1 Traffic Impact and Access Study Proposed Lowe s Home Improvement Center Dennis, Massachusetts Prepared for Prepared by Lowe s Home Centers, Inc Curtis Bridge Road Wilkesboro, North Carolina /Vanasse Hangen Brustlin, Inc. Transportation, Land Development, Environmental Services 101 Walnut Street P.O. Box 9151 Watertown, Massachusetts May 2013

2 Table of Contents Introduction... i Project Description... i Study Methodology... i Existing Conditions... 3 Study Area... 3 Roadway Geometry... 4 Roadways... 4 Intersections... 4 Roadway Jurisdiction... 9 Traffic Volume Data... 9 Seasonality of Count Data Public Transportation Vehicular Crash History Future Conditions Background Traffic Growth Historic Traffic Growth Site-Specific Growth No-Build Traffic Volumes Future Roadway Conditions Trip Generation Trip Distribution and Assignment Traffic Operations Analysis Level-of-Service and Delay Criteria Level-of-Service Analysis Signalized Intersection Capacity Analyses Unsignalized Intersection Capacity Analyses Roadway Link Capacity Analysis Freeway Weave Analyses Mitigation Transportation Demand Management Intersection/Roadway Safety Mitigation Congestion Management Fair Share Mitigation Conclusion i Table of Contents

3 List of Tables Table Title Page Table 1 Peak Season Existing Traffic Volumes Table 2 Vehicular Crash Data ( ) Table 2 Vehicular Crash Data ( ) continued Table 3 Proposed Project Trip Generation Breakdown Table 4 Proposed Project Trip Distribution Table 5 Signalized Intersection Capacity Analysis Summary Peak Summer Season Table 6 Unsignalized Intersection Capacity Analyses - Peak Summer Season Table 7 Roadway Link Analysis Summary Peak Summer Season Table 8 Level-of Service Criteria for Weave Areas Table 9 Ramp Weave Section Capacity Analysis Summary Table 10 Trip Reduction Requirement Calculation Table 11 Signalized Intersection Capacity Analysis Summary With Mitigation Table 12 Fair Share Mitigation Assessment Table 13 Mitigation Plan Cost Summary ii List of Tables

4 List of Figures Figure Title Follows Page 1 Site Location Map Study Area Intersection Geometry Roadway Jurisdiction Map Existing Weekday Evening Peak Hour Traffic Volumes Existing Saturday Midday Peak Hour Traffic Volumes No Build Weekday Evening Peak Hour Traffic Volumes No-Build Saturday Midday Peak Hour Traffic Volumes Project Trip Distribution Build Weekday Evening Peak Hour Traffic Volumes Build Saturday Midday Peak Hour Traffic Volumes Proposed Roadway Improvements Route 134 Corridor Proposed Roadway Improvements Theophilus F. Smith Road iii List of Figures

5 Executive Summary Vanasse Hangen Brustlin, Inc. (VHB) has prepared a traffic impact and access study (TIAS) for the proposed Lowe s Home Improvement Center (the Project ) to be located along Theophilus F. Smith Road in Dennis, Massachusetts. As designated on the land use vision map for the Town of Dennis, the site is located in an Economic Center. The site currently consists of approximately 15.2 acres of land which currently house the local Dick and Ellie s Flea Market and the Inflatable Park during the summer season. The existing uses on site will be eliminated and as such existing traffic associated from the existing uses will be eliminated as part of the project. The proposed project would involve the redevelopment of the site to include an approximately 135,018 sf Lowes Home Improvement Center with 371 parking spaces. Access to the site would be provided by three driveways on Theophilus F. Smith (TFS) Road. The easternmost driveway will be an unsignalized T-type intersection with TFS Road which will be designated for truck delivery. The middle site driveway will be a T-type intersection with TFS Road and will be limited to right-turn in/rightturn out access. The westernmost driveway will be under traffic signal control and will involve the realignment of Enterprise Road to form the southbound approach to the intersection. By introducing the traffic signal and realigning Enterprise Road to align with the site driveway, we are providing access management along this corridor. Based on a review of the anticipated trip generation and trip distribution for the proposed project, a study area was established. The study area was established also in part based on a review of the RPP and the RPP Functional Classification of Cape Cod Roadways Map, and through consultations with both the Town of Dennis and Cape Cod Commission. Using this approach, the project study area includes the following 21 intersections: Theophilus F. Smith Road and Site Driveways (3) Theophilus F. Smith Road at Duck Pond Road/S. Gages Way Route 134 and Theophilus F. Smith Road Route 134 and Market Place/Patriot Square Access Driveway Theophilus F. Smith Road and Enterprise Road Main Street at High Bank Road Old Bass River Road at Bob Crowell Road Old Bass River Road at Mayfair Road Route 134 and Route 6 Interchange (four-intersections) Route 134 at Airline Road Route 134 and Bob Crowell Road iv Executive Summary

6 Route 134 and Upper County Road Route 134 and Main Street (Route 28) S. Gages Way at Great Western Road Great Western Road at Depot Street (Harwich) Depot Street at Depot Road (Harwich) Manual turning movement counts [collecting peak hour data] were conducted at each of the study-area intersections during the weekday evening peak period from 4:00 PM to 6:00 PM and the Saturday midday peak period from 11:00 AM to 1:00 PM in August Concurrent with the TMCs, 24-hour automatic traffic recorder (ATR) counts were conducted at the following three locations: Route 134 south of Route 6 Theophilus F. Smith Road east of Route 134 Enterprise Road north of Theophilus F. Smith Road The proposed project is expected to result in a total of 2,104 net new trips (1,052 entering/1,052 exiting) on a typical weekday and 3,912 net new trips (1,956 entering/1,956 exiting) on a typical Saturday. The proposed project is expected to result in a total 215 net new vehicle trips (117 entering/98 exiting) during the weekday evening peak hour and 301 net new vehicle trips (157 entering/144 exiting) during the Saturday midday peak hour. Capacity analyses were conducted for each of the study area intersections and roadway links under 2013 Existing conditions, 2018 No-Build conditions (without the proposed development), and 2018 Build conditions (with the proposed development). Based on the results of these analyses and the anticipated sitegenerated traffic, the proponent will implement the following measures as part of the proposed transportation initiatives of the proposed project: Provide a comprehensive Transportation Demand Management Program (TDM) Provide monetary contribution in accordance with MPS TR0.4 Implement intersection safety and/or capacity enhancements at: o Theophilus F. Smith Road and Enterprise Road/Site Driveways o Route 134 and Theophilus F. Smith Road o Route 134 and Market Place/Patriot Square Access Driveway o Route 134 and Route 6 Eastbound Ramps o Route 134 and Route 6 Westbound Ramps o Route 134 and Airline Road o Route 134 and Bob Crowell Road o Route 134 and Main Street (Route 28) o Route 134 at Center Street Provide Fair Share contribution towards additional improvements in the study area v Executive Summary

7 Overall, VHB concludes that the implementation of the above-mentioned mitigation measures not only accommodates future site-generated traffic but also improves some existing operational deficiencies in the vicinity of the site. vi Executive Summary

8 1 Introduction This traffic study documents the findings of the traffic evaluation conducted for the project including an assessment of existing conditions, projection of future traffic volumes without and with the proposed development, analysis of impacts of the proposed development and recommendations for improving existing capacity deficiencies as well as to offset project related traffic impacts. Project Description The site, which is located on Theophilus F. Smith Road in Dennis, Massachusetts, currently consists of approximately 15.2 of land which currently house the local Dick and Ellie s Flea Market and the Inflatable Park during the summer season. The proposed project would involve the redevelopment of the site to include an approximately 135,018 sf Lowes Home Improvement Center with 371 parking spaces. The existing uses on site would be eliminated. Access to the proposed site would be provided by three driveways (two unsignalized and one signalized with a realigned Enterprise Road). Figure 1 shows the Project site in relation to the surrounding area. Study Methodology This traffic assessment has been conducted in three stages. The first stage involved an assessment of existing traffic conditions within the project area including an inventory of existing roadway geometry; observations of traffic flow, including daily and peak period traffic counts; and a review of vehicular crash data. The second stage of the study established the framework for evaluating the transportation impacts of the proposed project. Specific travel demand forecasts for the project were assessed along with future traffic demands on the study area roadways due to projected background traffic growth and other proposed area development that will occur, independent of the proposed development. The year 2018, a five-year time horizon, was selected as the design year for analysis for the preparation of this traffic impact and access assessment to satisfy the Executive Office of Environmental Affairs/Executive Office of Transportation [EOEA/EOT] guidelines and CCC DRI requirement. 1 Introduction

9 2 Introduction The third and final stage involved conducting traffic analyses to identify both existing and projected future roadway capacities and demands. This analysis was used as the basis for determining potential project impacts and potential mitigation measures.

