1 Memo To: From: Adrian Soo, P. Eng. Markham, ON : Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry A cursory review of the interchange geometrics at Dominion Boulevard, Dougall Avenue, and Howard Avenue has been completed. The review found that none of the deficiencies are major and should not be leading to any safety or operational concerns. The numbers from the 1993 Dillion report are still valid. It appears the N/S-W ramps at Dominion Bouldvard and Dougall Avenu have a Length of Curve (Lc) that are slightly shorter than they should be, which is not a significant deficiency. The overall length of the speed change lanes still meet the standard and will not affect the operations of the ramps. Similarly, the weaving lengths were reviewed. Generally, any weaving lengths should be kept above 600 metres. For shorter lengths, analysis is required, since any length creating a lower operational speed could be considered a weaving problem. Based on our review of the plans, the weaving length between Dominion Boulevard and Dougall Avenue is 465 metres, and between Dougall Avenue and Howard Avenue is 335 metres. 2. Assessment of Existing Operational Conditions 2.1 Traffic Data Traffic data counts were conducted and collected for the E.C. Row Expressway specifically between the section of Dominion Boulevard and Dougall Avenue. Video counts were undertaken in April 2015 during the a.m. and p.m. peak periods to capture ramp and mainline volumes in both the eastbound and westbound directions. Specifically, the video counts were utilized to determine merging, diverging, and through movements. It should be noted that during data collection, construction was underway on a section of the E.C. Row Expressway just east of the Howard Avenue interchange. The video count data for the on and off ramp volumes collected in April 2015 were compared to the ramp terminal volumes from the November 2014 intersection data collection. The April 2015 ramp volumes were generally found to be lower, which may be attributed to the construction activities occurring east of the Howard Avenue interchange. From reviewing the video files, it was also noted that there were many instances of large gaps in mainline flows or relatively sparse mainline flows, which allowed weaving movements to occur without conflict on a regular basis.

2 Page 2 of 29 Slowdowns in the weaving sections between Dominion Boulevard and Dougall Avenue due to the density of traffic and conflicting lane changes were relatively rare. The methodology to determine the weaving volumes for analysis was to utilize the existing on and off ramp volumes collected (November 2014 data) and apply the merge, diverge, and through movement percentages determined from the video counts. That is, the lower observed ramp volumes from the video counts were adjusted to match the November 2014 ramp terminal intersection counts. This only applies to the section between Dominion Boulevard and Dougall Avenue. For the section between Dougall Avenue and Howard Avenue, the existing on and off ramp volumes were again the base starting points. The 1993 Study conducted by Dillion Consulting Traffic Evaluation and Planning Study E.C. Row Expressway was referenced to determine the a.m. and p.m. peak hour merge, diverge, and through percentages (as well as truck percentages). These were subsequently applied to the existing ramp volumes to obtain the weaving volumes for analysis. In regards to truck percentages, the 1993 Study was referenced and it was determined that for our sections of interest suitable truck percentages would be 8% and 6%, for the a.m. and p.m. peak hours, respectively. In addition to the above, a further adjustment to the traffic volumes was made as a sensitivity test to account for what appears to be abnormally high ramp volumes in some of the November 2014 ramp terminal intersection counts (i.e. Dominion Boulevard EB On-Ramp & Howard Avenue EB Off- Ramp). Shown in Figure 1, Figure 2, and Figure 3, these volumes provide a balanced set of existing traffic volumes to be used for analysis, for the a.m., p.m. and p.m. sensitivity peak hours, respectively. 40% Dougall Ave - Dominion Blvd 8% Howard Ave - Dougall Ave Dominion Blvd , Dougall Ave ,303 Howard Ave. 81 1, ,040 3, , , , , % Dominion Blvd - Dougall Ave 12% Dougall Ave - Howard Ave

3 Page 3 of 29 Figure 1 AM Peak Hour Traffic Volumes 37% 8% Dougall Ave - Dominion Blvd Howard Ave - Dougall Ave Dominion Blvd. 314 Dougall Ave. 637 Howard Ave , , ,439 2, ,121 2, ,389 1, % 5% Dominion Blvd - Dougall Ave Dougall Ave - Howard Ave Figure 2 PM Peak Hour Traffic Volumes 37% 8% Dougall Ave - Dominion Blvd Howard Ave - Dougall Ave Dominion Blvd Dougall Ave ,303 Howard Ave. 69 1, ,439 2, ,128 2, % 5% Dominion Blvd - Dougall Ave Dougall Ave - Howard Ave Figure 3 Sensitivity PM Peak Hour Traffic Volumes

