1

2 FinalReport CorridorAnalysisforUS92/International SpeedwayBlvd FromUS17/WoodlandBlvdtoGarfieldAve April2017 Preparedfor: RivertoSeaTransportationPlanningOrganization (R2CTPO) 2570W.InternationalSpeedwayBlvd.,Suite100 DaytonaBeach,FL Preparedby: VHB,Inc. 250E.RobinsonStreet, Orlando,FL ProfessionalEngineer: KathrynL.Lee P.E.#62420 April10,2017

3 Corridor Analysis For US 92/International Speedway Blvd From US 17/Woodland Blvd To Garfield Ave Task Work Order #2 VOLUSIA COUNTY Prepared for: Prepared by: Vanasse Hangen Brustlin, Inc. Orlando, FL April 2017 VHB, Inc. ii

4 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO EXECUTIVESUMMARY This report presents the results of a corridor analysis completed for US 92/International SpeedwayBoulevardfromUS17/WoodlandBoulevardtoGarfieldAvenue,locatedintheCityof DeLand,VolusiaCounty,Florida.ThisreportwaspromptedbyanapplicationbyVolusiaCounty toevaluatethefeasibilityofextendingtheexistingwestboundrightturnlaneatalabamaavenue easttotheintersectionofameliaavenuetoprovideacontinuouswestboundrightturnlane along US 92/International Speedway Boulevard between US 17/Woodland Boulevard and GarfieldAvenue. TheexistingwestboundrightturnlaneatAlabamaAvenueisapproximately200feetlongwitha taperof100feet.theproposedextensionofthisrightturnlanewillcompletethegapandwill provide a continuous westbound right turn lane between US 17/Woodland Boulevard and Garfield Avenue. This study developed two alternatives to address overall traffic and the operationalefficiencyofthecorridor,andtwoimprovementstoaddresssafetyissuesobserved withinthestudyarea.thealternativesandimprovementsarebaseduponfieldobservations, trafficoperationalanalysis,historicalcrashanalysisandengineeringjudgment.theanalysisis basedonthepremisethattherecommendationsprovidedinthe IntersectionAnalysisforUS 92/International Speedway Boulevard at Garfield Avenue study (See Appendix A) are implemented. Alternative1,asrequestedinthefeasibilityapplication,evaluatestheextensionoftheexisting westboundrightturnlaneatalabamaavenuetoprovideacontinuouswestboundrightturnlane from US 17/Woodland Boulevard to Garfield Avenue. Also, included in this alternative are improvementsatus92/internationalspeedwayboulevardandthegarfieldavenueintersection. Alternative2evaluatestheextensionofeastboundleftturnlaneandconstructionofanexclusive northbound right turn lane at US 92/International Speedway Boulevard and Amelia Avenue intersection along with improvements at US 92/International Speedway Boulevard and the GarfieldAvenueintersection.Alternative2istherecommendedalternative. VHB, Inc. iii

5 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO Belowarebriefsummariesofthealternativesandimprovementsdevelopedinthisstudy: 1:Alternative1: Extend the existing westbound right turn lane along US 92/International Speedway BoulevardatAlabamaAvenueeasttoAmeliaAvenuetoprovideacontinuousrightturn lanefromus17/woodlandavenuetogarfieldavenue. Provideanexclusiveeastboundrightturnlaneandextendtheexistingwestboundleft turnlaneatus92/internationalspeedwayboulevardandgarfieldavenueintersection. Thisalternativeisbasedontheinputprovidedintheapplicationforafeasibilitystudycompleted bythecounty.basedontheexistingrightofway,therearenophysicalconstraintsfoundto preventtheextensionofthewestboundrightturnlanefromalabamaavenuetoameliaavenue. Thismodificationcanbeimplementedatanapproximatecostof$130,905.97andyieldsaB/C ratioof11.71,whichindicatesthattheanticipatedbenefitsoutweightheestimatedcostsfor theproposedmodifications. 2:Alternative2(RecommendedAlternative): Provideanexclusivenorthboundrightturnlaneandextendtheexistingeastboundleft turn lane (by approximately 100 feet) at the intersection of US 92/International SpeedwayBoulevardandAmeliaAvenue. Provideexclusiveeastboundandnorthboundrightturnlanesandextendtheexisting westbound left turn lane at US 92/International Speedway Boulevard and Garfield Avenueintersection. Thesemodificationscanbeimplementedatanapproximatecostof$174,220.86andyieldsa B/C ratio of 29.81, which indicates that the anticipated benefits significantly outweigh the estimatedcostsforthisrecommendedalternative. 3: Extend the existing sidewalk along the south side of US 92/International Speedway BoulevardfromtheeastsideofAlabamaAvenuetoGarfieldAvenue.Thecostforthissafety improvement(providedasaseparateitem)isestimatedat$67, thissafetyimprovement VHB, Inc. iv

6 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO willencouragepedestrianswhowanttoaccessthebusinesseslocatedonthesouthsideofus92 towalkonthesidewalkratherthantheshoulderoftheroad,thusimprovingpedestriansafety andreducingvehiclepedestrianconflicts. 4:Install2 4 skipguidelinesthroughtheintersectionatus17/woodlandavenuetoguide eastbound left turning vehicles into the inside northbound through lane. This will reduce conflictbetweentheeastboundleftturningvehiclesandwestboundrightturningvehicles,which frequentlytreatthisyieldmovementasafreeflowmovement,andaremergedimmediatelyinto theoutsidenorthboundthroughlanewithoutthebenefitofaseparatemergelane. VHB, Inc. v

7 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO Contents EXECUTIVE SUMMARY... iii INTRODUCTION... 1 EXISTING CONDITIONS... 3 Field Inventory... 3 Traffic Volume Data Crash Data CrashSummarybyYearandConditions...14 CrashSummaryforIntersectionsandSegments...14 CrashSummarybyCrashType...16 QUALITATIVE ASSESSMENT FEASIBILITY ANALYSIS Background Methodology Assessment of Proposed Site Operational Analysis Alternative Alternative2(RecommendedAlternative)...28 Benefit/Cost Analysis RECOMMENDATIONS APPENDICES... 7 ListofTables Table1:8HourTurningMovementPercentages(AllVehicles)...13 Table2:CrashSummarybySeverityandConditions(Jan2013Dec2015)...14 Table3:CrashSummarybyIntersectionsandsegments(Jan2013Dec2015)...15 Table4:CrashSummarybyCrashTypes(Jan2013Dec2015)...16 Table5:BeforeandAfterOperationalAnalysisResults(Alternative1)...28 Table6:BeforeandAfterOperationalAnalysisResults(Alternative2)...29 Table7:UnitValueofMOEs...30 Table8:Benefit/CostAnalysisResults(Alternative1)...31 Table9:Benefit/CostAnalysisResults(Alternative2)...32 VHB, Inc. vi

