1 Traffic Impact Study To: From: Eric Carlson ECA Architects and Planners Bill Grieve, P.E., PTOE Senior Transportation Engineer Justin Opitz Transportation Planner Date: November 2, 2018 Subject: Proposed Dunkin Donuts 206 East State Street - Geneva, Illinois Part I. Project Context and Summary Statement Gewalt Hamilton Associates, Inc. (GHA) has conducted a Traffic Impact Study (TIS) for the above captioned project. As proposed, a former gas station at 206 E. State Street in Geneva Illinois would be redeveloped with a Dunkin Donuts restaurant with 1,764 square feet (see Exhibit 1). A drive-thru would also be provided for the convenience of Dunkin Donuts customers. The following summarizes our TIS findings and provides various recommendations for your consideration. Exhibits and the Appendices referenced are located at the end of this document. Briefly summarizing, we believe that the adjacent roadways and the site access drives can accommodate the Dunkin Donuts traffic activity. Reasons include: The increase in new site traffic will be limited, as at least 65% of Dunkin Donuts trips will be made by vehicles already traveling on the adjacent roads. Dunkin Donuts business will be 65-70% completed before many other stores and restaurants become busy in the site vicinity. No additional access is being requested on State Street nor Crissey Avenue, nor is it needed to accommodate site traffic. All site traffic will enter and exit via the existing drives. Ample drive-thru stacking is provided, to not detrimentally impact on-site circulation. The parking supply meets City code requirements and should readily accommodate the busiest Dunkin Donuts patron and employee demands.

2 Dunkin Donuts 206 East State Street Geneva, Illinois Part II. Background Information Area Land-Uses, Roadway Inventory, and Pedestrian Mobility Exhibit 1 provides a site location map and Exhibit 2 provides a photo inventory of traffic operations. Pertinent comments on nearby land uses, the adjacent roadways, and non-auto facilities include: Area Land Uses The site is a former gas station that has three full access drives; two on State Street and one on Crissey Avenue. The site is well situated toward the east end of Downtown Geneva among many commercial buildings that tend to focus on service businesses. Residential neighborhoods lie to the north and south of the subject site. Roadway Inventory State Street State Street (IL 38) is an east-west route that is under the jurisdiction of the Illinois Department of Transportation (IDOT) and is designated as a Strategic Regional Arterial (SRA). It is classified as an Other Principal Arterial on the IDOT functional classification map. State Street has two through lanes in each direction along the site, then widens to the west to provide separate left turn lanes at its signalized intersection with Bennett Avenue (IL 25). The posted speed limit is 30-miles per hour (mph). On-street parking is prohibited. Crissey Avenue Crissey Avenue, a local street, has its northern terminus at State Street, where it has Stop control. Crissey Avenue has one travel lane in each direction and a posted speed limit of 25-mph, as well as a truck weight restriction of 6 tons. On-street parking is prohibited near State Street. Garfield Avenue Garfield Street, a local street, has its southern terminus at State Street, where it has Stop control. Garfield street has one travel lane in each direction and a posted speed limit of 25-mph, as well as a truck weight restriction of 6 tons. On-street parking is prohibited near State Street. Pedestrian Mobility There is no Pace bus service in the site vicinity. There are sidewalks provided on both sides of State Street, Crissey Avenue, and Garfield Street. The Fox River Trail is located just to the west. Discussion Point. It is our understanding that the City and IDOT are coordinating on a future plan to widen State Street from the Fox River on the west to Kirk Road on the east to provide a center left turn lane and a bike / pedestrian path. The project is in the design phase, but no funding sources have been identified. Gewalt Hamilton Associates, Inc. - Page 2

3 Dunkin Donuts 206 East State Street Geneva, Illinois Existing Traffic GHA conducted weekday morning and evening peak period traffic counts at both Crissey Avenue and Garfield Street intersections with State Street from 6AM 9AM and 3PM 6PM on Tuesday, September 11, These time periods were selected, because they represent the busiest combinations of background and Dunkin Donuts customer activity. No unusual events occurred during the counts that would have impacted the traffic volumes or travel patterns, such as, emergency vehicle activity, or severe weather. The traffic count data can be found in Appendix A. The most recent Average Daily Traffic (ADT) data was obtained from the IDOT web-site to augment the peak hour volumes. Exhibit 3 summarizes the existing weekday morning and evening peak hour traffic volumes which occurred from 7:00-8:00 AM and 4:45-5:45 PM and the ADT volumes. Discussion Point. As can be seen from Exhibit 3, State Street has a pronounced directional split during both the morning and evening peak hours. Over 65% of traffic is traveling eastbound in the morning and over 55% is traveling westbound in the evening. This trait is important from Dunkin Donuts perspective which attracts a very large percentage of their morning trips from vehicles already traveling the area roadways. The existing travel pattern will help promote a quick stop on the way to work in the morning, perhaps for coffee, as a right turn in and right turn out movement at the drives on State Street. Crash Analysis Crash data was obtained from the IDOT Division of Transportation and Safety for the last five calendar years, 2012 through A summary of the crash data is provided in Table 1 contained in Appendix B. As shown in Table 1, 11 total crashes occurred in the site vicinity of which 7 were rear-end. There were no crashes that involved pedestrians or bicyclists. No-Build Traffic Exhibit 4 summarizes the 2024 No-Build weekday morning and weekday evening peak hour traffic volumes under the current adjacent street geometrics. In accordance with IDOT requirements, future traffic volume conditions were developed for the anticipated opening year of the development, 2019 plus five years for an analysis horizon of the Year For this study and based on a review of historical traffic volumes, the Chicago Metropolitan Agency for Planning (CMAP) provided year 2040 projections (see Appendix C) Per CMAP, State Street is expected to experience an overall growth of approximately 12%. Crissey Avenue traffic is expected to increase significantly south of its intersection with Bennett Street (IL 25). To be conservative, traffic was also increased by 12% on Crissey Avenue along the site. It is not expected that Garfield Street will experience any appreciable growth in the Year 2024 analysis horizon. Gewalt Hamilton Associates, Inc. - Page 3

