Intersection LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5

Size: px
Start display at page:

Download "Intersection LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5"

Transcription

1 Intersection No- LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5 Ü Intersection No- LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive S C 32.6 D 43.0 Intersection No- LOS Delay (Sec) LOS Delay (Sec.) US 3/ Technology Drive N B 16.0 B 17.4 Intersection No- LOS Delay (Sec) LOS Delay (Sec.) US 3/ Technology Drive S C 25.6 C 25.6 MAAR Intersection No- LOS Delay (Sec) LOS Delay (Sec.) US 3/ MAAR WB Ramps C 23.9 C 24.9 MAAR Intersection No- LOS Delay (Sec) LOS Delay (Sec.) US 3/ MAAR EB Ramps C 29.8 C 30.3 Figure 9 INTERSECTION ANALYSIS Pettengill Road/ Airport Access Road Transportation- Land Use Study

2 US 3 S. of Hawthorne Dr. N. Two-Way PM Peak Hour Traffic 2025 No- Volumes 2025 Volumes 2025 No- V/C 2,483 2, V/C Ü US 3 S. of Technology Dr. N. Two-Way PM Peak Hour Traffic 2025 No- Volumes 2025 Volumes 2025 No- V/C 2,209 2, V/C US 3 S. of Technology Dr. S. Two-Way PM Peak Hour Traffic 2025 No- Volumes 2025 Volumes 2025 No- V/C 2025 V/C 2,787 2, MAAR US 3 S. of West Bound Ramp Two-Way PM Peak Hour Traffic 2025 No- Volumes 2025 Volumes 2025 No- V/C 2025 V/C 3,329 3, MAAR FIGURE 10 ARTERIAL SEGMENT ANALYSIS Pettengill Road/ Airport Access Road Transportation- Land Use Study

3 C. iv) b) Manchester Table 2 Intersection Analysis Results Bedford Corridor- "Existing Condition" Intersection No- LOS Delay (Sec) LOS Delay (Sec) US 3/ Hawthorne Drive S** F * F * US 3/ Technology Drive N E 65.3 E 74.1 US 3/ Technology Drive S** F * F * *Unsignalized results refer to critical movement from minor intersection legdelays in excess of 120 seconds. **Unsignalized Intersection The results of the intersection and arterial segment analyses for the Manchester corridor are shown in Figures 11 and 12. The results of the intersection analysis, shown in Figure 12, indicates that, with the Pettengill Road project, two of the study area intersections will continue to operate at acceptable LOS. LOS at the Brown Avenue/Goffs Falls Road intersection will increase from LOS C with 28.7 seconds of delay during the 2025 Weekday PM peak hour No- scenario to LOS D with 42.1 seconds of delay during the scenario. At the Brown Avenue/Perimeter Road intersection, operations will increase from LOS C with 30.7 seconds of delay during the 2025 Weekday PM peak hour No- scenario to LOS C with 31.9 seconds of delay during the scenario. Two other study area intersections will operate at unacceptable LOS during both the 2025 Weekday PM peak hour No- and scenarios. Movements from the critical westbound minor leg approach of the unsignalized Brown Avenue/Winston Street will increase from LOS F with 75.5 seconds of delay during the No- scenario to LOS F with greater than 120 seconds of delay. Operations at the signalized Brown Avenue/Raymond Street intersection will increase from LOS F with 98.4 seconds of delay during the 2025 Weekday PM peak hour No- scenario to LOS F with greater than 120 seconds of delay during the scenario. The results of the arterial segment analysis for the Manchester corridor are shown in Figure 12. Figure 12 indicates that the four study area arterial segments experienced increases in V/C ratio of about seven percent. The largest V/C ratio was experienced on Brown Avenue north of Winston Street, where the trips generated by Pettengill Road resulted in an increase from 0.54 to The lowest V/C ratio was experienced on Brown Avenue north of Goffs Falls Road, where the trips generated by Pettengill Road resulted in an increase from 0.45 to C. iv) c) Londonderry The results of the intersection and arterial segment analyses for the Londonderry corridor are shown in Figures 13 and 14. As noted in an earlier section of this report, analyses for the Pettengill Road/Harvey Road/Page Road Londonderry corridor consisted of a comparison of operating conditions for the Weekday PM peak hour 2025 scenario and the 2022 Weekday PM peak hour scenario from the Supplemental Traffic Study for Pettengill Road completed by the Town in The evaluation was 11

4 Intersection Brown Avenue/ Winston Street Intersection Brown Avnue/ Raymond Street B 3A/ NH Intersection Brown Avenue/ Goffs Falls Road No- LOS Delay (Sec) F * LOS F No- LOS Delay (Sec) F 98.4 LOS Delay (Sec.) F * No- LOS Delay (Sec) C 28.7 Delay (Sec.) * Ü LOS Delay (Sec.) D 42.1 row ve na Intersection Brown Avenue/ Perimeter Road No- LOS Delay (Sec) C 30.7 LOS C Delay (Sec.) 31.9 INTERSECTION ANALYSIS Figure 11 *- delays in excess of 120 seconds Pettengill Road/ Airport Access Road Transportation- Land Use Study

