1 This plan will show the new route for the Portland-Vancouver Junction Railroad. Remove the existing Portland-Vancouver Junction Railroad leg from the Northeast Hazel Dell Avenue curve to the Burlington Northern-Santa Fee Railroad intersection. Use the savings for the new rail section from the Hazel Dell Avenue curve to connect with the Cascadia High-Speed Rail flyover. Use the HSR route for the 0.9 miles till the turnout just south of the 39 th Street. Install new single track for the PVJR to the existing BNSF yard tracks. Install new connector curved track to the Port rail line. This will allow the turnaround by the existing loop tracks. Direct connections for the PVJR railroad traffic to industries and class one RR s is now possible. HSR Vancouver WA to Camas Commuter Des, by R.N.
2 Legend x CHSR Stations Commuter Stations Flyovers Cuts Fills Tunnels Roadway over or under passes Revised Roadways Generally on ground Freight Railroads (BNSF) (UPRR) = Closed RR Crossings Elv. = Rail Elevation E = Ground surface Elevation R = Radius HSR_Legend
3 This is to connect the Portland Vancouver Junction Railroad to the Port. The PVJR will intersect with the BNSF, the HSR and then by the new route eastwards. M-M flyover not shown in this drawing. New connecting track 14.5 BNSF HSR M_M_Br_04b North North
4 The new PVJR track is below the 4 th Plain Boulevard, independent and west of the BNSF. Also shown, the HSR-BNSF-UPRR flyover and the roadway intersect. HSR and Freight Buses only PVJR Motor roadway BNSF Yard HSR Station and Bus Terminal 4th Plain Blvd intersection HSR M_M_Br_03
5 Longview Portland Northern RR is below on ground the HSR-BNSF-UPRR flyover. The LPNR single track is on the west side of the BNSF tracks. 1800' EL. 97' LPNR BNSF Yard BNSF Rail El. 54' HSR M_M_Br. 02
6 BNSF and UPRR go on fill south of 39 th Street to ascend the flyover and the M-M Bridge. The PVJR will junction off, stay at ground level, on the west and later underpass the flyover to the east side. Re-locate this Building to the West 39th Street 1166' Grade 1.3% Flyover El. 66' Fill El. 53' BNSF-UPRR N HSR PREVAILING WIND PLANT GEOMETRICAL BNSF-UPRR HSR M-M_Br_01 eye 775'
7 New HSR tracks west of the BNSF. In this segment the PVJR will share the HSR track till the turnout south of the 39 th Street. 39th Street North BNSF BNSF BNSF HSR HSR LPN RR BNSF HSR M_M_Br_01b
8 HSR and PVJR will go on flyover just north of 39 th Street. PVJR will then flyover the BNSF and enter the tunnel. To Battle Ground-Camas New CHSR Track on Flyover Grade 0.7% VAN_01 Eye 5500'
9 PVJR and commuter line flyover of the BNSF to tunnel, may be single track only. HSR will continue north wards. Elv. 50' Grade 0.6% NW 69th X To four lane road between 69th and 78th Street New roadway overpass from NW Lakeshore Ave to CHSR station and NW Lakeshore Ave Close this route X Elv. 95' New route to Battle Ground and Camas X Elv. 116' Grade 1.3% E 149' VAN_02b Elv, 72' Grade 1.3% E 143' Elv, 71' Grade 0.8%
10 BNSF Vancouver shortcut bypass will also lessen grade crossings and Vancouver rail traffic. This route may be canceled, The Logging RR may be closed. This maybe obsolete, see alternative above. E 48' To/from Seattle Flyovers To/from Vancouver E 48' Possible Loop Route for BNSF Freight and Amtrak Spokane Logging RR Tunnel entrance Elv. 48' VAN_03b
11 New route. Flyover 0.3 miles, tunnel to HSR 0.6 miles. Grades 1.3% VAN_03ba Closed X Elv. 116' To Battle Ground Elv. 138' X E 150' To BNSF and Portland Elv. 122' To Camas
