APPENDIX 7.6 TRANSPORTATION

Size: px
Start display at page:

Download "APPENDIX 7.6 TRANSPORTATION"

Transcription

1 APPENDIX 7.6 TRANSPORTATION

2 7.6 TRANSPORTATION As discussed in Section 4.2 Transportation, this appendix contains the data obtained from the Sonoma County Traffic Model as part of the impact analysis for the Draft GP Exhibit contains the data for Sonoma County roadways for the AM Peak Hour. Exhibit contains the data for the PM Peak Hour. The methodology used to determine impacts to county roadways is discussed in Section 4.2 Transportation

3 Exhibit Traffic Model Data for the AM Peak Hour North or Eastbound Counts South or Westbound Counts Scenario Base Year Model Scenario 10: Projected/Preferred 2020 AM Peak AM County Count Locations Facility Max. Speed N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W N or E N or E N or E N or E S or W S or W S or W S or W N or E N or E N or E N or E S or W S or W S or W S or W 2001 Types Speed V/C=1 Counts Cap. V/C Speed LOS Counts Cap. V/C Speed LOS Base Vol Base V/C Base Speed Base LOS Base Vol Base V/C Base Speed Base LOS Alt 10 Final Vol Alt 10 V/C Alt 1 Speed Alt 10 LOS Alt 10 Final Vol Alt 10 V/C Alt 10 Speed Alt 10 LOS Adobe Road W/ Corona Road RSA , A 399 1, A C A A A Adobe Road E/ E. Washington Street Rural A , A 483 1, A C C A B Adobe Road E/ Frates Road Rural A , A 541 1, A A E B C Agua Caliente Road E/ Arnold Drive RSC , A 229 1, A A A A A Airport Boulevard E/ Regional Parkway ART C C A F D F Alexander Valley Road W/ Lytton Station Road RSA , A 139 1, A A A A A Arnold Drive N/ Watmaugh Road RSA , A 761 1, B A F A E Arnold Drive N/ Verano Avenue RSB , A 785 1, B C F B C Arnold Drive N/ Agua Caliente Road RSA , A 560 1, A A A B A Arnold Drive W/ S.H. 12 (Glen Ellen) RSA NA 1,280 NA A A A A Bennett Valley Road W/ Grange Road Rural A , A 242 1, A A A B B Bodega Avenue W/ Thompson Lane Rural A , A 260 1, A A A A A Bodega Highway W/ Watertrough Road Rural B , A 320 1, A A A A A Bohemian Highway N/ Freestone Flat Road Rural D , A 75 1, A A A A A Boyes Boulevard W/ Railroad Avenue ART A A A B A A Boyes Boulevard E/ Riverside Road ART A B C B A B Calistoga Road S/ Porter Creek Road Rural D , A 217 1, A A A A A Casa Grande Road S/ Adobe Road RSA , A 164 1, A A A A A Chileno Valley Road W/ Spring Hill Road Rural D , A 46 1, A A A A A Corona Road S/ Adobe Road RSB , A 206 1, A A A A A Crane Canyon Road E/ Petaluma Hill Road Rural C , A 315 1, A A A A B Crocker Road W/ River Road Rural A , A 111 1, A A A A A D Street S/ San Antonio Road Rural A , A 236 1, A A A A A Dry Creek Road N/ Lambert Bridge Road Rural A , A 88 1, A A A A A East Cotati Avenue W/ Petaluma Hill Road RSC , A 220 1, A A A A A East Washington Street S/ Adobe Road RSA , A 301 1, A A A A A Eastside Road N/ Trenton-Healdsburg Road Rural B , A 124 1, A A A A A Eighth Street East N/ S.H 12/ 121 RSB , A 41 1, A A A A A Eighth Street East S/ East Napa Street RSA , A 114 1, A B A A A Fifth Street West N/ Leveroni Road RSC , A 368 1, A A A A A Frates Road S/ Adobe Road RSA , A 445 1, A A A A A Fulton Road S/ River Road RSA , A 532 1, A C A F B Fulton Road N/ River Road RSA , A 477 1, A D B F B Graton Road W/ Green Hill Road Rural B , A 86 1, A A A A A Guerneville Road E/ Frei Road Rural A , A 336 1, A B A D A Guerneville Road E/ Vine Hill Road Rural A , A 256 1, A A B A B Laguna Road N/ Guerneville Road Rural B , A 147 1, A A A A A Lakeville Road N/ Hwy 37 Rural A , A 710 1, A A A A A Leveroni Road E/ Arnold Drive RSA , A 256 1, A B A A A Llano Road N/ Ludwig Avenue Rural A , A 256 1, A A A A A Madrone Road W/ S.H. 12 RSB , A 250 1, A A A A A Main Street S/ Adobe Road ART B D C F D D Mark West Springs Road E/ Highway 101 ART , A 709 1, A A A C F Mark West Springs Road W/ Porter Creek Road RSA , A 244 1, A A A A A Mecham Road S/ Dump RSA , A 130 1, A A A A A Millbrae Avenue E/ Stony Point Road ART A A A A A A Mirabel Road S/ Trenton Road RSB , A 286 1, A A A A B Mountain View Avenue E/ Santa Rosa Avenue RSC , A 149 1, A A A A A Napa Road E/ Burndale Road RSA , A 415 1, A B A A A Occidental Road E/ Mill Station Road RSA , A 127 1, A A A A A Occidental Road W/ Sanford Road RSB , A 266 1, A A A B A Old Redwood Highway S/ Ursiline Road RSB , A 560 1, A D F B F Old Redwood Highway N/ Fulton Road RSB , A 570 1, A A D D E Old Redwood Highway N/ Eastside Road Rural A , A 175 1, A A A A A Old Redwood Highway North N/ Ely Road RSB , A , E A F B E Pepper Road E/ Walker Road Rural A , A 196 1, A A A A A Petaluma Avenue E/ Arnold Drive RSC , A 213 1, A B B A A Petaluma Boulevard North N/ Skillman Lane RSA , A 687 1, A A B C A Petaluma Hill Road N/ Roberts RSA , A 328 1, A B F F A Petaluma Hill Road N/ Snyder Lane RSA , A 473 1, A A F F A Piner Road E/ Willowside Road RSB , A 63 1, A A A A A Pleasant Hill Road S/ Watertrough Road RSB , A 116 1, A A A A A River Road W/ Mirabel Road Rural A , A 443 1, A A C B D River Road Btw Olivet Rd. & Slusser Rd. Rural A NA 1,600 NA A B B E River Road W/ Fulton Road Rural A , A 402 1, A B B B C Riverside Drive N/ S.H. 12 RSD , B 453 1, B D F B B Roblar Road E/ Canfield Road Rural A , A 38 1, A A A A A Rohnert Park Expressway E/ Stony Point Road RSB , A 242 1, A D A A A Rohnert Park Expressway W/ Petaluma Hill Road RSA , A 203 1, A A A A A Santa Rosa Avenue N/ Mountain View Avenue RSB , A 552 1, A A C F A Skillman Lane E/ Thompson Lane RSB , A 119 1, A A A A A Skylane Boulevard N/ Airport Boulevard RSB , A 276 1, A A A A A Snyder Lane S/ Petaluma Hill Road RSA , A 237 1, A A C C A 7.6-2