10

11 2 Existing Conditions Evaluation of the transportation impacts associated with the proposed project requires a thorough understanding of the existing transportation system in the project study area. Existing transportation conditions in the study area include roadway geometry, traffic controls, daily and peak period traffic flow, and vehicular crash information data. Each of these elements is described in detail below. Study Area Based on a review of the anticipated trip generation and trip distribution for the proposed project, a study area was established. The study area was established also in part based on a review of the RPP and the RPP Functional Classification of Cape Cod Roadways Map and through consultation with CCC and the Town of Dennis. Using this approach, the project study area will include the following 21 intersections: Theophilus F. Smith Road and Site Driveways (3) Theophilus F. Smith Road at Duck Pond Road/S. Gages Way Route 134 and Theophilus F. Smith Road Route 134 and Market Place/Patriot Square Access Driveway Theophilus F. Smith Road and Enterprise Road Main Street at High Bank Road Old Bass River Road at Bob Crowell Road Old Bass River Road at Mayfair Road Route 134 and Route 6 Interchange (four-intersections) Route 134 at Airline Road Route 134 and Bob Crowell Road Route 134 and Upper County Road Route 134 and Main Street (Route 28) S. Gages Way at Great Western Road Great Western Road at Depot Street (Harwich) Depot Street at Depot Road (Harwich) The existing conditions evaluation consisted of an inventory of the traffic control; roadway, driveway, and intersection geometry in the study area; the collection of daily and peak period traffic volumes; and a review of recent vehicular crash history. 3 Existing Conditions

12 Roadway Geometry Roadways The major travel routes and intersections within the study area are described below. Figure 2 shows the observed existing geometry and traffic control at each study-area intersection. Route 134 Route 134 within the study area ranges from a two-lane to a four-lane roadway running generally in a north-south direction. Route 134 is under local jurisdiction with the exception of the section of roadway at the Route 6 interchange. The posted speed limit along Route 134 varies between 35 mph and 45 mph. Land use along Route 134 predominantly consists of commercial uses in the vicinity of the project site, with some residential uses north of the Route 6 interchange. Theophilus F. Smith Road Intersections Theophilus F. Smith Road (TFS Road) within the study area is a two-lane roadway running generally in an east-west direction. TFS Road is under local jurisdiction and provides two travel lanes with variable shoulder widths. The posted speed limit along TFS Road varies between 25 mph and 35 mph within the study area. Land use along TFS Road is a mix of retail, industrial and other commercial uses. The following sections describe the study-area intersections in detail. Theophilus F. Smith Road at S. Gages Way/Duck Pond Road Four-legged unsignalized intersection Intersection is under all-way STOP control All approaches provides a single general purpose lane Southbound leg provides access to the Transfer Station No sidewalks are provided at the intersection No crosswalks are provided at the intersection Land use in the area is primarily commercial and industrial 4 Existing Conditions

13

14 Theophilus F. Smith Road at Enterprise Road Three-legged unsignalized intersection Southbound approach provides a general purpose lane and is under STOP control Eastbound and Westbound approach provide a single general purpose lane No sidewalks are provided at the intersection No crosswalks are provided at the intersection Land use in the area is primarily retail, including Cranberry Square Plaza, Cumberland Farms, and Entertainment Cinemas Route 134 at Theophilus F. Smith Road Three-legged signalized intersection Northbound approach provides two general purpose lanes Southbound approach provides two general purpose lanes and an exclusive left-turn lane Westbound approach provides exclusive left and right-turn lanes A two-way left-turn lane is present just south of Theophilus F. Smith Road Sidewalk is provided along the east side of Route 134 A crosswalk is provided across Theophilus F. Smith Road Land use in the area is primarily retail, including two gas stations and the Mid-Cape Home Center Route 134 at Market Place/Patriot Square Access Four-legged signalized intersection Northbound and Southbound approaches provide an exclusive left-turn lane and two general purpose lanes Eastbound and Westbound approaches provide an exclusive left-turn lane, a through lane, and a channelized right-turn lane Sidewalk is provided along the east side of Route 134 A crosswalk is provided across Route 134 south of Market Place Land use in the area is primarily retail, including Patriot Square and Market Place shopping centers Main Street/Old Bass River Road at High Bank Road Four-legged unsignalized intersection Intersection is under all-way STOP control All approaches provides a single general purpose lane Sidewalk is provided along the east side of Old Bass River Road and Main Street A crosswalk is provided across the westbound approach Land use in the area is primarily residential 5 Existing Conditions

15 Old Bass River Road at Bob Crowell Road Three-legged unsignalized intersection Westbound approach is under STOP control All approaches provides a single general purpose lane Sidewalk is provided along the east side of Old Bass River Road A crosswalk is provided across the westbound approach Land use in the area consists of residential properties, the Johnny Kelley Recreation Area, the former site of the Dennis DPW, and a multi-unit public apartment building Old Bass River Road at Mayfair Road Three-legged unsignalized intersection Eastbound approach is under STOP control All approaches provides a single general purpose lane Sidewalk is provided along the east side of Old Bass River Road A crosswalk is provided across the eastbound approach Land use in the area consists of residential properties, a Masonic Lodge, and a multiunit public apartment building Route 134 at Route 6 Eastbound Ramps Full cloverleaf interchange Route 134 northbound provides two general purpose lanes Route 134 southbound provides a single lane general purpose lane Route 6 eastbound off ramp provides an exclusive lane to Route 134 southbound but is under YIELD control No sidewalks are provided at the intersection No crosswalks are provided at the intersection Land use in the area is a mix of commercial and residential Route 134 at Route 6 Westbound Ramps Full cloverleaf interchange Route 134 northbound provides a through lane and an exclusive right-turn lane Route 134 southbound provides a single lane general purpose lane No sidewalks are provided at the intersection No crosswalks are provided at the intersection Land use in the area is primarily residential 6 Existing Conditions

16 Route 134 at Bob Crowell Road Four-legged signalized intersection Northbound approach provides an exclusive left-turn lane and a general purpose lane Southbound approach provides an exclusive left-turn lane, a through lane, and a general purpose lane Eastbound approach provides a general purpose lane and a channelized right-turn lane Westbound approach provides a single general purpose lane Sidewalk is provided along the west side of Route 134 north of Bob Crowell Road No crosswalks are provided at the intersection Land use in the area includes retail, residential, and the police station Route 134 at Airline Road Three-legged unsignalized, Y-type intersection Westbound approach is under STOP control All approaches provides a single general purpose lane Sidewalk is provided along the west side of Route 134 No crosswalks are provided at the intersection Land use in the area consists of residential properties and the Doane Beal & Ames funeral home Route 134 at Upper County Road Five-legged signalized intersection Northbound and Southbound approaches provide an exclusive left-turn lane, two general purpose lanes, and a brief channelized right-turn lane Eastbound approach provides an exclusive left-turn lane and a general purpose lane Westbound approach provides a general purpose lane and an exclusive right-turn lane Duck Pond Road is the fifth leg and is one way traveling away from the intersection Sidewalk is provided along the north side of Upper County Road and the east side of Route 134. No crosswalks are provided at the intersection Land use in the area is primarily residential 7 Existing Conditions

