1 Capital Improvements Update April 2014: Pl dp j t Planned Projects through $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation Additions - $ 61,022,186 Deletions - $ 13,491,383 Net Addition Balance $ 47,530,803 - $ -0-1

2 Capital Improvements Update For this evening s discussion, staff has updated the planned project list to reflect current status. Additionally, we have updated the available funding amount by reconciling all funding sources through Recommendation Capital Improvements Update The result: Planned Projects through $ 138,394,012 Available Funding through $ 161,627,590 Un-appropriated - $ 23,233,578 Staff s Recommendation- $ 16,855,730 Add --- $23,405,730 Delete - $6,550,000 Balance $ 6,377,848 2

3 Staff s Recommendations March 2015 Parks Department Building - $1,500,000 (2016) OCR Interconnect Project - $2,680,000 (2016) ASR Project Phase II - $3,600,000 (2018) Crestwood Drive (Main to Navarro) - $3,296,093 (2019) Crestwood Drive (Navarro to Laurent) - $3,103,372 (2020) 2020 Seal Coat Project $2,144, Residential Streets $5,882,265 North Heights Utilities Phase VII - $1,200,000 (2020) Staff s Recommendations March 2015 Delete Juan Linn Reconstruction - $4,000,000 (2018) Delete Loop 175 Lift Station Upgrade - $1,850,000 (2018) Delete Ben Jordan Sanitary Sewer Extension - $700,000 (2019) Move Red River Reconstruction (Ben Jordan to Main) $4,715,000 (From 2019 to 2018) 3

4 Other Projects Crestwood (Laurent to Ben Jordan) - $4,535,000 Juan Linn Street (Laurent to Port Lavaca Hwy.) - $4,000,000 Mallette Drive - $13,491,383 Moody to Navarro $1,675,347 North St. - Navarro to Laurent $11,862,256 $2,878,390 Laurent to Ben Jordan - $3,537,813 Ben Jordan to Ben Wilson - $3,770,706 Sec. #1 - $1,669,375 Ball Airport Road Sec #2 - $6,402,406 $19,231,875 Sec #3 - $4,380,000 Sec #4 - $6,780,094 US 87 Annexation - $1,150,000 Dewatering Project - $2,200,000 ASR Phase III Project - $10,900, SCADA Upgrade - $750,000 Conclusion of Staff Input Council Discussion Planned Projects Staff s Rec. 10 Year Look Questions Start Direction 4

5 Staff Recommendations Staff Recommendations Parks Department Building Consists of Constructing a new office and maintenance building for the Parks and Recreation Department in Riverside Park - $1,500,000 5

6 OCR Interconnect Project B A A Aquifer Storage and Recovery (ASR) Phase II Consists of installing one new Aquifer Storage and Recovery Well and converting one existing City well into an Aquifer Storage and Recovery Well and dilli drilling three monitoring wells - Phase II - $3,600,000 6

7 Crestwood Drive Main to Navarro Add exhibits here Consists of reconstructing Crestwood Drive between Main Street and Navarro in a two lane asphalt section with curb and gutter, sidewalk and utilities - $3,296,093 Average Street Rating - 58 Crestwood Drive Navarro to Laurent Add exhibits here Consists of reconstructing Crestwood Drive between Navarro and Laurent Streets in a two lane asphalt section with curb and gutter, sidewalk and utilities - $3,103,372 Average Street Rating

8 2020 Seal Coat Project Add exhibits here Consists of applying a two course seal coat to the following subdivisions: Cimmaron Cherokee Hills / Hillcrest Fleetwood $2,144, Seal Coat Project Cimarron SR 92 Add exhibits here Consists of applying level up as needed and a two course seal coat to the 103,800 square yards of paved streets in the Ciamarron Subdivision - $1,038,000. 8

