1 Traffic Impact nalysis Plant ity, Florida Final Summary Report January 2015 Prepared by: U.S. Highway 41, Suite 600 Lutz, Florida ertificate of uthorization # 4548

2 Traffic Impact nalysis 2 of 63 Theodore. Petritsch, P.E. Florida License # 48857

3 Traffic Impact nalysis 3 of 63 SUMMRY This report summarizes a study conducted for the ity of Plant ity for the purpose of considering the traffic impacts for the ommunity Unit District modification (P ). The proposed development is located to the southwest of downtown Plant ity, generally bounded by Sydney Road, Turkey reek Road, Trapnell Road, SR 39, and lexander Street (See Figures 1 and 1). The following sections outline the estimation of background traffic and the project's anticipated trip generation, distribution, and assignment. lso, the results of the capacity analyses (for both background only and background plus project traffic conditions) are summarized with the levels of service for the four identified project access locations (shown in Figure 2), three internal development intersections, and nine additional off-site impacted intersections. In total, traffic was counted and analyzed at 16 intersections. The results of this traffic impact study indicate that the trips generated by the development will not significantly degrade the existing levels of service at the nearby analyzed intersections. Only three intersections suffer a decline in overall level of service score: lexander St at Timberlane Dr falls from a to a D for M peak conditions, Griffin lvd at Mud Lake Rd falls from an to a for M peak conditions, and Turkey reek Rd at Sydney Rd falls from an E to an F for PM peak conditions. No individual turning movement for any intersection experiences a decline in level of service score by more than one letter grade. Due to the minimal expected impact generated by the proposed development traffic, no mitigation efforts are recommended at this time.

4 Traffic Impact nalysis 4 of 63 FIGURE 1 Vicinity Map

5 Traffic Impact nalysis 5 of 63 FIGURE 1 General Site Plan

6 Traffic Impact nalysis 6 of 63 KGROUND TRFFI GENERTION PM peak hour turning movement counts were performed at each of the study intersections as outlined below: Primary Development ccess Points/Intersections lexander St at Timberlane Dr Timberlane Dr at Trapnell Rd Griffin lvd at Turkey reek Rd Griffin lvd at Mud Lake Rd Internal Development Intersections lubhouse Dr at Timberlane Dr Griffin lvd at Timberlane Dr (2 separately operating offset intersections) Other Impacted Intersections lexander St at irport Rd/Grant St lexander St at Mud Lake Rd lexander St at YM Pl harlie Griffin Rd at SR 39 Turkey reek Rd at Sydney Rd Mud Lake Rd at harlie Griffin Rd Turkey reek Rd at SR 574 Turkey reek Rd at Trapnell Rd Mud Lake Rd at Trapnell Rd t each study intersection, a seasonal adjustment factor of 1.04 was applied to the existing traffic volumes to determine the base traffic volumes. The seasonal adjustment factor was obtained via FDOT Florida Traffic Online 2013 Peak Season Factor ategory Report for Hillsborough ounty. Historical traffic counts from the same source, in the vicinity of the site, do not indicate a need to apply a growth factor. See ppendix for copies of turning movement counts (collected by Sprinkle onsulting,

7 Traffic Impact nalysis 7 of 63 Inc., October 2014). The final (calculated) volumes shown in the traffic volume generation worksheets are those used in the intersection capacity analyses. TRIP GENERTION Estimates of average daily traffic and peak hour traffic generations for the project were made using the Institute of Transportation Engineers' (ITE) Trip Generation Manual 9 th Edition. ased on the land use categories for the developments and their proposed size, the trip generation estimates were calculated and are shown below in Table 1. ecause of the planned repurposing and downsizing of existing facilities, namely a reduction in the sizes of the existing golf course, tennis club, and restaurant, vesting of these trips is provided in this analysis. The associated reduction of trips was calculated based on existing development components that are planned to be reduced in size. The reduced trips are shown in Table 2. The net trip generation (the difference between trip generation and reduced trips) is also shown in Table 3. The net trip generation was used in determining the traffic volumes expected at site access intersections and distributed to the surrounding road network.