4 Dunkin Donuts 206 East State Street Geneva, Illinois Part III. Traffic Evaluation Project Traffic Characteristics Per the site and utility plan prepared by Craig R. Knoche & Associates, shown on Exhibit 5, Dunkin Donuts will occupy 1,764 square feet. Exhibit 6 Part A summarizes the traffic generations for the weekday morning and evening rush hours and the daily volumes, which were based on rate information published by the Institute of Transportation Engineers (ITE) and provided in Appendix D. Key Finding. Exhibit 6 Part A also provides a comparison to trips generated by the previous gas station use. Per ITE, the gas station generated 45 more driveway trips during the weekday morning peak hour, almost 145 more driveway trips during the weekday evening peak hour, and 990 more driveway trips daily. The trip distribution is provided in Exhibit 6 Part B and shown on Exhibit 7 and is based primarily on current travel patterns. As can be seen, it is expected that most site traffic will be right turns in and right turns out, such as a stop for coffee on the way to work in the morning. Site and Total Traffic Assignments Exhibit 7 illustrates the weekday morning and evening peak site traffic assignment, which is based on the traffic characteristics summarized in Exhibit 6 and the access system. Site traffic and the Year 2024 No-build traffic volumes (see Exhibit 4) were combined to produce the Year 2024 Total Traffic assignment, which is illustrated in Exhibit 8. Discussion Point. The total traffic volumes are probably overstated, because the ITE allowed discount for pass-by trips was not taken. Intersection Capacity Analyses Capacity analyses are a standard measurement in the industry that identifies how an intersection operates. Exhibit 9 Part A lists the analysis parameters, as published in the Transportation Research Board s (TRB) Highway Capacity Manual (HCM), 6 th Edition, They are measured in terms of Level of Service (LOS). LOS A is the best rating, with LOS F being the worst. LOS C is often considered for design purposes and LOS D is usually considered as providing the lower threshold of acceptable operations. Capacity analyses at the intersections serving and adjacent to the site were modeled in HCS v7.6 software, for the following scenarios: Existing Traffic - Existing traffic (Year 2018). No-Build Traffic Future No-Build traffic volumes (Year 2024). Total Traffic Future No-Build traffic volumes (Year 2024) plus the addition of site generated traffic. Exhibit 9 - Part B summarizes the intersection capacity and queue analysis results. Capacity analysis summary printouts are provided in Appendix E. Gewalt Hamilton Associates, Inc. - Page 4

5 Dunkin Donuts 206 East State Street Geneva, Illinois Key Finding. A review of the summary shows that the northbound movement from Crissey Avenue, Access B, and Access C, onto State Street under future operations will operate with capacity constraints, at LOS F. Furthermore, the southbound movement from Garfield Street onto State Street will begin to operate under capacity constraints due to background traffic growth into the future, at LOS E. These constraints are commonplace throughout the Chicagoland area, especially on busy roads such as State Street. Traffic Impact Discussion Reviewing the existing traffic volumes (see Exhibit 3) and the site and total traffic assignments (see Exhibits 7 and 8) indicates that: There are over 2,550 vehicles or about 43 vehicles per minute that currently travel through the State Street / Crissey Avenue intersection during the weekday morning peak hour. Site traffic will add only 22 new vehicles, which is a about 1% or about 1 vehicle every 2-3 minutes. There are over 2,670 vehicles or about 45 vehicles per minute that currently travel through the State Street / Crissey Avenue intersection during the weekday evening peak hour. Site traffic will add only 10 new vehicles, which is less 1% or about 1 vehicle every 6 minutes. Key Finding. Based on the above, the site impacts on area traffic volumes and operations are limited. Thus, our recommendations focus on the access operations and the on-site planning elements. Part IV. Recommendations Access Operations The site s current full access drives, two on State Street at the far west and east ends of the property and one on Crissey Avenue at the north end of the property, are to remain. They should operate as follows: All three drives are wide enough to provide one inbound and two outbound travel lanes, striped for separate left and right turns. Per the Knoche plan, a Do Not Block Entrance sign will be provided on Crissey Avenue to visually inform drivers to not block the access intersection. Exiting site traffic should have a Stop bar and Stop sign control. Traffic should be monitored over time after Dunkin Donuts opens to assist IDOT and the City in determining the best access management strategy along this section of State Street, as part of the future widening plans. Gewalt Hamilton Associates, Inc. - Page 5