8 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO ListofFigures Figure1:LocationMap...2 Figure2:ConditionDiagram US17/WoodlandBlvd...7 Figure3:ConditionDiagram AlabamaAve...8 Figure4:ConditionDiagram AmeliaAve...9 Figure5:ConditionDiagram Lowe sentrance...10 Figure6:ConditionDiagram GarfieldAve...11 Figure7:CrashDiagrams US17/WoodlandBlvd...17 Figure8:CrashDiagrams B/WUS17/WoodlandBlvd.&AmeliaAve...18 Figure9:CrashDiagrams AmeliaAve...19 Figure10:CrashDiagrams AmeliaAve&GarfieldAve...20 Figure11:CrashDiagrams GarfieldAve...21 Figure12:Alternative1Improvements...35 Figure13:Alternative2Improvements... VHB, Inc. vii

9 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO INTRODUCTION VHB,Inc.wasretainedtoperformacorridoranalysisstudyforUS92/InternationalSpeedway BoulevardfromUS17/WoodlandBoulevardtoGarfieldAvenue,locatedintheCityofDeLand, VolusiaCounty,Florida,asillustratedinFigure1.Thisreportwaspromptedbyanapplicationby VolusiaCountytoevaluatethefeasibilityofextendingtheexistingwestboundrightturnlaneat AlabamaAvenueeasttotheintersectionofAmeliaAvenuetoprovideacontinuouswestbound right turn lane along US 92/International Speedway Boulevard between US 17/Woodland BoulevardandGarfieldAvenue. TheCountycontendsthatthereisaneedforthisprojectsincethefollowingnewdevelopments were approved or under review near the study intersection: 1) a Hampton Inn was recently approved within the vicinity of the US 92/International Speedway Boulevard and US 17/Woodland Boulevard intersection, which includes an Applebee s restaurant and another vacantparcel,2)goodwillindustriesisproposednearthewalmartsupercentreonthenorth legoftheus92/internationalspeedwayboulevardandus17/woodlandboulevardintersection, 3)AcreditunionisunderreviewneartheWalmartSuperCentreonthenorthlegoftheUS 92/InternationalSpeedwayBoulevardandUS17/WoodlandBoulevardintersection. TheanalysismethodsusedincompletingthisstudyareconsistentwiththeManualonUniform Traffic Control Devices (MUTCD), the Manual on Uniform Traffic Studies (MUTS), the Traffic EngineeringManual(TEM)andengineeringjudgment.Theremainderofthisreportdocuments existing conditions, vehicle and pedestrian counts, qualitative assessments, crash analyses, intersection/corridoranalysis,b/canalysisandrecommendations. Theinformation/commentsprovidedbytheCountyandFDOT,alongwiththeresponses,are providedinappendixb. VHB, Inc. 1

10 N. Spring Garden Ave. \\vhb\proj\orlando\ US 17 at US 92 R2CTPO\graphics\FIGURES\AI Source: Perkins Hwy. N. Spring Garden Ave. Grand Ave. Glenwood Reserve Carter Rd. Clark Bay Conservation Area N Not To Scale Pineland Heights Glenwood Rd. 92 DeLand Municipal Airport E. International Speedway Blvd. N. Woodland Blvd. Glenwood DeLand Fams Grand Ave. North DeLand E. Plymouth Ave. W. Plymouth Ave. E. Plymouth Ave. Garfield Ave. 17 W. Minnesota Ave. E. New York Ave DeLand W. New York Ave. Study Corridor Figure 1 Site Location Map

11 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO EXISTINGCONDITIONS FieldInventory ThestudycorridoralongUS92/InternationalSpeedwayBoulevardbetweenUS17/Woodland BoulevardandGarfieldAvenueislocatedintheCityofDeLand,VolusiaCounty,Florida.The ExistingConditionDiagrams,Figures2through6,depicttheexistingconditionsincludingthe generalroadwaygeometry,pavementmarkings,landuse,andintersectiontrafficcontrolofthe study corridor. In addition, photographs of the existing conditions around the US 92/InternationalSpeedwayBoulevardandUS17/WoodlandBoulevardintersectionareprovided inappendixc.theconditionsstatedinthisreportreflectconditionsasobservedonthedateof thequalitativeassessment. US92/InternationalSpeedwayBoulevardandUS17/WoodlandBoulevard:Theintersectionof US 92/International Speedway Boulevard and US 17/Woodland Boulevard is a plus shaped intersection with US 92/International Speedway Boulevard running eastwest and US 17/WoodlandBoulevardrunningnorthsouth.Theintersectionisundersignalcontrol. US 92/International Speedway Boulevard and US 17/Woodland Boulevard are 4lane divided roadways.attheintersection,thewestboundandsouthboundapproacheshavedualleftturn lanes, and the eastbound and northbound approaches have single left turn lanes. There are separaterightturnlanesonallapproaches,excepttheeastboundapproachwhichhasashared thru/right turn lane. The northbound right turn lane and the westbound right turn lane are channelizedrightturnmovements.thewestboundrightturnlaneatus17/woodlandboulevard wasrecentlyextendedeasttoalabamaavenueaspartofaresurfacingproject(fpn: ) byfdot.inaddition,theexistingeastboundrightturnlaneattheus92/internationalspeedway BoulevardandAlabamaAvenueintersectionwasconvertedtoasharedthrough/rightturnlane aspartofthesameresurfacingproject.thepostedspeedlimitonbothus92/international SpeedwayBoulevardandUS17/WoodlandBoulevardis45mph. Thetrafficsignalisamastarmdesignwithpaintedmastarmslocatedinallfourquadrantsofthe intersection.thesignalphasingprovidesprotectedleftturnmovementsonallfourapproaches. Therearesignalizedpedestriancrosswalksacrossalllegsoftheintersection.Sidewalksrunalong VHB, Inc. 3

