1 Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois N 83 rd Street Janes Avenue Soccer Fields Janes Avenue Shopping Plaza Cypress Cove Family Aquatic Park Janes Avenue Prepared For: Prepared By: March 31, 2014

2 Contents List of Figures and Tables, iii 1. Introduction Existing Conditions...3 Site Location...3 Roadway System Characteristics...3 Existing Traffic Volumes...4 Public Transportation Athletic Recreation Center Development...7 Development Plan...7 Site Accessibility, Parking and Circulation...7 Programming Space...8 Hours of Operation...8 Peak Periods of Activity...8 Peak Employment Levels...9 Directional Distribution of ARC-Generated Traffic...9 ARC Traffic Generation...9 ARC Traffic Assignment Projected Future Traffic Conditions Traffic Analysis Parking Analysis Compliance with Woodridge Zoning Regulations...21 Parking Supply and Demand...22 Parking Demand Reduction Strategies...23 Parking Overflow Accommodations Conclusions and Recommendations...24 Appendix Athletic Recreation Center Traffic and Parking Study ii

3 List of Figures and Tables Figures 1. Site Location Aerial View of Site Area Existing Roadway Characteristics Existing Traffic Volumes Directional Distribution of ARC-Generated Traffic ARC-Generated Traffic Volumes without Multi-Use Gym Addition ARC-Generated Traffic Volumes with Multi-Use Gym Addition Projected Future Traffic Volumes without Multi-Use Gym Addition Projected Future Traffic Volumes with Multi-Use Gym Addition Recommended Janes Avenue Pavement Marking Plan...26 Tables 1. Directional Distribution of ARC-Generated Traffic Traffic Generated by the ARC Level of Service Criteria Capacity Analysis Existing Traffic Conditions Capacity Analysis Projected Future Traffic Conditions ARC Parking Requirements by Zoning Projected Peak Parking Demand...22 Athletic Recreation Center Traffic and Parking Study iii

4 1. Introduction This report presents the methodologies, findings, and recommendations of a Traffic and Parking Study conducted by Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) for the Woodridge Park District s planned Athletic Recreation Center (ARC) on the Janes Avenue Shopping Plaza site at the northeast corner of Janes Avenue and 83 rd Street in Woodridge, Illinois. The site is bounded by the Janes Avenue soccer fields on the north, the Piers II condominium community on the east, 83 rd Street on the south, and Janes Avenue on the west. Figure 1 shows the site location and Figure 2 shows an aerial view of the site area. The Janes Avenue Shopping Plaza will be razed and the plaza s existing driveways (two on Janes Avenue and one on 83 rd Street) will be closed. The Janes Avenue soccer fields parking lot and driveways will also be removed. An approximately 77,930 gross square-foot, two-story ARC building (85,030 gross square feet with multi-use gymnasium addition) will be built on the property containing a gymnasium, turf field, health and fitness facility, track, program rooms, and administrative space. Site ingress and egress will provided from two new driveways on Janes Avenue. The ARC will be supported by a 286-space parking lot (306 spaces with multi-use gymnasium addition) that will be shared with the Janes Avenue soccer fields immediately north of the site. The anticipated ARC grand opening is in October The purpose of this study was to (1) examine existing traffic conditions adjacent to the site, (2) quantify the traffic generation from the planned ARC and assess the impact that the facility would have on traffic conditions adjacent to the site, (3) review site circulation, (4) evaluate site parking supply and demand, and (5) determine any roadway or access improvements necessary to accommodate the ARC-generated traffic and enhance the overall plan. Athletic Recreation Center 1 Traffic and Parking Study

5 Figure 1 Site Location Site 83 rd Street Janes Avenue Figure 2 Aerial View of Site Area Athletic Recreation Center 2 Traffic and Parking Study

6 2. Existing Conditions Transportation conditions in the vicinity of the site were inventoried to obtain a database for projecting future conditions. Four general components of existing conditions were considered: (1) the geographical location of the site, (2) the characteristics of the area roadway system, (3) existing traffic volumes, and (4) public transportation. Site Location As noted previously, the planned ARC is located on the site of the existing Janes Avenue Shopping Plaza at the northeast corner of Janes Avenue and 83 rd Street in Woodridge, Illinois. The site is bounded by the Janes Avenue soccer fields on the north, the Piers II condominium community on the east, 83 rd Street on the south, and Janes Avenue on the west. The Park District s Cypress Cove Family Aquatic Center is located at the southeast corner of the intersection, the 83 rd Street retail center is located at the northwest corner, and the Ultimate Faith Christian Center is located at the southwest corner. Roadway System Characteristics 83 rd Street is a minor arterial roadway that borders the south side of the ARC site. It is under the jurisdiction of the Village of Woodridge. In the vicinity of the site, 83 rd Street is a three-lane roadway with one lane in each direction and a center median that accommodates left-turn movements at intersections. There is a dedicated right-turn lane on the east leg of 83 rd Street at Janes Avenue. The posted speed limit on 83 rd Street is 30 miles per hour (mph) and parking is not permitted on the roadway. The Southern DuPage County Regional Trail, an off-road multiuse path, extends along the north side of 83 rd Street to the west of Janes Avenue and along the south side of 83 rd Street to the east of Janes Avenue. Sidewalks are located along 83 rd Street on the opposite side of the road from the trail. Janes Avenue is a collector road that borders the west side of the ARC site. It is also under the jurisdiction of the Village of Woodridge. In the vicinity of the site, Janes Avenue is a three-lane roadway with one lane in each direction and a center median that accommodates left-turn movements at intersections. There is a dedicated right-turn lane on the south leg of Janes Avenue at 83 rd Street. North of 83 rd Street there is a sidewalk on both sides of Janes Avenue. South of Athletic Recreation Center 3 Traffic and Parking Study

7 83 rd Street there is a sidewalk on the west side of Janes Avenue and a multi-use path on the east side between 83 rd Street and Sheffield Lane. The intersection of Janes Avenue with 83 rd Street is under traffic signal control and there are pedestrian signals with countdown timers on all four legs of the intersection. This signal is not part of a signal system. There are diagonal line crosswalks on the north and east legs of the intersection to guide users of the Southern DuPage County Regional Trail, and parallel line crosswalks on the west and south legs of the intersection. The posted speed limit on Janes Avenue is 25 mph to the north of 83 rd Street and 35 mph to the south of 83 rd Street, and parking is not permitted on the roadway. The existing roadway system characteristics are shown in Figure 3, including lane configurations, traffic controls and parking regulations. There are presently no traffic control signs posted on the Janes Avenue Shopping Plaza driveways. Existing Traffic Volumes Traffic counts were conducted by KLOA, Inc. at the Janes Avenue/83 rd Street intersection and the intersections of the Janes Avenue Shopping Plaza driveways with 83 rd Street and Janes Avenue. The counts were conducted during the evening (6:00-8:00 P.M.) of Thursday, January 23, 2014 and the morning (10:00 A.M.-12:00 P.M.) of Saturday, January 25, 2014, which are times that would coincide with the typical peak period of activity at the ARC, as confirmed by Park District staff. Weather conditions on the traffic count days were cold but dry. The traffic count data indicates that the peak hours of traffic activity during the traffic count period are from 6:00-7:00 P.M. on the weekday and from 11:00 A.M.-12:00 P.M. on the Saturday. The existing peak hour traffic volumes are shown in Figure 4. Summaries of the traffic count data are contained in the Appendix of this report. KLOA, Inc. also counted the number of pedestrians and bicyclists in the crosswalks at the Janes Avenue/83 rd Street intersection. However, due to the cold weather, there were only a couple of pedestrians and bicyclists at the intersection during the count periods. Public Transportation The ARC site is adjacent to two Pace bus routes that serve the Woodridge community. Route 821 (IL 53/83 rd Street-Belmont Metra Station) Provides weekday morning rush hour service from the IL 53/83 rd Street intersection to the Belmont Metra Station in Downers Grove and weekday evening rush hour service from the Belmont Metra Station to the IL 53/83 rd Street intersection. The route travels along 83 rd Street past the ARC site. Route 834 (Joliet-Downers Grove) Provides weekday and Saturday service between Joliet Union Station and Yorktown Center in Lombard. The route travels along Janes Avenue past the ARC site and there are posted bus stops with benches adjacent to the site and at the northwest corner of the Janes Avenue/83 rd Street intersection. Athletic Recreation Center 4 Traffic and Parking Study