6 Dunkin Donuts 206 East State Street Geneva, Illinois Internal Circulation and Parking On-site planning elements include: The drive-thru on the east side of the building will operate one-way counterclockwise. On-site signage is to be provided to direct traffic properly to avoid wrong-way turns / maneuvers. Per the Knoche site plan, 26 parking spaces are required by code and 26 spaces are to be provided, which meets the City code requirement. GHA surveyed parking data (see Exhibit 10), and it indicates that the planned supply should also meet the Dunkin Donuts parking demands by need. Employees should be encouraged to park in the more remote spots to maximize the amount of prime parking available for customers. A bike rack should be provided to encourage non-auto trips; both local neighborhood and from the Fox River Trail. Drive-Thru Operations Dunkin Donuts drive-thru characteristics include: The drive-thru beverage and food pick-up window will be located on the east side of the building and will provide two lanes of stacking for 13 vehicles prior to reaching the pick-up window (see Exhibit 5). Based on GHA survey data conducted at several Dunkin Donuts (see Exhibits 10A and 10B), the drivethru stacking provided should readily meet the expected vehicle queuing. The inner lane will be for traditional order board trips, while the outside lane will be for customers pickup after ordering from the Dunkin Donuts app. The targeted transaction time from when the Dunkin Donuts customer orders to when they pick up their beverage and/or food is 90 seconds. This quick timeframe can be accomplished, because Dunkin Donuts has a more limited menu and there are fewer special-order options available than other coffee shops and drive-thru restaurants. Dunkin Donuts trip characteristics follow the Rule of 65s : o About 65% of their business is completed by 10 AM. o 65% or more of their customers use the drive-thru. o At least 65% of their business comes from vehicles already traveling the adjacent roads, known as pass-by trips, perhaps as a stop for coffee on their way to work. o Often, 65% of their business is made by the convenience of right turn in and out movements. Business Deliveries and Refuse Pick-up Deliveries Based on information provided by Dunkin Donuts, the restaurant will generate limited delivery traffic: Baked goods / donuts are delivered twice daily at 2 AM and 6 AM. Restaurant items (e.g. cups, beverages, etc.) are delivered once a week overnight. Most delivery vehicles are via smaller trucks and will predominantly take place at the employee entrance on the south side of the building. Deliveries tend to take 20 minutes or less. Gewalt Hamilton Associates, Inc. - Page 6

7 Dunkin Donuts 206 East State Street Geneva, Illinois Refuse Pick-up Refuse removal for Dunkin Donuts will be scheduled about two times a week during non-peak hours. The duration is only for a few minutes. Part V. Technical Addendum The following Exhibits and Appendices were previously referenced. They provide technical support for our observations, findings, and recommendations discussed in the text. Exhibits 1. Site Location Map 2. Photo Inventory 3. Existing Traffic 4. Year 2024 No-Build Traffic 5. Site Plan 6. Project Traffic Characteristics 7. Site Traffic 8. Year 2024 Total Traffic 9. Intersection Capacity and Queue Analyses 10. Dunkin Donuts Survey Data Appendices A. Traffic Count Summary Sheets B. Crash Data Summary C. CMAP Correspondence D. Trip Generation Excerpts E. Capacity Analysis Worksheets Gewalt Hamilton Associates, Inc. - Page 7

8 EXHIBITS Proposed Dunkin Donuts Geneva, IL

9 Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), MapmyIndia, OpenStreetMap contributors, and the GIS User Community Drawn By: jopitz File: P:\ \ TRAFFIC\4392 Dunkin' Donuts\ E. State St. - Geneva\Study\Exhibits\Ex 1-Map Horizontal.mxd o 1 inch = 440 Feet Exhibit 1 - Location Map Proposed Dunkin' Donuts - Geneva, IL Map Center: Date: 9/19/2018 Project:

10 Looking north along Crissey Ave at IL 38 Looking north along Crissey Ave at IL 38 & NW Access Looking east along IL 38 at Crissey Ave Looking west along IL 38 at Crissey Ave Exhibit 2 Photo Inventory Page 1 2

11 Looking east across Crissey Ave at Site Looking east along IL 38 at NE Access & Garfield St Looking west along IL 38 at Garfield St Looking west along IL 38 at Site Exhibit 2 Photo Inventory Page 2 2

