BIDDING DOCUMENTS FOR DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND TRAINING OF 378 NOS. OF STANDARD GAUGE CARS FOR MUMBAI METRO PROJECT
|
|
- Shauna Carroll
- 5 years ago
- Views:
Transcription
1 Addendu No. 4 Page 1 of 25 BIDDING DOCUMENTS FOR DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND TRAINING OF 378 NOS. OF STANDARD GAUGE CARS FOR MUMBAI METRO PROJECT BID NO. MRS1 ADDENDUM NO. 4 Bidding Docuent for 'MRS1'
2 Addendu No. 4 Page 2 of 25 MRS1 Bid docuent: Addendu No. 4 Part, Section, Clause, Description, Page, Location etc. Requireents, Section-6A: ERGS Clause 1.1.4: Scope Page 4 of 63 Aendents The Scope of Works under this Contract covers design, anufacture, supply, testing and coissioning of passenger rolling stock and the training of operation and aintenance personnel for Mubai MRTS. The Scope also covers supply of spares, special tools, testing and diagnostics equipent, jigs and fixture etc for aintenance, repair and overhaul of cars. The cars required for the corridors shall be of odern design, lightweight ade of stainless steel/aluiniu, with 3 phase AC drive having V.V.V.F control, regenerative braking, suitable for CBTC based ATP, ATO, etc. provided by other Designated Contractors and shall be suitable for Unattended Train Operation conforing to Grade of Autoation GOA4 as specified in IEC :2006. The cars shall operate on 25 kv AC single phase 50 Hz flexible OCS syste for elevated and atgrade sections. The detailed perforance requireents, and design criteria of the cars and equipent are covered in Eployer's Requireents -Technical Specification. The Scope of Works under this Contract covers design, anufacture, supply, testing and coissioning of passenger rolling stock and the training of operation and aintenance personnel for Mubai MRTS. The Scope also covers supply of spares, special tools, testing and diagnostics equipent, jigs and fixture etc. for aintenance, repair and overhaul of cars. The cars required for the corridors shall be of odern design, lightweight ade of stainless steel, with 3 phase AC drive having V.V.V.F control, regenerative braking, suitable for CBTC based ATP, ATO, etc. provided by other Designated Contractors and shall be suitable for Unattended Train Operation conforing to Grade of Autoation GOA4 as specified in IEC :2006. The cars shall operate on 25 kv AC single phase 50 Hz flexible OCS syste for elevated and at-grade sections. The detailed perforance requireents, and design criteria of the cars and equipent are covered in Eployer's Requireents -Technical Specification. Requireents, Section-6A: ERGS Clause 6.9.1: Test Software Page 37 of 63 All test software, with the exclusion of built-in test software, shall be produced in accordance with a quality syste controlled under the requireents of accepted international standards. Test software shall be developed and docuented using structured techniques and shall be designed to be aintainable throughout the duration of the Contract. All test software shall be docuented to be supportive of aintenance. Any test software, which is to be delivered to the Eployer (for long ter testing use), shall be fully docuented including source code listings to allow the Eployer to aintain the software for the life of the supported syste. All test software, with the exclusion of built-in test software, shall be produced in accordance with a quality syste controlled under the requireents of accepted Bidding Docuent for 'MRS1'
3 Addendu No. 4 Page 3 of 25 international standards. Test software shall be developed and docuented using structured techniques and shall be designed to be aintainable throughout the duration of the Contract. All test software shall be docuented to be supportive of aintenance. Any test software, which is to be delivered to the Eployer (for long ter testing use), shall be fully docuented to allow the Eployer to aintain the software for the life of the supported syste. Requireents, Section-6A: ERGS Clause Page 47 of 63 Requireents, Section-6A: ERGS Clause Page 57 of 63 (i) (ii) (iii) (iv) (i) Training of Project Owner s Driving Instructors and Drivers (4 an onths) in operation of Trains (as per GoA2/GoA3/GoA4) off shore and on-shore including the test track in the Contractor s Works. Training of Project Owner s aintenance personnel (20 an onths) in Contractors / Sub-Contractor s Works and MRTS off-shore and onshore. DELETED. Provision of OEM s Experts / Instructors (24-an onth) for Training of Project Owner s aintenance personnel in India. Training of Project Owner s Driving Instructors and Drivers (2 an onths) in operation of Trains (as per GoA2/GoA3/GoA4) in the Contractor s Works. (ii) Training of Project Owner s/eployer s aintenance personnel (10 an onths) in Contractors / Sub-Contractor s Works and MRTS. (iii) (iv) Provision of Contractor s Driving Instructors (2 an onths) for training of Project Owner s operating personnel in India. Provision of OEM s Experts / Instructors (12 an onth) for Training of Project Owner s aintenance personnel in India. Thirty days before the date of coenceent of test running of the first EMU train, the Contractor shall deliver the originals and 6 coloured copies each of the final Operation and Maintenance anuals. These anuals shall have been subitted for proof reading and training purposes prior to delivery. It is accepted that further aendents ay subsequently be required. Thirty days before the date of coenceent of test running of the first EMU train, the Contractor shall deliver the originals and 5 coloured copies each of the final Operation and Maintenance anuals. These anuals shall have been subitted for proof reading and training purposes prior to delivery. It is accepted that further aendents ay Bidding Docuent for 'MRS1'
4 Addendu No. 4 Page 4 of 25 subsequently be required. Requireents, Section-6A: ERGS Clause (iv) Page 57 of 63 prograe listing including coprehensive 'coent stateents' in hard copy and soft forat for source code, copilers and developent tools necessary to odify and recopile software; prograe listing in hard copy and soft copy forat, copilers and developent tools necessary to odify and recopile software; Requireents, Section-6B: Appendix to ERGS Appendix-7: Annexure (iv) Clause 4: Interface with PSD Contractors First Paragraph Page 25 of 30 Platfor Screen Door (PSD) shall be provided for this project. Passenger doors shall be of bi-parting, power operated sliding doors into door pocket accoodated inside the car body side structure. The two door panels at each passenger doorway shall be synchronously controlled and shall provide a door clear opening width of 1400.The passenger door pitch shall be approxiately equally spaced to provide the sooth passenger flow. The Rolling Stock contractor shall provide KE and door drawings of train to PSD contractor for placeent of Platfor Screen Doors. The passenger door pitch shall be copatible with that of passenger pitch of the PSD being installed in the stations. Platfor Screen/Edge Door (PSD/PED) shall be provided for this project. Passenger doors of train shall be as per Chapter 7. The two door panels at each passenger doorway shall be synchronously controlled and shall provide a door clear opening width of 1400.The passenger door pitch shall be approxiately equally spaced to provide the sooth passenger flow. The Rolling Stock contractor shall provide KE and door drawings of train to PSD contractor for placeent of Platfor Screen Doors. The passenger door pitch shall be copatible with that of passenger pitch of the PSD being installed in the stations. Requireents, Section-6B: Appendix to ERGS Appendix-9: Siulator Page 27 of 30 APPENDIX-9 Revised APPENDIX-9 is attached as Annexure-I to this Addendu. Bidding Docuent for 'MRS1'
5 Addendu No. 4 Page 5 of 25 Requireents, Clause : Deliverables Page 28 of 240 Requireents, Clause 3.2.6: Approval for anufacturing plant(s) for Rolling Stock Page 30 of 240 Requireents, Clause Table 3.5: Current Collection Syste Page 36 of 240 Requireents, Clause Table 3.9 Line-7 (Andheri East to Dahisar East) Page 46 of 240 S.No. Clause No (ix) S.No. Clause No (ix) Tools/Equipent/Software Noise Siulation software tools. Tools/Equipent/Software Noise Siulation software tools. ADD THE FOLLOWING AT THE END OF CLAUSE Quantity As advised by Engineer. Quantity One set at noinated depot. In case Contractor proposes a new anufacturing plant(s) then the Contractor shall furnish sufficient inforation to prove the basic soundness and reliability of the proposal for review of the Engineer. The Engineer s decision on contractor s proposal shall be final and binding. Height of Contact Wire fro rail level Height of Contact Wire fro rail level 30 At National Park At National Park 30 a in. and 5500 ax. for elevated, at-grade and depot sections. b in. for underground sections. a in. and 5500 ax. for elevated, at-grade and depot sections. b in. for underground sections. Bidding Docuent for 'MRS1'
6 Addendu No. 4 Page 6 of 25 Requireents, Clause Page 62 of 240 All the couplers (Auto, sei-peranent) shall have the shear-off functionality. Wearing parts/plates of the gangway and couplers shall give a service life of iniu fifteen years. All the couplers (Auto, sei-peranent) shall have the shear-off functionality. Wearing parts/plates of couplers shall give a service life of iniu fifteen years. Requireents, Clause 4.15: Inter-Car Gangways Page 69 of 240 Single piece, single skin with interior panel gangway suitably protected fro heat and dust (subject to Engineer s approval) with suitable claping and jointing arrangeent on both ends with saloon end walls shall be provided within the unit. The attenuation of outside noise through the gangway shall not be less than 33 db. In case of separation of cars, the gangways shall have securing arrangeent and shall not get daaged or deshaped. Suitable for of guiding pin/plate etc. shall be provided so that the coupling /uncoupling of gangways can be carried out by one person. Single piece/double piece, single skin/double skin with interior panel gangway suitably protected fro heat and dust (subject to Engineer s approval) with suitable claping and jointing arrangeent on both ends with saloon end walls shall be provided within the unit. The attenuation of outside noise through the gangway shall not be less than 33 db. In case of separation of cars, the gangways shall have securing arrangeent and shall not get daaged or de-shaped. Suitable for of guiding pin/plate etc. shall be provided so that the coupling /uncoupling of gangways can be carried out by one person. Requireents, Clause (vi) Page 70 of 240 The rubber/elastoer eleents of the gangway shall give a service life of iniu fifteen years. The rubber/elastoer eleents of the gangway shall give a service life of iniu eight years. However, bellows shall give the service life of iniu fifteen years. Requireents, Clause Page 71 of 240 Wearing parts/plates of the gangway and couplers shall give a service life of iniu fifteen years. Deleted. Bidding Docuent for 'MRS1'
7 Addendu No. 4 Page 7 of 25 Requireents, Clause 4.18: Obstruction Deflection Device Page 72 of Obstruction Deflection Device At the front of the cab car, an obstruction deflection device shall be installed to push away objects on track to avoid derailent. The actuation of the deflection device due to ipact of the object, shall initiate the eergency brake and shall be recorded by the TCMS. The design of obstacle deflection device and its ounting arrangeent shall be proven and should be in use in siilar etro applications The Contractor shall subit the detailed calculation of design proof load, installation arrangeent, safety against derailent, energy absorbing capabilities etc. during detailed design Obstruction deflection device ounted on the leading bogie shall be preferred. Detailed arrangeent shall however, be discussed during the detailed design and approval of the Engineer shall be obtained. Engineer decision shall be final and binding Obstruction Deflection & Derailent Detection Device (ODD) At the front of the DM car, an obstruction deflection & derailent detection device shall be installed to push away objects on track to avoid derailent along with derailent detection functionality. The actuation of the obstruction deflection & derailent detection device due to ipact of the object, shall initiate the eergency brake and shall be recorded by the TCMS. The design of obstacle deflection & derailent detection device and its ounting arrangeent shall be proven and should be in use in siilar etro applications The Contractor shall subit the detailed calculation of design proof load, installation arrangeent, safety against derailent, energy absorbing capabilities etc. during detailed design Obstruction deflection & derailent detection device ounted on the leading bogie shall be preferred. Detailed arrangeent shall however, be discussed during the detailed design and approval of the Engineer shall be obtained. Engineer decision shall be final and binding. Bidding Docuent for 'MRS1'