17 Route 134 at Main Street (Route 28) Four-legged signalized intersection Northbound approach provides a single general purpose lane Southbound approach provides an exclusive left-turn lane and a general purpose lane Eastbound and Westbound approaches provide a general purpose lane and an exclusive left-turn lane Sidewalks and crosswalks are provided on all four approaches to the intersection Land use in the area includes retail, restaurant, and bank uses S. Gages Way at Great Western Road Three-legged unsignalized intersection Southbound approach is under STOP control All approaches provides a single general purpose lane The Cape Cod Rail Trail runs east/west along the north side of Great Western Road No crosswalks are provided at the immediate intersection, but a crossing of the Cape Cod Rail Trail is provided north of Great Western Road Land use in the area is primarily commercial/industrial Great Western Road at Depot Street Two offset, three-legged unsignalized intersections Northbound and Southbound approaches provide a single lane under STOP control Eastbound and westbound approaches provide an exclusive left-turn lane and a general purpose lane No sidewalks are provided at the intersection No crosswalks are provided at the intersection Land use in the area is primarily commercial/industrial Depot Street at Depot Road Three-legged unsignalized, Y-type intersection Northbound approach is under STOP control All approaches provides a single general purpose lane No sidewalks are provided at the intersection No crosswalks are provided at the intersection Land use in the area is primarily residential 8 Existing Conditions

18 Roadway Jurisdiction Roadways within the Town of Dennis are either under the jurisdiction of the Town of Dennis or MassDOT. Within the project study area, all roadways are under local jurisdiction with the exception of Route 6 and Route 28, and a section of Route 134 at the Route 6 interchange which are under MassDOT jurisdiction. Figure 3 illustrates the roadway jurisdiction designations within the study area. Traffic Volume Data Manual turning movement counts [collecting peak hour data] were conducted at each of the study-area intersections during the weekday evening peak period from 4:00 PM to 6:00 PM, and the Saturday midday peak period from 11:00 AM to 1:00 PM. It is during these two periods when the combination of site traffic and area background traffic are at their most critical level. These counts were conducted in August 2012, which represents peak summer conditions (except for the intersection of Depot Street at Depot Road, which was counted in September 2012). The weekday evening peak period is consistent with typical peak commuter traffic periods, and coincide with the expected peak periods for traffic entering and exiting the proposed site. The Saturday midday peak period is consistent with the typical peak of shopping/commercial activity and turn-over for summer rental properties. These periods represent the most critical traffic volume conditions. Based on the TMCs, the weekday evening peak period generally occurred from 4:00 to 5:00 PM and the Saturday midday peak period occurred from 11:00 AM to 12:00 PM. Concurrent with the TMCs, 72-hour automatic traffic recorder (ATR) counts were conducted on Route 134, Theophilus F. Smith Road, and Enterprise Road. A summary of the ATR traffic data is presented in Table 1. All traffic count data is contained in the Appendix. 9 Existing Conditions

19

20 Table 1 Peak Season Existing Traffic Volumes Weekday Weekday PM Peak Period Saturday Saturday Midday Peak Period ADT a Volume b K c Dir. Dist d ADT a Volume b K c Dir. Dist d Route 134 Northbound south of Route 6 Route 134 Southbound south of Route 6 Theophilus F. Smith Road east of Route 134 Enterprise Road north of Theophilus F Smith Rd. 16,900 1, % 100% NB 16,750 1, % 100% NB 17,220 1, % 100% SB 16,850 1, % 100% NB 10, % 57% WB 10,220 1, % 53% WB 5, % 53% SB 5, % 54% SB a b c d daily traffic expressed in vehicles per day. Based on daily volumes for Thursday August 23, 2012 and Saturday August 25, Exact peak hours of the ATRs may not coincide with the peak hour of the TMCs. peak period volumes expressed in vehicles per hour percent of daily traffic that occurs during the peak period directional distribution of peak period traffic Seasonality of Count Data Comparison of traffic count data with historic seasonal data available from the Cape Cod Traffic Counting Report 2012 indicated that August traffic counts represent peak summer season conditions. This report also shows that August counts are approximately 31.6 percent higher than the average annual month conditions and the September counts are approximately 8.7 percent higher than the average annual month conditions and approximately 17.4 percent below peak summer season conditions. As such, the average conditions capacity analysis contained in the Appendix was conducted using the CCC Seasonal Adjustment Factors, which is 0.76 to adjust August volumes and 0.92 to adjust September volumes to average month conditions. A factor of 1.21 was applied to the September volumes to adjust them to peak summer season conditions. Figures 4 and 5 illustrate the 2013 Existing weekday evening and Saturday midday peak hour traffic volumes, respectively. 10 Existing Conditions

21

22

23 Public Transportation Several transit services are currently provided on Cape Cod. The following information was provided by the Cape Cod Regional Transit Authority (CCRTA). The Proponent is exploring opportunities to bring public transportation to the site, which would be accommodated with a transit stop on site. Cape Cod Regional Transit Authority The Cape Cod Regional Transit Authority (CCRTA) oversees local bus service on Cape Cod. There are six, year-round, fixed-route services provided by CCRTA including The SeaLine, The Villager, and The H 2 OLine, Flex Route, Bourne Route, and Sandwich Route. All buses are wheelchair accessible and equipped with bicycle racks. All SeaLine, Villager, and H 2 OLine routes connect at the Plymouth & Brockton bus terminal in downtown Hyannis. CCRTA also offers demand response service through three separate lines; (1) ADA Paratransit Service is a door-to-door, shared-ride service for those eligible individuals who are unable to use the CCRTA fixed route services. It is a comparable service to the fixed route service schedule in that it operates during the same hours and travels within the ¾ of a mile of the fixed route service areas; (2) DART Service (Dial-a-Ride Transportation) is a daily general public service that is a door-to-door, ride by appointment, transportation service. This service is available to all Cape Cod residents for any purpose; and (3) Boston Hospital Transportation is a service that runs four days a week, by reservation, transportation service to 15 Boston area hospitals. The BHT has bus stops in Wellfleet, Eastham, Orleans, Harwich, the Barnstable Commuter Lot, and the Sagamore Commuter Lot. While six fixed-route services are provided by the CCRTA, only one of these fixed routes serves the Town of Dennis, which is the H 2 OLine. The H 2 OLine travels from the Hyannis Transportation Center to Stop & Shop in Orleans. One of the stops on this route is at Patriot Square, which is adjacent to the proposed Lowe s site. As part of the proposed project, the Proponent will work with the CCRTA to provide transit service to the site through a stop on the H 2 OLine. 11 Existing Conditions

24 Vehicular Crash History To identify potential vehicle crash trends in the study area, reported vehicular crash data for the study-area intersections and roadway links was obtained from MassDOT for the years 2008 through 2010, the most recent three-year history available. A summary of the MassDOT vehicle crash history and crash rates is presented in Table 2. This data is contained in the Appendix. The 2010 MassDOT average crash rates for signalized and unsignalized intersections for District 5 [the MassDOT district designation for Dennis] are 0.77 and 0.60, respectively. As shown in Table 2, eight intersections within the study area have a crash rate higher than the MassDOT District 5 average rate. Ten intersections in total have experienced three or more crashes per year over the past three years: Route 134 at Theophilus F. Smith Road Route 134 at Market Place/Patriot Square Route 134 at Route 6 Eastbound Ramps Route 134 at Route 6 Westbound Ramps Route 134 at Bob Crowell Road Route 134 at Airline Road Theophilus F. Smith Road at Enterprise Road/Cumberland Farms/Cranberry Sq. Route 134 at Upper County Road Route 134 at Main Street (Route 28) Route 134 at Center Street In accordance with RPP MPS TR1.3 for locations experiencing three or more crashes per year, The applicant shall be required to implement the needed safety improvements as determined by the Commission Discussion of proposed improvements is provided in Chapter 5, Mitigation. In addition to the standard intersection crash analysis, the CCC requested that a collision diagram be prepared for the weave section on Route 134 southbound between the Route 6 eastbound off ramp and the Patriot Square Driveway. The Town of Dennis Police Department assisted VHB by compiling vehicle crash data for this section of roadway from 2009 to March Based on this data, only four crashes were reported on this roadway segment, which is less than one crash per year. It should also be noted that only one of these crashes is potentially attributable to weaving maneuvers from the Route 6 eastbound off ramp to Patriot Square. The collision diagram and the crash reports provided by the Town of Dennis are provided in the Appendix. 12 Existing Conditions