5 Ü Brown Ave. N. of Winston St. Two-Way PM Peak Hour Traffic 2025 No No 2025 Volumes Volumes V/C V/C 3,861 4, Brown Ave. N. of Raymond St. Two-Way PM Peak Hour Traffic 2025 No No 2025 V/C V/C Volumes Volumes 3,834 4, B 3A/ NH Brown Ave. N. of Goffs Falls Rd. Two-Way PM Peak Hour Traffic 2025 No No 2025 Volumes Volumes V/C V/C 3,232 3, row ve na Brown Ave. N. of Perimeter Rd. Two-Way PM Peak Hour Traffic 2025 No No 2025 Volumes Volumes V/C V/C 3,290 3, ARTERIAL SEGMENT ANALYSIS Figure 12 Pettengill Road/ Airport Access Road Transportation- Land Use Study

6 Ü Intersection 2022 PM Peak 2025 PM Peak LOS Delay (Sec) LOS Delay (Sec) Airport Access Road/ S. Perimeter Road B 10.8 B 11.8 MAAR Grenier Field Rd Intersection 2022 PM Peak 2025 PM Peak LOS Delay (Sec) LOS Delay (Sec) Airport Access Road/ Pettengill Road D 54.9 E 58.2 Page Rd Intersection 2022 PM Peak 2025 PM Peak LOS Delay (Sec) LOS Delay (Sec) Pettengill Road/ South Loop Road F * F * Pettengill Rd Harvey Rd Intersection 2022 PM Peak 2025 PM Peak LOS Delay (Sec) LOS Delay (Sec) Rockingham Road/ Page Road F F * Intersection 2022 PM Peak 2025 PM Peak LOS Delay (Sec) LOS Delay (Sec) Grenier Field Road/ Webster Road F 81.1 F * MAAR Harvey Rd Intersection 2022 PM Peak 2025 PM Peak LOS Delay (Sec) LOS Delay (Sec) Pettengill Road/ Harvey Road F * F * Intersection 2022 PM Peak 2025 PM Peak LOS Delay (Sec) LOS Delay (Sec) Pettengill Road/ Industrial Drive C 28.9 D 50.1 MAAR Pettengill Road Figure 13 *- delay in excess of 120 seconds INTERSECTION ANALYSIS Pettengill Road/ Airport Access Road Transportation- Land Use Study

7 Ü MAAR Grenier Field Rd Page Rd Harvey Rd Page Rd. W. of Rockingham Rd. Two-Way PM Peak Hour Traffic 2025 Volumes 2025 V/C 1, Pettengill Rd Pettengill Rd MAAR Pettengill Rd. W. of Industrial Dr. Two- Way PM Peak Hour Traffic 2025 Volumes 2025 V/C 3, Pettengill Rd. W. of Harvey Rd. Two-Way PM Peak Hour Traffic 2025 Volumes 2025 V/C 3, Harvey Rd MAAR Pettengill Road Figure 14 ARTERIAL SEGMENT ANALYSIS Pettengill Road/ Airport Access Road Transportation-Land Use Study

8 designed to provide the Town of Londonderry with additional information on the traffic impacts of Pettengill Road through the evaluation of a scenario representing a 2025 Weekday PM peak hour -Out in the vicinity of the corridor. The analysis, based on information in the Supplemental Traffic Study for Pettengill Road, assumes that the following intersections are signalized as part of State and local roadway improvement projects (shown in paretheses): 1) Rockingham Road/Page Road (Rockingham Road/Page Road Intersection Improvements Project); 2) MAAR/South Perimeter Road (MAAR Project); 3) Pettengill Road/Harvey Road (Pettengill Road Project); 4) Pettengill Road/Industrial Drive (Pettengill Road Project); 5) MAAR/Pettengill Road (MAAR Project). The results of the intersection analysis, shown in Figure 13, indicates that, with the additional development of lands in the vicinity of the Pettengill Road project, two of the study area intersections will continue to operate at acceptable LOS. Operations at the Pettengill Road/Industrial Drive intersection will increase from LOS C with 28.9 seconds of delay during the 2022 Weekday PM peak hour No- scenario to LOS D with 50.1 seconds of delay during the 2025 scenario. At the MAAR/South Perimeter Road intersection, operations will increase from LOS B with 10.8 seconds of delay during the 2025 Weekday PM peak hour 2022 scenario to LOS B with 11.8 seconds of delay during the 2025 scenario. Four Londonderry study area intersections will operate at unacceptable LOS during both the 2022 and 2025 Weekday PM peak hour scenarios. The Pettengill Road/South Loop Road, Pettengill Road/Harvey Road, Grenier Field Road/Webster Road and Rockingham Road/Page Road intersections will operate at LOS F with delays in excess of 120 seconds during both scenarios. It should be noted that the LOS F operating conditions at the Pettengill Road/South Loop Road intersection refers to critical turning movements from the minor side street at this location. The results of the arterial segment analysis for the Londonderry corridor are shown in Figure 14. Figure 14 indicates that the V/C ratios for the three study area arterial segments evaluated will vary from 0.35 on Page Road west of Rockingham Road to 0.96 on Pettengill Road west of Harvey Road. Operations at the study areas intersection and the need for mitigation at selected intersection locations on the Londonderry corridor were discussed in detail in the Supplemental Traffic Study for Pettengill Road. The analyses completed for this study generally reinforce these findings. The following list of proposed mitigation recommendations is discussed in the Supplemental Traffic Study for Pettengill Road: Rockingham Road/Page Road geometric improvements are recommended by 2022 Pettengill Road/Harvey Road additional geometric improvements are recommended by 2022 Pettengill Road/South Loop Road - intersection is recommended for signalization by 2022 MAAR/Pettengill Road additional geometric improvements recommended by 2022 Grenier Field Road/Webster Road geometric improvements recommended by

