Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.
|
|
- Elijah Clarke
- 5 years ago
- Views:
Transcription
1 TECHNICAL MEMORANDUM TO: FROM: Molly McCartney MnDOT Project Manager Haifeng Xiao, PE Tom Sohrweide, PE, PTOE DATE: November 27, 2012 RE: Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No Introduction The Trunk Highway 13 () study corridor between the County State-Aid Highway 101 (CSAH 101) in the City of Savage and Nicollet Avenue in the City of Burnsville is a four-lane divided roadway with dedicated turn lanes at several at-grade intersections. It generally runs west-east and connects two major freeways respectively US 169 in the west and I-35W in the east in the study area. The study corridor is designated as a principal arterial in Metropolitan Council s functional classification system. The previous Corridor Study for the same corridor was completed in Since then, it has provided great guidance on the projects that were completed in recent years as well as the projects that are currently under construction or to be constructed in the coming years. Because the study was conducted over a decade ago, and economic forecast and growth trends have shifted from what was predicted in the study, a thorough review of the corridor and future needs is now necessary to ensure future investments to gain maximum return in the way of improved safety and mobility for all different travel modes that use the corridor. MnDOT, in cooperation with Scott County, Dakota County, City of Savage and City of Burnsville, has initiated the TH 13 Corridor Study Update (the Study). As one of the tasks for the Study, the existing and future No-Build traffic conditions were reviewed and evaluated. This memorandum summarizes the traffic analysis methodology and results. 2. Traffic Analysis Scope and Methodology It is noted that the /CSAH 101 Interchange Project was completed in summer 2012 and the /Quentin Avenue Signal Project was completed in fall The construction of the TH 13/CSAH 5 Interchange is scheduled to be completed in Therefore, it was determined that the base analysis year for the Study is 2014 and future analysis year is 2034 and the base No- Build conditions for the years include the completion of all those projects.
2 2 Page Trunk Highway 13 Corridor Study Update 11/27/2012 Technical Memo #2B: No Build Traffic Forecasts and Operations Analysis Traffic analysis under 2014 and 2014 No-Build conditions was conducted for all the intersections along between CSAH 101 and Nicollet Avenue. Figure 1a illustrates the study corridor and intersections and Figure 1b illustrates the study intersection geometry. These intersections are listed as follows (The intersections with asterisk * are side street stop controls, others are signal controls): /CSAH 101 Interchange Ramps Intersection */Dakota Avenue */Yosemite Avenue */Vernon Avenue /Quentin Avenue /Lynn Avenue */Chowen Avenue /Washburn Avenue /CSAH 5 South Ramps Intersection /CSAH 5 North Ramps Intersection CSAH 5/Williams Drive /Nicollet Avenue The 2009 A.M. and P.M. peak hour turning movements were available from MnDOT at all major signal intersections along the corridor. The 2012 peak hour turning movements were collected for the intersections between Quentin Avenue and Washburn Avenue in mid November after the completion of the /Quentin Avenue Signal Project and /CSAH 101 Interchange Project. The P.M. peak hour traffic counts show that the turning movement counts in and out of the study area are generally consistent between the two years while the through traffic volumes on haven t recovered to their 2009 levels prior to the construction of the two projects (9% lower for eastbound and 19% for westbound ). The Twin Cities Travel Demand Model (TCTD Model) was used to develop traffic forecasts for the study and the model base year is 2009, therefore the 2009 counts were used for the development of turning movement traffic forecasts. The TCTD model was refined to include more detailed roadway network and traffic analysis zones (TAZs) based on the Scott County Model (SC Model) and Dakota County Model (DC Model) to develop a subarea model (Subarea Model). The Subarea Model was used to develop daily traffic forecasts for major roadways in the study area under 2014 and 2034 No- Build conditions. The daily traffic growth factors were applied to 2009 turning movements to develop peak hour turning movement forecasts under 2014 and 2034 No-Build conditions. Synchro/SimTraffic software was used to perform traffic operations analysis. Major measures of effectiveness including delays were collected from the model runs. A Level of Service (LOS, A through F) was identified at approach, movement and intersection levels for all the intersections based on the delays and the thresholds defined in the Highway Capacity Manual (HCM). LOS A indicates the best traffic operation and LOS F indicates the worst. LOS D or better is generally considered acceptable.
3 3 Page Trunk Highway 13 Corridor Study Update 11/27/2012 Technical Memo #2B: No Build Traffic Forecasts and Operations Analysis 3. Existing Corridor Daily Traffic Conditions Review Generally speaking, as a four-lane divided arterial with turn lanes, the Average Annual Daily Traffic (AADT) capacity of is 40,000 at acceptable LOS D. However, the AADT in 2010 on the study corridor major segments varied from 36,000 on east of I-35W, 57,000 on the west of I-35W and 45,000 on the east of CSAH 101. Trucks make up nearly 10 percent of all the vehicles on the study corridor, much higher than the average of 4 percent in the Twin Cities. The corridor experiences serious congestion, safety and local traffic accessibility issues. As a matter of fact, it is one of the four corridors that carry over 40,000 AADT while provide local access with at-grade intersections in the Twin Cities Principal Highway System (shown on Figure 2). Most of the corridors carrying over 40,000 AADT are freeways. Besides study corridor, Figure 2 shows the other three corridors serving high level of daily traffic with at-grade intersections are TH 7 west of I-494 (40,000-46,000 in 2010), TH 65 north of US 10 (40,000-58,000 in 2010) and TH 36 east of US 61 (43,000-51,000 in 2010). It is noted that the at-grade intersections on TH 36 corridor east of US 61 will be replaced with an interchange and realigned frontage roads and 2034 No-Build Traffic Forecasts The development of traffic forecasts for this study was based largely on the use of the most recent TCTD Model released by the Metropolitan Council in 2011 and the recently updated SC Model and DC Model. The components of those models utilize the four step modeling process which includes trip generation, trip distribution, mode choice, and trip assignment. The refinement of the TCTD Model within the study area was based on the subdivided Traffic Analysis Zones (TAZs) and land development data from the SC Model and DC Model. After the full TCTD model run, the trip tables for the TAZs in the study area were split and then reassigned onto the refined network. The splits for the subdivided TAZs in the Dakota County Model were directly available from its county model and the splits for subdivided TAZs in the Scott County were calculated based on the socio-economic (SE) data splits in its county model. No changes were made to the TCTD model outside of the study area. This subarea model development methodology ensures that the overall trips for each TAZ in the TCTD model remain unchanged while the distributions are consistent with two county models within the study area. The use of the TCTD Model adheres to 2006 MnDOT Memo Revised Guidelines for Twin City Travel Demand Forecasts Prepared for the Metropolitan District. The 2014 and 2034 daily and peak hour traffic forecasts were developed using the following steps: 1. The base 2009 TCTD Model was refined to create a subarea model. The Subarea Model includes more subdivided TAZs and more detailed arterial street network within the study area. 2. The daily outputs from the base 2009 subarea model were calibrated and validated based on a screen line analysis in the study area. 3. The 2030 subarea model was created based on the 2030 TCTD model and it incorporated all the refinements in the validation process of the base 2009 model as well as all the improvement projects after 2009 including /CSAH 101 and /CSAH 5
4 4 Page Trunk Highway 13 Corridor Study Update 11/27/2012 Technical Memo #2B: No Build Traffic Forecasts and Operations Analysis interchanges in the study area. The 2030 socio-economic (SE) data for the TAZs in the study area were reviewed and the socio-economic data from the county models remained unchanged. 4. The 2014 and 2034 daily outputs for major roadways in the study area were calculated based on the 2030 model outputs assuming the same average annual growth rates from 2009 existing to The calculated 2014 and 2034 daily outputs were adjusted to develop daily forecasts based on the differences between 2009 actual counts and 2009 base model outputs. 6. The daily growth factors were applied to existing turning movement counts to develop peak hour turning movement forecasts for years 2014 and Figure 3a illustrates the subarea model TAZs and corresponding TAZs in the TCTD, SC and DC models. Figure 3b summarizes the 2009 and 2030 SE data for the TAZs in the study area in the TCTD model. The SE data in the TCTD model were used to estimate the trips at its TAZ level and the trips were reallocated to subdivided TAZs in the subarea model based on the county models. Figure 4 summarizes the results from the original TCTD Model and the Subarea Model for the primary roadways across the east-west and south-north screen lines in the study area. The figure shows the total traffic volumes crossing the screen lines in the model were generally in agreement with the actual counts except for the Minnesota River bridges due to the differences in the original TCTD Model. The calibration of the Minnesota River bridge screen requires more thorough investigation on the original TCTD model, thus was not conducted in this study. Nevertheless, the differences for arterials are less than 10% at screen line level. The calibration results show that the Subarea Model can be a good tool for the development of daily forecasts on the arterial corridors for this study. Figure 5 illustrates the existing and forecasted 2014 and 2034 AADTs. Figure 6 illustrates the existing peak hour turning movements from year Figure 7 illustrates the 2014 No-Build peak hour turning movements. Figure 8 illustrates the 2034 No-Build peak hour turning movements.
5 5 Page Trunk Highway 13 Corridor Study Update 11/27/2012 Technical Memo #2B: No Build Traffic Forecasts and Operations Analysis & 2034 No-Build Peak Hour Traffic Operations Analysis and Results A.M. and P.M. peak hour operations analysis was conducted using Synchro/SimTraffic for years 2014 and 2034 under No-Build conditions. Table 1 below summarizes the final analysis results at approach and intersection level. The analysis results at movement level are attached in the appendix in Figures 9a & 10b (2014 No-Build AM & PM) and Figures 10a & 10b (2034 No- Build AM & PM). The results show that all study intersections will operate at unacceptable LOS E or worse either at overall intersection level or some approach level except the /CSAH 101 ramp intersection and intersections on CSAH 5 during A.M. and P.M. peak hours under 2014 & 2034 No-Build conditions. The recently completed /CSAH 101 interchange and to-be completed /CSAH 5 interchange increase the capacity and improve the traffic operations at those locations. It is noted that the intersection at /Nicollet Avenue will operate at overall unacceptable LOS E or F during peak hours for both years. The figures in the appendix (Figures 9a&9b, 10a&10b) show that there are serious operational problems on side streets and left turns from at all those at-grade intersections along the study corridor..
6 6 Page Trunk Highway 13 Corridor Study Update 11/27/2012 Technical Memo #2B: No Build Traffic Forecasts and Operations Analysis Table 1 No-Build A.M. (P.M.) Peak Hour Traffic Operations Analysis Results Summary (SimTraffic) Intersection Approach Approach Intersection Approach Intersection LOS LOS LOS LOS AM PM AM PM AM PM AM PM TH13/CSAH 101 Ramp Intersection (Signal) NB B A B B WB C B B B C C B B /Dakota Ave EB A A A A WB A A A A A A B B NB F F F F SB F F F F /Yosemite Ave EB A A A A WB A A A B A A A A NB F F F F SB F F F F /Vernon Ave EB A A A A WB A A A A A A A A SB E F F F /Quentin Ave (Signal) EB A C B C WB A B B C B A C C NB E F F F /Lynn Ave (Signal) EB B B C B WB B C C C C B C E NB F F F F SB D F E E /Chowen Ave EB A B B B WB A B B B A A B C NB F F F F SB F F F F /Washburn Ave (Signal) EB B C C C WB B E B D B B C C NB E E E F SB E F E E CSAH 5/North Ramp (Signal) EB B A B B NB A B A B A B A B SB B B B B CSAH 5/South Ramp (Signal) EB B B C B NB A A A B A A A A SB B B B B CSAH 5/Williams Dr (Signal) EB C C C D WB C D C C C C C C NB C C D C SB B B B B /Nicollet Ave (Signal) EB D C F F WB E E E E F F F F NB E E F F SB E E E E Reference Appendix for detailed MOEs Figures 9a,9b Figures 10a,10b Cc: Mark Benson, SEH
7 12 10 HENNEPIN ANOKA 61 WASHINGTON 10 35E RAMSEY 61 Bloomington W 35E HENNEPIN CARVER SCOTT 35 35W DAKOTA Path: C:\Haifeng\SEH projects\ko\mndot\ Corridor Study Upates\traffic forecasts\figure1a Study Locations.mxd «151 Savage Legend SCOTT xxx Intersection ID «³ Signal Control Partial Signal Control Side Street Stop Control Study Corridor DAKOTA Burnsville : /CSAH 101 Interchange Ramps Intersection 154: /Dakota Avenue 155: /Yosemite Avenue 156: /Vernon Avenue 157: /Quentin Avenue : /Chowen Avenue 170: /Washburn Avenue 181: /CSAH 5 South Ramps Intersection 182: /CSAH 5 North Ramps Intersection 190: CSAH 5/Williams Drive 160: /Lynn Avenue 210: /Nicollet Avenue O Corridor Study Update Mn/DOT Traffic Study Intersections (2014&2034 No-Build) Figure 1a
8 Palmer Ave Princeton Ave Ottawa Ave Nicollet Ave Dakota Ave Yosemite Ave Bloomington Vernon Ave Chowen Ave S Frontage Rd Xenwood Ave S OP > = > = OP (70') Xenwood Ave S OP > = > = OP (70') (100') OP = 123rd St > Toledo Ave (200') (70') x3 M N ³ (300') (250') > = > = Lodge Cir (250') M N ³ (70') x3 W Travelers Tr (200') Nicollet Ave (330'x2) (330') (160') > P = > = > = E Travelers Tr (290') >O ³N (240') (290'x2) (110') Path: C:\Haifeng\SEH projects\ko\mndot\ Corridor Study Upates\traffic forecasts\figure1b intersection geometry.mxd 13th Ave Legend «124th St = > > «#1 «#2 ú (600') MMN á (600') Savage TH 1 Signal Control «Partial Signal Control ³ Side Street Stop Control Quentin Ave TH 101 (600') = 123rd St > MMP (280') 126th St (650') (600') (600') (200') Natchez Ave MP > = Burnsville 125th St > = MP 126th St (200') (380') 124th St Lynn Ave (xxx) Storage Length «#3 Washburn Ave (100') x3 (450') (450') MON > = > = Vincent Ave MP (60') x2 (270') (460') Study Corridor (280') x2 ³ ³ ³ N N >N ³ ³ (300') (300') M > P ³ (350') M M (350') >P >P ³ ³N ³ (350') (150') M P (250') ³ Williams Dr SE County Hwy 5 County Hwy 5 County Hwy 5 Apple Valley Note: #1:/CSAH 101 Interchange completed in summer 2012 #2:/Quentin Ave Signal completed in fall 2012 #3:/CSAH 5 Interchange to-be completed in 2014 O Corridor Study Update Mn/DOT Study Intersections Geometry (2014&2034 No-Build) Figure 1b
9 Legend 10?A 65 35W Existing Daily Traffic Over 100 K (2010) 94?A 610?A 47?A 65 «3 35E Existing Daily Traffic K (2010) W 694 Existing Daily Traffic K (2010) 494?A ?A 280?A 36 35E 10 «4?A Existing Daily Traffic Less Than 40 K (2010) Study Corridor Path: C:\Haifeng\SEH projects\ko\mndot\ Corridor Study Upates\traffic forecasts\figure2 ADTOver40k.mxd 212 «2?A ?A 101?A 13?A 100?A «1 35w 35w?A 13 35w?A 77?A 55?A 5 35E Note: Generally speaking, the daily traffic capacity of four-lane divided arterials with turn lanes is 40,000 at acceptable LOS. These arterial corridors include: 1) Study Corridor (AADT: k) 2) TH 7 West of I-494 (AADT: k) 3) TH 65 North of CR 10 (AADT: k) 4) TH 36 West of US 61 (AADT: 43-51k, already planned an interchange) and a few other locations in interchange areas. O Corridor Study Update Mn/DOT Arterials Carrying Over 40k AADT in Twin Cities Highway System (2010) Figure 2
10 Boone Ave Vernon Ave Eden Prairie Bloomington Minnesota Bluffs Dr HENNEPIN W 110th St Auto Club Rd Normandale Blvd France Ave S Overlook Dr S Xerxes Ave S W 110th St Overlook Dr 35w 606 (1691) W River Hills Dr Path: C:\Haifeng\SEH projects\ko\mndot\ Corridor Study Upates\traffic forecasts\figure3b subareamodel_studyarea_taz.mxd Stagecoach Rd 13th Ave Shakopee SCOTT Prior Lake Savage 1748 (1701)?A (1702) 128th St (1699) Connelly Pkwy 1747 (1700) Miles?A (1717) 126th St 1781 (1712) 1773 (1698) 1734 (1703) 1739 (1713) (1716) 1749 (1710) Legend 1075 Xenwood Ave S 1750 (1711) 1740 (1708) 1742 (1714) 138th St 1744 (1715)?A (1709) Quentin Ave 123rd St 125th St Lynn Ave GH 16 GH 16 W Hidden Valley Dr W 140th St 1764 (1719) 1765 (1720) 1732 (1697) 1738 (1707) (1704) Natchez Ave Scott County Model TAZ (subarea model TAZ) 1743 (1718) 1736 (1705) 1737 (1706) W 133rd St 1743 (1718) Glendale Rd Glenhurst Ave Chowen Ave 677 (1676) 687 (1635) 618 (1680) (1689) 662 (1674) 692 (1636) 698 (1639) Judicial Rd 708 (1642) 648 (1685) Burnsville 190?A 13 Williams Dr 681 (1634) 694 (1637) 717 (1644) (1646) (1645) DAKOTA 204 Upton Ave 655 (1688) Judicial Rd Dakota County Model TAZ (subarea model TAZ) 698 (1639) 647 (1684) 673 (1675) 680 (1633) 613 (1679) GH 5 Highland Dr 704 (1640) 696 (1638) 709 (1643) 705 (1641) 610 (1677) 644 (1681) 651 (1687) 666 (1690) 676 (1673) Burnsville Pkwy W 136th St W 702 (1652) 724 (1653) (1647)(1648) 645 (1682) (1650) 701 (1651) Burnhaven Dr 611 (1678) 646 (1683) 35w 649 (1686) 674 (1672) (1649) Aldrich Ave Aldrich Ave 640 (1696) 667 (1671) 35w Twin Cities Regional Model TAZ (1654) 685 (1655) (1656) 206 Nicollet Ave 628 (1693) ?A (1695) 13 (1694) 650 (1663) (1665) (1669) 665 (1670) 710 (1657) Portland Ave Burnsville Pkwy E Nicollet Blvd E 614 (1692) 130th St E Plymouth Ave 639 (1660) 657 (1666) th Ave 35E 658 (1667) Parkwood Dr Study Corridor Burnsville Pkwy 134th St E River Hills Dr W (1658) (1659) (1662)(1661) (1664) 659 (1668) Apple Valley Palomino Dr 140th St W O Corridor Study Update Mn/DOT TAZs for the Twin Cities Regional Model County Models and Subarea Model Figure 3a
11 Corridor Study Update SEH Inc Figure 3b 2009 and 2030 SE data for the TAZs in the study area in the Twin Cities Travel Demand Model (TCTD Model) County TAZ 2009 SE Pop* HH Ret Non R Pop HH Ret Non R Changes Pop HH Ret Non R 190 6,642 2, ,166 3, ,061 2,524 38% % 52 23% % 191 3,466 1, ,520 1, % 19 2% 12 29% 10 18% 199 2,877 1, ,824 1, % % 68 19% % Dakota 202 4,862 2, ,661 4,926 2, , % 32 1% % % County 203 1, , % 9 1% 20 19% % % 96 30% 78 18% % ,085 1, ,600 3, % 0 0% % 1, % , , % 2 1% 39 24% % County subtotal 20,762 8,599 3,187 8,346 24,594 10,108 4,117 11,665 3,832 18% 1,509 18% % 3,319 40% % 0 0% 7 0% % ,093 1, ,744 4,650 1, , % % % 1 0% Scott County , ,044 5,144 2, ,105 2, % 1, % % 61 3% ,733 1, ,941 2, ,208 59% % % 5 3% ,538 1, ,356 2, ,818 40% % 8 5% 8 8% County subtotal 14,686 5,020 1,286 4,286 22,091 8,286 2,141 4,483 7,405 50% 3,266 65% % 197 5% Study area 35,448 13,619 4,473 12,632 46,685 18,394 6,258 16,148 11,237 32% 4,775 35% 1,785 40% 3,516 28% Pop: Population; HH: Household; Ret: Retail Employment Jobs; Non R: Non retail Employment Jobs; 2030 SE Note: The SE data in the TCTD Model were used to estimate the total trips at its TAZ level; The trips for each TAZ were then reallocated to subdivided TAZs based on the data from the Count Models.
