1 CITY OF MONTPELIER CAPITAL CITY OF VERMONT City Manager s Weekly Report 10/12/2018 UPCOMING MEETINGS Monday, October 15 Monday, October 15 Monday, October 15 Tuesday, October 16 Tuesday, October 16 Tuesday, October 16 Wednesday, October 17 Design Review Committee, 5:30 PM, Council Chambers Development Review Board, 7 PM, Council Chambers Recreation Board, 7 PM, Barre Street Recreation Bldg. Social & Economic Justice Advisory Committee, 5:30 PM, Council Chambers Parks Commission, 6:00 PM, Police Dept. Community Room Energy Advisory Committee, 7:00 PM, Memorial Room Complete Streets Committee, 5:30 PM, City Manager s Conference Room ATTACHMENTS Trip Generation Report CITY MANAGER S REPORT 1 Taylor Street/Recreation Path As you might have noticed, the concrete walls on the 1 Taylor Street structure are going up. A general project timeline (which we will update periodically as warranted): Timeframe for 1 Taylor Street project: Weather tight building March 22, 2019 Substantial Completion Aug. 15, 2019 Project Completion Aug. 22, 2019 Completed: Erosion control and soil testing Excavation, most piles for support of structure Power line and Pole work, water/sewer work Upcoming: Sitework: on-going -- Dec (pile caps, grade beams, concrete walls, elevator pit, slabs) Core and shell: Nov April 2019 (structural steel, metal framing, stairs and rails, roofing, windows and exterior doors, siding) Interior Fit-up: March 2019 August 2019 (drywall, flooring, paint, etc.) Timeframe for Recreation Path: Project completion July 2019

2 Upcoming: Historic retaining walls and Pathway by end of Oct Pedestrian bridge April 2019 Sitework and landscaping May 2019 Overlook deck June 2019 Benching and seating July 2019 City Manager s Report- October 12, 2018 Page 2 Public Parking Garage The project goes before Design Review Committee and Development Review Board for a second time on Monday night. This is another opportunity for public feedback, in addition to the Council meetings and hearings also scheduled. David Grover, PE, from RSG issued the trip generation and distribution report associated with the proposed hotel and public parking garage. The study took a conservative (i.e. worst-case) look at trip generation, noting that the analysis assumes that all trips associated with the garage are new trips, but adding that in fact some of those vehicles are already on the road network. He added, It is possible that the actual impact of the new garage will be smaller than estimated here. Based on our findings, we conclude that the LOS (level of service) at the study intersections will be acceptable for most approaches, the report concluded. For the northbound approach at Taylor Street, the operations [in the design year] are expected to be in a failed condition with and without traffic from the proposed project. The full report is attached. DPW Director Tom McArdle is reviewing the report and expects to issue his analysis by Monday, prior to the DRB meeting that evening. The report scope exceeded the VTrans analysis requirements for this amount of traffic. The city requested that a level of service also be included. Scooters We received the indemnification and insurance language as well as Bird s certificate of insurance. All appears to be in place for their roll out (bad pun) next week. Legal unchanged The City s petition to enter the proceedings concerning GMP s re-construction of the Marshfield Dam has been approved. We are now a party to the matter, for the purpose of monitoring the information in case there is anything relevant to the city. Legal unchanged In the appeal by Conservation Law Foundation (CLF) of the City s WWTF discharge permit, the matter has now been fully briefed by all parties, including motions for summary judgment, responses thereto and reply filings. In its submissions to the Court, the City supported the legal briefs filed by the State of Vermont, Agency of Natural Resources (ANR) and also filed a separate reply memo addressing the issue of whether the discharge permit authorized an increase in phosphorous, as CLF has claimed. A hearing before the Environmental Court was held on July 30 th to present oral arguments on the motions. We are now awaiting rulings on the motions and summary judgement. Council Chambers & Memorial Room Audio/Visual Access AV will be upgrading our sound and video system in the Council Chambers and Memorial Room. Installation will take two to three days starting Wednesday, December 5 th. City of Montpelier Help Wanted View the latest job opportunities at View the latest City committee vacancies at