12 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO thenorthandsouthsidesofus92/internationalspeedwayboulevardandtheeastandwest sides of US 17/Woodland Boulevard. A shareduse trail runs along the north side of US 92/InternationalSpeedwayBoulevardbetweenthesidewalkandtheroadwayalongtheeastleg of the intersection.there are street lights mounted on wood utility poles located in the northwestandthesouthwestquadrantsoftheintersection.thestreetlightingdoesnotcontinue north or south along US 17/Woodland Boulevard. There is no street lighting along US 92/InternationalSpeedwayBoulevard. Thelandusewithinthevicinityoftheintersectionconsistsofshoppingcentersandrestaurants on all quadrants, except the southeast quadrant which has a Walgreens pharmacy and a McDonald s.us92/internationalspeedwayboulevardisamajorarterialconnectingthecityof DeLandtoI95andtheCityofDaytonaBeach.US17/WoodlandBoulevardisamajorarterial connectingthecityofdelandtoi4andthecityofdeltona. US 92/International Speedway Boulevard and Amelia Avenue: The intersection of US 92/InternationalSpeedwayBoulevardandAmeliaAvenueisa plus shapedintersectionwithus 92/International Speedway Boulevard running eastwest and Amelia Avenue running north south.theintersectionisundersignalcontrol. US92/InternationalSpeedwayBoulevardisa4lanedividedroadwayandAmeliaAvenueisa2 laneundividedroadway.attheintersection,thereareseparateleftturnlanesonallapproaches. The eastbound and westbound approaches have separate right turn lanes, whereas the northboundandsouthboundapproacheshavesharedthru/rightturnlanes.thepostedspeed limits are 45 mph along US 92/International Speedway Boulevard and 30 mph along Amelia Avenue. Thetrafficsignalisaboxspanstrainpoledesignwithconcretepoleslocatedinallfourquadrants oftheintersection.thesignalphasingprovidesprotectedleftturnsfromus92/international Speedway Boulevard and protective/permissive left turns from Amelia Avenue.There are signalizedpedestriancrosswalksacrossthenorth,westandsouthlegsoftheintersection.the pedestrian detectors are audible style detectors.sidewalks run along the north side of US 92/International Speedway Boulevard. A shareduse trail runs along the north side of US VHB, Inc. 4

13 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO 92/InternationalSpeedwayBoulevardbetweenthesidewalkandtheroadway.Thereisastreet lightmountedonawoodutilitypoleslocatedinthesouthwestquadrantoftheintersection.the streetlightingdoesnotcontinuenorthorsouthalongameliaavenue.thereisnostreetlighting alongus92/internationalspeedwayboulevard. Thelandusewithinthevicinityoftheintersectionconsistsofshoppingcentersandrestaurants onallquadrants.us92/internationalspeedwayboulevardisamajorarterialconnectingthecity ofdelandtoi95andthecityofdaytonabeach.ameliaavenueislargelydevelopedandit providesaccesstocommercialand/orresidentialdevelopment. US 92/International Speedway Boulevard and Garfield Avenue: Please note that the field inventoryprovidedbelowisthesameinventorythatwasprovidedinthe IntersectionAnalysis forus92/internationalspeedwayboulevardatgarfieldavenue study(seeappendixa). The intersection of US 92/International Speedway Boulevard and Garfield Avenue is a plus shaped intersection with US 92/International Speedway Boulevard running eastwest and GarfieldAvenuerunningnorthsouth.Theintersectionisundersignalcontrol. US92/InternationalSpeedwayBoulevardisa4lanedividedroadwayandGarfieldAvenueisa2 laneundividedroadway.attheintersection,thereisaseparateleftturnlaneforallapproaches, exceptthenorthboundwhichhasasharedleftthroughandrightturnlane.thereisaseparate right turn lane in westbound direction only.the posted speed limits are 45 mph along US 92/InternationalSpeedwayBoulevardand25mphand30mphalongGarfieldAvenuenorthand southoftheintersection,respectively. Thetrafficsignalisaboxspanstrainpoledesignwithconcretepoleslocatedinallfourquadrants of the intersection. The signal phasing provides protected/permissive left turns from US 92/InternationalSpeedwayBoulevardandpermissiveleftturnsfromGarfieldAvenue.Thereare signalized special emphasis pedestrian crosswalks across the north and west legs of the intersection.sidewalksrunalongthenorthsideofus92/internationalspeedwayboulevard westofintersection,theeastsideofgarfieldavenuenorthofintersection,andbotheast&west sidesofgarfieldavenuesouthoftheintersection.thesidewalksalonggarfieldavenuedonot VHB, Inc. 5

14 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO extendtotheintersection.asharedusetrailrunsalongthenorthsideofus92/international SpeedwayBoulevardbetweenthesidewalkandtheroadway.Thereisnostreetlightingalong US92/InternationalSpeedwayBoulevardoralongGarfieldAvenue. ThelandusewithinthevicinityoftheintersectionconsistsofaLowe shomeimprovementin thenorthwestquadrant,adqgrill&chillrestaurantinthenortheastquadrant,adunkindonuts andcomfortinninthesouthwestquadrantandanautozoneinthesoutheastquadrant.us 92/InternationalSpeedwayBoulevardisamajorarterialconnectingtheCityofDeLandtoI95 andthecityofdaytonabeach.garfieldavenueislargelydevelopedanditprovidesaccessto commercialand/orresidentialdevelopment. VHB, Inc. 6

15

16

17

18

19

20 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO TrafficVolumeData 72hour classification traffic counts were collected on the westbound approach of US 92/International Speedway Boulevard, east of US 17/Woodland Boulevard, from Tuesday, December 6, 2016, through Thursday, December 9, 2016 representing a typical commuter weekday. The counts recorded that 12,144 vehicles approached on US 92/International SpeedwayBoulevardinthewestbounddirection. The 72hour classification traffic counts were supplemented with 8hour intersection turning movementcounts.theturningmovementcountswerecollectedbetween7:00am 9:00AM, 11:00AM 1:00PMand2:00PM 6:00PMalongUS92/InternationalSpeedwayBoulevardat the US 17/Woodland Boulevard, Amelia Avenue, Lowe s Entrance and Garfield Avenue intersections.thesehoursrepresentthehighesteighthoursobtainedfromtheapproachcounts. Fromthisdata,theAM,middayandPMpeaktraffichourswerefoundtooccurfrom7:15AMto 8:15AM,11:30AMto12:30PMand4:45PMto5:45PM,respectively,foralloftheintersections alongus92/internationalspeedwayboulevard.theoverallpeakhourfortheintersectionswas foundtooccurduringthepmpeakhour. TheturningmovementcountsonUS92/InternationalSpeedwayBoulevardrevealthatthetraffic in eastbound direction peaks during AM conditions and traffic in westbound direction peaks duringpmconditions.duringmiddayconditions,thetrafficseemstobeequallydistributedin bothdirections.the72hourwestboundapproachclassificationcount,8hourturningmovement counts and pedestrian/bicycle counts are provided in greater detail in the Appendix C. The following table summarizes the distribution of turning movements along US 92/International SpeedwayBoulevardattheUS17/WoodlandBoulevard,AmeliaAvenueandGarfieldAvenue intersections: VHB, Inc. 12