8 Traffic Impact nalysis 8 of 63 TLE 1 Trip Generation Development (Trip Type) Size Land Use ode DT M Peak Hour Trip Ends Enter/Exit (%) (%) PM Peak Hour Trip Ends Enter/Exit (%) (%) ssisted are Living Facility 282 beds /14 65%/35% 27/35 44%/56% Multi-family Housing 215 units /87 20%/80% 88/48 65%/35% Single-family Housing 170 units /97 25%/75% 107/63 63%/37% Total /198 29%/71% 222/146 60%/40% TLE 2 Reduced Trips Development (Trip Type) Size Land Use ode DT Golf ourse 13 holes Racquet/Tennis lub Quality Restaurant 2 courts ,144 sq ft Total 1005 M Peak Hour Trip Ends Enter/Exit (%) (%) 21/6 79%/21% 2/1 N/* 2/2 N/* 25/9 74%/26% PM Peak Hour Trip Ends Enter/Exit (%) (%) 19/19 51%/49% 4/3 N/* 26/13 67%/33% 49/35 58%/42% TLE 3 Net Trip Generation DT M Peak Hour Trip Ends Enter/Exit (%) (%) PM Peak Hour Trip Ends Enter/Exit (%) (%) Net Total Trips /189 23%/77% 173/111 61%/39%

9 Traffic Impact nalysis 9 of 63 TRIP DISTRIUTION ND SSIGNMENT In keeping with practices outlined in the Institute of Transportation Engineer s (ITE s) Traffic ccess and Impact Studies for Site Development, the total project trips are distributed based upon the surrounding land development patterns, existing traffic splits, and knowledge of the project s general market area. Four intersections, shown as blue dots in Figure 2, were identified as primary site access points. Each intersection was then assigned a portion of the net trips expected for the development. The expected percentage for each access intersection is also illustrated in Figure 2. Trips were then distributed for each access intersection (Figures 3-6). Impacted intersections are marked by red dots. oth M and PM peak hours were analyzed independently. Note that certain intersections are expected to be impacted by trips through more than one access point. The site generated trips (Figures 7 through 32) reflect this fact and are shown accordingly. The background and background plus project trips can be seen in Figures 33 through 64 and Figures 65 through 90, respectively.

10 Traffic Impact nalysis 10 of 63 FIGURE 2 nticipated Primary Trip Distribution Percentage of Trips at Site ccess Points

11 Traffic Impact nalysis 11 of 63 FIGURE 3 nticipated Trip Distribution - Northeast ccess

12 Traffic Impact nalysis 12 of 63 FIGURE 4 nticipated Trip Distribution - West ccess

13 Traffic Impact nalysis 13 of 63 FIGURE 5 nticipated Trip Distribution - South ccess

14 Traffic Impact nalysis 14 of 63 FIGURE 6 nticipated Trip Distribution - Southeast ccess

15 Traffic Impact nalysis 15 of 63 FIGURE 7 Trip ssignment: lexander Timberlane Dr (M) FIGURE 8 Trip ssignment: Timberlane Trapnell Rd (M)

16 Traffic Impact nalysis 16 of 63 FIGURE 9 Trip ssignment: Griffin Turkey reek Rd (M) FIGURE 10 Trip ssignment: Griffin Mud Lake Rd (M)

17 Traffic Impact nalysis 17 of 63 FIGURE 11 Trip ssignment: lexander irport Rd/Grant St (M) FIGURE 12 Trip ssignment: lexander Mud Lake Rd (M)

18 Traffic Impact nalysis 18 of 63 FIGURE 13 Trip ssignment: lexander YM Pl (Maki Rd) (M) FIGURE 14 Trip ssignment: harlie Griffin SR 39 (M)

19 Traffic Impact nalysis 19 of 63 FIGURE 15 Trip ssignment: Turkey reek Sydney Rd (M) FIGURE 16 Trip ssignment: Mud Lake harlie Griffin Rd (M)

20 Traffic Impact nalysis 20 of 63 FIGURE 17 Trip ssignment: Turkey reek SR 574 (M) FIGURE 18 Trip ssignment: Turkey reek Trapnell Rd (M)