3 WEEKLY REPORTS FROM DEPARTMENT HEADS City Manager s Report- October 12, 2018 Page 3 Community Justice Center The Montpelier Community Justice Center is excited to announce that filmmaker Bess O Brien is bringing her new film Coming Home to Montpelier. The movie provides an in-depth look at the work of Circles of Support and Accountability (COSAs) in Vermont and features a Montpelier COSA. Coming Home focuses on five core members as they navigate the challenges of reentering their communities after incarceration. The film highlights volunteers, staff and core members of the Barre, Montpelier, St. Johnsbury and Hartford CJCs. Bess O Brien is an award-winning documentary filmmaker and theater producer whose work focuses on pressing social issues. Her films shed light on the human stories behind opiate addiction, foster care, domestic violence, eating disorders, incarceration, and bullying. The film will be shown at the Savoy Theater in Montpelier on October 18 at 7:00 pm. The presentation is free, and donations are accepted. Watch the trailer at See Press Release attached to this report. Planning The City of Montpelier was selected as the winner of the Stone Environmental s Vermont Municipal Arc GIS HUB competition. This grant award will allow Montpelier to develop a community web application to utilize the power of local information and stories to drive civic engagement and support local initiatives. ArcGIS HUB is a web based, two-way community engagement platform that can be customized, including interactive maps, informative charts, narrative story maps, dashboards, and a place to collaborate and connect with members of the community. The web application also helps communities enlist citizens to gather data in a useful digital format through surveys, development proposals, community events, and meet ups. The City would like to thank Stone Environmental for their generosity in establishing this grant competition and for selecting Montpelier to be the first winner. We look forward to working with their team over the coming year to get this project on line. Public Works Shared Use Path Project Granite St Gallison Hill Road: Little has changed from our report of October 5th. Currently awaiting approval of material & product submittals. Staff met with the contractor and engineer to receive a presentation about the proposed wall product materials, color selection for the pre-cast blocks to match the native stone, and the protective sealant. Work planned for the week of October 15th includes the installation of erosion control devices and check dams, tree protection systems, and installation of the project definition fencing. First Ave Sidewalk Reconstruction: The main work force from the streets division will continue work on the sidewalk reconstruction project. The curb base has been prepared a new curbing installation begun. We anticipate full completion by about the 19th or soon after. Lague Drive Reconstruction: We expect the contractor will complete the road reconstruction by the middle of next week. We are now attempting to obtain a schedule commitment from paving contractor and expect to have everything wrapped up including restoration by the end of the month with the possible exception of the new guardrail. One Taylor Street Transit Center: Water, wastewater, and stormwater connections on Taylor Street have been made. The contractor will continue to pour walls for the building. They will also be mobilizing to the west side of the North Branch to drive piles for the new pedestrian bridge abutments.

4 City Manager s Report- October 12, 2018 Page 4 Main, State & Elm Street Class One Highway Paving project: This contract remains open. The contractor has finally begun work on the punch list items including addressing some of the puddles that have been mentioned recently at City Council meetings. The contractor is also now applying a surface treatment to a few sections of the concrete sidewalks which have begun to spall. This repair technique will be evaluated in the spring to determine if this will be an acceptable long term solution. We ll also be reevaluating the untreated areas to see if the condition worsens or has stabilized. Northfield Street: Paving of the repaired section on Northfield Street along with other hand paving work located along Northfield Street. Miscellaneous: Our bagged leaf program is now in full swing. Please check the schedule for our daily pick-up areas. Other customary fall work is also underway including storm system inspection and cleaning, seasonal sign changes, and placing our orders for salt, sand and liquid de-icing materials, etc. The equipment division will be preparing for winter operations making ready our critical equipment for use on short notice as the season changes. Community Services Enchanted Forest! The Parks and Trees crew has been preparing for the Enchanted Forest taking place the afternoon and evening of Saturday, Oct. 13. Hubbard Park will turn into an even more enchanted forest; with a pumpkin lit road to the tower, hay wagon rides and guided tours to four performances in different locations throughout the forest. Since the event sold out last year, this year we are trying out an added event on Sunday. Sunday afternoon, the pumpkins and lanterns will be re-lit and we invite community members to come for a self-guided, performancefree by donation stroll through the forest. Repairs to Mountain Biking Infrastructure in North Branch River Park On Sunday, October 7, 2018, seven Norwich College students and 7 members from the local mountain bike club, MAMBA, as well as John Pelkey, helped replace decking and repair five bridge along the mountain bike path in the North Branch River Park. Congratulations Montpelier Youth Track! On Thursday, October 12, 2018, Arne McMullen was pleased to accept on behalf of the Youth Track program, the 2018 State Championship for Small Communities. Ski & Skate Sale Winter is coming.and so are winter sports! Get ready for your favorite winter activities by shopping the Recreation Department s Ski and Skate sale at Montpelier High School on October 20th. Volunteers at the sale get access to a special preview sale on Friday, October 19th! Please consider volunteering as either a check in volunteer on Friday, October 19th or at the sale the morning and afternoon of October 20th. For more information or to sign up today, please call or Becky at rjohnston@montpelier-vt.org or Spooktacular Halloween Party Children in grades six and below are invited to join us for a not-so-scary Halloween party with games, prizes, and a magic show! We are seeking a team of volunteers to join us from Montpelier High School on October 27th from 1:00-2:30pm. These volunteers will help decorate the space, organize the games, and hand out prizes. If you re interested in joining us for the party, please call or Becky at rjohnston@montpelier-vt.org or Governance Policies and Procedures for Montpelier Senior Activity Center At the Annual Meeting on June 19, MSAC membership approved a new Governance Policies and Procedures