21 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO Table1:8HourTurningMovementPercentages(AllVehicles) Intersection Movement Northbound Southbound Eastbound Westbound US92& WoodlandBlvd US92&Amelia Ave US92&Garfield Ave Leftturn/Uturn 10.30% 33.30% 29.90% 24.60% Through 59.70% 52.20% 62.90% 41.00% Rightturn 30.00% 14.50% 7.20% 34.40% Leftturn/Uturn 27.60% 29.10% 10.90% 7.10% Through 35.20% 28.90% 84.90% 84.60% Rightturn 37.10% 41.90% 4.20% 8.20% Leftturn/Uturn 32.30% 51.10% 3.70% 6.90% Through 31.40% 21.10% 90.20% 85.30% Rightturn 36.20% 27.80% 6.10% 7.80% Theexistingfieldcollectedturningmovementcountswerebalanced(basedonthepresenceof additionalaccesslocationsbetweenstudyintersections)andusedintheoperationalanalysis. VHB, Inc. 13

22 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO CrashData Thelatestavailablethreeyearsofcrashdata(fromJanuary1,2013toDecember31,2015)along US92/InternationalSpeedwayBoulevardfromUS17/WoodlandBoulevardtoGarfieldAvenue wereobtainedfromthesignalfouranalytics.basedonthecrashdata,atotalof89crashes occurredwithinthestudylimitsinthelastthreeyears.rawcrashdataisincludedinappendix D. CrashSummarybyYearandConditions Table2showsthesummaryofthecrashesbyseverityandconditionsforeachyear(January2013 December2015).Onaverage,about30crashesoccurredperyearforthelastthreeyearswithin thestudylimits,noneofthemwerefatalcrashesand25werecrashesthatresultedinsomekind ofinjury.atotalof15crashes(about17%ofthetotal)werereportedtohaveoccurredduring dark conditions (at night, dawn or dusk), averaging about 5 crashes per year. In addition, 4 crashes(about4%ofthetotal)occurredinwetweatherconditions. Table2:CrashSummarybySeverityandConditions(Jan2013Dec2015) Year Total Number ofcrashes Injury Crashes Fatal Crashes Dark Conditions Crashes Wet Conditions Crashes Average Percent 28.09% 0.00% 16.85% 4.49% CrashSummaryforIntersectionsandSegments Adetailedreviewofthecrashdataforthecorridorwasperformed.AsshowninTable3,the intersectionatus92andwoodlandboulevard,at49crashes,hadthehighestnumberofcrashes, accountingfor55%ofthetotalcrasheswithinthestudycorridor. VHB, Inc. 14

23 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO Table3:CrashSummarybyIntersectionsandsegments(Jan2013Dec2015) Intersection Total Fatal Crashes Injury Crashes Property Damage Only Night US92atWoodlandBlvd US92atAmeliaAve US92atGarfieldAve SubTotalIntersections Segment Total Fatal Crashes Injury Crashes Property Damage Only Night US92b/wWoodlandBlvd&AmeliaAve US92b/wAmeliaAve&GarfieldAve SubTotalSegments TotalIntersections&Segments Twentyfiveinjurycrashesandzerofatalitieswererecordedwithinthestudyareaduringthe threeyearperiod.onlytwoofthethreeanalyzedintersections,us17/woodlandboulevardand AmeliaAvenue,haveanyformofstreetlighting.LightingisnotpresentalongUS92/International SpeedwayBoulevardandUS17/WoodlandBoulevard. Wet Wet Thefollowingisasummaryofthetypesofcrashesattheintersectionsandalongthesegments: US92atWoodlandBlvd:Thisintersectionexperienced49crashesoverthelatestthreeyear reportingperiod,withanaverageof16crashesperyear.themajorityofthesecrasheswererear end crashes (77.6% of total), followed by left turn crashes (10.2% of total). There were no pedestriancrashesandnofatalcrashesreportedatthisintersectionoverthelatestthreeyear reportingperiod. US92atAmeliaAve:Thisintersectionexperienced19crashesovertheoverthelatestthreeyear reportingperiod,withanaverageof6crashesperyear.themajorityofthesecrasheswererear endcrashes(42.1%oftotal),followedbyangle,leftturn,andsideswipecrashes.therewereno pedestriancrashesandnofatalcrashesreportedatthisintersectionoverthelatestthreeyear reportingperiod. VHB, Inc. 15

24 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO US 92 at N Garfield Ave: This intersection experienced 16 crashes over the latest three year reportingperiod,averagingabout5crashesperyear.themajorityofthesecrasheswererear endcrashes(68.7%oftotal),followedbysideswipesandanglecrashes.therewerenopedestrian crashesandnofatalcrashesreportedatthisintersectionoverthelatestthreeyearreporting period. CrashSummarybyCrashType Table4showsthesummaryofthecrashesbycrashtype.Withinthestudycorridor,rearend crashesaccountforthemajorityofcrashes(about64%oftotal)followedbysideswipecrashes (about12%oftotal),leftturncrashes(about11%oftotal),andanglecrashes(about7%oftotal). Therewerenopedestriancrashesandnobicyclecrashesreportedatthisintersectionoverthe latestthreeyearreportingperiod. Table4:CrashSummarybyCrashTypes(Jan2013Dec2015) CrashType Peryear Percent Angle % RearEnd % HeadOn % LeftTurn % Sideswipe % Pedestrian % RightTurn % Bicycle % Other % Total % TheCrashDiagrams,figures7through11,areprovidedinthefollowingpages. VHB, Inc. 16