8 Addendu No. 4 Page 8 of 25 Requireents, Clause Page 74 of 240 The bogies proposed to be supplied against the tender shall be of proven design principles. Siilar bogies as proposed for this tender, shall have been in use and have established their satisfactory perforance and reliability on at least three ass rapid transit systes in revenue service over a period of five years or ore (in each MRTS) either outside the country of origin or in Indian Metros. The Tenderer should subit perforance certificate on the letterhead of etro operator, confiring that the supplied bogies have copleted satisfactory perforance for ore than five years. Tenderers ust subit following inforation with their offer The bogies proposed to be supplied against the tender shall be of proven design principles. Siilar bogies as proposed for this tender, shall have been in use and have established their satisfactory perforance and reliability on at least three ass rapid transit systes in revenue service over a period of three years or ore (in each MRTS) either outside the country of origin or in Indian Metros. The Tenderer should subit perforance certificate on the letterhead of etro operator, confiring that the supplied bogies have copleted satisfactory perforance for ore than five years. Tenderers ust subit following inforation with their offer Requireents, Clause Page 75 of 240 The design life of the car the bogie shall not need any rebuilding, repair or strengthening of structural ebers. The design life of the car and the bogie shall not need any rebuilding, repair or strengthening of structural ebers. The service life of rubber bonded etal coponents shall not be less than 8 years and shall be warranted for the sae. Bidding Docuent for 'MRS1'
9 Addendu No. 4 Page 9 of 25 Requireents, Clause Page 75 of 240 The bogie suspension, in conjunction with the car body, shall be designed to enable cars to operate satisfactorily on track with the axiu specified track twist. The axiu offloading of wheels ΔQ/Q shall not exceed 60% of noinal wheel load for track twist 1 in 330 and axiu cant grad 1 in 200 in both inflated and deflated conditions up to axiu perissible speeds. Requireents, Clause 5.4.1: First Paragraph Page 76 of 240 The bogie suspension, in conjunction with the car body, shall be designed to enable cars to operate satisfactorily on track with the axiu specified track twist. The axiu offloading of wheels ΔQ/Q shall not exceed 60% of noinal wheel load for bogie twist and vehicle body twist as per EN in both inflated and deflated conditions. The Contractor shall subit a proposal for the priary suspension syste of proven helical coil steel springs. Vertical daper shall be provided with priary suspension and secondary pneuatic suspension syste, and contractor shall declare the estiated ean service life for operation in the Mubai environent. Quality of dapers used shall be very high and guaranteed against any oil leakage/oozing. The service life of rubber bonded etal coponents shall not be less than 12 years, and shall be warranted for the sae. The Contractor shall subit a proposal for the priary suspension syste of proven helical coil steel springs. Vertical daper shall be provided with priary suspension and secondary pneuatic suspension syste, and contractor shall declare the estiated ean service life for operation in the Mubai environent. Quality of dapers used shall be very high and guaranteed against any oil leakage/oozing. Requireents, Clause Page 78 of 240 The gearbox shall be copatible with the flexible single stage coupling. The otor and the gearbox shall be proven for the proposed gear ratio selected by the Contractor. Gearbox oveent shall be restrained by a torque reaction link between the gearbox and bogie frae. A safety device shall be incorporated to restrain gearbox rotation should the link fail in service. The gears including bearings shall not require overhaul at least earlier than 1.2 illion ks. No sensor shall be installed in the gear case. Coprehensive, flexible and fully autoatic test bench(s) shall be provided to test an overhauled/newly assebled gear case with transission arrangeent and duly ounted on the wheel set. The specification shall be got approved fro the Engineer. The gearbox shall be copatible with the flexible single stage/double stage coupling. Bidding Docuent for 'MRS1'
10 Addendu No. 4 Page 10 of 25 The otor and the gearbox shall be proven for the proposed gear ratio selected by the Contractor. Gearbox oveent shall be restrained by a torque reaction link between the gearbox and bogie frae. A safety device shall be incorporated to restrain gearbox rotation should the link fail in service. The gears including bearings shall not require overhaul at least earlier than 1.2 illion ks. No sensor shall be installed in the gear case. Coprehensive, flexible and fully autoatic test bench(s) shall be provided to test an overhauled/newly assebled gear case with transission arrangeent and duly ounted on the wheel set. The specification shall be got approved fro the Engineer. Requireents, Clause Page 79 of 240 Requireents, Clause Page 82 of 240 Wheel shall not cause squealing on curves. Squeal noise shall be easured for at least one sharpest curve by placing icrophone at 7.5 distance fro rail centre at 3.5 height fro rail top toward the direction of both inner rail and outer rail at elevated section (beyond the parapet wall by fixing the icrophone on suitable height pole/ ast etc.) or at grade, with noral vehicle operating conditions (i.e. TOR, WFL,Wheel Dapers as available in operating condition) including all installed assets, environental and track conditions as per ISO 3095 at noral operational speed. Sound easuring tie shall be the train pass by tie (fro train head passing tie to train tail passing tie) as per ISO A squeal noise shall be evaluated on basis of tone to noise ratio ethod/proinence ratio ethod as per Annex A of ANSI S In the event of total failure of electric brakes and one air copressor on a fully loaded six-car train, the reaining air copressor on the train shall have sufficient capacity to enable the train to reain in service for at least four (4) hours. An intelligent air copressor anageent (with option of forced start) shall be provided to ensure that both the copressors on a six-car train are operated during fill-up and both the copressors in the train are operated alternatively thereafter, to avoid oisture condensation in the copressor due to low duty cycle. In the event of total failure of electric brakes and one air copressor on a fully loaded six as well as eight car train, the reaining air copressor on the train shall have sufficient capacity to enable the train to reain in service for at least four (4) hours. An intelligent air copressor anageent (with option of forced start) shall be provided to ensure that both the copressors on a six as well as eight car train are operated during fill-up and both the copressors in the train are operated alternatively thereafter, to avoid oisture condensation in the copressor due to low duty cycle. Bidding Docuent for 'MRS1'
11 Addendu No. 4 Page 11 of 25 Requireents, Clause First Paragraph Page 85 of 240 The brake syste and coponents shall be proven, state of art and widely used in odern etro rolling stock. The brake coponents, valves etc. shall have been in use and have established their satisfactory perforance and reliability on at least three ass rapid transit systes in revenue service over a period of last five years or ore (in each MRTS) outside the country of origin in three different countries or in an MRTS in India. The options for brake syste have been specified in clause Train braking perforance shall be as specified in Chapter 3, Clause and shall be designed for 90 kph. The operational speed shall be 80 kph. The syste shall generally confor to EN The brake syste and coponents shall be proven, state of art and widely used in odern etro rolling stock. The brake coponents, valves etc. shall have been in use and have established their satisfactory perforance and reliability on at least three ass rapid transit systes in revenue service over a period of last three years or ore (in each MRTS) outside the country of origin in three different countries or in an MRTS in India. The options for brake syste have been specified in clause Train braking perforance shall be as specified in Chapter 3, Clause and shall be designed for 90 kph. The operational speed shall be 80 kph. The syste shall generally confor to EN Requireents, Clause Page 86 of 240 The EP brake shall be so designed that its control function including Wheel Slide Protection (WSP) can be taken over by the other redundant control eleents in the case of failure of individual electronic or electrical control eleents. Redundant power supply and processor card for hot stand by in the control unit and spare slots for I/O cards shall be ensured. However, any other suitable design for redundancy of EP Brake control function including WSP ay be proposed by the Contractor subject to approval of the Engineer. The EP brake shall be so designed that its control function can be taken over by the other redundant control eleents in the case of failure of individual electronic or electrical control eleents. Redundant power supply and processor card for hot stand by in the control unit and spare slots for I/O cards shall be ensured. However, any other suitable design for redundancy of EP Brake control function ay be proposed by the Contractor subject to approval of the Engineer. Bidding Docuent for 'MRS1'
12 Addendu No. 4 Page 12 of 25 Requireents, Clause Page 88 of 240 Parking brakes shall be applied in the event of loss of the ain copressed air supply. The parking brakes shall be capable of release fro within the driving console when the copressed air supply is present. With no copressed air supply available, it shall be possible to release individual parking brake actuators anually fro saloon. Application of parking brakes shall also be controllable fro the driving console and reotely fro OCC. The design shall be such that the parking brakes will take effect prior to fade off of service brake and shall ensure that the cobined brake effect of the pneuatic brake and parking brake is never less than the full brake effort of the parking brake alone. Parking brakes shall be directly actuated by MR pressure. Parking brakes shall be applied in the event of loss of the ain copressed air supply. The parking brakes shall be capable of release fro within the driving console when the copressed air supply is present. With no copressed air supply available, it shall be possible to release individual parking brake actuators anually fro saloon or fro platfor level. Application of parking brakes shall also be controllable fro the driving console and reotely fro OCC. The design shall be such that the parking brakes will take effect prior to fade off of service brake and shall ensure that the cobined brake effect of the pneuatic brake and parking brake is never less than the full brake effort of the parking brake alone. Parking brakes shall be directly actuated by MR pressure. Requireents, Clause Page 88 of 240 In the event of air leakage fro the air feed to parking brake/within the unit and consequential application of parking brake/traction block, arrangeent shall be provided for isolation and anual release of Parking Brake(s) so that traction block is released and train is operable as usual. The parking brake anual release arrangeent shall be provided in each car and it shall not be accessible to the passengers. Separate Isolating cocks (PIC- Parking Isolation Cock), adjacent to the Isolating cocks (BIC) shall be provided in each car. For DM cars, these shall be in Driving Console. No traction block shall occur on account of parking brakes, after the sae has been isolated. In the event of air leakage fro the air feed to parking brake/within the unit and consequential application of parking brake/traction block, arrangeent shall be provided for isolation and anual release of Parking Brake(s) so that traction block is released and train is operable as usual. The parking brake anual release arrangeent shall be provided in each car or at platfor level and it shall not be accessible to the passengers. If anual release arrangeent for parking brake is provided at platfor level then special tools shall be provided for accessing it fro platfor level when train stops at any position with respect to Platfor Screen Doors (PSD). Two (2) no. of such tools shall be provided in each train. Separate Isolating cocks (PIC- Parking Isolation Cock), adjacent to the Isolating cocks (BIC) shall be provided in each car. For DM cars, these shall be in Driving Console. No traction block shall occur on account of parking brakes, after the sae has been isolated. Bidding Docuent for 'MRS1'
13 Addendu No. 4 Page 13 of 25 Requireents, Clause 6.26: Deliverables Page 92 of 240 S.No. Clause No. Tools/Equipent/Software Hardware/Software tool to adjust/change Brake Cylinder Pressure. Quantity As advised by Engineer. Requireents, Clause 7.2.3(vii) Page 96 of 240 S.No. Clause No. Tools/Equipent/Software Hardware/Software tool to adjust/change Brake Cylinder Pressure. Quantity One set at each depot. The force required for closing/opening of any door leaf, when fully connected with the driving gear shall not exceed 60 N. The force required for closing/opening of any door leaf, when fully connected with the driving gear shall not exceed as entioned in EN14752:2015 or latest. Requireents, Clause (a): Eergency Release of Doors Page 98 of 240 On each side of every car, a device (Eergency Access Device - EAD) shall be provided, close to the id-point of the vehicle. This device shall be operable fro outside the vehicle fro platfor level or track-side. Operation of this device shall release the locking echanis on the adjacent door. Manual eergency release device shall be unobtrusive, flushed with, or recessed into, the car side, but readily available in an eergency. The anual eergency release device shall be provided with spring loaded cover to ensure water tightness. This shall require a special key so that only authorised personnel can operate the sae. On each side of every car, a device (Eergency Access Device - EAD) shall be provided. The location of EAD shall be finalized through interface with the PSD Contractor during design stage with the approval of Engineer. This device shall be operable fro outside the vehicle fro platfor level or track-side. Operation of this device shall release the locking echanis on the adjacent door. Manual eergency release device shall be unobtrusive, flushed with, or recessed into, the car side, but readily available in an eergency. The anual eergency release device shall be provided with spring loaded cover to ensure water tightness. This shall require a special key so that only authorised personnel can operate the sae. Bidding Docuent for 'MRS1'