5 City Manager s Report- October 12, 2018 Page 5 (GPP) document. The MSAC Advisory Council voted, at their September 17 meeting, to amend the GPP. The amendments and revised document are now available for viewing at: MSAC s Swingin Over Sixty band to play at Fall Harvest Festival The MSAC Swingin Over Sixty band will once again be playing at the Montpelier High School Fall Festival on Thursday, October 18. New this year, the band will be joined by a high school pianist to round out their sound. MSAC Kitchen Receives near Perfect Score on Latest Health Inspection A surprise visit by the State Health Inspector was no big deal at the Montpelier Senior Activity Center earlier this week. The kitchen facility received a score of a whopping 96%. Bravo! to Michael Morse of Good Taste Catering and the entire FEAST team for the professional care with which they treat the facility, keeping it up to code, sanitary, and in great working order. UPCOMING COUNCIL MEETINGS... Oct 24 Nov 14 Dec 12 Art Synergy Master Plan P&D Investment Committee appts. - ATCM Energy Advisory Committee appts. ATCM Design Review Committee appts. - ATCM Body Cam Policy (budget) MPD DID Budget MA Energy Efficiency Update Facilities Central Vermont Internet Rep. ACM Parklet Ordinance, 2 nd reading Budget Guidelines Finance Budget Schedule Finance Community Profile ACM CVPSA Board Presentation joint w/barre CC MTIC & Tree Board appointments ATCM Budget Finance/CM Official Map P&D Complete Streets Plan DPW Oct 29 (Mon.) Nov 28 Dec 19 Special Meeting Public Information session for special election items CM Report on PCI Targets DPW Main/Barre Corridor Study DPW Personnel Plan Revision CM/Finance Master Plan Update P&D Zoning Fixes P&D Budget Finance/CM Economic Development Summary P&D MDC goals/measures CM/MDC Housing Strategy (Purchasing land?) P&D Sabins Pasture Plan CM/P&D Tax Stabilization Policy CM/P&D/MDC Storefront Incentives CM/P&D Livable Wage/Min wage ordinances CM Ex-Officio Committee Appts ATCM Jan 2 Budget if needed Finance/CM Jan 9 Budget Finance/CM Voluntary rental inspection program P&D Jan 16 Budget public hearing CM Warning Public hearing CM Riverfront Access plan P&D District heat summer operations plan ACM Jan 24 (Thurs) Budget public hearing CM Warning Public hearing CM Charter Public hearing CM Bond public hearing/necessity res. CM Approve warning CM Audit Report - Finance Feb 13 Restructure revolving loan funds P&D Complete Ordinance review 1 st reading ATCM Manager Review CM Feb 27 Main/Barre Implementation Plan DPW Ordinance review 2 nd reading ATCM

6 City Manager s Report- October 12, 2018 Page 6 Not calendared as agenda items: Utilize TIF for applicable projects being done with Garage Reinstitute council budget survey CM done Implement municipal facility best practices for stormwater DPW - ongoing Ensure any new facility or renovation meets net zero goals Facilities Publish and Post resources for landlords and tenants ACM/P&D done Conduct public outreach about housing rights and issues ACM/P&D done Add public dashboard from Envisio (October) ATCM Community workshops on social justice if approved by council Continue W/S master plan DPW - ongoing Continue planning for CSO elimination DPW ongoing Seek grants for EV Charging stations P&D Employee parking incentive (possibly with Oct 24 parking plan) ACM/P&D Substance Abuse prevention program with schools CS For Budget: Upgrade street lights to LED DPW Consider Net Zero fund/benefit charge CM/MEAC Seek funding to expand COSA to work with DCF families CJC Prioritize non-fossil fuel based vehicles in equipment plan DPW/Finance One Taylor Street develop & Fund maintenance plan DPW Evaluate compatible fuel match DPW Police staffing and training MPD Replace aging fire vehicles MFD Facility Management CM/Facilities Community Services integration and staffing ACM/CS Pending Meeting items: Parks tour and meeting with Parks Commission - done Open Meeting/Public records briefing William Fraser City Manager