4 Exhibit Traffic Model Data for the AM Peak Hour North or Eastbound Counts South or Westbound Counts Scenario Base Year Model Scenario 10: Projected/Preferred 2020 AM Peak AM County Count Locations Facility Max. Speed N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W N or E N or E N or E N or E S or W S or W S or W S or W N or E N or E N or E N or E S or W S or W S or W S or W 2001 Types Speed V/C=1 Counts Cap. V/C Speed LOS Counts Cap. V/C Speed LOS Base Vol Base V/C Base Speed Base LOS Base Vol Base V/C Base Speed Base LOS Alt 10 Final Vol Alt 10 V/C Alt 1 Speed Alt 10 LOS Alt 10 Final Vol Alt 10 V/C Alt 10 Speed Alt 10 LOS Stony Point Road S/ Mecham Road Rural A , A 715 1, A A B A A Stony Point Road N/ Roblar Road RSA , A 878 1, B A C C B Stony Point Road N/ S.H. 116 RSA , A 461 1, A C D C A Stony Point Road N/ Scenic Avenue RSA , A 819 1, B A F F F Todd Road E/ Stony Point Road RSB , A 219 1, A A A A B Tomales Road W/ Bodega Avenue Rural A , A 94 1, A A A A A Trinity Road E/ S.H. 12 RSD , B 515 1, B A A B B Valley Ford Road E/ Gericke Road Rural A , A 138 1, A A A A A Verano Avenue W/ S.H. 12 ART A A B C A B Warm Springs Road N/ Sonoma Mt Road RSC , A 172 1, A A A B A Watmaugh Road E/ Arnold Drive RSA , A 102 1, A A A A A Westside Road N/ Felta Road Rural B , A 91 1, A A A A A Caltrans (State-owned) Highways Note: NO AM PEAK COUNT DATA AVAILBLE S.H. 1 W/ Bodega Hwy ART na na 1, F B S.H. 12 S/ Warm Springs Rd. Rural A , na 1, na 1, E A S.H. 12 S/ Pythian Rd. Rural A , na 1, na 1, E A S.H. 12 N/ Agua Caliente ART na na 1, E A S.H. 12 N/ Boyes Blvd. ART na na 1, F 1, F S.H. 12 E/ Llano Rd. RSA , na 1, na 1, F 1, F S.H. 12 S/ Verano Rd. ART na na F C S.H. 37 W/ Lakeville Hwy. FWY , na 3, na 2, C 2, B S.H. 37 Btw Lakeville & S.H. 121 FWY , na 3, na 2, D 2, D S.H. 37 E/ Hwy 121 FWY , na 1, na 1, B 1, B S.H. 116 E/ Adobe Rd. Rural B , na 1, na C 2, F S.H. 116 Guerneville Br over Russian River Rural A , na 1, na A 1, C S.H. 116 N/ Guerneville Rd. Rural A , na 1, na A 1, C S.H. 116 S/ Occidental Rd. Rural A , na 1, na A 1, C S.H. 116 S/ Adobe Rd. Rural B , na 1, na A A S.H. 116 W/ Stony Point Rd. Rural A , na 1, na 1, E C S.H. 116 N/ Hwy 121 Rural A , na 1, na A B S.H. 121 E/ Napa Rd. Rural A , na 3, na 2, C A S.H. 121 S/ Junction Hwy. 116 Rural A , na 1, na 1, C 1, C S.H. 121 N/ Hwy 37 Rural A , na 1, na 1, C 1, C S.H. 128 W/ Chalk Hill Rd. ART na na A A S.H. Napa County Line ART na na A A Note: At some locations on 101, "spillbacks" from bottle neck points may result in worse LOS conditions than indicated