8 P JANES AVENUE P JANES AVENUE SOCCER FIELDS N NOT TO SCALE 25 SITE JANES B AVENUE SHOPPING PLAZA PIER II CONDOMINIUMS RETAIL CENTER B P P 83RD STREET 30 P P 30 LEGEND ULTIMATE FAITH CHRISTIAN CENTER 35 P P CYPRESS COVE FAMILY AQUATIC CENTER P - TRAVEL LANE - TRAFFIC SIGNAL - STOP SIGN - NO PARKING XX - SPEED LIMIT - BIKE PATH B - PACE BUS STOP PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois Existing Roadway Characteristics Job No: Figure: 3 5

9 30 (29) 358 (409) 13 (9) JANES AVENUE N NOT TO SCALE 31 (24) 1 (0) 12 (8) 17 (13) 0 (1) 5 (6) 374 (423) 1 (1) 10 (4) 287 (367) 0 (0) 2 (3) SITE 11 (7) 295 (368) 119 (63) 198 (295) 68 (72) 14 (20) 118 (83) 433 (173) 198 (143) 6 (2) 3 (7) 10 (6) 743 (397) 83RD STREET 59 (79) 214 (204) 1 (0) 355 (387) 88 (118) 79 (86) 132 (226) 74 (111) LEGEND 00 (00) - WEEKDAY EVENING PEAK HOUR (6:00 PM-7:00 PM) - SATURDAY MIDDAY PEAK HOUR (11:00 AM-12:00 PM) PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois Existing Traffic Volumes Job No: Figure: 4 6

10 3. Athletic Recreation Center Development The following provides a description of the ARC development plan, site access and circulation, on-site parking supply, facility programming and employment, projected traffic generation, and the directional distribution and assignment of ARC-generated traffic. Development Plan The Woodridge Park District plans to construct an Athletic Recreation Center (ARC) on the site of the Janes Avenue Shopping Plaza at the northeast corner of Janes Avenue and 83 rd Street. The Janes Avenue Shopping Plaza will be razed and the existing Janes Avenue soccer fields parking lot will be removed to accommodate the approximately77,930 gross square-foot, two-story ARC building (85,030 gross square feet with multi-use gymnasium addition) and adjoining parking lot. The anticipated ARC grand opening is in October The site plan for the development is contained in the Appendix of this report. Site Accessibility, Parking and Circulation The existing curb cuts at the driveways to the Janes Avenue Shopping Plaza (two on Janes Avenue and one on 83 rd Street) will be closed, as will the driveways to the Janes Avenue soccer fields parking lot. Site ingress and egress for the ARC will be provided from two new driveways, both of which will be on Janes Avenue. The south driveway on Janes Avenue will be located approximately 480 feet north of 83 rd Street and aligned with the driveway to the 83 rd Street retail center. The north driveway on Janes Avenue will be located approximately 120 feet north of the south driveway. Both driveways will provide one entrance lane and one exit lane. The ARC will be supported by a 286-space surface parking lot (306 spaces with multi-use gymnasium addition) that will be shared with the Janes Avenue soccer fields immediately north of the site. The lot is intended to serve ARC patrons and staff members as well as users of the Janes Avenue soccer fields. A drop-off/pick-up lane will be located on the north side of the ARC building and will accommodate approximately four vehicles. Several programmed activities will generate dropoff/pick-up traffic, such as Kidz Squad, basketball and soccer games/practices, birthday parties, Athletic Recreation Center 7 Traffic and Parking Study

11 winter camp, etc. Building servicing will occur at the northeast corner of the building. Emergency service vehicles will have access to the building from the north, south and west sides. Programming Space The ARC will have space allocated to the following uses and activities: 1 st Level Gymnasium with one full-size basketball court (or two short courts) and bleacher seating Optional multi-use gymnasium addition with one short basketball court and bleacher seating Turf field (one full-size or two short fields) with bleacher seating and batting cages 2 program rooms Multi-purpose room for rentals/birthday parties for up to 20 people Child watch room Kitchen Locker rooms Administrative space Lobby/public space Mechanical/storage rooms Small outdoor playground 2 nd Level Track overlooking turf fields below Fitness facility Aerobics room Hours of Operation The hours of operation at the ARC are anticipated to be as follows: Weekdays: 6:00 A.M. - 11:00 P.M. Saturdays: 7:00 A.M. 9:00 P.M. Sundays: 8:00 A.M. - 8:00 P.M. Peak Periods of Activity The ARC will provide programming during all 12 months of the year. The peak month that is anticipated to generate the highest number of program participants and facility users is January due to the limited number of outdoor recreational opportunities available in the winter. Weekday visitation is expected to be highest on Monday and Wednesday evenings (6:00-7:00 P.M.) after typical work hours. Weekend visitation is expected to be highest on Saturdays during the late morning hours from 11:00 A.M.-Noon. A few large events are envisioned over the course of the year, such as basketball and soccer tournaments. These events are anticipated to be scheduled on Friday evenings after 6:00 P.M. and on weekends. Athletic Recreation Center 8 Traffic and Parking Study

12 Peak Employment Levels Staffing levels at the ARC will coincide with the programming schedules. During the peak activity periods, approximately 30 staff members are anticipated to be on-site, consisting of facility managers, programmed activity leaders, gym/turf field competition monitors, child watch personnel, and custodial staff. Directional Distribution of ARC-Generated Traffic The directions from which traffic will approach and depart the site are a function of several variables, including the distribution of households in the Woodridge Park District boundary area and the continuity of the roadway system. Based on these variables, as well as current traffic patterns in the area, the estimated directional distribution of ARC-generated traffic is shown in Table 1 and Figure 5. Table 1 DIRECTIONAL DISTRIBUTION OF ARC-GENERATED TRAFFIC Direction Percent of Traffic Janes Avenue To and From the North 55% Janes Avenue To and From the South 10% 83 rd Street To and From the East 15% 83 rd Street - To and From the West 20% Total 100% ARC Traffic Generation Traffic generation estimates for the ARC were developed for the anticipated peak weekday (6:00-7:00 P.M.) and Saturday (11:00 A.M.-Noon) activity times at the ARC. The weekday peak time coincides with the tail end of the commuter rush hour and the Saturday peak time coincides with the midday time period when weekend traffic volumes on the adjacent roadway system are typically at high levels. The ARC-generated traffic volumes for the peak weekday and Saturday activity times are shown in Table 2, with and without the potential multi-use gymnasium addition. These volumes were estimated from a survey of a comparable facility, national traffic generation rates contained in the Institute of Transportation Engineers (ITE) Trip Generation Manual (9 th Edition, 2012), and anticipated facility programming and employment schedules provided by the Park District. Athletic Recreation Center 9 Traffic and Parking Study