7 MEMO TO: Gregory Rabideau AIA, Rabideau Architects Inc FROM: David Grover PE DATE: October 11, 2018 SUBJECT: Proposed Capitol Plaza Hotel and Parking Garage Traffic Study Greg, RSG has projected the trip generation and distribution associated with the proposed Capitol Plaza hotel and parking garage in Montpelier, Vermont. The following memo explains the project background, previous studies, existing background traffic, trip generation, and trip distribution. PROJECT BACKGROUND Our understanding of the proposed project is as follows: An 81-room hotel and a 348-space parking garage will be constructed behind (south of) the existing Capitol Plaza Hotel and Conference Center on the existing parking lot (see Figure 1 and Figure 2). The parking garage will be built on two properties the Capitol Plaza lot and the Heney lot (see Figure 1 and Figure 2). The site lies on the corner of to the north and Taylor Street to the west and has access to both streets via existing curb cuts. The distribution of new trips leaving and entering the site are assumed to be the same as the existing traffic flows. Building the parking garage and hotel on the existing surface parking lot will remove 185 surface parking spaces. Therefore, the garage will create a net gain of 163 spaces on the site. 200 spaces will be leased to the hotels. 80 spaces will be leased as monthly passes. 30 spaces will be leased to a new 25-unit multifamily housing project, and the remaining 38 spaces will be used as pay-by-the hour spaces. We assume these hourly spaces will be utilized by retail shoppers for our analysis The garage will provide additional pay-by-the hour spaces as demand allows, and these spaces will generate more trips than the other uses. To be conservative, our analysis assumes that the hotel is half-full with the remaining spaces devoted to retail shoppers. Additional details are included in the Parking and Trip Generation section. RSG wrote a memo describing the existing background traffic and traffic generated by the proposed hotel dated March 1, 2018, which referenced a 2015 study by DuBois and King studying traffic operations at the intersection of Taylor Street and and a draft bus circulation study by DuBois and King. This memo expands on RSG s original findings. RSG 180 Battery Street, Suite 350, Burlington, Vermont

8 FIGURE 1: PROJECT LOCATION MAP FIGURE 2: SITE LAYOUT 2

9 The new hotel and the 49 PM peak hour trips associated with it have already received approval at the City level. This memo includes trips associated with the new hotel due to the nature of the parking analysis. This study investigates traffic changes associated with the new hotel and parking garage at two intersections: o o /Taylor Street and /Elm Street. This study uses parking and trip generation rates from the Institute of Transportation Engineer s (ITE) publications Parking Generation 1 and Trip Generation Manual 2 to calculate parking and trip generation respectively. This study assumes a design year of SUMMARY OF PREVIOUS STUDIES AND BACKGROUND TRAFFIC In their 2015 study, DuBois and King studied traffic operations at the intersection of Taylor Street and. This is a stop-controlled intersection where, running east-west, is free and Taylor Street (northbound) and Governor Davis Avenue (southbound) have stop signs. They found that traffic volumes had been declining in recent years. Although they counted turning movements at the intersection in 2015, they used higher 2013 counts by VTrans to assess level of service (LOS). Using Synchro 3, they found that, in the PM peak hour, the Taylor Street and Governor Davis Avenue approaches experience LOS F and E respectively. This intersection did not meet the warrant for a traffic signal. It did meet the warrant for all-way stop control, but that created unacceptable LOS on the approaches. Given the poor level of service of these side streets and the result of the all-way stop control warrant, DuBois and King recommended that the City reconfigure the intersection s lanes to provide two lanes on Taylor Street while removing the right turn lane from eastbound. The City plans to implement this change in an upcoming road maintenance project, and analysis in this memo assumes that the change has taken place. According to the Synchro worksheets in report, the changes result in a northbound left/through lane with LOS F and a right turn lane with LOS B. DuBois and King also performed field measurement of delays, and the Taylor Street approach showed delays equivalent to LOS D. They concluded that the Synchro analysis was overly conservative and that actual delays were not excessive for peak hour conditions. It should be noted that the Synchro analysis included peak hour factors (PHF) of 0.76 and 0.84 on the approaches (PHF less than 1.0 create larger volumes), and these increased the volumes used in the Synchro analysis. VTrans traditionally increases volumes to a design hour volume (DHV) and then uses a PHF of 1.0, i.e. does not increase volumes with a PHF. 1 Institute of Transportation Engineers, Parking Generation 4th Edition (Washington, D.C.: Institute of Transportation Engineers, 2010). 2 Institute of Transportation Engineers, Trip Generation 10th Edition (Washington, D.C.: Institute of Transportation Engineers, 2017). 3 A traffic analysis software by Trafficware which implements Highway Capacity Analysis equations 3