5 Exhibit Traffic Model Data for the PM Peak Hour. Buildout Alternative Pro ect Alternative / / / V/ V/C V/C V/C V/C V/C V/C V/C / l A C 0 A D E F A / i l l A A B B C D F B / l l A A A E A E E C li / l i ll A A A A A A A Ai l / i l Ai ial F C D B F F F Al ll / i Al ll A A A A A A A l i / ll B A D A F E D l i / ll C B F E F F 4 F l i / li ll A A A C B C A l i / (Gl ll ) ll A A 0 A 0 A A A A ll / in l A A A C B D C C / ll / l A A A A A A B A i / / / ll n l B A A A A A A A i i / l / / ll n l D A A A A A A A l / il ll 7 A A A 0 A B A 0 A l / Ri i ll 7 C A 0 B 0 B C B 0 B li / l l D A A A 6 A A A A / l A A A 4 A A 0 A A il ll / i ill / l D A A 0 A A A A 0 A / l A A B A B A B / l ill / i l C A A B A C B B / Ri Cl le l A A A A A A A A / i l l A A A 0 A A A A 0 A / i l A A A A A A A A i / l ill / i A A 0 A B D F B i / l A A A 0 A A A A i / l i i / Ri l B A A A A A A A Ei / / ll A A A 0 A A A A Ei / ll A A A A A A A Fi / i A A B 0 A B A B / l A A A A B A A l / Ri Ai / i B C A B F F F l / Ri Ai / i B B A B F F D / ill / / ll n l B A A A A A A A ill / i ill i / l A A A A C B F A ill / Vi ill ill i / l A A A A A B E A / ill ill i / l B A A A A A A A ill / ille l A D A A A F B E i / l i ll A A B A B B A Ll / i l A A A A A A A A / ll A A A A A A 4 A i / ( ) l 7 F B F D F F F i / Hi l B A F E F F F i / l A A A A A A A / l l A A A A A A A Mill / i / i A A A 1 A A B A Mi l / i i / Ri A A A A A B A i i / / i A A B B A B A / l llvill A A A B B B A i l / Mill i l A A A A A A A i l / l A C A C B D A Ol i / li l E A C A F F F Ol i / l Ai / i B A F C F F F Ol i / i l l A A A A A A C A Ol i / El l F B D A F E F / l l l A A A A A A A A l / l i ll A A A A C D A l l / ill l C B E 0 B F F E l ill / / i D A F B F F F l ill / / i D B F F F F 0 F Pi / Will i ill i / A A A A A B A Pl ill / / / ll n A A A A A A A Ri / Mi l i i / Ri l A A B A B B E A Ri li l i i / Ri l A A A A A A E A Ri / l i i / Ri l A A A B C B F A Ri i i / B B B C F D B l / iel ll / l A A A A A A A A / i / i B D C F D F C / l ill / i A A A A A B A / i i / i F B F E F F F ill / l A A A A A A A l l / Ai l Ai ial A A B A F B B / l ill / i A A A B A F 0 A i / / i l A B A C A E B C i / l / i C A D A F D E i / / i A A C C F F D i / i / i D A A A F F E / i / i A A A A B B A l / l l A A A 0 A A A A 0 A ini / ll A A 0 A 0 A A 6 A A ll / i ll / l A A A A A A A A / B C C C D F B i / ll A A A B B B A / l i ll A A 0 A 4 A A A 1 A i / l l l B A A A A A A A j PM Pk Count PM Pk Count Alt 2 North or Eastbound Alt 2 South or Westbound Alt 3 Alt 3 Alt 4 Locations District Ratio Facility Max. Speed N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W Raw N or E N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W S or W N or E N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W S or W N or E N or E N or E N or E N or E N or E S or W Highlighting means capacity added in Preferred Alts Corridor wknd wkdy Type Speed C=1 Vol. Cap. Speed LOS Vol. Cap. Speed LOS Vol Additive Vol. Speed LOS Vol Additive Vol. Speed LOS Vol Additive Vol. Speed LOS Vol Additive Vol. Speed LOS Vol Additive Vol. Speed LOS Vol Adobe Road W Corona Road Peta uma Urban 0.90 RSA , , ,965 1,163 1, , , , , ,088 Adobe Road E E. Wash ngton Street Peta uma Urban 0.90 Rura , , , , , , , , , , ,187 Adobe Road E Frates Road Peta uma Urban 0.90 Rura , , , , , , , , , , Agua Ca ente Road E Arno d Dr ve Sonoma Va ey 1.10 RSC , , rport Bou evard E Reg ona Parkway rport Industr 0.35 ART , , ,730 2,754 3, ,732 1,469 2, , , exander Va ey Road W Lytton Stat on Road exander Va ey 1.30 RSA , , Arno d Dr ve N Watmaugh Road Sonoma Va ey 0.83 RSA , , , , , , , , , , Arno d Dr ve N Verano Avenue Sonoma Va ey 0.83 RSB , , , , , , , , , , ,376 1, ,188 Arno d Dr ve N Agua Ca ente Road Sonoma Va ey 0.83 RSA , , , , , , , , Arno d Dr ve W S.H. 12 en E en Sonoma Va ey 1.10 RSA , , Bennett Va ey Road W Grange Road Sonoma Mounta 1.30 Rura , , , , , , Bodega Avenue W Thompson Lane Va ey Ford Two Rock Areas 1.40 Rura , , Bodega H ghway W Watertrough Road Graton Rd. Bodega Hwy. Va ey Ford-Freesto 1.13 Rura , , Bohem an H ghway N Freestone F at Road Graton Rd. Bodega Hwy. Va ey Ford-Freesto 1.13 Rura , , Boyes Bou evard W Ra road Avenue Sonoma Va ey 0.90 ART Boyes Bou evard E vers de Road Sonoma Va ey 0.90 ART Ca stoga Road S Porter Creek Road Santa Rosa Northeast Rura 0.80 Rura , , Casa Grande Road S Adobe Road Peta uma Urban 0.90 RSA , , Ch eno Va ey Road W Spr ng H Road South Sonoma Hwy. 121 Area 1.30 Rura , , Corona Road S Adobe Road Peta uma Urban 0.90 RSB , , Crane Canyon Road E Peta uma H Road Rohnert Park Cotat Urban 1.00 Rura , , Crocker Road W ver Road overda 1.20 Rura , , D Street S San Anton o Road South Peta uma 1.10 Rura , , Dry Creek Road N Lambert Br dge Road Dry Creek Area 2.00 Rura , , East Cotat Avenue W Peta uma H Road Rohnert Park Cotat Urban 0.90 RSC , , , , East Wash ngton Street S Adobe Road Peta uma Urban 0.90 RSA , , Easts de Road N Trenton-Hea dsburg Road Russ an R ver ver Road 1.20 Rura , , ghth Street East N S.H Sonoma Va ey 1.10 RSB , , ghth Street East S East Napa Street Sonoma Va ey 1.10 RSA , , fth Street West N Leveron Road Sonoma Urban 0.90 RSC , , Frates Road S Adobe Road Peta uma Urban 0.90 RSA , , , Fu ton Road S ver Road rport S. W ndsor Area 0.80 RSA , , , , , , ,731 1,150 2, ,919 2,135 3, , , ,489 Fu ton Road N ver Road rport S. W ndsor Area 0.80 RSA , , , , , ,761 1,159 1, ,740 2,806 3, , ,625 Graton Road W Green H Road Graton Rd. Bodega Hwy. Va ey Ford-Freesto 1.13 Rura , , Guernev e Road E Fre Road Guernev e Road Corr dor West Santa Rosa 0.80 Rura , , , ,003 1,443 2, Guernev e Road E ne H Road Guernev e Road Corr dor West Santa Rosa 0.80 Rura , , ,003 1, , Laguna Road N Guernev e Road Guernev e Road Corr dor West Santa Rosa 0.90 Rura , , Lakev e Road N Hwy 37 Lakev 0.60 Rura ,357 1, , , , , Leveron Road E Arno d Dr ve Sonoma Va ey 1.10 RSA , , , , ano Road N Ludw g Avenue Santa Rosa Urban 0.90 Rura , , Madrone Road W S.H. 12 Sonoma Va ey 0.90 RSB , , Ma n Street S Adobe Road Penngrove Peta uma Urban 0.90 ART ,136 1, , , , , , Mark West Spr ngs Road E ghway 101 Santa Rosa Northeast Rura 0.80 ART , , , , , ,612 1,252 2, ,354 1,024 1, , , Mark West Spr ngs Road W Porter Creek Road Santa Rosa Northeast Rura 0.80 RSA , , Mecham Road S Dump Peta uma Rura 1.10 RSA , , brae Avenue E Stony Po nt Road Rohnert Park Cotat Urban 1.00 ART rabe Road S Trenton Road Russ an R ver ver Road 1.20 RSB , , Mounta n V ew Avenue E Santa Rosa Avenue Rohnert Park Cotat Urban 1.00 RSC , , Napa Road E Burnda e Road Sche e Area 0.90 RSA , , Occ denta Road E Stat on Road Sebastopo 0.90 RSA , , Occ denta Road W Sanford Road Sebastopo 0.90 RSB , , d Redwood H ghway S Ursu ne Road Santa Rosa Northeast Rura 0.90 RSB ,089 1, , , , , , ,984 2,350 3, ,646 1,620 2, , , ,711 d Redwood H ghway N Fu ton Road rport S. W ndsor Area 0.90 RSB , , , , ,076 1,476 2, ,518 1,022 1, , , d Redwood H ghway N Easts de Road Hea dsburg 1.10 Rura , , , , d Redwood H ghway North N y Road Peta uma Urban 0.90 RSB ,396 1, , ,284 2,464 2, ,497 1,677 3, , , , , Pepper Road E Wa ker Road South Coasta 1.10 Rura , , Peta uma Avenue E Arno d Dr ve Sonoma Va ey 0.90 RSC , , , , Peta uma Bou evard North N Sk man Lane Peta uma Urban 0.90 RSA , , ,119 1,284 1, , , , , , Peta uma H Road N Roberts Rohnert Park Cotat Urban 0.90 RSA ,148 1, , ,447 1,966 1, ,970 1,489 2, ,882 1,187 1, , , ,109 Peta uma H Road N Snyder Lane Rohnert Park Cotat Urban 0.90 RSA ,077 1, , ,742 1,202 1, ,911 1,061 1, ,784 1,244 2, ,248 3,398 4, ,345 1, ,202 ner Road E ows de Road Guernev e Road Corr dor West Santa Rosa 0.90 RSB , , easant H Road S Watertrough Road Graton Rd. Bodega Hwy. Va ey Ford-Freesto 1.13 RSB , , ver Road W rabe Road Russ an R ver ver Road 1.05 Rura , , , , ver Road Btw O vet Rd. & S usser Rd. Russ an R ver ver Road 1.05 Rura , , ,591 1,099 1, ver Road W Fu ton Road Russ an R ver ver Road 1.05 Rura , , , , ,962 1,231 1, ,031 vers de Dr ve N S.H. 12 Sonoma Urban 0.80 RSD , , , , , , , , ,089 Rob ar Road E Canf d Road Va ey Ford Two Rock Areas 1.60 Rura , , Rohnert Park Expressway E Stony Po nt Road Rohnert Park Cotat Urban 0.90 RSB , , , , , Rohnert Park Expressway W Peta uma H Road Rohnert Park Cotat Urban 0.90 RSA , , Santa Rosa Avenue N Mounta n V ew Avenue Rohnert Park Cotat Urban 0.90 RSB ,250 1, , , , , , , , , Sk man Lane E Thompson Lane Peta uma Urban 0.90 RSB , , Sky ane Bou evard N rport Bou evard rport Industr 0.50 RSB , , ,862 1,639 1, Snyder Lane S Peta uma H Road Rohnert Park Cotat Urban 0.90 RSA , , ,493 1,122 1, Stony Po nt Road S Mecham Road Rohnert Park Cotat Urban 0.90 Rura , , ,065 1,309 1, , , , Stony Po nt Road N Rob ar Road Rohnert Park Cotat Urban 0.90 RSA , , ,106 1,297 1, , , , , , , Stony Po nt Road N S.H. 116 Rohnert Park Cotat Urban 0.90 RSA , , ,274 1,598 1, , , ,785 1,109 1, ,182 1,635 2, , , ,117 Stony Po nt Road N Scen c Avenue Rohnert Park Cotat Urban 0.90 RSA ,094 1, , ,629 1,582 1, , , ,137 1,090 2, ,204 1,376 2, , , ,233 Todd Road E Stony Po nt Road Rohnert Park Cotat Urban 0.90 RSB , , Toma es Road W Bodega Avenue South Coasta 1.60 Rura , , Tr ty Road E S.H. 12 Sonoma Va ey 1.10 RSD , , Va ey Ford Road E Ger cke Road Va ey Ford Two Rock Areas 1.60 Rura , , Verano Avenue W S.H. 12 Sonoma Urban 0.90 ART Warm Spr ngs Road N Sonoma Mt Road Sonoma Va ey 1.10 RSC , , Watmaugh Road E Arno d Dr ve Sonoma Va ey 1.10 RSA , , Wests de Road N Fe ta Road Hea dsburg 1.40 Rura , ,