4 Page 4 of Weaving Segment and Ramps riteria Weaving The following information was extracted from the HCS+ Plus Software Guide Level of Service Criteria for Basic Freeway Sections from HCM Exhibit 24-2 in Maximum Density: Level of Service LOS A LOS D LOS E LOS F Freeway, Multilane and C-D 0 8 pc/km/ln >8 15 pc/km/ln >15 20 pc/km/ln >20 23 pc/km/ln >23 25 pc/km/ln > 25 pc/km/ln Ramps &Ramp Junctions Level of Service Criteria for Ramps and Ramp Junctions from HCM Exhibit 25-4 in Maximum Density Level of Service LOS A LOS D LOS E LOS F Ramps/Ramp Junctions 0 6 pc/km/ln >6 12 pc/km/ln >12 17 pc/km/ln >17 22 pc/km/ln >22 pc/km/ln Exceed HCM Exhibit 25-4 Limits

5 Page 5 of E.C. Row Expressway Analysis Weaving HCS+ software was utilized to analyze the weaving volume sections. The HCS+ software implements the methods of the 2000 Highway Capacity Manual (HCM). The analysis results are summarized below in Table 1. The p.m. peak hour sensitivity analysis results are provided in brackets. Table 1 Weaving Analysis E.C. Row Expressway Existing 2014 Conditions Direction Weaving Section AM Peak Hour PM Peak Hour EB Dominion Boulevard Dougall Avenue (465 m weaving section) () Dougall Avenue Howard Avenue (335 m weaving section) () WB Howard Avenue Dougall Avenue (335 m weaving section) Dougall Avenue Dominion Boulevard (465 m weaving section) The analysis results indicate that the weaving sections between Dominion Boulevard and Dougall Avenue, and between Dougall Avenue and Howard Avenue, are currently operating at or better in both the eastbound and westbound directions, which is an acceptable level of service and HCS+ software was utilized to analyze the merge and diverge ramp movements. The analysis results are summarized below in Table 2. Similarly, the p.m. peak hour sensitivity analysis results are provided in brackets.

6 Page 6 of 29 Table 2 Ramp Analysis E.C. Row Expressway Existing 2014 Conditions Direction E.C. Row Expressway Section / AM Peak Hour PM Peak Hour EB Dominion Boulevard Dougall Avenue (on-ramp) () (off-ramp) () Dougall Avenue Howard Avenue (on-ramp) () (off-ramp) () WB Howard Avenue Dougall Avenue (on-ramp) LOS D (off-ramp) Dougall Avenue Dominion Boulevard (on-ramp) (off-ramp) LOS D The ramps analysis results indicate that operations at the on and off ramps at Dominion Boulevard, Dougall Avenue, and Howard Avenue are all operating at good levels of service during both the a.m. and p.m. peak hours.

7 Page 7 of Assessment of E.C. Row Expressway Alternatives 3.1 Single Point Urban Interchange (SPUI) at Dominion Boulevard The single point urban interchange (SPUI) design is similar in form to a diamond interchange, but has the advantage of allowing opposing left turns to proceed simultaneously by compressing the two closely spaced intersections of a diamond into one single intersection over or under the free-flowing road. Along Dominion Boulevard, combining the two existing ramp terminal intersections into a single intersection would require reconstruction of most of the existing interchange. Most notably, a new longer bridge structure on the E.C. Row Expressway over Dominion Boulevard would be required. The proposed SPUI design for Dominion Boulevard is illustrated in Figure 4. Figure 4 Single Point Urban Interchange at Dominion Boulevard The main purpose of the SPUI alternative is to address the queuing issues between the existing, closely-spaced north and south ramp terminals.

8 Page 8 of 29 Using existing base year (November 2014) traffic counts, traffic volumes were redistributed to the appropriate ramps and subsequently analyzed. The traffic volumes are illustrated in Figure 5 and Figure 6, for the a.m. and p.m. peak hours, respectively. Figure 5 SPUI Dominion Boulevard AM Peak Hour Volumes

9 Page 9 of 29 Figure 6 - SPUI Dominion Boulevard PM Peak Hour Volumes A level of service analysis was undertaken, and the results for the SPUI interchange alternative are summarized in Table 3. Intersection Dominion Boulevard/ EC Row SPUI Table 3 Single Point Urban Interchange (SPUI) at Dominion Boulevard Existing 2014 Conditions Approach/Movement AM Peak Hour PM Peak Hour LOS Delay v/c Q LOS Delay v/c Q Left C C Dual Through C D Left D E Dual Through A B EB Left B B WB Left D D Overall Intersection C D