10 Taylor Street Existing Drive West Taylor Street Existing Drive West The bus circulation study is still in a draft version, so its volumes are not finalized. DuBois and King presented 2022 traffic volumes at the intersection of Taylor Street and the future One Taylor Transit Center (south of the proposed hotel). These volumes are approximately 50 percent higher than the volumes in the 2015 study along Taylor Street between and the Carr Lot. They include traffic from the busses using the proposed Transit Center and the proposed apartment building on this site. DuBois and King note that it is likely that traffic will actually decrease with the addition of the Transit Center because the Carr Lot traffic will be removed. For this reason our traffic projections are not changed to account for the Transit Center. RSG s March 1, 2018 memo projected 2022 background traffic using the Taylor Street volumes included in DuBois and King s draft memo as these were the most recent traffic projections. VTrans published a 2018 Annual Average Daily Traffic (AADT) volume for west of Taylor Street which is used here to update the background traffic. The 2017 VTrans Redbook recommends using the %K value of a nearby Continuous Traffic Counter (CTC) to estimate DHV from AADT. The 2018 AADT on State street west of Taylor Street is 7,262 vehicles per day. The closest CTC is W024 on Memorial Drive, which has a 2017 %K value of 12.2%. The resulting DHV on west of Taylor Street is 886 vehicles during the peak hour. This is less than the 949 vehicles counted in the 2013 traffic counts and would indicate that the 2013 counts should be reduced for a traffic analysis. This analysis follows DuBois and King s methodology of using the 2013 turning movement counts without reducing them. The Redbook expects traffic to grow 3% between 2018 and 2025, so the 2013 turning movement counts are increased by 3%. Based on DuBois and King s findings and the 2018 DHV being lower than the 2013 turning movement counts, traffic has not increased in recent years. However, to follow the Redbook methodology, this analysis grows DHV traffic volumes by 3%. Trip generation of the new hotel from the March 1, 2018 memo (49 PM trips) remains unchanged. Future trip distribution is typically assumed to follow existing traffic flows. RSG observed vehicles entering and exiting the two project driveways on February 20, 2018 during the PM peak traffic hour (4:30-5:30 PM). Figure 3 shows the observed entrances and exits at the site driveways and the approximate distribution of trips entering and exiting the site. FIGURE 3: OBSERVED ENTRANCES AND EXITS AND TRIP DISTRIBUTION Observed Driveway Entrances and Exits Approximate Observed Trip Distribution 17 I % I58 30% % 10% 60% C Existing Drive North C58 10% Existing Drive North 20% 19 30% Figure 4 shows the background traffic after adjusting for traffic growth to

11 FIGURE 4: BACKGROUND TRAFFIC 2025 AM Peak Hour 2025 PM Peak Hour 2025 Gov. Davis Ave. Elm Street Gov. Davis Ave. Elm Street C C I I Taylor Street Parking Lot Taylor Street Parking Lot PARKING AND TRIP GENERATION Trip Generation is the number of trips a land use is expected to generate over a given time period based on previous observations in the Trip Generation Manual. Trip generation is used to understand how traffic will change as land uses change. Similarly, parking generation is the number of parking spots a land use is expected to require based on previous observations in Parking Generation. Both parking and trip generation are based on the size of a land use. This study examines the trip generation of an 81-room hotel and the net gain of 163 parking spaces at the project site. Trip generation for the hotel is straightforward, as explained in our previous memo. The proposed parking garage will not create new trips on the road network since people will not visit the garage for the garage s sake. Instead, drivers attracted to nearby land uses will park at the garage. Except for the hotel guests, these vehicles parking at the garage are already on the road network. Since they are going to a nearby land use, they may already be driving past the site in search of a parking space. In that case, the trip generation of the parking garage is zero trips. However, if one assumes that the vehicles entering and exiting the garage were originally not traversing Taylor Street or, then these vehicles will add volume to the study intersections. They may also be removed from traffic volumes from other parts of the City that are outside the scope of this study. To be conservative, this analysis assumes that all trips associated with the garage are new trips at the project intersections. It is possible that the actual impact of the new garage will be smaller than estimated here. The 348 parking garage spaces are associated with four land uses, whose trips are modeled based on ITE land use types. Hotel, ITE spaces Multifamily Housing, ITE spaces Hourly Spaces, ITE 820 Shopping Center 38 spaces, additional spaces as supply allows Monthly Spaces, ITE 701 (parking) or 710 (trips) General Office Building 80 spaces The garage will create 163 net new parking spaces whose trip generation is modeled here, 47% of the 348 garage spaces. These spaces are distributed to the land uses according to the above proportion in Figure 5. When spaces are not in use, they will be leased out on a pay-by-hour basis, also modeled as 5

12 820 Shopping Center. For this analysis, we assume that that half of the hotel spaces (47) are available as pay-by-hour (see Figure 5). The ITE 820 land use generates more trips than the hotel land use, so this scenario provides a more conservative approach. FIGURE 5: NEW PARKING SPACE ALLOCATIONS WHEN HOTEL IS FULL AND HALF-FULL Land Use Hotel Full Hotel Half-Full Hotel Pay-By-Hour Multifamily Housing Office Building Total The number of Hotel rooms and Multifamily Housing units are known: 81 and 25 total units respectively. Since only 47% of the spaces are considered new, 12 of the 25 proposed Multifamily housing units will be modeled. All trips associated with the new hotel will be modeled; assuming the hotel is half full results in 41 rooms generating trips. No trips associated with the existing Capitol Plaza hotel will be modeled because they are already part of background traffic. The size of pay-by-hour and office building land uses are not known, so the ITE Parking Generation rate is used to calculate the size of a land use that the available parking can serve. This calculated land use size is then used to calculate the trip generation (Figure 6). Note that ITE Land Use 701 Office Building is used for parking generation while ITE Land Use 710 General Office Building is used for trip generation because Parking Generation and Trip Generation Manual do not have the same land use numbers for General Office Building. FIGURE 6: TRIP GENERATION TABLE The new parking garage and hotel are projected to generate 55 and 103 trips distributed between the site driveways in the AM and PM peak hours, respectively. TRIP DISTRIBUTION Parking Generation Rate Trip Generation Rate Total Trips Enters Exits Land Use Spaces Size 310 Hotel AM Rooms Hotel PM Rooms Shopping Center AM ksf Shopping Center PM ksf Multifamily Housing AM Dwelling Units Multifamily Housing PM Dwelling Units /710 General Office Building AM ksf /710 General Office Building PM ksf Total AM Total PM Future trip distribution is typically assumed to follow existing traffic flows. Figure 7 shows the projected trip distribution according the observed existing traffic flows in Figure 3. 6

13 Taylor Street Existing Drive West Taylor Street Existing Drive West FIGURE 7: TRIP DISTRIBUTION DURING PEAK TRAFFIC HOURS New Trip Distribution - AM Peak Trip Generation New Trip Distribution - PM Peak Trip Generation 9 I I Existing Drive 6 Existing Drive C76 North C76 North The new trips projected to be generated by the hotel and parking garage represent a modest increase in traffic at the two study intersections. During the PM peak hour, the project is projected to generate 30 trips that will pass through the Taylor Street and intersection and 49 trips through the and Elm Street intersection (Figure 8). 26 trips are projected to pass by the Transit Center s entrance during the PM peak traffic hour, approximately one trip every two minutes. FIGURE 8: NEW TRIPS THROUGH PROJECT INTERSECTIONS AM Trip Generation PM Trip Generation Gov. Davis Ave. Elm Street Gov. Davis Ave. Elm Street C C I I Taylor Street Parking Lot Taylor Street Parking Lot Figure 9 shows the total traffic volume expected at the project intersections after the project. FIGURE 9: INTERSECTION VOLUMES AFTER PROJECT AM Peak Hour 2025 After Project PM Peak Hour 2025 After Project Gov. Davis Ave. Elm Street Gov. Davis Ave. Elm Street C C I I Taylor Street Parking Lot Taylor Street Parking Lot VTrans Traffic Impact Study Guidelines 4 stipulate that a Traffic Impact Study should be considered when the proposed development generates 75 or more peak hour trips directly accessing the State Highway System. The study should analyze intersections that would see an increase of 75 4 Vermont Agency of Transportation Policy and Planning Division. Traffic Impact Study Guidelines. Electronic document, TISGuidelinesRevisedSeptember2018CGC.pdf 7

14 or more trips. Due to traffic being distributed between the two driveways, no intersection will see an increase of 75 of more trips. LEVEL OF SERVICE RESULTS Level-of-service (LOS) is a qualitative measure describing the operating conditions as perceived by motorists driving in a traffic stream. LOS is calculated using the procedures outlined in the 2010 Highway Capacity Manual. In addition to traffic volumes, key inputs include the number of lanes at each intersection, traffic control type (signalized or unsignalized), and the traffic signal timing plans. The 2010 Highway Capacity Manual defines six qualitative grades to describe the level of service at an intersection. Level-of-Service is based on the average control delay per vehicle. Figure 10 shows the various LOS grades and descriptions for signalized and unsignalized intersections. FIGURE 10: LEVEL-OF-SERVICE CRITERIA FOR SIGNALIZED AND UNSIGNALIZED INTERSECTIONS UNSIGNALIZED SIGNALIZED LOS CHARACTERISTICS TOTAL DELAY (SEC) TOTAL DELAY (SEC) A Little or no delay B Short delays C Average delays D Long delays E Very long delays F Extreme delays > 50.0 > 80.0 The Highway Capacity Manual congestion reports within Synchro (v9), a traffic analysis software package from Trafficware routinely relied upon by transportation engineering professionals, were used to assess traffic congestion at the study intersections. Figure 11 shows projected LOS and delay for the study intersection before and after the project is completed for the AM and PM peak hours in FIGURE 11: LOS AT STUDY INTERSECTIONS AM Peak Hour PM Peak Hour Background Traffic With Project Background Traffic With Project Intersections LOS Delay v/c LOS Delay v/c LOS Delay v/c LOS Delay v/c State St/Taylor St/Gov. Davis Ave EB, along A < A < A A WB, along A A A A NB Left/Through, along Taylor Street D D F F NB Right, along Tayloer Street B B B B SB, along Gov. Davis Avenue C C C C State St/Elm St/Driveway EB, along A A A A WB, along A < A < A < A < NB, at driveway A A C C SB, along Elm Street C C D D Most approaches are projected to operate within an acceptable level of service. However, the northbound left/through lane on Taylor Street is projected to operate at LOS F before and after the project. This is similar to DuBois and King s finding in their 2015 study of the intersection. Also, this methodology does not account for drivers on waving in Taylor street turns, which 8