12 General commuter route layout to Camas by tunnel and possible Empire Builder VAN_03h
13 Tunnel below I-5 and NE Hwy 99 intersection E=ground elevations. Tunnel to Camas 4 miles E 98' VAN_03c1 E 101' E 208'
14 Tunnel below I-5 and Hwy 500 intersection with possible new underground Commuter and Amtrak Empire Builder station. Tunnel Ventilation Shaft and access to underground Station VAN_03d1 HWY 500 E 190' E 117'
15 Tunnel below Central Park E 202' VAN_03f3 E 168'
16 Tunnel below Harney Elementary School E 139' VAN_03f2
17 Blandford Drive area, tunnel is single bore two tracks for this application with possible commuter stations. Possible route extension east to Camas. May be used for the Empire Builder and access for the BNSF to the M-M Br. E 186' Blandford Dr Tunnel entrance Elv. 52' E 84' VAN_03g Existing BNSF Elv, 52' E 76' Trench Cut Commuter Station Hwy 14 Overpass Grade 2%
18 New twin tunnel entrance for Portland connections over the M-M Bridge. (Layout example in southern Switzerland and under construction)
19 Camas section from S Blandford Drive (Dubois Park) to SE Union St in Camas. This segment may be needed in the future and may need to be on flyover the whole length due to the many grade crossings. (12 Mi) Parallel to BNSF and north side Flyover BNSF HWY 14 VAN_03i
This corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.
Alignment is double tracked for 80 mph commuter trains, 110 mph CHSR speeds between Bridgeport OR and 78 th Street in Vancouver WA. New alignment for freight trains will allow speeds up to 40 mph over
More informationThis corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.
Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be
More informationDes. by R.N. HSR RQ_South_08
The Cascadia High-Speed Rail corridor from the Rose Quarter Transportation Hub to Tualatin/Bridgeport will have stops at the Oregon Museum of Science and Industry Transit Center. This stop will connect
More informationJune WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington
DESIGN DEVIATION NOs. 1 & 2 Horizontal Stopping Sight Distance and Shoulder Width Reduction SR 99 S. Holgate St to S. King St. Viaduct Replacement Stage 2 MP 29.89 TO MP 30.78 XL-3237 PIN-809936D June
More informationMobile Ventilation Unit Tunnel Test BNSF Railway Seattle Tunnel (Great Northern / King Street Tunnel) November 14, 2002
Mobile Ventilation Unit Tunnel Test BNSF Railway Seattle Tunnel (Great Northern / King Street Tunnel) November 14, 2002 Background On November 14, 2002, Tempest Technology worked with BNSF Railway and
More informationPublic Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)
Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement
More informationPAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc
PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS Paul Mak, PE, SE HDR Inc 801 S. Grand Ave. Suite 500, Los Angeles, CA 90017. Tel
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationProposed Project I 35 Improvements from SH 195 to I 10
I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four
More informationHighway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary
Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared
More informationSherman Oaks Community Traffic Plan
Sherman Oaks is a community that is geographically bound by the Santa Monica mountains on its southern boundary, and the ever-expanding San Fernando Valley on its western, northern, and eastern boundaries.