21 Traffic Impact nalysis 21 of 63 FIGURE 19 Trip ssignment: Mud Lake Trapnell Rd (M) FIGURE 20 Trip ssignment: lexander Timberlane Dr (PM)

22 Traffic Impact nalysis 22 of 63 FIGURE 21 Trip ssignment: Timberlane Trapnell Rd (PM) FIGURE 22 Trip ssignment: Griffin Turkey reek Rd (PM)

23 Traffic Impact nalysis 23 of 63 FIGURE 23 Trip ssignment: Griffin Mud Lake Rd (PM) FIGURE 24 Trip ssignment: lexander irport Rd/Grant St (PM)

24 Traffic Impact nalysis 24 of 63 FIGURE 25 Trip ssignment: lexander Mud Lake Rd (PM) FIGURE 26 Trip ssignment: lexander YM Pl (Maki Rd) (PM)

25 Traffic Impact nalysis 25 of 63 FIGURE 27 Trip ssignment: harlie Griffin SR 39 (PM) FIGURE 28 Trip ssignment: Turkey reek Sydney Rd (PM)

26 Traffic Impact nalysis 26 of 63 FIGURE 29 Trip ssignment: Mud Lake harlie Griffin Rd (PM) FIGURE 30 Trip ssignment: Turkey reek SR 574 (PM)

27 Traffic Impact nalysis 27 of 63 FIGURE 31 Trip ssignment: Turkey reek Trapnell Rd (PM) FIGURE 32 Trip ssignment: Mud Lake Trapnell Rd (PM)

28 Traffic Impact nalysis 28 of 63 FIGURE 33 ackground Traffic: lexander Timberlane Dr (M) FIGURE 34 ackground Traffic: Timberlane Trapnell Rd (M)

29 Traffic Impact nalysis 29 of 63 FIGURE 35 ackground Traffic: Griffin Turkey reek Rd (M) FIGURE 36 ackground Traffic: Griffin Mud Lake Rd (M)

30 Traffic Impact nalysis 30 of 63 FIGURE 37 ackground Traffic: lubhouse Timberlane Dr (M) FIGURE 38 ackground Traffic: Griffin Timberlane Dr North (M)

31 Traffic Impact nalysis 31 of 63 FIGURE 39 ackground Traffic: Griffin Timberlane Dr South (M) FIGURE 40 ackground Traffic: lexander irport Rd/Grant St (M)

32 Traffic Impact nalysis 32 of 63 FIGURE 41 ackground Traffic: lexander Mud Lake Rd (M) FIGURE 42 ackground Traffic: lexander YM Pl (Maki Rd) (M)

33 Traffic Impact nalysis 33 of 63 FIGURE 43 ackground Traffic: harlie Griffin SR 39 (M) FIGURE 44 ackground Traffic: Turkey reek Sydney Rd (M)

34 Traffic Impact nalysis 34 of 63 FIGURE 45 ackground Traffic: Mud Lake harlie Griffin Rd (M) FIGURE 46 ackground Traffic: Turkey reek SR 574 (M)

35 Traffic Impact nalysis 35 of 63 FIGURE 47 ackground Traffic: Turkey reek Trapnell Rd (M) FIGURE 48 ackground Traffic: Mud Lake Trapnell Rd (M)

36 Traffic Impact nalysis 36 of 63 FIGURE 49 ackground Traffic: lexander Timberlane Dr (PM) FIGURE 50 ackground Traffic: Timberlane Trapnell Rd (PM)

37 Traffic Impact nalysis 37 of 63 FIGURE 51 ackground Traffic: Griffin Turkey reek Rd (PM) FIGURE 52 ackground Traffic: Griffin Mud Lake Rd (PM)

38 Traffic Impact nalysis 38 of 63 FIGURE 53 ackground Traffic: lubhouse Timberlane Dr (PM) FIGURE 54 ackground Traffic: Griffin Timberlane Dr North (PM)

39 Traffic Impact nalysis 39 of 63 FIGURE 55 ackground Traffic: Griffin Timberlane Dr South (PM) FIGURE 56 ackground Traffic: lexander irport Rd/Grant St (PM)