10 Page 10 of 29 It should be noted that the existing cycle lengths were utilized due to coordination along the Dominion Boulevard corridor. Signal timing was optimized within the background cycle length. In comparison to the existing interchange configuration, there are southbound left-turn queuing issues at the South Ramp, with queues extending to the upstream North Ramp. These queuing issues are resolved under the SPUI alternative, but result in several movements, and the intersection as a whole, operating at or slightly above capacity. As well, a widening of Dominion Boulevard north of the E.C. Row Expressway would be required to accommodate the longer southbound left turn lane in the SPUI alternative. In summary, the SPUI alternative alleviates the existing queuing issue, but the single ramp terminal approach would essentially operate at capacity during peak periods. To improve the operation would require capacity improvements such as consideration of dual left turn lanes on one or more approaches and any related widening of the north-south legs of the intersection to accommodate dual turning lanes (both on the approach and receiving lanes). 3.2 Combined Dougall Avenue and Howard s A combined interchange design eliminates the inner loop ramps at Dougall Avenue (Ramps E-N/S and Ramps N/S-E), and provides connecting east-west service roads (grade separated on structures where crossing the CN rail line) on both the north and south sides of the E.C. Row Expressway. Additionally, the combined interchange would result in changes to signing on the expressway to indicate that two interchanges are served by the westbound off-ramp at Howard Avenue and the eastbound off-ramp at Dougall Avenue. The combined interchanges alternative design is illustrated in Figure 7.

11 Page 11 of 29 Legend: New East-West Service Roads To Be Removed Figure 7 Combined Interchange (Dougall Avenue & Howard Avenue) The purpose of this alternative is to eliminate the short weaving section between Dougall Avenue and Howard Avenue. Traffic volumes were generated from base year (November 2014) counts for the new intersection arrangements at the North and South Ramp s with Dougall Avenue, and at the North and South Ramp s with Howard Avenue. The traffic volumes are illustrated in Figure 8 and Figure 9 for a.m. and p.m. peak hours, at Dougall Avenue and Howard Avenue, respectively.

12 Page 12 of 29 Dougall Avenue South North 0 (1) 2001 (1394) 239 (231) (2304) 948 (268) (7) 0 (1) 2001 (1394) 239 (231) (2304) 948 (268) (7) Before After 0 (2) 271 (356) 1772 (1061) (546) 371 (1723) (11) 0 (2) 1772 (1061) 271 (356) (1723) 799 (546) (11) Figure 8 Combined Interchange Dougall Avenue Peak Hour Traffic Volumes

13 Page 13 of 29 Howard Avenue North 5 (6) 1256 (1185) 171 (518) (2197) 761 (174) (0) 5 (6) 1256 (1185) 171 (518) (2197) 761 (174) (0) Before After South 5 (4) 13 (53) 1048 (1497) (2059) 896 (439) (0) 5 (4) 13 (53) 1048 (1497) (2059) 896 (439) (0) Figure 9 Combined Interchange Howard Avenue Peak Hour Traffic Volumes A level of service analysis was undertaken to determine whether the proposed alternative would operate and accommodate the re-distributed traffic volumes. Analysis was undertaken by providing necessary additional lanes for the new ramp approaches, but with no other improvements. Subsequently, analysis was also undertaken with logical improvements to accommodate the additional traffic volumes. The intersections were optimized within their existing cycle lengths and offsets.

14 Page 14 of 29 Analysis results are summarized in Table 4 below. Intersection Dougall Avenue/ EC Row North Ramp Dougall Avenue/ EC Row North Ramp Improved Dougall Avenue/EC Row South Ramp Dougall Avenue/ EC Row South Ramp Improved Table 4 Combined Interchanges Dougall Avenue & Howard Avenue Existing 2014 Conditions Approach/Movement AM Peak Hour PM Peak Hour LOS Delay v/c Q LOS Delay v/c Q Left E F WB Through C F Right C D Left B F Dual Through A B Dual Through C F Right A < < 1 A < < 1 Overall Intersection C F Left D E WB Dual Through C D Right C C Left B F Triple Through A C Triple Through C D Right A < < 1 A < < 1 Overall Intersection B D EB Dual Left C C Thru/Right F F Dual Through F A Right B A Left F F Dual Through B A Overall Intersection F F Left E C EB Dual Through C E Right C C Triple Through E D Right B D Left E E Triple Through A B Overall Intersection D D * Shaded Orange Cells: The additional lane improvements required as compared to the initial analysis

15 Page 15 of 29 Intersection Howard Avenue/ EC Row North Ramp Howard Avenue/ EC Row North Ramp Improved Howard Avenue/ EC Row South Ramp Howard Avenue/ EC Row South Ramp Improved Table 4 Combined Interchanges Dougall Avenue & Howard Avenue Existing 2014 Conditions Approach/Movement AM Peak Hour PM Peak Hour LOS Delay v/c Q LOS Delay v/c Q Left B D WB Left/Through D F Right A < 1 A < < 1 Left C F Triple Through B B Triple Through C F Right A < < 1 A < < 1 Overall Intersection C F Left C F WB Dual Through D D Right A < 1 A < < 1 Left B F Triple Through B B Triple Through B F Right A < < 1 A < < 1 Overall Intersection B E Left F F EB Through B B Right A < < 1 A < < 1 WB Right A B Triple Through C D Right C < 1 B Triple Through D C Right A < < 1 A < < 1 Overall Intersection D E Dual Left C D EB Through B C Right A < < 1 A < < 1 WB Right B B Triple Through C C Right C < 1 B Triple Through C B Right A < < 1 A < < 1 Overall Intersection C C * Shaded Orange Cells: The additional lane improvements required as compared to the initial analysis

16 Page 16 of 29 The initial analysis undertaken for the combined interchanges alternative resulted in relatively poor operations, as such, major intersection improvements would be required. The improvements required would involve providing additional through lanes on several approaches. These improvements are highlighted in orange cells and have been analyzed. It is noted that even with substantial intersection improvements, volume demands approach or exceed capacity on many critical movements. In summary, the combined interchange would eliminate the short weaving section on the E.C. Row Expressway between Dougall Avenue and Howard Avenue, but would incur substantial cost for new structures over the CN rail line and for intersection improvements, and the ramp terminal intersections would operate at or over capacity. 3.3 Core-Collector System of E.C. Row Expressway As in the 1993 Dillon Traffic Evaluation and Planning Study (TEPS) report, the addition of 2-lanes both eastbound and westbound in the centre median area and separated from the existing expressway lanes, would allow through traffic to bypass the Dominion Boulevard to Howard Avenue weaving sections. The purpose of a core-collector system on the E.C. Row Expressway would be to provide additional mainline capacity and to improve weaving operations by reducing traffic in the subject weaving areas. Based upon adjusted traffic volumes, through traffic has been reassigned to core lanes with the corresponding reduction in traffic in the weaving sections. The reassigned traffic volumes are illustrated in Figure 10, Figure 11, and Figure 12, for the a.m., p.m., and p.m. sensitivity peak hours Dominion Blvd. 279 Dougall Ave. 269 Howard Ave , , Figure 10 AM Peak Hour Traffic Volumes

17 Page 17 of Dominion Blvd. 314 Dougall Ave. 637 Howard Ave , , , Figure 11 PM Peak Hour Traffic Volumes Dominion Blvd. 314 Dougall Ave. 637 Howard Ave , Figure 12 Sensitivity PM Peak Hour Traffic Volumes Weaving analysis as well as ramp analysis was again undertaken to evaluate operational conditions with a core-collector system Weaving HCS+ software was utilized to analyze the weaving volume sections. The HCS+ software implements the methods of the 2000 Highway Capacity Manual (HCM). The analysis results are summarized below in Table 5. The p.m. peak hour sensitivity analysis results are provided in the brackets.

18 Page 18 of 29 Table 5 Weaving Analysis E.C. Row Expressway Core-Collector System Conditions Direction Weaving Section AM Peak Hour PM Peak Hour EB Dominion Boulevard Dougall Avenue (465 m weaving section) (LOS A) Dougall Avenue Howard Avenue (335 m weaving section) () WB Howard Avenue Dougall Avenue (335 m weaving section) Dougall Avenue Dominion Boulevard (465 m weaving section) In comparison to the existing conditions assessment, the weaving analysis results remain generally similar; however, several areas improve as a result of the core-collector system. This includes the p.m. sensitivity analysis (highlighted results) where the weaving sections in the eastbound direction between Dominion Boulevard and Dougall Avenue improve by a full level of service & HCS+ software was utilized to analyze the merge and diverge ramps. The analysis results are summarized below in Table 6. Similarly, the p.m. peak hour sensitivity analysis results are provided in brackets. Table 6 Ramp Analysis E.C. Row Expressway Core-Collector System Conditions Direction E.C. Row Expressway Section / AM Peak Hour PM Peak Hour EB Dominion Boulevard Dougall Avenue (on-ramp) () (off-ramp) LOS A LOS A (LOS A) Dougall Avenue Howard Avenue (on-ramp) () (off-ramp) LOS A LOS A (LOS A) WB Howard Avenue Dougall Avenue (on-ramp) LOS A LOS A

19 Page 19 of 29 (off-ramp) (on-ramp) (off-ramp) Dougall Avenue Dominion Boulevard LOS A LOS A In comparison to the existing conditions assessment, the ramp analysis results show several areas improving as a result of the core-collector system. The highlighted results represent improved operating conditions in comparison to the existing conditions assessment. Most notably the off-ramp operations in the westbound direction at Dominion Boulevard improved significantly, from LOS D and, during the a.m. and p.m., respectively, to LOS A for both peak hours. In summary, the development of a core-collector system would have the benefits of providing higher mainline capacity for the E.C. Row Expressway, maintaining or improving operations in the weaving sections between Dominion Boulevard and Dougall Avenue and between Dougall Avenue and Howard Avenue, facilitating alternative routing during routine maintenance along this section of the expressway, and retaining the convenience and familiarity of the ramp terminals at each of these north-south roadways. 6. E.C. Row Expressway Collisions New traffic data was received from the City of Windsor on April 23, 2015 for the entire section of the E.C. Row Expressway. This data set included traffic volumes and collisions on the mainline, collector, transfer, and ramp facilities for a 5-year collision history period from 2007 through to Traffic data and collision information pertaining to our Study Area is summarized in Table 7 and Table 8, mainline and ramp facilities, respectively.

20 Page 20 of 29 Road Section Count Date Table 7 Mainline Mid-Block Collisions E.C. Row Expressway Section Length (km) Est. Average AADT ( ) 1 Total Collisions ( ) Collision Rate (collisions per MVkm) Predicted Collisions Excess Collisions ( ) EB Direction Huron Church to Dominion , Dominion to Dougall , Dougall to Howard , WB Direction Howard to Dougall , Dougall to Dominion , Dominion to Huron Church , Estimated averaged AADT over 5 year period based upon growth rate from historical volumes;

21 Page 21 of 29 Ramp Section Count Date Table 8 Ramp Collisions E.C. Row Expressway Section Length Est. Average AADT ( ) 1 Total Collisions ( ) Collision Rate (collisions per MVkm) Predicted Collisions Excess Collisions ( ) Dominion Boulevard EB Off-Ramp , WB On-Ramp WB Off-Ramp , EB On-Ramp , Dougall Avenue WB On-Ramp , EB Off-Ramp , WB Off- Ramp , EB On-Ramp , Howard Avenue WB On-Ramp , EB Off-Ramp , WB Off-Ramp , EB On-Ramp (N-E) , EB On-Ramp (S-E) , Estimated averaged AADT over 5 year period based upon growth rate from historical volumes;

22 Page 22 of Future Assessment Future growth in traffic over 20 years has been determined and the existing traffic volumes have been factored up. Specifically, a growth rate of 0.25% per annum has been utilized which represents 5% growth over 20 years. 4.1 Future E.C. Row Expressway Analysis Future Weaving Weaving analysis results for the future 2034 condition are summarized below in Table 9. The p.m. peak hour sensitivity analysis results are provided in brackets. Table 9 Weaving Analysis E.C. Row Expressway Future 2034 Conditions Direction Weaving Section AM Peak Hour PM Peak Hour Dominion Boulevard Dougall Avenue () EB (465 m weaving section) pc/km/ln 9.46 pc/km/ln Dougall Avenue Howard Avenue () (335 m weaving section) pc/km/ln pc/km/ln Howard Avenue Dougall Avenue (335 m weaving section) pc/km/ln pc/km/ln WB Dougall Avenue Dominion Boulevard (465 m weaving section) pc/km/ln pc/km/ln The analysis results in comparison to existing conditions all results remain the same with the exception of westbound section between Howard Avenue and Dougall Avenue. Under the a.m. peak hour the weaving level of service changes from to.

23 Page 23 of Future and Future analysis results for the merge and diverge ramp movements are summarized below in Table 10. Similarly, the p.m. peak hour sensitivity analysis results are provided in brackets. Table 10 Ramp Analysis E.C. Row Expressway Future 2034 Conditions Direction E.C. Row Expressway Section / AM Peak Hour PM Peak Hour () Dominion Boulevard Dougall Avenue (on-ramp) 12.5 pc/km/ln 10.0 pc/km/ln () EB (off-ramp) 10.3 pc/km/ln 7.5 pc/km/ln () Dougall Avenue Howard Avenue (on-ramp) 11.5 pc/km/ln 11.2 pc/km/ln () (off-ramp) 9.9 pc/km/ln 9.6 pc/km/ln LOS D Howard Avenue Dougall Avenue (on-ramp) 18.1 pc/km/ln 13.9 pc/km/ln LOS D WB (off-ramp) 17.2 pc/km/ln 12.8 pc/km/ln (on-ramp) 16.0 pc/km/ln 12.4 pc/km/ln Dougall Avenue Dominion Boulevard (off-ramp) LOS D 19.4 pc/km/ln 15.4 pc/km/ln In comparison to existing conditions results, the movements highlighted in bold degraded a level of service.

24 Page 24 of Future Assessment of E.C. Row Expressway Alternatives 5.1 Single Point Urban Interchange (SPUI) at Dominion Boulevard Analysis results for the future condition are summarized in Table 11 below. Intersection Dominion Boulevard/ EC Row SPUI Table 11 Single Point Urban Interchange (SPUI) at Dominion Boulevard Future 2034 Conditions Approach/Movement AM Peak Hour PM Peak Hour LOS Delay v/c Q LOS Delay v/c Q Left C C Dual Through D D Left D F Dual Through B B EB Left B B WB Left D E Overall Intersection D D Analysis results are slightly exacerbated in comparison to existing conditions. 5.2 Combined Dougall Avenue and Howard s Analysis results for the future conditions are summarized in Table 12. Intersection Dougall Avenue/ EC Row North Ramp Dougall Avenue/ EC Row North Ramp Table 12 Combined Interchanges Dougall Avenue & Howard Avenue Future 2034 Conditions Approach/Movement AM Peak Hour PM Peak Hour LOS Delay v/c Q LOS Delay v/c Q Left F F WB Through C F Right C D Left B F Dual Through B B Dual Through C F Right A < < 1 A < < 1 Overall Intersection C F Left D E WB Dual Through C D Right C C Left B F Triple Through B C

25 Page 25 of 29 Triple Through C D Improved Right A < < 1 A < < 1 Overall Intersection B D Dual Left C C EB Dougall Thru/Right F F Avenue/EC Dual Through F A Row South Right B A Ramp Left F F Dual Through B A Overall Intersection F F Left F C Dougall EB Dual Through C E Avenue/ Right C C EC Row Triple Through D D South Ramp Right B E Left F E Triple Through A B Improved Overall Intersection D D * Shaded Orange Cells: The additional lane improvements required as compared to the initial analysis Intersection Howard Avenue/ EC Row North Ramp Howard Avenue/ EC Row North Ramp Improved Table 12 Combined Interchanges Dougall Avenue & Howard Avenue Future 2034 Conditions Approach/Movement AM Peak Hour PM Peak Hour LOS Delay v/c Q LOS Delay v/c Q Left B E WB Left/Through E F Right A < 1 A < < 1 Left C F Triple Through B B Triple Through C F Right A < < 1 A < < 1 Overall Intersection C F Left C F WB Dual Through C D Right A < 1 A < < 1 Left B F Triple Through B B Triple Through B F Right A < < 1 A < < 1 Overall Intersection B E Howard EB Left F F

26 Page 26 of 29 Avenue/ EC Row South Ramp Howard Avenue/ EC Row South Ramp Improved Through B B Right A < < 1 A < < 1 WB Right B B Triple Through C D Right C < 1 C Triple Through C D Right A < < 1 A < < 1 Overall Intersection E F Dual Left C D EB Through B C Right A < < 1 A < < 1 WB Right B B Triple Through B C Right B < 1 B Triple Through C B Right A < < 1 A < < 1 Overall Intersection B C * Shaded Orange Cells: The additional lane improvements required as compared to the initial analysis Analysis results under future conditions are slightly exacerbated. 5.3 Core-Collector System of E.C. Row Expressway Future Weaving Analysis results are summarized in Table 13. Table 13 Weaving Analysis E.C. Row Expressway Future Core-Collector System Conditions Direction Weaving Section AM Peak Hour PM Peak Hour EB Dominion Boulevard Dougall Avenue (465 m weaving section) () Dougall Avenue Howard Avenue (335 m weaving section) () WB Howard Avenue Dougall Avenue (335 m weaving section) Dougall Avenue Dominion Boulevard (465 m weaving section) * Highlighted cells indicate a LOS improvement in comparison to Future Do Nothing

27 Page 27 of 29 The weaving segments LOS in comparison to existing core-collector system remains the same, with the exception of the eastbound section between Dominion Boulevard and Dougall Avenue during the p.m. peak hour. sensitivity scenario. The LOS changes from A to B Future and Analysis results are summarized in Table 14. Table 14 Ramp Analysis E.C. Row Expressway Core-Collector System Conditions Direction E.C. Row Expressway Section / AM Peak Hour PM Peak Hour EB Dominion Boulevard Dougall Avenue (on-ramp) () (off-ramp) LOS A LOS A (LOS A) Dougall Avenue Howard Avenue (on-ramp) () (off-ramp) LOS A LOS A (LOS A) WB Howard Avenue Dougall Avenue (on-ramp) (off-ramp) LOS A LOS A Dougall Avenue Dominion Boulevard (on-ramp) (off-ramp) LOS A LOS A * Highlighted cells indicate a LOS improvement in comparison to Future Do Nothing The future merge and diverge ramp analysis under a core-collector system remains the same in comparison to existing conditions results. 5.4 Northwood-Edinborough E-W Link Future Weaving With the Northwood-Edinborough alternative being the preferred alternative for east-west flow, a future analysis of the E.C. Row Expressway weaving sections was analyzed. The weaving sections take into account the reduced volumes within these sections due to the transfer of traffic to the Northwood-Edinborough E-W Link.

28 Page 28 of 29 Analysis results are summarized in Table 15. Table 15 Weaving Analysis E.C. Row Expressway Future Northwood-Edinborough E-W Link Conditions Direction Weaving Section AM Peak Hour PM Peak Hour Dominion Boulevard Dougall Avenue EB (465 m weaving section) pc/km/ln 9.33 pc/km/ln Dougall Avenue Howard Avenue (335 m weaving section) pc/km/ln pc/km/ln Howard Avenue Dougall Avenue WB (335 m weaving section) pc/km/ln pc/km/ln Dougall Avenue Dominion Boulevard (465 m weaving section) pc/km/ln pc/km/ln Weaving LOS analysis results remain similar to Future Do Nothing, but with reductions to the weaving segment densities Future and (w/ Northwood-Edinborough E-W Link) Analysis results are summarized in Table 16. Table 16 Ramp Analysis E.C. Row Expressway Future Northwood-Edinborough E-W Link Conditions Direction E.C. Row Expressway Section / AM Peak Hour PM Peak Hour Dominion Boulevard Dougall Avenue (on-ramp) 10.7 pc/km/ln 8.2 pc/km/ln EB (off-ramp) 10.3 pc/km/ln 7.5 pc/km/ln Dougall Avenue Howard Avenue (on-ramp) 11.1 pc/km/ln 10.9 pc/km/ln (off-ramp) 9.9 pc/km/ln 9.6 pc/km/ln LOS D WB Howard Avenue Dougall Avenue (on-ramp) 17.9 pc/km/ln 13.6 pc/km/ln LOS D (off-ramp) 17.2 pc/km/ln 12.8 pc/km/ln

29 Page 29 of 29 (on-ramp) 15.0 pc/km/ln Dougall Avenue Dominion Boulevard LOS D (off-ramp) 19.4 pc/km/ln * Highlighted cells indicate a LOS improvement in comparison to Future Do Nothing 11.4 pc/km/ln 15.4 pc/km/ln In comparison to future do nothing analysis results, the ramp densities have reduced for each merge and diverge movement in both peak hours. STANTEC CONSULTING LTD. Adrian Soo, P. Eng. Transportation Engineer Phone: (905) Fax: (905) Adrian.Soo@stantec.com

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis Technical Note 02 - N2/M41 AIMSUN Micro-simulation Tongaat Hullette Developments Cornubia Phase 2 Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis Prepared by: 18/11/14 Justin Janki Date Approvals

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

Technical Feasibility Report

Technical Feasibility Report Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Prepared By: 53 Regional Drive Concord, NH 03301 NHDOT Project # 13742 Federal Project #T-A000(018) September 2018 TABLE OF CONTENTS

More information

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK Gene

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

3.0 Future (2040) Transportation

3.0 Future (2040) Transportation 30 Future () Transportation Conditions Future traffic and structural bridge conditions within the I-84 Hartford Project Area have been analyzed to identify the needs and deficiencies which the Project

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment 2.1.5 Traffic and Circulation This section addresses the potential impacts to traffic and circulation associated with construction and long-term operation of the proposed project. The traffic and circulation

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

TRAFFIC AND TRANSPORTATION TECHNICAL REPORT

TRAFFIC AND TRANSPORTATION TECHNICAL REPORT TRAFFIC AND TRANSPORTATION TECHNICAL REPORT for ENVIRONMENTAL ASSESSMENT Route 29 Bypass State Project No.: 0029-002-844, P101; UPC 102419 Federal Project Number: TBD From: Route 250 Bypass To: U.S. Route

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Airport Road Improvements

Airport Road Improvements Airport Road Improvements October 2015 ENVIRONMENTAL STUDY REPORT Airport Road from 1.0 km north of Mayfield to 0.6 km north of King Street Town of Caledon D TRAFFIC STUDY & ROUNDABOUT EVALUATIONS Airport

More information

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Capability City of Mississauga Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga,

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Project Working Group Meeting #5

Project Working Group Meeting #5 September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com

More information

Interchange Justification Report

Interchange Justification Report Interchange Justification Report Interstate 29 at 85 th Street- Exit 74 Sioux Falls, SD SEH No. 132589 October 1, 2018 Prepared by: Short Elliott Hendrickson Inc. Executive Summary The Interchange Justification

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Mr. Kyle Zimmerman, PE, CFM, PTOE County Engineer

Mr. Kyle Zimmerman, PE, CFM, PTOE County Engineer Los Alamos County Engineering Division 1925 Trinity Drive, Suite B Los Alamos, NM 87544 Attention: County Engineer Dear Kyle: Re: NM 502 Transportation Corridor Study and Plan Peer Review Los Alamos, New

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

APPENDIX A Interstate 26 Widening Traffic Analysis Report

APPENDIX A Interstate 26 Widening Traffic Analysis Report Interstate 26 Widening MM 85-MM101, Newberry, Lexington, Richland Counties, SC Environmental Assessment APPENDIX A Interstate 26 Widening Traffic Analysis Report Interstate 26 Widening Traffic Analysis