13 55% JANES AVENUE N NOT TO SCALE SITE 20% 15% 83RD STREET 10% LEGEND 00% - PERCENT DISTRIBUTION PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois Directional Distribution of ARC-Generated Traffic Job No: Figure: 5 10

14 The comparable facility utilized in this analysis is the Bolingbrook Park District s Annerino Community Center at 201 Recreation Drive in Bolingbrook, Illinois. This facility is a little smaller in size (approximately 50,000 sf) than the ARC but offers similar recreational/programming activities. The facility has a gymnasium with basketball/volleyball courts, programming rooms, a fitness center, a climbing wall, and community activities, but does not have indoor or outdoor swimming facilities. Traffic counts were performed by KLOA, Inc. at the Annerino Center in July 2005 and a trip generation profile for the facility was developed. This profile was referenced in developing the traffic generation estimates for the ARC shown in Table 2. Table 2 TRAFFIC GENERATED BY THE ARC Land Use Athletic Recreation Center w/o Multi-Use Gym addition Athletic Recreation Center w/ Multi-Use Gym addition Weekday P.M. Peak Hour 1 Number of Vehicle Trips Saturday Midday Peak Hour 2 Size Enter Exit Total Enter Exit Total 77,930 gsf ,030 gsf Trip generation based on Trip Generation Manual, 9 th Edition, Institute of Transportation Engineers, 2012 (Land Use Code 495 Recreational Community Center). 2 Trip generation based on traffic volume surveys of the Annerino Community Center in Bolingbrook, Illinois. ARC Traffic Assignment The weekday and Saturday peak period vehicle trips generated by the ARC were assigned to the roadway system based on the directional distribution shown in Table 1 and Figure 5. Figure 6 shows the assignment of the ARC-generated peak hour traffic volumes without the multi-use gymnasium addition. Figure 7 shows the assignment of the ARC-generated traffic volumes with the multi-use gymnasium addition. Athletic Recreation Center 11 Traffic and Parking Study

15 58 (71) 10 (13) JANES AVENUE 55 (60) 8 (10) 19 (20) 15 (17) N NOT TO SCALE 15 (17) 58 (71) 55 (60) * (*) 45 (49) * (*) SITE 20 (22) 8 (10) 83RD STREET 25 (30) 12 (15) 27 (29) 13 (15) 48 (58) 19 (23) LEGEND 00 - WEEKDAY EVENING PEAK HOUR (6:00 PM-7:00 PM) (00) - SATURDAY MIDDAY PEAK HOUR (11:00 AM-12:00 PM) * - MINIMAL VOLUME PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois ARC-Generated Traffic Volumes Without Multi-Use Gym Addition Job No: Figure: 6 12

16 62 (77) 11 (14) JANES AVENUE 60 (65) 9 (11) 20 (22) 16 (18) N NOT TO SCALE 16 (18) 62 (77) 60 (65) * (*) 49 (54) * (*) SITE 22 (24) 9 (11) 83RD STREET 27 (33) 13 (17) 29 (32) 14 (16) 51 (64) 20 (25) LEGEND 00 - WEEKDAY EVENING PEAK HOUR (6:00 PM-7:00 PM) (00) - SATURDAY MIDDAY PEAK HOUR (11:00 AM-12:00 PM) * - MINIMAL VOLUME PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois ARC-Generated Traffic Volumes With Multi-Use Gym Addition Job No: Figure: 7 13

17 4. Projected Future Traffic Conditions The projected future traffic volumes during the weekday and Saturday peak periods of traffic activity at the ARC, upon completion of the ARC facility in 2016, are shown in Figures 8 and 9 for the ARC development with and without the multi-use gymnasium addition, respectively. The projected future traffic volumes were calculated by combining the estimated traffic generated by the ARC (Figures 6 and 7) with the existing traffic volumes, minus the traffic presently generated by the Janes Plaza Shopping Plaza, which will be razed. The existing shopping plaza has at total of approximately 16,600 square feet of retail space within two buildings. Approximately 62 percent of the retail space is presently vacant. Active uses within the plaza include a 7-Eleven convenience store, a pizzeria, a hair salon, an insurance company, and a tax services company. Since the traffic generated by these uses will no longer be present on the site when the ARC is constructed, it was removed from the analysis of future traffic conditions. Athletic Recreation Center 14 Traffic and Parking Study

18 445 (508) 10 (13) JANES AVENUE 30 (29) 372 (425) 58 (71) 371 (448) 8 (10) 19 (20) 15 (17) 55 (60) * (*) 45 (49) N NOT TO SCALE 31 (24) * (*) 12 (8) 10 (4) 293 (374) 48 (58) SITE 138 (86) 203 (303) 88 (94) 137 (106) 427 (171) 198 (143) 83RD STREET 77 (99) 213 (204) 88 (118) 79 (86) 137 (231) 74 (111) LEGEND 00 - WEEKDAY EVENING PEAK HOUR (6:00 PM-7:00 PM) (00) - SATURDAY MIDDAY PEAK HOUR (11:00 AM-12:00 PM) * - MINIMAL VOLUME PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois Projected Future Traffic Volumes Without Multi-Use Gym Addition Job No: Figure: 8 15

19 449 (514) 11 (14) JANES AVENUE 30 (29) 373 (426) 62 (77) 376 (453) 9 (11) 20 (22) 16 (18) 60 (65) * (*) 49 (54) N NOT TO SCALE 31 (24) * (*) 12 (8) 10 (4) 294 (375) 51 (64) SITE 140 (89) 204 (304) 90 (96) 138 (108) 427 (171) 198 (143) 83RD STREET 79 (102) 213 (204) 88 (118) 79 (86) 138 (233) 74 (111) LEGEND 00 - WEEKDAY EVENING PEAK HOUR (6:00 PM-7:00 PM) (00) - SATURDAY MIDDAY PEAK HOUR (11:00 AM-12:00 PM) * - MINIMAL VOLUME PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois Projected Future Traffic Volumes With Multi-Use Gym Addition Job No: Figure: 9 16