25

26

27

28

29

30 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO QUALITATIVEASSESSMENT A qualitative assessment (QA) was conducted in the field in order to evaluate the existing operatingconditionsoccurringonatypicalweekday,andtoidentifyareaswhereimprovements wouldbepotentiallybeneficialtotheoverallsafetyandefficiencyofthelocation.aregistered professionalengineerperformedtheqafrom4:00pm 5:30PMduringtheeveningpeakhour period. US92/InternationalSpeedwayBoulevard&US17/WoodlandBoulevard 1. DuringtheQA,theintersectionasawhole,appearedtooperatewithmoderatedelays. AmeliaAvenueislocatedapproximately1,300feettotheeastandthePlazaEntranceis locatedapproximately500feettothewest.becauseoftheproximityoftheseadjacent signalized intersections, vehicles along US 92/International Speedway Boulevard generally arrived in platoons. During the time period between 5:00 PM 5:20 PM, queuesonwestboundus92/internationalspeedwayboulevardwereobservedtoback uptoameliaavenue,whichresultedinsomecyclefailures. 2. Duringtheremainderofthepeakhour,theintersectionoperatedwithmoderatedelays, withqueuesonwestboundus92/internationalspeedwayboulevardextendingbackto AlabamaAvenue.However,thequeueswereabletocleartheintersectioninonecycle. QueuesoneastboundUS92/InternationalSpeedwayBoulevardwerenotassignificant, andwereabletocleartheintersectionwithinasinglecycleaswell. 3. Thegeometryoftheintersectionis,ingeneral,straightandflat,sothesightdistanceto the signal is not impeded and was not observed to present any operational or safety concerns. 4. Therearecrosswalkswithpedestriansignalsacrossallthelegsoftheintersection.The crosswalksaremarkedwithspecialemphasispavementmarkings,whichareappropriate foracrossingatasignalizedintersection.thewalktimesprovidedappearedadequate forpedestrianstocrossatanormalpaceandwithintheallottedtime. VHB, Inc. 22

31 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO 5. Thereisa blankout signlocatedonthemastarmfacingtheeastboundapproach.the sign remains unlit until the westbound left turn movement, when it is activated to prohibittheeastboundrightturnmovement. 6. Thewestboundrightturnmovementisunderyieldsigncontrol.Itwasobservedthat westboundrightturningvehiclesfrequentlytreatedthisyieldmovementasafreeflow movement.the westbound right turning vehicles are immediately merged into the outsidenorthboundthroughlanewithoutthebenefitofaseparatemergelane.some conflictsandnearmisseswereobservedwhenwestboundleftturningvehicles,whohave the rightofway, attempted to turn into the outside northbound through lane.the westbound left turn lane does not have 2 4 skip lines to guide them through the intersection. US92/InternationalSpeedwayBoulevard&AmeliaAvenue 1. DuringtheQA,theintersectionasawhole,appearedtooperatewithmoderatedelays. During the time between 5:00 PM 5:20 PM, queues on westbound US 92/InternationalSpeedwayBoulevardwereobservedtobackuptotheadjacentsignal atgarfieldavenue.duringtheremainderofthepeakhour,theintersectionoperated with moderate delays, with queues on westbound US 92/International Speedway BoulevardbackinguptoLowe sentrance.however,thequeueswereabletodissipate withinonecyclelength.inafewinstances,thequeuesoneastboundus92/international SpeedwayBoulevardwerebackedupandblockedtheleftturningvehicles. 2. There are tracking marks on the shoulders of the eastbound approach which bear evidence that vehicles are traveling on the shoulder to get around stopped through traffictoproceedwiththeirleftturn. 3. Thegeometryoftheintersectionis,ingeneral,straightandflat,sothesightdistanceto thesignalisnotimpededandwasnotobservedtopresentanyoperationalorsafety concerns. 4. Therearecrosswalkswithpedestriansignalsacrossallthelegsoftheintersection,except ontheeastleg.thecrosswalksaremarkedwithspecialemphasispavementmarkings, whichareappropriateforacrossingatasignalizedintersection.thewalktimesprovided VHB, Inc. 23

32 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO appearedadequateforpedestrianstocrossatanormalpaceandwithintheallotted time.thepedestriandetectorsareaudibletypedetectors. US92/InternationalSpeedwayBoulevard&GarfieldAvenue PleasenotethattheQAprovidedbelowisthesameQAthatwasprovidedinthe Intersection Analysis Study for the Intersection of US 92/International Speedway Boulevard and Garfield Avenue providedinappendixa. 1. During the QA, the intersection, as a whole, appeared to operate smoothly and with minimal delay. The volume of traffic observed on US 92/International Speedway BoulevardwassignificantlyhigherthanthevolumesobservedonGarfieldAvenue.The flowoftrafficonus92/internationalspeedwayboulevardwasheavierinthewestbound directionthanintheeastbounddirection.foracoupleofcyclesbetween5:00pmand 5:20PM,queuesonwestboundUS92/InternationalSpeedwayBoulevardwereobserved tobackupapproximately800feet,thusblockingtheleftturningvehiclesandcausing cyclefailures(queuesclearedupinthenextcycle).duringthesameperiod(5:00 5:20 PM), the queues on westbound US 92/International Speedway Boulevard frequently backed up approximately 600 feet. During the remainder of the PM peak hour time period, the intersection operated without significant queues or cycle failures. It was observed that the outside through lane on eastbound US 92/International Speedway Boulevardwasutilizedmorethantheinsidethroughlane.Inafewinstances,thequeues oneastboundus92/internationalspeedwayboulevardwerebackeduptothelowe s Entrance;however,allqueuedvehicleswereabletocleartheintersectioninonecycle. 2. Thegeometryoftheintersectionis,ingeneral,straightandflat,sothesightdistanceto the signal is not impeded and was not observed to present any operational or safety concerns. 3. There are tracking marks on the shoulders of the eastbound approach which bear evidencethatvehiclesaretravelingontheshouldertogetaroundstoppedthroughtraffic toproceedwiththeirrightturn. VHB, Inc. 24

33 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO 4. TherearecrosswalkswithpedestriansignalsacrossthenorthandwestlegsoftheUS 92/InternationalSpeedwayBoulevardandGarfieldAvenueintersection.Thecrosswalks are marked with special emphasis pavement markings, which are appropriate for a crossingatasignalizedintersection.thewalktimesprovidedappearedadequatefor pedestrianstocrossatanormalpaceandwithintheallottedtime. 5. Crosswalksarenotprovidedonthesouthandeastlegsoftheintersection.Thesidewalks alongtheeastandwestsideofgarfieldavenue(southleg)areterminatedjustbeforethe intersection. VHB, Inc. 25