9 2020 Seal Coat Project Cherokee Hills / Hillcrest SR 94 Consists of applying level up as needed and a two course seal coat to the 42,700 square yards of paved streets in the Cherokee Hills/Hillcrest Subdivision - $427, Seal Coat Project Fleetwood SR 94 Add exhibits here Consists of applying level up as needed and a two course seal coat to the 67,900 square yards of paved streets in he Fleetwood Subdivision - $679,000. 9

10 2020 Residential Streets Castle Hills West Add exhibits here Consists of reconstructing the residential streets in Castle Hills West - $4,848,400. Average Street Rating Residential Streets North Heights Phase VI Add exhibits here North Heights Phase VI Consists of Re- Constructing San Antonio Street between Navarro and Laurent and portions of Depot, Cameron, East, Goldman, Jecker, Levi and Louis Streets. - $1,033,865 Street Rating

11 North Heights Utilities Phase VII Add exhibits here North Heights Utilities Phase VII Consists of Replacing or Rehabilitating the Water and Sanitary Sewer Lines in Nueces Street between Navarro and Laurent and portions of Depot, Cameron, East, Goldman, Jecker, Levi and Louis Streets. - $1,200,000 Juan Linn Street Laurent to Port Lavaca Hwy. Street Rating Was 60 Now 99 Juan Linn Laurent Street to Port Lavaca Hwy. - Four-Lane, Asphalt Section, Replacement of Utilities, Storm Sewer, Curb and Gutter Replacement, Sidewalk- $4,000,000 11

12 Loop 175 Lift Station Upgrade Add exhibits here Consists of Replacing Pumps, Motors and Controls at the Loop 175 Lift Station to increase the firm capacity of the Lift Station by 3.1 MGD to accommodate future growth along Loop $1,850,000 Ben Jordan Sewer Extension Add exhibits here Consists of Extending a 12 Sanitary Sewer line along Ben Jordan Street from John Stockbauer to the Northeast side of Loop 463 to serve growth that is anticipated to occur along Loop $700,000 12

13 Red River Street Ben Jordan to Main Phase II - Ben Jordan Street to Goldman Street - Four-Lane, Asphalt Section, Replacement of Utilities, Minimal Curb and Gutter Replacement, No Sidewalk- $2,715,000 Phase III Goldman Street to Main Street - Four-Lane, Asphalt Section, Replacement of Utilities, Minimal Curb and Gutter Replacement, No Sidewalk- $2,000,000 Total Project - $4,715,000 Other Projects Other Projects for Consideration 13

14 Crestwood Drive Laurent to Ben Jordan Street Rating 64 Laurent to Ben Jordan - Four- Lane, Asphalt Section, Utilities, Minimal Curb and Gutter Replacement, with Sidewalk - $4,000,535. Juan Linn Street Laurent to Port Lavaca Hwy. Street Rating Was 60 Now 99 Juan Linn Laurent Street to Port Lavaca Hwy. - Four-Lane, Asphalt Section, Replacement of Utilities, Storm Sewer, Curb and Gutter Replacement, Sidewalk- $4,000,000 14

15 Mallette Drive Improvement Project Construction of Mallette Drive from Solar Drive to Loop 463 in a four lane concrete section with storm sewer, sidewalks, and utilities - $13,491,203. North Street Main to Ben Wilson Main Street to Ben Wilson Street - Four-Lane, Asphalt Section, Utilities, Minimal Curb and Gutter Replacement, with Sidewalk - Section 1 - Moody to Navarro SR 62 - $1,675,347 Section 2 - Navarro to Laurent SR 62 - $ 2,878,390 Section 3 - Laurent to Ben Jordan SR 62 - $3,537,813 Section 4 - Ben Jordan to Ben Wilson SR 65 - $3,770,706 Total - $11,862,256 15

