1 4.0 SUMMARY OF ARTERIAL INTERSECTIONS CONGESTION ANALYSIS AND IMPROVEMENT CONCEPTS 4.1 SUMMARY The Arterial Intersection Congestion Analysis Report, dated May 29, 2012, was approved by the SR-91/I-605/I-405 Technical Advisory Committee (TAC) meeting on May 29, That report summarized the results of the arterial intersection analysis for the SR-91/I-605/I-405 Congestion Hot Spots project, including intersection ranking methodology and corresponding analysis results and suggested arterial intersection improvements. A total of 97 study arterial highway intersections and 118 freeway ramp intersections (total of 215 study intersection locations) were included within the SR-91/I-605/I-405 study area for analysis. From that list of study intersections, 40 locations were designated for further analysis as described in the Arterial Intersection Congestion Analysis Report, including the development of concept improvements to improve existing and future operating deficiencies. The Top 40 intersections selected for initial improvement evaluation are listed in Table 16 and shown graphically in Figure 5. Note that the intersections of I-405 Northbound at Seal Beach Boulevard and I-405 Southbound at Seal Beach Boulevard have already been identified as part of the I-405 West County Connector Project, thus additional improvements were not identified at this time. The proposed improvements have been analyzed and are shown to result in improved LOS conditions. For clarity, the locations are shown with strikethrough on the table, and similarly marked in the graphics. Similarly, as the proposed intersection improvements were reviewed in the sub-tac meetings with city representatives in February and March 2012, another small group of intersections were removed from consideration for improvement. These locations were requested to be removed by the city, GCCOG and Metro representatives for various reasons, and included: I-605 NB Ramps and Valley View/Temple Ave. Carmenita Road and Artesia Boulevard Carmenita Road and Rosecrans Avenue Lakewood Boulevard and Carson Street Bellflower Boulevard and Carson Street This resulted in a total of 33 initial intersections that ultimately moved forward with the development of conceptual improvement plans (see Table 16). Additional intersections improvements will be identified in later phases of work. Page 51

2 TABLE 16: TOP 40 INTERSECTIONS ANALYZED Intersection Number Intersection Jurisdiction 83 Santa Fe Springs Rd and Whittier Blvd (Pickering Ave/Washington Blvd) Whittier 12 Lakewood Blvd and Telegraph Rd Downey/Pico Rivera 92 Painter Rd and Whittier Blvd Whittier 4 Lakewood Blvd and Del Amo Blvd Long Beach/Lakewood R66-R67 I-605 SB Ramps and Washington Boulevard Santa Fe Springs 16 Rosemead Blvd and Beverly Blvd Pico Rivera 25 Studebaker Rd and Rosecrans Ave Norwalk 91 Painter Rd and Mulberry Rd Whittier/LA County (South Whittier) R87 I-405 SB Ramps and Seal Beach Boulevard Seal Beach 42 Colima Rd and Whittier Blvd Whittier 15 Rosemead Blvd and Whittier Blvd Pico Rivera 80 Bloomfield Ave and Imperial Hwy Santa Fe Springs/Norwalk 46 Valley View Ave and Imperial Hwy LA County (South Whittier)/La Mirada 57 Los Alamitos Blvd and Katella Ave Los Alamitos 39 & 110 Orr and Day Rd and Florence Ave (I-5 NB Ramp) Santa Fe Springs 7 Lakewood Blvd and Alondra Blvd Bellflower/Paramount 1 Lakewood Blvd and Spring St Long Beach 9 Lakewood Blvd and Imperial Hwy Downey 71 Norwalk Blvd and Whittier Blvd Whittier/LA County (West Whittier-Los Nietos) 48 Bellflower Blvd and Spring St Long Beach 36 Pioneer Blvd and Imperial Hwy Norwalk 10 Lakewood Blvd and Firestone Blvd Downey R88 I-405 NB Ramps and Seal Beach Boulevard Seal Beach 13 Rosemead Blvd and Slauson Ave Pico Rivera 11 Lakewood Blvd and Florence Ave Downey 45 Valley View Ave and Rosecrans Ave La Mirada/Santa Fe Springs 14 Rosemead Blvd and Washington Blvd Pico Rivera R86 I-605 NB Ramps and Valley Boulevard and Temple Avenue LA County/Industry 70 Norwalk Blvd and Washington Blvd Santa Fe Springs 90 Carmenita Rd and Telegraph Rd Santa Fe Springs/LA County (South Whittier) R61 I-605 NB Ramps and Telegraph Road Santa Fe Springs 44 Valley View Ave and Alondra Blvd Santa Fe Springs/La Mirada R60 I-605 SB Ramps and Telegraph Road Santa Fe Springs 77 Bloomfield Ave and Artesia Blvd Cerritos 85 Carmenita Rd and Artesia Blvd Cerritos 24 Studebaker Rd and Alondra Blvd Norwalk/Cerritos 87 Carmenita Rd and Rosecrans Ave Norwalk/Santa Fe Springs 3 Lakewood Blvd and Carson St Long Beach/Lakewood 50 Bellflower Blvd and Carson St Lakewood/Long Beach 84 Carmenita Rd and South St La Palma/Cerritos Page 52