12 Corridor Study Update SEH Inc Figure Base Subarea Model Screen Line Checks Summary 2009 Base Subarea Model East West Roads Screen Line Check Screenline Location Major East West Cross Roads Screen Line Cliff Rd Williams Dr Highland Dr Bursville Pkwy McAndrews Rd CSAH 42 Total Count 10,900 35,000 17,400 16,500 52, ,800 TCTDModel 10,955 42,795 8,630 10,564 65, ,828 East of Difference (%) 1% 22% 50% 36% 27% 5% I 35W Sub area Model 12,962 41,121 17,097 15,018 54, ,873 Difference (%) 19% 17% 2% 9% 5% 7% Count 44,000 14,400 3,400 9,000 36, ,800 TCTDModel 39,525 18,879 11,643 49, ,697 West of Difference (%) 10% 31% 29% 38% 12% CSAH 5 Sub area Model 43,900 10,933 5,154 12,874 33, ,975 Difference (%) 0% 24% 52% 43% 8% 1% Count 50,000 6,500 22,300 78,800 TCTDModel 45,337 10,368 17,634 73,339 West of Difference (%) 9% 60% 21% 7% /CSAH 101 Sub area Model 54,580 6,103 20,964 81,647 Difference (%) 9% 6% 6% 4% 2009 Base Subarea Model North South Roads Screen Line Check Screenline Location Major North South Cross Roads Screen Line Nicollet Ave I 35W Bursville Pkwy CSAH 5 Lynn Ave Quentin Ave Vernon Ave Dakota Ave CR 21 US 169 Total Count 99,000 87, ,000 TCTDModel 123, , ,813 Mn River Bridge Difference (%) 25% 18% 22% Sub area Model 123,508 99, ,386 Difference (%) 25% 15% 20% Count 15,500 83,000 19,900 4,600 2,950 22,800 24,400 43, ,150 TCTDModel 17, ,569 25,940 11,419 14,142 24,926 51, ,826 South of Difference (%) 11% 24% 30% 148% 38% 2% 20% 15% Sub area Model ,475 Difference (%) 13% 15% 17% 83% 7% 28% 2% 3% 8% Count 17,200 76,000 13,100 7,300 4,100 9,400 18, ,500 TCTDModel 11,897 89,064 8,371 12,339 10,800 16, ,733 South of Difference (%) 31% 17% 36% 69% 15% 12% 2% Williams Dr Sub area Model 8,268 87,814 14,339 8,395 4,168 8,910 16, ,246 Difference (%) 52% 16% 9% 15% 2% 5% 11% 2%
13 4,300 (4,700)- -6,300- Vernon Ave Upton Ave 15,600 (17,000)- -20,300- Nicollet Ave HENNEPIN Auto Club Rd Bloomington 5,000 (6,100)- -10,700-10,900 (11,400)- -14,400- Path: C:\Haifeng\SEH projects\ko\mndot\ Corridor Study Upates\traffic forecasts\figure5 ADT Forecasts.mxd 50,000 (52,400)- -62, th St SCOTT Savage 6,500 (7,700)- -11,700-22,800 (24,900)- -30,600-18,200 (19,200)- -23, th St Connelly Pkwy 11,500 (12,600)- -17,600-9,400 (9,800)- -11,400- Xenwood Ave S 12,600 (14,400)- -22, th St Legend Miles Quentin Ave 45,000 (47,200)- -56, th St 11,200 (13,800)- -23,000- W Hidden Valley Dr 9,900 (11,000)- -12,500-5,400 (7,900)- -11,700- Lynn Ave Glendale Rd 400 (1,400)- -3,300-11,500 (12,100)- -19,500- Inglewood Ave S xx,xxx Existing Daily Traffic Counts (xx,xxx) 2014 NoBuild Daily Traffic Forecasts -xx,xxx NoBuild Daily Traffic Forecasts Chowen Ave 47,000 (50,900)- -59,400- Burnsville Judicial Rd DAKOTA 2,300 (3,000)- -6,300-10,300 (10,900)- -18,300- Williams Dr 5,000 (7,000)- -13,800-14,400 (14,800)- -19,300- Highland Dr Study Corridor 13,100 (13,400)- -14,500-57,000 (59,700)- -70,600-13,500 (15,000)- -15, th St W Aldrich Ave 36,000 (37,600)- -42,700-17,400 (18,900)- -21,400-3,300 (4,300)- -7,200-30,000 (31,200)- -35, th St E 134th St E O Corridor Study Update Mn/DOT Existing and Forecasted 2014 & 2034 No-Build Daily Traffic Figure 5
14 4,300 Bloomington 10,900 53(318) 60(271) 21(138) 383(138) 1356(1271) 92(265) Nicollet Ave 162(51) 1123(1497) 80(213) à á 499(272) 435(92) 96(161) 5,000 30,000 Path: C:\Haifeng\SEH projects\ko\mndot\ Corridor Study Upates\traffic forecasts\figure6tms_2009_11by17.mxd 50,000 Savage CSAH (1932) 360(1003) 6,500 22,800 à 18,200 á à 1298(566) 1485(1646) 144(373) á 138(142) 11,500 9, (2287) 20(35) á 12,600 à à Quentin Ave 10(8) 45, (1961) 22(155) TH 101 á 168(24) 11,200 9,900 2(3) 5,400 1(12) 5(8) 14(4) 1640(2079) 39(155) 11,500 Lynn Ave 9(17) 1578(2021) 39(177) à á 229(127) 3(2) 204(78) 47,000 Burnsville Legend xx(xxx) Intersection AM(PM) Peak Hour Turning Movements Signal Control Study Corridor Miles xx,xxx Roadway Two-way Daily Traffic Volume ³ Side Street Stop Control 10,300 35(127) 12(38) 30(67) 38(70) 1891(1899) 47(84) Washburn Ave 14,400 3,400 19,900 13,100 à á 50(33) 64(29) 1508(2108) 46(136) 28(31) 37(63) 57,000 13,500 89(416) 198(547) 36, (383) 200(42) 138(292) 17,400 33(28) CSAH 5 3,300 15,600 13(10) 16(20) 4(13) à á 203(270) 572(371) Williams Dr 7(12) 33(67) 53(243) 33(21) 26(165) 1845(1820) 80(188) CSAH 5 à á 292(189) 55(110) 1283(2017) 187(560) 262(116) 560(459) Apple Valley O Corridor Study Update Mn/DOT Intersection Peak Hour Turning Movements (2009 Counts) Figure 6