16 Ball Airport Road Section #1 US 87 to Nursery Road with Traffic Signal and Railroad Crossing- $1,669,375 Section #2 Nursery Road to Spring Creek Four Lane Concrete Section with Utilities - $6,402,406 Section #3 Spring Creek Bridge - $4,380,000 Section #4 Spring Creek to Mallette Drive Four Lane Concrete Section with Utilities - $6,780,094 Total Sections #1, 2, 3 and 4 - $19,231,875 US 87 N. Annexation This proposed annexation consists of land on the west side of US Hwy 87, directly across from Tropical Acres and Lake Forest subdivisions. The area is just north of VISD s West High School and Cade Middle School campus. It includes the City s Water Tower and a portion of the Ball Airport Road corridor. Acres: Cost of Service = Landtech.. $1,150,000.a measure of excellence 16

17 US 87N Annexation Project Consists of installing a 16 water line and a 24 sanitary sewer line along US 87 from the intersection of West Tropical Drive and US 87 to a point directly across from Water Tower #6 - $1,150,000 Sludge Dewatering Project Consists of replacing the existing belt filter press at the Regional Wastewater Treatment facility with either a new belt filter press or a centrifuge tif - $2,200,

18 Aquifer Storage and Recovery (ASR) Phase III Consists of installing nine new Aquifer Storage and Recovery System Wells and retrofitting five existing City wells to Aquifer Storage and Recovery Wells- Phase III - $10,900,000 SCADA Project Consists of consolidating SCADA systems so that they interact with one another and replacing some obsolete SCADA equipment and components-$750,

19 Current Planned Projects Current Planned Project List Current Planned Project List 19

20 Current Planned Project List Current Planned Project List 20

21 Current Planned Project List Current Planned Project List 21

22 Current Planned Project List Recommended Planned Projects Recommended Planned Project List 22

23 Proposed Planned Project List Proposed Planned Project List 23

24 Proposed Planned Project List Proposed Planned Project List 24

25 Proposed Planned Project List Proposed Planned Project List 25

26 Proposed Planned Project List 26

Landtech...a measure of excellence

Landtech...a measure of excellence Capital Improvements Plan Update Agenda: Review Recommended Changes Add New Year (2023) to the CIP Planning Window Alternative Projects & Other Needs Discussion & Questions Consensus (2018 & 2019 Projects)

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Purpose and Need Report

Purpose and Need Report Purpose and Need Report State Highway (SH) 29 From Southwestern Boulevard to SH 95 Williamson County, Texas (CSJ: 0337-02-045) Prepared by Blanton & Associates, Inc. Date: November, 2015 The environmental

More information

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX:

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX: 435 Martin Street, #3000 BLAINE, WA 98230 BUS: 360.332.8311 FAX: 360.332.8330 www.cityofblaine.com September 10, 2018 To: From: Subject: City Council Department Heads Michael Jones, City Manager Jeffrey

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

CITY OF BELLEVILLE 2017 Capital Budget

CITY OF BELLEVILLE 2017 Capital Budget CITY OF BELLEVILLE 2017 Capital Budget Proposed Financing COMBINED SERVICES 1.001 Bridge St W Coleman to Highland Design EDS 73 300.0 150.0 150.0 1.002 University Ave McFarland Dr to Tice Cres EDS 65 1,900.0

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

Clarksville Street Department. Fiscal Year 2018 Budget Presentation Clarksville Street Department Fiscal Year 2018 Budget Presentation Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay Clarksville

More information

GATTIS SCHOOL RD / SH 130 SUBDIVISION

GATTIS SCHOOL RD / SH 130 SUBDIVISION AMISTAD DR MEADOWILD DR NO. DESCRIPTION INDEX ROYAL BURGESS DR. E NAKOMA SITE SH 130 CITY LIMITS LITTLE LAKE RD KAATZ LN ESTATE DR DANA DR MARJORIE DR 1 COVER 2 PRELIMINARY PLAT 3 EXISTING CONDITIONS 4