9 C. iv) d) Litchfield The result of the intersection analysis for the NH 3A/Corning Avenue intersection is shown in Table 3. The NH 3A/Corning Road intersection is currently unsignalized and stop controlled only at the Corning approach. The Weekday PM peak hour turns equal a level of service C under base year conditions and a level of service C in both the 2025 No- and scenarios. Delay at this intersection improves from 24.9 seconds during the Base Year to 19.2 seconds during the 2025 No- scenario and 16.2 seconds during the 2025 scenario. Because Corning Road currently acts as a cut-through route between Litchfield, Southern Manchester and Londonderry, reductions in delay are likely the result primarily of the presence of the MAAR and Pettengill Road that provides an alternative route between these locations. Table 3 Estimated Peak Hour Traffic Changes NH 3A/Corning Road Current Count Model Base Model 2025 NB Percent Change 2025 Projected Pettingill Change 2025 NH3A Southbound Thru % NH3A Northbound Thru % NH3A Southbound to Corning % NH3A Northbound to Corning % Corning to NH3A Southbound % Corning to NH3A Northbound % NOTES: Current count = PM peak hour (4:30-5:30) turning movement count conducted June 2010 Model Base and 2025 NB = 24-hour model outputs 2025 Projected = Current Count * Percent Change The result of the intersection analysis for the NH 3A/Albuquerque Avenue intersection is shown in Table 4. This intersection is currently unsignalized and stop controlled only at the Albuquerque approach. Estimated Weekday PM peak hour turning movements were used to quantify the impact at this intersection. These peak hour turns, outlined in Table 4, equal LOS B conditions under Base Year conditions and LOS C during both the 2025 No- and scenarios. Delay increases from 14.2 seconds during the Base Year scenario to 20.6 seconds in the 2025 No- scenario and 23.1 seconds during the 2025 scenario. Unlike Corning Road, Albuquerque Avenue does not act as a cutthrough route to the east, and as a result, traffic relief from the presence of the MAAR and Pettengill Road is minimal here. Table 4 Estimated Peak Hour Traffic Changes NH 3A/Albuquerque Avenue Current Count Model Base Model 2025 NB Percent Change 2025 Projected Estimated Change 2025 NH3A Southbound Thru % NH3A Northbound Thru % NH3A Southbound to Albuquerque % NH3A Northbound to Albuquerque % Albuquerque to NH3A Southbound %

10 Albuquerque to NH3A Northbound % NOTES: Current count = PM peak hour (400-5:00) turning movement count conducted June 2010 Model Base and 2025 NB = 24-hour model outputs 2025 Projected = Current Count * Percent Change Estimated Change = Estimated PM Peak Hour Volume Changes, extrapolated from Traffic Study 2025 = Final Peak Hour Forecast C. iv) e) Merrimack Estimating procedures as described in a previous section of this report were used to quantify the impact of Pettengill Road at the Merrimack intersections. NRPC relied on the forecasted volumes to the north of this location, along the US 3 in Bedford. For new traffic coming from the Bedford Road location, NRPC examined the northbound traffic at the closest study area location at South River Road/MAAR Eastbound Ramps. Here, Weekday PM Peak Hour northbound through traffic does not change from the 2025 No- to the 2025 scenario and right turns onto the MAAR increase from 75 to 95. Therefore, the net increase in northbound trips at this location is 20. NRPC assumed a split of these trips, assigning ten to the through movement and ten to the right turn from Bedford Road. For traffic heading to the Bedford Road intersection, southbound traffic at the MAAR intersection was considered. Here, southbound through traffic increases from 1432 to 1478 and right turns from the eastbound off-ramp onto US 3 remain at 410 during both scenarios. Therefore, the net increase in southbound trips is 46. Even assuming that each one of those vehicles ends up at the Bedford Road intersection which is unlikely given the number of smaller intersections in between the two sites, there is a very small impact on overall peak hour operations. A split of these trips was assumed and 23 trips each were assigned to the through movement and left turn movement on Bedford Road. The estimated peak hour changes in traffic at the US 3/Bedford Road intersection are presented in Table 5. Table 5 Estimated Peak Hour Traffic Changes US 3/Bedford Road Current Count Model Base Model 2025 NB Percent Change 2025 Projected Estimated Change 2025 US3 Southbound Thru % US3 Northbound Thru % US3 Southbound to Bedford Rd % US3 Northbound to Bedford Rd % Bedford Rd to US3 Southbound % Bedford Rd to US3 Northbound % It should be noted that the commercial driveway serving as the westbound intersection approach is not include in the NRPC model and thus could not be included in the analysis. The driveway currently accounts for roughly 45 trips in and 50 trips out during the peak hour. NRPC does not currently perform level of service analysis for actuated signalized intersections. However a 2009 study ( Merrimack Roadway Infrastructure Master Plan ) by Fay, Spofford, and Thorndike lists this intersection as operating at LOS C during the base year and at LOS F during the 14