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More informationDanger CAUTION - RR tracks (2 sets) Food SERVICES - Quik Mart on left
Dist Day Leg PAC TOUR 600k Dist (km) Type Instruction ORGANIZER - Susan Notorangelo - (612) 804-9970 START - TUCSON 0.0 0.0 0.0 Country Inn and Suites - 6681 South Tucson Boulevard, Tucson, AZ 85756-0.0
More informationPAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS
1 PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS Paul Mak, PE, SE - DMJM HARRIS 515 S. Flower Street 9th Floor, Los Angeles, CA 90071. Tel 213-593-8337 Fax 213-593-8622
More informationRailyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY
Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)
More informationCentral Park Drives Traffic Management Overview
Central Park Drives Traffic Management Overview Spring 2015 New York City Department of Transportation Existing Traffic Management From Labor Day thru Last Day of NYC Public School: 8-10 AM weekdays (Southbound)
More informationStation Evaluation. Durham-Orange Light Rail Transit Project Spring 2012
Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly
More informationRTID Travel Demand Modeling: Assumptions and Method of Analysis
RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel
More information1.3 OVERVIEW OF THE CORRIDOR
while the central option was a tunnel under DFW Airport. As of now, the northern access option appears to be favored. However, airport access options will continue to be studied and evaluated, and are
More informationExtending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process
Extending TRACKS Issue 5 Spring 2014 Preliminary design plan review underway Public comment and approval process in May & June Residents and businesses along the Southwest LRT (METRO Green Line Extension)
More informationCountdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition
Countdown to the Closure Extended 3-Hour Closure of I-40 Freeway Between U.S. 0 and I-0 Planned in Mid-July for Mulholland Bridge Demolition Work Los Angeles, Calif. Plan Ahead, Avoid The Area, Or Stay
More informationT-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)
A: 2014 SFMTA TRANSIT SERVICE INFORMATION B: SFMTA TRAFFIC COUNT DATA C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS) E: LAND USE AND VALUE
More information4 Circulation & Transportation
4.1 Mobility Network The mobility network at the new St. Paul s hospital and health campus is comprised of an interconnected system of sidewalks, cycle paths, transit routes and roadways. Figure 4-1: Indicative
More informationALTERNATIVES ANALYSIS/ ENVIRONMENTAL IMPACT STATEMENT SCOPING BROCHURE
I-10 WEST ALTERNATIVES ANALYSIS/ ENVIRONMENTAL IMPACT STATEMENT SCOPING BROCHURE INTRODUCTION Cricket Pavilion Study Description, Project Background The Federal Transit Administration (FTA) and METRO are
More informationI-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange
I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet
More informationAVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE
AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No
More informationGold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014
Gold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014 RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides;
More informationDesign of the High Speed Rail System in California. Orange County to Los Angeles Segment
Andrew W. Sokol 1 Design of the High Speed Rail System in California Orange County to Los Angeles Segment Andrew W. Sokol, P.E. STV Incorporated 2009 AREMA Conference and Exposition Chicago, Illinois (total
More informationHarlem Avenue between 63 rd and 65 th
Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap
More informationHillsdale Academy Directions to Sporting Events
Hillsdale Academy Directions to Sporting Events ADDISON HIGH SCHOOL 219 N Comstock St., Addison, MI 49220 Phone 517-547-6121 Take State Road EAST out of Hillsdale. Follow State Road until it turns LEFT
More informationDevelopment of 220 mph High Speed Rail Service for Illinois. Mark C. Walbrun, PE TranSystems Corporation
Development of 220 mph High Speed Rail Service for Illinois Mark C. Walbrun, PE TranSystems Corporation 1 Study Purpose Worldwide Use of High Speed Rail Technology Japan, France, Italy, Germany, Spain,
More information1000 Bluff Street, Pittsburgh, PA - Google Maps http://maps.google.com/maps?f=q&source=s_q&hl=en&geocode=&q=1000+bluff+street,+p... Page 1 of 1 Address 1000 Bluff St Duquesne University, Pittsburgh, PA
More informationTRAIN, BUS & TRANSIT