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget Capital Improvement Program (CIPs) City of Industry FY 2017/18 155 FY 2017/18 156 City of Industry, California Capital Improvement Program Overview of Department The Capital Improvement Program (CIP) is

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia

More information

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status or) STREET RESURFACING, WATER MAIN AND SEWER 1 ERGB Construction Engr Phase III $ 150,000 $ 723,804 1/11/16 Const Phase Status 2 ERGB Improvements $ 150,000 $ 11,173,776 2016 1Q Const Finalizing lighting

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual - 2023 Proposed Capital Maintenance Improvement Program (CMIP) Fund/Departm ent New Original Amended 2019 2020 2021 2022 2023 FY18-23 110 - City - General Fund Chief Knowledge Office 1 9 AUTO - 1997 -

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator City of Summit Administration Memo To: Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator CC: Department Heads & File Date: July 29, 2010 Re: 2010 Capital Improvement

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Pump Station 7 Improvements

Pump Station 7 Improvements Project Business Case ID: C04 2/18/2017 Pump Station 7 Project Purpose: The purpose of this project is to ensure that Pump Station 7 continues to operate in an efficient and effective manner following

More information

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269)

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269) City of South Haven City Hall 539 Phoenix Street South Haven, Michigan 49090-1499 Telephone (269) 637-0700 Fax (269) 637-5319 Dunkley and Black River Infrastructure Improvements Dunkley - Dyckman Avenue

More information

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN 2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated

More information

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for GENERAL FUND (01) C017060.589000 EXPO Maintenance Yard Buffer Park 440,000 - - - C019098.589000 Downtown Santa Monica Temporary Use TOD Site 836,400 - - - M014078.589000 Swim Facilities Planned Maintenance

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors. system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and

More information

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently

More information

Village of Bensenville CY2017 Community Investment Plan

Village of Bensenville CY2017 Community Investment Plan Grade Seperation (York & Irving) 12204 31080810-596000 York & Irving CIP - Streets & Highways 50 Years CY 17 Total Cost: $ 1,279,109 Village portion of Streetscape and aesthetic improvements along York

More information

Caltrans Shopp Lump Sum Projects and Backup List

Caltrans Shopp Lump Sum Projects and Backup List appendix d Caltrans Shopp Lump Sum Projects and Backup List 46 Tahoe Regional Planning Agency - Federal Transportation Improvement Program (Dollars in Whole) State Highway System DIST: PPNO: 03 COUNTY:

More information

O-Train Light Rail Transit Stage 2 Look Ahead

O-Train Light Rail Transit Stage 2 Look Ahead National Capital Heavy Construction Association January 15, 2018 O-Train Light Rail Transit Stage 2 Look Ahead John Manconi, General Manager Transportation Services Department City of Ottawa 1 3 Current

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM Board of Commissioners 229 Rehoboth Avenue P.O. Box 1163 Rehoboth Beach, Delaware 19971 City of Rehoboth Beach Telephone 302-227-6181 www.cityofrehoboth.com THE COMMISSIONERS OF REHOBOTH BEACH Special

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

Rural Planning. Highway Projects - CULLMAN COUNTY

Rural Planning. Highway Projects - CULLMAN COUNTY 4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

City of Grand Island Tuesday, October 10, 2017 Council Session

City of Grand Island Tuesday, October 10, 2017 Council Session City of Grand Island Tuesday, October 10, 2017 Council Session Item G-12 #2017-276 - Approving Change Order No. 1 for Lift Station No. 20 Upgrade and Force Main Rehabilitation & Lift Station No. 14 Abandonment;

More information

Capital Improvement Plan

Capital Improvement Plan Capital Improvement Plan 2019 2023 City of Kaukauna December 17, 2018 Prepared By: John W. Sundelius, P.E., M.P.A. Director of Public Works/City Engineer Projects and items that appear in the CIP are not

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air

More information

DES MOINES AIRPORT AUTHORITY BOARD SUMMARY OF REGULAR MEETING Des Moines International Airport Board Room May 13, 2014