25 Table 2 Vehicular Crash Data ( ) Route 134 at Theophilis Smith Road Route 134 at Patriot Square/ Market Place Route 134 at Route 6 EB Ramps Route 134 at Route 6 WB Ramps Route 134 at Route 6 Interchange (not located) Route 134 at Bob Crowell Road/ Hemlock Lane Route 134 at Airline Road Theophilus F. Smith Road at Enterprise Road/ Cumberland Farms/ Condo Driveway Signalized? Yes Yes No No -- Yes No No No No No No No No Yes No Yes No MassDOT Average Crash Rate Calculated Crash Rate Exceeds Average? No Yes No No -- Yes Yes Yes No No No No No No Yes No Yes No Year Total Average Collision Type Angle Head-on Rear-end Rear-to-rear Sideswipe, opposite direction Sideswipe, same direction Single-vehicle crash Unknown Not reported Total Crash Severity Fatal injury Non-fatal injury Property damage only (none injured) Unknown Not reported Total Time of day Weekday, 7:00 AM - 9:00 AM Weekday, 4:00 PM - 6:00 PM Saturday, 11:00 AM - 2:00 PM Weekday, other time Weekend, other time Total Pavement Conditions Dry Wet Snow Sand, mud, dirt, oil, gravel Not reported Total Non Motorist (Bike, Pedestrian) Source: MassDOT vehicle crash data. Theophilus F. Smith Road at Gages Way Old Bass River Road at Mayfair Road Old Bass River Road at Bob Crowell Road Great Western Road at Depot Street (East) Great Western Road at Depot Street (West) Great Western Road at Gages Way Route 134 at Upper County Road/ Duck Pond Road Main Street at Highbank Road/ Upper County Road Route 134 at Main Street/ Swan River Road Depot Street at Depot Road 13 Existing Conditions

26 Table 2 Vehicular Crash Data ( ) continued Theophilus F. Smith Road Route 134 S. Gages Way Great Western Road Depot Street Bob Crowell Road Old Bass River Road Route 134 at Route 134 to Site Drive W Site Drive W to Site Drive E Site Drive E to Truck Site Drive Truck Site Drive to S. Gages Way Theophilus F. Smith Road to Upper County Road Upper County Road to Route 28 Theophilus F. Smith Road to Patriot Square Access Road Patriot Square Access Road to Route 6 EB Ramps Route 6 EB Ramps to Route 6 WB Ramps Route 6 WB Ramps to Bob Crowell Road Bob Crowell Road to Airline Road Theophilus F. Smith Road to Great Western Road S. Gages Way to Depot Street Great Western Road to Depot Road Route 134 to Old Bass River Road Bob Crowell Road to Mayfair Road Center Street Year Total Average Collision Type Angle Head-on Rear-end Rear-to-rear Sideswipe, opposite direction Sideswipe, same direction Single-vehicle crash Unknown Not Reported Total Severity Fatality injury Non-fatal injury Property-damage only (none injured) Unknown Not Reported Total Time of day Weekday, 7:00 AM - 9:00 AM Weekday, 4:00 PM - 6:00 PM Saturday, 11:00 AM - 2:00 PM Weekday, other time Weekend, other time Total Pavement Conditions Dry Wet Snow Sand, mud, dirt, oil, gravel Not Reported Total Non Motorist (Bike, Pedestrian) Source: MassDOT vehicle crash data 14 Existing Conditions

27 As shown in the second page of Table 2, which focuses on the crash history of the study area roadway links, there are three links that experienced over three crashes per year over their entire length during the most recent three years. Route 134 between Patriot Square and TFS Road experienced a total of 15 crashes from 2008 to Of these 15 crashes, the majority of them were spread out over the length of this link, with the exception of a group of 8 crashes that were reported at the access points for the Gulf Station and Cumberland Farms. It should be noted that as part of the Cumberland Farms redevelopment project, improvements are being proposed to the site access on Route 134. The two existing wide curb cuts will be consolidated to one driveway and left turns will be prohibited from the site onto Route 134. These access improvements will improve safety in this area. Route 134 between TFS Road and Upper County Road experienced a total of 15 crashes over the three year review period. Review of the geolocation of these crashes based on the MassDOT crash records showed that there is no concentration of crashes at any single point on this roadway link that experiences more than three crashes per year. Route 134 between Upper County Road and Route 28 experienced a total of 36 crashes over the three year review period. Review of the geolocation of these crashes based on the MassDOT crash records showed that 15 of the crashes occurred at the intersection of Rotue 134 and Center Street. The remaining crashes were spread across the roadway link in low concentrations. Based on the crash frequency, VHB provided a detailed summary of the crashes at the intersection of Route 134 at Center Street in the second page of Table 2. The crash summary for this intersection shows that 10 of the 15 crashes were angle and rear end crashes, suggesting that vehicles are attempting to accept short gaps in mainline traffic when turning from the side street. Given that both of the minor street approaches to this intersection are skewed, sight distance can be compromised. Measures recommended to improve this condition are summarized in Chapter 5, Mitigation. 15 Existing Conditions

28 3 Future Conditions Traffic volumes in the study area were projected to the year 2018, reflecting a typical five-year traffic-planning horizon. Independent of the project, volumes on the roadway network under year 2018 No Build conditions were assumed to include existing traffic and new traffic resulting from background traffic. Anticipated sitegenerated traffic volumes were added to the year 2018 No Build traffic volumes to reflect the year 2018 Build conditions in the study area. Background Traffic Growth Historic Traffic Growth Traffic growth on area roadways is a function of the expected land development, economic activity, and changes in demographics. A frequently used procedure is to estimate an annual percentage increase and apply that increase to study-area traffic volumes. An alternative procedure is to identify estimated traffic generated by specific planned major developments that would be expected to affect the project study area roadways. For the purpose of this assessment, both methods were utilized. VHB conducted research to determine the historic growth rate for traffic in this area as well as other planned developments that may affect traffic within the study area for the proposed project. Based on information contained in the Cape Cod 2012 Traffic Counting Report, traffic has decreased at a rate of percent per year Capewide over the last ten years ( ). As described in this report, the Town of Dennis is considered to be part of the Mid Cape region, in which traffic decreased at a rate of percent per year between 2002 and To provide a conservative analysis, and based on discussions with the CCC Transportation Staff, a background growth rate of 0.5 percent per year was applied. The historic growth data provided in the Cape Cod 2012 Traffic Counting Report is contained in the Appendix. 16 Future Conditions

29 Site-Specific Growth In addition to the historic traffic growth, VHB contacted representatives of the CCC and the Town of Dennis to identify any other development projects planned within the vicinity of the site. Based on these discussions, there is currently one development project proposed in this area that would affect traffic volumes in the vicinity of the site. Just to the west of the proposed project, Cumberland Farms is planning to reconfigure their existing gas station/retail site. The project involves the demolition of the existing gas pumps and retail space and the construction of a new 4,221 sf Cumberland Farms convenience store, eight gas pumps, 2,001 sf of retail space, and a 2,970 sf drive-thru bank. Traffic volumes associated with the proposed redevelopment were taken from the October 2012 Traffic Impact Study prepared for the project by McMahon Associates. This project is currently under construction. As noted previously, the existing seasonal uses on the site (Dick & Ellie s Flea Market and The Inflatable Park) will be eliminated as part of the proposed redevelopment. As is discussed in detail the Trip Generation section of this chapter, trip generation credit will be taken for a portion of the traffic generated by the existing uses since traffic associated with these uses will be eliminated from this area. However, to provide a conservative assessment of traffic in the vicinity of the site, the remainder of the peak season traffic generated by the existing uses will not be removed from the roadway system. No-Build Traffic Volumes The 2018 No Build traffic volumes were developed by applying the 0.5 percent per year growth rate to the existing conditions volumes and adding the project traffic associated with the proposed Cumberland Farms redevelopment project. Figures 6 and 7 display the resulting 2018 No Build peak hour traffic volumes. Future Roadway Conditions Another factor affecting background traffic conditions is the implementation of roadway improvements within the study area. Three roadway improvement projects have been identified by the Town of Dennis and MassDOT. The following text was obtained from the MassDOT Project Information website and provides a summary of project details and anticipated schedule: RECONSTRUCTION ON ROUTE 134 FROM ROUTE 28 TO UPPER COUNTY ROAD Work on this project includes milling, resurfacing and full depth roadway reconstruction of Route 134 from Route 28 to Upper County Road. The proposed 17 Future Conditions