3 FIGURE 8: 40 TOTAL INTERSECTIONS SELECTED FOR IMPROVEMENT EVALUATION Page 53

4 The proposed arterial intersection improvements were reviewed with the staff of all affected jurisdictions during special sub-tac focus meetings and one on one meetings as required. Comments were received and reviewed and concept improvement drawings revised as appropriate. The final concept plans are presented in Appendix H. Table 18 displays the arterial intersection location, the jurisdiction it falls within, the 2035 No-Build level of service (before improvement), and the 2035 level of service for the Build condition on the freeways with the proposed improvements for each intersection. This LOS value is representative of the volume analysis for Concept B, as discussed in the approved Arterial Intersection Congestion Analysis Report. It is labeled as the Build condition to reflect the fact there would be no appreciable change in the intersection volumes for the subsequent Freeway Improvement Concept C, which will have a combination of freeway improvements from Concept A, B, and new or modified improvements for Concept C, or the existing No-Build condition. In summary, most of the locations were found to improve at least one level of service and in many cases the locations improve by multiple service levels. A summary of the results is as follows, and these are recommended as the initial intersections to be improved: AM Peak Hour Arterial Intersection Level of Service Summary No-Build AM Peak 11 LOS F, 9 LOS E, 12 LOS D or better 2035 Concept B with Improvements AM peak 1 LOS F, 3 LOS E, 28 LOS D or better PM Peak Hour Arterial Intersection Level of Service Summary No-Build PM Peak 21 LOS F, 9 LOS E, 2 LOS D or better 2035 Concept B with Improvements AM peak 4 LOS F, 7 LOS E, 21 LOS D or better These results indicate significant overall improvement with Concept B conditions combined with proposed intersection improvements. During the AM peak hour, 10 LOS F locations are improved with only one LOS F condition remaining, and during the PM peak hour, 17 LOS F conditions are improved with only 4 remaining. The number of LOS D or better locations improves from 12 in the AM peak hour to 28, and it improves from only 2 in the PM peak hour to 21. The Gateway Cities Council of Governments, in partnership with LA Metro, is proceeding with a Phase II Transportation Strategic Plan that will further examine all the arterial highways in Gateway Cities. The analysis completed for the Arterial Intersection Congestion Analysis Report will served as the foundation for identifying and evaluating additional intersections and/or arterial highway segments/highways for further improvements. Table 17 includes the preliminary estimated cost for each of the 33 locations for which improvement concepts were prepared. Appendix I provides the detailed back-up for the preliminary cost estimates for the individual intersection locations. The costs were estimated Page 54

5 utilizing current bid data for similar local street improvement projects in 2012 dollars and are not escalated to any particular year of future construction. For ease of reference the same template was utilized for each location. At the request of the affected cities (Pico Rivera, Santa Fe Springs, and Downey) the preliminary cost estimates include widening of the Washington Boulevard and Telegraph Road bridges over the San Gabriel River to their respective master plan width for these streets. This cost has been included within the I-605 SB Ramp/Washington Boulevard and I-605 SB Ramp/Telegraph Road arterial intersection locations. 4.2 COST ESTIMATES FOR ARTERIAL INTERSECTION IMPROVEMENT CONCEPTS Planning level cost estimates were prepared for each of the arterial intersection improvement concepts. Refer to Appendix J for detailed cost estimate data for arterial intersections. TABLE 17: COST ESTIMATES FOR ARTERIAL INTERSECTIONS Page 55

6 TABLE 18: ARTERIAL INTERSECTION CONGESTION ANALYSIS IMPROVEMENT DETAIL Page 56

7 TABLE 18 (CONT.): ARTERIAL INTERSECTION CONGESTION ANALYSIS IMPROVEMENT DETAIL Page 57

8 TABLE 18 (CONT.) ARTERIAL INTERSECTION CONGESTION ANALYSIS IMPROVEMENT DETAIL Page 58

Metro Highway Program

Metro Highway Program Metro Highway Program ACEC November 2018 I-5 North HOV and Truck Lanes 14 miles of HOV lanes in both directions 2 miles of truck climbing lanes at the south end 7 bridge modifications at: Gavin Canyon

More information

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways.

