPALITY OF HALTON

TRAFFIC IMPACT STUDY 3171 LAKESHORE ROAD WEST RESIDENTIAL DEVELOPMENT TOWN OF OAKVILLE, REGIONAL MUNICIPALITY OF HALTON TRAFFIC IMPACT STUDY 3171 LAKESHORE ROAD WEST RESIDENTIAL DEVELOPMENT TOWN OF OAKVILLE, REGIONAL MUNICIPALITY OF HALTON PREPARED FOR: VOGUE WYCLIFFE (OAKVILLE) LIMITED PREPARED BY: C.F. CROZIER & ASSOCIATES

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

267 O Connor Street Residential Development

267 O Connor Street Residential Development M a y 2014 267 O Connor Street Residential Development Transportation Brief Google 2014 Bing 2014 Prepared for: MASTERCRAFT STARWOOD Prepared by: Study 267 O'Connor Type Street May 2014 Study Residential

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

TRANSPORTATION MASTER PLAN AND TRANSPORTATION IMPACT ASSESSMENT FOR THREE SISTERS MOUNTAIN VILLAGE RESORT CENTRE ASP

TRANSPORTATION MASTER PLAN AND TRANSPORTATION IMPACT ASSESSMENT FOR THREE SISTERS MOUNTAIN VILLAGE RESORT CENTRE ASP TRANSPORTATION MASTER PLAN AND TRANSPORTATION IMPACT ASSESSMENT FOR THREE SISTERS MOUNTAIN VILLAGE RESORT CENTRE ASP OCTOBER 2016 STANDARD LIMITATIONS This report was prepared by MMM Group Limited, a WSP

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

Trim Road, Commercial Development, City of Ottawa

Trim Road, Commercial Development, City of Ottawa HARDEN REALTIES July 2016 Trim Road, Commercial Development, City of Ottawa Transportation Impact Study Trim Road, Commercial Development, City of Ottawa Transportation Impact Study prepared for: Harden

More information

Appendix B: Traffic Reports

Appendix B: Traffic Reports Appendix B: Traffic Reports 407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION Report Markham Road Station Traffic Study Prepared for Ministry of Transportation, Ontario

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle