OPEN HOUSE PUBLIC INVOLVEMENT MEETING. Stark County Garage Ohio Department of Transportation 4505 Atlantic Boulevard, Canton, OH 44705

Size: px
Start display at page:

Download "OPEN HOUSE PUBLIC INVOLVEMENT MEETING. Stark County Garage Ohio Department of Transportation 4505 Atlantic Boulevard, Canton, OH 44705"

Transcription

1 OPEN HOUSE PUBLIC INVOLVEMENT MEETING Stark County Garage Ohio Department of Transportation 4505 Atlantic Boulevard, Canton, OH Thursday, December 10, :00 p.m. to 7:00 p.m. US 62 (Atlantic Boulevard), Middlbranch Avenue, Harrisburg Avenue and 30 th Street Improvements ODOT Project No. STA-US (PID # 96346) City of Canton and Plain Township in Stark County, Ohio Ohio Department of Transportation District South Arlington Road Akron, Ohio (330) or (800) (Ohio)

2 INFORMATIONAL HANDOUT Purpose of this Public Meeting The purpose of this open house public involvement meeting is to present and discuss the proposed roadway improvements with the general public, residents, business owners and public officials and solicit public opinion regarding the proposed improvement. No formal presentation will be made, however, project team members from the Ohio Department of Transportation (ODOT) and DLZ, the project design engineer, are available to discuss the proposed improvements and address your questions. Exhibits showing preliminary design for the proposed work and the current Maintenance of Traffic plan and related detours are on display for your review. You are invited to comment regarding the proposed improvements. In compliance with Section 106 of the National Historic Preservation Act of 1966, as amended (codified as 36 CFR 800), ODOT also requests information regarding the presence of any cultural resources in the vicinity of the proposed project. Cultural resources include prehistoric and historic archaeological sites, historic bridges, and historic buildings, sites and districts. Proposed Roadway Improvements The proposed transportation improvement (ODOT Project No. STA-US ; PID No ) extends along US Route 62 (Atlantic Boulevard) from the ramp to Harrisburg Avenue NE to a point east of Roosevelt Avenue NE; along Middlebranch Avenue NE from US Route 62 north 800 feet; along Harrisburg Avenue NE from US 62 to 400 feet south of a proposed new roundabout intersection with 30 th Street NE; and along 30 th Street NE from the new roundabout east to a point near Roosevelt Avenue NE. Furthermore, the project includes: a relocated and reconstructed intersection with a proposed traffic signal at US 62 and Harrisburg Avenue NE; a reconstructed intersection with a proposed traffic signal at US 62 and Middlebranch Avenue NE; a relocated and reconstructed intersection at Harrisburg Avenue NE and 30 th Street NE to create a roundabout; widening on US 62 from the new intersection at Harrisburg Avenue NE to Middlebranch Avenue NE to accommodate side-by-side left-turn lanes; and widening to accommodate eight-foot shoulders on US 62 from west of Harrisburg Avenue NE to east of Roosevelt Avenue NE. Purpose and Need The purpose of the transportation improvements in the project area is to improve the safety of the intersections for the roadway users; to correct geometric deficiencies; to improve the level of service; and to provide appropriate access to the corridor for local residences, businesses, and future developments consistent with the ODOT Access Management System Inventory. 2

3 The proposed project is being considered in response to the existing safety problems, geometrical deficiencies, and predicted future congestion within the project study area. Under the existing roadway geometry, the project study area has a higher crash rate when compared to the state average. Additionally, intersection delays are predicted to increase in the design year (2040). To maintain an efficient and safe route of travel for the public, the crashes and capacity deficiencies within the project study area must be addressed. Crash Data Based on crash data collected from 2011 to 2013, 101 total crashes occurred within the project study area. At the intersection of US 62/Harrisburg Avenue NE/Middlebranch Avenue NE, 44 total crashes occurred during the three-year study period. The highest crash type was rear-end, accounting for 45.5 percent (20) of the total crashes at this intersection. The second highest crash type was angle with 15.9 percent (7). Parked vehicle crashes were 13.6 percent (6) of the total crashes and sideswipepassing crashes were 11.4 percent (5) of the total crashes. Thirty-three (33) property damage only crashes (75%) and 11 injury related crashes (25%) were reported at the intersection. Based on the 2013 Stark County Regional Planning Commission (SCRPC) crash report, this intersection has a Stark County Area Transportation Study (SCATS) Hazard Rating of (30 th highest in Stark County) and a crash rate of 0.82 (36 th highest in Stark County). Overall, this intersection is rated the 2 nd highest in Plain Township based on the crash rate, severity, and SCATS hazard rating. At the intersection of Harrisburg Avenue NE/30 th Street NE, 30 total crashes occurred during the threeyear study period. The highest crash type was angle, accounting for 56.7 percent (17) of the total crashes. The second highest crash type was rear-end with 10 percent (3). Left-turn, backing, and fixed-object crashes each accounted for 6.7 percent (2) of all crashes. Twenty-three (23) property damage only crashes (76.7%) and seven injury related crashes (23.3%) were reported at the intersection. Based on the 2013 SCRPC crash report, this intersection has a SCATS Hazard Rating of (5 th highest in Stark County) and a crash rate of 2.17 (8 th highest in Stark County). Overall, this intersection is rated the 5 th highest in Stark County (1 st in Plain Township) based on the crash rate, severity, and SCATS hazard rating. Twenty-seven (27) crashes occurred at the intersection of US 62/Westbound On-Ramp (from Harrisburg Avenue NE/30 th Street NE). The highest crash type was rear-end, accounting for 70.4 percent (19) of the total crashes at this intersection. The second highest crash type was angle with 14.8 percent (4), while parked vehicle crashes were 7.4 percent (2). Eighteen (18) property damage only crashes (66.7%) and nine injury related crashes (33.3%) were reported at the intersection. This intersection was not identified in the 2013 SCRPC crash report. Based on the crash data noted above, this intersection had a crash rate of 1.84 per million vehicle miles traveled, which is higher than the state average on Principal Arterials and Minor Aterials. Roadway Geometrics The ODOT Location and Design Manual, Volume 1, Section 401.3, states that all new or relocated highways provide intersection angles of 70 to 90 degrees. An angle of 60 degrees may be satisfactory if one of two conditions is met: (1) the intersection is signalized; or (2) the intersection is skewed such that a driver stopped on the side road has the acute angle (at center of intersection) on the left side (vision not blocked by his/her own vehicle). Currently, the intersection of US 62 and the ramp to 3

4 Harrisburg Avenue NE create an angle of 51 degrees, while the US 62 and Middlebranch Avenue NE intersection is 65 degrees, and the US 62 and Harrisburg Avenue NE Intersection is 35 degrees. Level of Service and Capacity Analysis Traffic congestion is ranked using a Level of Service (LOS) designation expressed in terms of letters. According to the Highway Capacity Manual (HCM), LOS is a qualitative measure which describes the operational conditions within a traffic stream which is generally described in terms of such factors as speed and travel time, freedom to maneuver, traffic interruptions, comfort and convenience, and safety. LOS is expressed by assigning a ranking with LOS "A" representing the highest quality traffic flow and minimal delay, to LOS "F" representing poor traffic operations, excessive vehicular delay, and substantial queuing (Table 1). Table 1 LOS Criteria Control Delay per Vehicle (sec) Level of Service Signalized Intersections Unsignalized Intersections A B > 10.0 and 20.0 > 10.0 and 15.0 C > 20.0 and 35.0 > 15.0 and 25.0 D > 35.0 and 55.0 > 25.0 and 35.0 E > 55.0 and 80.0 > 35.0 and 50.0 F > 80.0 > 50.0 Source: Highway Capacity Manual, Transportation Research Board, 2010 Traffic analysis was completed to determine the future No Build Condition LOS for the intersections within the project area. This analysis was conducted using ODOT Certified Traffic data and Highway Capacity Software (HCS). As shown in Table 2, under the No Build conditions (2030), the intersections are predicted to operate at LOS D at the US 62 intersections with Middlebranch Avenue NE and Harrisburg Avenue NE. The Harrisburg Avenue NE/30 th Street NE intersection is predicted to operate at an unacceptable LOS E and F during the morning (AM) and afternoon (PM) peak hours, respectively. With projected traffic volume increases, the efficiency and operational conditions associated with the current roadways will continue to worsen throughout the project study area. Table 2 - Level of Service No Build Conditions in 2030 Intersection & Analysis Period LOS Delay (SECONDS) AM Peak Hour US-62 & Middlebranch D 35.5 US-62 & Harrisburg D 35.5 Harrisburg & 30 th E* 46.5 PM Peak Hour US-62 & Middlebranch D 43.5 US-62 & Harrisburg D 43.5 Harrisburg & 30 th F* >300 *Delay is for the WB left-turn movement, since NB & SB movements are free flow 4

5 Table 3 shows the projected LOS with the proposed intersection improvements. Note that the Level of Service for the signalized intersection modifications and proposed roundabout ranges from LOS A to C, all acceptable LOS ratings for this type of facility by ODOT standards. Table 3 - Level of Service Proposed Roundabout and Intersections in 2030 Intersection & Analysis Period LOS Delay (SECONDS) AM Peak Hour US-62 & Middlebranch C 26.9 US-62 & Harrisburg B 17.1 Harrisburg & 30 th A 7.0 PM Peak Hour US-62 & Middlebranch B 17.8 US-62 & Harrisburg C 21.3 Harrisburg & 30 th B 13.6 Realizing the severity of the existing and anticipated future conditions, a need has been identified to implement improvements to accommodate the projected traffic volumes, address geometric deficiencies, and improve the efficiency of the roadway. Environmental Considerations ODOT and the DLZ project team have conducted several environmental studies throughout the course of this project. In the sections below, the findings of these studies are categorized and summarized. Ecological Resources (including wetlands, streams, aquatic and terrestrial habitats, and threatened and endangered species) DLZ evaluated the project study area and completed an Ecological Survey Report (ESR) in June of Though the Middle Branch of Nimishillen Creek is in the project vicinity, it is located 200 feet outside the project study area and no project impacts are expected to the creek. No evidence was found of any endangered species habitat in the project study area. No substantive ecological resources will be impacted by the proposed project. Cultural Resources (including historic sites, archaeological sites, and historic architecture) The DLZ team completed a Section 106 Request for Review (RFR) for the project study area in January No previously identified previously identified cultural resources were identified within the project study area. In 2009 Crider and Stoll completed a Phase 1 archaeological survey near and west of the project study area. No other archaeological sites appear in the Archeological Atlas of Ohio and no properties 50 years of age or older were identified in the project study area as being eligible for inclusion in the National Register of Historic Places (NRHP). 5

6 In accordance with Stipulation 4B of the Section 106 Programmatic Agreement approved on November 30, 2011 (Agreement No ) and in compliance with 36 CFR 800.4(d)(1); Ohio Department of Transportation - Office of Environmental Services (ODOT-OES) has determined that no historic properties affected is the appropriate finding for the proposed undertaking based on the following: 1. The work is limited to the existing street rights-of-way and areas totally disturbed by modern commercial development. No further archaeological investigations are recommended. 2. No National Register eligible or listed properties will be affected by the project. Section 4(f)/6(f) Resources (including parks and other recreation land, natural and wildlife areas, waterfowl refuges and cultural historical resource) No known Section 6(f) property is affected by the proposed work, but Willig Park is proposed to be impacted and is a qualified Section 4(f) property. Willig Park is a public recreational park located in the city of Canton, Ohio, at the southeast corner of the 30 th Street NE and Ohio Avenue NE intersection. Willig Park encompasses approximately 20 acres, and includes four ball fields and associated facilities, open grass areas, and a small playground. The primary use for this recreational park is by baseball and softball leagues. The project will require acquisition of temporary and permanent rights-of-way from Willig Park to complete construction. Approximately 0.65 acre of park land will be converted to public roadway rightof-way and approximately 0.69 acre of existing park land/mowed green space will be converted into parking for the park resulting in impacts to 1.34 acres of the 20 acres of existing park land. Coordination with the City of Canton Recreation Park Commission during design and construction is required for this project. Several commitments made to the City of Canton to minimize or mitigate harm to the qualified 4(f) property are listed below: The proposed project will provide a paved and lined parking lot with a higher parking total capacity than the existing parking lot to ensure the transportation improvement project will not impact the facility s current use. The proposed project will provide safer defined access to the public road system with two dedicated park access driveways. A high fence between the proposed parking lot and the ball fields will be constructed to protect vehicles using the parking lot. No staging and/or storage of construction equipment will occur outside the project construction area within the Section 4(f) property. The full list of commitments are included in the project documentation and available on request. Hazardous Materials/Wastes (sites with potential hazardous material concerns) Following completion of an Environmental Site Assessment Screening performed for the project study area, DLZ completed Phase I Environmental Site Assessment (ESA) on eight sites (comprised of 14 parcels) for the project in October Investigations conducted for the Phase I ESA recommended one site be advanced to Phase II investigation, and six other sites which had been used as auto repair shops, service stations, or other petroleum related activities were recommended for plan notes to 6

7 address possible subsurface petroleum contamination during project construction. At the recommendation of ODOT, three of these sites were added to the Phase II ESA investigation. Field sampling and analysis for the Phase II ESA was conducted on three sites in January Results of the laboratory testing indicated that chemical compounds were detected in a few samples of soil from the various sites investigated within the project area. Generally, the reported concentrations were below the Ohio Voluntary Action Program (VAP) residential Generic Direct Contact Soil Standard or Bureau of Underground Storage Tank Regulations (BUSTR) unrestricted reuse limits for petroleum contaminated soils. On the basis of the chemical testing conducted for this investigation, it is recommended that plan notes addressing potential subsurface petroleum contaminated soils be included for one site. Noise (analysis of traffic noise and feasibility of noise abatement) A noise analysis of the project area identified traffic generated noise levels at 21 noise sensitive receptor sites representing residential dwelling units and a park located nearest the roadway improvement using the Federal Highway Administration Traffic Noise Model (FHWA TNM) Version 2.5 for the Existing Year 2020 and the Design Year 2040 Build alternative. Of the 21 modeled noise sensitive receptor sites, five of the receptors were predicted to experience peak hour traffic noise levels that approach or exceed the Noise Abatement Criteria (NAC) for the Activity Category B classification for the Design Year 2040 build scenario. None of the sites in the project area were predicted to experience a substantial increase in noise levels (increase > 10 dba) as a result of the proposed action. In accordance with 23 CFR Part 772, when noise impacts are identified as a result of a proposed action, noise abatement measures must be considered for impacted sites predicted to approach or exceed the applicable FHWA NAC. Based on an evaluation of the noise abatement measures, it was determined that noise barriers would not meet the applicable definitions of feasibility, as the close proximity of driveways to each other and density of driveways along the corridor would not allow for the construction of noise barriers with an adequate length to effectively reduce noise levels and construction of an effective noise barrier would eliminate access to the residential properties. Therefore, noise barriers are not recommended for further consideration. Social and Economic/Community Impacts (including businesses, residences, emergency services, travel patterns, schools, recreational activities, etc.) Two relocations of businesses are anticipated to construct the project due to the placement of the proposed roundabout on the existing business properties. US 62 shall remain open to traffic during construction; however, there will be closures and/or one way detours for 30 th Street NE and Harrisburg Avenue NE during portions of the project. Other localized closures may be necessary at times during the project. Access shall be maintained to adjacent properties at all times during construction of the project. Emergency services will have access to the project area but may experience short term minor delays in response times due to construction activities. No impacts to schools will occur with the proposed improvements. The project should not adversely impact the local community or the local economy. 7

8 Maintenance of Traffic A minimum of one lane of traffic will be maintained on US 62 and Middlebranch Avenue NE at all times during project construction utilizing appropriate maintenance of traffic measures. Harrisburg Avenue NE and 30 th Street NE will be open during the initial construction phase, but local northbound and westbound traffic will be detoured and a full detour may be required as construction continues. Detour routes will be posted for northbound Harrisburg Avenue NE traffic and westbound 30 th Street NE traffic as required by construction phasing. A detour route for US 62 traffic bound for Harrisburg Avenue NE and 30 th Street NE will be posted during a construction period that will be time-restricted for the contractor. During the final part of construction a detour for traffic on Harrisburg Avenue NE and 30 th Street NE bound for US 62 will be posted. The detour for 30 th Street NE includes Harmont Avenue NE north to US 62 (for US 62 bound traffic) or Harmont Avenue NE to Mahoning Avenue to Harrisburg Avenue NE (for Harrisburg bound traffic). The detour for Harrisburg Avenue NE includes Mahoning Avenue to Harmont Avenue NE to US 62. Access to adjacent properties shall be maintained at all times during project construction. All signs utilized for the project will be placed according to the guidelines in the Ohio Manual of Uniform Traffic Control Devices and ODOT specifications. The ODOT District 4 Office of Public Information will notify the local officials, public services, school system and the public of the roadway closures a minimum of fourteen (14) days prior to project construction. For additional detailed information on the anticipated Maintenance of Traffic phasing and detours, please review the project displays available tonight. Right-of-Way Acquisition To accommodate the roadway widening, the relocated signalized intersection, utility relocations and the proposed roundabout intersection, the purchase of additional permanent right-of-way, easements and temporary right-of-way will be required. Preliminary estimates on right-of-way acquisition indicate approximately 53 parcels will be affected by the proposed project. ODOT operates under the Uniform Relocation Assistance and Acquisition Policies Act of 1970 and amendments of The main objective of this Act is to ensure that every effort is made to acquire the needed right-of-way in a fair and equitable manner. This Act provides advice and financial assistance to persons whose residence, business, farm and/or non-profit organization may be acquired as part of a project. Operated in accordance with Chapter 163 of the Ohio Revised Code and Public Laws and , the Relocation Assistance Program (RAP) ensures fair and equitable treatment of each individual, family, business, farm, and non-profit organization. The Federal Highway Administration and ODOT have established basic policies in this effort. All properties must be appraised before acquisition is started. Qualified appraisers who are familiar with real estate values in the area do this. Upon determination of the fair market value, an ODOT Real Estate representative will contact the owner for an appointment. At this time, the representative will explain a project to the owner and the effect of a project on the property, and will present the offer based on the appraisal, both orally and in writing. 8

9 It is ODOT s hope that any needed right-of-way would be acquired through successful negotiations. However, if an agreement cannot be reached, property owners have recourse through the local judicial system where compensation will be determined by a jury, if necessary. This is a basic overview of the right-of-way procedures. It is the intent of ODOT that every effort will be made to obtain a mutual agreement with the owner and to see that the owner is justly compensated for the property. This will be accomplished by consistent and fair treatment of all owners. Estimated Project Costs The estimated total construction cost for the proposed improvements is approximately $7.36 million. The project is anticipated to include approximately $1.79 million for the acquisition of Right-of-Way and easements. Federal, state and local funds will be used to complete the recommended transportation improvements. Project Schedule Final design plans will be complete in October 2017 and Right-of-Way acquisition will occur between September 2016 and November Project construction will begin in June 2018 and end in Public Comments Your comments are an important part of the planning process for this project. Please review all the exhibits on display, speak with the study team representatives, and return the attached comment sheet during this meeting or mail the comment sheet to ODOT by Tuesday, December 29, Project information, including the meeting displays, will be available on the ODOT District 4 website: (select the Public Meetings/Public Involvement heading on the left side menu). Also, a summary of public comments received during the public comment period and responses to those comments will be available on the ODOT District 4 website within 60 days after the close of the public comment period. 9

10 OPEN HOUSE PUBLIC INVOLVEMENT MEETING COMMENT SHEET US Route 62/Middlebranch Ave/Harrisburg Ave & Harrisburg Ave/30 th St Intersection Improvements STA-US ; PID # Summary of Project: Construction of separate signalized intersections at US Route 62 and relocated Harrisburg Avenue NE and US Route 62 and Middlebranch Avenue NE; widening US Route 62 between the two intersections to create side-by-side turn lanes; and realignment and reconstruction of 30 th Street NE and Harrisburg Avenue NE Intersection to create a new roundabout intersection. Please use this sheet to provide project comments. If more space is required, attach another sheet. COMMENTS: Name Address Phone Please turn in this comment sheet at the meeting or return to: Date Dayna Mallas, P.E. ODOT Project Manager Ohio Department of Transportation District S. Arlington Road Akron, OH The final date for submission of comments is Tuesday, December 29, A summary of public comments received during the public comment period and responses to those comments will be available on the ODOT District 4 website within 60 days after the close of the public comment period: (select the Public Meetings/Public Involvement heading on the left side menu). 10

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Access Management Standards

Access Management Standards Access Management Standards This section replaces Access Control Standards on Page number 300-4 of the Engineering Standards passed February 11, 2002 and is an abridged version of the Access Management

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

Sound Transit East Link: Bus/LRT System Integration Study

Sound Transit East Link: Bus/LRT System Integration Study Sound Transit East Link: Bus/LRT System Integration Study Prepared For: Sound Transit King County Metro Mercer Island WSDOT Prepared By: CH2M HILL July, 2014 1 SOUND TRANSIT EAST LINK: BUS/LRT SYSTEMES

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B... Speed Hump Program CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 1. GENERAL... 3 2. ELIGIBILITY REQUIREMENTS... 3 A. PETITION... 3 B. OPERATIONAL AND GEOMETRIC CHARACTERISTICS OF

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

Project Working Group Meeting #5

Project Working Group Meeting #5 September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Report Addendum. Terry Keller, SDDOT. Noise Study Technical Report I-29 from Tea Interchange to Skunk Creek Sioux Falls, South Dakota

Report Addendum. Terry Keller, SDDOT. Noise Study Technical Report I-29 from Tea Interchange to Skunk Creek Sioux Falls, South Dakota Report Addendum To: Terry Keller, SDDOT From: HDR Project: Noise Study Technical Report I-29 from Tea Interchange to Skunk Creek Sioux Falls, South Dakota cc: file Date: May 28, 2010; rev July 16, July

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY Public Meeting SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY Neil Schochenmaier, PE Road Design Engineering Supervisor March 16, 2017 Purpose of the Meeting

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Construction Noise Memorandum

Construction Noise Memorandum Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Technical Feasibility Report

Technical Feasibility Report Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Prepared By: 53 Regional Drive Concord, NH 03301 NHDOT Project # 13742 Federal Project #T-A000(018) September 2018 TABLE OF CONTENTS

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Summary of the Alcoa Highway Redevelopment Project

Summary of the Alcoa Highway Redevelopment Project Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

Environmental Assessment Derry Road and Argentia Road Intersection

Environmental Assessment Derry Road and Argentia Road Intersection Air and Noise Study Environmental Assessment Derry Road and Argentia Road Intersection Project 11-4295 City of Mississauga, Region of Peel October 17, 2014 1 Region of Peel Environmental Assessment for

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm PUBLIC MEETING Bear Creek Park Community Center January 24, 2017 5:30 pm to 7:30 pm PURPOSE OF THE MEETING This is an open House No formal presentation Introduce the project to the public Present existing

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation - Ohio Turnpike Infrastructure Commission Turnpike Mitigation Program Application The application has been improved to enable project sponsors to save the application

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy A. GENERAL Speed humps are an effective and appropriate device for safely reducing vehicle speeds on certain types of streets when installed accordance with the provisions of this policy. In order for

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Public Meeting Summary And Responses to Comments

Public Meeting Summary And Responses to Comments Public Meeting Summary And Responses to Comments Oklahoma Department of Transportation From 209 th E. Avenue to Franklin Road Rogers County, JP 27031(04) Prepared by: 6450 S. Lewis Ave., Suite 300 Tulsa,

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Traffic Regulations Guidelines

Traffic Regulations Guidelines Traffic Regulations Guidelines PREPARED BY TRAFFIC AND SAFETY June, 2012 Providing the highest quality transportation services for economic benefit and improved quality of life. MDOT Traffic and Safety

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Introduction and Executive Summary... 1 Existing Conditions... 3 Intersection Volume Conditions... 5 Intersection Operations... 9 Safety

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013 CITY OF MORENO VALLEY DEPARTMENT OF PUBLIC WORKS TRANSPORTATION ENGINEERING DIVISION Administration Policy #A-14A POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION Effective Date: July 10, 2013 Approved

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

CHAPTER 2 ZONING AND DEVELOPMENT

CHAPTER 2 ZONING AND DEVELOPMENT 2.200 GENERAL DEVELOPMENT STANDARDS CHAPTER 2 ZONING AND DEVELOPMENT Section 2.201 GENERAL PROVISIONS... 2.2-1 Section 2.202 FENCES AND VISIONS CLEARANCE... 2.2-2 2.202.01 Fences... 2.2-2 2.202.02 Vision

More information

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina Public Meeting & Open House July 23, 2013 Project Roadway Limits From: FM 1957 To: FM 471 MAP OR PHOTO Counties Bexar & Medina 1 I. Project History II. III. IV. Project Overview Project Alternatives Response

More information

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

TRAFFIC REGULATION APPROVAL PROCESS

TRAFFIC REGULATION APPROVAL PROCESS Approved: Effective: August 22, 2017 Review: June 21, 2017 Office: Traffic Engineering and Operations Topic No.: 750-010-011-e Department of Transportation PURPOSE TRAFFIC REGULATION APPROVAL PROCESS To

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

I-190/Silver Street Study

I-190/Silver Street Study I-190/Silver Street Study Interchange Modification Justification Report December, 2011 Interchange Modification Justification Report I-190/Silver Street Interchange Rapid City, South Dakota December 2011

More information