11 2025 No- scenario. As the estimated traffic changes from the Pettengill Road project are minimal, NRPC does not project a huge different in delay. No exact delay calculations were available at this time. Finally, NRPC estimated traffic at the intersection of the proposed Bedford Road/F.E. Everett Turnpike Exit 12 On/Off Ramps intersection. Any trips along this path would most likely be northbound left turns (to Pettengill Road) or southbound right turns (from Pettengill Road) at the intersection in question. Utilizing trip generation calculations completed by SNHPC, 110 vehicles traveling northbound on the F. E. Everett Turnpike to Pettengill Road and 183 vehicles traveling southbound from Pettengill Road were estimated. As no estimate in the SNHPC data was included, it was assumed that 50 percent of the traffic (92 trips) traveled south on the Turnpike. It was also assumed that, given the larger population centers that exist further south along the turnpike, a small percentage of these trips would leave the Turnpike at Exit 12. It was assumed that twenty-five percent of all Turnpike traffic would travel through Exit 12 and the Bedford Road intersection. Table 6 below presents the estimated Weekday PM peak hour changes in traffic at this intersection. Table 6 Estimated Peak Hour Traffic Changes Bedford Road/ F.E. Everett Turnpike Exit 12 On/Off Ramps Current Count Model Base Model 2025 NB Percent Change 2025 Projected Estimated Change 2025 Bedford Rd Westbound Thru % Bedford Rd Eastbound Thru % Bedford Rd Westbound to Exit 12 NB On n/a n/a 5710 n/a Bedford Rd Eastbound to Exit 12 NB On n/a n/a 1446 n/a Exit 12 NB Off to Bedford Rd West % Exit 12 NB Off to Bedford Rd East % Because this is an anticipated future intersection, no comparison of current and 2025 conditions can be accurately made without additional assumptions. For this project, it was assumed that the peak hour volumes and turns at the future northbound on-ramp were consistent in terms of direction distribution on the existing legs of the intersection. Because 13.3% of the modeled 24-hour traffic is projected as peak hour traffic, that percent was applied to the 2025 projected volume on the new ramp to arrive at Weekday PM peak hour estimates. Once again, because this is a signalized intersection under current and future conditions, no exact level of service estimates are available. However, assuming the intersection is unsignalized with stop control at Bedford Road results in LOS F operations during the 2025 No- and scenarios. D. Observations/Conclusions The Pettengill Road/Airport Access Road Transportation/Land Use Plan has identified transportation and land-use related impacts of increased access to the study area resulting from the Pettengill Road project. It has also provided information related to the need for additional roadway improvements in the study area resulting from this increased access. The following specific observations/conclusions regarding the study area corridors can be made from the results of the Pettengill Road/Airport Access Road Transportation/Land Use Plan: 15

12 1. An upgraded US 3 corridor in Bedford (assuming the completion of the MAAR and US 3/Hawthrone Drive North intersections and infrastr ucture improvements included in the Town s Route 3 Corridor Study), including improvements at the study area intersections and arterial segments appears to be capable of accommodating the trips generated by Pettengill Road. Portions of the existing study area corridor (not including the US 3 intersections with the MAAR and the US 3/Hawthrone Drive North intersection) will experience unacceptable (LOS E F) operations in the future both with and without the trips generated by Pettengill Road. 2. Portions of the Brown Avenue corridor in Manchester will experience unacceptable traffic operations in the future both with and without the trips generated by Pettengill Road. These unacceptable operations will occur in the vicinity of the Brown Avenue intersections with Winston Street and Raymond Street. 3. Selected intersection locations on the Londonderry study area corridor (including Pettengill Road, Harvey Road and Page Road) will experience unacceptable traffic operations in the future. As described in the Supplemental Traffic Study for Pettengill Road, the following intersections will require improvements to mitigate the impacts of this traffic: 1) Rockingham Road/Page Road 2) Pettengill Road/Harvey Road 3) Pettengill Road/South Loop Road 4) MAAR/Pettengill Road 5) Grenier Field Road/Webster Road. 4. Trips generated by Pettengill Road do not appear to have a significant impact on operations at the NH 3A (Henry Bancroft Highway)/Corning Road and NH 3A/Albuquerque Avenue intersections in Litchfield. 5. Assuming that it operates as unsignalized, the Bedford Road/ F.E. Everett Turnpike Exit 12 On/Off Ramps intersection will operate at LOS F during the 2025 No- and scenarios. 6. Based on the results of prior work completed for this location, LOS F conditions are projected for the US 3 (Daniel Webster Highway)/Bedford Road intersection during the 2025 No- scenario. 7. Principals of access management should be incorporated into the design of roadway improvements resulting from the observations and conclusions of this study. 8. New facilities resulting from the development of land adjacent to the Pettengill Road project should be designed so as to pursue opportunities for transit-oriented development and other practices to encourage transit use. 16