15 4,700 0(0) 5(20) 1750(2205) Dakota Ave 20(5) 1730(2150) 35(20) à á 0(0) 20(35) 0(0) 10(15) 1755(2245) 10(5) Yosemite Ave 15(10) 1770(2155) 30(10) à á 5(10) 0(0) 10(30) 5(5) Bloomington 5(5) 5(5) 1770(2285) à á Vernon Ave 5(5) 1810(2170) 35(60) 0(10) 10(15) 60(30) 2045(2080) 10(50) Chowen Ave 1605(2365) 30(65) à á 50(10) 0(0) 60(60) 11,400 55(335) 65(280) 25(145) 385(145) 1390(1290) 95(280) Nicollet Ave 180(55) 1150(1540) 90(220) à á 510(285) 470(95) 110(165) 6,100 31,200 Path: C:\Haifeng\SEH projects\ko\mndot\ Corridor Study Upates\traffic forecasts\figure7tms_2014_11by17.mxd 52,400 Savage CSAH (2070) 390(1075) 7,700 24,900 à 19,200 á «à 1390(610) 1590(1765) 160(405) á 150(155) 12,600 9, (2110) 60(180) á 14,400 à à Quentin Ave 130(75) 47, (2100) 45(230) TH 101 á 215(90) 13,800 11,000 5(10) 7,900 5(15) 20(10) 1875(2050) 35(140) 12,100 Lynn Ave 15(20) 1615(2250) 60(165) à á 110(70) 5(5) 230(100) 50,900 Burnsville Legend xx(xxx) Intersection AM(PM) Peak Hour Turning Movements Signal Control Study Corridor Miles xx,xxx Roadway Two-way Daily Traffic Volume «Partial Signal Control ³ Side Street Stop Control 10,900 40(130) 15(40) 35(70) 40(75) 2025(1990) 50(90) Washburn Ave 7,000 14,800 3,900 13,400 à á 55(35) 70(30) 1550(2275) 50(140) 30(35) 40(70) 59,700 15, (440) 190(530) 37, (410) 205(45) 140(290) 18,900 40(30) CSAH 5 4,300 17,000 15(15) 20(25) 5(15) à á 205(270) 555(345) Williams Dr 10(15) Ramp 240(800) à 50(30) 90(200) 50(95) á 35(200) 100(485) 70(135) 175(515) CSAH 5 CSAH 5 á Ramp Apple Valley 620(345) à 310(205) 510(425) 360(170) O Corridor Study Update Mn/DOT Intersection Peak Hour Turning Movements (2014 NoBuild) Figure 7
16 6,300 0(0) 5(20) 2065(2590) Dakota Ave 20(5) 2035(2540) 40(20) à á 0(0) 20(40) 0(0) 10(15) 2070(2635) 10(5) Yosemite Ave 15(10) 2080(2545) 30(10) à á 5(10) 0(0) 10(30) 5(5) Bloomington 5(5) 5(5) 2085(2675) à á Vernon Ave 5(5) 2120(2560) 35(60) 0(10) 10(15) 60(35) 2400(2430) 10(50) Chowen Ave 1870(2775) 30(65) à á 50(10) 0(0) 60(60) 14,400 60(340) 75(285) 30(145) 405(145) 1480(1715) 100(285) Nicollet Ave 190(55) 1440(1750) 95(225) à á 535(325) 520(105) 120(190) 10,700 35,400 Path: C:\Haifeng\SEH projects\ko\mndot\ Corridor Study Upates\traffic forecasts\figure8tms_2034_11by17.mxd 62,000 Savage CSAH (2410) 460(1280) 11,700 á 30,600 à 23,100 «à 1670(730) 1850(2050) 205(510) á 200(200) 17,600 11, (2490) 65(190) á 22,900 à à Quentin Ave 135(80) 56, (2485) 45(245) TH 101 á 225(95) 23,000 12,500 5(10) 11,700 5(20) 25(10) 2170(2375) 55(200) 19,500 Lynn Ave 15(20) 1865(2620) 75(205) à á 165(100) 5(5) 290(130) 59,400 Burnsville Legend xx(xxx) Intersection AM(PM) Peak Hour Turning Movements Signal Control Study Corridor Miles xx,xxx Roadway Two-way Daily Traffic Volume «Partial Signal Control ³ Side Street Stop Control 18,300 40(140) 15(40) 35(75) 45(80) 2375(2335) 50(90) Washburn Ave 13,800 19,300 5,400 14,500 à á 55(40) 70(35) 1815(2670) 50(145) 30(35) 40(70) 70,600 15, (560) 215(520) 42, (510) 235(55) 140(295) 21,400 45(40) CSAH 5 7,200 20,300 20(15) 25(30) 5(15) à á 225(295) 580(410) Williams Dr 10(15) Ramp 295(935) 60(410) à 110(60) 95(200) 105(185) 180(885) á 135(270) 175(460) CSAH 5 CSAH 5 á Ramp Apple Valley 835(485) à 300(220) 435(450) 645(325) O Corridor Study Update Mn/DOT Intersection Peak Hour Turning Movements (2034 NoBuild) Figure 8
17 Corridor Study Update SEH Inc Figure 9a Peak Hour Traffic Operations Analysis Results Summary (2014 No-Build AM Peak Hour) Intersection Approach Demand Volumes Delay (s/veh) LOS By Approach L T R Total L LOS T LOS R LOS Delay (S/Veh) LOS LOS By Intersection Delay (S/Veh) LOS TH13/CSAH 101 Ramp Intersection (Signal) NB , B 0.0 A 0.0 A 12.0 B WB C 0.0 A 0.0 A 29.7 C 14.0 B /Dakota Ave EB , F 5 A 4 A 5 A WB , F 2 A 2 A 3 A 7 A NB F 0 A 57 F 239 F SB F 0 A 47 E 225 F /Yosemite Ave EB , D 2 A 4 A 3 A WB , E 1 A 0 A 2 A 4 A NB F 0 A 27 D 162 F SB F 0 A 52 F 238 F /Vernon Ave EB , E 1 A 0 A 1 A WB ,815 0 A 2 A 2 A 2 A 2 A SB F 0 A 28 D 44 E /Quentin Ave (Signal) EB ,775 0 A 9 A 4 A 9 A WB , E 7 A 0 A 9 A 13 B NB E 0 A 56 E 63 E /Lynn Ave (Signal) EB , F 16 B 4 A 17 B WB , F 17 B 7 A 20 B 25 C NB F 93 F 78 E 83 F SB D 66 E 21 C 49 D /Chowen Ave EB , E 8 A 9 A 9 A WB , F 4 A 4 A 6 A 12 B NB F 0 A 143 F 524 F SB F 0 A 39 E 146 F /Washburn Ave (Signal) EB , E 15 B 7 A 16 B WB , F 10 A 5 A 11 B 17 B NB F 103 F 33 C 73 E SB E 82 F 37 D 62 E CSAH 5/North Ramp (Signal) EB C 0 A 2 A 11 B NB A 1 A 0 A 5 A 8 A SB A 19 B 8 A 15 B CSAH 5/South Ramp (Signal) EB D 0 A 3 A 15 B NB ,130 0 A 3 A 5 A 4 A 6 A SB D 6 A 0 A 11 B CSAH 5/Williams Dr (Signal) EB C 18 B 3 A 25 C WB E 40 D 12 B 32 C 25 C NB D 23 C 19 B 27 C SB D 23 C 2 A 18 B /Nicollet Ave (Signal) EB , F 35 C 7 A 47 D WB , F 78 E 34 C 75 E 63 E NB , E 74 E 51 D 74 E SB F 92 F 30 C 67 E