15 happens frequently. For that reason, the delays experienced by drivers turning off Taylor Street may be less than projected. Based on our findings, we conclude that the LOS at the study intersections will be acceptable for most approaches. For the northbound approach at Taylor Street, the operations are expected to be in a failed condition with and without traffic from the proposed project. Please let me know if you have any questions about this material or require additional information. 9

16 HCM 2010 TWSC 2025 AM 1: Taylor Street/Gov. Davis Ave & No Build Intersection Int Delay, s/veh 4.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized 4 4 None 4 4 None 4 4 None 4 4 None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow4up Hdwy Pot Cap41 Maneuver Stage Stage Platoon blocked, % Mov Cap41 Maneuver Mov Cap42 Maneuver Stage Stage Approach EB WB NB SB HCM Control Delay, s HCM LOS C C Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS D B A A 4 A A 4 C HCM 95th %tile Q(veh) Synchro 9 Report RSG Page 1

17 HCM 2010 TWSC 2025 AM 2: Driveway/Elm Street & No Build Intersection Int Delay, s/veh 9.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized 4 4 None 4 4 None 4 4 None 4 4 None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow4up Hdwy Pot Cap41 Maneuver Stage Stage Platoon blocked, % Mov Cap41 Maneuver Mov Cap42 Maneuver Stage Stage Approach EB WB NB SB HCM Control Delay, s HCM LOS A C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A A A 4 A A 4 C HCM 95th %tile Q(veh) Synchro 9 Report RSG Page 2

18 HCM 2010 TWSC 2025 AM 1: Taylor Street/Gov. Davis Ave & Build Intersection Int Delay, s/veh 4.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized 4 4 None 4 4 None 4 4 None 4 4 None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow4up Hdwy Pot Cap41 Maneuver Stage Stage Platoon blocked, % Mov Cap41 Maneuver Mov Cap42 Maneuver Stage Stage Approach EB WB NB SB HCM Control Delay, s HCM LOS C C Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS D B A A 4 A A 4 C HCM 95th %tile Q(veh) Synchro 9 Report RSG Page 1

19 HCM 2010 TWSC 2025 AM 2: Driveway/Elm Street & Build Intersection Int Delay, s/veh 9.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized 4 4 None 4 4 None 4 4 None 4 4 None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow4up Hdwy Pot Cap41 Maneuver Stage Stage Platoon blocked, % Mov Cap41 Maneuver Mov Cap42 Maneuver Stage Stage Approach EB WB NB SB HCM Control Delay, s HCM LOS A C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A A A 4 A A 4 C HCM 95th %tile Q(veh) Synchro 9 Report RSG Page 2

20 HCM 2010 TWSC 2025 PM 1: Taylor Street/Gov. Davis Ave & No Build Intersection Int Delay, s/veh 6.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized 4 4 None 4 4 None 4 4 None 4 4 None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow4up Hdwy Pot Cap41 Maneuver Stage Stage Platoon blocked, % Mov Cap41 Maneuver Mov Cap42 Maneuver Stage Stage Approach EB WB NB SB HCM Control Delay, s HCM LOS D C Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS F B A A 4 A A 4 C HCM 95th %tile Q(veh) Synchro 9 Report RSG Page 1

21 HCM 2010 TWSC 2025 PM 2: Driveway/Elm Street & No Build Intersection Int Delay, s/veh 10.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized 4 4 None 4 4 None 4 4 None 4 4 None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow4up Hdwy Pot Cap41 Maneuver Stage Stage Platoon blocked, % Mov Cap41 Maneuver Mov Cap42 Maneuver Stage Stage Approach EB WB NB SB HCM Control Delay, s HCM LOS C D Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS C A A 4 A A 4 D HCM 95th %tile Q(veh) Synchro 9 Report RSG Page 2

22 HCM 2010 TWSC 2025 PM 1: Taylor Street/Gov. Davis Ave & Build Intersection Int Delay, s/veh 7.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized 4 4 None 4 4 None 4 4 None 4 4 None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow4up Hdwy Pot Cap41 Maneuver Stage Stage Platoon blocked, % Mov Cap41 Maneuver Mov Cap42 Maneuver Stage Stage Approach EB WB NB SB HCM Control Delay, s HCM LOS D C Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS F B A A 4 A A 4 C HCM 95th %tile Q(veh) Synchro 9 Report RSG Page 1