40 Traffic Impact nalysis 40 of 63 FIGURE 57 ackground Traffic: lexander Mud Lake Rd (PM) FIGURE 58 ackground Traffic: lexander YM Pl (Maki Rd) (PM)

41 Traffic Impact nalysis 41 of 63 FIGURE 59 ackground Traffic: harlie Griffin SR 39 (PM) FIGURE 60 ackground Traffic: Turkey reek Sydney Rd (PM)

42 Traffic Impact nalysis 42 of 63 FIGURE 61 ackground Traffic: Mud Lake harlie Griffin Rd (PM) FIGURE 62 ackground Traffic: Turkey reek SR 574 (PM)

43 Traffic Impact nalysis 43 of 63 FIGURE 63 ackground Traffic: Turkey reek Trapnell Rd (PM) FIGURE 64 ackground Traffic: Mud Lake Trapnell Rd (PM)

44 Traffic Impact nalysis 44 of 63 FIGURE 65 ackground Plus Project Traffic: lexander Timberlane Dr (M) FIGURE 66 ackground Plus Project Traffic: Timberlane Trapnell Rd (M)

45 Traffic Impact nalysis 45 of 63 FIGURE 67 ackground Plus Project Traffic: Griffin Turkey reek Rd (M) FIGURE 68 ackground Plus Project Traffic: Griffin Mud Lake Rd (M)

46 Traffic Impact nalysis 46 of 63 FIGURE 69 ackground Plus Project Traffic: lexander irport Rd/Grant St (M) FIGURE 70 ackground Plus Project Traffic: lexander Mud Lake Rd (M)

47 Traffic Impact nalysis 47 of 63 FIGURE 71 ackground Plus Project Traffic: lexander YM Pl (Maki Rd) (M) FIGURE 72 ackground Plus Project Traffic: harlie Griffin SR 39 (M)

48 Traffic Impact nalysis 48 of 63 FIGURE 73 ackground Plus Project Traffic: Turkey reek Sydney Rd (M) FIGURE 74 ackground Plus Project Traffic: Mud Lake harlie Griffin Rd (M)

49 Traffic Impact nalysis 49 of 63 FIGURE 75 ackground Plus Project Traffic: Turkey reek SR 574 (M) FIGURE 76 ackground Plus Project Traffic: Turkey reek Trapnell Rd (M)

50 Traffic Impact nalysis 50 of 63 FIGURE 77 ackground Plus Project Traffic: Mud Lake Trapnell Rd (M) FIGURE 78 ackground Plus Project Traffic: lexander Timberlane Dr (PM)

51 Traffic Impact nalysis 51 of 63 FIGURE 79 ackground Plus Project Traffic: Timberlane Trapnell Rd (PM) FIGURE 80 ackground Plus Project Traffic: Griffin Turkey reek Rd (PM)

52 Traffic Impact nalysis 52 of 63 FIGURE 81 ackground Plus Project Traffic: Griffin Mud Lake Rd (PM) FIGURE 82 ackground Plus Project Traffic: lexander irport Rd/Grant St (PM)

53 Traffic Impact nalysis 53 of 63 FIGURE 83 ackground Plus Project Traffic: lexander Mud Lake Rd (PM) FIGURE 84 ackground Plus Project Traffic: lexander YM Pl (Maki Rd) (PM)

54 Traffic Impact nalysis 54 of 63 FIGURE 85 ackground Plus Project Traffic: harlie Griffin SR 39 (PM) FIGURE 86 ackground Plus Project Traffic: Turkey reek Sydney Rd (PM)

55 Traffic Impact nalysis 55 of 63 FIGURE 87 ackground Plus Project Traffic: Mud Lake harlie Griffin Rd (PM) FIGURE 88 ackground Plus Project Traffic: Turkey reek SR 574 (PM)

56 Traffic Impact nalysis 56 of 63 FIGURE 89 ackground Plus Project Traffic: Turkey reek Trapnell Rd (PM) FIGURE 90 ackground Plus Project Traffic: Mud Lake Trapnell Rd (PM)