14 Addendu No. 4 Page 14 of 25 Requireents, Clause Page 104 of 240 Deleted In case of entangleent of any pantograph with OHE, other pantographs of the sae train shall be protected by Auto Dropping Device (ADD) feature in train. The syste shall react iediately to lock down the other pantographs to avoid any physical daage to the syste. It shall be deonstrated through the tests. Requireents, Clause :AC Traction Motor Page 110 of 240 The otor bearing aintenance inspection interval (excluding lubrication if required) shall exceed 1.2 illion kiloetres and the insulated bearing shall have a design life of iniu 2.1 illion kiloetres. Lubrication of otor and gearbox bearings shall be accessible without the need of equipent reoval. Calculations supporting the choice of bearings shall be subitted for review. Miniu four traction otors shall be fully wired on four different trains on each line fully equipped with data logger for data recording. The otor bearing aintenance inspection interval (excluding lubrication if required) shall exceed 1.2 illion kiloetres and the insulated bearing shall have a design life of iniu 2.1 illion kiloetres. Lubrication of otor and gearbox bearings shall be accessible without the need of equipent reoval. Calculations supporting the choice of bearings shall be subitted for review. Miniu Four traction otors shall be fully wired on four different trains (one Traction Motor on each train) fully equipped with data logger for data recording and sensors/therocouples. The data loggers shall be able to record teperatures and vibrations at various points of traction otor at different speeds. The detailed locations of sensors in traction otors shall be as per the test bed schee which shall be finalised during design stage. Requireents, Clause Page 110 of 240 The traction otor shall be connected to the single stage gear unit through a flexible coupling. The coupling design and the otor to gear unit ounting arrangeent shall iniize coupling dynaic angular displaceent. The otor shall be dynaic balanced. The gaskets shall be of suitable aterial, copatible for use with gear case oil and service life shall be ore than 1,000,000 ks. The traction otor shall be connected to the single stage/double stage gear unit through a flexible coupling. The coupling design and the otor to gear unit ounting arrangeent shall iniize coupling dynaic angular displaceent. The otor shall be dynaic balanced. The gaskets shall be of suitable aterial, copatible for use with gear case oil and service life shall be ore than 1,000,000 ks. Bidding Docuent for 'MRS1'
15 Addendu No. 4 Page 15 of 25 Requireents, Clause 8.12: Deliverables Page 112 of 240 Requireents, Clause Page 119 of 240 S.No. Clause No. Tools/Equipent/Software Wayside easureent device for easureent of carbon strip width of pantograph and coplete roof body inspection for any external agents (if any) during entry /exit point in the depot (i) Test equipent as per clause (i) All necessary tools, jigs/fixtures/hardware & software/test bench required for in-house aintenance (both preventive and breakdown) of the CI and other equipent. S.No. Clause No. Tools/Equipent/Software Wayside easureent device for easureent of carbon strip width of pantograph and coplete roof body inspection for any external agents (if any) during entry /exit point in the depot (i) Test equipent as per clause (i) All necessary tools, jigs/fixtures/hardware & software/test bench required for in-house aintenance (both preventive and breakdown) of the CI and other equipent. Quantity At least one in each depot. As advised by the Engineer. As advised by the Engineer. Quantity One set at noinated depot. One set at each depot. One set at each depot. The cables which are intended to be used in eergency circuit for alars and counication shall have intrinsic fire resistant property in copliance with EN PH90. The cables which are intended to be used in eergency circuit for alars and counication shall have intrinsic fire resistant property in copliance with EN Bidding Docuent for 'MRS1'
16 Addendu No. 4 Page 16 of 25 Requireents, Clause : Ethernet Consist Network (ECN) Page 120 of 240 Requireents, Clause (ii) Page 129 of 240 Ethernet Consist Network with dual-hoing ladder-type topology (copliant with IEC ) shall be adopted. The ECN shall aintain redundant counication links to the ETB. Ethernet Consist Network with dual-hoing ladder-type topology/dual-hoing ringtype topology (copliant with IEC ) shall be adopted. The ECN shall aintain redundant counication links to the ETB. Reote downloading of TCMS data (as defined in 10.10) to wayside central server through wireless counication network of signalling/teleco using aintenance notebook coputers. The Contractor shall conduct necessary interface with S&T and shall be responsible for coplete set up, coissioning and satisfactory working of the syste during DLP. Train to ground connection fro the onboard network to a ground network shall be provided by Mobile Counication Gateways (MCG) as defined in Para 4.5 of IEC A MCG shall provide at least two interfaces, one to the onboard network and one to the ground network. Mobile Counication Gateways shall support 4G (LTE) and upgradable to latest technology. The facilities of reote downloading shall be in addition to the hardwire downloading. Reote downloading of TCMS data (as defined in 10.10) to wayside central server through wireless counication network of signalling/teleco using aintenance notebook coputers: The Contractor shall conduct necessary interface with S&T and shall be responsible for coplete set up, coissioning and satisfactory working of the syste during DLP. The facilities of reote downloading shall be in addition to the hardwire downloading. Requireents, Clause (i): Download Triggers Page 130 of 240 The triggers for reote downloading to central server shall be tie interval actuated, fault actuated, anual triggered fro train and forced downloaded reotely by authorized etro personnel. The triggers for reote downloading to central server shall be tie interval actuated, fault actuated, anual triggered fro OCC/BCC and forced downloaded reotely by authorized etro personnel. Bidding Docuent for 'MRS1'
17 Addendu No. 4 Page 17 of 25 Requireents, Clause 10.14: Deliverables Page 132 of 240 S.No. Clause No. Tools/Equipent/Software Tools required for reading and processing of recorded data log files as per clause Analytical Software Tools as per clause S.No. Clause No. Tools/Equipent/Software Tools required for reading and processing of recorded data log files as per clause Analytical Software Tools as per clause Quantity As decided by the Engineer. As decided by the Engineer. Quantity One set at each depot. One set at each depot. Requireents, Clause Page 135 of 240 Eployer expects that an energy efficient syste coparable with the best available in the arket shall be provided. Good energy efficiency shall be achieved in cooling and de-huidification operations of the HVAC. Contractor shall furnish Energy Efficiency Ratio (EER) for the offered syste. In cooling ode, the Coefficient of Perforance (COP) of HVAC shall be at least 2.8 in suer abient conditions under all loading conditions fro AW0 to AW3 which ay be achieved by utilizing variable frequency control (if required) of copressors or any other control echanis. The COP shall be validated as per IS8148, ASHRAE 37 or any other relevant standard, as agreed by the Engineer. The Contractor shall subit the record of proven syste already functional in any etros with the specified COP. The Contractor shall furnish expected power consuption of the HVACs per car for peak Suer, Monsoon and Winter abient conditions for AW0, AW1, AW2 and AW3 passenger loads. Eployer expects that an energy efficient syste coparable with the best available in the arket shall be provided. Good energy efficiency shall be achieved in cooling and de-huidification operations of the HVAC. Contractor shall furnish Energy Efficiency Ratio (EER) for the offered syste. In cooling ode, the Coefficient of Perforance (COP) of HVAC shall be at least 2.5 in suer abient conditions under all loading conditions fro AW0 to AW3 which ay be achieved by utilizing variable frequency control (if required) of copressors or any other control echanis. The COP shall be validated as per IS8148, ASHRAE 37 or any other relevant standard, as agreed by the Engineer. The Contractor shall subit the record of proven syste already functional in any etros with the specified COP. The Contractor shall furnish expected power consuption of the HVACs per car for peak Suer, Monsoon and Winter abient conditions for AW0, AW1, AW2 and AW3 passenger loads. Bidding Docuent for 'MRS1'
18 Addendu No. 4 Page 18 of 25 Requireents, Clause Page 136 of 240 Air-conditioned unit shall have noise less copressors & condenser fans. Condenser fan assebly and evaporator otor-blower assebly shall be balanced in two planes, in-situ, as defined in ANSI/AMCA 204, and the residual unbalance should liit vibrations at otor end bells within peak-to-peak displaceent, or 2.3 /s RMS velocity, in any direction. This shall be a type test on prototype unit. Air-conditioned unit shall have noise less copressors & condenser fans. Condenser fan assebly and evaporator otor-blower assebly shall be balanced in two planes, in-situ, as defined in ANSI/AMCA 204, and the residual unbalance should liit vibrations at otor end bells within peak-to-peak displaceent, or 2.3 /s RMS velocity, in any direction. However, any other balancing ethod ay be proposed by the Contractor with the approval of Engineer. This shall be a type test on prototype unit. Requireents, Clause Page 136 of 240 The design shall ensure easy cleaning of the drains, evaporator coils, and condenser coils without need for lifting of HVAC unit fro the car roof. LP and HP switches, filter replaceent, data downloading by PTU, electrical connection cubicle, control panel cubicle etc. shall be easily accessible fro inside of saloon to the aintenance personnel, but not to the passengers. The design shall ensure easy cleaning of the drains, evaporator coils, and condenser coils without need for lifting of HVAC unit fro the car roof. Filter replaceent, data downloading by PTU, electrical connection cubicle, control panel cubicle etc. shall be easily accessible fro inside of saloon to the aintenance personnel, but not to the passengers. Requireents, Clause (B)(k) First & Second Paragraph Page 140 of 240 OCC shall get details of the track conditions such as rail fractures, running edge defects, rail head surface defects, issing fasteners etc. through a suitably designed Digital Line Scan Caera with autoatic real tie detection and warning up to 90 kph of train speed. Such caera shall be installed on both DM cars of 6 no. of trains. Trains on which the equipent shall be installed shall be decided by the Engineer. Siilarly, a Digital Line Scan Caera with autoatic real tie detection and warning shall also be installed on leading (DM) cars of 6 no. of trains at appropriate place for onitoring of overhead catenary conditions and interface between OHE and pantograph, up to 90kph of train speed. OCC shall get details of the track conditions such as rail fractures, running edge Bidding Docuent for 'MRS1'
19 Addendu No. 4 Page 19 of 25 defects, rail head surface defects, issing fasteners etc. through a suitably designed Digital Line Scan Caera with autoatic real tie detection and warning up to 90 kph of train speed. Such caera shall be installed on both DM cars of 4 no. of trains. Trains on which the equipent shall be installed shall be decided by the Engineer. Siilarly, a Digital Line Scan Caera with autoatic real tie detection and warning shall also be installed on leading (DM) cars of 4 no. of trains at appropriate place for onitoring of overhead catenary conditions and interface between OHE and pantograph, up to 90kph of train speed. Requireents, Clause Page 144 of 240 Fire resistant cables shall be proposed for circuits, which should survive for long periods during fire, as per applicable international standards. As a iniu, the cables and wires for Public Address Syste, eergency lighting, door opening and warning systes shall be fire resistant in copliant to EN PH15. Fire resistant cables shall be proposed for circuits, which should survive for long periods during fire, as per applicable international standards. As a iniu, the cables and wires for Public Address Syste, eergency lighting, door opening and warning systes shall be fire resistant in copliant to EN Requireents, Clause Page 149 of 240 All cubicles shall have sufficient lighting arrangeent for facilitating their aintenance related works and it should be supplied fro battery line, duly interlocked with door of that cubicle. All cubicles shall have sufficient lighting arrangeent for facilitating their aintenance related works and it should be supplied fro battery line, duly interlocked with door of that cubicle. Lighting in the cubicles for aintenance related works shall be ade available even after isolation of control supply of the train. Bidding Docuent for 'MRS1'