13 APPENDIX A DEVELOPMENT OF STUDY AREA TRAFFIC PROJECTIONS/TRIP DISTRIBUTION METHDOLOGY

14 2025 -J;lrb\vl2fl.v!Olwith fjettengill Rd Trips "2025 BN......" Winston SI BN Raymond St BN Goffs Falls Rd ~.j. I '-l> 13 ~ j.. t t J I ~." ~ -'- t BN t Perimeter Rd j. ~ ' I t ", A f t I" r 'L _ ~ I I-?" , , A '--- I 1-0" ,.- -' ~ I t r,, _...--"

15 1 20?S.~roWn Ave No-Eluild, 2025N8". Winston St J t L, 0 -~ 0 1 /" N8 ~ Raymond St ,.-J t..l., ~-~ N8 ~ Goffs Falls Rd. ~ n97 ) ~ P c N8 i- Perimeter Rd ~ t L t ~ ~ 22 <I-- 1 t 1 +-; r-r I t ~ "'-"e... \-l.,,\ ~---~-- L-... R."-'l~ 109 ~ <I r--p I I b '" L-... e <I-- 18 'f 237 t 'I 1~7~ 3 J L- 207 <I-- 80 v I I I &~'" A,Hi. N t: GcKs ~e,\.ij «). n ~~..r< fr;,..ue Nt, ft?~,\ ila-e-.l-; RJ-A.,..

16 l{\ rj r'" Hawthorn Dr. North 0 ' t I J l+ 3q -, '" - ~\{?~ l(\ t 5 ~?:,q ~ I 2o'i...'5 (3\)\tJ Vt'\ rv\l L- \10 $".ch'),, h., '0",.~ r.. k.:: _0 43 i r- - f"'i ~ G _--'..~-~- 1'b 00 pefh{ \'" ::c I ~)OD)( A,::: T.I.OO j, \: f"i Ii. "".s '"\l V- +ca.q.;;= 2(02.'0 Lf\...;- a 31 N! L- <\b a.~. /' J Hawthorn Dr. so~."~~' -""'#../ f I :],0 i a ~ ~ 11 0;;> "'" iv' V\ ~ N '" J "" o- L t I i r 0 N, I I +-.~ J l+ \ \"" t I i t;, 3\<.:\ o West Bound Ramp L- (~t r' 2.10 J L - 1\0 I '1 i I.r\ - -.~~ :J1 <P --.,.-~'::)- _._._-_._,..._.._ _---_._.-- -,---~ \,,L, L, ) 11 (:» '" +-. ~ l~ \02.. East Bound Ramp Q? If\ 0..0 '<J ~ I.i'l r- 0 'II (\j rj JJ ~~ 41St J L ~ t 4-ID " CO i r ~ -~-e <:1 tr'i t t(~}-'" "'"' '"

17 2o:LS N,,, 6\,l\lA 04[15([ D <, Dr, North l(i rj J,- 'j - I..,{) l" QJ Q\ L- lib t L 0 +--' 43...J'\ t '1 t PMpt2-~, :3.. N,]C\ "l I""- 1"'1 t r" -"" 1.1\ 1./\ Hawthorn Dr. South - -.,jfj' - - l J N l.-. ~O t 0 II> "12 t L- It{, 0 - \ol.. '1 t CO t!"' CO N t"'l - tv' I.l'I rj \.0 r '-.!1 0 N 0 Technology Dr, N )-:.3 J l L~ -- 5 S'2. letl t '1 t 5 ~ ~ C\O 1"\ 0'. G 0 "" 00 0 :\ Technology Dr. S \ II.a _...1 '1 t r 5 ~ '/, \ If\ """'!.I'i LI\ r- t + 1"\1 <0 West Bound Ramp -* East Bound Ram p *. 0 ljl J J l L \ \"2..i<u,. )f\ 0.CO If\ l L ~5 t I ~ 40 t '* f\j '-0 "" 'Ii- 1"' l *' L t< L- lloq I b+* '1 t Q. U\ "" +\0 " CO *r 0 l1\ en " i!j) V l.ri ~"~--"': ~ ~-~~->'--- :'.:>.. \"7' l; I, -* tkjk'''j \l \ ~J q-e"e.it~~j-~ Bu,t) b~ov-t 0+ \,c;:, \'-' -- e: r"""'p lvk&e...~l"'~