30

31

32 cross section will provide two 11-foot travel lanes and two 5-foot shoulders/bike lanes, and a 5 foot ADA/AAB compliant walk on the east side of Route 134. Additional proposed work includes traffic signal upgrades at the Upper County Road intersection, pedestrian accommodations, drainage improvements, guard rail upgrades, pavement markings and signage installation. Construction began following the summer of Future Conditions

33 BRIDGE REPLACEMENTS - UPPER COUNTY ROAD & ROUTE 28 OVER SWAN POND RIVER The bridge carrying Upper County Road over the Swan Pond River is to be replaced with a three-span continuous superstructure. The existing Main Street Bridge over Swan Pond River is to be replaced with a three-span continuous superstructure system. The curb-to-curb width of the bridge shall be 40 feet, with a 6 foot sidewalk on both sides. During construction, traffic will be shifted to a temporary bridge that will be built to the south of the existing bridge. Construction began following the summer of DENNIS/YARMOUTH - CAPE COD RAIL TRAIL EXTENSION FROM ROUTE 134 TO STATION AVENUE Work on this project consists of the construction of a 5.2 mile multi-user path. The path is an extension of the Cape Cod Rail Trail. The proposed path begins east of Route 134 in Dennis and extends to the Yarmouth/Barnstable Town Line. Construction is expected to begin in the winter of 2013/2014. No other roadway improvement projects were identified within the vicinity of the Project site other than routine maintenance. Trip Generation The proposed redevelopment would involve the construction of an approximately 135,018 sf Lowes Home Improvement Center with 371 parking spaces. For trip generation purposes, additional outdoor sales and storage area were added to the building area to provide a conservative assessment. The total square footage (135,018 sf) is comprised of 127,683 sf of building area and garden center, 3,420 sf of outdoor sales area, and 3,915 sf of outdoor storage on the back of the building. To estimate the site-generated traffic, the Institute of Transportation Engineers (ITE) publication Trip Generation, 9 th Edition was utilized. For the purposes of this evaluation, trip generation estimates were conducted using standard ITE data for Land Use Code (LUC) 862 (Home Improvement Superstore). Table 3 summarizes the estimated vehicle trips for the future retail use of the property. Under existing conditions, the site is occupied during the summer and shoulder months by Dick & Ellie s Flea Market and the Inflatable Park. With the proposed project in place, both uses will be removed from the site and therefore the traffic from these uses will be eliminated. For the purpose of this analysis, an annualized credit for the elimination of the existing uses is allowed under the RPP MPS TRO.2 at the discretion of the Commission. Based on detailed discussion with CCC staff prior to preparation of this document, the traffic credit was calculated on an annual basis since the existing uses are seasonal. This approach to adjusting the existing volumes was suggested to VHB by Commission staff at a meeting and included the following: 19 Future Conditions

34 Adjust existing driveway counts from August to an average condition for the months the businesses are open. Use an average of the CCC Seasonal Adjustment Factors for the months of May, June, July, August, September, and October. Annualize the existing site traffic by dividing the number of operating days (101) by 365, which yields a factor of to assess an annual average condition. Estimate weekday daily and Saturday daily traffic volumes based on K-factors available for comparable retail and recreational uses available in ITE Trip Generation, 9 th Edition. To provide a conservative assessment, the highest K- factors available for the comparable land uses were utilized. It should also be noted that according to Technical Bulletin , a 25% reduction of peak hour trip generation is allowed for the purposes of analyzing peak hour impacts. As such, the trip generation projections summarized in Table 3 assume the full 25 percent credit. The trip generation calculations, prepared in accordance with ITE guidelines and Technical Bulletin , are summarized in Table 3. The detailed Trip Generation calculations are provided in the Appendix. Table 3 Proposed Project Trip Generation Breakdown Gross Total Existing Trip 5% Credit for 25% Trip Net Total Pass-By Net New Time Period Direction Trip Generation a Generation b Interconnection c Reduction d Trips Trips e Trips Weekday Daily Enter 2, , ,052 Exit 2, , ,052 Total 4, , ,104 Weekday Morning Enter Peak Hour Exit Total Weekday Evening Enter Peak Hour Exit Total Saturday Daily Enter 3, , ,956 Exit 3, , ,956 Total 7, ,740 5,216 1,304 3,912 Saturday Midday Enter Peak Hour Exit Total a Trip Generation estimate based on ITE LUC 862 (Home Improvement Superstore) for 135,018 SF store using Peak Hour of Generator b Based on traffic counts conducted at the existing site driveway in August 2012, adjusted according to CCC recommended methodology c Project will allow an interconnection to the adjacent Cranberry Square site d In accordance with RPP Goal TR2 and Technical Bulletin e Pass-by Traffic assumed to be 25% per state and CCC guidelines 20 Future Conditions

35 Consistent with EOEEA and CCC guidelines, a pass-by rate of 25 percent was utilized to determine the amount of new traffic that will be generated by the Project. As shown in Table 3, the proposed project is expected to result in a total of 2,104 net new trips (1,052 entering/1,052 exiting) on a typical weekday and 3,912 net new trips (1,956 entering/1,956 exiting) on a typical Saturday. The proposed project is expected to result in a total 215 net new vehicle trips (117 entering/98 exiting) during the weekday evening peak hour and 301 net new vehicle trips (157 entering/144 exiting) during the Saturday midday peak hour. Trip Distribution and Assignment The directional distribution of traffic approaching and departing the Project is a function of several variables: population densities, shopping opportunities, competing uses, existing travel patterns, and the efficiency of the roadways leading to the site. The trip distribution for the Project was developed based on a population-based gravity model utilizing the 2010 U.S. Census data for all Cape communities. Based on the distribution of population within the projected market trade area, arrival and departure patterns for project-related traffic were estimated and adjusted, if appropriate, based on known local factors such as locations of competing opportunities and efficiency of local roadways. The assignment of sitegenerated traffic to specific travel routes was based on observed traffic flow conditions on available routes, and the assumption that most motorists will seek the fastest and most direct routes to and from the Site. The traffic distribution proposed has been reviewed in detail with CCC staff prior to this filing as requested by the Town of Dennis. Refer to the Appendix for the trip distribution calculations as well as a map illustrating the distribution of the peak hour project trips. The anticipated trip distribution is summarized in Table 4 and illustrated in Figure 8. Table 4 Proposed Project Trip Distribution Direction (To/From) Travel Route Percent Assigned to Route North Route % South Route % East S. Gages Way 20% Total All Routes 100% The projected site-generated traffic volume, summarized in Table 3, was distributed on the study area roadways using the trip distribution shown in Table 4 and added to the 2018 No Build peak hour traffic volumes to develop the 2018 Build peak hour traffic volumes. These 2018 Build traffic volumes are shown in Figures 9 and Future Conditions

36

37

38

39 4 Traffic Operations Analysis Measuring existing traffic volumes and projecting future traffic volumes quantifies traffic within the study area. To assess quality of flow, roadway capacity analyses were conducted with respect to the 2013 Existing conditions and projected 2018 No Build and Build traffic volume conditions. Capacity analyses provide an indication of the adequacy of the roadway facilities to serve the anticipated traffic demands. In accordance with CCC guidelines, capacity analyses were conducted for both Peak Summer Season and Average Month traffic conditions. The analysis summary tables provided in this chapter contain the results of the Peak Summer Season analyses. All Average Month capacity analyses are contained in the Appendix with corresponding summary tables. Level-of-Service and Delay Criteria Level-of-service (LOS) is the term used to denote the different operating conditions that occur on a given roadway segment under various traffic volume loads. It is a qualitative measure of the effect of a number of factors including roadway geometrics, speed, travel delay, freedom to maneuver, and safety. Level-of-service provides an index to the operational qualities of a roadway segment or an intersection. Level-of-service designations range from A to F, with LOS A representing the best operating conditions and LOS F representing the worst operating conditions. 22 Traffic Operations Analysis