34 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO FEASIBILITYANALYSIS Background AnapplicationwasreceivedfromVolusiaCountytoperformafeasibilitystudytoextendthe existingwestboundrightturnlanealongus92/internationalspeedwayboulevardatalabama AvenueeasttoAmeliaAvenuetoprovideacontinuousrightturnlanebetweenUS17/Woodland BoulevardandGarfieldAvenue. Thisstudydevelopedtwoalternativestoaddressoveralltrafficandtheoperationalefficiencyof thecorridor.thealternativesarebaseduponfieldobservations,trafficoperationalanalysis, historicalcrashanalysisandengineeringjudgment.theanalysisisbasedonthepremisethatthe recommendations provided in the Intersection Analysis Study for the Intersection of US 92/International Speedway Boulevard and Garfield Avenue are implemented. These recommendationsincludetheinstallationofaneastboundrightturnlane,anorthboundright turn lane, the extension of the westbound left turn lane and full crosswalks with pedestrian signalsatgarfieldavenue. Alternative1providesanalysisbasedonrequestinthefeasibilitystudytoextendtheexisting westboundrightturnlaneatalabamaavenuesothatthereisacontinuousrightturnlanefrom US17/WoodlandBoulevardtoGarfieldAvenue.Alternative2providesanalysiswithanextended eastboundleftturnlaneandexclusivenorthboundrightturnlaneatameliaavenuewithouta continuouswestboundrightturnlanefromus17/woodlandboulevardtoameliaavenue(i.e., thewestboundoutsidelaneremainsasexisting).alternative2istherecommendedalternative. Methodology Themethodologyfordeterminingthefeasibilityofimplementingtheproposedimprovements includes performing an assessment of the proposed site, a comparison of before and after operatingconditionswithinthestudycorridorutilizingtrafficoperationanalysissoftware,and preparingab/canalysisforanyproposedimprovements. VHB, Inc. 26

35 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO AssessmentofProposedSite There were some geometric constraints observed that would impact the extension of the westbound right turn lane along US 92/International Speedway Boulevard between Alabama AvenueandAmeliaAvenue.Theseincludethatthepedestriansignalinthenorthwestquadrant will need to be relocated, along with the multipost sign along the north side of US 92/InternationalSpeedwayBoulevard.Iftheroadwayiswidenedtothenorth,thesignalpolein the northwest quadrant will fall within the 24 clear zone required for new construction; however,sincethisisnotnewroadconstruction,resurfacing,restorationandrehabilitation (RRR)criteriacouldprobablybeapplied,whichallowsfora6 14 clearzone,dependingonthe actual speeds observed along the corridor.the drainage along the corridor is open swale. Therefore,iftheroadiswidenedtothenorth,thedrainageswalewouldneedtobereworked. Sincethevolumeofwaterwillincreasewiththeincreasedimpervioussurfaceareaofthenew lane,theswalesshouldbeanalyzedtodetermineiftheycanaccommodatetheadditionalwater. InordertoconstructanorthboundrightturnlaneatAmeliaAvenue,curbandgutterwillbe requiredtomaintaintheclearzonealongtheeastsideoftheroad.thenorthboundapproach currentlydrainsnorthtowardstheintersectionandintotheswalesalongus17,andtheaddition ofcurbandgutterwouldnotchangethat;althoughthevolumeofwaterwillincreasewiththe increasedimpervioussurfaceareaofthenewlane.theswalesshouldbeanalyzedtodetermine iftheycanaccommodatetheadditionalwater.surveywasnotprovidedfortheimprovement Diagrams;however,fromlotandparcellinespulledfromtheVolusiaCountyPropertyAppraisers webpage,itappearsthattheturnlanecouldfitwithintheexistingrightofway.theoverhead utilitylinesandthewaterlinethatrunsalongtheeastsideofameliaavenuewouldneedtobe relocated.itisnotanticipatedthattheexistingtrafficsignalpoleinthesoutheastquadrantwill needtobereplacedsincethecurbandgutterwillprovidetheappropriateclearzone. Therewasalsoageometricconstraintobservedthatcouldimpacttheextensionoftheeastbound leftturnlaneatameliaavenue.thelengthoftherecommendedextensioncouldpossiblybe limitedbythegradechangebetweenwestboundandeastboundus92/internationalspeedway Boulevard.However,theexistingleftturnlaneisnotconstructedperFDOTstandardcriteriaand VHB, Inc. 27

36 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO currently has a 165 taper. If the turn lane were reconstructed per current criteria, approximately100 ofextrastoragecouldbegainedwithminimalimpacttothegrade. OperationalAnalysis Theoperationalanalysiswasperformedfortheproposedandrecommendedalternativesfor beforeandafterconditions.thebeforeconditionsassumethatthereisnochangeinintersection geometry and signal timings, whereas, the after conditions assume improvements under the proposedalternativestheexistingandimprovedoperatingconditionsweredeterminedusing Synchro 9/SimTraffic simulation software.the signal timing information was obtained from VolusiaCounty. Alternative1 Table 5 summarizes the intersection delay and levels of service (LOS) for before and after conditionsduringthethreepeakperiods.thesimtrafficsimulationresultswereprovidedin AppendixD. Table5:BeforeandAfterOperationalAnalysisResults(Alternative1) AMPeakHour MidDay PMPeakHour Intersection Delay (Sec.) Before After Before After Before After LOS Delay (Sec.) LOS Delay (Sec.) LOS Delay (Sec.) LOS Delay (Sec.) LOS Delay (Sec.) LOS US92& Woodland Blvd US92& AmeliaAve US92& GarfieldAve 35.6 D 36.0 D 38.3 D 36.3 D 41.0 D 40.8 D 22.1 C 23.1 C 29.8 C 26.3 C 38.8 D 39.3 D 10.9 B 9.7 A 12.9 B 9.7 A 19.0 B 18.0 B Note:Theresultsarebasedonaverageof10randomseedSimTrafficSimulationruns Alternative2(RecommendedAlternative) Table 6 summarizes the intersection delay and levels of service (LOS) for before and after conditionsduringthethreepeakperiods.thesimtrafficsimulationresultswereprovidedin AppendixE. VHB, Inc. 28

37 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO Table6:BeforeandAfterOperationalAnalysisResults(Alternative2) AMPeakHour MidDay PMPeakHour Intersection Delay (Sec.) Before After Before After Before After LOS Delay (Sec.) LOS Delay (Sec.) LOS Delay (Sec.) LOS Delay (Sec.) LOS Delay (Sec.) LOS US92& Woodland Blvd US92& AmeliaAve 35.6 D 31.6 C 38.3 D 35.5 D 41.0 D 35.6 D 22.1 C 16.2 C 29.8 C 28.7 C 38.8 D 31.4 C US92& 10.9 B 9.4 A 12.9 B 9.1 A 19.0 B 17.5 B GarfieldAve Note:Theresultsarebasedonaverageof10randomseedSimTrafficSimulationruns VHB, Inc. 29