6 Exhibit Traffic Model Data for the PM Peak Hour PM Pk Count PM Pk Count Alt 2 North or Eastbound Alt 2 South or Westbound Alt 3 Alt 3 Alt 4 Raw N Locations District/ Ratio Facility Max. Speed N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W or E N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W S or W N or E N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W S or W N or E N or E N or E N or E N or E N or E S or W Highlighting means capacity added in Corridor wknd/ Type Speed V/C=1 Vol. Cap. V/C Speed LOS Vol. Cap. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Vol Preferred Alts. 2/10 wkdy Caltrans (State-owned) Highways S.H. 1 W/ Bodega Hwy South Coastal 1.60 ART A A A A B A A 299 S.H. 12 S/ Warm Springs Rd. Sonoma Valley 1.00 Rural A , A 653 1, A 1, , C 1, , B 1, , E 1, , C 1, , B 1,203 S.H. 12 S/ Pythian Rd. Sonoma Valley 1.00 Rural A , A 762 1, A 1, , B 1, , B 1, , C 1, , C A 1,173 S.H. 12 N/ Agua Caliente Sonoma Valley 1.10 ART A B A C 1, , F 1, , F 1, C 1,068 S.H. 12 N/ Boyes Blvd. Sonoma Valley 1.10 ART D C 1, , F 1, , F 1, , F 1, , F 1, , F 1,245 S.H. 12 E/ Llano Rd. Santa Rosa SR 12 West Area 1.10 RSA ,523 1, F 921 1, C 1, , C 1, , B , F 1, , E , F 1,149 S.H. 12 S/ Verano Rd. Sonoma Urban 1.10 ART , F 1, F , F , F 1, , F 1, , F , F 903 S.H. 37 W/ Lakeville Hwy. Lakeville 0.50 FWY ,943 3, E 813 3, B 2, , F B 2, , F 1, , B 2, , F 1,508 S.H. 37 Btw Lakeville & S.H. 121 Lakeville 0.50 FWY ,093 3, B 1,345 3, B 3, , E 0 0 1, B 2, , E 2, , B 2, , D 1,633 S.H. 37 E/ Hwy 121 Lakeville 0.50 Rural A ,097 1, C 753 1, A 1, , F B 1, , F 1, , D 1, , E 912 S.H. 116 E/ Adobe Rd. SR-116 Stage Gulch Road 1.15 Rural B ,254 1, D 798 1, B 2,308 1,054 2, F B 2, , F 1, , F 1, , F 1,048 S.H. 116 Guerneville Br over Russian River SR-116 Sebastapol to Guerneville 1.40 Rural A , A 140 1, A A A A A A 219 S.H. 116 N/ Guerneville Rd. SR-116 Sebastapol to Guerneville 1.40 Rural A , A 247 1, A A A A B A 384 S.H. 116 S/ Occidental Rd. SR-116 Sebastapol to Guerneville 1.40 Rural A , A 484 1, A A A 1, , D B A 578 S.H. 116 S/ Adobe Rd. SR-116 Stage Gulch Road 1.15 Rural B , A 918 1, B C C B , C B 62 S.H. 116 W/ Stony Point Rd. SR-116 Rohnert Park to Sebastapol 1.20 Rural A , A 1,289 1, D A 1, , C 1, , C 2,151 1,089 2, F A 1,231 S.H. 116 N/ Hwy 121 South Sonoma/ Hwy 121 Area 1.00 Rural A , B 531 1, A B A , C B B 653 S.H. 121 E/ Napa Rd. South Sonoma/ Hwy 121 Area 1.30 Rural A ,225 3, A 1,114 3, A 1, , B 1, , A 2, , B 1, , B 1, , B 1,296 S.H. 121 S/ Junction Hwy. 116 South Sonoma/ Hwy 121 Area 1.00 Rural A ,022 1, C 556 1, A 1, , E A 1, , E A 1, , D 935 S.H. 121 N/ Hwy 37 South Sonoma/ Hwy 121 Area 1.30 Rural A , A 455 1, A 1, , D A 1, , C A 1, C 935 S.H. 128 W/ Chalk Hill Rd. Healdsburg 0.80 ART A A A A A A A 217 S.H. Napa County Line Healdsburg 1.20 ART A A A A A A A