12 XX Not to Scale 27,900

13 Not to Scale

14 EXISTING FIRE HYDRANT AREA OF TEMP. CONSTRUCTION EASEMENT TO BE GRANTED TO THE CITY BY OWNER DURING PERMIT PROCESS FOR EAST STATE STREET IMPROVEMENTS THE EXISTING SANITARY SERVICE TO BE TELEVISED BY THE DEVELOPER PRIOR TO RE-USING. VIDEO TO BE SUBMITTED TO BOB VAN GYSEGHEM (WATER SUPER.) FOR REVIEW OF EXISTING PIPE CONDITION. IL ROUTE 38 (EAST STATE STREET) STOP BAR & STOP SIGN (TYP) 6" SOLID YELLOW 6" SOLID YELLOW CRISSEY AVENUE BIT PAVEMENT DIRECTIONAL SIGN DRIVE THRU CLEARANCE 9' HIGH STOP BAR & STOP SIGN "THANK YOU" SIGN 6" SOLID WHITE (TYP) 2 BIT PAVEMENT "DO NOT ENTER" & DRIVE THRU DIRECTIONAL SIGN STOP BAR, STOP SIGN & "THANK YOU" SIGN SITE ANALYSIS SITE SE Corner of Crissey Ave & E. State St. (IL RT 38) Geneva, IL Proposed Use Dunkin Donuts Existing Zoning B-2 Required Zoning B-2 "DO NOT BLOCK ENTRANCE" SIGN P.C.C. LIMITS SEATING AREA BOLLARD & FENCING AROUND SEATING AREA B6.12 C&G 6" SOLID WHITE (TYP) "DO NOT ENTER" SIGN MONUMENT SIGN Parcel Area Building Area SETBACKS 25,759 SF 0.59 ± Acres 1,769 sf Dunkin Donuts UPGRADED ELECTRIC SERVICE TO BE INSTALLED UNDERGROUND FROM EXISTING POLE TO TRANSFORMER HANDICAP SIGN (TYP) 6'X6' TRANSFORMER PAD WHEEL STOP (TYP) INTERNAL GREASE TRAP TO BE INSTALLED (SEE ARCH. PLANS) P.C.C. LIMITS Front Yard Rear Yard Side Yard Side Yard (E State St) (B-2) (B-3E) (Crissey Ave) Building Setback 0' 0' 0' 0' 37' 81' 58' 53' Provided Landscape Setback 0' 0' 0' 0' Provided 0' 15' 5.4' 2' PROPOSED WATER SERVICE LINE TO BE INSTALLED WITHIN OPEN CUT FOR THE REMOVAL OF EXISTING WATER SERVICE LINE. SEE SHEET C0.2. BBOX-1 RIM TO MATCH EXISTING GRADE 11' DEPRESSED C&G B6.12 C&G ELECTRIC METER PROPOSED BUILDING 1,769 SF 1 1/4 " WATER PICK-UP SERVICE LINE WINDOW BOLLARD (TYP) PROPOSED TRASH ENCLOSURE (SEE ARCH. PLANS) MENU BOARD WHEEL STOP (TYP) 9 EXISTING STONE RETAINING WALL PARKING Quantity Reqd 21 = 15 x 1,397/1000 Sit Down/ Drive Thru (15 per 1000 sf floor area) 5 = 5 Employees (1 space per each employee) 26 Required Provided LEGEND 26 = 6 Standard (90 ) + 18 Standard (60 ) + 2 ADA Stall Size Required 9' x 19' (60 ), 9' x 18.5' (90 ) Provided 9' x 19' (60 ), 9' x 18.5' (90 ), 16' x 19' (ADA), 8' x 18.5' (Employee 90 ) 8' x 19' (Employee 60 ) Driveway Width Minimum 24' Provided 35' EXISTING R/R TIE RETAINING WALL "EMPLOYEE PARKING ONLY" SIGN (TYP) YIELD SIGN SITE NOTES 3 WHEEL STOP (TYP) BIT PAVEMENT 3 "EMPLOYEE PARKING ONLY" SIGN (TYP) 9 IMPERVIOUS CALCULATIONS Existing Impervious Area - 22,816 sf or 0.52 acres Proposed Impervious Area - 20,326 sf or 0.47 acres Net Impervious Area Decrease - 2,490 sf or 0.05 acres WARPED BOARDS & POSTS TO BE REPLACED AS NEEDED. FENCE TO BE STAINED TO MAKE IT LOOK NEW LANDSCAPE CALCULATIONS Interior Landscape Required: 10% Provided: 4%

15 Part A. Traffic Generation Calculations Weekday Peak Hours ITE Morning Evening Size Code In Out Sum New In Out Sum New Sum New Step 1. Proposed Use Dunkin' Donuts 1,764 SF #937 Walk-in Drive-Thru Totals = , Step 2. Previous Use Gas Station 10 Fueling Stations # , Notes: Incerements (Step 1. - Step 2.) = ) Sources: Institute of Transportation Engineers (ITE) Trip Generation Manual (10th Edition) and Dunkin' Donuts data. 2) Per ITE and Dunkin' Donuts data, about 65-70% of their traffic, particularly in the AM peak hour, could be "pass-by" in nature. A gas station can also be about 65% pass-by traffic. Part B. Trip Distribution Route & Direction State Street (IL 38) Exhibit 6 Project Traffic Characteristics Dunkin' Donuts; Geneva, Illinois Discussion: Trip discount for pass-by was not taken to ensure that the maximum site traffic impacts are tetsed. Percent Use Approach Site From Depart Site To - East of Garfield St. 25% 55% - West of Chrissey Ave. 55% 25% Garfield Street - North of State St. 5% 5% Chrissey Avenue - South of Site 15% 15% Totals = 100% 100% Daily

16 25% 55% XX% 15% 15% 5% 5% Not to Scale

17 Not to Scale

18 Exhibit 9 Intersection Capacity and Queue Analyses Proposed Dunkin' Donuts - Geneva, Illinois Part A. Parameters - Type of Traffic Control (Source: Highway Capacity Manual 6th Edition) I. Traffic Signals II. Stop Sign LOS Delay (sec / veh) Description LOS Delay (sec / veh) <10 All signal phases clear waiting vehicles without delay A < 10 >10 and < 20 Minimal delay experienced on select signal phases B >10 and < 15 A B C >20 and < 35 D >35 and < 55 E >55 and < 80 F >80 Some delay experienced on several phases; often used as design criteria C >15 and < 25 Usually considered as the acceptable delay standard D >25 and < 35 Very long delays experienced during the peak hours E >35 and < 50 Unacceptable delays experienced throughout the peak hours F >50 Part B. Results 1. IL 38 & Crissey Ave A. Weekday Morning Peak Hour Roadway Conditions TWSC - NB Stops LOS Per Movement By Approach > = Shared Lane - = Non Critical or not Allowed Movement Eastbound Westbound Northbound Southbound Delay Intersection / Approach LT TH RT LT TH RT LT TH RT LT TH RT (sec / veh) LOS NB Approach Delay Existing Traffic (See Exhibit 3 ) Current C - - > E < E 95th Queue Length (ft) No-Build Traffic (See Exhibit 4 ) Current C - - > F < F 95th Queue Length (ft) Total Traffic (See Exhibit 8 ) Current C - - > F < F 95th Queue Length (ft) B. Weekday Evening Peak Hour Existing Traffic (See Exhibit 3) Current B - - > C < C 95th Queue Length (ft) No-Build Traffic (See Exhibit 4) Current B - - > F < NC - 95th Queue Length (ft) Total Traffic (See Exhibit 8) Current B - - > F < NC - 95th Queue Length (ft) IL 38 & Garfield St A. Weekday Morning Peak Hour TWSC - SB Stops SB Approach Delay Existing Traffic (See Exhibit 3 ) Current A > B < 11.7 B 95th Queue Length (ft) No-Build Traffic (See Exhibit 4 ) Current B > B < 12.3 B 95th Queue Length (ft) Total Traffic (See Exhibit 8 ) Current B > B < 12.5 B 95th Queue Length (ft) B. Weekday Evening Peak Hour Existing Traffic (See Exhibit 3) Current B > D < 31.0 D 95th Queue Length (ft) No-Build Traffic (See Exhibit 4) Current B > E < 41.5 E 95th Queue Length (ft) Total Traffic (See Exhibit 8) Current B > E < 36.3 E 95th Queue Length (ft)

19 Part B. Results 3. Crissey Ave & Access A A. Weekday Morning Peak Hour Roadway Conditions TWSC - WB Stops LOS Per Movement By Approach > = Shared Lane - = Non Critical or not Allowed Movement Eastbound Westbound Northbound Southbound Delay Intersection / Approach LT TH RT LT TH RT LT TH RT LT TH RT (sec / veh) LOS WB Approach Delay Total Traffic (See Exhibit 8 ) Current B - A A B 95th Queue Length (ft) B. Weekday Evening Peak Hour Total Traffic (See Exhibit 8) Current B - A A A 95th Queue Length (ft) IL 38 & Access B A. Weekday Morning Peak Hour TWSC - NB Stops NB Approach Delay Total Traffic (See Exhibit 8 ) Current C - - F - C F 95th Queue Length (ft) B. Weekday Evening Peak Hour Total Traffic (See Exhibit 8) Current B - - F - B F 95th Queue Length (ft) IL 38 & Access C A. Weekday Morning Peak Hour TWSC - NB Stops NB Approach Delay Total Traffic (See Exhibit 8 ) Current C - - F - C F 95th Queue Length (ft) B. Weekday Evening Peak Hour Total Traffic (See Exhibit 8) Current B - - F - B F 95th Queue Length (ft)

20 Exhibit 10A Dunkin' Donuts Operations Survey Data Time Drive Thru In Store Total Parking Supply Parking Demand Occupied Queue Service Time 6:00-6:15 AM % 4 0:50, 1:15 1:02 6:15-6:30 AM % 4 1:05, 1:05, 2:15 1:28 6:30-6:45 AM % 3 1:30, 1:40, 1:10 1:48 6:45-7:00 AM % 5 1:25, 0:50, 1:35 1:16 7:00-7:15 AM % 4 2:10, 1:15, 1:05 1:30 7:15-7:30 AM % 6 2:05, 1:50 1:58 7:30-7:45 AM % 8 2:30, 1:55 2:13 7:45-8:00 AM % 8 2:35, 2:00 2:18 8:00-8:15 AM % 9 1:55, 1:20, 2:00 1:45 8:15-8:30 AM % 8 1:40, 2:00 1:50 8:30-8:45 AM % 9 2:12, 4:30, 2:30 3:21 8:45-9:00 AM % 9 1:10, 1:55, 2:25 1:50 3-Hour Totals = % Max Queue = 9 Peak Hour = % of Total = 77% 23% 100% 100% 65% Time Drive Thru In Store Total Parking Supply Parking Demand Occupied Queue Service Time 6:00-6:15 AM % 5 2:10, 1:40 1:55 6:15-6:30 AM % 6 3:05, 3;17 3:12 6:30-6:45 AM % 5 1:00, 1:03 1:01 6:45-7:00 AM % 7 3:23, 1:42 2:33 7:00-7:15 AM % 6 2:57, 2:52 2:55 7:15-7:30 AM % 7 3:29, 4:12 3:51 7:30-7:45 AM % 5 2:25, 3:07 2:46 7:45-8:00 AM % 5 2:02, 2:17 2:10 8:00-8:15 AM % 6 1:59, 2:41 2:20 8:15-8:30 AM % 6 1:38, 2:16 1:57 8:30-8:45 AM % 6 1:43, 2:04 1:54 8:45-9:00 AM % 7 2:21, 3:01 2:41 3-Hour Totals = % Max Queue = 7 Peak Hour = % of Total = 80% 20% 100% 100% 52% Time Drive Thru In Store Total 2775 Dundee Rd, Northbrook, IL - Observed 07/20/ Rollins Rd, Round Lake Beach, IL - Observed 07/12/ Belvidere Rd, Waukegan, IL - Observed 07/13/2017 Parking Supply Parking Demand Occupied Queue Service Time 6:00-6:15 AM % 3 1:53, 2:11 2:02 6:15-6:30 AM % 2 1:41, 1:33 1:37 6:30-6:45 AM % 4 2:18, 2:34 2:26 6:45-7:00 AM % 7 3:19, 2:49 3:04 7:00-7:15 AM % 4 1:41, 2:05 1:53 7:15-7:30 AM % 5 2:48, 2:24 2:36 7:30-7:45 AM % 5 2:37, 2:41 2:39 7:45-8:00 AM % 5 3:10, 2:04 2:37 8:00-8:15 AM % 5 2:42, 3:27 3:04 8:15-8:30 AM % 3 1:50, 2:44 2:17 8:30-8:45 AM % 3 1:38, 1:54 1:46 8:45-9:00 AM % 1 1:48 1:48 3-Hour Totals = % Max Queue = 7 Peak Hour = % of Total = 71% 29% 100% 100% 47% Avg. Service Time Avg. Service Time = 1:51 Avg. Service Time Avg. Service Time = 2:26 Avg. Service Time Avg. Service Time = 2:19

21 Time Drive Thru In Store Total Parking Supply Parking Demand Occupied Queue Service Time 6:00-6:15 AM % 1 2:10, 0:55 1:33 6:15-6:30 AM % 2 1:00, 0:55, 1:20 1:03 6:30-6:45 AM % 6 1:45, 5:40, 3:35 3:40 6:45-7:00 AM % 7 4:50, 3:45, 1:20 3:18 7:00-7:15 AM % 6 2:35, 3:10, 2:05 2:37 7:15-7:30 AM % 4 1:30, 2:55, 2:20 2:15 7:30-7:45 AM % 6 1:00, 4:15, 3:40 2:58 7:45-8:00 AM % 5 2:50, 1:55, 1:20 2:02 8:00-8:15 AM % 7 1:40, 2:15, 2:55 2:17 8:15-8:30 AM % 4 1:40, 2:35 2:07 8:30-8:45 AM % 3 2:10, 2:12, 2:00 2:07 8:45-9:00 AM % 4 3:15, 3:08, 1:25 2:36 3-Hour Totals = % Max Queue = 7 Peak Hour = % of Total = 68% 32% 100% 100% 58% Time Drive Thru In Store 8080 N. Milwaukee Ave, Niles, IL - Observed 07/13/ N. Broadway Ave, Chicago, IL - Observed 07/12/2017 Total Patrons Parking Supply Parking Demand Occupied Queue Service Time 6:00-6:15 AM % 4 1:50, 1:50, 2:00 1:53 6:15-6:30 AM % 4 1:30, 2:05, 1:20 1:51 6:30-6:45 AM % 7 2:40, 2:30, 3:15 2:48 6:45-7:00 AM % 4 1:30, 1:35, 3:15 1:38 7:00-7:15 AM % 6 2:08, 2:35, 1:30 2:04 7:15-7:30 AM % 6 3:10, 2:00, 2:45 2:38 7:30-7:45 AM % 8 1:29, 1:59, 3:40 2:22 7:45-8:00 AM % 10 4:00, 4:20, 2:20 3:33 8:00-8:15 AM % 10 1:18, 3:20, 4:20 2:59 8:15-8:30 AM % 8 3:45, 1:45, 3:50 3:07 8:30-8:45 AM % 5 1:35, 2:00, 3:15 2:16 8:45-9:00 AM % 2 1:30, 2:15 1:53 3-Hour Totals = % Max Queue = 10 Peak Hour = % of Total = 85% 15% 100% 100% 47% Avg. Service Time Avg. Service Time = 2:23 Avg. Service Time Avg. Service Time = 2:25

22 Exhibit 10B Dunkin' Donuts Operations Survey Data Survey Dates: AM Peak Period in Location Parking Statistics Drive-Thru Statistics Supply Demand Occupied Queue Wait Bartlett, IL % minutes 751 S. Route 59 Mt. Prospect, IL minutes Lake Wolf Road Libertyville, IL. 3 < 1 minte 121 N. Milwaukee Avenue Chicago, IL % minutes Addison Elston St. Lake Zurich, IL % minutes 485 South Rand Road Rolling Meadows 4 2 minutes 3350 Kirchoff Road Mundelein, IL minutes 722 S. Route 83 Palatine, IL % 5 2 minutes Route Palatine Road Mundelein, IL % 6 3 minutes US Hawley Street Arlington Heights, IL % minutes 1010 E. Rand Road Arlington Heights, IL % minutes 122 S. Arlington Heights Rd. Zion, IL % 3 2 minutes 2101 Sheridan Road Waukegan, IL % 3 2 minutes Lewis Avenue Round Lake, IL % 8 4 minutes 369 E. Rollins Road

23 APPENDIX A Traffic Count Summary Proposed Dunkin Donuts Geneva, IL

24 Gewalt Hamilton Associates Inc. 625 Forest Edge Drive Vernon Hills, Illinois, United States (847) Count Name: IL-38 & Crissey Ave Site Code: Start Date: 09/11/2018 Page No: 1 Start Time Turning Movement Data Driveway Access IL-38 Crissey Ave IL-38 Southbound Westbound Northbound Eastbound Right Thru Left U-Turn Peds App. Total Right Thru Left U-Turn Peds App. Total Right Thru Left U-Turn Peds App. Total Right Thru Left U-Turn Peds 6:00 AM :15 AM :30 AM :45 AM Hourly Total :00 AM :15 AM :30 AM :45 AM Hourly Total :00 AM :15 AM :30 AM :45 AM Hourly Total *** BREAK *** :00 PM :15 PM :30 PM :45 PM Hourly Total :00 PM :15 PM :30 PM :45 PM Hourly Total :00 PM :15 PM :30 PM :45 PM Hourly Total Grand Total Approach % Total % Lights % Lights Mediums % Mediums Articulated Trucks App. Total Int. Total

25 % Articulated Trucks Bicycles on Crosswalk % Bicycles on Crosswalk Pedestrians % Pedestrians

26 Gewalt Hamilton Associates Inc. 625 Forest Edge Drive Vernon Hills, Illinois, United States (847) Count Name: IL-38 & Crissey Ave Site Code: Start Date: 09/11/2018 Page No: 4 Start Time Turning Movement Peak Hour Data (7:00 AM) Driveway Access IL-38 Crissey Ave IL-38 Southbound Westbound Northbound Eastbound Right Thru Left U-Turn Peds App. Total Right Thru Left U-Turn Peds App. Total Right Thru Left U-Turn Peds App. Total Right Thru Left U-Turn Peds 7:00 AM :15 AM :30 AM :45 AM Total Approach % Total % PHF Lights % Lights Mediums % Mediums Articulated Trucks % Articulated Trucks Bicycles on Crosswalk % Bicycles on Crosswalk Pedestrians % Pedestrians App. Total Int. Total

27 Gewalt Hamilton Associates Inc. 625 Forest Edge Drive Vernon Hills, Illinois, United States (847) Count Name: IL-38 & Crissey Ave Site Code: Start Date: 09/11/2018 Page No: 6 Start Time Turning Movement Peak Hour Data (4:45 PM) Driveway Access IL-38 Crissey Ave IL-38 Southbound Westbound Northbound Eastbound Right Thru Left U-Turn Peds App. Total Right Thru Left U-Turn Peds App. Total Right Thru Left U-Turn Peds App. Total Right Thru Left U-Turn Peds 4:45 PM :00 PM :15 PM :30 PM Total Approach % Total % PHF Lights % Lights Mediums % Mediums Articulated Trucks % Articulated Trucks Bicycles on Crosswalk % Bicycles on Crosswalk Pedestrians % Pedestrians App. Total Int. Total

28 Gewalt Hamilton Associates Inc. 625 Forest Edge Drive Vernon Hills, Illinois, United States (847) Count Name: IL-38 & Garfield St Site Code: Start Date: 09/11/2018 Page No: 1 Turning Movement Data Garfield St IL-38 IL-38 Start Time Southbound Westbound Eastbound Right Left U-Turn Peds App. Total Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Int. Total 6:00 AM :15 AM :30 AM :45 AM Hourly Total :00 AM :15 AM :30 AM :45 AM Hourly Total :00 AM :15 AM :30 AM :45 AM Hourly Total *** BREAK *** :00 PM :15 PM :30 PM :45 PM Hourly Total :00 PM :15 PM :30 PM :45 PM Hourly Total :00 PM :15 PM :30 PM :45 PM Hourly Total Grand Total Approach % Total % Lights % Lights Mediums % Mediums Articulated Trucks % Articulated Trucks Bicycles on Crosswalk

29 % Bicycles on Crosswalk Pedestrians % Pedestrians

30 Gewalt Hamilton Associates Inc. 625 Forest Edge Drive Vernon Hills, Illinois, United States (847) Count Name: IL-38 & Garfield St Site Code: Start Date: 09/11/2018 Page No: 4 Turning Movement Peak Hour Data (7:00 AM) Garfield St IL-38 IL-38 Start Time Southbound Westbound Eastbound Right Left U-Turn Peds App. Total Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Int. Total 7:00 AM :15 AM :30 AM :45 AM Total Approach % Total % PHF Lights % Lights Mediums % Mediums Articulated Trucks % Articulated Trucks Bicycles on Crosswalk % Bicycles on Crosswalk Pedestrians % Pedestrians

31 Gewalt Hamilton Associates Inc. 625 Forest Edge Drive Vernon Hills, Illinois, United States (847) Count Name: IL-38 & Garfield St Site Code: Start Date: 09/11/2018 Page No: 6 Turning Movement Peak Hour Data (4:45 PM) Garfield St IL-38 IL-38 Start Time Southbound Westbound Eastbound Right Left U-Turn Peds App. Total Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Int. Total 4:45 PM :00 PM :15 PM :30 PM Total Approach % Total % PHF Lights % Lights Mediums % Mediums Articulated Trucks % Articulated Trucks Bicycles on Crosswalk % Bicycles on Crosswalk Pedestrians % Pedestrians

32 APPENDIX B Crash Data Summary Proposed Dunkin Donuts Geneva, IL

33 Table 1: Crash Summary A Location / Year No. of Crashes PD Severity B PI C Crash Type D F CM RE HO FO Ped Bike Percent During Wet/Icy Conditions A B C IL 38 (State Street) in Site Vicinity % % % % % Total ( ) % A Source: IDOT Division of Transportation Safety for the calendar years. B PD = property damage only; PI = personal injury; F = fatality. C Type A (incapacitating injury); Type B (non-incapacitating injury); Type C (possible injury). D CM = cross movement/angle; RE = rear end; HO = head on; FO = fixed object; Ped = pedestrian.