TRAIN, BUS & TRANSIT Input Metra 1 Metra does not want to add parking because of space; maxed out on number of cars per train. Developments on Rt. 59 will affect. 2 Should do studies regarding what the
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More information2040 Metropolitan Transportation Plan -- Table XVII-1
C:\7. \Projects\ 2040MTP Project List_Nov16-16.xlsx ID # NAME LIMITS DESCRIPTION COST () AGENCY PROJECT TYPE* 2017 1 B Dr S and Capital Ave SW B Dr S from 3.5 Mile Rd eastward to M-66 (1.7 mi); Capital
More informationExpanding Capacity for the Northeast Corridor The Gateway Program
Expanding Capacity for the Northeast Corridor The Gateway Program Petra Todorovich Messick March 4, 2013 Raritan Valley Rail Coalition Somerville, NJ The Northeast Corridor Mainline and Branches 899 Route-miles
More informationB Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015
1 B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015 Northwest Rail (B) Line 6.2 miles electric commuter rail Downtown to Westminster at the 71 st /Lowell Station 11-minute travel time
More informationPlan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP
414 Nicollet Mall Minneapolis, MN 55401 March 13, 2017 Daniel P. Wolf Executive Secretary Minnesota Public Utilities Commission 121 7 th Place East, Suite 350 St. Paul, MN 55101 Via Electronic Filing RE:
More informationNEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis
Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle
More informationANDERSON PROPERTY SITE ANALYSIS
ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion
More informationDevelopment of the Preferred Option and Implementation Plan
Presentation To RMRA Peer Panel Day #1 Preferred Option and Risk Assessment August 25, 2009 TEMS, Inc. / Quandel Consultants, LLC 0 Development of the Preferred Option and Implementation Plan 1 1 Results
More informationTo: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015
Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry
More informationTransitways. Chapter 4
4 Transitways Figure 4-1: Hiawatha LRT Train at the Lake Street/Midtown Station The 23 Transportation Policy Plan identifies a network of transitway corridors to be implemented by 23. Transitways recommended
More informationAttachment E3 Vibration Technical Memorandum
Attachment E3 Technical Memorandum 77 South Bedford Street Burlington, MA 01803 T 781.229.0707 F 781.229.7939 E jross@hmmh.com W www.hmmh.com TECHNICAL MEMORANDUM To: Alisa Swank, CH2M HILL Jodi Ketelsen,
More informationVTA Board of Directors: We are forwarding you the following: Comments regarding 2016 Peninsula Corridor SEIR. Member of the Public. Thank you.
From: Board.Secretary Sent: Friday, July 22, 2016 5:07 PM To: VTA Board of Directors Subject: VTA Correspondence: Comments Regarding 2016 Peninsula Corridor SEIR VTA Board of Directors: We are forwarding
More informationPUBLIC INFRASTRUCTURE PROJECTS
PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING
More informationFRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)
FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST) The Fresno County subsection of the California High- Speed Train System (HST) is analyzed in two separate EIR/EISs the Merced-Fresno EIR/EIS
More informationLeg 1 (D) 7.1 Miles - The Chase Begins. The majority of this leg is run on a trail / abandoned road while the remainder is on quiet country lanes.
7.1 Miles - The Chase Begins Leg 1 (D) GPS START 37.93071,-85.653022 END 37.89913,-85.564764 The majority of this leg is run on a trail / abandoned road while the remainder is on quiet country lanes. 0.0
More informationBusiness Advisory Committee. July 7, 2015
Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS
More informationVIADUCT LOCATION STUDY. October 19, 2009
VIADUCT LOCATION STUDY October 19, 2009 Background Information Traffic Study Alternative Evaluation Public Involvement Preferred Concept Next Steps Evaluate alternatives for the location of a viaduct to
More informationAttachment F Transportation Technical Memorandum
Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002
ALAMEDA CORRIDOR A A Project of National Significance TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002 Top U.S. Container Ports (2001) LOS ANGELES 5.18 LONG
More informationService Planning Open House
Service Planning Open House Presentation to Community RTA Board Room July 17, 2018 575 EYES See Something, Text Something Transit App RTA CLE Mobile Ticketing Bus Stop Consolidation/Safety Improvement
More informationExisting Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.