57 Traffic Impact nalysis 57 of 63 INTERSETION NLYSES, LEVEL OF SERVIE DETERMINTIONS ND REOMMENDTIONS The intersection impact analyses were conducted for both background and background plus project conditions. Highway apacity Software was used to determine the expected levels of service. Tables 4, 5, and 6 summarize the results of the HS analysis for primary development intersections, internal development intersections, and off-site intersections, respectively. The results of the analyses are included in ppendix for the background and background plus project conditions. Note than for two-way stop controlled intersections, overall LOS was not calculated by HS. These intersections scores are noted with N/. Primary Development Intersection Impacts s Table 4 indicates, levels of service at primary site access intersections remain nearly unaffected by traffic generated by the development. The M peak level of service for lexander St at Timberlane Dr drops from a to a D. Similarly, the M peak level of service for Griffin lvd at Mud Lake Rd drops from an to a. However, the total delay per vehicle at the Griffin lvd and Mud Lake Rd intersection increases by less than ½ second. No individual turning movement level of service falls by more than one letter grade. Internal Development Intersection Impacts Internal intersections were not analyzed for level of service with project traffic conditions, as traffic distribution throughout the development would be too variable and difficult to predict without an origin-destination study. However, it is expected that level of service scores for internal intersections would remain steady or deteriorate only slightly. ll movements currently operate at level of service or.

58 Traffic Impact nalysis 58 of 63 Other Intersection Impacts Level of service scores for off-site intersections by and large remain unchanged. Delays increase minimally for most intersections. s expected, intersections closer to site access points and those impacted by vehicles travelling through more than one access point suffer greater delays than intersections located further away from site access points. This is predictable, as traffic volume dispenses more and more as distance from site access points increases. Turkey reek Rd at Sydney Rd was the only intersection with a decline in overall level of service, with a drop from an E to an F for the PM peak period. Delays are not such that we would recommend a traffic signal. With regard to individual turning movements, level of service scores drop by no more than one letter grade for off-site intersections. Recommendations Of the 16 intersections analyzed, most remain unaffected by the proposed site developments. While site generated traffic does affect all intersections analyzed, the expected delays per vehicle are increased by only marginal amounts. In fact, only three intersections suffer a decrease in overall level of service score: lexander St at Timberlane Dr, Griffin lvd at Mud Lake Rd, and Turkey reek Rd at Sydney Rd. However, no individual turning movement level of service is expected to decrease by more than one letter grade. For these reasons, no mitigation efforts are recommended at this time.

59 Traffic Impact nalysis 59 of 63 TLE 4 Primary Development Intersections Levels of Service - Summary Intersection Name Movemen t M Peak Period ackground with Project PM Peak Period ackground with Project lexander Timberlane Dr E L E T W L W T N L N T N R S L S T S R F E D F F E D F E E D E F E D E Overall D Timberlane Trapnell Rd E LTR W LTR N LTR S LTR Overall N/ N/ N/ N/ Griffin Turkey reek Rd S LT W L W R D D D Overall N/ N/ N/ N/ Griffin Mud Lake Rd E W N Overall

60 Traffic Impact nalysis 60 of 63 TLE 5 Internal Development Intersections Levels of Service - Summary Intersection Name Movemen t M Peak Period ackground with Project PM Peak Period ackground with Project lubhouse Timberlane Dr N LT E LR N/ N/ Overall N/ N/ N/ N/ Griffin Timberlane Dr North N L S L W LTR E LTR N/ N/ Overall N/ N/ N/ N/ Griffin Timberlane Dr South N LT E LR N/ N/ Overall N/ N/ N/ N/

61 Traffic Impact nalysis 61 of 63 TLE 6 Other Impacted Intersections Levels of Service - Summary Intersection Name Movemen t M Peak Period ackground with Project PM Peak Period ackground with Project lexander irport Rd/Grant St E L E T E R W L W T N L N T N R S L S T S R E E F D D E E F D D D F F D D D F F D D Overall D D D D lexander Mud Lake Rd N L E LR E E E E Overall N/ N/ N/ N/ lexander YM Pl E L W L N LTR S LTR D E E E Overall N/ N/ N/ N/ harlie Griffin SR 39 E L E T W T N L N T N R S L S T S R D E D D E D E E D E E D Overall Turkey reek Sydney Rd E W N S D E E E F E F F Overall E F