20 Addendu No. 4 Page 20 of 25 Requireents, Clause Page 160 of 240 Siilarly, in case of certain critical events like opening of Eergency door, Fire & Soke, opening of driver console desk, Obstacle detected by saloon door or by obstruction deflection device track/catenary/infrastructure related events etc. the caera(s) shall focus and alert the train operator/occ by autoatically flashing the iage. Full details shall be subitted for Engineer s review. Siilarly, in case of certain critical events like opening of Eergency door, Fire & Soke, opening of driver console desk, Obstacle detected by saloon door or by obstruction deflection device, ADD (Auto-Dropping Device) /track/catenary/infrastructure related events etc. the caera(s) shall focus and alert the train operator/occ by autoatically flashing the iage (Refer Clause TD of Appendix TD). Full details shall be subitted for Engineer s review. Requireents, Clause Page 161 of 240 Suitable provision to detect & capture rail fracture, issing fasteners etc. shall be provided by the Rolling Stock contractor. Full details shall be discussed during the design stage. Suitable provision for onitoring of track, pantograph, OHE shall be in line with Clause (B)(k). Full details shall be discussed during the design stage. Requireents, Clause Page 161 of 240 Wi-fi internet facility in train shall be installed by Signalling Contractor. Rolling Stock Contractor shall install 8 core gigabyte counication cable or latest standard cable. Coplete routing to access points, router, and internet antennae shall be carried out by Rolling Stock Contractor. Full details shall be subitted for review by the Engineer. Wi-Fi internet facility in train shall be installed by Designated Contractor. Rolling Stock Contractor shall install CAT 7 standard counication cable or latest standard cable. Coplete cabling to access points, router, and internet antennae etc. shall be carried out by Rolling Stock Contractor. Full details shall be subitted for review by the Engineer. Requireents, Clause 13.13: S.No. Clause No. Tools/Equipent/Software Quantity Bidding Docuent for 'MRS1'
21 Addendu No. 4 Page 21 of 25 Deliverables Page 162 of (xi) Coplete tools including software, hardware, equipent etc. as per clause (xi) Software / hardware configurator for enabling the Eployer s personnel carry out the adjustent as per the proposed syste in line with clause (v) The hardware and dedicated software etc. for editing, creating and odifying the speech and route database in line with clause (v) (vi) Equipent and eans for display and announceent of coputer generated essages for AVAS Any additional tool hardware/software required as per clause Set-up facilities for PA, PIS & PSSS in depots as per clause S.No. Clause No. Tools/Equipent/Software (xi) Coplete tools including software, hardware, equipent etc. as per clause (xi) 2. Deleted. As advised by Engineer. As advised by Engineer. As advised by Engineer. As advised by Engineer. As advised by Engineer. As decided by the Engineer. Quantity One Coplete set at each depot (v) The hardware and dedicated software etc. for editing, creating and odifying the speech and route database in line with clause (v). 4. Deleted. One Coplete set at each depot. Requireents, Clause (i) Page 167 of Any additional tool hardware/software required as per clause Set-up facilities for PA, PIS & PSSS in depots as per clause One Coplete set at each depot, if required. One Coplete set at each Depot. Dry heat test: The dry heat test shall be tested for class T3 and teperature shall be considered 80 o C against 70 o C specified in IEC/EN. An extra perforance check at 98 o C shall also be carried out for 10 inutes over teperature value. LCD display units ay be tested into 70 o C. Bidding Docuent for 'MRS1'
22 Addendu No. 4 Page 22 of 25 Dry heat test: The dry heat test shall be conducted for class T3 and teperature shall be considered 80 o C against 70 o C specified in IEC/EN. An extra perforance check at 95 o C shall also be carried out for 10 inutes over teperature value. LCD/LED display units ay be tested into 70 o C and an extra perforance check at 85 o C shall also be carried out for 10 inutes over teperature value. Requireents, Clause Page 168 of 240 Software shall be written in a structured anner and fully docuented during all stages of its design and developent, with at least two levels of docuentation above the source code level. Software shall be written in a structured anner and fully docuented during all stages of its design and developent. Requireents, Clause : First Paragraph Page 179 of 240 A coplete set of brake equipent coprising all ites of equipent foring the Brake Syste shall be assebled and shall be subjected to brake dynaoeter tests. These shall include the Brake Controller and interface with ATO equipent and a transceiver to easure force at the push rod of Brake unit. A coplete series of tests shall be carried out on this rig under all service conditions to deonstrate the function of the brake syste as a whole, both in anual and auto odes. A coplete set of brake equipent coprising all ites of equipent foring the Brake Syste shall be assebled and shall be subjected to brake syste bed test. These shall include the Brake Controller and interface with ATO equipent and a transceiver to easure force at the push rod of Brake unit. A coplete series of tests shall be carried out on this rig under all service conditions to deonstrate the function of the brake syste as a whole, both in anual and auto odes. Bidding Docuent for 'MRS1'
23 Addendu No. 4 Page 23 of 25 Requireents, Clause 15.30: Deliverables Page 186 of 240 Requireents, Appendix TD Clause TD Page 218 of 240 S.No. Clause No. Tools/Equipent/Software Software package required for analysis of the raw data acquired during oscillation trials. S.No. Clause No. Tools/Equipent/Software Software package required for analysis of the raw data acquired during oscillation trials. Quantity As advised by Engineer. Quantity One set at noinated depot. Rolling Stock and Signalling Contractors shall interface to ensure that at least but not liited to following eergency conditions should result in the event based auto popup of CCTV iages via CCTV network on RS Controller Terinal. The detail ipleentation shall be finalized during interface with the approval of Engineers. The utilization of bandwidth of CCTV network shall be anaged dynaically. - PAD activation - Detrainent Door Activation - ODD activation - Side Door Obstacle detection - Fire/Soke Detection - CCTV Eergency Button Activation - Driving console cover open Transfer and display of such iages fro CCTV Server to LVS and Traffic Controller work stations shall be responsibility of Lead Contractor for which RS and Lead Contractor shall interface. Rolling Stock and Signalling Contractors shall interface to ensure that at least but not liited to following eergency conditions should result in the event based auto popup of CCTV iages via CCTV network on RS Controller Terinal. The detail ipleentation shall be finalized during interface with the approval of Engineers. The utilization of bandwidth of CCTV network shall be anaged dynaically. - PAD activation - Detrainent Door Activation - ODD activation - Side Door Obstacle detection - Fire/Soke Detection - CCTV Eergency Button Activation - Driving console cover open - ADD (Auto-Dropping Device) /track/catenary/infrastructure related events etc. (Refer Clause (B)(k). Bidding Docuent for 'MRS1'
24 Addendu No. 4 Page 24 of 25 Transfer and display of such iages fro CCTV Server to LVS and Traffic Controller work stations shall be responsibility of Lead Contractor for which RS and Lead Contractor shall interface. Requireents, Appendix TD Clause TD Last Paragraph Page 222 of 240 During design stage, RS and Signalling contractors ay have to interface to integrate TCMS/DMI inputs, if considered necessary to optiise the driving console in the cab for operation under GoA3/GoA4 keeping in ind that there will be 2 stages of coissioning. Also, Signalling Contractor shall interface with RS Contractor, to provide required inputs, like current speed, target speed, advisory speed, target distance and ode of the train, as a iniu, to RS HMI for display purposes. During design stage, RS and Signalling contractors ay have to interface to integrate TCMS/DMI inputs, if considered necessary to optiise the driving console in the cab for operation under GoA3/GoA4 keeping in ind that there will be 2 stages of coissioning. Also, Signalling Contractor shall interface with RS Contractor, to provide required inputs, like current speed, target speed, advisory speed, Noral Stopping Point (NSP) distance and ode of the train, as a iniu, to RS HMI for display purposes. Requireents, Appendix TD Annexure 1/TD Table TDA1.1: Rolling Stock Characteristics Page 230 of 240 Tare weight of a unit Tare weight of a unit 123T for 3-car unit with weight of any car not exceeding 42T. 126T for 3-car unit with weight of any car not exceeding 42T. Bidding Docuent for 'MRS1'
25 Addendu No. 4 Page 25 of 25 Requireents, Appendix TE: Drawings and Docuents Table TE.1: S.No. 2(ii) General Alignent drawings Dahisar East to Andheri East Page 232 of 240 DRG. No C-LINE7-CA01-GAL-001 and DRG. No C-LINE7-CA01-GAL- 013 Revised DRG. No C-LINE7-CA01-GAL-001 and DRG. No C-LINE7- CA01-GAL-013 are attached as Annexure-II to this Addendu. Requireents, Section-6D: Bid Drawings Figure No. MMWSG-1A and Figure No. MMWSG-1A (TNL) Notes: S. No. 6 Requireents, APPENDIX TE Clause TE 1.3 Page 232 of 240 Clause 2.2 of CHAPTER 2 of SOD applicable on date, is attached as Annexure-III to this Addendu. Add the Clause TE1.3 at the end of APPENDIX TE TE1.3 In case speed restrictions are not entioned in the General Alignent Drawings, Bidders ay refer Appendix-1 of SOD: Perissible Speed, Cant and Miniu Track Spacing on Curves. Appendix-1 of SOD: Perissible Speed, Cant and Miniu Track Spacing on Curves, is attached as Annexure-IV to this Addendu. Bidding Docuent for 'MRS1'
26 Annexure-I Section 6B Appendix to Eployer s Requireents: General Specifications Page 1 of 7 APPENDIX SIMULATOR 1.1 DRIVING SIMULATOR Scope of Supply: Driving Siulator package shall include the following: a1. Motion Based Driving Siulator - 1 No. a2. Driving Siulator Workstation (DSW) - 1 No. b. Driving Instructors /Controller Workstations (IWS) for Motion - 2 Nos. Based Driving Siulator and for DSW c. Observer Workstations for Motion Based Driving Siulator - 2 Nos. and for DSW 1.1.2(A) Motion Based Driving Siulator: Main coponents in Motion Based Driving Siulator shall include but not liited to the following: a. Driving console Exact replica of driving console with full cab structure as provided in the train shall be provided and shall be capable of representing vibration, jerks, acceleration, braking, curves etc. Driving Siulator shall have 6 Degrees of Freedo (DOF) otion syste not surpassing the following DOF. (i) surge to represent variations in accelerations (start-up, oscillation at end of braking, start of braking, coupling). (ii) pitch to represent sustained longitudinal accelerations. (iii) sway to represent lateral ipacts on entering bends and points. (iv) roll to represent the centrifugal force/cant result and in the bends. (v) heave to represent the heaving otion of the train as well as track defects such as subsidence. (vi) Yaw to represent swivels left & right. The otion syste will need to represent the following particular oveents: (i) speeds of up to 100 k/h. (ii) longitudinal and lateral steady state accelerations. (iii) bounce in cross over, low joints (iv) Longitudinal shocks fro on-set of acceleration. (v) lateral in the gage and entering a curve. (vi) bup fro collision or coupling. (vii) y and z axis Driving Console vibrations including rando phases. The otion syste shall have at least an overall frequency range and an acceleration as that of real train. Bidding Docuent for 'MRS1'
27 Annexure-I Section 6B Appendix to Eployer s Requireents: General Specifications Page 2 of 7 The otion syste shall include an eergency stop button bringing the syste to a stable state. If ounted on a otion platfor, the LED onitor (size at least 72) for the track view ust be ounted so that the position of the iage relative to the driver s eyes reains fixed. To achieve this in the siplest way, the LED onitor should be ounted on the body of the Driving Console itself, or on a frae directly attached to this. The ounting should include anti-vibration and anti-shock features to protect the LED onitor fro potential daage caused by the otion platfor itself. With the LED onitor ounted on the Driving Console, any pitch and roll effects will have to be reproduced by software control of the iage. b. At least 72 LED onitor, suitable for displaying Coputer Generated Graphic Iages (CGI) duly depicting the track, signals, PSDs, Overhead traction and stations etc. of the actual route of Line 2 and 7. On CGI, there shall also be realistic depiction of passengers oveent on platfor, announceents and door closing/opening etc. The forward view shall include a iniu horizontal field of view of 40 degrees. The forward view screen shall be placed as far away as possible to enhance and assist the driver s view, approxiately 3 eters. c. Prograable sound syste to siulate the train oveents. d. HD video caera with recorder for recording video of the trainee on Driving Siulator. Provision for indexing and storage of the video footage of the trainee in suitable copact state-of-the-art (both fixed and portable) storage devices. e. Provision for voice as well as text counication with Instructor Workstation (IWS). f. Workstation Controller shall record not only the video iages/files but shall also create Response file with log of the actions initiated by the trainee in response to each fault/condition loaded on the workstation either fro the IWS or directly fro Motion Based Driving Siulator. g. Motion Based Driving Siulator Cab: The Driving Siulator Cab shall have an interior, which is highly realistic. The Driving Siulator Cab shall be strong and robust enough to provide a reasonable service life of 35 years while attached to the otion syste. The exterior shall be painted in MMRDA livery and shall be discussed detailed during design stage. Design of the exterior can include a loss in realis in favour of light-weight and optical design issues. The Driving Siulator Console shall have a ventilation and air-conditioning syste required to aintain the Driving Console at a reasonable teperature and huidity (for at least 4 people in the Driving Console at any point of tie). h. A Virtual Train Navigator (VTN) to siulate actions of the trainee in other cars, or out of the cab. This "virtual" access shall be capable to operate train equipent located outside the cab (B) Driving Siulator Workstation (DSW): Main coponents in DSW shall include but not liited to the following: a. Driving console Exact replica of driving console with enclosure as provided in the train shall be provided on the Workstation desk. b. 46 LED onitor, suitable for displaying Coputer Generated Graphic Iages (CGI). Bidding Docuent for 'MRS1'