23 HCM 2010 TWSC 2025 PM 2: Driveway/Elm Street & Build Intersection Int Delay, s/veh 11.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized 4 4 None 4 4 None 4 4 None 4 4 None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow4up Hdwy Pot Cap41 Maneuver Stage Stage Platoon blocked, % Mov Cap41 Maneuver Mov Cap42 Maneuver Stage Stage Approach EB WB NB SB HCM Control Delay, s HCM LOS C D Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS C A A 4 A A 4 D HCM 95th %tile Q(veh) Synchro 9 Report RSG Page 2

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) APPENDICES Appendix T No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) 661 Bear Valley Parkway EIR March 2017 APPENDICES This page intentionally left blank 661 Bear Valley

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE Roadway Segment Level of Service Definitions LOS V/C Congestion/Delay Traffic Description (Used for surface streets,

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes. Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 SCREENING... 1 1.1

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

Date: December 20, Project #:

Date: December 20, Project #: To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS 1 FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction... 3 II. Project Description... 3 III. Existing Conditions... 6 IV. Future Traffic Demand... 10 V. Conclusions and Mitigation...

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis Congregate Care Facility Billerica, Massachusetts Prepared For: Hawthorn Development, LLC 35 Kettle Court Salem, OR 973 Prepared By: Sebago Technics, Inc. 75 John Roberts Road,

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey Traffic Impact Study Residences at Bancroft Block 14, Lot 2 April 30, 2018 REVISED: JANUARY 17, 2019 Prepared For 2 Hopkins Lane, LLC 2701 Renaissance Boulevard King of Prussia, PA 19406 Prepared By Maser

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Tijuana River Valley Regional Park Campground and Education Center

Tijuana River Valley Regional Park Campground and Education Center Tijuana River Valley Regional Park Campground and Education Center Draft Report September 2018 Prepared for: County of San Diego 5500 Overland Avenue, Suite 410 San Diego, CA 92123 Prepared by: 3900 Fifth

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

Project Advisory Committee

Project Advisory Committee Meredith US 3/NH 25 Improvements Transportation Planning Study Project Advisory Committee March 18, 2008 Meredith US 3/NH 25 Improvements Transportation Planning Study Meeting Agenda Welcome Traffic Model

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825 TRAFFIC IMPACT ANALYSIS FOR RESIDENCE INN PROJECT Davis, CA Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825 Prepared By: KD Anderson & Associates, Inc. 3853 Taylor Road,

More information

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview 2 March 2015 OUR REF: TO3205TOB00 Conseil des écoles catholiques du Centre-Est (CECCE) 4000 rue Labelle Ottawa, Ontario K1J 1A1 Attention: Maguy Eustache Dear Maguy: Re: Sainte-Geneviève Elementary School

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. CastleGlenn Consultants Inc. Engineers, Project Managers & Planners March 11 th, 2013 Domenic Idone, P. Eng Planning Manager R.W. Tomlinson Ltd. 5597 Power Road Ottawa, Ontario K1G 3N4 Dear Mr. Idone:

More information

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study 19 May 2015 BY EMAIL: asaggarwal@gmail.com Manor Park Management 231 Brittany Drive, Suite D Ottawa, ON K1K 0R8 Attention: Mr. Anand Aggarwal RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation Background and Project Needs SR 104 is functionally classified as a rural-principal arterial. It is a limited

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA (St. Tammany Parish Mandeville, LA) Prepared For The Pittman Companies Michael N Pittman, MD 328 East Boston St Covington, LA 70433

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Travel Action Plan De Montfort University

Travel Action Plan De Montfort University 1. Scope 3 emissions from commuting to be a three-year average of

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 TO: FROM: Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 RE: Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street,

More information

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated)

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated) MEMORANDUM Date: May 26, 2016 To: From: Subject: Debbie Bent and Kris Overleese, City of Kenmore Kendra Breiland and Sarah Keenan, Fehr & Peers Saint Edward Ballfields Traffic and Parking Analysis (Updated)

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 Presentation Outline Context t of Mississauga i City Centre Implementing Paid Parking and TDM

More information

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B Memorandum DATE: AUGUST 1, 2013 TO: PAUL TILTON, P.E., SANDWICH DPW DIRECTOR/TOWN ENGINEER FROM: LEV MALAKHOFF, SR. TRANSPORTATION ENGINEER RE: ROUTE 130/QUAKER MEETINGHOUSE ROAD INTERSECTION Paul: Per

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

Revised Strategy for Downtown Parking

Revised Strategy for Downtown Parking Revised Strategy for Downtown Parking December 4, 2017 Council Workshop Presented by Jennifer McCoy, P.E., City Traffic Engineer City-Owned Parking Today 3,500 metered parking spaces Parking meters charge

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Trip Generation and Parking Study New Californian Apartments, Berkeley

Trip Generation and Parking Study New Californian Apartments, Berkeley Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information