20 5. Traffic Analysis Intersection capacity analyses were performed for the intersection of Janes Avenue and 83 rd Street, as well as the intersections of the ARC driveways with Janes Avenue and 83 rd Street, to determine the operation of the existing roadway system, evaluate the incremental impact of the ARC, and determine the ability of existing roadway system to accommodate future traffic demands. Analyses were performed for the following weekday evening and Saturday midday peak period traffic conditions: 1. Existing traffic volumes 2. Projected future traffic volumes (with ARC without multi-use gymnasium addition) 3. Projected future traffic volumes (with ARC with multi-use gymnasium addition) The traffic analyses were performed using SYNCHRO computer software, which generally follows the methodologies outlined in the Transportation Research Board s Highway Capacity Manual (HCM), The methodologies use traffic signal timings and phasing, stop sign controls, traffic volumes, and street characteristics to determine the average control delay and levels of service for vehicles at an intersection. Traffic signal timings for the Janes Avenue/83 rd Street intersection were obtained from the Village of Woodridge for use in this analysis. The ability of an intersection to accommodate traffic flow is expressed in terms of level of service, which is a qualitative term developed to express intersection operating conditions. Alpha designations from A to F are assigned based on the average control delay experienced by vehicles passing through the intersection. Control delay is that portion of the total delay attributed to the traffic signal or stop sign control operation, and includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay until resumption of free flow speed. Level of Service A is the highest grade (best traffic flow, least delays), Level of Service E represents saturated or at-capacity conditions, and Level of Service F is the lowest grade (oversaturated conditions, extensive delays). Typically, Level of Service D is the lowest acceptable grade for peak-hour conditions in a suburban environment such as Woodridge. For signal-controlled intersections, levels of service are calculated for lane groups, intersection approaches, and the intersection as a whole. For two-way stop controlled (TWSC) intersections, levels of service are only calculated for the approaches controlled by a stop sign. Level of Athletic Recreation Center 17 Traffic and Parking Study

21 Service F at TWSC intersections occurs when there are not enough suitable gaps in the flow of traffic on the major (uncontrolled) street to allow minor-street traffic to safely enter the major street flow or cross the major street. The Highway Capacity Manual criteria for levels of service and the corresponding control delay for signalized and unsignalized intersections are shown in Table 3. Tables 4 and 5 summarize the results of the capacity analyses for the existing and projected future peak period conditions, respectively. The capacity analysis worksheets are included in the Appendix of this report. Table 3 LEVEL OF SERVICE CRITERIA Signalized Intersections Level of Service A B C D E Interpretation Very short delay, with extremely favorable progression. Most vehicles arrive during the green phase and do not stop at all. Good progression, with more vehicles stopping than for Level of Service A, causing higher levels of average delay. Light congestion, with individual cycle failures beginning to appear. Number of vehicles stopping is significant at this level. Congestion is more noticeable, with longer delays resulting from combinations of unfavorable progression, long cycle lengths, or high V/C ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. High delays result from poor progression, high cycle lengths, and high V/C ratios. Average Control Delay (seconds per vehicle) 10 >10-20 >20-35 >35-55 >55-80 F Unacceptable delays occurring, with oversaturation. >80.0 Unsignalized Intersections Average Control Delay Level of Service (seconds per vehicle) A 0-10 B >10-15 C >15-25 D >25-35 E >35-50 F >50 Source: Highway Capacity Manual, Athletic Recreation Center 18 Traffic and Parking Study

22 Table 4 CAPACITY ANALYSIS EXISTING TRAFFIC CONDITIONS Weekday PM Peak Period Saturday Midday Peak Period Intersection LOS Delay LOS Delay Janes Avenue / 83 rd Street 1 C 25.2 C 22.9 Janes Avenue / North Site Access Drive 2 B 10.5 B 11.3 Janes Avenue / South Site Access Drive 2 B 11.0 B rd Street / Site Access Drive 2 C 15.4 C 15.1 Note: LOS=Level of Service; Delay is measured in seconds. 1 Represents overall intersection operations under traffic signal control. 2 Represents operation of site access drive under stop sign control. Table 5 CAPACITY ANALYSIS PROJECTED FUTURE TRAFFIC CONDITIONS Weekday PM Peak Period Saturday Midday Peak Period Intersection LOS Delay LOS Delay ARC w/o Multi-Use Gymnasium Addition Janes Avenue / 83 rd Street 1 C 24.8 C 22.9 Janes Avenue / North Site Access Drive 2 B 11.5 B 12.3 Janes Avenue / South Site Access Drive 2 B 13.0 B 14.3 ARC w/ Multi-Use Gymnasium Addition Janes Avenue / 83 rd Street 1 C 24.8 C 22.9 Janes Avenue / North Site Access Drive 2 B 11.6 B 12.4 Janes Avenue / South Site Access Drive 2 B 13.2 B 15.0 Note: LOS=Level of Service; Delay is measured in seconds. 1 Represents overall intersection operations under traffic signal control. 2 Represents operation of site access drive under stop sign control. Athletic Recreation Center 19 Traffic and Parking Study

23 The capacity analysis results shown in Table 4 indicate that the traffic-signal controlled intersection of Janes Avenue and 83 rd Street presently operates at a satisfactory level of service C in both the weekday evening and Saturday midday peak periods. Vehicle queues on each of the four intersection approaches were observed to range from two to seven vehicles, and all vehicles were observed to clear the intersection with each signal cycle. The westbound vehicle queues on 83 rd Street did at times extend beyond the Janes Avenue Shopping Plaza driveway on 83 rd Street, but the southbound vehicle queues on Janes Avenue were never observed to extend back to the shopping plaza s south driveway on Janes Avenue. The access driveways to the Janes Avenue Shopping Plaza also operate at satisfactory levels of service B or C during the peak periods under stop sign control. Under projected future traffic conditions with the ARC but without the multi-use gymnasium addition, the Janes Avenue/83 rd Street intersection will continue to operate at the same level of service C during the weekday and Saturday peak periods with minimal changes in average vehicle delay. The future ARC access driveways on Janes Avenue are also projected to operate at a satisfactory level of service (B) under stop sign control during the same peak periods, and southbound vehicle queues on Janes Avenue are not projected to extend back to the ARC access drives. The addition of the multi-use gymnasium will have a minimal traffic impact on the operation of the Janes Avenue/83 rd Street intersection and the ARC access drives with no changes in level of service and minimal increases in average vehicle delay. Athletic Recreation Center 20 Traffic and Parking Study

24 6. Parking Analysis A parking analysis was performed to (1) determine project compliance with the off-street parking requirements of the Village of Woodridge Zoning Regulations, (2) compare the proposed parking supply with the projected peak parking demand, (3) identify potential parking demand reduction strategies, and (4) develop a plan to accommodate potential periodic overflow parking. Compliance with Woodridge Zoning Regulations The site plan depicts a surface parking supply of 286 spaces for an ARC without the multi-use gymnasium addition, which exceeds the off-street parking requirements in the Village s zoning regulations by 11 spaces, as shown in Table 6. With the multi-use gymnasium addition, the parking supply is proposed to be increased to 306 spaces, which as shown in Table 6 would also exceed the Village s parking requirements (by 2 spaces). The site plan depicts nine accessible parking spaces, seven adjacent to the west side of the ARC building and two adjacent to the outdoor soccer fields, which exceeds the minimum accessible parking requirements (7-8 spaces) of the Illinois Accessibility Code for this sized lot. Table 6 ARC PARKING REQUIREMENT BY ZONING Land Use Net Floor Area Parking Ratio Municipally- or privately- 64,026 sf nfa 1.0 space/250 sf nfa owned recreation w/o Multi-Use Gym + 19 spaces for buildings or community outdoor soccer centers fields Parking Parking Surplus/ Required Provided (Deficit) ,126 sf nfa w/ Multi-Use Gym 1.0 space/250 sf nfa + 19 spaces for outdoor soccer fields Athletic Recreation Center 21 Traffic and Parking Study