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways. 4.7 Transportation and Circulation This report documents the results of a study of the potential traffic impacts created by the Whittier Main Oil Field Development Project. The study is included as Appendix

More information

Report of Registration County Summary

Report of Registration County Summary Report of Registration County Summary Report Filter(s): County: ROR Date: County Supervisorial 1 906,719 486,606 104,765 16,259 4,008 4,755 7,454 4,960 5,458 272,454 County Supervisorial 2 1,050,058 634,672

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition Countdown to the Closure Extended 3-Hour Closure of I-40 Freeway Between U.S. 0 and I-0 Planned in Mid-July for Mulholland Bridge Demolition Work Los Angeles, Calif. Plan Ahead, Avoid The Area, Or Stay

More information

Construction Management Association of America (CMAA) Thursday, August 18, 2011 Frank Quon, PE Lan Saadatnejadi, PE

Construction Management Association of America (CMAA) Thursday, August 18, 2011 Frank Quon, PE Lan Saadatnejadi, PE Metro s Highway Program Construction Management Association of America (CMAA) Thursday, August 18, 2011 Frank Quon, PE Lan Saadatnejadi, PE Los Angeles County Sources: Metro 2009 Long Range Transportation

More information

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017 West Santa Ana Branch Transit Corridor Informational Briefing Gateway Cities Service Council April 13, 2017 Project Study Area 98 square miles 20 individual cities plus unincorporated LA County 1.2 million

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate

More information

Portland-Milwaukie Light Rail Project Johnson Creek Boulevard

Portland-Milwaukie Light Rail Project Johnson Creek Boulevard Portland-Milwaukie Light Rail Project Johnson Creek Boulevard EXISTING AND FUTURE OPERATIONS AND POTENTIAL MITIGATIONS Presented by Alan Snook DKS Associates October 12, 2009 1 AGENDA Traffic 101 Study

More information

Westbound State Route 91 Improvement Project

Westbound State Route 91 Improvement Project Westbound State Route 91 Improvement Project CITIES OF CERRITOS AND ARTESIA, CALIFORNIA DISTRICT 7 LA 91, (SR-91 PM 16.9 19.8, I-605 PM 5.0 5.8) EA 29811/EFIS 0716000284 Initial Study with Proposed Negative

More information

Evaluation of Renton Ramp Meters on I-405

Evaluation of Renton Ramp Meters on I-405 Evaluation of Renton Ramp Meters on I-405 From the SE 8 th St. Interchange in Bellevue to the SR 167 Interchange in Renton January 2000 By Hien Trinh Edited by Jason Gibbens Northwest Region Traffic Systems

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

3.4 UTILITY/EMERGENCY SERVICES

3.4 UTILITY/EMERGENCY SERVICES 3.4 UTILITY/EMERGENCY SERVICES The information in this section is based on the Utility Impacts Report (November 2011) and the CIA (March 2012). 3.4.1 AFFECTED ENVIRONMENT The physical impacts of the build

More information

Appendix F: Traffic Impact Analysis

Appendix F: Traffic Impact Analysis City of Commerce - Commerce Walmart Project Draft EIR Appendix F: Traffic Impact Analysis Michael Brandman Associates H:\Client (PN-JN)\4147\41470001\EIR\4 - Screencheck2 DEIR\41470001 Sec99-00 Appendix

More information

ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE

ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE NATE LARSON HDR SEATTLE, WA ABHISHEK DAYAL VALLEY METRO PHOENIX, AZ ITE WESTERN DISTRICT ANNUAL MEETING JULY 16, 2013 Presentation

More information

Key Project Elements Status Report

Key Project Elements Status Report Los Angeles County Metropolitan Transportation Authority Key Project Elements Status Report presented to the Corridor Advisory Committee August 18, 2016 Background Motion 22.1 elements are grouped into

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

4.1 Traffic, Circulation, and Parking

4.1 Traffic, Circulation, and Parking 4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

Proposed Commercial Service at Paine Field Traffic Impact Analysis

Proposed Commercial Service at Paine Field Traffic Impact Analysis Gibson Traffic Consultants 80 Wetmore Avenue Suite 0 Everett, WA 980.9.86 Prepared for: Federal Aviation Administration July 0 GTC #09-07 TABLE OF CONTENTS. EXECUTIVE SUMMARY.... PROJECT IDENTIFICATION....