38 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO Benefit/CostAnalysis Abenefitcostanalysiswasperformedforthestudyintersectionstoestimatetheeffectiveness ofthepotentialintersectionimprovementusingsimtrafficsimulation.thebenefitsaredefined intermsofannualizedcostsavingsassociatedwithreductionsinthefollowingthreemeasures ofeffectiveness(moes): o o o TotalDelay(VehicleHours) Stops FuelConsumption(Gallons) Thebenefitswerecalculatedfor300daysinayearaccountingforreducedbenefitsanticipated duetolowertrafficvolumesduringtheweekend.thevalueofdelaytimeperhour($17.67)and fuelcost($3.27)wereobtainedfrom TheMobilityDataforOrlando publishedbytexasa&m University.Stopswereestimatedtocost$0.014each.Table7summarizestheunitvalueofeach MOEinatabularformatalongwithitssource. Table7:UnitValueofMOEs MOEValues UnitValue Source Stops($) Transyt7F Delay($) Fuel($/gal.) DaysperYear UrbanMobilityReportpublishedby TexasA&MTransportationInstitute(TTI) 2014 UrbanMobilityReportpublishedby TTI AveragedayswithobservableAM&PM peakingcharacteristics TheestimatedcostfortheAlternative1modificationsis$130,905.97(presentdayvalue)andit has a corresponding annualized cost amounting to $9, The service life for the modificationisassumed20yearsandtheinterestrateusedinthecalculationofannualizedcosts isassumed4%,whichisavaluefrequentlyusedbythefloridadepartmentoftransportation (FDOT)intheirbenefitcostcomputations.TheCostEstimateforAlternative1canbefoundin AppendixF. VHB, Inc. 30

39 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO Table8summarizesthebenefitcostanalysisforAlternative1.TheanalysisyieldsaB/Cratioof ThecalculatedB/Cratioindicatesthattheanticipatedbenefitsoutweightheestimated costsfortheproposedmodification,withbenefitsderivedthroughreducedcostsassociatedwith lowerdelay,stopsandfuelconsumption. BenefitPeriod AMPeakHour MidDay PMPeakHour EstimatedDaily(AM+ Mid+PM) Table8:Benefit/CostAnalysisResults(Alternative1) MeasuresofEffectiveness TotalStops TotalDelay FuelConsumption (vehhrs) (gal) Existing 4, Proposed 4, Existing 5, Proposed 4, Existing 7, Proposed 7, Existing 17, Proposed 16, EstimatedDailySavings EstimatedUnitCost $0.014 $ $3.270 DailyUserBenefitbyMOE $6.66 $ $ DailyUserBenefitTotal $ AnnualUserBenefit $112, TotalAnnualCost $9, BenefitCostRatio Notes: 1) Theservicelifeoftheimprovementswaskeptat20years 2) Interestrateof4%wasusedtodeterminetheannualcostofimprovements 3) Annualuserbenefitwascalculatedfor300dayswith2hourseachofAM,MiddayandPMpeakperiods TheestimatedcostfortheAlternative2improvementsis$174,220.86(presentdayvalue)andit has a corresponding annualized cost amounting to $12, The service life for the modificationsareassumed20yearsandtheinterestrateusedinthecalculationofannualized costs is assumed 4%, which is a value frequently used by the FDOT in their benefit cost computations.thecostestimateforalternative2canbefoundinappendixf. VHB, Inc. 31

40 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO Table9summarizesthebenefitcostanalysisforAlternative2.TheanalysisyieldsaB/Cratioof ThecalculatedB/Cratioindicatesthattheanticipatedbenefitsoutweightheestimated costsfortheproposedmodifications,withbenefitsderivedthroughreducedcostsassociated withlowerdelay,stopsandfuelconsumption. BenefitPeriod AMPeakHour MidDay PMPeakHour EstimatedDaily(AM+ Mid+PM) Table9:Benefit/CostAnalysisResults(Alternative2) MeasuresofEffectiveness TotalStops TotalDelay FuelConsumption (vehhrs) (gal) Existing 4, Proposed 3, Existing 5, Proposed 4, Existing 7, Proposed 6, Existing 17, Proposed 15, EstimatedDailySavings 1, EstimatedUnitCost $0.014 $ $3.240 DailyUserBenefitbyMOE $24.61 $ $ DailyUserBenefitTotal $ AnnualUserBenefit $382, TotalAnnualCost $12, BenefitCostRatio Notes: 1) Theservicelifeoftheimprovementswaskeptat20years 2) Interestrateof4%wasusedtodeterminetheannualcostofimprovements 3) Annualuserbenefitwascalculatedfor300dayswith2hourseachofAM,MiddayandPMpeakperiods VHB, Inc. 32

41 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO RECOMMENDATIONS Baseduponthecrashandspeedanalyses,qualitativeassessment,fieldobservations,intersection analysis,b/canalysisandengineeringjudgment,thefollowingmodificationsarerecommended toimprovethesafetyandoperationoftheintersection: 1:Alternative1: Extend the existing westbound right turn lane along US 92/International Speedway BoulevardatAlabamaAvenueeasttoAmeliaAvenuetoprovideacontinuousrightturn lanefromus17/woodlandavenuetogarfieldavenue. Provideanexclusiveeastboundrightturnlaneandextendtheexistingwestboundleft turnlaneatus92/internationalspeedwayboulevardandgarfieldavenueintersection. Thisalternativeisbasedontheinputprovidedintheapplicationforafeasibilitystudycompleted bythecounty.basedontheexistingrightofway,therearenophysicalconstraintsfoundto preventtheextensionofthewestboundrightturnlanefromalabamaavenuetoameliaavenue. Thismodificationcanbeimplementedatanapproximatecostof$164,901.20andyieldsaB/C ratioof9.30,whichindicatesthattheanticipatedbenefitsoutweightheestimatedcostsfor theproposedmodifications. 2:Alternative2(RecommendedAlternative): Provideanexclusivenorthboundrightturnlaneandextendtheexistingeastboundleft turn lane (by approximately 100 feet) at the intersection of US 92/International SpeedwayBoulevardandAmeliaAvenue. Provideexclusiveeastboundandnorthboundrightturnlanesandextendtheexisting westbound left turn lane at US 92/International Speedway Boulevard and Garfield Avenueintersection. Thesemodificationscanbeimplementedatanapproximatecostof$191,139.90andyieldsa B/C ratio of 26.44, which indicates that the anticipated benefits significantly outweigh the estimatedcostsforthisrecommendedalternative. VHB, Inc. 33