18 Corridor Study Update SEH Inc Figure 9b Peak Hour Traffic Operations Analysis Results Summary (2014 No-Build PM Peak Hour) Intersection Approach Demand Volumes Delay (s/veh) LOS By Approach L T R Total L LOS T LOS R LOS Delay (S/Veh) LOS LOS By Intersection Delay (S/Veh) LOS TH13/CSAH 101 Ramp Intersection (Signal) NB A 0.0 A 0.0 A 8.0 A WB B 0.0 A 0.0 A 17.5 B 11.5 B /Dakota Ave EB , F 6 A 7 A 7 A WB , F 3 A 3 A 7 A 10 A NB F 0 A 999 F 999 F SB F 0 A 999 F 999 F /Yosemite Ave EB , D 3 A 4 A 4 A WB , F 1 A 0 A 2 A 12 B NB F 0 A 986 F 987 F SB F 0 A 687 F 785 F /Vernon Ave EB , F 2 A 0 A 2 A WB ,175 0 A 3 A 2 A 3 A 4 A SB F 0 A 40 E 439 F /Quentin Ave (Signal) EB ,290 0 A 31 C 16 B 30 C WB , F 10 A 0 A 18 B 26 C NB F 0 A 61 E 88 F /Lynn Ave (Signal) EB , E 14 B 13 B 14 B WB , F 19 B 15 B 24 C 22 C NB F 80 E 62 E 84 F SB F 74 E 91 F 93 F /Chowen Ave EB , F 9 A 11 B 10 B WB , F 8 A 6 A 11 B 15 B NB F 0 A 76 F 88 F SB F 127 F 110 F 171 F /Washburn Ave (Signal) EB , F 28 C 14 B 30 C WB , F 44 D 38 D 64 E 50 D NB F 114 F 39 D 79 E SB F 114 F 67 E 85 F CSAH 5/North Ramp (Signal) EB D 0 A 2 A 9 A NB B 2 A 0 A 11 B 11 B SB A 14 B 9 A 13 B CSAH 5/South Ramp (Signal) EB D 0 A 12 B 15 B NB A 6 A 5 A 5 A 11 B SB , D 7 A 0 A 14 B CSAH 5/Williams Dr (Signal) EB C 22 C 8 A 22 C WB D 37 D 17 B 39 D 22 C NB D 19 B 8 A 29 C SB , D 23 C 6 A 15 B /Nicollet Ave (Signal) EB , F 34 C 5 A 34 C WB , F 54 D 29 C 66 E 56 E NB E 69 E 29 C 59 E SB E 85 F 66 E 75 E
19 Corridor Study Update SEH Inc Figure 10a Peak Hour Traffic Operations Analysis Results Summary (2034 No-Build AM Peak Hour) Intersection Approach Demand Volumes Delay (s/veh) LOS By Approach L T R Total L LOS T LOS R LOS Delay (S/Veh) LOS LOS By Intersection Delay (S/Veh) LOS TH13/CSAH 101 Ramp Intersection (Signal) NB , B 0.0 A 0.0 A 11.6 B WB C 0.0 A 0.0 A 28.2 C 13.8 B /Dakota Ave EB , F 6 A 5 A 6 A WB , F 3 A 3 A 6 A 10 B NB F 0 A 999 F 999 F SB F 0 A 660 F 660 F /Yosemite Ave EB , F 3 A 4 A 3 A WB , F 1 A 0 A 3 A 7 A NB F 0 A 125 F 458 F SB F 0 A 416 F 590 F /Vernon Ave EB , F 2 A 0 A 2 A WB ,125 0 A 3 A 4 A 3 A 3 A SB F 0 A 64 F 83 F /Quentin Ave (Signal) EB ,090 0 A 14 B 5 A 14 B WB , F 10 A 0 A 12 B 27 C NB F 0 A 234 F 183 F /Lynn Ave (Signal) EB , F 24 C 10 B 24 C WB , F 29 C 13 B 34 C 34 C NB F 155 F 77 E 84 F SB E 102 F 53 D 63 E /Chowen Ave EB , F 13 B 16 C 14 B WB , F 5 A 6 A 7 A 13 B NB F 0 A 207 F 405 F SB F 0 A 56 F 110 F /Washburn Ave (Signal) EB , F 29 C 20 B 30 C WB , F 11 B 7 A 14 B 26 C NB F 114 F 48 D 78 E SB E 81 F 63 E 72 E CSAH 5/North Ramp (Signal) EB C 0 A 2 A 16 B NB A 1 A 0 A 4 A 8 A SB A 19 B 10 B 16 B CSAH 5/South Ramp (Signal) EB D 0 A 3 A 23 C NB ,270 0 A 3 A 5 A 4 A 7 A SB D 5 A 0 A 12 B CSAH 5/Williams Dr (Signal) EB , D 18 B 3 A 28 C WB B 28 C 23 C 25 C 30 C NB E 26 C 31 C 37 D SB D 26 C 3 A 20 B /Nicollet Ave (Signal) EB , F 54 D 19 B 93 F WB , F 452 F 405 F 447 F 243 F NB , F 241 F 180 F 237 F SB F 77 E 34 C 63 E
20 Corridor Study Update SEH Inc Figure 10b Peak Hour Traffic Operations Analysis Results Summary (2034 No-Build PM Peak Hour) Intersection Approach Demand Volumes Delay (s/veh) LOS By Approach L T R Total L LOS T LOS R LOS Delay (S/Veh) LOS LOS By Intersection Delay (S/Veh) LOS TH13/CSAH 101 Ramp Intersection (Signal) NB B 0.0 A 0.0 A 13.3 B WB C 0.0 A 0.0 A 22.6 C 14.7 B /Dakota Ave EB , F 6 A 4 A 6 A WB , F 3 A 1 A 7 A 12 B NB F 0 A 927 F 935 F SB F 0 A 408 F 526 F /Yosemite Ave EB , F 3 A 3 A 3 A WB , F 1 A 0 A 2 A 5 A NB F 0 A 66 F 303 F SB F 0 A 383 F 409 F /Vernon Ave EB , C 2 A 0 A 2 A WB ,565 0 A 3 A 3 A 3 A 3 A SB F 0 A 26 D 71 F /Quentin Ave (Signal) EB ,680 0 A 24 C 9 A 23 C WB , E 7 A 0 A 8 A 33 C NB F 0 A 119 F 210 F /Lynn Ave (Signal) EB , F 17 B 11 B 18 B WB , F 17 B 7 A 20 B 57 E NB F 513 F 418 F 433 F SB F 78 E 28 C 70 E /Chowen Ave EB , F 12 B 14 B 13 B WB , F 5 A 5 A 9 A 16 C NB F 0 A 137 F 413 F SB F 0 A 72 F 230 F /Washburn Ave (Signal) EB , F 21 C 13 B 22 C WB , F 11 B 6 A 15 B 22 C NB F 190 F 59 E 119 F SB F 97 F 47 D 78 E CSAH 5/North Ramp (Signal) EB D 0 A 2 A 17 B NB C 4 A 0 A 14 B 14 B SB ,085 0 A 13 B 11 B 12 B CSAH 5/South Ramp (Signal) EB D 0 A 3 A 18 B NB A 4 A 5 A 4 A 7 A SB , D 6 A 0 A 13 B CSAH 5/Williams Dr (Signal) EB D 24 C 4 A 36 D WB D 37 D 15 B 27 C 29 C NB D 23 C 13 B 28 C SB , D 21 C 2 A 15 B /Nicollet Ave (Signal) EB , F 57 E 21 C 93 F WB , F 277 F 224 F 274 F 163 F NB F 139 F 90 F 139 F SB F 81 F 38 D 67 E
Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.
Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology
More informationInterstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output
NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical
More informationST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE:
ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: TRAVEL DEMAND FORECASTS May 12, 2005 Prepared for Minnesota
More informationIntroduction. Assumptions. Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer
SRF No. 10482 To: From: Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer Date: May 16, 2018 Subject: City of Brooklyn Park Year 2040 Forecasts
More informationAlpine Highway to North County Boulevard Connector Study
Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1
More informationMEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:
MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed
More informationINTERSECTION CONTROL EVALUATION
INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska
More informationThe major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:
3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown
More informationSRF No MEMORANDUM. Project Steering Committee. Steve Wilson, Principal John Hagen, Senior Associate SRF Consulting Group, Inc.
APPENDIX G SRF No. 009 6658 MEMORANDUM TO: Project Steering Committee FROM: Steve Wilson, Principal John Hagen, Senior Associate SRF Consulting Group, Inc. DATE: August 17, 2009 SUBJECT: ROCHESTER INTERNATIONAL
More informationEXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.
EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and
More informationTraffic Engineering Study
Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested
More informationOpen House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition
Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212
More informationBennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017
Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,
More informationEscondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT
Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite
More informationMILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND
MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,
More informationTraffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT
Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main
More informationLacey Gateway Residential Phase 1
Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West
More informationAPPENDIX E. Traffic Analysis Report
APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska
More informationProject Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013
Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013 TASK #3 PROCESS TRUCK GPS DATA AND DERIVE PERFORMANCE
More informationInterstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results
NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results
More information2016 Congestion Report
2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles
More informationAPPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS
APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix
More informationMetropolitan Freeway System 2013 Congestion Report
Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...
More informationTo: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015
Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry
More informationAppendix 3 Traffic Technical Memorandum
Appendix 3 Traffic Technical Memorandum DRAFT TECHNICAL MEMORANDUM Southport Connector Project Traffic Development Comparison of Future Year Model Results Date: September 10, 2015 Project #:11730.030 To:
More informationV. DEVELOPMENT OF CONCEPTS
Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion
More informationAppendix G Traffic Study Methodology
REVISED DRAFT ENVIRONMENTAL IMPACT REPORT/ Appendix G Traffic Forecasting Model Methodology In addition to the existing/baseline condition (year 2005), a level of service (LOS) analysis was conducted for
More informationDRAFT Travel Demand Methodology & Forecast
DRAFT Travel Demand Methodology & Forecast February 2016 Revision 4 Southwest LRT Project Technical Report This page intentionally blank. Contents 1. Introduction... 1 2. Methodology... 3 2.1. Model Overview...
More informationRTID Travel Demand Modeling: Assumptions and Method of Analysis
RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel
More informationCEDAR AVENUE TRANSITWAY Implementation Plan Update
CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,
More informationTransitways. Chapter 4
4 Transitways Figure 4-1: Hiawatha LRT Train at the Lake Street/Midtown Station The 23 Transportation Policy Plan identifies a network of transitway corridors to be implemented by 23. Transitways recommended
More informationTRAFFIC AND TRANSPORTATION TECHNICAL REPORT
TRAFFIC AND TRANSPORTATION TECHNICAL REPORT for ENVIRONMENTAL ASSESSMENT Route 29 Bypass State Project No.: 0029-002-844, P101; UPC 102419 Federal Project Number: TBD From: Route 250 Bypass To: U.S. Route
More informationTIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:
TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive
More informationLAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS
LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...
More informationMountain Area Transportation Study Model Methodology and Assumptions Final
Model Methodology and Assumptions Final February 19, 2017 Submitted to: 17J17-1768.17 Prepared by Iteris, Inc. Innovating Through Informatics TABLE OF CONTENTS 1.0 OVERVIEW... 1 1.1 Project Objective and
More informationTraffic Impact Statement (TIS)
Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205
More informationAVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE
AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No
More informationMPO Staff Report Technical Advisory Committee: July 12, 2017
MPO Staff Report Technical Advisory Committee: July 12, 2017 RECOMMENDED ACTION: 2 nd TAC Meeting with Kimley-Horn/WSB in Updating the Street/Highway Element of 2045 Metropolitan Transportation Plan. Matter
More informationSignal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St.
I. Overview Consultant A was retained by the Ohio Department of Transportation to conduct traffic signal timing analyses on approximately one mile of roadway on between the Main Street and the Fourth Street
More informationPROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis
TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District
More informationBERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS
BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic
More information3.0 Future (2040) Transportation
30 Future () Transportation Conditions Future traffic and structural bridge conditions within the I-84 Hartford Project Area have been analyzed to identify the needs and deficiencies which the Project
More informationAECOM 30 Leek Cres., 4 th Floor Richmond Hill, ON L4B 4N4 Canada
\ AECOM 30 Leek Cres., 4 th Floor Richmond Hill, ON L4B 4N4 Canada www.aecom.com 905-882-4401 tel 905-882-4399 fax Memorandum To CC Subject Peter Dorton (MTO), Eric Terro (MTO) Olga Garces (MTO) Page 1
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationTransportation & Traffic Engineering
Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family
More informationTRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION
TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED
More informationRecommended Transportation. Capital Improvement Program
Recommended 2018-2022 Transportation Capital Improvement Program 1 Overview 2017 Review 2018-2022 Considerations 2018-2022 Recommended CIP 2 Limited Resources are Directed to the Highest Priority Number
More informationAPPENDIX B Traffic Analysis
APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,
More informationMetropolitan Freeway System 2007 Congestion Report
Metropolitan Freeway System 2007 Congestion Report Minnesota Department of Transportation Office of Traffic, Safety and Operations Freeway Operations Section Regional Transportation Management Center March
More informationProposed Commercial Service at Paine Field Traffic Impact Analysis
Gibson Traffic Consultants 80 Wetmore Avenue Suite 0 Everett, WA 980.9.86 Prepared for: Federal Aviation Administration July 0 GTC #09-07 TABLE OF CONTENTS. EXECUTIVE SUMMARY.... PROJECT IDENTIFICATION....