25 Parking Supply and Demand The proposed parking supply was compared with nationwide parking data on suburban recreational community centers, as published by the Institute of Transportation Engineers in Parking Generation, 4 th Edition, The ITE parking demand data indicates this type of land use generates an average weekday peak parking demand ratio of 3.2 spaces per 1,000 square feet of gross floor area. In addition, the outdoor soccer fields are estimated by Park District staff to require another 19 spaces. The application of this parking demand ratio yields a peak parking demand of 268 spaces for an ARC facility without a multi-use gymnasium addition, and a peak parking demand of 291 spaces for an ARC facility with a multi-use gymnasium addition, as shown in Table 7. In either case, the proposed parking supply would be adequate to meet the projected peak parking demand leaving a surplus reserve ranging from spaces. Table 7 PROJECTED PEAK PARKING DEMAND Land Use Gross Floor Area ITE Parking Ratio 1 Suburban Recreational 77,930 sf gfa 3.2 spaces/1,000 sf gfa Community Centers w/o Multi-Use Gym + 19 spaces for outdoor soccer fields Peak Parking Demand Parking Provided Surplus/ (Deficit) ,030 sf gfa w/ Multi-Use Gym 3.2 space/1,000 sf gfa + 19 spaces for outdoor soccer fields Represents average weekday peak parking demand ratio for recreational community center (Land Use Code: 495) in a suburban location, as documented in Parking Generation, 4 th Edition, 2010, published by the Institute of Transportation Engineers, plus parking demand estimate of 19 spaces for outdoor soccer fields. The proposed parking supply was also compared with the projected peak parking demand generated by the anticipated facility programming and employment schedules, as provided by the Park District, for the peak weekday and weekend hours of visitation during the peak visitation month of the year (January), as well as for the highest ARC visitation month (October) that overlaps with outdoor soccer games scheduled at the Janes Avenue soccer fields. As noted earlier, the ARC parking lot will be used by those participating in games at the Janes Avenue soccer fields. Similar to the comparison with the ITE parking demand ratios above, this comparison indicated that the proposed parking supply would be adequate to meet the projected peak parking demand. The breakdown of this parking analysis is included in the Appendix of this report. Athletic Recreation Center 22 Traffic and Parking Study

26 Parking Demand Reduction Strategies Potential strategies that could effectively reduce parking demand at the ARC site are described below. Carpooling The Park District can provide notices to participants in activities at the ARC that encourage carpooling to events to ease traffic congestion on the site at the conclusion of activities and to reduce the demand for parking. Bicycle Parking The Park District can provide a sufficient supply of covered outdoor bicycle racks to encourage bicycle use as an alternative mode of travel to the ARC, in combination with providing a multiuse path connection along 83 rd Street to the Southern DuPage County Regional Trail at the northeast corner of the Janes Avenue/83 rd Street intersection. Parking Overflow Accommodations Should activities at the ARC create a parking demand that exceeds the site s 286-space capacity (306-space capacity with multi-use gymnasium addition), employees and/or participants can make use of the Park District s parking lots at the Cypress Cove Family Aquatic Center (394 total spaces) across 83 rd Street from the ARC site. The potential need for additional parking could be related to periods of high visitation at the ARC that overlap with soccer games at the Janes Avenue soccer fields, periodic events at the ARC such as basketball or soccer tournaments, or a large event such as the facility s grand opening. Athletic Recreation Center 23 Traffic and Parking Study

27 7. Conclusions and Recommendations Based on the proposed ARC development plan and the preceding traffic and parking study, the following conclusions and recommendations are made: The location of the proposed ARC on the Janes Avenue Shopping Plaza site is a relatively centralized location within the Woodridge Park District boundary area and is conveniently accessible from two major roadways (Janes Avenue and 83 rd Street), two Pace bus routes (Routes 821 and 834), the Southern DuPage County Regional Trail, and the local sidewalk system. The redevelopment of the site will result in the closing of the existing curb cut on 83 rd Street and the existing four curb cuts along Janes Avenue, two of which serve the Janes Avenue Shopping Plaza and two of which access the Janes Avenue soccer fields parking lot. ARC ingress and egress will be provided from the two new driveways on Janes Avenue, which will efficiently disperse site traffic onto Janes Avenue. The south ARC driveway will be aligned with the 83 rd Street retail center driveway and will be located 150 feet further from the Janes Avenue/83 rd Street intersection than the existing south driveway to the Janes Avenue Shopping Plaza, which will lessen the likelihood that southbound vehicle queues from the Janes Avenue/83 rd Street intersection will impede access to/from the ARC. The north ARC driveway will be located approximately 120 feet north of the south driveway. Both ARC driveways should be designed with a single entrance and exit lane, with stop signs and stop lines installed on the exit lanes. The volume of traffic generated by the ARC during the weekday (6:00-7:00 P.M.) and weekend (Saturday 11:00 A.M.-Noon) peak periods of activity at the ARC can be adequately accommodated on the adjacent roadway system with minimal impacts to traffic operations. The Janes Avenue/83 rd Street intersection presently operates at a satisfactory level of service C during the peak periods and will remain at the same level of service upon completion of the ARC, regardless of whether the multi-use gymnasium addition is added. Athletic Recreation Center 24 Traffic and Parking Study

28 This minimal traffic impact from the ARC is due in part to the fact that traffic currently generated by the Janes Avenue Shopping Plaza will be eliminated when the plaza is razed for construction of the ARC. The ARC access driveways on Janes Avenue are also projected to operate at a satisfactory level of service (B) under stop sign control during the peak periods, with or without the multi-use gymnasium addition. To prevent left-turning conflicts on Janes Avenue by motorists bound to the ARC and 83 rd Street retail center, the existing two-way left-turn channelization lane (i.e., painted median) on Janes Avenue should be re-striped to provide a dedicated left-turn lane for turning movements to the ARC south driveway and 83 rd Street retail center drive. To the north of the ARC south driveway, the left-turn lane would transition back to the existing two-way leftturn channelization lane, as shown in Figure 10. All drive aisles within the ARC parking lot should operate with two-way circulation. The drop-off/pick-up lane on the north side of the ARC building will accommodate approximately four vehicles. Many of the programmed activities that generate drop-off/pickup traffic will have different start and end times, which will spread out the traffic movements using this lane. If the lane is fully-utilized, drivers will be able to park in the nearby spaces to pick-up program participants. To prevent traffic conflicts, lane striping and/or pavement treatments should be used to differentiate the drop-off/pick-up lane and channelize traffic movements past the lane. Building servicing (i.e., trash pick-up, loading) will occur at the northeast corner of the building and will not impede traffic movements through the site. Emergency service vehicles will have access to the ARC from the north, south and west sides. The proposed 286-space parking lot (ARC without multi-use gymnasium addition) exceeds the off-street parking requirements in the Village s zoning regulations by 11 spaces. With the multi-use gymnasium addition, the proposed parking lot expansion to 306 spaces would exceed the Village s zoning requirements by two spaces. The proposed parking supply for the ARC, with or without the multi-use gymnasium addition, would also adequately accommodate the projected average weekday peak parking demand based on nationwide parking data for suburban recreational community centers published by the Institute of Transportation Engineers, as well as estimates of the ARC s peak parking demand based on anticipated facility programming and employment schedules during the peak weekday and weekend hours of visitation during the peak visitation month of the year (January) and the highest ARC visitation month (October) that overlaps with outdoor soccer games scheduled at the Janes Avenue soccer fields. Athletic Recreation Center 25 Traffic and Parking Study