40 For this study, capacity analyses were completed for the signalized and unsignalized study area intersections and roadway links. Level-of-service (LOS) designation is reported differently for signalized, unsignalized, and roadway links. For signalized intersections, the analysis considers the operation of each lane or lane group entering the intersection and assigns a LOS designation to each. Overall intersection data is then calculated in order to represent the overall conditions at the intersection. For unsignalized intersections, however, the analysis assumes that traffic on the mainline is not affected by traffic on the side streets. The LOS is determined primarily for left turns from the main street and all movements from the minor street. The study of an unsignalized intersection is, for the most part, done by observing the most critical movement, which is most often the left turn out of the side street. For roadway links, the roadway geometrics determine the link capacity and the link traffic volume-tocapacity ratio is used to assess level-of-service. The evaluation criteria used to analyze area intersections and roadway links is based on the 2000 Highway Capacity Manual (HCM) 1 and are included in the Appendix. Level-of-Service Analysis Signalized Intersection Capacity Analyses Levels-of-service analyses were conducted for the 2013 Existing, 2018 No Build, and 2018 Build conditions for the signalized and unsignalized study-area intersections. Table 5 presents a summary of the capacity analyses for the signalized intersections in the study area. The capacity analyses worksheets are included in the Appendix. 1 Highway Capacity Manual, HCM2000, Transportation Research Board, Washington, DC. (2000) 23 Traffic Operations Analysis

41 Table 5 Signalized Intersection Capacity Analysis Summary Peak Summer Season 2013 Existing Conditions 2018 No-Build Conditions 2018 Build Conditions Location Period v/c a Delay b LOS c v/c Delay LOS v/c Delay LOS Route 134 at Theophilus F Smith Weekday Evening C C E Road Saturday Midday C C F Route 134 at Market Place/Patriot Weekday Evening C C C Square Saturday Midday C C C Route 134 at Bob Crowell Road Weekday Evening A A A Saturday Midday A A A Route 134 at Upper County Road Weekday Evening C D D Saturday Midday C E E Route 134 at Main Street Weekday Evening D D D (Route 28) Saturday Midday D D D Theophilus F. Smith Road at Weekday Evening NA NA NA NA NA NA B Enterprise Road/Site Driveway Saturday Midday NA NA NA NA NA NA C a b c NA volume to capacity ratio average delay in seconds per vehicle level of service Not applicable. This intersection is unsignalized under Existing and No Build conditions As shown in Table 5, the intersection of Route 134 at Theophilus F. Smith Road, currently operates at LOS C during both the weekday evening and Saturday midday peak hours. Operations are expected to remain at LOS C under 2018 No-Build conditions. Under 2018 Build conditions, the intersection of Route 134 at Theophilus F. Smith Road is expected to operate at LOS E during the weekday evening peak hour and LOS F during the Saturday midday peak hour with the addition of Projectrelated traffic. Specific mitigation measures are proposed for this intersection and are discussed in the next chapter. The intersection of Route 134 at Market Place/Patriot Square currently operates at LOS C during both the weekday evening and Saturday midday peak hours. These intersections are expected to continue to operate at LOS C under both 2018 No-Build and 2018 Build conditions. The intersection of Route 134 at Bob Crowell Road currently operates at LOS A during both the weekday evening and Saturday midday peak hours. This intersection is expected to operate at LOS A during the weekday evening peak hour and LOS B during the Saturday midday peak hour under 2018 Build conditions, with the addition of Project-related traffic. 24 Traffic Operations Analysis

42 The intersection of Route 134 at Upper County Road currently operates at LOS C during both the weekday evening and Saturday midday peak hours. This intersection is planned to be modified as part of the aforementioned roadway project along Route 134 between Route 28 and Upper County Road. With the modifications at this intersection, it is expected to operate at LOS D during the weekday evening peak hour and LOS E during the Saturday midday peak hour under both 2018 No Build and Build conditions. The intersection of Route 134 at Main Street currently operates at LOS D during both the weekday evening and Saturday midday peak hours. It is expected to continue to operate at LOS D during the peak hours under 2018 No Build conditions. With the addition of Project-related traffic, the intersection is expected to continue to operate at LOS D during the weekday evening peak hour and is expected to operate at LOS E during the Saturday midday peak hour. Specific mitigation measures are proposed for this intersection and are discussed in the next chapter. Detailed tables with operations and vehicle queues summarized by movement are provided in the Appendix. Discussion of proposed improvements at these locations are contained in Chapter 5 Mitigation. Unsignalized Intersection Capacity Analyses The analytical methodologies typically used for the analysis of unsignalized intersections use conservative analysis parameters, such as high critical gaps 2. Actual field observations indicate that drivers on minor streets generally accept smaller gaps in traffic than those used in the analysis procedures and therefore experience less delay than reported by the analysis software. Consequently, the analysis results tend to overstate the actual delays experienced in the field. For this reason, the results of the unsignalized intersection analyses should be considered highly conservative. Table 6 presents a summary of the capacity analyses for the unsignalized intersections in the study area. The capacity analyses worksheets are included in the Appendix. 2 critical gap is defined as the minimum time, in seconds, between successive major-stream vehicles, in which a minor-street vehicle can make a maneuver 25 Traffic Operations Analysis

43 Table 6 Unsignalized Intersection Capacity Analyses - Peak Summer Season Side Street Peak 2013 Existing Conditions 2018 No-Build Conditions 2018 Build Conditions Location Movement Period Dem a v/c b Del c LOS d Dem v/c Del LOS Dem v/c Del LOS Theophilus F. Smith Road at NB LTR Weekday Evening B B B Duck Pond Rd/S. Gages Way NB LTR Saturday Midday > 50 F > 50 F > 50 F Theophilus F. Smith Road at SB LR Weekday Evening > 50 F > 50 F NA NA NA NA Enterprise Road SB LR Saturday Midday > 50 F > 50 F NA NA NA NA Theophilus F. Smith Road at NB LR Weekday Evening C C B East Site Driveway(right NB LR Saturday Midday D E B in/right-out) Theophilus F. Smith Road at NB LR Weekday Evening NA NA NA NA NA NA NA NA B Truck Driveway NB LR Saturday Midday NA NA NA NA NA NA NA NA C Main Street at Highbank Rd. EB LTR Weekday Evening > 50 F > 50 F > 50 F EB LTR Saturday Midday E > 50 F > 50 F Old Bass River Road at WB LTR Weekday Evening E E > 50 F Bob Crowell Road WB LTR Saturday Midday E F > 50 F Old Bass River Road at EB LTR Weekday Evening C C C Mayfair Road EB LTR Saturday Midday C C C Route 134 at Route 6 EB R Weekday Evening > 50 F > 50 F > 50 F Eastbound Off Ramp EB R Saturday Midday > 50 F > 50 F > 50 F Route 134 at Route 6 EB R Weekday Evening C C D Westbound Off Ramp WB R Saturday Midday C C D Route 134 at Airline Road WB LR Weekday Evening > 50 F > 50 F > 50 F WB LR Saturday Midday > 50 F > 50 F > 50 F S. Gages Way at Great SB LR Weekday Evening D E E Western Road SB LR Saturday Midday > 50 F > 50 F > 50 F Great Western Road at NB LR Weekday Evening > 50 F > 50 F > 50 F Depot Street (West) NB LR Saturday Midday > 50 F > 50 F > 50 F Great Western Road at SB LR Weekday Evening C C D Depot Street (East) SB LR Saturday Midday D D E Depot Street at Depot Road WB LR Weekday Evening B B B WB LR Saturday Midday A A A a b c d NA LTR L R demand in vehicles per hour for unsignalized intersections; the demand applies to only the most critical street approach or lane group volume-to-capacity ratio for the critical movement delay of critical approach only, rounded to the nearest whole second level of service of the critical movement Driveway does not exist under this scenario shared left, through, right left right As shown in the Table 6, the critical movements at the intersections of T.F. Smith Road at S. Gages Way, T.F. Smith Road at Enterprise Road, Main Street at Highbank Road, Route 134 at the Route 6 EB Off-Ramp, Route 134 at Airline Road, Great Western Road at S. Gages Way, and Great Western Road at Depot Street (West) 26 Traffic Operations Analysis