28 Annexure-I Section 6B Appendix to Eployer s Requireents: General Specifications Page 3 of 7 c. Prograable sound syste to siulate the train oveents. High quality headset shall be provided separately for Workstation with volue control. d. HD video caera with recorder for recording video of the trainee on workstation. Provision for indexing and storage of the video footage of the trainee in suitable copact state-of-the-art (both fixed and portable) storage devices. e. Provision for voice as well as text counication with Instructor Workstation (IWS). f. Workstation Controller shall record not only the video iages/files but shall also create Response file with log of the actions initiated by the trainee in response to each fault/condition loaded on the workstation either fro the IWS or directly fro DSW. g. A Virtual Train Navigator (VTN) to siulate actions of the trainee in other cars, or out of the cab. This "virtual" access shall be capable to operate train equipent located outside the cab Instructor Workstations (IWS) for Motion Based Driving Siulator and Driving Siulator Workstation (DSW): Two dedicated IWS one each for Motion Based Driving siulator and Driving Siulator Workstation (DSW) shall include but not liited to the following: a. All equipent as provided in driving console of the Motion Based Driving Siulator/ DSW. b. An additional LED touch screen onitor. c. Soft select option for viewing the footage of trainee on one screen. d. Menu driven option for loading different troubleshooting scenarios fro IWS to the Motion Based Driving Siulator/ DSW. e. Facility for counication with the Motion Based Driving Siulator/ DSW. f. Workstation Controller shall be equipped with suitable software incorporating detailed odeling of the cab, under-frae, roof etc. In addition, exhaustive fault troubleshooting directory (prograable with facility for augentation/editing of different scenarios) shall be available. Evaluation of response file of the trainee with respect to the loaded troubleshooting scenario(s) shall be reasonably autoated (by coparing with standard response file) to aid the instructor and to highlight the non-conforing response(s). g. Suitable facility in IWS to enable video calling between IWS and Trainee on the Motion Based Driving Siulator/ DSW. h. Suitable training facility in IWS for the Rolling Stock Controller of OCC for assigned duties in GoA2 and GoA4 ode of operation Observer Stations for Motion Based Driving Siulator and DSW: Two dedicated observer stations one each for Motion Based Driving Siulator and Driving Siulator Workstation (DSW) shall include but not liited to the following: a. 46 LED screen, suitable for display of Motion Based Driving Siulator/ DSW and IWS of Motion Based Driving Siulator/DSW. b. Suitable furniture for the observer stations. Bidding Docuent for 'MRS1'
29 Annexure-I Section 6B Appendix to Eployer s Requireents: General Specifications Page 4 of Deleted General Provisions: The following shall be included: a. The Contractor shall be responsible to provide electrical power connections fro the power ains to the Motion Based Driving Siulator, DWS, IWS and Observer Stations. b. Suitable capacity UPS for at least back up of 1 hour. c. Exhaustive library of iages for generating CGI. The library shall be expandable. d. Exhaustive troubleshooting directory covering all ajor equipent, coplete with standard expected response for faults up to two hundred (200) Nos. to be included. Provision shall be available with increasing the nuber of faults with facility for editing/augenting the fault scenario. e. Suitable package with Interactive graphics shall be provided for indicating the exact location of any coponent on the train. Detailed instructions (with graphics interface) shall be provided to enable access to the specified coponent. f. Coputer Based Tutorials (CBT) covering up to 15 different scenarios such as rescue operation, isolation of doors, isolation of bogie brakes, evacuation of passengers in the section etc. shall be provided with graphics and siple to explain instructions. Each CBT package shall be of approxiate 30 inutes duration. Such CBT packages shall be designed to operate on any workstation/window based desk coputer. Coentary of the CBT packages shall be subitted to Engineer for approval. g. Data Base Manageent Syste for organizing the detailed record trainee s response and evaluation thereof. h. Power Shut Down button at all Instructor Workstations (IWS) for shut down the coplete Siulator Module in case of eergency Deleted Training: Training of Project Owner personnel for suitable duration shall be included either at Project Owner preises and at the preises of the fir engaged for developing the CGI, Troubleshooting directories, Data Base Manageent Syste and CBTs etc The contractor shall provide the optiized layout of the Motion Based Driving Siulator and other auxiliary roos required to house the siulator. Adequate roos and space shall be incorporated in the sae layout for classroo for the trainees, rest roos, pantry, chaber of instructor and office for the Project Owner s engineers. The building shall be built by the Project Owner at its expense as per the broad details and layout provided by the Contractor. 1.2 MAINTENANCE SIMULATOR MODULES (MSM) Scope of Supply Sub-syste Maintenance Siulator Module (SSMSM): The Contractor shall supply working Sub- Syste Maintenance Siulator Module (SSMSM) for each of the following sub-systes: a. HVAC b. Doors including detrainent door c. TCMS d. Converter inverter and auxiliary converter-inverter e. Traction Motors and gear case f. Brake and pneuatics g. Bogies, suspension and wheel sets Bidding Docuent for 'MRS1'
30 Annexure-I Section 6B Appendix to Eployer s Requireents: General Specifications Page 5 of 7 h. PA/PIS and CCTV i. Vehicle Control Circuit j. Couplers k. Gangways l. Syste integration and interface (including signaling and counication) of above ites for UTO All equipent such as UPS etc. for installation and coissioning of above ites Salient features of SSMSM: a. Each odule shall be fully equipped with replica/original equipent of the sub-systes. The odules shall be fabricated to provide hands-on experience for the aintenance personnel for both preventive and corrective aintenance. b. Wherever feasible, 3D cut sections of the equipent shall also be provided. c. Detailed instructions with video graphics on 46 LED touch screen onitor for assebling / disantling for each subsystes as entioned in clause above and any other sub-syste(s) as suggested by the Engineer during design stage. d. Detailed instructions of e-learning with audio and video graphics for carrying out preventive and corrective aintenance actions with linked tools and spares. e. Detailed data base (including part nos., drawing nos., vendor details etc.) of the various parts/coponents f. Detailed description and function of each part including electronic cards in text, graphics, logic diagras etc. g. Detailed description of the software with graphics, detailed flow diagras, logic diagras etc. with detailed narrative explanation. h. Extensive library of faults and standardized response for rectification of faults. The nuber of faults in the library of each odule would be average 250 or as agreed by the Engineer during design stage. Provision shall also be available for recording of the actions initiated by the trainee for rectification of the faults. i. Detailed Testing procedure of different equipent (including provisions in the relevant standards) with graphics. j. Any other feature that would assist in training of the aintenance personnel. k. Data Base Manageent Syste for organizing the detailed record trainee s response and evaluation thereof General Maintenance Siulator Modules (GMSM): The Contractor shall supply 6 nos. of GMSM Modules. Each odule shall include the following: a. 46 LED touch screen onitor with controller and associated power connection equipent and associated furniture. b. Coputer based tutorials (CBTs) for various ajor subsystes, including systes for which SSMSM are specified above in clause c. Coplete software package of all the functions covering list of faults and fault activation & response thereon, assebling/disantling instructions, testing procedure, aintenance schedule etc. of each SSMSM. 1.3 TRAINING OF PROJECT OWNER S ENGINEERS: Bidding Docuent for 'MRS1'
31 Annexure-I Section 6B Appendix to Eployer s Requireents: General Specifications Page 6 of 7 The Rolling Stock Contractor shall also ipart training to 04 Project Owner s Engineers in the atheatical odeling and coputer siulation prograing and photographic techniques required for use in the Siulator hardware and software aintenance of the siulator for a iniu period of 10 working days. After copletion of this training these Project Owner s Engineers will be authorized and provided with all necessary hardware/software tools for inor odifications and additions in odeling in close coordination with Siulator contractor, up to the copletion of DLP. The Contractor shall provide full descriptive anuals for Operation, Maintenance and Training in the use of the Motion Based Driving Siulator, Driving Siulator Workstation (DSW), Maintenance Siulator and associated equipent. The Contractor shall also supply a catalogue of spare parts for the equipent. All supplied docuentation shall be in English language. 1.4 WARRANTY The defect liability period of siulator and other equipent supplied shall be 24 onths fro date of acceptance or expiry of the defect liability period of trains, whichever is later All odifications done on actual train ust be reflected on siulators within 6 onths i.e. odification up gradation should be done twice in a year All observations raised by Project Owner and within the scope should be corrected within 90 days i.e. observation correction up gradation should be done on quarterly basis in each year Contractor shall ensure that the local technical support for the coplete Siulator Module till the end of DLP shall e ade available for eeting DLP obligations. 1.5 SUMMARY OF REQUIREMENTS: Ites included in one set of Trouble Shooting & Driving Siulator, for which prices are to be quoted against ite G7 of Cost Centre G are detailed above at and The odules included in the above said one set is suarized below: S.No. Description Quantity A Driving Siulator package will include the following: 1 Motion Based Driving Siulator with cab & driving console coplete 1 No. 2 Driving Siulator Workstation (DSW) 1 No. 3 Driving Instructors /Controller Workstations (IWS) for Motion Based Driving Siulator and for DSW 4 Observer Workstations for Motion Based Driving Siulator and for DSW 2 Nos. 2 Nos. B. I Sub-syste aintenance Siulator Module (SSMSM) include the following sub-systes 1 HVAC 1 2 Doors including detrainent door 1 3 TCMS 1 4 Converter Inverter and Auxiliary Converter-Inverter 1 Bidding Docuent for 'MRS1'
32 Annexure-I Section 6B Appendix to Eployer s Requireents: General Specifications Page 7 of 7 5 Traction Motor and gear case 1 6 Brake and pneuatics 1 7 Bogies, Suspension and wheel sets 1 8 PA/PIS and CCTV 1 9 Vehicle Control Circuit 1 10 Couplers 1 11 Gangways 1 12 Syste integration and interface (including signaling and counication) of above ites for UTO 1 B. II General Maintenance Module (GMSM) 6 Nos. 1.6 SPARES, SPECIAL TOOLS & TEST EQUIPMENT (i) Spares for aintenance up to DLP is also required to be delivered as part of the Contract. (ii) The Contractor will recoend a suitable spares inventory to be held for first-line repairs. (iii) The Contractor will provide a recoended set of spare parts for eergency replaceent, to be held on-site with the siulator. The Contractor will ensure that the local holding of spare parts is proptly replenished and aintained at the level agreed in the contract. (iv) Any special tools and test equipent required for noral operation of the siulator will be provided by the Contractor and handed over along with the siulator. Bidding Docuent for 'MRS1'