29 50' 50' 75' 75' JANES AVENUE ONLY Bike Rack ACTIVITY RECREATION CENTER N NOT TO SCALE ONLY 83RD STREET PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois RECOMMENDED JANES AVENUE PAVEMENT MARKING PLAN 26 Job No: Figure: 10

30 Nine (9) of the proposed parking spaces will be designed as accessible spaces, seven adjacent to the west side of the ARC building and two adjacent to the outdoor soccer fields, which exceeds the minimum accessible parking requirements (7-8 spaces) of the Illinois Accessibility Code for this sized lot. Should periodic events at the ARC, such as tournaments, create a parking demand that exceeds the site s 286-space capacity (306-space capacity with multi-use gymnasium addition), employees and/or participants can make use of the Park District s parking lots at the Cypress Cove Family Aquatic Center (394 total spaces) across 83 rd Street from the site. Potential strategies to reduce parking demand on the ARC site include encouraging program participants to carpool and providing a sufficient supply of outdoor covered bicycle racks. The preferred bicycle rack design is the Inverted U, A, Post and Loop, or Wave-style rack as these provide good support to the bicycle and users are able to lock both the wheels and frame of the bicycle to the rack. While the ARC site plan shows paved connections to the existing sidewalk system along Janes Avenue and 83 rd Street, a wider multi-use path should be considered along the ARC frontage on 83 rd Street to provide a better linkage to the Southern DuPage County Regional Trail at the northeast corner of Janes Avenue/83 rd Street intersection to accommodate ARC users that travel by bicycle. Crosswalk markings should be installed across the two ARC access driveways. The stop signs and stop lines should be installed in advance of the crosswalks. Athletic Recreation Center 27 Traffic and Parking Study

31 Appendix

32 Site Plan

33

34 Peak Parking Demand Analysis Based on Facility Programming & Employment Schedules

35 PROJECTED PEAK PARKING DEMAND (Capacity: 286 w/out gym addition / 306 spaces w/ gym addition) Parking Demand No. of Program January October No. of No. of Staff Weekday Saturday Weekday Saturday Activity Participants Coaches/Vol.'s (Refs/Scorers) Total 6:00-7:00 PM 11:00 AM-Noon 6:00-7:00 PM 11:00 AM-Noon Fitness Area Walking/Jogging Track Group Fitness Room Indoor Athletic Turf (2 Fields) Games Practices/Rentals 2, Gymnasium (2 Courts) Games Practices/Rentals 2, Multi-Program Room # Multi-Program Room # Multi-Program Room # Child Watch Room Included in count from other activity areas Employees (Facility) Outdoor Soccer Games (1 Field Programmed) Games 2, Practices/Rentals 2, Future Gymnasium Addition (1 Court) Games 2, Practices/Rentals 2, An auto occupancy of 1.25 people/car was assumed for all adult activities. 2 An auto occupancy of 1.5 people/car was assumed for all youth activities. 3 Assumes 1/2 participants are dropped-off/picked-up without parking. 4 Gym addition activities include youth basketball practices, youth floor hockey, open gym, etc. 5 Game start times separated by 30 minutes to avoid parking demand overlap. Peak Demand w/o Gym Addition Peak Demand w/ Gym Addition

36 Traffic Counts

37 Woodridge, IL Weather: Very Cold and Dry 01/28/14 83rd St and Janes Ave 11:09:56 Thursday January 23, 2014 TURNS/TEAPAC[Ver ] - 15-Minute Flow Rates: Appr/Exit Totals Intersection # 7 83/janes/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total TURNS/TEAPAC[Ver ] - 60-Minute Volumes: by Movement Intersection # 7 83/janes/thurs ============================================================== Begin N-Approach E-Approach S-Approach W-Approach Int Time RT TH LT RT TH LT RT TH LT RT TH LT Total ===== ============== ============== ============== ============== ===== * * * ===== ============== ============== ============== ============== ===== TURNS/TEAPAC[Ver ] - 60-Minute Volumes: Appr/Exit Totals Intersection # 7 83/janes/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total * * *

38 Woodridge, IL Weather: Very Cold and Dry 01/28/14 83rd St and Janes Ave Pedestrians Only 11:11:07 Thursday January 23, 2014 TURNS/TEAPAC[Ver ] - 15-Minute Flow Rates: Appr/Exit Totals Intersection # 8 83/janes/peds/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total TURNS/TEAPAC[Ver ] - 60-Minute Volumes: by Movement Intersection # 8 83/janes/peds/thurs ============================================================== Begin N-Approach E-Approach S-Approach W-Approach Int Time RT TH LT RT TH LT RT TH LT RT TH LT Total ===== ============== ============== ============== ============== ===== * * * ===== ============== ============== ============== ============== ===== TURNS/TEAPAC[Ver ] - 60-Minute Volumes: Appr/Exit Totals Intersection # 8 83/janes/peds/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total * * *

39 Woodridge, IL Weather: Very Cold and Dry 01/28/14 83rd St and Janes Ave Bikers Only 11:12:14 Thursday January 23, 2014 TURNS/TEAPAC[Ver ] - 15-Minute Flow Rates: Appr/Exit Totals Intersection # 9 83/janes/bikers/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total TURNS/TEAPAC[Ver ] - 60-Minute Volumes: by Movement Intersection # 9 83/janes/bikers/thurs ============================================================== Begin N-Approach E-Approach S-Approach W-Approach Int Time RT TH LT RT TH LT RT TH LT RT TH LT Total ===== ============== ============== ============== ============== ===== * * * ===== ============== ============== ============== ============== ===== TURNS/TEAPAC[Ver ] - 60-Minute Volumes: Appr/Exit Totals Intersection # 9 83/janes/bikers/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total * * *

40 Woodridge, IL Weather: Very Cold and Dry 01/28/14 Janes Ave and Janes Plaza North Access Dr 11:17:58 Thursday January 23, 2014 TURNS/TEAPAC[Ver ] - 15-Minute Flow Rates: Appr/Exit Totals Intersection # 11 janes/janesplaza/north/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total TURNS/TEAPAC[Ver ] - 60-Minute Volumes: by Movement Intersection # 11 janes/janesplaza/north/thurs ============================================================== Begin N-Approach E-Approach S-Approach W-Approach Int Time RT TH LT RT TH LT RT TH LT RT TH LT Total ===== ============== ============== ============== ============== ===== * * * ===== ============== ============== ============== ============== ===== TURNS/TEAPAC[Ver ] - 60-Minute Volumes: Appr/Exit Totals Intersection # 11 janes/janesplaza/north/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total * * *

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach,

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Final Report 2011 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter

More information

Trip and Parking Generation Study of the Peaks Ice Arena

Trip and Parking Generation Study of the Peaks Ice Arena Trip and Parking Generation Study of the Peaks Ice Arena Introduction The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed a trip and parking generation