34 APPENDIX C CMAP Correspondence Proposed Dunkin Donuts Geneva, IL

35 Justin Opitz Transportation Planner Gewalt Hamilton Associates 625 Forest Edge Drive Vernon Hills, IL September 12, 2018 Subject: State Street (IL Bennett Street/Crissey Avenue IDOT Dear Mr. Opitz: In response to a request made on your behalf and dated September 12, 201, we have developed year 2040 average daily traffic (ADT) projections for the subject location. ROAD SEGMENT Current ADT Year 2040 ADT State St (IL 38) east of Fox River 27,900 38,000 Bennett St north of State St 7,250 8,000 Crissey Ave south of Spring St 8,750 13,800 Traffic projections are developed using existing ADT data provided in the request letter and the results from the March 2018 CMAP Travel Demand Analysis. The regional travel model uses CMAP 2040 socioeconomic projections and assumes the implementation of the GO TO 2040 Comprehensive Regional Plan for the Northeastern Illinois area. The provision of this data in support of your request does not constitute a CMAP endorsement of the proposed development or any subsequent developments. If you have any questions, please call me at (312) Sincerely, Jose Rodriguez, PTP, AICP Senior Planner, Research & Analysis cc: Quigley (IDOT) S:\AdminGroups\ResearchAnalysis\2018cy_TrafficForecasts\Geneva\ka-14-18\ka docx

36 APPENDIX D ITE Trip Generation Excerpts Proposed Dunkin Donuts Geneva, IL

37

38

39

40

41

42

43

44 APPENDIX E Capacity Analyses Summaries Proposed Dunkin Donuts Geneva, IL

45 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst JTO Intersection IL 38 & Crissey Ave Agency/Co. GHA Jurisdiction IDOT Date Performed 10/3/2018 East/West Street IL 38 Analysis Year 2018 North/South Street Crissey Ave Time Analyzed Existing AM Peak Hour Factor 0.93 Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description Lanes Vehicle Volumes and Adjustments Major Street: East-West Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U U Number of Lanes Configuration T TR LT T LR Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 0 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) Capacity, c (veh/h) v/c Ratio % Queue Length, Q (veh) Control Delay (s/veh) Level of Service (LOS) C E Approach Delay (s/veh) Approach LOS E Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.6 Generated: 10/3/2018 4:32:38 PM Ex AM 83 & Crissey.xtw

46 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst JTO Intersection IL 38 & Garfield St Agency/Co. GHA Jurisdiction IDOT Date Performed 10/3/2018 East/West Street IL 38 Analysis Year 2018 North/South Street Garfield St Time Analyzed Existing AM Peak Hour Factor 0.94 Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description Lanes Vehicle Volumes and Adjustments Major Street: East-West Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U U Number of Lanes Configuration LT T T TR LR Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 0 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) 0 12 Capacity, c (veh/h) v/c Ratio % Queue Length, Q (veh) Control Delay (s/veh) Level of Service (LOS) A B Approach Delay (s/veh) Approach LOS B Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.6 Generated: 10/3/2018 4:43:17 PM Ex AM 83 & Garfield.xtw

47 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst JTO Intersection IL 38 & Crissey Ave Agency/Co. GHA Jurisdiction IDOT Date Performed 10/3/2018 East/West Street IL 38 Analysis Year 2018 North/South Street Crissey Ave Time Analyzed Existing PM Peak Hour Factor 0.98 Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description Lanes Vehicle Volumes and Adjustments Major Street: East-West Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U U Number of Lanes Configuration T TR LT T LR Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 0 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) Capacity, c (veh/h) v/c Ratio % Queue Length, Q (veh) Control Delay (s/veh) Level of Service (LOS) B C Approach Delay (s/veh) Approach LOS C Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.6 Generated: 10/3/2018 4:34:06 PM Ex PM 83 & Crissey.xtw

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS

DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS PRELIMINARY ENGINEERING PLANS DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS ERIC CARLSON ARCHITECTS LOCATION MAP DRAWINGS INDE CONTACTS REV DATE NOT TO SCALE BENCHMARKS CRISSEY AVENUE IL ROUTE 38

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS Executive Summary... 2 Project Background... 2 Conditions... 2 Findings... 3 Recommendations... 4 Introduction... 6

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial

More information

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1):

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1): 2709 McGraw Drive Bloomington, Illinois 61704 p 309.663.8435 f 309.663.1571 www.f-w.com www.greennavigation.com November 4, 2016 Mr. Kevin Kothe, PE City Engineer City of Bloomington Public Works Department

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

DOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009

DOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009 DOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009 Prepared for: Manhard Consulting, Ltd. 900 Woodlands Parkway Vernon Hills, Illinois 60061 Prepared

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

Citizens Committee for Facilities

Citizens Committee for Facilities Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

LCPS Valley Service Center

LCPS Valley Service Center Traffic Impact Study LCPS Valley Service Center Loudoun County, Virginia November 4, 2015 Prepared For: Loudoun County Public Schools 21000 Education Court Ashburn, VA 20148 Prepared by: 1140 Connecticut

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Introduction and Executive Summary... 1 Existing Conditions... 3 Intersection Volume Conditions... 5 Intersection Operations... 9 Safety

More information