44 currently operate at LOS F during one or both of the peak analysis periods. These movements are expected to continue to operate at LOS F under the 2018 No Build and 2018 Build conditions scenarios. The intersection of Old Bass River Road at Bob Crowell Road currently operates at LOS E during both the weekday evening and Saturday midday peak hours and is expected to continue to operate at LOS E under 2018 No Build conditions. This intersection is expected to operate at LOS F during both peak hours under 2018 Build conditions with the addition of Project-related traffic. As mentioned above, the results of the unsignalized intersection analysis should be considered highly conservative. Roadway Link Capacity Analysis Capacity analyses were conducted for the eight roadway links identified in the study area using HCS Two-Lane Highways and HCS Multi-Lane Highways. Capacity analyses were conducted for 2013 Existing conditions and the 2018 No-Build and Build conditions. The results of the peak month conditions are shown in Table 7. Table 7 Roadway Link Analysis Summary Peak Summer Season 2013 Existing Conditions 2018 No Build Conditions 2018 Build Conditions Roadway Link Period Density LOS* Density LOS Density LOS Route 134 between: Multilane Analysis Route 6 Eastbound Ramps and Market Place/ Patriot Square Northbound Weekday Evening 16.3 B 16.9 B 17.5 B Saturday Midday 16.2 B 16.8 B 17.6 B Southbound Weekday Evening 16.2 B 16.8 B 17.5 B Saturday Midday 15.5 B 16.0 B 17.0 B Market Place/Patriot Square and Theophilus F. Smith Road Northbound Weekday Evening 14.4 B 14.9 B 15.5 B Saturday Midday 14.6 B 15.1 B 16.0 B Southbound Weekday Evening 14.1 B 14.6 B 15.3 B Saturday Midday 14.7 B 15.2 B 16.1 B Theophilus F. Smith Road and Upper County Road Northbound Weekday Evening 12.5 B 13.0 B 13.4 B Saturday Midday 12.7 B 13.1 B 13.6 B Southbound Weekday Evening 13.0 B 13.5 B 13.9 B Saturday Midday 13.9 B 14.3 B 14.8 B 27 Traffic Operations Analysis

45 Table 7 (Continued) 2013 Existing Conditions 2018 No Build Conditions 2018 Build Conditions Roadway Link Period V/C ** LOS V/C LOS V/C LOS Two Lane Analysis Route 134 between: Upper County Road and Main Street (Route 28) Weekday Evening 0.36 C 0.37 C 0.38 C Saturday Midday 0.46 D 0.48 D 0.49 D Route 6 Westbound Ramps and Bob Crowell Road Weekday Evening 0.62 D 0.65 D 0.66 D Saturday Midday 0.75 E 0.78 E 0.80 E Bob Crowell Road and Airline Road Weekday Evening 0.51 D 0.52 D 0.53 D Saturday Midday 0.57 D 0.59 D 0.60 D Route 6 EB Ramps and Route 6 WB Ramps Weekday Evening 0.53 D 0.56 D 0.58 D Saturday Midday 0.62 D 0.64 D 0.67 D Bob Crowell Road between: Route 134 and Old Bass River Road Weekday Evening 0.19 B 0.19 B 0.20 B Saturday Midday 0.21 B 0.22 B 0.23 B Old Bass River Road between: Bob Crowell Road and Mayfair Road Weekday Evening 0.33 C 0.34 C 0.35 C Saturday Midday 0.35 C 0.36 C 0.37 C Bob Crowell Road and Highbank Road Weekday Evening 0.25 B 0.25 B 0.26 B Saturday Midday 0.27 B 0.28 B 0.29 C Highbank Road between: Main Street and Route 134 Weekday Evening 0.40 C 0.41 C 0.42 C Saturday Midday 0.35 C 0.36 C 0.36 C Great Western Road between: Upper County Road and S. Gages Way Weekday Evening 0.17 A 0.18 A 0.18 A Saturday Midday 0.19 B 0.20 B 0.20 B S. Gages Way and Depot Street Weekday Evening 0.34 C 0.35 C 0.36 C Saturday Midday 0.38 C 0.39 C 0.41 C Depot Street between: Great Western Road and Depot Road Weekday Evening 0.19 B 0.19 B 0.20 B Saturday Midday 0.21 B 0.22 B 0.22 B Upper County Road Between: Route 134 and Great Western Road Weekday Evening 0.44 D 0.45 D 0.46 D Saturday Midday 0.49 D 0.50 D 0.51 D Theophilus F. Smith Road Between: Truck Driveway and S. Gages Way Weekday Evening 0.22 B 0.23 B 0.24 B Saturday Midday 0.35 C 0.37 C 0.39 C S. Gages Way Between: Theophilus F. Smith Road and Great Western Road Weekday Evening 0.22 B 0.23 B 0.24 B Saturday Midday 0.29 C 0.30 C 0.32 C * LOS -- Level-of-Service. ** V/C= Volume to Capacity Ratio As shown in Table 7, all roadway links within the study area currently operate at LOS D or better during the peak hours. Under future 2018 No Build and Build conditions, the roadway links are expected to operate at LOS D or better. There are 28 Traffic Operations Analysis

46 no changes in LOS between No Build and Build conditions. The roadway link analyses worksheets are included in the Appendix. Freeway Weave Analyses The analyses of weaving conditions along freeways facilities is based on procedures presented in Chapter 24 Freeway Weaving Methodology, in the HCM. The procedure focuses on the interaction between two or more crossing traffic streams traveling in the same direction. A common weaving segment is formed by a onelane freeway on-ramp followed by a one-lane freeway off-ramp, with the two connected by an auxiliary lane. The analysis takes into account geometric and operational factors such as the length of the weaving section; free-flow vehicle speed along the freeway facility; and the number of vehicles in the weaving lanes. The focus of the analysis is within the weaving segment itself, where vehicles must attempt to find gaps and also accelerate or decelerate as they traverse the weaving segment. Table 8 Level of Service Criteria for Weave Areas shows the Level-of-Service criteria for weaving segments. Table 8 Level-of Service Criteria for Weave Areas Vehicle Density a Level of Service Freeway Weaving Segment Multilane and Collector- Distributor Weaving Segments A <10 <12 B >10 20 >12 24 C >20 28 >24 32 D >28 35 >32 36 E >35 43 >36 40 F >43 >40 Source: Highway Capacity Manual, Transportation Research Board, National Research Council, Washington, D.C., a Passenger cars per mile per lane. (pc/mi/ln) Based on concerns raised by the Town of Dennis and the Cape Cod Commission, weave analyses were conducted for the existing weave along Route 134 southbound between the Route 6 eastbound off-ramp and Theophilus F. Smith Road for 2013 Existing, 2018 No Build, and 2018 Build conditions. A summary of the weave analysis is presented in Table 9 - Weave Segment Capacity Analysis Summary, with the detailed analysis sheets provided in the Operational Analyses section of the Appendix. 29 Traffic Operations Analysis

47 Table 9 Ramp Weave Section Capacity Analysis Summary 2013 Existing Conditions 2018 No Build Conditions 2018 Build Conditions Location/Period Demand Density LOS Demand Density LOS Demand Density LOS Route 6 EB Off Ramp to SB Left Turn Lane at Theophilus F. Smith Road Weekday Evening 1, C 1, C 1, C Saturday Midday 1, C 1, C 1, C Demand Density LOS total volume in the weaving section in passenger cars per mile per lane Level of Service As shown in Table 9, the weave segment currently operates at LOS C during both the weekday evening and Saturday midday peak hours under 2013 Existing conditions. It is expected to continue to operate at LOS C under future No Build and Build conditions. 30 Traffic Operations Analysis

48 5 Mitigation The preceding analysis of the 2013 Existing conditions and projected future traffic demands in the 2018 No Build and Build conditions indicate that traffic volumes during the peak-hour periods show some minor impact at select study area intersections. The proponent has proposed a combination of structural and nonstructural mitigation measures to address the potential impacts of the proposed project. The proposed measures are identified below. Transportation Demand Management The goal of the TDM plan is to reduce the project s overall traffic impact through the implementation of measures that are aimed at minimizing the use of singleoccupancy vehicles. The Proponent will implement a number of measures that will contribute toward the reduction of vehicular traffic to and from the site. The following text describes in detail, the project s Transportation Demand Management program. Ridesharing The Proponent will promote ridesharing to its employees via car pools. Information regarding carpooling and its benefits will be distributed to all employees, interested carpooler names will be posted in the employee area, and a notice of interested carpoolers will be listed in the facility newsletter. Additionally, a guaranteed ride home program, in the case of an emergency for registered ride-sharers, will be provided via a local taxi service. Preferential parking spaces will be designated for employees that rideshare. Financial incentives will be established to encourage employees to rideshare. The on-site transportation coordinator will continue to ensure that the ridesharing program is consistently promoted and provided. 31 Mitigation