18 P" r~"d:{ c : ~ :> -,~ t '" ~ ----.J / ()'-. "-~! "1-1 'P \ I 1)-, /' (,

19 ()) ()) uj 0 0 ~( <ttr o 9 PETTENGill ROAD EXTENSiON 0-" 0->- a: 0 w < f-f-o Ultra: WO MANCHESTm - BOSTON Ul s; ::CLU) REGiONAL ;u Oa: W AiRPORT < rn Z~' «0 -< 2: < ;u L , " ~ ~ s; WEBSTER ROAD Z o NOIHH Oc rn ;Uen -< CUL-DE SAC --l <)0 ;u ROAD rn_ ; 0-.. ~ bls «;f-- Jr c.:- 126 PFTTENGILl ) ~ l..., ;- '~7 "'. h 7 -" ~S PETTENGilL :.c '3, en ;u0 HESTER OC AIRPORT l>-l..::--'7' OI ACCESS ~5 ROAD '0 SOUTH PEcRIMETER " ~1-7..t? -u,..' t ;. /~. 2.1 PETTENGill" M i i -ft';...,?" ::; ~ \ I I W ()l 543~ en ;uo OC»-l OI.r roo '0 " f:. ; o.. ~ ~ o '" "..J ~ ;u -n _0 mgl r;u Orn ;tl~ ;;: \ I om I»;U ZO IA ;UZ OGi c I ;u -ll> 0 0 rn:i:: l> N;U 0 ",0» o it c c.., -~ HARVEY ROAD.., '" c,.~ '" GRENIER FIELD ROAD ~l... \..' i--laii ROAD ;U$:I ZG'l EiijiI J!( ~ru~...; 0 0J J!C L114 L30 " {) '-910,,"28,r-18 PAGE it( it( PAGE 36-" Cil ROAD 1\05-+ """;W--'" ROAD W(.l1r:.; 942" "'""" ~'" " 5 ;;: () l> 15 ;;: ;UZ!'!: ogi c -4 -<l> I I rrf~ ;U N;U ~o ~ o 6 LITCHFIELD ROAD L1TCHFI ELD ROAD '::t' "'-' f.(j, ~. Ii3 ~ "$: Pettengill Road Supplemental Traffic Study Figure Location: Londonderry, NH Stantec Scale; Not to Scale 17

20 \-:Ltt\:i1,J'\~ f<,d, ~\r; > (r-(ikfl:,-h;!r') S'I--\-e G~rl<~«\'\--t<'~ -,(\", PM!ll\. 0(1(0'3(D (!

21 APPENDIX B SYNCHRO INTERSECTION ANALYSIS RESULTS BEDFORD

22 1: Hawthorne Dr. N & US Rt.3 Page 1 Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Turn Type pm+pt Prot pm+pt Prot Prot Protected Phases Permitted Phases 4 8 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 16.7% 16.7% 16.7% 16.7% 16.7% 0.0% 16.7% 50.0% 0.0% 16.7% 50.0% 0.0% 2025

23 1: Hawthorne Dr. N & US Rt.3 Page 2 Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) Recall Mode None None None None None None Max None Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C B B A C C D B Approach Delay Approach LOS C A C B Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 55 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 17.5 Intersection Capacity Utilization 66.6% Analysis Period (min) 15 Intersection LOS: B ICU Level of Service C Splits and Phases: 1: Hawthorne Dr. N & US Rt

24 1: Hawthorne Dr. N & US Rt.3 Page 1 Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Turn Type pm+pt Prot pm+pt Prot Prot Protected Phases Permitted Phases 4 8 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 16.7% 16.7% 16.7% 16.7% 16.7% 0.0% 16.7% 50.0% 0.0% 16.7% 50.0% 0.0% 2025 No-

25 1: Hawthorne Dr. N & US Rt.3 Page 2 Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) Recall Mode None None None None None None Max None Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C B B A C B D B Approach Delay Approach LOS C A B B Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 55 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.75 Intersection Signal Delay: 16.1 Intersection Capacity Utilization 63.8% Analysis Period (min) 15 Intersection LOS: B ICU Level of Service B Splits and Phases: 1: Hawthorne Dr. N & US Rt No-

26 2: Hawthorne Dr. S & US Rt.3 Page 1 Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) 0 *1770 * *1770 *1583 *1770 * *1770 * Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor *1.00 *1.00 *1.00 *1.00 *1.00 *1.00 *1.00 *1.00 *1.00 *1.00 *1.00 *1.00 Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Turn Type pm+pt Prot pm+pt Prot Prot Prot Protected Phases Permitted Phases 4 8 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 12.5% 27.5% 27.5% 12.5% 27.5% 27.5% 12.5% 47.5% 0.0% 12.5% 47.5% 0.0% 2025

27 2: Hawthorne Dr. S & US Rt.3 Page 2 Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) Recall Mode Max Max Max Max Max Max Max Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS B A C A D E D C Approach Delay Approach LOS B B E C Intersection Summary Area Type: CBD Cycle Length: 80 Actuated Cycle Length: 80 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.05 Intersection Signal Delay: 43.0 Intersection Capacity Utilization 64.1% Analysis Period (min) 15 * User Entered Value Intersection LOS: D ICU Level of Service C Splits and Phases: 2: Hawthorne Dr. S & US Rt