More informationProject Advisory Committee
Meredith US 3/NH 25 Improvements Transportation Planning Study Project Advisory Committee March 18, 2008 Meredith US 3/NH 25 Improvements Transportation Planning Study Meeting Agenda Welcome Traffic Model
More informationTask Force Meeting January 15, 2009
Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized
More informationParks and Transportation System Development Charge Methodology
City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update
More informationNEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis
Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle
More informationTRAVEL DEMAND FORECASTS
Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components
More informationCurrent Corridor Characteristics. MN 62 Corridor Performance
Corridor Context The corridor runs 12 miles between I-494 and MN 55 south of Minneapolis. The corridor serves as an important East-West connection for the Metro area. A portion of the corridor has been
More informationDulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17, 2013 1 On March 19, 2013 the Fairfax County Board of Supervisors asked FCDOT staff
More information2018 Corridors of Commerce Final Scoring
2018 Corridors of Commerce Final Scoring District Highway Description Cost Return on Investment Economic Impact Freight Efficiency Safety Improvem ents Regional Connectio ns Policy Objectives Community
More informationBUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM
BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority
More informationCounty State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study
County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101
More informationAppendix B- Memorandums
Appendix - Memorandums MEMORADUM To Tom Percival, FDOT Joe erenis, OOEA Mark allahan, H2MHill Gary Skaff, PS&J From Luis Diaz, HT Josiah anet, HT c Subject Impacts to Mount Dora Traffic Due to Wekiva Parkway
More informationCounty State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study
County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101
More informationTraffic Impact Analysis Update
Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS
More informationAppendix H: Construction Impacts H-2 Transportation
Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction
More informationF:\PROJ\ \dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/ :22:17 PM, saamhu, Acrobat PDFWriter
F:\PROJ\55211014\dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/2002 03:22:17 PM, saamhu, Acrobat PDFWriter MERRIFIELD RIVER CROSSING METHOD OF CHANGE FROM ID# ISSUES MEASUREMENT UNITS VALUE BASE CONDITIONS
More informationFinal Traffic Technical Memorandum
SR 54 Project Development and Environment (PD&E) Study From CR 577 (Curley Road) to CR 579/CR 54 (Morris Bridge Road) Final Traffic Technical Memorandum WPI Segment No: 416561-1 Pasco County Prepared for
More informationShirk Road at State Route 198 Interchange Analysis Tulare County, California
Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project
More informationCity of Pacific Grove
Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency
More informationLane Closure Manual. Route Report Index: US12-A US12-03 (WB) US12-01 (EB WB) US12-02 (EB)
Route Report Index: US1-A?A@ 15 %&'( 94?A@ 5?A@?A@ 95 +, 16 9?A@?A@ 47 %&'( 95 5?A@ 65 +, 8 +, 1 5 %&'( 94 %&'( 69 4 %&'( 5 W %&'( 5 E +, 61?A@ 95 %&'( %&'( 69 4 9 4 %&'( 94 %&'( 49 4 NOTE: Lane closures
More information3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project
Chapter 3 Transportation Environment and Consequences 3. Introduction This chapter summarizes the characteristics of the transportation system in the East Link Project vicinity and discusses potential
More informationVanier Parkway and Presland Road Residential Development Transportation Impact Study
Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine
More information4.14 TRANSPORTATION AND CIRCULATION
4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to
More informationTravel Forecasting Methodology
Travel Forecasting Methodology Introduction This technical memorandum documents the travel demand forecasting methodology used for the SH7 BRT Study. This memorandum includes discussion of the following:
More informationGEORGIA DEPARTMENT OF TRANSPORTATION
GEORGIA DEPARTMENT OF TRANSPORTATION Statewide Truck Lanes Needs Identification Study SR 21 CORRIDOR NEEDS ANALYSIS PREPARED FOR Georgia Department of Transportation Office of Planning #2 Capitol Square
More informationMemorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017
Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: Sue Polka, City Engineer, City of Arden Hills From:
More informationAppendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability
(http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement
More informationMemorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee
To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette
More informationDate: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis
Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.
More informationBusiness Advisory Committee. July 7, 2015
Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS
More informationCitizens Committee for Facilities
Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on
More informationPopulation Trends. US 12 Corridor Performance
Corridor Context The corridor runs over 81 miles from Willmar to the Twins Cities metropolitan area. It connects the Twin Cities and the cities of Montrose, Howard Lake, Cokato, Dassel, Litchfield, Atwater,
More informationMEMORANDUM. Figure 1. Roundabout Interchange under Alternative D
MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis
More informationProject Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013
MnDOT Contract No. 998 Work Order No.47 213 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/3/213 TASK #4:
More informationEvaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)
Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline
More informationSANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT
SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT May 8, 2018 Page i TABLE OF CONTENTS Table of Contents... i 1. Introduction... 1 1.1 Summary... 1 2.
More informationDecember 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701
Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic
More informationAPPENDIX H. Transportation Impact Study
APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett
More informationTraffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.
Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis
More informationPlainfield, Indiana Speed Limit Study
March 21 st, 2017 Prepared on behalf of: Town of Plainfield Building and Engineering Department 206 W. Main Street Plainfield, IN 46168 (317) 839-2561 Prepared by: Thomas S. Vandenberg, PE, PTOE Matthew
More informationInterchange Justification Report
Interchange Justification Report Interstate 29 at 85 th Street- Exit 74 Sioux Falls, SD SEH No. 132589 October 1, 2018 Prepared by: Short Elliott Hendrickson Inc. Executive Summary The Interchange Justification
More informationCraig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject
TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022
More informationOakbrook Village Plaza City of Laguna Hills
Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna
More informationPerformance Measure Summary - Portland OR-WA. Performance Measures and Definition of Terms
Performance Measure Summary - Portland OR-WA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance
More informationINTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange
INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road
More informationCommercial Industrial Land Available
Commercial Industrial Land Available PID: 200970010 List Price $744,292 Price Per Square Foot: $3.00 Sq. Ft. Property Details Street Address: Laredo St. & South St. Parcel ID: 200970010 City: Belle Plaine
More informationClean Harbors Canada, Inc.
Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260
More informationSection 5.8 Transportation and Traffic
Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);
More informationAppendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project
Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version
More informationAppendix G: Transportation/Traffic
City of Irvine - William Lyon Homes: Vista Verde Draft EIR Appendix G: Transportation/Traffic Michael Brandman Associates H:\Client (PN-JN)\0006\00060034\EIR\3 - DEIR\00060034 Sec99-00 Appendix Dividers
More informationFreight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS)
Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS) Chen-Fu Liao Department of Civil, Environmental, and Geo- Engineering University
More information