49 Public Transit To encourage the use of transit by employees to the Lowe s site, transit schedule and route information will be provided in the employee areas. In addition, the Proponent is working with the CCRTA to provide bus service to the site. To accommodate this bus service, the Proponent would provide a bus shelter on site at a location jointly determined to be appropriate by the Proponent and the CCRTA. As stated in Technical Bulletin , The trip reduction program should include securing (or maintaining) a bus stop and/or shelter at the location and employee/customer use incentives such as discount passes, posted schedules, etc. The credit for developments with adjacent year round service is 5% and with seasonal only service (running a minimum of eight weeks including July and August), 2.5% of the average daily traffic. The Proponent will work with the CCRTA to establish a permanent stop on the H 2 O Line, which is a year round service allowing the project a 5% traffic credit. Bicycle and Pedestrian Measures Bicycling and walking to the project site may be attractive to some employees and local residents who live nearby especially with the Cape Cod Rail Trail adjacent to the site. To facilitate bicycle access to the site, secure bicycle storage racks will be provided near building entrances. To encourage pedestrian activity to the site, an area for taxi pick-up will be designated for patrons who walk to the stores, but wish to take a taxi home. Information on local taxi services, including telephone numbers will be available at the customer service desk. Sidewalk and crosswalks improvements will also be implemented on site and on TFS Road along the entire site frontage and extending to Route 134. On-site Services Employees make mid-day trips during their breaks and at lunchtime to conduct personal business. On-site services could reduce the need for employees to leave the site to conduct errands during the day. The following on-site services will be provided on-site to decrease employee mid-day trip-making: Employee refrigerators Employee microwaves Vending machines Direct deposit of paychecks As currently proposed, the Trip Reduction Plan will cost approximately $15,000 the first year and an additional $5,000 to maintain during subsequent years. The full cost of this Plan will be assumed by the Proponent. As currently proposed, this Trip Reduction Plan includes amenities that would result in employee and patron trip reductions beyond the 5% credit outlined in the Technical Bulletin for a permanent bus stop on site. However, to provide a conservative assessment, it is assumed that 32 Mitigation

50 the Trip Reduction Plan will reduce equivalent average annual daily trips by 5% (187 trips), which falls short of the trip reduction goal by approximately 280 vehicles per day. By providing the transit stop on-site alone, a 5% credit is available based on the RPP Technical Bulletin so with that and all of the other TDM measures proposed, application of only a 5% credit is a very conservative approach. As stated in RPP MPS TR0.4, For DRIs located within Economic Centers, the applicant may choose to meet certain trip-reduction and congestion standards of the RPP as identified in this MPS by making a payment of funds based on the DRI s daily or peak hour trip generation. The applicant may elect to pay either $500 per daily trip or $5,000 per peak hour trip as determined by MPS TR0.1 to mitigate all trip reduction and congestion impacts (the transportation mitigation payment). Utilizing this strategy, the monetary contribution to account for the shortfall in the 12.5% Trip Reduction Requirement is summarized in Table 10. Table 10 Trip Reduction Requirement Calculation Daily Trip Generation* 12.5% Reduction Requirement 5% TDM Credit Shortfall (Assuming 5% TDM Success) Monetary Contribution 3, $140,000 * Based on trip generation projections summarized in Table 3. Please refer to the Appendix for the detailed trip generation calculations. vpd = vehicles per day As shown in Table 10, the monetary contribution in accordance with MPS TR0.4 is $140,000 to offset the shortfall in the trip reduction requirement. Intersection/Roadway Safety Mitigation It is recognized that operations of the intersection of will degrade slightly between the No-Build and Build conditions at certain study area locations. The following text summarizes future conditions operations and measures proposed by the proponent to address impacts within the study area. Figure 11 shows proposed improvements along the Route 134 corridor and Figure 12 shows proposed improvements along Theophilus F. Smith Road. 33 Mitigation

51 X STOP X \\vhb\proj\wat-ld\ \graphics\figures\route132-rev1.dwg X X X X VAN LOADING ZONE X Feet Vanasse Hangen Brustlin, Inc. Figure 11 Proposed Roadway Improvements Route 134 Corridor Proposed Lowe's Home Improvement Center Dennis, Massachusetts VAN VAN LOADING ZONE LOADING ZONE 127,683 sf Total (Building and Garden Center) 83,448 sf Sales Floor (MODIFIED) 94K DEEP X X X

52 LOADING ZONE LOADING ZONE LOADING ZONE \\vhb\proj\wat-ld\ \graphics\figures\route132-rev1.dwg VAN VAN VAN 127,683 sf Total (Building and Garden Center) 83,448 sf Sales Floor (MODIFIED) 94K DEEP Feet Vanasse Hangen Brustlin, Inc. Figure 12 Proposed Roadway Improvements Theophilus F. Smith Road Proposed Lowe's Home Improvement Center Dennis, Massachusetts X X X X X X X X X STOP X

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Transportation Land Development Environmental S e r v i c e s

Transportation Land Development Environmental S e r v i c e s Transportation Land Development Environmental S e r v i c e s Memorandum To: Ms. Kristin E. Kassner Planning Director Town Hall Annex 25 Center Street Burlington, MA 01803 Date: September 23, 2013 Project

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Appendix 3. Transportation Narrative and Supplements

Appendix 3. Transportation Narrative and Supplements Appendix 3. Transportation Narrative and Supplements TRANSPORTATION Vanasse & Associates, Inc. (VAI) has completed a Transportation Impact Assessment (TIA) in support of this Application pursuant to Section

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Mineola Village Green

Mineola Village Green Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements Existing Conditions Belmont Circle Bourne, MA Speakers Pam Haznar, MassDOT Ed Hollingshead, Fay Spofford & Thorndike Heather Ostertog, Fay, Spofford & Thorndike Goals for Group Local Knowledge Work through

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS

TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS PARE PROJECT NO. 17120.00 REPORT TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS SUBMITTED TO: GEORGETOWN CAPITAL MANAGEMENT PO BOX 369 GEORGETOWN, MA 01833

More information

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2 TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

Interstate 85 Widening Phase III Interchange Modification Report Exit 106 E. Cherokee Street. Cherokee County, SC

Interstate 85 Widening Phase III Interchange Modification Report Exit 106 E. Cherokee Street. Cherokee County, SC Interstate 85 Widening Phase III Interchange Modification Report Exit 16 E. Cherokee Street Cherokee County, SC Prepared for: South Carolina Department of Transportation Prepared by: Stantec Consulting

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

Traffic and Toll Revenue Estimates

Traffic and Toll Revenue Estimates The results of WSA s assessment of traffic and toll revenue characteristics of the proposed LBJ (MLs) are presented in this chapter. As discussed in Chapter 1, Alternatives 2 and 6 were selected as the

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

South Lexington Transportation Study Lexington, Massachusetts

South Lexington Transportation Study Lexington, Massachusetts South Lexington Transportation Study Lexington, Massachusetts Preliminary Findings and Options for Consideration Businesses Meeting 10/10/13 Town of Lexington Engineering and Planning Departments Meeting

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

The remainder of this memorandum contains the details of our peer review findings.

The remainder of this memorandum contains the details of our peer review findings. REF: MAX-2014067.00 DATE: June 20, 2014 TO: FROM: RE: Mr. Leo Bartolini, Jr. Chairman, Zoning Board of Appeals 17 Common Street Southborough, MA 01772 Mr. Jason DeGray, P.E., PTOE Proposed Residence at

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study )

Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study ) Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study ) D-bar-A Project Traffic Impact Study November 3 rd, 2015 1427

More information

Technical Feasibility Report

Technical Feasibility Report Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Prepared By: 53 Regional Drive Concord, NH 03301 NHDOT Project # 13742 Federal Project #T-A000(018) September 2018 TABLE OF CONTENTS

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information