33 REGISTERED OFFICE: RAHEJA CHAMBERS NARIMAN POINT MUMBAI STUP Consultants Pvt. Ltd. DETAILED DESIGN CONSULTANT : TO CONTRACTOR APPROVED BY ASG JVP 05/10/2017 CHECKED BY DCA APM 05/10/2017 DESIGN BY RR SM 05/10/2017 DRAWN BY DS DM 05/10/2017 PROCESS NAME DESIGNATION SIGN DATE 502-A, Poona Chabers, Shiv Sagar Estate A wing, Dr. A.B. Road Worli, Mubai AICA Consortiu (GC) ADD.Unit Nos. 3 and 4A, The Centriu,3rd Floor, Phoenix Market City, L.B.S. Road, Kurla (West),Mubai Mubai Metropolitan region Developent Authority (MMRDA) CONTRACTOR CLIENT: HC AB NAME DGM GM DESIGNATION SIGN 05/10/ /10/2017 DATE DETAIL DESIGN CONSULTANT THIS DRAWING HAS BEEN PROOF CHECKED IN ACCORDANCE THE REQUIREMENTS OF CONTRACT NO. CA01/ LINE 7 AND FOUND SUITABLE FOR EXECUTION PURPOSE CHECKED BY APPROVED BY PROCESS NAME DESIGNATION SIGN DATE 25/08/2016 DATE: DRG. NO. :- SIMPLEX INFRASTRUCTURES LIMITED REVIEWED BY APPROVED BY PROCESS GENERAL CONSULTANT OWNER ASHOK KUMAR OSD (ELE) REVIEWED BY THIS DRAWING HAS BEEN VERIFIED AS PER REQUIREMENTS OF CONTRACT NO. CA01/LINE 7 AND FOUND SUITABLE FOR EXECUTION PURPOSE. G.S.TUTEJA NAME NAME DESIGNATION SIGN DATE CONSORTIUM / GC CERTIFICATE T.K. BHOSLE CE (CIVIL) OSD (C&S) A.F.SHEVARE OSD (CIVIL) APPROVED BY PROCESS PROOF CHECKER'S / DDC CERTIFICATE DESIGNATION SIGN P.R.K MURTY DIR (PROJECT) NAME DESIGNATION SIGN NOTICE OF 'NO OBJECTIONS' FROM EMPLOYER IS BEING ACCORDED FOR DESIGN PRINCIPLES. HOWEVER, THE OVERALL RESPONSIBILITY FOR THE DETAILING AND DESIGN ACCURACY LIES THE DESIGN AND BUILD CONTRACTOR C-LINE7-CA01-GAL-001 R11 TO 008 R11, 009 R13 TO 011 R13, 12 R14, 13 R5 & 14 R3.dwg AS SHOWN CONSTRUCTION REFERENCE DRAWING STATUS: SCALE: R11 REV. Design Developent Preliinary Design GENERAL ARRANGEMENT DRAWING DATE PREP. APPROVED Definitive Design Construction Reference Drawing Working Drawing As Built Issue Record Approved for Issue DESCRIPTION R10 05/10/17 RR ASG REVISED AS MARKED R9 27/09/17 RR ASG REVISED AS PER GEC'S COMMENTS R8 28/06/17 RR ASG TITLE SHEET MODIFIED R7 17/04/17 RR ASG GENERALLY REVISED R6 04/04/17 RR ASG REVISED AS PER COMMENTS GIVEN BY GEC'S Cant = 0.00 Cant Def = EXISTING GROUND LEVELS (M) TRL = R = CL = TRL = C-LINE7-CA01-GAL-001 (SHEET 1 OF 13) TITLE :- PROJECT :PART DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT AND FOUR ELEVATED STATIONS VIZ., ANDHERI METRO(E), SHANKARWADI, JVLR JUNCTION AND MAHANAND [EXCLUDING ARCHITECTURAL FINISHING AND PRE-ENGINEERED STEEL ROOF STRUCTURE OF STATIONS] FROM CHAINAGE (-) 450 TO OF ANDHERI (E) - DAHISAR (E) CORRIDOR OF MUMBAI METRO RAIL PROJECT OF MMRDA REV. LONGITUDINAL PROFILE CHAINAGE Cant = 0.00 Cant Def =74.89 Speed =80.00 Cant = 0.00 Cant Def =0.00 Speed =80.00 CANT ALIGNMENT PROPOSED RAIL LEVELS (M) LEVEL DIFFERENCE Straight = HORIZONTAL ALIGNMENT L = G= 0.000% VERTICAL ALIGNMENT L = R= DATUM= PVI Ele= PVI Ele= L= G= 0.000% LEGEND: AT O AT PL 7M 09 F 5. :5 D H EN C S AT TA R C T H O :-1 F 29 PL.9 A 03 TF M O FO R M M R S AT TA R C T H O :-1 F 59 ST.9 A 03 TI M ON C X H SR C : -1 J RO S 9 IN SO 03 9 V R ER 30 0 C X H SR CR : -2 J O SS 90 IN O 3 9 VE R R 30 0 AT CH: ANDHERI STATION PLAN ST CS SC TS CH: X CROSSOVER SRJ 1 IN 9 R CH: X CROSSOVER SRJ 1 IN 9 R BOARD SIGN SIGN BOARD SIGN BOARD SIGN KEY PLAN ANDHERI (E) BOARD Bus Stop POB BOARD NOTES: SIGN DECK CONTINUITY TO BE PROVIDED FOR SPANS BETWEEN P6 TO P10 POB ANDHERI EAST FLYOVER Bus Stop CH: X CROSSOVER SRJ 1 IN 9 R CH: X CROSSOVER IN R300 SRJ TS SC START OF STATION AT CH: START AT CH: Curve No. = 1 Delta = 4 17'20.052" R= D= 1 08'04.45" CL = TL = TRL = VMax=80 Ca=0 Kph HIP Ch: E = N = CS ST STATION AT CH: M ANDHERI START OF STATION AT CH: END OF PLATFORM AT CH: CH. = ELE % G= EAST FLYOVER G= 0.000% ANDHERI G= % G= 0.000% CH. = ELE END OF STATION CH: SRJ (RHS) 1 IN 9 R KM CH: SRJ (RHS) 1 IN 9 R TS SC ANDHERI EAST FLYOVER END OF FLYOVER Curve No. = 3 Delta = 7 02'14.652" R= CH: D= 1 38'13.28" CL = TL = TRL = VMax=80 Kph Ca=65 HIP Ch: E = N = SC WESTERN EXPRESS HIGHWAY CH. = ELE % HIGHWAY HIGHWAY EXPRESS EXPRESS WESTERN G= WESTERN TS G= 0.476% Curve No. = 4 Delta = 8 46'12.364" R= D= 1 38'13.28" CL = TL = TRL = VMax=80 Ca=65 Kph HIP Ch: E = N = CS ST SC G= % G= 2.444% CH. = ELE No. = Curve 44 22'27.249" Delta = R= D= 3 38'16.18" CL = TL = TRL = Kph VMax=70 Ca= HIP Ch: E = N = CS WESTERN ST KM TS EXPRESS HIGHWAY =6 No. Curve= 30 48'25.750" Delta R= D= 3 49'10.99" G= 0.000% CL = % TL = G= = Kph TRL VMax=65 Ca=90Ch: HIP E = N= SC CH. = ELE KM ST START OF STATION AT CH: M SHANKARWADI STATION WESTERN EXPRESS HIGHWAY WESTERN EXPRESS HIGHWAY END OF STATION TS G= 0.000% SC G= % CH. = ELE CS WESTERN EXPRESS HIGHWAY WESTERN EXPRESS HIGHWAY Curve No. = 7 Delta = 0 32'32.478" R= D= 0 12'30.05" CL = TL = TRL = VMax=80 Kph Ca=10 HIP Ch: E = N = ST CH. = ELE G= % WESTERN EXPRESS HIGHWAY WESTERN EXPRESS HIGHWAY G= % SC Curve No. = Delta = 1 00'13.830" R= D= 0 22'55.10" CL = TL = TRL = VMax=80 Kph Ca=15 HIP Ch: E = N = CS ST WESTERN EXPRESS HIGHWAY WESTERN EXPRESS HIGHWAY KM G= % G= % CH. = ELE TS SC E = N = WESTERN EXPRESS HIGHWAY SS WESTERN EXPRESS HIGHWAY Curve No. = Delta = 9 14'59.072" R= D= 1 52'42.78" CL = TL = TRL = Kph VMax=80 Ca=70 HIP Ch: CS NALLAH D= 1 52'42.78" CL = TL = TRL = VMax=80 Kph Ca=70 HIP Ch: E = N = NALLAH BRIDGE START JAY COACH FLYOVER CS No. = 10 Curve Delta = 8 33'15.117" R= SC NALLAH ST AAREY JAY COACH FLYOVER KM TS SC G= CH. = ELE G= % Curve No. = 11 Delta = 20 28'21.823" R= D= 3 31'33.22" CL = TL = TRL = VMax=70 Kph Ca=100 HIP Ch: E = N = START OF STATION JAY COACH FLYOVER JVLR AT CH: STATION M % CS ST KM TS END OF STATION KM G= % CH. = ELE G= % JAY COACH FLYOVER SC VER.CLE= Curve Delta No. = 12 = 11 58'17.450" R= D= 1 38'13.28" CL = TL = TRL = VMax=80 Kph Ca=65 HIP Ch: E = N = CS KM AT CH: CH. = ELE CS KM TS START OF FLYOVER CH: END OF PLATFORM VER.CLE=2.958 VER.CLE= KM VER.CLE=3.971 VER.CLE=5.672 VER.CLE=8.496 KM VER.CLE= ST VER.CLE= CH. = ELE G= 2.165% FLYOVER G= % JAY COACH KM TS END OF FLYOVER CH: BRIDGE END SC WESTERN EXPRESS WESTERN EXPRESS ST HIGHWAY HIGHWAY Curve No. = 13 Delta = 0 27'35.539" R= D= 0 09'49.33" CL = TL = TRL = VMax=80 Kph Ca=10 HIP Ch: E = N = CS GL= H.T.LINE CROSSING AT CH: M RAIL LEVEL = TO BE CABLED TS SC Curve No. = 14 Delta = 0 50'18.130" R= D= 0 17'11.32" CL = TL = TRL = VMax=80 Kph Ca= KM G= 2.165% HIP Ch: E = N = CS ST CH. = ELE G= % MAHANANDA START START OF STATION MRINAL GORE EXPRESS EXPRESS WESTERN WESTERN HIGHWAY HIGHWAY STATION AT CH: M MAHANANDA FLYOVER KM KM MAHANANDA END TS FLYOVER CH. = ELE G= % Curve No. = 15 Delta = 4 28'21.217" R= D= 0 38'11.83" CL = TL = TRL = VMax=80 Kph Ca=25 HIP Ch: E = N = CS G= % END OF STATION SC GORE MRINAL ST VER.CLE=2.412 TS SC HIGHWAY HIGHWAY EXPRESS EXPRESS WESTERN WESTERN G= % CH. = ELE G= 1.203% Curve No. = 16 Delta = 1 11'02.622" R= D= 0 22'55.10" CL = TL = TRL = VMax=80 Kph Ca=15 HIP Ch: E = N = CS ST KM TOWARDS AAREY START OF PLATFORM AT CH: SC CS G= 0.476% END Curve No. = 2 Delta = 3 25'06.666" R= D= 0 45'50.20" BRIDGE CL = TL = TRL = VMax=80 Kph Ca=30 HIP Ch: E = N = CH. = ELE ST TS G= 0.000% CS KM END GANTRY BRIDGE SS ANDHERI EAST FLYOVER VER.CLE=2.395 VER.CLE=2.400 VER.CLE=6.685 N 0% G= 0.000% G= JVLR START JVLR END Bus Stop BOARD BOARD SIGN SIGN BOARD SIGN Bus Stop OF PLATFORM ANDHERI EAST FLYOVER N ANDHERI STATIO 3M : CH AT Curve No. = 1 Delta = 4 17'20.052" R= D= 1 08'04.45" CL = TL = TRL = VMax=80 Kph Ca=0 HIP Ch: E = N = TOWARDS ANDHERI (E) TS CS CH. = ELE G= 0.721% HIGHWAY HIGHWAY EXPRESS EXPRESS FLYOVER G= 0.721% CH. = ELE G= 2.998% FLYOVER AAREY AAREY N Annexure-II WESTERN WESTERN NALLAH KM Curve No. = 17 Delta = 1 19'56.277" R= D= 0 27'30.12" CL = TL = TRL = VMax=80 Kph Ca=20 HIP Ch: E = N = ST START OF FLYOVER CH: G= 1.203% SC NALLAH BRIDGE START TS SC FLYOVER ST CH. = ELE AAREY AAREY G= 0.000% FLYOVER FLYOVER G= 2.998% Curve No. = 18 Delta = 0 20'26.852" R= D= 0 08'05.33" CL = TL = TRL = VMax=80 Kph AAREY FLYOVER Ca=5 HIP Ch: E = N = AAREY CS VER.CLE= POE Bus Stop FLYOVER AAREY FLYOVER AAREY BRIDGE END
34 NOTES: DETAILS OF HORIZONTAL ALIGNMENT LEGEND: CANT CALCULATION TABLE R3 05/10/17 RR ASG TITLE SHEET MODIFIED R2 19/05/17 RR ASG REVISED AS MARKED R1 17/04/17 RR ASG GENERALLY REVISED R0 11/01/17 RR ASG FOR APPROVAL REV. DATE PREP. APPROVED DESCRIPTION PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE APPROVED BY ASG JVP 05/10/2017 APPROVED BY AB GM 05/10/2017 CHECKED BY DCA APM 05/10/2017 DESIGN BY RR SM 05/10/2017 REVIEWED BY HC DGM 05/10/2017 DRAWN BY DS DM 05/10/2017 DETAILED DESIGN CONSULTANT : TO CONTRACTOR STUP Consultants Pvt. Ltd. REGISTERED OFFICE: RAHEJA CHAMBERS NARIMAN POINT MUMBAI CONTRACTOR CLIENT: SIMPLEX INFRASTRUCTURES LIMITED 502-A, Poona Chabers, Shiv Sagar Estate A wing, Dr. A.B. Road Worli, Mubai THIS DRAWING HAS BEEN PROOF CHECKED IN PROCESS ACCORDANCE THE REQUIREMENTS OF APPROVED BY CONTRACT NO. CA01/ LINE 7 AND FOUND SUITABLE FOR EXECUTION CHECKED BY PURPOSE DETAIL DESIGN CONSULTANT PROOF CHECKER'S / DDC CERTIFICATE NAME DESIGNATION SIGN DATE THIS DRAWING HAS BEEN VERIFIED AS PROCESS PER REQUIREMENTS OF CONTRACT NO. CA01/LINE 7 AND APPROVED BY FOUND SUITABLE FOR EXECUTION PURPOSE. REVIEWED BY GENERAL CONSULTANT AICA Consortiu (GC) CONSORTIUM / GC CERTIFICATE NAME DESIGNATION SIGN DATE ADD.Unit Nos. 3 and 4A, The Centriu,3rd Floor, Phoenix Market City, L.B.S. Road, Kurla (West),Mubai NAME NOTICE OF 'NO OBJECTIONS' FROM EMPLOYER IS BEING ACCORDED FOR DESIGN PRINCIPLES. HOWEVER, THE OVERALL RESPONSIBILITY FOR THE DETAILING AND DESIGN ACCURACY LIES THE DESIGN AND BUILD CONTRACTOR. A.F.SHEVARE G.S.TUTEJA ASHOK KUMAR OWNER DESIGNATION SIGN NAME DESIGNATION SIGN OSD (CIVIL) OSD (C&S) OSD (ELE) P.R.K MURTY DIR (PROJECT) T.K. BHOSLE CE (CIVIL) Mubai Metropolitan region Developent Authority (MMRDA) PROJECT :- PART DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT AND FOUR ELEVATED STATIONS VIZ., ANDHERI METRO(E), SHANKARWADI, JVLR JUNCTION AND MAHANAND [EXCLUDING ARCHITECTURAL FINISHING AND PRE-ENGINEERED STEEL ROOF STRUCTURE OF STATIONS] FROM CHAINAGE (-) 450 TO OF ANDHERI (E) - DAHISAR (E) CORRIDOR OF MUMBAI METRO RAIL PROJECT OF MMRDA TITLE :- GENERAL ARRANGEMENT DRAWING (SHEET 13 OF 13) Issue Record As Built Working Drawing Construction Reference Drawing Definitive Design Preliinary Design Approved for Issue REV. DRG. NO. :- Design Developent 8217-C-LINE7-CA01-GAL-013 R3 DATE: SCALE: STATUS: 25/08/2016 AS SHOWN CONSTRUCTION REFERENCE DRAWING 8217-C-LINE7-CA01-GAL-001 R11 TO 008 R11, 009 R13 TO 011 R13, 12 R14, 13 R5 & 14 R3.dwg
Middle Bhotekoshi Hydroelectric Project (102 MW)
Tender Docuents Lot 1 Addendu No. 1 MADHYA BHOTEKOSHI JALAVIDYUT COMPANY LIMITED Middle Bhotekoshi Hydroelectric Project (102 MW) ADDENDUM NO 1 Additional Inforation (for Section 12 Changes to Volue 3
More informationOperating instructions torque limiters ECE, ECG, ECI, ECR, ECH
Operating instructions torque liiters ECE, ECG, ECI, ECR, ECH Contents 1. Assebly drawings 2. Construction and function 2.1 Construction 2.2 Function 3. Torque liiter design 3.1 Choosing the right torque
More informationPQS Quality Assurance protocol
PQS Quality Assurance protocol WHO/PQS/E03/PV01-VP2.1 Original: English Distribution: General TITLE: Solar power syste for copression-cycle vaccine refrigerator or cobined refrigerator-icepack freezer
More informationBM14200 Roller Brake Tester
BM14200 Roller Brake Tester The perfect choice if you are looking for... Roller Brake Tester designed to last. The ost coprehensive Load Siulation Syste Progra and EBS Diagnosing tool. Roller Brake Tester
More informationigubal Pillow Block Lifetime calculation, configuration and more igubal pillow block
igubal Pillow Block Maintenance-free, dry running High tensile strength High endurance strength Can be used in cobination with E series rod ends Lightweight 801 igubal igubal Pillow Block The igubal bearings
More information145.2 ENGLISH. Courtesy of Crane.Market
5. ENGLISH Standards Optionals Hexagonal profile boos "STAND UP OPERATOR" platfor Rack rotation Swing-up stabilizers, hydraulically activated ETL (Effer Twin Links) Winch Sequence valve Crane adjustent
More information308C CR. Hydraulic Excavator. 4M40E1 Engine
308C CR Hydraulic Excavator 4M40E1 Engine Flywheel Power 41 kw/54 hp Operating Weight with 2470 blade, one-piece boo, 2210 stick, 600 shoes and 0.6 3 bucket 8040 kg Maxiu Drawbar Pull 57 kn Swing Torque
More informationENERGY EFFICIENT MRV III-C. Aviation noise reduction patent fan design. DC fan motor DC inverter technology High efficiency Low noise
MRVIII-C Special Heat Exchanger Design 1 New fan with aviation design viation noise reduction patent fan design Strealine vortex fan, sharp fan blade edge, and a certain degree of curvature, reduce the
More informationM313D. Wheel Excavator. The D Series incorporates innovations for improved performance and versatility.
M313D Wheel Excavator The D Series incorporates innovations for iproved perforance and versatility. High lifting capacity, fast cycle ties and ease of operation lead to increased productivity and lower
More informationElectric winch model RPE
Electric winch odel RPE 250-1000 Winches series RPE and RPA are designed explicitly for perforance, efficiency and safety and offer any advantages and options. RPE's and RPA's extreely copact, practical
More informationRailroader A 922 Rail. Operating Weight: 19,900 22,800 kg Engine: 110 kw / 150 HP
Railroader A 922 Rail Operating Weight: 19,900 22,800 kg Engine: 110 kw / 150 HP A 922 Rail Litronic Operating Weight: 19,900 22,800 kg Engine: 110 kw / 150 HP Perforance Copact, flexible Perfect cobination
More informationSAC1000 SANY All Terrain Crane 100 Tons Lifting Capacity
SAC1000 SANY All Terrain Crane www.sany.co.cn 02 03 Highlights Highlights Outstanding Lifting Capacity Efficient Power Syste Highly reliable with low fuel consuption and easy aintenance.single-engine power
More informationCrawler Excavator R 920
Crawler Excavator R 92 Operating Weight: 2,2 23,6 kg Engine Output: 15 kw / 143 HP Bucket Capacity:.55 1.15 ³ New engine output R 92 Operating Weight: 2,2 23,6 kg Engine Output: 15 kw / 143 HP Bucket Capacity:.55-1.15
More informationCeiling Slot Diffusers
Ceiling Slot Diffusers Series CJD, CJD-LED, CJD-MF, CSD, CSDA/I, CSDE, CSDF, CSDL, CSDR, CSD-T, CSD-MF, CWD, CWD-MF B CJD & CJD-LED Ceiling Jet Diffuser & Lighted Ceiling Jet Diffuser CSD Ceiling Slot
More informationTIER 3 ENGINE POWER MAX OPERATING WEIGHT BUCKET CAPACITY. E175C 96 kw hp Kg 0.24 m m 3