62 Traffic Impact nalysis 62 of 63 TLE 6 (cont d) Intersection Name Movemen t M Peak Period ackground with Project PM Peak Period ackground with Project Mud Lake harlie Griffin Rd E W N S Overall Turkey reek SR 574 E L E T E R W L W T WR N L N T S L S T D D D D Overall Turkey reek Trapnell Rd E T W T N T S T Overall Mud Lake Trapnell Rd E W N S Overall

63 Traffic Impact nalysis 63 of 63 PPENDIX Data and nalyses Sheets

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

13.1. INTRODUCTION AND SUMMARY OF FINDINGS

13.1. INTRODUCTION AND SUMMARY OF FINDINGS Chapter 13: Traffic and Transportation 13.1. INTRODUCTION ND SUMMRY OF FINDINGS This Chapter assesses the potential traffic and transportation impacts of the Proposed Project and the Proposed Project s

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Table 1 Eagle River Station Trip Generation Estimate Eagle, Colorado (LSC #110150; May, 2011) Trip Generation Rates (1),(2) Total Trips Generated Land

Table 1 Eagle River Station Trip Generation Estimate Eagle, Colorado (LSC #110150; May, 2011) Trip Generation Rates (1),(2) Total Trips Generated Land Table 1 Eagle River Station Trip Generation Estimate Eagle, olorado (LS #110150; May, 2011) Trip Generation Rates (1),(2) Total Trips Generated Land Land Trip verage Morning fternoon lternate verage Morning

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out October 24, 218 Mr. Justin D. Bridges, AIA, LEED AP Davidson A+E 431 Indian Creek Parkway Overland Park, KS 6627 RE: Dear Mr. Bridges, Trip Generation Overland Park, Kansas As requested, Priority Engineers,

More information

STAFF REPORT # CHANGE OF ZONING

STAFF REPORT # CHANGE OF ZONING STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Transportation Land Development Environmental S e r v i c e s

Transportation Land Development Environmental S e r v i c e s Transportation Land Development Environmental S e r v i c e s Memorandum To: Ms. Kristin E. Kassner Planning Director Town Hall Annex 25 Center Street Burlington, MA 01803 Date: September 23, 2013 Project

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Appendix B- Memorandums

Appendix B- Memorandums Appendix - Memorandums MEMORADUM To Tom Percival, FDOT Joe erenis, OOEA Mark allahan, H2MHill Gary Skaff, PS&J From Luis Diaz, HT Josiah anet, HT c Subject Impacts to Mount Dora Traffic Due to Wekiva Parkway

More information

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS 161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

RE: Traffic Impact Statement: Paper Mill Lake Subdivision

RE: Traffic Impact Statement: Paper Mill Lake Subdivision April 6 th, 2016 United Gulf Developments Limited 60 Walter Havill Dr, Suite 111 Halifax, Nova Scotia B3N 0A9 Attention: Navid Saberi RE: Traffic Impact Statement: Paper Mill Lake Subdivision DesignPoint

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS

TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS This document reviews the methodologies and tools used to calculate the projected ridership and parking space needs from the proposed Texas City Park & Ride to

More information

AVAILABLE AM / PM PEAK HOUR TRAFFIC VOLUMES AND LEVELS OF SERVICE (17 JANUARY 2013)

AVAILABLE AM / PM PEAK HOUR TRAFFIC VOLUMES AND LEVELS OF SERVICE (17 JANUARY 2013) 471 / 402 (A / A) 14 / 39 (B / B) 46 / 22 (B / B) 32 / 65 (B / B) 358 / 415 (A / A) 8 / 34 (B / B) 125 / 210 () 434 / 243 () 17 / 15 (C / C) [C / B] [B / C] 18 / 10 (B / B) 13 / 11 (C / C) 108 / 192 (C

More information

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i EXECUTIVE SUMMARY MacKenzie Engineering and Planning, Inc. performed an analysis of the traffic impacts resulting from the proposed project site located at 25 SE 4th Avenue, Delray Beach, Florida (PCN