More information

P07033 US 50 EB Weaving Analysis between El Dorado Hills and Silva Valley Ramp Metering Analysis for US 50 EB On-Ramp at Latrobe Road

P07033 US 50 EB Weaving Analysis between El Dorado Hills and Silva Valley Ramp Metering Analysis for US 50 EB On-Ramp at Latrobe Road 180 Grand Avenue, Suite 250 428 J Street, Suite 500 Oakland, CA 94612 Sacramento, CA 95814 510.839.1742 916.266.2190 510.839.0871 fax 916.266.2195 Dowling Associates, Inc. www.dowlinginc.com traffic@dowlinginc.com

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Interstate 85 Widening Phase III Interchange Modification Report Exit 106 E. Cherokee Street. Cherokee County, SC

Interstate 85 Widening Phase III Interchange Modification Report Exit 106 E. Cherokee Street. Cherokee County, SC Interstate 85 Widening Phase III Interchange Modification Report Exit 16 E. Cherokee Street Cherokee County, SC Prepared for: South Carolina Department of Transportation Prepared by: Stantec Consulting

More information

Draft US Corridor Study Traffic Analysis Report

Draft US Corridor Study Traffic Analysis Report Draft US 15-501 Corridor Study Traffic Analysis Report US 15-501 from NC 54 to US 64 Year 2013-2040 Prepared for: North Carolina Department of Transportation Prepared by: Stantec Consulting Services, Inc.

More information

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Introduction and Executive Summary... 1 Existing Conditions... 3 Intersection Volume Conditions... 5 Intersection Operations... 9 Safety

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Final Interchange Justification Report

Final Interchange Justification Report I- / TROSPER ROAD Final Interchange Justification Report Prepared for: Prepared by: I-/Trosper Road Final Interchange Justification Report Prepared for City of Tumwater Israel Rd SW, Olympia, WA 0

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

PREPARED BY STANTEC CONSULTING

PREPARED BY STANTEC CONSULTING INTERSTATE 526 Addendum CORRIDOR ANALYSIS For Between North Charleston and West Ashley May 2014 - Addendum MARCH 2013 PREPARED BY STANTEC CONSULTING IN ASSOCIATION WITH FLORENCE & HUTCHESON, INC. DAVIS

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

The Highway Safety Manual: Will you use your new safety powers for good or evil? April 4, 2011

The Highway Safety Manual: Will you use your new safety powers for good or evil? April 4, 2011 The Highway Safety Manual: Will you use your new safety powers for good or evil? April 4, 2011 Introductions Russell Brownlee, M.A. Sc., FITE, P. Eng. Specialize in road user and rail safety Transportation

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Ce document est aussi disponible en français

Ce document est aussi disponible en français Ministry of Community Safety and Correctional Services August 2005 Ce document est aussi disponible en français What Is A Community Safety Zone? C ommunity Safety Zones are sections of roadways where public

More information

Freeway Weaving and Ramp Junction Analysis

Freeway Weaving and Ramp Junction Analysis TEXAS TECH UNIVERSITY Freeway Weaving and Ramp Junction Analysis Along IH 27 at Plainview, TX Hao Xu, Jared A. Squyres, Wesley Kumfer, and Hongchao Liu 7/15/2011 Table of Contents Project Description...

More information

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT

SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT May 8, 2018 Page i TABLE OF CONTENTS Table of Contents... i 1. Introduction... 1 1.1 Summary... 1 2.

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Traffic and Toll Revenue Estimates

Traffic and Toll Revenue Estimates The results of WSA s assessment of traffic and toll revenue characteristics of the proposed LBJ (MLs) are presented in this chapter. As discussed in Chapter 1, Alternatives 2 and 6 were selected as the

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Craigieburn Employment Precinct North and English Street

Craigieburn Employment Precinct North and English Street Craigieburn Employment Precinct North and English Street METROPOLITAN PLANNING AUTHORITY Intersection Analyses 7 February 2014 Intersection Analyses Craigieburn Employment Precinct North and English Street

More information

Interchange Operations Study

Interchange Operations Study CUY 480 14.32 PID No. 102053 Ohio Department of Transportation District 12 550 Transportation Boulevard Garfield Heights, OH 44125 5396 Interchange Operations Study Analysis Summary August 2016 8101 N.

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Environmental Assessment Derry Road and Argentia Road Intersection

Environmental Assessment Derry Road and Argentia Road Intersection Air and Noise Study Environmental Assessment Derry Road and Argentia Road Intersection Project 11-4295 City of Mississauga, Region of Peel October 17, 2014 1 Region of Peel Environmental Assessment for

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

Appendix B: Traffic Reports

Appendix B: Traffic Reports Appendix B: Traffic Reports 407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION Report Markham Road Station Traffic Study Prepared for Ministry of Transportation, Ontario

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the