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Metro. Board Report. B. PROGRAM AND AMEND the FY 17 budget to add $900,000 in Measure R Commuter Rail service funds to conduct this study; and

Metro. Board Report. B. PROGRAM AND AMEND the FY 17 budget to add $900,000 in Measure R Commuter Rail service funds to conduct this study; and Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #:2016-0284, File Type:Motion / Motion Agenda Number:9. REVISED PLANNING

More information

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit S REGION OF WATERLOO TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: FILE CODE: A02-30/PW SUBJECT: NORTHFIELD DRIVE AT

More information

Green Line Extension to Torrance Supplemental Alternatives Analysis. 2. Purpose and Need 2. PURPOSE AND NEED

Green Line Extension to Torrance Supplemental Alternatives Analysis. 2. Purpose and Need 2. PURPOSE AND NEED 2. PURPOSE AND NEED This chapter characterizes the transportation and mobility problems and identifies project goals, objectives, and evaluation criteria to improve these problems for the Green Line Extension

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

APPENDIX H. Transportation Impact Study

APPENDIX H. Transportation Impact Study APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside Los Angeles County Metropolitan Transportation Authority November 2012 Connecting the San Fernando Valley and the Westside Interstate 405 Sepulveda Pass THIS PAGE INTENTIONALLY LEFT BLANK Sepulveda Pass

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Appendix G Traffic Study Methodology

Appendix G Traffic Study Methodology REVISED DRAFT ENVIRONMENTAL IMPACT REPORT/ Appendix G Traffic Forecasting Model Methodology In addition to the existing/baseline condition (year 2005), a level of service (LOS) analysis was conducted for

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

I-405 Corridor Master Plan

I-405 Corridor Master Plan Southern California Association of Governments I-405 Corridor Master Plan Presentation to Streets and Freeways Subcommittee October 13, 2015 1 Presentation Overview Expectations and Approach Corridor Performance

More information

Introduction Environmental Setting. Section 3.10 Transportation/Circulation Regional and Local Access

Introduction Environmental Setting. Section 3.10 Transportation/Circulation Regional and Local Access Section.0 Transportation/Circulation Section.0 Transportation/Circulation 0 0 0.0. Introduction This section summarizes the transportation/circulation impact analysis for the proposed Southern California

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

MANHATTAN VILLAGE ENHANCEMENT PROJECT

MANHATTAN VILLAGE ENHANCEMENT PROJECT MANHATTAN VILLAGE ENHANCEMENT PROJECT Traffic & Parking Analysis Manhattan Beach City Council September 2013 Study Area and Analyzed Intersections Intersection LOS Results Project Improvements Dedicate

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

Appendix C. Traffic Impact Study

Appendix C. Traffic Impact Study Appendix C Traffic Impact Study TRAFFIC STUDY FOR THE EAGLE ROCK AGGREGATE TERMINAL Prepared by: FEHR & PEERS 201 Santa Monica Blvd. Suite 500 Santa Monica, CA 90401-2213 T. (310) 458-9916 F. (310) 394-7663

More information

Welcome. Please Sign In

Welcome. Please Sign In Welcome South Bay Bus Rapid Transit (BRT) Draft Environmental Impact Report (DEIR) Public Meeting Please Sign In Please comment in any of the following manners: 1. Submit a comment form 2. Provide verbal

More information

Sepulveda Pass Corridor Systems Planning Study Update

Sepulveda Pass Corridor Systems Planning Study Update Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Update June 20, 2012 Measure R Transit Corridors One of 12 Measure R Transit Corridors approved by

More information

Business Advisory Committee. November 3, 2015

Business Advisory Committee. November 3, 2015 Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal

More information

Section 5.0 ENVIRONMENTAL ANALYSIS

Section 5.0 ENVIRONMENTAL ANALYSIS Section 5.0 ENVIRONMENTAL ANALYSIS 5.2 TRANSPORTATION/CIRCULATION/PARKING This section evaluates potential traffic-related and parking impacts associated with the proposed project. The following discussion

More information

CITY OF BEVERLY HILLS STAFF REPORT

CITY OF BEVERLY HILLS STAFF REPORT Meeting Date: July 7, 2011 To: From: Subject: CITY OF BEVERLY HILLS STAFF REPORT Honorable Mayor & City Council Pamela Mottice Muller, Director of Emergency Management 405 Closure Attachments: 1. 1-405