7 Exhibit Traffic Model Data for the PM Peak Hour Weekend PM Peak Hour Alt 4 Alt 5 Alt 5 Alt 5 Alt 5 Alt 5 Alt 5 Alt 6 Alt 6 Alt 6 Alt 6 Alt 6 Alt 6 Alt 7 Alt 7 Alt 7 Alt 7 Alt 7 Alt 7 Alt 8 Alt 8 Alt 8 Alt 8 Alt 8 Alt 8 raw S or S or W S or W S or W S or W S or W N or E N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W S or W N or E N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W S or W New Alt 7 N or E N or E N or E N or E N or E N or E W S or W S or W S or W S or W S or W N or E N or E N or E N or E N or E N or E S or W S or W S or W S or W S or W S or W Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Capacity Vol Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS Vol Additive Vol. V/C Speed LOS 286 1, E A , D A , D 1, A C A 1, , D 296 1, C A , C A , C 1, A B B , C B B B C B 1, B B , C B A A A A A 1, A A A A F , F F , F F 1, , D B B A A A A A A 1, A A A A A , D A , D A 1, , C A , C A 93 1, E , F , E , F , E 1, , C , B , F , D B A A A B 1, A , A A A A A A A A 1, A A A A B , C A , C B 1, , C B , E 1, , C A A A A A 1, A A A B A A A A A 2, A A A A A A A A A 1, A A A A A A A A A B A A A B B B B B B B B B A A A A A 1, A A A A A A A A A 1, A A A A A A A A A 1, A A A A A B A B A 1, A A B A A B A B A 1, B A B A A A A A A 1, A A A A A A A A A 1, A A A A A A A A A 1, A A A A C C C B C 1, B C B C A A A A A 1, A A A A A A A A A 1, A A A A A A A A A 1, A A A A A A A A A 1, A A A A A B A B A 1, A A A A A A A A A 1, A A A A 705 1, F , F , F , F , F 2, , A , B , D 1, , F 691 1, F , D , F , D , F 2, , A , A C 1, , E A A A A A 1, A A A A 398 1, C A , C A , C 1, A B A B A B B A A 1, A A A A A A A A A 1, A A A A A , E A , E A 3, , B A B A A A A A A 1, A A A A A A A A A 1, A A A A A A A A A 1, A A A A D F D F D F C F D 644 1, E , F , E , F , E 1, , F , E , D 1, , C A A A A A 1, A A A A A A A A A 1, A A A A A A A A A A A A A A A A A A 1, A A A A A A A A A 1, A A A A A A A A A 1, A A A A A A A A A 1, A A A A C A C A C 1, B D A C 685 1, F , F C , F , F 2, , B A , F 1, , E C , D B , F B 2, , A A , E B A A A A A 1, A A A A C , F C , F C 2, , C A , F C A A A A A 1, A A A A A A A A A 1, A A A A 159 1, C , E C , E , C 1, C B , D C 414 1, C , E B , F , C 2, , A , A , E C 1,352 2, F , E ,172 2, F , F ,299 2, F 2, , A ,293 2, D , E 2, , F A A A A A 1, A A A A A A A A A 1, A A A A B A B A B 1, A , C B 1, , C A A A A A 1, A A A B B A B A B 3, A A B , C B B B B B 1, C C B B A A A A A 1, A A A A 86 1, D C , E C , D 1, B , D B D A A A A A 1, A A A A 678 1, F , F , F , F , F 1, , F , E , F 1, , F A A A A A 1, A A A A A B A B A 1, A A A A C A C A B 1, A B A B A , C A , C A 3, A A B A A , D A , D A 2, , A A , D A 570 1, D , C , C , C , C 2, , A , A , C , C 405 1, D , E C , D , D 2, , A , A , D C A B B A A 1, A A A A A A A A A 1, A A A A A A A A A 1, A A A A A A A A A 1, A A A A C C C C C B C B C B A A A B 1, A B B B A A A A A 1, A A A A A A A A A 1, A A A A 7.6-6