TIER 3 ENGINE POWER MAX OPERATING WEIGHT BUCKET CAPACITY E175C 96 kw - 129 hp 18720 Kg 0.24 3-0.90 3 AS LONG AS WE KEEP BUILDING ROADS, THER MORE PRODUCTIVITY The hydraulic syste axiizes perforance according
More informationConstruction Loadalls /541-70/535-95/ / HiViz/ HiViz/ /
Construction Loadalls -/-/-/-/- HiViz/- HiViz/-/- Gross power: kw/hp kw/hp, Lift capacity: -, Lift height: SPECIFICATION CONSTRUCTION LOADALLS -/-/-/-/- HiViz/- HiViz/-/- STATIC DIMENSIONS C A H D J E
More informationElectric wire rope hoists
Electric wire rope hoists ABUS GM wire rope hoists: Quality at your fingertips Type D crab units on double-girder overhead travelling cranes Type E onorail hoist on a type VS pillar jib crane Two type
More information311D LRR. Hydraulic Excavator. Cat C4.2 Engine with ACERT Technology Net Power (ISO 9249) at 2200 rpm Operating Weights
311D LRR Hydraulic Excavator Cat C4.2 Engine with ACERT Technology Net Power (ISO 9249) at 2200 rp Operating Weights 311D LRR Long undercarriage, 500 shoes, 2800 stick, 0.3 3 bucket 60 kw/82 hp 12 480
More informationCrawler Excavator R 918. Operating Weight: 18,150 21,800 kg Engine Output: 85 kw / 116 HP Bucket Capacity: m³
Crawler Excavator R 918 Operating Weight: 18,15 21,8 kg Engine Output: 85 kw / 116 HP Bucket Capacity:.17.95 ³ R 918 Operating Weight: 18,15 21,8 kg Engine Output: 85 kw / 116 HP Bucket Capacity:.17.95
More informationPRODUCT INFORMATION. PowerCEMS100 EFFICIENT SYSTEM FOR CONTINUOUS EMISSION MONITORING IN POWER PLANTS. Customized analyzer systems
PRODUCT INFORMATION PowerCEMS100 EFFICIENT SYSTEM FOR CONTINUOUS EMISSION MONITORING IN POWER PLANTS Custoized analyzer systes POWERCEMS100: CERTIFIED QUALITY SIMPLE INSTALLATION AND OPERATION The PowerCEMS100
More informationCrawler Excavator R 956
Crawler Excavator R 956 Motor: 240 kw / 326 HP Stage IV Operating weight: Backhoe: 51,000 58,150 kg 56,750 57,300 kg Shovel: Bucket Capacity: Backhoe: 1.25 3.30 3 Shovel: 2.50 3.10 3 R 956 Litronic Motor
More informationSAC1300S SANY All Terrain Crane 130 Tons Lifting Capacity
SAC1300S SANY All Terrain Crane Max. Lifting Capacity: 130 t Max. Boo Length: 63 Max. Lifting Height: 92.5 www.sanyglobal.co 02 03 Technical Features Technical Features Efficient Power Syste The carrier
More informationActive Control of Vibrations in Piping Systems
th International Conference on Structural Mechanics in Reactor Technology (SMiRT ) Espoo, Finland, ugust 94, 9 SMiRT Division 6, Paper 658 ctive Control of Vibrations in Piping Systes Carsten Block a,
More informationComparative Studies of the Tread Brake Dynamometer Between Dry and Wet Conditions
Coparative Studies of the Tread Brake Dynaoeter Between Dry and Wet Conditions Min-Soo Ki, Jeong-Guk Ki, Byeong-Choon Goo, and Na-Po Ki Vehicle Dynaics & Propulsion Syste Research Departent Korea Railroad
More informationConcept Air Seeding & Tillage System
Concept 2000 Air Seeding & Tillage Syste Flexibility and contourability is a tradeark of Morris floating frae design featuring independent wing sections. Floating frae sections, with a tricycle suspension
More informationDIE TWIN HEAD PUMPS IN-LINE ELECTRONIC CONTROL Heating - Air conditioning S.H.W. 50 Hz
OPERATING LIMITS Flow rates up to: /h Head up to: Max. discharge pressure: bar up to + C bar up to + C Teperature range: to + C Max. abient teperature: + C Flanges ND: to DIE TWIN HEAD PUMPS IN-LINE ELECTRONIC
More informationCONSTRUCTION LOADALLS
CONSTRUCTION LOADALLS -/-/-/-/- HiViz/- HiViz/-/- HiViz/- Gross power: kw/hp kw/hp, Lift capacity: kg kg, Lift height: Unrivalled pedigree... JCB first pioneered the telehandler concept back in and have
More informationInternational Journal of Advanced Engineering Research and Science (IJAERS) [Vol-2, Issue-5, May- 2015] ISSN:
Interpreting & Modeling Concentration in Air with Traffic Density using Artificial Neural Network with Reference to Nagpur City Shekhar L. Pandharipande 1, Shubha R. Joshi 2 1 Associate Professor, Departent
More informationOUTLINE OF SPECIFICATION FOR 400FT JACK UP RIG (CP400)
1 P a g e OUTLINE OF SPECIFICATION FOR 400FT JACK UP RIG (CP400) 1 General Provisions 1.1 Purpose and Applicability of Platfor This platfor is a non-self-propelled self-elevating drilling rig used for
More informationESR 5200 SERIES. Specifications Moving Mast Reach Truck
ESR 5200 SERIES Moving Mast Reach Truck ESR 5220 Series Reach Truck 26 20 23 24 19 28 Outrigger Width 4.2" (108 ) 22 20 18 15 25 12 14 38.2" (970 ) 16 17 13 43.6" (1108 ) 44.3" (1125 ) 20 10 29 10 7 38.8"
More informationLifting device Type Sulzer /
Lifting device Type Sulzer 61260280 / 61260281 1 597 0535 EN 10.2016 en Installation and Operating Instructions Translation fro original instruction www.sulzer.co Installation and Operating Instructions
More informationMC Line. MC 96 Duty-cycle crane
MC Line MC 96 Duty-cycle crane Diensions basic achine 2040 450 50 2990 6040 3050 4700 000 3980 530 40 7280 020 R 4700 Operating weight 8300 with HD undercarriage,,000- triple-grouser track shoes, uppercarriage
More informationMining Excavator R 9100
Mining Excavator R 9100 Operating Weight with Backhoe Attachent: 108.5 tonnes / 120 tons Shovel Attachent: 112.5 tonnes / 124 tons Engine: 565 kw / 757 HP Bucket Capacity: 7.0 ³ / 9.2 yd³ Shovel Capacity:
More informationENGLISH. Courtesy of Crane.Market
ENGLISH Standards Optionals Hexagonal profile boos Wind & Drive Crane foldable with fly-jib without disounting winch coponents ETL (Effer Twin Links) Swing-up stabilizers, hydraulically activated Sequence
More informationThe Effect of Slip Torque on Gearbox Design of ITM 8200 Series Tractor
The Effect of Slip Torque on Gearbox Design of ITM 8200 Series Tractor Mohaad Reza KAMANDAR, Majid DOWLATI 2, 2 Faculty eber of Mechanic of Agric. Machinery Dept., Agric. College of Jiroft, Shahid Bahonar
More informationMachine for Industrial Applications LH 80 M
Machine for Industrial Applications LH M litronic` : 7, 7,9 kg Engine: 3 kw / 313 HP Stage IIIB / Tier i Max. Syste Perforance: 3 kw Technical Data Engine Rating per ISO 99 Model Type Bore/Stroke Displaceent
More information325B L 330B L 345B L. Ultra-high Demolition
B L 0B L B L Ultra-high Deolition B L 0B L B L Cat turbocharged engine TA 0 TA 7C ATAAC Gross power kw/77 hp 7 kw/ hp kw/ hp Flywheel power kw/8 hp kw/ hp kw/90 hp Operating weight range 0 000 to 0 000
More information318C, 318C L 318C N. Hydraulic Excavators. Cat turbocharged 3066 T diesel engine
318C, Hydraulic Excavators Cat turbocharged 3066 T diesel engine Gross power Flywheel power Operating weight range Travel speed Drawbar pull 97 kw/132 hp 94 kw/127 hp 19 300 to 20 940 kg 5.2 k/h 195 kn
More informationCeiling Slot Diffusers
Ceiling Slot Diffusers Ceiling Slot Diffusers Series CJD, CJD-LED, CJD-MF, CSD, CSDA/I, CSDE, CSDF, CSDL, CSDR, CSD-T, CSD-MF, CWD, CWD-MF CJD & CJD-LED Ceiling Jet Diffuser & Lighted Ceiling Jet Diffuser
More informationWHEELED EXCAVATORS WX188 I WX218 MISSION ACCOMPLISHED
WHEELED EXCAVATORS WX188 I WX218 MISSION ACCOMPLISHED 2 WHEELED EXCAVATORS THE 8 SERIES POWER AND CONTROL The WX wheeled excavators are designed to deliver a axiu of productivity and precision. The extra
More informationStandard Specification for Carbon Steel Wire for Wire Rope 1
Designation: A 1007 07 Standard Specification for Carbon Steel Wire for Wire Rope 1 This standard is issued under the fixed designation A 1007; the nuber iediately following the designation indicates the
More informationWHEELED EXCAVATORS WX148 I WX168 I WX188
WHEELED EXCAVATORS WX148 I WX168 I WX188 WHEELED EXCAVATORS WX148 I WX168 I WX188 THE NEW GENERATION OF WHEELED EXCAVATORS 2 THE 8 SERIES Power and Control The WX wheeled excavators are designed to deliver
More informationDOZER MACHINERY. Reliability. Strength. Advantage. STANDARD EQUIPMENT SUPPLEMENTARY EQUIPMENT. EQUIPMENT for operation in arctic conditions
Reliability. Strength. Advantage. STANDARD EQUIPMENT Adjustable suspension seat Air cleaner Cab heating syste fan Decelerator Horn Front tow hook protection Hydraulic unit for track tension echanis Lighting
More informationINSPIRE 1. Quick Start Guide V1.4
INSPIRE Quick Start Guide V.4 INSPIRE The Inspire is a professional aerial filaking and photography platfor that is ready to fly right out of the box. Featuring an onboard caera equipped with a 0 lens
More informationTECHNICAL DATA SHEET. Manitou Telescopic. FT140EN_A_0316_MRT2150_2550stIV
TECHNICAL DATA SHEET MRT PrivilEGE Manitou Telescopic + FTEN_A MRT_stIV MRt PRIVILEGE + MRT Privilege + MRT Privilege + Liing Max. capacity with forks at LC kg Max. liing height.. Max. outreach.. Tyres
More informationTECHNICAL DATA SHEET. Manitou Telescopic. FT140EN_A_0316_MRT2150_2550stIV
TECHNICAL DATA SHEET MRT PrivilEGE Manitou Telescopic + FTEN_A MRT_stIV MRt PRIVILEGE + MRT Privilege + MRT Privilege + Liing Max. capacity with forks at LC kg Max. liing height.. Max. outreach.. Tyres
More informationLiebherr Specialist Machines. for Scrap Handling
Liebherr Specialist Machines for Scrap Handling 2 Handling scrap steel etal and other etals is one of the toughest operational areas in industrial aterial handling. To cope with this, robustness and reliability
More informationApplication Modeling and Simulation of a new Hydraulic Piezo Valve
Application Modeling and Siulation of a new Hydraulic Piezo Valve Introduction and Overview This study is related to the iproveent of hydraulic drives perforances for circuit-breaker. The response tie
More informationDevelopment of UAV Indoor Flight Technology for Building Equipment Works
34 th International Syposiu on Autoation and Rootics in Construction (ISARC 2017) Developent of UAV Indoor Flight Technology for Building Equipent Works H. Toita a, T. Takaatake a, S. Sakaoto a, H. Arisui,
More informationSPEC SHEET NET FLYWHEEL POWER MAX OPERATING WEIGHT BUCKET CAPACITY. E175C 96 kw hp Kg 0.24 m m 3
SPEC SHEET NET FLYWHEEL POWER MAX OPERATING WEIGHT BUCKET CAPACITY E175C 96 kw - 129 hp 19180 Kg 0.24 3-0.90 3 E175C MORE PRODUCTIVITY Tier 4 interi engine and SCR technology, which optiizes cobustion,
More information330D L 330D LN. Hydraulic Excavators. Cat C9 Diesel Engine with ACERT Technology Net Power (ISO 9249) at 1800 rpm
330D L 330D L Hydraulic Excavators Cat C9 Diesel Engine with ACERT Technology et Power (ISO 9249) at 1800 rp 200 kw/270 hp Operating Weight 35 300 to 37 500 kg Maxiu Travel Speed 5 k/h Maxiu Reach at Ground
More informationEQUIPMENT. ZAXIS-5A series HYDRAULIC EXCAVATOR. Hitachi Construction Machinery Co., Ltd. CAB ENGINE UNDERCARRIAGE UPPER STRUCTURE
EQUIPMENT ZAXIS-A series : Standard equipent : Optional equipent ENGINE CAB UPPER STRUCTURE UNDERCARRIAGE Air cleaner double filters Air suspension seat with heater Auxiliary overload relief valve Blade
More information312E. Hydraulic Excavator
312E Hydraulic Excavator Engine Drive Engine Model Cat C4.4 ACERT Maxiu Travel Speed 5.5 k/h 3.4 ph Net Power SAE J1349 68 kw 91 hp Maxiu Drawbar Pull 114 kn 25,628 f Gross Power SAE J1995 71 kw 95 hp
More informationCrawler Excavator R 918 Compact
Crawler Excavator R 918 Copact Preliinary Version Motor: 1 kw / 136 HP Stage IV / Tier 4f Operating Weight: 18,75 21,3 kg Bucket Capacity:.3.95 3 Long live progress with the R 918 Copact Very cofortable
More informationSTANDARD EQUIPMENT OPTIONAL EQUIPMENT
STANDARD EQUIPMENT OPTIONAL EQUIPMENT We build a better future ISO Standard cabin All-weather steel cab with 360 O visibility Safety glass windows Rise-up type windshield wiper Sliding fold-in front window
More informationMaterial Handling Machines. LH 22 Industry. Operating Weight 19,200 22,200 kg Engine 105 kw / 143 HP Stage IV Stage IIIA
Material Handling Machines LH Industry Operating Weight,, kg Engine kw / HP Stage IV Stage IIIA LH M Industry Litronic Operating Weight,, kg* Engine kw / HP Stage IV Stage IIIA LH C Industry Litronic Operating
More informationLH 24 Industry LH 26 Industry
Material Handling Machines LH Industry LH Industry Operating Weight,, kg Engine kw / HP kw / HP Stage IV Perforance Power plus speed Redefined perforance Econoy Good investent Savings for long-ter LH M
More informationSCX Stage III A / Tier 3 General dimensions
SCX35003 Stage III A / Tier 3 General diensions (Re R6 8 ar 00 en ds w 1500 ing 24000 8640 rad ius ) 7120 Units: 1930 3150 3830 1750 3510 2990 1250 9265 10500 R6800 R8300 8750 550 (Short tail swing radius
More informationCERAMICS. Fans / Exhaust fans. Balls / Hammer Mills Rollout Tables GLASS. Fans / Exhaust fans. Rollout tables REFRIGERATION.
SSW07 Soft Starters are static starting switches, designed for the acceleration, deceleration and protection of the three phase, electric, induction otor through the control of the voltage applied to the
More informationSPEC SHEET NET FLYWHEEL POWER MAX OPERATING WEIGHT BUCKET CAPACITY. E195C 96 kw hp Kg 0.24 m m 3
SPEC SHEET NET FLYWHEEL POWER MAX OPERATING WEIGHT BUCKET CAPACITY E195C 9 kw - 129 hp 20400 Kg 0.24 3-0.90 3 MORE PRODUCTIVITY Tier 4 interi engine and SCR technology, which optiizes cobustion, deliver
More informationWHEELED EXCAVATORS WX148 I WX168 I WX188
WHEELED EXCAVATORS WX148 I WX168 I WX188 WHEELED EXCAVATORS WX148 I WX168 I WX188 2 Power and Control The WX wheeled excavators are designed to deliver a axiu of productivity and precision. The extra powerful
More informationSCX1500A-3. SCX1500A-3 Stage III A / Tier 3
SCX1500A3 SCX1500A3 Stage III A / Tier 3 General diensions Units: 3900 3900 R4950 (Rear end swing radius) R5150 (Rear end swing radius) R4950 1350 1535 4525 15000 75000 When a counter weight selfassebly
More informationCrawler Excavator R 926COMPACT. Operating Weight: 25,050 28,900 kg Engine Output: 120 kw / 163 PS Bucket Capacity: m³
Crawler Excavator R 926COMPACT Operating Weight: 2, 28,9 kg Engine Output: 12 kw / 163 PS Bucket Capacity:. 1.3 ³ R 926COMPACT Operating Weight: 2, 28,9 kg Engine Output: 12 kw / 163 HP Bucket Capacity:.