High Plains ECONOMIC DEVELOPMENT D i s t r i c t Rail Transportation Southeast Wyoming Southeast Wyoming is served by both the Burlington Northern Santa Fe Railroad (BNSF) and the Union Pacific Railroad
More informationGetting to EvCC: Bus, Bike & Carpool
Getting to EvCC: Bus, Bike & Carpool September 201 March 2018 Campus Map CARPOOL LOT BICYCLE BICYCLE REPAIR COLLEGE BROADWAY & TOWER SB BROADWAY & TOWER NB North Area Transit & Bicycle s Transit s Transit
More informationBrigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction
Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will
More information2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS
2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak
More informationWelcome. Please Sign In
Welcome South Bay Bus Rapid Transit (BRT) Draft Environmental Impact Report (DEIR) Public Meeting Please Sign In Please comment in any of the following manners: 1. Submit a comment form 2. Provide verbal
More informationPort Terminal Railroad Association. Committed to Safety and Service
Port Terminal Railroad Association Committed to Safety and Service Port Terminal Railroad History Port Terminal Railroad History The Port Terminal Railroad Association (PTRA), formed in 1924, is the culmination
More informationChapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR
Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR 9.0 RECOMMENDED LOCALLY PREFERRED ALTERNATIVE AND ALTERNATIVES FOR EVALUATION IN DRAFT SEIS/SEIR
More informationII. PROJECT DESCRIPTION
II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicants for the proposed Sepulveda/Rosecrans Site Rezoning are: Mar Ventures, Inc., 2050 West 190 th Street, Suite 108, Torrance, California,
More informationBullhead City, AZ. Topock, Lake Havasu, Parker, Vidal Jct, Needles, AVI- 205 miles. Full day ride. Take Laughlin Ranch Blvd to Bullhead Pkwy
Bullhead City, AZ to Bullhead Area Chamber of Commerce Topock, Lake Havasu, Parker, Vidal Jct, Needles, AVI- 205 miles. Full day ride Drive 205 miles, 4 h 3 min Map data 2015 Google 10 mi Bullhead City,
More informationTECHNICAL MEMORANDUM
California High-Speed Train Project TECHNICAL MEMORANDUM Alignment Standards for Shared Use Corridors (Specific to Los Angeles to Anaheim) TM 1.1.6 Prepared by: Signed document on file 17 Dec 07_ George
More informationAppendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report
Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report Appendix B Bus Bay, Maintenance, and Storage Capacity Analysis Technical Memorandum FINAL MAY 2016 INTRODUCTION This technical memorandum
More informationLocation Concept Plan Amendment Recommendation Approved 2011 Concept Plan
Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West
More informationNICTI Alternatives Analysis
EXECUTIVE SUMMARY Development of Detailed Alternatives Report Prepared for: Northern Illinois Commuter Transportation Initiative City of Rockford, Illinois Prepared by: 222 South Riverside Plaza, Suite
More informationTransportation Technical Report
Transportation Technical Report Puyallup Station Access Improvements Transportation Technical Report 4 South Jackson Street Seattle, WA 984 2826 February 26 This Page Intentionally Left Blank Puyallup
More informationSouthern California - CHSRA
CALIFORNIA HIGH-SPEED RAIL Michael Gillam, Deputy Program Director Southern California - CHSRA CMAA - Construction Management Association of America July 19, 2012 CALIFORNIA S HIGH-SPEED TRAIN SYSTEM Largest
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationUnified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report
Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations
More informationFinal Series of Public Meetings
Final Series of Public Meetings Public Meeting Locations City Date Jasper Monday, September 26 Livingston Tuesday, September 27 Huntsville Wednesday, September 28 Bryan Thursday, September 29 Eldorado
More informationClifton Corridor Transit Initiative. Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016
Clifton Corridor Transit Initiative Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016 Neighborhood Concerns and Requests Provide a general overview and background of the project
More informationCharter Bus Staging and Pick-Up
W Area Dr Charter Bus Staging and Pick-Up Event Charter Bus Loading Zone AirTrain Domestic Terminals: Level 1 (Arrivals) Designated spaces in Courtyards 1, 3, or 4 Terminal 2 International Terminal: Level
More informationClifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016
Clifton Corridor Transit Initiative Briefing to Great Lakes Community February 11, 2016 Neighborhood Concerns and Requests Provide a general overview and background of the project What are the different
More informationengineering phase and during the procurement of design build contracts.