DES MOINES AIRPORT AUTHORITY BOARD SUMMARY OF REGULAR MEETING Des Moines International Airport Board Room May 13, 2014 DES MOINES AIRPORT AUTHORITY BOARD SUMMARY OF REGULAR MEETING Des Moines International Airport Board Room May 13, 2014 Call to Order and Roll Call: Present: Erickson, Feldmann, Hansell, and Ward. Absent:

More information

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas Tax Increment Reinvestment Zone #1 City of Kaufman, Texas PRELIMINARY PROJECT AND FINANCING PLAN DECEMBER 2015 Foreword Table of Contents Introduction TIRZ Boundary Current Conditions & Ownership Proposed

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance

More information

Capital Improvements Plan. Adopted January 2018

Capital Improvements Plan. Adopted January 2018 Capital Improvements Plan Adopted January 2018 Capital Improvement Plan 2019-2023 Fiscal Years Adopted - March 5, 2018 Resolution #18-082 Mayor and City Council City Staff - CIP Preparation Tim Moerman,

More information

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM This chapter presents the proposed Capital Improvement Program (CIP) for the District based on the findings of this Master Plan. The Master Plan primarily

More information

Committee Report. Transportation Committee. Business Item No

Committee Report. Transportation Committee. Business Item No Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope

More information

MGM SPRINGFIELD OFF-SITE MITIGATION - 9/25/17 TO 10/6/17 WORK HOURS: 7:00 AM TO 3:30 PM

MGM SPRINGFIELD OFF-SITE MITIGATION - 9/25/17 TO 10/6/17 WORK HOURS: 7:00 AM TO 3:30 PM 1 A Dwight Street & I-291 Off Ramp 2 B Locust Street & Mill Street No work anticipated 3 B Main Street & East Columbus Avenue No work anticipated 4 C State Street & St. James Avenue No work anticipated

More information

City of Grand Island Tuesday, June 26, 2018 Council Session

City of Grand Island Tuesday, June 26, 2018 Council Session City of Grand Island Tuesday, June 26, 2018 Council Session Item G-21 #2018-188 - Approving Change Order No. 3 for Sanitary Sewer Collection System Rehabilitation Various Locations; Project No. 2017-S-2A

More information

Making Mobility Better, Together

Making Mobility Better, Together Making Mobility Better, Together Austin Transportation Department Gordon Derr, P.E., for Robert J. Spillar, P.E Director, Austin Transportation Department 1 AUSTIN TRANSPORTATION DEPARTMENT Our Mission

More information

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020 CFS SUMMARY Updated: 01/18/2011 CATEGORY / PROJECT NAME FY10-11 FY11-12 FY12-13 FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-20 LOCAL OPTION SALES TAX SUMMARY LOCAL OPTION SALES TAX 6,700,000 6,834,000

More information

ENGINEERING BEST PRACTICE BP2.2.1

ENGINEERING BEST PRACTICE BP2.2.1 1. SUBJECT DRIVEWAY REQUIREMENT POLICIES RESIDENTIAL 2. DEFINITIONS Driveway Paved area that provides access from a roadway to private property. Frontage Exterior lot line abutting a public right-of-way,

More information

City of Pittsburg Five Year Capital Improvements Plan. Introduction

City of Pittsburg Five Year Capital Improvements Plan. Introduction Introduction Hello, The attached documents represent the five year capital improvements plan for the City of Pittsburg. The City Commission adopted this plan through Resolution 1159 on September 9, 2014.