Appendix 3 Traffic Technical Memorandum

Appendix 3 Traffic Technical Memorandum Appendix 3 Traffic Technical Memorandum DRAFT TECHNICAL MEMORANDUM Southport Connector Project Traffic Development Comparison of Future Year Model Results Date: September 10, 2015 Project #:11730.030 To:

More information

Event Press Log. Sonoma County Sheriff's Office 11/26/2017. Date Time Call Number Case # Location Beat Call Type Call Disposition

Event Press Log. Sonoma County Sheriff's Office 11/26/2017. Date Time Call Number Case # Location Beat Call Type Call Disposition Event Press Log Sonoma County Sheriff's Office 11/26/2017 Date Time Call Number Case # Location Beat Call Type Call Disposition 11/26/2017 0001 173300001 HARDIES LN / W STEELE LN TRAFFIC STOP 11/26/2017

More information

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No

More information

2018 Waves to Wine Day Mile

2018 Waves to Wine Day Mile 2018 Waves to Wine Day 1-100 Mile Route and Rest Stops subject to change. A. Rest Stop 1 B. Rest Stop 2 C. Rest Stop 3 D. Lunch E. Rest Stop 4 F. Rest Stop 5 G. Rest Stop 6 2018 Waves to Wine Day 1-100

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

APPENDIX H. Transportation Impact Study

APPENDIX H. Transportation Impact Study APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett

More information

Chapter 7: Corridor Visions

Chapter 7: Corridor Visions Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United

More information

Attachment A RONALD REAGAN WASHINGTON NATIONAL AIRPORT ROADWAY NETWORK IMPROVEMENTS ENVIRONMENTAL ASSESSMENT

Attachment A RONALD REAGAN WASHINGTON NATIONAL AIRPORT ROADWAY NETWORK IMPROVEMENTS ENVIRONMENTAL ASSESSMENT Attachment A RONALD REAGAN WASHINGTON NATIONAL AIRPORT ROADWAY NETWORK IMPROVEMENTS ENVIRONMENTAL ASSESSMENT The general location of Ronald Reagan Washington National Airport (DCA or the Airport) is shown

More information

Light Emitting Diode (LED) Induction

Light Emitting Diode (LED) Induction February 8 8, 2011 DOE awarded the City $491,000 EECBG in 2009 In December 2010, Council authorized reallocating $85,000 from the Financial Incentive Program to the Streetlight Conversion Program $382,000

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

NEWS RELEASE November 8, 2017

NEWS RELEASE November 8, 2017 NEWS RELEASE November 8, 2017 Contact: Marsha Roa Public Information Manager 909.839.7055 mroa@diamondbarca.gov GRAND AVENUE INTERCHANGE AT SR-57 (ORANGE) AND SR-60 (POMONA) MULTIPLE ROADWAY, RAMP AND

More information

LIFTING CHARTS - Crawler Cranes AMERICAN MODEL TON CAPACITY

LIFTING CHARTS - Crawler Cranes AMERICAN MODEL TON CAPACITY LIFTING CHARTS - Crawler Cranes AMERICAN MODEL 7260-100 TON CAPACITY 7260 1 LIFT RATINGS with 59S Tubular Chord Hammerhead and "S-S" Counterweight (49,700 lbs.) (15,150 kg.) (Feet) Feet (Pounds) Feet From

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

Section 5.0 ENVIRONMENTAL ANALYSIS

Section 5.0 ENVIRONMENTAL ANALYSIS Section 5.0 ENVIRONMENTAL ANALYSIS 5.2 TRANSPORTATION/CIRCULATION/PARKING This section evaluates potential traffic-related and parking impacts associated with the proposed project. The following discussion

More information

Traffic Impact Study for the Maria Drive Apartment Complex

Traffic Impact Study for the Maria Drive Apartment Complex Traffic Impact Study for the Maria Drive Apartment Complex Prepared for the City of Petaluma Submitted by Whitlock & Weinberger Transportation, Inc. 490 Mendocino Avenue Suite 201 Santa Rosa, CA 95401

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

TRANSIT TECHNICAL MEMORANDUM FOR RTD SOUTHWEST CORRIDOR EXTENSION PROJECT. January Prepared By Southwest Corridor Extension Project Team

TRANSIT TECHNICAL MEMORANDUM FOR RTD SOUTHWEST CORRIDOR EXTENSION PROJECT. January Prepared By Southwest Corridor Extension Project Team TRANSIT TECHNICAL MEMORANDUM FOR RTD SOUTHWEST CORRIDOR EXTENSION PROJECT January 2010 Prepared By Southwest Corridor Extension Project Team In some cases, information in this Environmental Technical Report

More information

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA Tube Counts Type of report: Tube Count - Volume Data LOCATION: Scotts Valley Dr QC JOB #: 245667 SPECIFIC LOCATION: ft from Tabor St DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA DATE: Mar 2 24 - Mar

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

Traffic Impact Study for the Cader Corporate Center

Traffic Impact Study for the Cader Corporate Center Traffic Impact Study for the Cader Corporate Center Prepared for the City of Petaluma Submitted by Whitlock & Weinberger Transportation, Inc. 490 Mendocino Avenue Suite 201 Santa Rosa, CA 95401 475 14th

More information

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma.

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma. Revised Report Traffic Study for Safeway Fuel Center at Washington Square Shopping Center In The Pleasanton Fresno Sacramento Santa Rosa TJKM www.tjkm.com Revised Report Traffic Study for Safeway Fuel

More information

Traffic Impact Analysis. Yelm East Gateway Planned Action

Traffic Impact Analysis. Yelm East Gateway Planned Action Traffic Impact Analysis Planned Action Yelm, Washington November 2014 Traffic Impact Analysis Project Information Project: Prepared for: Evergreen Pacific Fund, LLC Steve Guidinger 2724 Alki Avenue SW,

More information

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR 9.0 RECOMMENDED LOCALLY PREFERRED ALTERNATIVE AND ALTERNATIVES FOR EVALUATION IN DRAFT SEIS/SEIR

More information

1.3 OVERVIEW OF THE CORRIDOR

1.3 OVERVIEW OF THE CORRIDOR while the central option was a tunnel under DFW Airport. As of now, the northern access option appears to be favored. However, airport access options will continue to be studied and evaluated, and are

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition Countdown to the Closure Extended 3-Hour Closure of I-40 Freeway Between U.S. 0 and I-0 Planned in Mid-July for Mulholland Bridge Demolition Work Los Angeles, Calif. Plan Ahead, Avoid The Area, Or Stay

More information

SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT SUMMARY OF FINDINGS. May 9, 2016

SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT SUMMARY OF FINDINGS. May 9, 2016 May 9, 2016 Mr. Jesus "Freddie" Olmos ECORP CONSULTING, INC. 215 North 5 th Street Redlands, CA 92374 SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT Dear Mr. Jesus "Freddie" Olmos:

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Welcome. Please Sign In

Welcome. Please Sign In Welcome South Bay Bus Rapid Transit (BRT) Draft Environmental Impact Report (DEIR) Public Meeting Please Sign In Please comment in any of the following manners: 1. Submit a comment form 2. Provide verbal

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

4.5 TRANSPORTATION AND CIRCULATION

4.5 TRANSPORTATION AND CIRCULATION The transportation and circulation section of this Draft EIR describes the existing transportation system in the Planning Area and analyzes the potential impacts associated with the proposed land uses

More information

Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20

Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20 Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 202 BRT 2030 BRT 2030 BRT Mitigation COMPARE Wed May 8 2:02: 20

More information

DELICETO, LLC PALM BEACH COUNTY, FL

DELICETO, LLC PALM BEACH COUNTY, FL COMPREHENSIVE PLAN AMENDMENT TRAFFIC ANALYSIS DELICETO, LLC PALM BEACH COUNTY, FL PREPARED FOR: DELICETO, LLC Project #042787007 April 18, 2018 Revised May 29, 2018 CA 00000696 Kimley-Horn and Associates,

More information

Making. Connections: Access, Connectivity and Parking at the Downtown SMART Station. Petaluma SMART Station Area TOD Master Plan.

Making. Connections: Access, Connectivity and Parking at the Downtown SMART Station. Petaluma SMART Station Area TOD Master Plan. Petaluma SMART Station Area TOD Master Plan Photo by Scott Hess, see http://cityofpetaluma.net/ Making June 23, 2011 Connections: Access, Connectivity and Parking at the Downtown SMART Station Petaluma

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project Chapter 3 Transportation Environment and Consequences 3. Introduction This chapter summarizes the characteristics of the transportation system in the East Link Project vicinity and discusses potential

More information

APPENDIX B. Fire Flow Evaluation in the High Severity Zones TM February 16, 2012

APPENDIX B. Fire Flow Evaluation in the High Severity Zones TM February 16, 2012 APPENDIX B Fire Flow Evaluation in the High Severity Zones TM February 16, 2012 Technical Memorandum February 16, 2012 Page 2 Oakmont Pressure Zones (A8, R12 and reduced R12, and R15) Wild Oak Pressure

More information

4.1 Traffic, Circulation, and Parking

4.1 Traffic, Circulation, and Parking 4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

A Cal Trans District 4 TANK SIZE MED/LG DELIVERY LOCATION

A Cal Trans District 4 TANK SIZE MED/LG DELIVERY LOCATION DOE DELIVERY LOTION Sweetwater FFS 705 Mines Road Dublin Area Office 999 Gleason Drive Dublin Hayward Area Office 23 Whipple Road Hayward Nimitz Inspection Sta. N/B I-880 S of Fremont Fremont Oakland Area

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

Sepulveda Pass Corridor Systems Planning Study

Sepulveda Pass Corridor Systems Planning Study Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Streets and Freeways Subcommittee January 17, 2013 1 Sepulveda Pass Study Corridor Extends for 30

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016 Clifton Corridor Transit Initiative Briefing to Great Lakes Community February 11, 2016 Neighborhood Concerns and Requests Provide a general overview and background of the project What are the different

More information

PARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate.

PARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate. Exhibitors will have complimentary parking during the first 4 days of move-in (Nov. 8-11) and moveout (after 4pm, Nov. 16 through 12pm, Nov. 18). The last day of move-in (Nov. 12) and show days (Nov. 13-16)

More information

PARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate.

PARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate. NEW! Exhibitors will have complimentary parking during move-in (Nov. 9-13) and move-out (after 4pm, Nov. 17 through 12pm, Nov. 19) if they show a valid IAAPA Attractions Expo 2017 exhibitor badge. During

More information

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT MONTEREY, CALIFORNIA Prepared for Denise Duffy & Associates 947 Cass St. Suite 5 Monterey, CA 93940 April 16,

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 10

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 10 Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Jurisdiction Report 10 Prepared By In Cooperation With U.S. Department of Transportation Federal Highway Administration

More information

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors. system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

HSR Vancouver WA to Camas Commuter Des, by R.N.

HSR Vancouver WA to Camas Commuter Des, by R.N. This plan will show the new route for the Portland-Vancouver Junction Railroad. Remove the existing Portland-Vancouver Junction Railroad leg from the Northeast Hazel Dell Avenue curve to the Burlington

More information

Introduction. Assumptions. Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer

Introduction. Assumptions. Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer SRF No. 10482 To: From: Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer Date: May 16, 2018 Subject: City of Brooklyn Park Year 2040 Forecasts

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE:

ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: TRAVEL DEMAND FORECASTS May 12, 2005 Prepared for Minnesota

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Directions to Games from JICHS (times are Google Maps estimates by car)

Directions to Games from JICHS (times are Google Maps estimates by car) Directions to Games from JICHS (times are Google Maps estimates by car) Arrupe Jesuit (1 hour 30 min) 4343 Utica Street Denver 80212 303-455-7449 I25 north about 73 miles to exit 212B for N Speer Blvd.

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

3.0 Future (2040) Transportation

3.0 Future (2040) Transportation 30 Future () Transportation Conditions Future traffic and structural bridge conditions within the I-84 Hartford Project Area have been analyzed to identify the needs and deficiencies which the Project

More information

TRANSPORTATION MASTER PLAN AND TRANSPORTATION IMPACT ASSESSMENT FOR THREE SISTERS MOUNTAIN VILLAGE RESORT CENTRE ASP

TRANSPORTATION MASTER PLAN AND TRANSPORTATION IMPACT ASSESSMENT FOR THREE SISTERS MOUNTAIN VILLAGE RESORT CENTRE ASP TRANSPORTATION MASTER PLAN AND TRANSPORTATION IMPACT ASSESSMENT FOR THREE SISTERS MOUNTAIN VILLAGE RESORT CENTRE ASP OCTOBER 2016 STANDARD LIMITATIONS This report was prepared by MMM Group Limited, a WSP

More information

Historical count data from Page 7-14

Historical count data from Page 7-14 Project Background The annual Lawrence count data was collected following the National Bicycle & Pedestrian Documentation Project (NBPDP) methodology (http://bikepeddocumentation.org). The project aims