More informationSTANDARD EQUIPMENT OPTIONAL EQUIPMENT
STANDARD EQUIPMENT OPTIONAL EQUIPMENT We build a better future ISO Standard cabin All-weather steel cab with 360 O visibility Safety glass windows Rise-up type windshield wiper Sliding fold-in front window
More informationZAXIS-5 series Short-tail-swing version
ZAXIS-5 series Short-tail-swing version HYDRAULIC EXCAVATOR Model Code : ZX85USB-5A Engine Rated Power : 34.1 kw (46 HP) Operating Weight : 8 430-9 060 kg Backhoe Bucket ISO Heaped : 0.13-0.33 ³ ZX85USB-5
More informationNo accidents reported to CARFAX. No other damage reported to CARFAX. Types of owners: Personal lease, Personal. Last reported odometer reading
For Personal Use Only Vehicle Inforation: 2009 MERCEDES-BENZ C300 4 MATIC VIN: WDDGF81X99R072949 SEDAN 4 DR 3.0L V6 F DOHC 24V GASOLINE ALL WHEEL DRIVE Standard Equipent Safety Options No accidents reported
More informationTIER 3 ENGINE POWER MAX OPERATING WEIGHT BUCKET CAPACITY. E385C EL/LC E385C BEH 209 kw / 280 hp Kg Kg 0.74 m m m 3-2.
TIER 3 ENGINE POWER MAX OPERATING WEIGHT BUCKET CAPACITY E385C EL/LC E385C BEH 209 kw / 280 hp 38292 Kg 36453 Kg 0.74 3-1.85 3 0.74 3-2.10 3 E385C POWER AND FAST CYCLES Powerful Tier 3 engine. The advanced
More informationWHEELED EXCAVATORS WX148 I WX168 I WX188 MISSION ACCOMPLISHED. EXPERTS FOR THE REAL WORLD SINCE 1842
WHEELED EXCAVATORS WX148 I WX168 I WX188 MISSION ACCOMPLISHED www.casece.co EXPERTS FOR THE REAL WORLD SINCE 1842 1 2 WHEELED EXCAVATORS WX148 I WX168 I WX188 POWER AND CONTROL The WX wheeled excavators
More informationSCX1500A-3. SCX1500A-3 Stage IV / Tier 4 f
SCX1500A-3 SCX1500A-3 Stage IV / Tier 4 f General diensions Units: 3900 3900 R4950 Rear End Swing Radius R4950 1350 R5150 Rear End Swing Radius 1535 4525 15000 to 75000 When a counter weight with self-assebly
More informationRed Rooster Air Winches 0,2-3,5 tonnes
Red Rooster Winches 0,2-3,5 tonnes RED ROOSTER AIR WINCHES ARE CUSTOM MADE PRODUCTS www.rai-yokota.co Choosing a winch Many constructions are possible, and there are any nors and selection criteria for
More information385C L. Ultra-high Demolition. Cat C18 Diesel Engine with ACERT Technology Net Power (ISO 9249) at 1800 rpm Operating weight with 40 m UHD front parts
385 L Ultra-high Deolition at 18 Diesel Engine with ERT Technology Net Power (ISO 9249) at 1800 rp 390 kw/530 hp Operating weight with 30 UHD front parts 94 100 kg with 36 UHD front parts 96 600 kg with
More informationmetric BOlTs: 42 ft/lbs.
2-12 TP20112, rev 7 Older-Jeep & Jeep CJ BOlT TORQue specifications standard BOlTs: size grade Torque 5/16 5 20 ft/lbs. 3/8 5 35 ft/lbs. 7/16 5 56 ft/lbs. 1/2 5 85 ft/lbs. etric BOlTs: size 8 10 12 14
More informationWheeled Excavator A 900 C A 904 C
Wheeled Excavator A 9 C A 94 C Operating : 18, - 19, kg 2,4-2,6 kg Engine Output: 9 kw / 129 HP 1 kw / 143 HP Bucket Capacity:.32-1. ³. - 1.2 ³ A 9 C Operating : 18, - 19, kg Engine Output: 9 kw / 129
More informationODISHA POWER TRANSMISSION CORPORATION LIMITED VOL-II (PART-II)
ODISHA POWER TRANSMISSION CORPORATION LIMITED VOL-II (PART-II) Package CPC-79/2014-15: Construction of 220kV Double Circuit Transission line on DC tower fro 400/220 KV Grid S/S, Pandiabil (Benapanjari)
More informationM318D MH M322D MH. Wheel Material Handlers
M8D MH MD MH Wheel Material Handlers M8D MH MD MH Cat C6.6 engine with ACERT Technology Net power (ISO 99) kw/69 hp kw/67 hp Operating weight 00 to 00 kg 500 to 5 700 kg Maxiu reach (stick pin) 000 80
More informationCAT.E101 B. Electric Actuators
CAT.E Electric Actuators Siplified Selection Flow Chart Single Axis Electric Actuator Series LJ (AC Servootor) Series Clean roo Dust seal rake Work load kg Maxiu speed /s Positioning repeatability Lead
More informationMULTI-PURPOSE DREDGERS
MULTI-PURPOSE DREDGERS ACHIEVING THE LOWEST COST & ENVIRONMENTAL IMPACT PER M3 Dredge Yard +31 85 3035 866 www.dredgeyard.co MULTI-PURPOSE DREDGERS QUALITY FROM START TO FINISH Dredge Yard designs and
More informationTGBgroup. Slewing Rings
TGBgroup Slewing Rings WWW.TGB-GROP.COM 1 2 3 TGB Group With over 20 years of experience in bearings, gears and power transission, the TGB Group has becoe a global leader in the developent and production
More informationSELF-PRIMING CENTRIFUGAL PUMPS
OPERATING RANGE Flow rates up to: /h Mano. head up to: 6 CE Operating pressure: 6 bar Teperature range: - to + C* Connection: / to DN to DN Flange PN: PN/6 Max. solids: DN * According to odel S SELF-PRIMING
More informationPROlink OWNER'S MANUAL
PROlink OWNER'S MANUAL Table of Contents 3 PROlink Overview 4 PROlink Installation 4...Locating the Transforer 5...Mounting Transforers 7...Running Cable to Fixture 18 Installation Tools 18...Recepticle
More information323D 323D L 323D LN. Hydraulic Excavators. Cat C6.4 Engine with ACERT Technology Net Power (ISO 9249) at 1800 rpm. Maximum Travel Speed
323D 323D L 323D L Hydraulic Excavators Cat C6.4 Engine with ACERT Technology et Power (ISO 9249) at 1800 rp Operating Weight Maxiu Travel Speed Maxiu Reach Maxiu Digging Depth 110 kw/150 hp 22 750 to
More informationALME / ALPE ELECTRONIC IN-LINE PUMPS FOR CIRCULATION SYSTEMS TECHNICAL DATA
LME / LPE FOR CIRCULTION SYSTEMS TECNICL DT Operating range: fro 1 to, ³/h with head up to 1 etres. Liquid teperature range: fro -1 C to +1 C. Puped liquid: clean, free of solids and abrasives, non-viscous,
More informationSERIES WHEEL LOADERS D521D-D XT 621D-D XT -D XR
SERIES WHEEL LOADERS D521D-D XT 621D-D XT -D XR D 521D-D SERIES WHEEL LOADERS 621D-D XT -D XR XT TOTAL PRODUCTION MACHINES MID - MOUNT COOLING MODULE The Case, id-ount cooling odule features an ultra-efficient
More informationAustralia s First Fully Automated Metro Opportunities & Solutions. Oliver Fried Technical Director, Sydney Metro
Australia s First Fully Automated Metro Opportunities & Solutions Oliver Fried Technical Director, Sydney Metro Overview Sydney s rail future - Opportunities for metro Project features & performance Fully
More informationFINAL. E75C SR E75C SR E85C MSR MONOBOOM OFFSET BOOM SWING BOOM 42 kw - 56 hp 7540 kg kg 8270 kg m 3
FINAL ENGINE POWER MAX OPERATING WEIGHT* BUCKET CAPACITY MONOBOOM OFFSET BOOM SWING BOOM 42 kw - 56 hp 7540 kg 8.430 kg 8270 kg 0.23-0.35 3 * With long ar and 450 rubber shoes OUTSTANDING EFFICIENCY ULTRA
More informationFrame. Crane engine. Crane drive. Crane control. Hoist gear. Lufing gear. Slewing gear. Crane cab. Safety devices. Counterweight Telescopic boom
Equipent Crane carrier Frae Outriggers Engine Transission Axles Cardan shaft Suspension Tyre equipent Steering Brakes Driving cab Electrical syste Self-anufactured, torsion-resistant box-type design of
More informationSRC 350 ROUGH-TERRAIN CRANE 35 metric tons capacity
SRC 350 ROUGH-TERRAIN CRANE 35 etric tons capacity PAGE 01 SRC 350 ROUGH-TERRAIN CRANE The international product developed jointly by the experts of the two countries based on the Sino-Aerican R&D platfor;
More informationTAURANGA CITY COUNCIL THIRD AVENUE OFFICE FITOUT
FINAL COST REVIEW SEPTEMBER 0 Prepared For: VEROS PROPERTY SERVICES Prepared By: Rider Levett Bucknall Auckland Ltd Office, 60 Caeron Road Tauranga Ph: (0) 9 Our Reference: B96- FINAL COST REVIEW SEPTEMBER
More informationBEA 030 and BDM 300 For exact engine speed and temperature measurement
3 and BDM 3 For exact engine speed and teperature easureent 3 Bluetooth BDM 3 3: For engine speed and teperature easureent BDM 3: The testing odule for engine speed The new, practical odule for fast and
More informationMTU Friedrichshafen 3B
Sheet 1 of 8 Printout: (yd) 200707 ENGINE DATA MTU Project No. No. Index Unit 18V2000G85TB Chargeair coolant teperature Rawwater inlet teperature 0 0. DATARELEVANT ENGINE DESIGN CONFIGURATION 1 Fuelconsuption
More informationSPEC SHEET. E385C EL/LC E385C BEH 213 kw hp Kg Kg 0.74 m m m m 3
SPEC SHEET NET FLYWHEEL POWER MAX OPERATING WEIGHT BUCKET CAPACITY E3C EL/LC E3C BEH 213 kw - 2 hp 3292 Kg 343 Kg 0.4 3-1. 3 0.4 3-2.10 3 E3C POWER AND FAST CYCLES Powerful Tier 4 interi engine with CEGR
More informationSECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES
SECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 8 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED Portions of this Section of the ROA
More informationDoing Our Best to Provide You the Best. Dodge Ram BOlT TORQuE SPECIfICATIONS TP20235,Rev.4. STANDARD BOlTS: metric BOlTS:
Dodge Ra 1500 3-13 TP20235,Rev.4 BOlT TORQuE SPECIfICATIONS STANDARD BOlTS: ETRIC BOlTS: Size grade Torque Size Torque 5/16 5 20 ft/lbs. 8 22 ft/lbs. 3/8 5 35 ft/lbs. 10 42 ft/lbs. 7/16 5 56 ft/lbs. 12
More informationLH 40 Port LH 50 Port
Material Handling Machines LH Port LH Port litronic` litronic` Operating Weight 1,,7 kg * Engine 1 kw / 11 HP Stage IV Stage IIIA Syste Perforance 33 kw * without working tool Technical Data Diesel Engine
More information307C 307C SB. Hydraulic Excavators. Swing Mechanism Swing Torque N.m 10,440 lb ft. Weights 307C Operating Weight* 7210 kg 15,895 lb 307C SB
307C 307C SB Hydraulic Excavators Weights 307C Operating Weight* 7210 kg 15,895 lb 307C SB Operating Weight* 8390 kg 18,479 lb Drive Max. Drawbar Pull 57 kn 12,810 lb Engine Engine Model 4M40E1 Flywheel
More informationAn Energy Storage Technique for Gearless Wind Power Systems
1 An Energy Storage Technique for Gearless Wind Power Systes Sina Hazehlouia, Meber, IEEE, Afshin Izadian, Senior Meber, IEEE, and Sohel Anwar Abstract Hydraulic wind power transfer systes allow collecting
More informationReduction of Noise Generated from Lower Part of Shinkansen Cars with Sound-Absorbing Panels
Reduction of Noise Generated fro Lower Part of Shinkansen Cars with Sound-Absorbing Panels Yoshiki KIKUCHI 1, Takeshi KURITA 1, Haruo YAMADA 1 and Atsushi IDO 2 1 R&D Center of JR East Group, East Japan
More information330D L. Ultra-high Demolition. Cat C9 Engine with ACERT Technology Net Power (ISO 9249) at 1800 rpm 200 kw/270 hp. Maximum Pin Height
330D L Ultra-high Deolition Cat C9 Engine with ACERT Technology Net Power (ISO 9249) at 1800 rp 200 kw/270 hp Operating Weight (UHD) 41 900 to 47 870 kg Maxiu Pin Height 21.3 330D L Ultra-high Deolition
More informationMandatory Bidder s Meeting Tender Call City of Toronto
1 of 27 2 of 27 Mandatory Bidder s Meeting Tender Call 123-2016 Contract 16ECS-TI-08MR Bayview Avenue Resurfacing and Partial Reoval of Curbs and Sidewalks Fro Truan Road to Steeles Avenue City of Toronto
More informationSTC600S STC600S TRUCK CRANE 60 TONS LIFTING CAPACITY. Quality Changes the World
STC600S STC600S TRUCK CRANE 60 TONS LIFTING CAPACITY 2 COMPANY BRIFE INTRODUCTION COMPANY BRIFE INTRODUCTION 3 SANY Autoobile Hoisting Machinery is one of the core business unit of Sany Heavy Industry,
More information