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Traffic Impact Study. Chicago, Illinois. May 2017 RETAIL UPPER N COLUMBUS US DRIVE. Parcel O, LLC. Prepared for: EXISTING SIDEWALK EXISTING PLA

Traffic Impact Study. Chicago, Illinois. May 2017 RETAIL UPPER N COLUMBUS US DRIVE. Parcel O, LLC. Prepared for: EXISTING SIDEWALK EXISTING PLA 0F 0E LAKESHORE EAST PARCEL O Traffic Impact Study EXISTING SIDEWALK EXISTING PLA Chicago, Illinois May 2017 NEW PLANTER NEW PLANTERS Prepared for: Parcel O, LLC UPPER N COLUMBUS US DRIVE RETAIL NEW PLANTERS

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA. Section 1 INTRODUCTION 1

GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA. Section 1 INTRODUCTION 1 GLEBE 672 TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VIRGINIA TABLE OF CONTENTS Page Section 1 INTRODUCTION 1 Section 2 BACKGROUND INFORMATION 6 Public Road Network... 6 Non Auto Facilities and Services...

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Trip Generation and Parking Study New Californian Apartments, Berkeley

Trip Generation and Parking Study New Californian Apartments, Berkeley Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter

More information

THE REHABILITATION INSTITUTE OF CHICAGO Traffic Impact Study

THE REHABILITATION INSTITUTE OF CHICAGO Traffic Impact Study THE REHABILITATION INSTITUTE OF CHICAGO Traffic Impact Study Chicago, Illinois March 2013 Prepared for: The Rehabilitation Institute of Chicago Prepared by: TADI 233 S. Wacker Drive - Suite 8400 Chicago,

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation

More information

Click to edit Master title style

Click to edit Master title style Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment

More information

Address Land Use Approximate GSF

Address Land Use Approximate GSF M E M O R A N D U M To: Kara Brewton, From: Nelson\Nygaard Date: March 26, 2014 Subject: Brookline Place Shared Parking Analysis- Final Memo This memorandum presents a comparative analysis of expected

More information

3.8 TRANSPORTATION, CIRCULATION AND PARKING

3.8 TRANSPORTATION, CIRCULATION AND PARKING 3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicants for the proposed Sepulveda/Rosecrans Site Rezoning are: Mar Ventures, Inc., 2050 West 190 th Street, Suite 108, Torrance, California,

More information

ROAD SAFETY AUDIT. Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) MassDOT Project #607756

ROAD SAFETY AUDIT. Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) MassDOT Project #607756 ROAD SAFETY AUDIT Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) MassDOT Project #607756 Town of Great Barrington August 13, 2015 Prepared For:

More information

Capital Metro Downtown Multimodal Station

Capital Metro Downtown Multimodal Station Capital Metro Downtown Multimodal Station Stakeholder Briefing December 11, 2015 Agenda 1 2 3 4 5 Project Summary Downtown Station Concept Evaluation 4 th Street Traffic Analysis 5 th Street Traffic Analysis

More information

BETHLEHEM MISSIONS TRUST CAMPUS

BETHLEHEM MISSIONS TRUST CAMPUS BETHLEHEM MISSIONS TRUST CAMPUS Prepared For: Prepared By: Wasley Knell Consultants PO Box 5015, Mount Maunganui, 3150 BruceWRobinson@msn.com/(027) 4515685 Table of Contents Introduction... 3 Site Vicinity...

More information

City of Meridian - Limited Parking Supply and Demand Analysis

City of Meridian - Limited Parking Supply and Demand Analysis City of Meridian - Limited Parking Supply and Demand Analysis Prepared for: City of Meridian, Idaho Planning and Zoning 660 East Watertower, Ste. 202 Meridian, ID 83642 Prepared by: Carl Walker, Inc. 4

More information

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II TRAFFIC IMPACT ANALYSIS LOTUS RANCH El Centro, California July 31, 2015February 12, 2016 LLG Ref. 3-14-2392 Prepared by: KC Yellapu, P.E Senior Transportation Engineer & Charlene Sadiarin Transportation

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

CTA Blue Line Study Area

CTA Blue Line Study Area CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

Link Light Rail Operations and Maintenance Satellite Facility

Link Light Rail Operations and Maintenance Satellite Facility September 2015 Link Light Rail Operations and Maintenance Satellite Facility TRANSPORTATION TECHNICAL REPORT Appendix E1 Central Puget Sound Regional Transit Authority Appendix E.1 TABLE OF CONTENTS PROJECT

More information

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description

More information

Appendix C Transportation. C-1: Chelsea Market Survey Results C-2: Transportation Demand Factors Memo C-3: Proposed Safety Improvements

Appendix C Transportation. C-1: Chelsea Market Survey Results C-2: Transportation Demand Factors Memo C-3: Proposed Safety Improvements Appendix C Transportation C-1: Chelsea Market Survey Results C-2: Transportation Demand Factors Memo C-3: Proposed Safety Improvements Appendix C-1 Chelsea Market Survey Results CHELSEA MARKET SURVEY

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

Chapter 4 : THEME 2. Transportation

Chapter 4 : THEME 2. Transportation Chapter 4 : THEME 2 Strengthen connections to keep the Central Area easy to reach and get around 55 Figure 4.2.1 Promote region-wide transit investments. Metra commuter rail provides service to the east,

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1):

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1): 2709 McGraw Drive Bloomington, Illinois 61704 p 309.663.8435 f 309.663.1571 www.f-w.com www.greennavigation.com November 4, 2016 Mr. Kevin Kothe, PE City Engineer City of Bloomington Public Works Department

More information

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Re: 233 Armstrong Street Residential Condominium Traffic Brief 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,

More information

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES)

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) 0 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) C O TRANSPORTATION ANALYSIS STUDY March th, 0 APPLICANT: Alexandria City Public Schools Educational Facilities Department Operational & Maintenance

More information

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information

Sherman Oaks Community Traffic Plan

Sherman Oaks Community Traffic Plan Sherman Oaks is a community that is geographically bound by the Santa Monica mountains on its southern boundary, and the ever-expanding San Fernando Valley on its western, northern, and eastern boundaries.

More information

Mannheim/Higgins. Lee/Touhy. Municipal. Alternate 1), Village of Rosemont (Eastbound. Major Considerations:

Mannheim/Higgins. Lee/Touhy. Municipal. Alternate 1), Village of Rosemont (Eastbound. Major Considerations: Mannheim/Higgins Municipality: Municipality: City of Village Des Plaines of Skokie (Eastbound Alternate 1), Village of Rosemont (Eastbound Alternate Major 2 and Considerations: Westbound Alternate 1),

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

Central Loop Bus Rapid Transit

Central Loop Bus Rapid Transit Central Loop Bus Rapid Transit Transportation Goals of the Chicago Central Area ACTION Plan, page 2-6 Central Area Plan Improve Transit in Central Area Improve Pedestrian Environment Manage Traffic Circulation

More information

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by:

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by: State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report Prepared for: City of Morro Bay Prepared by: (Caltrans Project No. 0515000104, EA 0F670) State Route 1/State Route

More information

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B... Speed Hump Program CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 1. GENERAL... 3 2. ELIGIBILITY REQUIREMENTS... 3 A. PETITION... 3 B. OPERATIONAL AND GEOMETRIC CHARACTERISTICS OF