CONSIDERATION OF ALTERNATIVES Below-grade trench alignment along Aviation Boulevard, adjacent to LAX south runways. miles. MOS-Century would extend from the Metro Exposition Line to the Aviation/ Century
More informationAttachment D Environmental Justice and Outreach
Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income
More informationCentral Loop Bus Rapid Transit
Central Loop Bus Rapid Transit Transportation Goals of the Chicago Central Area ACTION Plan, page 2-6 Central Area Plan Improve Transit in Central Area Improve Pedestrian Environment Manage Traffic Circulation
More informationElkhart River Greenway Trail
EXTENDED ROUTE Elkhart River Greenway Trail For more information on this trail, see page 34 of the Elkhart County 2017 Trail Guide. Start at the Elkhart River Greenway Trailhead in Studebaker Park and
More informationRocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More informationLoop 375 Border Highway West Extension Project
Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\1_13_05_21_UPRR_Pinch_Pts_South_Asarco.mxd Date Saved: 5/31/13 PAISANO UPRR ExistingTrack 3 Aerial: NAIP, 08/30/12
More informationAPPENDIX H. Transportation Impact Study
APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett
More informationI-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No
TECHNICAL MEMORANDUM TO: FROM: Transit Advisory Group Jeff Rhoda DATE: RE: I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P. 2785-330B SEH No. 123252 04.00 I-494/I-35W Interchange
More informationMobility Corridor Updates. Transit & Active Transportation Projects
Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate
More informationDirections to Belmont Switch (Spur 2) Turn RIGHT (North) onto Mill Creek NE. Veer RIGHT (North) onto West River Drive NE
For overnight parking and staging Mill Creek Middle School 100 Betty Street NE Comstock Park, MI 49321 Use google maps to find exact location..parking in front of school off of School St Cap & Cork Liquor
More informationTRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site
TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734
More informationChapter 4 : THEME 2. Transportation
Chapter 4 : THEME 2 Strengthen connections to keep the Central Area easy to reach and get around 55 Figure 4.2.1 Promote region-wide transit investments. Metra commuter rail provides service to the east,
More informationNew Mexico Rail Runner
New Mexico Rail Runner New Mexico Division Employee Timetable No. 1 Effective 0001 MST December 6, 2008 Emergency Phone Number: (866) 874 6679 Chief Dispatcher: (505) 843 1702 Train Dispatcher: (505) 245
More informationRail alignment and benefits (rab) study
Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study May 22, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create
More informationIMPROVEMENT CONCEPTS
IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic
More informationDirections to The MITRE Corporation
MITRE-1 Building (H) 7525 Colshire Drive McLean, VA 22102-7539 Phone: (703) 983-6000 McLean Metro Station Old Meadow Dr. The MITRE Corporation - McLean Campus Colshire Meadow Drive Rt. 123 (Dolley Madison
More information3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project
Chapter 3 Transportation Environment and Consequences 3. Introduction This chapter summarizes the characteristics of the transportation system in the East Link Project vicinity and discusses potential
More informationTraffic Engineering Study
Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested
More informationLeander ISD General Stadium Information
Leander ISD Athletic Administration 202 W. South, Street Leander, TX 78641 (512) 570-0170 Leander ISD General Stadium Information A.C. Bible Jr. Stadium: 3301 S Bagdad Rd, Leander, TX 78641 John Gupton
More informationBERKS COUNTY FIELD DIRECTIONS
BERKS COUNTY FIELD DIRECTIONS BOYERTOWN AREA LITTLE LEAGUE DIRECTION NORTH AND SOUTH FILEDS FROM OLD AIRPORT ROAD & RTE 562 (TOWARDS ST. LAWRENCE) TO FIRST LIGHT ON MANATAWNY, AT Y GO RIGHT ONTO LONGVIEW.
More informationChapter 1 Project Description
Chapter 1 Project Description 1.1 INTRODUCTION The Metro Gold Line light rail transit (LRT) system currently extends from Los Angeles to Pasadena serving cities and communities along the alignment corridor.
More informationPlan Check Policies and Guidelines
Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation
More informationEast Link light rail: Bel-Red/Overlake Open House Summary
East Link light rail: Bel-Red/Overlake Open House Summary April 2010 East Link Light Rail Project Overview East Link is Sound Transit s voter-approved project to build light rail between Seattle and the
More informationIH 35 FEASIBILITY STUDY
IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE
More informationCorridor Sketch Summary
Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins
More information