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

APPENDIX A Interstate 26 Widening Traffic Analysis Report

APPENDIX A Interstate 26 Widening Traffic Analysis Report Interstate 26 Widening MM 85-MM101, Newberry, Lexington, Richland Counties, SC Environmental Assessment APPENDIX A Interstate 26 Widening Traffic Analysis Report Interstate 26 Widening Traffic Analysis

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Table of Contents SR-91 IMPLEMENTATION PLAN i

Table of Contents SR-91 IMPLEMENTATION PLAN i Table of Contents TABLE OF CONTENTS...I SECTION 1: 2009 STATUS REPORT AND UPDATE...1 SECTION 2: IMPLEMENTATION PLAN...7 BY YEAR 2011...8 BY YEAR 2015...13 BY YEAR 2022...19 BY YEAR POST-2025/2030...23

More information

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No. TECHNICAL MEMORANDUM TO: FROM: Molly McCartney MnDOT Project Manager Haifeng Xiao, PE Tom Sohrweide, PE, PTOE DATE: November 27, 2012 RE: Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation Capital Improvements Update April 2014: Pl dp j t Planned Projects through 2019 - $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation

More information

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants TJKM Transportation Consultants Draft Report Traffic Impact Study for the Residential Development at 4659 Proctor

More information

Mountain Area Transportation Study Model Methodology and Assumptions Final

Mountain Area Transportation Study Model Methodology and Assumptions Final Model Methodology and Assumptions Final February 19, 2017 Submitted to: 17J17-1768.17 Prepared by Iteris, Inc. Innovating Through Informatics TABLE OF CONTENTS 1.0 OVERVIEW... 1 1.1 Project Objective and

More information

Clifton Corridor Transit Initiative. Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016

Clifton Corridor Transit Initiative. Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016 Clifton Corridor Transit Initiative Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016 Neighborhood Concerns and Requests Provide a general overview and background of the project

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

4.0 SUMMARY OF ARTERIAL INTERSECTIONS CONGESTION ANALYSIS AND IMPROVEMENT CONCEPTS

4.0 SUMMARY OF ARTERIAL INTERSECTIONS CONGESTION ANALYSIS AND IMPROVEMENT CONCEPTS 4.0 SUMMARY OF ARTERIAL INTERSECTIONS CONGESTION ANALYSIS AND IMPROVEMENT CONCEPTS 4.1 SUMMARY The Arterial Intersection Congestion Analysis Report, dated May 29, 2012, was approved by the SR-91/I-605/I-405

More information

Total Usage (kwh) Present Reading (kwh) (=)

Total Usage (kwh) Present Reading (kwh) (=) Alamo Anderson Angwin Antioch Bakersfield 1 6/9/2010 9/24/2010 03170 00002 3168 10269 07112 3157-11 Gen 2 2 6/11/2010 9/24/2010 02959 00002 2957 07899 04945 2954-3 Gen 2 3 6/18/2010 9/24/2010 03528 00001

More information

TRAFFIC IMPACT ANALYSIS WESTMINSTER SEMINARY. Escondido, California June 25, LLG Ref Transportation Engineer II

TRAFFIC IMPACT ANALYSIS WESTMINSTER SEMINARY. Escondido, California June 25, LLG Ref Transportation Engineer II TRAFFIC IMPACT ANALYSIS WESTMINSTER SEMINARY Escondido, California June 25, 2015 LLG Ref. 3-15-2420 Prepared by: Pedram Massoudi Transportation Engineer II Under the Supervision of: John Boarman, P.E.

More information

A IR Q UALITY A PPENDIX

A IR Q UALITY A PPENDIX A P P E N D I X B A IR Q UALITY A PPENDIX... CO EWP Petaluma East Washington Place, Petaluma CARBON MONOXIDE ANALYSIS PM Peak Hour Assumes worst case of all intersections based on total volume, LOS and

More information

2007 Traffic Impact Mitigation Fee Update Study

2007 Traffic Impact Mitigation Fee Update Study 2007 Traffic Impact Mitigation Fee Update Study Prepared for: Council of San Benito County Governments Prepared by: Hexagon Transportation Consultants Adopted June 21, 2007 MEMORANDUM To: From: Subject:

More information

Mid-Coast Corridor Transit Project

Mid-Coast Corridor Transit Project San Diego Transportation Development Association Mid Coast Construction Update June 11, 2018 Mid-Coast Corridor Transit Project Mid-Coast Project 11-mile extension of Trolley Blue Line New LRT Infrastructure:

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

STOREY CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)

STOREY CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775) H U M B O L D T E L K O W A S H O E P E R S H I G L A D E R E U R E K A C H U R C H I L L STOREY W H I T E P I E L Y O CA R S O CITY DOUGLAS M I E R A L Y E E S M E R A L D A L I C O L EVADA C L A R K

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

APPENDIX A: BABCOCK CHAIN-OF-CUSTODY, DRIVING DIRECTIONS, AND LABORATORY PROCEDURES (Procedures provided electronically by request only)

APPENDIX A: BABCOCK CHAIN-OF-CUSTODY, DRIVING DIRECTIONS, AND LABORATORY PROCEDURES (Procedures provided electronically by request only) Riverside County Flood Control and Water Conservation District Volume II - QAPP Consolidated Monitoring Program October 2017 APPENDIX A: BABCOCK CHAIN-OF-CUSTODY, DRIVING DIRECTIONS, AND LABORATORY PROCEDURES

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

TRAFFIC AND TRANSPORTATION TECHNICAL REPORT

TRAFFIC AND TRANSPORTATION TECHNICAL REPORT TRAFFIC AND TRANSPORTATION TECHNICAL REPORT for ENVIRONMENTAL ASSESSMENT Route 29 Bypass State Project No.: 0029-002-844, P101; UPC 102419 Federal Project Number: TBD From: Route 250 Bypass To: U.S. Route

More information

PHONE # FAX # BOX ELDER COUNTY P F P F P F CACHE COUNTY

PHONE # FAX # BOX ELDER COUNTY P F P F P F CACHE COUNTY 1 1 REHABILITATION ACILITIES Mission at Bear River Rehab Ctr 460 W 600 N, Tremonton 84337 Pioneer Care Ctr 815 S 200 W, Brigham City 84302 Willow Glen Health Rehab 775 N 200 E, Brigham City 84302 Rocky

More information

NICTI Alternatives Analysis

NICTI Alternatives Analysis EXECUTIVE SUMMARY Development of Detailed Alternatives Report Prepared for: Northern Illinois Commuter Transportation Initiative City of Rockford, Illinois Prepared by: 222 South Riverside Plaza, Suite

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information