More information

CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE ELEMENT

CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE ELEMENT CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE ELEMENT CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE GUIDING PRINCIPLE 1.0 INTRODUCTION The City of Carson is committed to providing a safe and efficient circulation

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Southeastern Wisconsin Regional Freeway System Reconstruction Study

Southeastern Wisconsin Regional Freeway System Reconstruction Study Southeastern Wisconsin Regional Freeway System Reconstruction Study July 26, 2001 1 Agenda Item 3 Presentation of Projected Traffic Impacts of the Possible New Freeway Segment Connecting IH 43 and USH

More information

metro.net/ridesafely TRANSIT SAFETY PROGRAMS

metro.net/ridesafely TRANSIT SAFETY PROGRAMS metro.net/ridesafely TRANSIT SAFETY PROGRAMS 2017 calendar JANUARY S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 #LAMetroSafety metro.net/ridesafely

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis Transit Coalition September 26, 2012 2 Study Area Pacific Electric Rightof-Way/West Santa Ana Branch (PEROW/ WSAB) extends

More information

TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH

TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH, California November 11, 2016 LLG Ref. 3-14-2334 EXECUTIVE SUMMARY The Project proposes the development of 550 luxury residential dwelling units, public trails,

More information

Sepulveda Pass Corridor Systems Planning Study

Sepulveda Pass Corridor Systems Planning Study Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Streets and Freeways Subcommittee January 17, 2013 1 Sepulveda Pass Study Corridor Extends for 30

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015 Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Final Interchange Justification Report

Final Interchange Justification Report I- / TROSPER ROAD Final Interchange Justification Report Prepared for: Prepared by: I-/Trosper Road Final Interchange Justification Report Prepared for City of Tumwater Israel Rd SW, Olympia, WA 0

More information

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS 5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS The Transportation Services Committee recommends the adoption of the recommendations contained in the following report

More information

MTA Post 1989 Retrofit Soundwall Projects Phase I, Priority 1

MTA Post 1989 Retrofit Soundwall Projects Phase I, Priority 1 Phase I, Priority 1 ( Not in Rank Order ) 1 134 0.9 2.6 1.7 1.7 Burbank Eo Cahuenga Blvd/Eo California St: EB 2 134 2.7 2.9 0.2 0.4 Burbank Eo & Wo Riverside Dr: WB & EB 3 210 31.9 32.2 0.3 0.3 Arcadia

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

Section 3.6 Ground Transportation

Section 3.6 Ground Transportation Section.6 Ground Transportation 5 6 7 0 5 6 7 0 5 6 7 0 5 SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area, and addresses the reasonably foreseeable

More information

Post 1989 Retrofit Soundwall Program Phase I, Priority 1

Post 1989 Retrofit Soundwall Program Phase I, Priority 1 Post 1989 Retrofit Soundwall Program Phase I, Priority 1 Phase I, Priority 1 contains soundwall projects along freeway HOV segments where soundwalls were constructed on one side of the freeway only. Rte

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

One Gateway Plaza Mctropoliin Tknsmon Authority Los Angeles, CA OP , SOUTH REGION CONTRACT BUS SERVICES MV TRANSPORTATION, INC.

One Gateway Plaza Mctropoliin Tknsmon Authority Los Angeles, CA OP , SOUTH REGION CONTRACT BUS SERVICES MV TRANSPORTATION, INC. Lor Angdes County One Gateway Plaza Mctropoliin Tknsmon Authority Los Angeles, CA 90012-2952 'Metra - OPERATIONS COMMllTEE JUNE 17,2010 SU WECT: ACTION: OP35902470, SOUTH REGION CONTRACT BUS SERVICES MV

More information

NOTICE OF PUBLIC HEARING Los Angeles County Metropolitan Transportation Authority

NOTICE OF PUBLIC HEARING Los Angeles County Metropolitan Transportation Authority NOTICE OF PUBLIC HEARING Los Angeles County Metropolitan Transportation Authority The Los Angeles County Metropolitan Transportation Authority will hold public hearings in February 2011 to receive community

More information

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS January 2, 2018 Mr. Paul DeBotton Marple Associates, L.P. 1604 Walnut Street, 4 th Floor Philadelphia, PA 19103 RE: Langford Run Road Traffic Analysis Proposed Mid County Shopping Center Marple Township,