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Inwood Bypass Retail Center Berkeley County, West Virginia October 2014

Inwood Bypass Retail Center Berkeley County, West Virginia October 2014 Inwood ypass Retail Center erkeley County, West Virginia October 2014 TRFFIC IMPCT NLYSIS FOR INWOOD YPSS RETIL CENTER LOCTED IN ERKELEY COUNTY, WEST VIRGINI Prepared for: ohler Engineering, P.e. 28 lackwell

More information

Environmental Assessment Derry Road and Argentia Road Intersection

Environmental Assessment Derry Road and Argentia Road Intersection Air and Noise Study Environmental Assessment Derry Road and Argentia Road Intersection Project 11-4295 City of Mississauga, Region of Peel October 17, 2014 1 Region of Peel Environmental Assessment for

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development Solmar Development Corp. 144&176 John St. and 2 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development TRANSPORTATION IMPACT STUDY 18145 November 217 LEA Consulting Ltd. Consulting

More information

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508) Associates Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508) 885-5121 Ms. Teri Ford, Associate 800 Boylston Street, Suite 1570 Boston, MA July

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Replacement Project EIR Appendices TRAFFIC IMPACT ANALYSIS LAKE WOHLFORD DAM Escondido, California December 19,

More information

Shoppes at Pine Meadow BPUD DeBary, Florida. Traffic Impact Analysis

Shoppes at Pine Meadow BPUD DeBary, Florida. Traffic Impact Analysis Shoppes at Pine Meadow BPUD DeBary, Florida Traffic Impact Analysis Prepared for: CPH, Inc. By: Lassiter Transportation Group, Inc. Revised October 2015 Table of Contents Introduction... 1 Study Procedures...

More information

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject:

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject: MEMORANDUM Date: August 12, 2014 TG: 13329.01 To: From: Subject: Jeremy Krout EPD Solutions Inc. Rafik Albert EPD Solutions Inc. Rawad Hani Transpo Group AP North Lake Solar Project Traffic Scoping The

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Prepared for: Ontario Inc. CHICKADEE GROVE COMMUNITY PROPOSED RESIDENTIAL DEVELOPMENT TOWN OF CALEDON TRANSPORTATION OPINION LETTER

Prepared for: Ontario Inc. CHICKADEE GROVE COMMUNITY PROPOSED RESIDENTIAL DEVELOPMENT TOWN OF CALEDON TRANSPORTATION OPINION LETTER Prepared for: 2414176 Ontario Inc. CHICKADEE GROVE COMMUNITY PROPOSED RESIDENTIAL DEVELOPMENT TOWN OF CALEDON TRANSPORTATION OPINION LETTER 1616095-001-T01 October 2016 October 06, 2016 16-16095-001 Mr.

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA 20 March 2014 Report prepared by: Corli Havenga Transportation Engineers

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II

LOTUS RANCH TRAFFIC IMPACT ANALYSIS. LLG Ref Senior Transportation Engineer & Charlene Sadiarin Transportation Engineer II TRAFFIC IMPACT ANALYSIS LOTUS RANCH El Centro, California July 31, 2015February 12, 2016 LLG Ref. 3-14-2392 Prepared by: KC Yellapu, P.E Senior Transportation Engineer & Charlene Sadiarin Transportation

More information

Do Standard Trip Generation Rates Overstate Impact of Commercial Uses?

Do Standard Trip Generation Rates Overstate Impact of Commercial Uses? Do Standard Trip Generation Rates Overstate Impact of Commercial Uses? Presented by: Tindale-Oliver & Associates, Inc. Presentation Overview 1 2 3 4 5 Introduction Trip Characteristics Database TOA Demand

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

MANHATTAN VILLAGE ENHANCEMENT PROJECT

MANHATTAN VILLAGE ENHANCEMENT PROJECT MANHATTAN VILLAGE ENHANCEMENT PROJECT Traffic & Parking Analysis Manhattan Beach City Council September 2013 Study Area and Analyzed Intersections Intersection LOS Results Project Improvements Dedicate

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

Citizens Committee for Facilities

Citizens Committee for Facilities Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information