28 2: Hawthorne Dr. S & US Rt.3 Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 1289 px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Err Err 8 5 Control Delay (s) Err Err Lane LOS F F C A Approach Delay (s) Err Err Approach LOS F F Intersection Summary Average Delay Intersection Capacity Utilization 112.8% ICU Level of Service H Analysis Period (min) (US 3 Existing) HCM Unsignalized Intersection Capacity Analysis

29 2: Hawthorne Dr. S & US Rt.3 Page 1 Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Turn Type pm+pt Prot pm+pt Prot Prot Prot Protected Phases Permitted Phases 4 8 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 12.5% 27.5% 27.5% 12.5% 27.5% 27.5% 12.5% 47.5% 0.0% 12.5% 47.5% 0.0% 2025 No-

30 2: Hawthorne Dr. S & US Rt.3 Page 2 Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) Recall Mode Max Max Max Max Max Max Max Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS B A C A D D D C Approach Delay Approach LOS B B D C Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 32.6 Intersection Capacity Utilization 56.3% Analysis Period (min) 15 Intersection LOS: C ICU Level of Service B Splits and Phases: 2: Hawthorne Dr. S & US Rt No-

31 2: Hawthorne Dr. S & US Rt.3 Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 1289 px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Err Err 7 4 Control Delay (s) Err Err Lane LOS F F B A Approach Delay (s) Err Err Approach LOS F F Intersection Summary Average Delay Intersection Capacity Utilization 107.3% ICU Level of Service G Analysis Period (min) No- (US 3 Existing) HCM Unsignalized Intersection Capacity Analysis

32 5: Technology Dr. N & US Rt.3 Page 1 Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Turn Type pm+pt Prot pm+pt Prot Prot Prot Protected Phases Permitted Phases 4 8 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 15.4% 30.8% 30.8% 15.4% 30.8% 30.8% 15.4% 38.5% 0.0% 15.4% 38.5% 0.0% 2025

33 5: Technology Dr. N & US Rt.3 Page 2 Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) Recall Mode None None None None None None None Max None Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C A B A C C D B Approach Delay Approach LOS B A C B Intersection Summary Area Type: Other Cycle Length: 65 Actuated Cycle Length: 51.3 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 17.4 Intersection Capacity Utilization 64.1% Analysis Period (min) 15 Intersection LOS: B ICU Level of Service C Splits and Phases: 5: Technology Dr. N & US Rt

34 5: Technology Dr. N & US Rt.3 Page 1 Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Turn Type Perm Perm Perm Perm Prot Perm Prot Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 13.0% 13.0% 13.0% 13.0% 13.0% 13.0% 8.7% 63.5% 63.5% 10.4% 65.2% 65.2% 2025 (US 3 Existing)

35 5: Technology Dr. N & US Rt.3 Page 2 Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) Recall Mode None None None None None None None Max Max None Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS F B F B E E A F C A Approach Delay Approach LOS F E E D Intersection Summary Area Type: Other Cycle Length: 115 Actuated Cycle Length: 115 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.80 Intersection Signal Delay: 74.1 Intersection Capacity Utilization 89.6% Analysis Period (min) 15 Intersection LOS: E ICU Level of Service E Splits and Phases: 5: Technology Dr. N & US Rt (US 3 Existing)

C. iv) Analysis/Results

C. iv) Analysis/Results The Pettengill Road project is located outside the borders of the model in an external zone. As a result, inserting all Pettengill Road trip generation assumptions into the NRPC model and running a new

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) 116 20 8 405 137 56 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.81 0.81 0.67 0.67 0.89 0.89 Hourly flow

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

MEMORANDUM November 19, 2012

MEMORANDUM November 19, 2012 COUNCIL OF GOVERNMENTS CENTRAL NAUGATUCK VALLEY 60 NORTH MAIN ST 3RD Floor WATERBURY, CT 06702-1403 (203)757-0535 Web Site: www.cogcnv.org E-Mail: cogcnv@cogcnv.org November 19, 2012 MEMORANDUM 111912

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Market Street Road Diet Wilmington, NC 2016 Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Wilmington, NC Parsons Brinckerhoff January 2016 FINAL TECHNICAL REPORT US 17 Corridor

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 March 2015 Prepared for Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3 JRL consulting JRL consulting TABLE OF CONTENTS 1 INTRODUCTION... 2 1.1 BACKGROUND... 2 2 EXISTING

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017 Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A7 519-591-0426 November 8, 2017 Revised December 20, 2017 Laurie Wills, PEng Deputy Director of Public Works Town of Cobourg 740 Division

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

(A) Project Manager, Infrastructure Approvals

(A) Project Manager, Infrastructure Approvals February 14th, 2014 BY E-MAIL: wally.dubyk@ottawa.ca City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor, Ottawa, Ontario K1P 1J1 Attention: Wally Dubyk, C.E.T (A) Project

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

Date: December 20, Project #:

Date: December 20, Project #: To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long

More information

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings TECHNICAL MEMORANDUM Summary of Findings Date: June 17, 2014 Project #: 17121.15 To: Si Lau, P.E.; City of Oakland, CA From: Erin Ferguson, P.E.; Aaron Elias, P.E.; Daphne Dethier; and Mark Bowman, P.E.;

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

APPENDIX G. Traffic Data

APPENDIX G. Traffic Data APPENDIX G Traffic Data HCM Signalized Intersection Capacity Analysis 2: Duanesburg Road & I-88 Ramps 10/7/2004 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl)

More information

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc.