More information

SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018

SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018 SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018 The Wednesday, March 21, 2018, meeting of the St. Charles County Road Board was called to order at 4:30 p.m. in Room 542 of the Administration

More information

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS 5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS The Transportation Services Committee recommends the adoption of the recommendations contained in the following report

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Williamson County Projects

Williamson County Projects Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin

More information

Chapter 7: Corridor Visions

Chapter 7: Corridor Visions Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

Purpose: General Provisions:

Purpose: General Provisions: 10-19-1 Purpose: The purpose of off-street parking requirements is to promote traffic/pedestrian safety and efficiency and to minimize hard surfaced areas to reduce storm water run-off and visual impacts

More information

Information Meeting Transfer Station Options. September 30, 2014

Information Meeting Transfer Station Options. September 30, 2014 Information Meeting Transfer Station Options September 30, 2014 Outline of Presentation Why we are looking at changes Background on current Transfer Station Options that were considered need, function

More information

Revised Evaluation Scores. System Preservation

Revised Evaluation Scores. System Preservation Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights

More information

Dixie Transportation Planning Office

Dixie Transportation Planning Office A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina Public Meeting & Open House July 23, 2013 Project Roadway Limits From: FM 1957 To: FM 471 MAP OR PHOTO Counties Bexar & Medina 1 I. Project History II. III. IV. Project Overview Project Alternatives Response

More information

Town of Caledon. Transportation Development Charges. October 8, 2013

Town of Caledon. Transportation Development Charges. October 8, 2013 Town of Caledon Transportation Development Charges October 8, 2013 Introduction MRC was retained to Update Transportation Development Charges Rural Road Settlement Areas Town of Caledon Transportation

More information

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE TOWN OF PRESCOTT VALLEY, ARIZONA, AS FOLLOWS:

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE TOWN OF PRESCOTT VALLEY, ARIZONA, AS FOLLOWS: RESOLUTION NO. 1873 A RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE TOWN OF PRESCOTT VALLEY, A MUNICIPAL CORPORATION OF ARIZONA, APPROVING A PLAN, POLICY OR PROCEDURE IN ACCORDANCE WITH ARS 9-471(O)

More information

April 17, 2018 CITY OF BONNEY LAKE WATER PROJECTS. Geoff Dillard, P.E.

April 17, 2018 CITY OF BONNEY LAKE WATER PROJECTS. Geoff Dillard, P.E. April 17, 2018 CITY OF BONNEY LAKE WATER PROJECTS Geoff Dillard, P.E. HOW TO DECIDE? Council vested in making informed decisions which protect the City s assets and citizens Factors that influence decisions

More information

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017 The Board of Public Works and Safety of Plymouth, Indiana, met in Regular Session on December 27, 2017, at 6:00 p.m. in the meeting room of the Plymouth Fire Department, 111 N. Center St., Plymouth, IN.

More information

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP 414 Nicollet Mall Minneapolis, MN 55401 March 13, 2017 Daniel P. Wolf Executive Secretary Minnesota Public Utilities Commission 121 7 th Place East, Suite 350 St. Paul, MN 55101 Via Electronic Filing RE:

More information

DR SE WAY SOMERSIDE. C-N Neighborhood Commercial Site. R-LD - Development in accordance. Fully Landscaped Park/ Playground.

DR SE WAY SOMERSIDE. C-N Neighborhood Commercial Site. R-LD - Development in accordance. Fully Landscaped Park/ Playground. LAND & BUSINESS SUPPORT DEPT Southlands Phase 6A Plan 01231 City of Medicine Hat Land & Business Support Ph (03) 52-1 Fax (03) 502-055 land_properties@medicinehat.ca updated August 20, 201 SOMERSET BAY

More information

City of Des Moines. Operating Budget & Governmental CIP. January 22, 2018

City of Des Moines. Operating Budget & Governmental CIP. January 22, 2018 City of Des Moines Operating Budget & Governmental CIP January 22, 2018 Preliminary FY2019 Total Budget by Fund Operating Budget General & Road Use Tax Funds General Fund Budget General Fund Source & Use