More information

Parking And Loading

Parking And Loading Title 33, Planning and Zoning Chapter 33.266 2/1/17 Parking And Loading 33.266 Parking And Loading 266 Sections: 33.266.010 Introduction Motor Vehicle Parking 33.266.100 General Regulations 33.266.110

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Mercer Island Town Center Parking Study Joint Commission Presentation March 16, 2016

Mercer Island Town Center Parking Study Joint Commission Presentation March 16, 2016 Mercer Island Town Center Parking Study Joint Commission Presentation March 16, 2016 Mercer Island Town Center Parking Study Study Area Town Center Bordered by Sunset Way, Island Crest Way, SE 32 nd Street,

More information

Metra Milwaukee District West Line Transit-Friendly Development Plan

Metra Milwaukee District West Line Transit-Friendly Development Plan Metra Milwaukee District West Line Transit-Friendly Development Plan Community Input Workshop April 6, 2011 Overview of Presentation Workshop Goals Study Context Existing Conditions Market Overview Employment

More information

ON-STREET AND OFF-STREET PARKING SURVEY: METHODOLOGY AND RESULTS

ON-STREET AND OFF-STREET PARKING SURVEY: METHODOLOGY AND RESULTS ON-STREET AND OFF-STREET PARKING SURVEY: METHODOLOGY AND RESULTS TOWN OF WINDSOR, CT REPORT JUNE 2016 CONTENTS Parking Survey Design... 3 Parking Supply Inventory... 3 Parking Demand Survey... 3 Surveyed

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Estimation of Vehicle Queue Lengths Based on Driveway Access Design

Estimation of Vehicle Queue Lengths Based on Driveway Access Design Estimation of Vehicle Queue Lengths Based on Driveway Access Design! Prof. Jaisung Choi!! The University of Seoul Sept 26 2014 International Conference on Access Management Access management & I One of

More information

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II TRAFFIC IMPACT ANALYSIS LOTUS RANCH El Centro, California April 26, 2016 LLG Ref. 3-14-2392 Prepared by: KC Yellapu, P.E Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II Under

More information

ELMORE COUNTY HIGHWAY DEPARTMENT

ELMORE COUNTY HIGHWAY DEPARTMENT Adopted 11/27/06 Effective 2/1/07 Amended 4/10/08 ELMORE COUNTY HIGHWAY DEPARTMENT 155 County Shop Road Wetumpka, Alabama 36092 Phone (334) 567-1162 Fax (334) 567-1100 Access Management Policy The Elmore

More information

US 211/US 17/29 Bus (Broadview Avenue) Access Management Improvements

US 211/US 17/29 Bus (Broadview Avenue) Access Management Improvements September 2015 Intersection Traffic Analysis Broadview Ave @ rost Ave / Waterloo St US 211/US 17/29 Bus (Broadview Avenue) Access Management Improvements rom South of rost Avenue to South of Winchester

More information

Transportation Review

Transportation Review 1445-1455 West Georgia Street Transportation Review Draft Report Prepared for BCG Developments Date November 10, 2016 Project No. 4608.12 November 10, 2016 4608.12 Dawn Guspie James KM Cheng Architects

More information

Project Status Update January 2017

Project Status Update January 2017 Project Status Update January 2017 1 What is the Purple Line? A new 16 mile east-west light rail line Operates mostly on the surface with 21 stations Connects New Carrollton in Prince George s County and

More information

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County

More information

Submission to Greater Cambridge City Deal

Submission to Greater Cambridge City Deal What Transport for Cambridge? 2 1 Submission to Greater Cambridge City Deal By Professor Marcial Echenique OBE ScD RIBA RTPI and Jonathan Barker Introduction Cambridge Futures was founded in 1997 as a

More information

Summary of Findings: Parking and Trip Generation Study For Coffee/Donut Shops with Drive-Through Window. District 5 Tennessee Section: Memphis, TN

Summary of Findings: Parking and Trip Generation Study For Coffee/Donut Shops with Drive-Through Window. District 5 Tennessee Section: Memphis, TN Summary of Findings: Parking and Trip Generation Study For Coffee/Donut Shops with Drive-Through Window District 5 Tennessee Section: Memphis, TN Submitted to: Ed Stollof, AICP Institute of Transportation

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

Heartland Town Square

Heartland Town Square Attachment TRA- Assignment of Other Developments Hamlet of Brentwood Town of Islip Suffolk County, New York Prepared by: 0 Joshua s Path Suite 00 Hauppauge, New York.. May 0 Planned Development Project

More information

February 2012 Caltrain Annual Passenger Counts Key Findings

February 2012 Caltrain Annual Passenger Counts Key Findings February 2012 Caltrain Annual Passenger Counts Key Findings Key Findings February 2012 Caltrain Annual Passenger Counts The 2012 annual Caltrain passenger counts, which were conducted in February 2012,

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay TO: FROM: Chair and Members Engineering and Public Works Committee Mark Misko, C.E.T. Manager, Roads Maintenance and Construction DATE: March 23, 2016 SUBJECT: REPORT NO: Designation of a Community Safety

More information

Town of Newmarket. Parking Directions Report. Prepared for: Town of Newmarket

Town of Newmarket. Parking Directions Report. Prepared for: Town of Newmarket Town of Newmarket Parking Directions Report Prepared for: Town of Newmarket April, 2010 TOWN OF NEWMARKET: PARKING DIRECTIONS APRIL, 2010 P:\73\28\01\Reports\APR 19 2010 - Parking Directions_ckc.doc TABLE

More information

Speed Evaluation Saw Mill Drive

Speed Evaluation Saw Mill Drive Speed Evaluation Saw Mill Drive Prepared for: Mount Laurel Township Burlington County, New Jersey Prepared by: Dana Litwornia Litwornia & Associates, Inc. Transportation, Traffic & Environmental Engineering

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

COMPREHENSIVE TRANSPORTATION REVIEW THE LADYBIRD

COMPREHENSIVE TRANSPORTATION REVIEW THE LADYBIRD COMPREHENSIVE TRANSPORTATION REVIEW THE LADYBIRD WASHINGTON, DC November 22, 2017 Prepared by: 1140 Connecticut Avenue NW Suite 600 Washington, DC 20036 Tel: 202.296.8625 Fax: 202.785.1276 3914 Centreville

More information

The Smart Growth Countywide Transit Master Plan

The Smart Growth Countywide Transit Master Plan Choose the Future The Smart Growth Transit Master Plan What is the Transit Master Plan? A robust and integrated plan to establish countywide public transportation priorities over the next thirty years

More information

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways.

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways. 4.7 Transportation and Circulation This report documents the results of a study of the potential traffic impacts created by the Whittier Main Oil Field Development Project. The study is included as Appendix

More information

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway

More information

Section 6H.01 Typical Applications

Section 6H.01 Typical Applications December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all

More information

Lombard Commuter Parking Study. Department of Community Development

Lombard Commuter Parking Study. Department of Community Development Lombard Commuter Parking Study Department of Community Development December 2007 Contents: Executive Summary... 3 Metra Statistics... 4 Lombard Commuter Parking Inventory... 4 Commuter Parking Lot Usage...

More information