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc. TRANSPORTATION ANALYSIS Wawa US 441 and Morningside Drive Prepared for: Brightwork Real Estate, Inc. TABLE OF CONTENTS Introduction... 1 Project Description... 1 Estimated Daily Project Traffic... 3 Estimated

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

267 O Connor Street Residential Development

267 O Connor Street Residential Development M a y 2014 267 O Connor Street Residential Development Transportation Brief Google 2014 Bing 2014 Prepared for: MASTERCRAFT STARWOOD Prepared by: Study 267 O'Connor Type Street May 2014 Study Residential

More information

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure MMM Group Limited Traffic Study CASA MIA Community Care Facility Vancouver, BC Communities Transportation Buildings Infrastructure February 2013 5011001-033 STANDARD LIMITATIONS This report was prepared

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. CastleGlenn Consultants Inc. Engineers, Project Managers & Planners March 11 th, 2013 Domenic Idone, P. Eng Planning Manager R.W. Tomlinson Ltd. 5597 Power Road Ottawa, Ontario K1G 3N4 Dear Mr. Idone:

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment MEMORANDUM Date: June 22, 2018 Project #: 21562 To: Colin McArthur, AICP From: Project: Subject: Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

Wellington Street West

Wellington Street West Transportation Brief prepared for: 185 Davenport Road Suite 300 Toronto, ON M5R 1J1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 November 5, 2013 TO3131TOH Transportation Brief November

More information

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA (St. Tammany Parish Mandeville, LA) Prepared For The Pittman Companies Michael N Pittman, MD 328 East Boston St Covington, LA 70433

More information

Appendix B: Traffic Reports

Appendix B: Traffic Reports Appendix B: Traffic Reports 407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION Report Markham Road Station Traffic Study Prepared for Ministry of Transportation, Ontario

More information

1140 Wellington Street West Transportation Brief

1140 Wellington Street West Transportation Brief 1140 Wellington Street West Transportation Brief October 2013 Study 1140 Wellington Type Street West October 2013 Study Transportation Name Brief February 2011 TB Check List TIS / TB/ CTS Check List prepared

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Interstate 80 Corridor Study

Interstate 80 Corridor Study Interstate 80 Corridor Study Final Technical Memorandum 5: Traffic Volumes, Accident Locations and Operational Deficiencies West Verdi (SR 425) Interchange to West McCarran Boulevard (SR 651) and East

More information

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by:

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by: 700 Hunt Club Road Transportation Impact Study - Addendum #1 Submitted by: 14 June 2013 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com 14 June 2013

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

LEMON FLATS SECOND ACCESS

LEMON FLATS SECOND ACCESS LEMON FLATS SECOND ACCESS RECONNAISSANCE STUDY SEPTEMBER 2007 APPENDIX A Synchro Analysis Worksheets HCM Signalized Intersection Capacity Analysis 2005 - Background 3: Anka Street & Lemon Flats Second

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM TO: Merrimack Valley Metropolitan Planning Organization FROM: James Terlizzi, P.E., Transportation Planning Engineer DATE: March 6, 2017 SUBJECT: Further analysis of the recommendations

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants TJKM Transportation Consultants Draft Report Traffic Impact Study for the Residential Development at 4659 Proctor

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012 BOSTON REGION METROPOLITAN PLANNING ORGANIZATION State Transportation Building Ten Park Plaza, Suite 2150 Boston, MA 02116-3968 Tel. (617) 973-7100 Fax (617) 973-8855 TTY (617) 973-7089 www.bostonmpo.org

More information

Dartmouth, NS B3B 1X7 Tel: WSP. Canada Inc.

Dartmouth, NS B3B 1X7 Tel: WSP. Canada Inc. Traffic Impact Study: Proposed Residential Development Herring Cove Road Halifax, NS Presented to: FH Construction Ltd. 1 Spectacle Lake Drive Dartmouth, NS B3B 1X7 Tel: 902 835 9955 Fax: 902 835 1645

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

Minto Mahogany Stage 2

Minto Mahogany Stage 2 Minto Mahogany Stage 2 Transportation Impact Study prepared for: Minto Developments Inc 200-180 Kent Street Ottawa, ON K1P 0B6 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 June 27, 2017

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 TO: FROM: Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 RE: Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street,

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

City of Fairfax, Virginia City Council Work Session

City of Fairfax, Virginia City Council Work Session City of Fairfax, Virginia City Council Work Session Agenda Item # City Council Meeting 8g 9/29/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: Honorable Mayor and Members of City Council Robert Sisson, City

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information