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

EASTSIDE PHASE 2 - PART 1 GREENWOOD AVE. STATION LOCATION PLAN PNR + TOD TOD BY OTHERS WASHINGTON BLVD. STATION FACILITIES + TOD

EASTSIDE PHASE 2 - PART 1 GREENWOOD AVE. STATION LOCATION PLAN PNR + TOD TOD BY OTHERS WASHINGTON BLVD. STATION FACILITIES + TOD PARKING STRUCTURE 120 x 180 FOOTPRINT 2 STORY STRUCTURE 200 CARS PNR + TOD OO DA VE. TOD BY OTHERS EE NW A2 06 270 GR x 23 WA S HIN PL AT F OR M GT ON BL VD. STATION FACILITIES + TOD S. SCHWARZKOPF S.

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic impacts were analyzed for both the

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

STATE ROUTE 1 HOV LANE WIDENING PROJECT (FROM MORRISSEY BOULEVARD TO SAN ANDREAS ROAD)

STATE ROUTE 1 HOV LANE WIDENING PROJECT (FROM MORRISSEY BOULEVARD TO SAN ANDREAS ROAD) STATE ROUTE 1 HOV LANE WIDENING PROJECT (FROM MORRISSEY BOULEVARD TO SAN ANDREAS ROAD) HOV REPORT Prepared for: Santa Cruz County Regional Transportation Commission September 2007 TABLE OF CONTENTS CHAPTER

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

NEWS RELEASE November 8, 2017

NEWS RELEASE November 8, 2017 NEWS RELEASE November 8, 2017 Contact: Marsha Roa Public Information Manager 909.839.7055 mroa@diamondbarca.gov GRAND AVENUE INTERCHANGE AT SR-57 (ORANGE) AND SR-60 (POMONA) MULTIPLE ROADWAY, RAMP AND

More information

TRANSPORTATION 1. INTRODUCTION

TRANSPORTATION 1. INTRODUCTION IV.F TRANSPORTATION 1. INTRODUCTION This section evaluates potential impacts associated with Project-related traffic, circulation, and access. The analysis summarizes the findings of the traffic study

More information

2017 Local Government Partnership Program

2017 Local Government Partnership Program 2017 Local Government Partnership Program Frequently Asked Questions General 1) How much funding is allocated for my agency? A: Please see attached list. 2) Q: Can matching amount (from AB2766) exceed

More information

Citizens Committee for Facilities

Citizens Committee for Facilities Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on

More information

APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010)

APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010) APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010) TRANSPORTATION IMPACT ANALYSIS FOR THE LOYOLA MARYMOUNT UNIVERSITY MASTER PLAN PROJECT JUNE 2010 PREPARED FOR AECOM Design PREPARED BY

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting August 2, 2011 Introduction Key players Local lead agency: Metro Federal lead agency: Federal

More information

Sherman Oaks Community Traffic Plan

Sherman Oaks Community Traffic Plan Sherman Oaks is a community that is geographically bound by the Santa Monica mountains on its southern boundary, and the ever-expanding San Fernando Valley on its western, northern, and eastern boundaries.

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

METRO SERVICE CHANGE LINE 577 EXPRESS: A TALE OF TWO BUS LINES

METRO SERVICE CHANGE LINE 577 EXPRESS: A TALE OF TWO BUS LINES METRO SERVICE CHANGE LINE 577 EXPRESS: A TALE OF TWO BUS LINES METRO SERVICE TO RIO HONDO COLLEGE LINE 270 LINE 577 El Monte Rio Hondo College 2 BACKGROUND Overcrowding problems identified on Line 270

More information

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA)

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA) LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA) NOTICE OF PREPARATION (NOP)/NOTICE OF INTENT (NOI) OF AN ENVIRONMENTAL IMPACT STATEMENT (EIS)/ENVIRONMENTAL

More information

2.4 Build Alternatives

2.4 Build Alternatives Table 2-1. Future Transit Network Changes between No Build and TSM Alternatives Operator Route Group No. Route ID and Description Peak Headway (min) No Build Off-peak Headway (min) Peak Headway (min) TSM

More information

Mr. Kyle Zimmerman, PE, CFM, PTOE County Engineer

Mr. Kyle Zimmerman, PE, CFM, PTOE County Engineer Los Alamos County Engineering Division 1925 Trinity Drive, Suite B Los Alamos, NM 87544 Attention: County Engineer Dear Kyle: Re: NM 502 Transportation Corridor Study and Plan Peer Review Los Alamos, New

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information