More information

Capital Improvement Plan

Capital Improvement Plan 2017-22 Capital Improvement Plan Adopted: January 23, 2017(Planning Commission) February 6, 2017 (City Council) This document outlines planned capital improvement expenditures for the City of Springfield

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance

More information

Proposed Project I 35 Improvements from SH 195 to I 10

Proposed Project I 35 Improvements from SH 195 to I 10 I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four

More information

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by 2. Assessment of Current Conditions and Needs In order to prepare a plan to reach the vision desired by the residents of Texarkana, it is first necessary to ascertain the current situation. Since there

More information

APPENDIX C. Existing Utilities

APPENDIX C. Existing Utilities APPENDIX C Existing Utilities THIS PAGE INTENTIONALLY BLANK Existing Utilities Numerous utilities exist within the project area, including natural gas, sewer, water, electric, communications, and street

More information

Bettendorf City Council Joint Use Sewer Administrative Consent Order February 4, 2013

Bettendorf City Council Joint Use Sewer Administrative Consent Order February 4, 2013 Bettendorf City Council Joint Use Sewer Administrative Consent Order February 4, 2013 History/Timeline Interceptor Sewers/Locations (approximately 13 miles) Strategy for Financial Plan, Plan of Action

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

CITY OF STEVENS POINT AGENDA

CITY OF STEVENS POINT AGENDA CITY OF STEVENS POINT BOARD OF PUBLIC WORKS MEETING Monday, September 11, 2017 6:00 p.m. (or immediately following previously scheduled meeting) Lincoln Center 1519 Water Street Stevens Point, WI 54481

More information

FY Projects

FY Projects FY 2009-2010 Projects Project # 1 1037 Light Emitting Diode (LED) Signal Lamps Upgrading Program Replace Light Emitting Diode indications in traffic signal heads. $50,000 2 1103 City Government Channel

More information

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Guam Transportation Program Project Updates Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Agenda Road Construction Highlights Ongoing Construction Route 17 Rehabilitation and

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue NORTHWEST HIGHWAY SCURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY Northwest Highway (US 14) From Seegers Road to Western Avenue Northwest Highway SCurve Pedestrian/Bicycle Access Feasibility Study City

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

CAPITAL OUTLAY. Improvements other than buildings. Furniture & Office Equipment

CAPITAL OUTLAY. Improvements other than buildings. Furniture & Office Equipment CAPITAL OUTLAY Capital Outlay Item expenditures for fixed assets such as equipment, remodeling, minor building improvements, and vehicles may be funded from the operating budget or shortterm financing.

More information

CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO

CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO PREPARED FOR: SHEA HOMES 9380 STATION ST., SUITE 600 LONE TREE, CO 80124 PHONE: 303-791-8180 CONTACT: RYAN MCDERMED PREPARED BY:

More information

PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS

PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS To review the proposed amendments Approval of the amendments (5-3) Ogden City Planning is proposing several amendments and clarifications to the parking

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Recommended Transportation. Capital Improvement Program

Recommended Transportation. Capital Improvement Program Recommended 2018-2022 Transportation Capital Improvement Program 1 Overview 2017 Review 2018-2022 Considerations 2018-2022 Recommended CIP 2 Limited Resources are Directed to the Highest Priority Number

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects October 12, 2006 Town of Ashland Counties of Charles City Chesterfield Goochland Hanover Henrico New Kent Powhatan City of Richmond Richmond Regional Planning

More information

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0 TSPLOST 2018 Project Statements from Submitted Projects Project # 01, 01 Airport Capital Improvements Program (CIP) Matching Funds, will include the construction of numerous FAA and GDOT funded projects

More information

Public Works Department, Capital Improvement Program Project Tracking

Public Works Department, Capital Improvement Program Project Tracking Community Facilities Name CF-01 Eastshore State Park/Powell Street Bioswale Seeking grant funding. TT CF-02 South Bayfront Bridge and Horton Landing Park CF-03 / - 04 Transit Center Updated plans are being

More information