42 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO 3: Extend the existing sidewalk along the south side of US 92/International Speedway BoulevardfromtheeastsideofAlabamaAvenuetoGarfieldAvenue.Thecostforthissafety improvement(providedasaseparateitem)isestimatedat$67, thissafetyimprovement willencouragepedestrianswhowanttoaccessthebusinesseslocatedonthesouthsideofus92 towalkonthesidewalkratherthantheshoulderoftheroad,thusimprovingpedestriansafety andreducingvehiclepedestrianconflicts. 4:Install2 4 skipguidelinesthroughtheintersectionatus17/woodlandavenuetoguide eastbound left turning vehicles into the inside northbound through lane. This will reduce conflictbetweentheeastboundleftturningvehiclesandwestboundrightturningvehicles,which frequentlytreatthisyieldmovementasafreeflowmovement,andaremergedimmediatelyinto theoutsidenorthboundthroughlanewithoutthebenefitofaseparatemergelane. TheAlternative1andAlternative2recommendedimprovementsareillustratedinFigures12and 13,respectively. VHB, Inc. 34

43

44

45

46

47

48

49

50

51

52

53

54

55 Corridor Analysis US 92/International Speedway Blvd From US 17/Woodland Blvd to Garfield Ave R2CTPO APPENDICES VHB, Inc. 7

56 APPENDIXA: US92/InternationalSpeedwayBoulevardandGarfieldAvenue B/CAnalysisReport VHB, Inc. 1

57

58 FinalReport IntersectionAnalysisfor US92/InternationalSpeedwayBlvd. atgarfieldave. April2017 Preparedfor: RivertoSeaTransportationPlanningOrganization (R2CTPO) 2570W.InternationalSpeedwayBlvd.,Suite100 DaytonaBeach,FL Preparedby: VHB,Inc. 225E.RobinsonStreet, Orlando,FL ProfessionalEngineer: KathrynL.Lee P.E.#62420 April07,2017 VHB, Inc. 0

59 Intersection Analysis For US 92/International Speedway Blvd. at Garfield Ave. Task Work Order #1 VOLUSIA COUNTY Prepared for: Prepared by: Vanasse Hangen Brustlin, Inc. Orlando, FL April 2017 VHB, Inc. 1

60 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO EXECUTIVESUMMARY ThisreportpresentstheresultsofanIntersectionAnalysiscompletedforUS92/International SpeedwayBoulevardatGarfieldAvenue,whichislocatedintheCityofDeLandinVolusiaCounty, Florida.ThisreportwaspromptedbyanapplicationbyVolusiaCountytoconstructarightturn lanealongeastboundus92/internationalspeedwayboulevardandtoextendtheexistingleft turnlanealongwestboundus92/internationalspeedwayboulevardatgarfieldavenue. The existing westbound left turn lane on US 92/International Speedway Boulevard is approximately400feetlongwithataperof50feet.theproposedextensionoftheleftturnwill enablevehiclestomoveoutofthethroughlaneandmoveintothedesignatedturnlane,and improve the overall intersection operations. Constructing an eastbound right turn lane will enablevehiclestomoveoutofthewayofthroughtrafficanddecelerateinaseparateturnlane, thusdecreasingdelaytothroughvehiclesandreducingtheriskofrearendcrashes.inaddition to this improvement, this study recommends installing a northbound right turn lane and pedestriansafetyimprovementsasmentionedbelow. Baseduponthecrashanalyses,qualitativeassessment,fieldobservations,intersectionanalysis, Benefit/Cost (B/C) analysis and engineering judgment, the following modifications are recommendedtoimprovethesafetyandoperationoftheintersection: 1:ExtendtheexistingleftturnlanealongwestboundUS92/InternationalSpeedwayBoulevard atgarfieldavenue.therewerenophysicalconstraintsobservedthatwouldimpedethe200 extensionofthewestboundleftturnlaneattheintersectionofus92/internationalspeedway Boulevard and Garfield Avenue. Therefore, the extension of the westbound left turn lane is consideredfeasibleatthislocation.theleftturnlaneextensionwillhaveabeneficialeffectto theoperationofthewestboundmovementaswellastotheintersectionasawhole.theabove modificationcanbeimplementedatanapproximatecostof$13, :ConstructarightturnlanealongeastboundUS92/InternationalSpeedwayBoulevardat Garfield Avenue.The right of way is sufficient to install a separate right turn lane on the VHB, Inc. i

61 eastboundapproach;however,theexistingdrainageswalewouldneedtobereworkedandthe crossdrainwouldneedtobeextendedalongthesouthwestquadrantoftheintersection.the existingpedestriansignal,pullboxandpedestrianlanding,equippedwithahandrail,wouldneed toberelocated.aseparaterightturnlanewillhaveabeneficialeffecttotheoperationofthe eastboundmovementaswellastotheintersectionasawhole.theabovemodificationcanbe implementedatanapproximatecostof$72, : Construct a right turn lane along northbound Garfield Avenue at US 92/International SpeedwayBoulevard.TypeFcurbandgutterwouldbeneededalongtheeastsideofGarfield Avenue to fit a separate northbound right turn lane within the limited rightofway.as the improvementsareconceptual,surveywasnotprovided,andtherightofwaylinesshownonthe ImprovementDiagramarebasedonlotandparcellinespulledfromtheVolusiaCountyProperty Appraiserswebpage.Itisnotanticipatedthattheexistingtrafficsignalpoleswillneedtobe relocated;however,thereareoverheadutilitiesalongtheeastsideofgarfieldavenuethatwould requirerelocation.thenorthboundrightturnlanewillreducedelayandqueueingongarfield Avenue.Theabovemodificationcanbeimplementedatanapproximatecostof$49,357.65(not includinganyadditionalrightofwayorutilityrelocationthatmightberequired). Modifications13canbeimplementedatanapproximatecostof$135,473.65andyieldsaB/C ratioof5.39,whichindicatesthattheanticipatedbenefitsoutweightheestimatedcostsforthe proposedmodifications 4:ExtendtheexistingsidewalksalongtheeastandwestsidesofGarfieldAvenueonthesouth approach all the way to the intersection of US 92/International Speedway Boulevard and GarfieldAvenue.Theseconnectionswillprovideasafepassageforpedestriansbyeliminating theneedforthemtowalkonthepavementorinthegrass.providecrosswalksalongtheeast and south legs of the US 92/International Speedway Boulevard and Garfield Avenue intersection.thecostfortheserecommendations(providedasaseparateitem)isestimatedat $15, VHB, Inc. ii

62 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO Contents EXECUTIVESUMMARY...i INTRODUCTION...3 EXISTINGCONDITIONS...5 FieldInventory...5 TrafficVolumeData...13 CrashData...14 QUALITATIVEASSESSMENT...16 FEASIBILITYANALYSIS...18 Background...18 Methodology...18 AssessmentofProposedSite...18 OperationalAnalysis...19 Benefit/CostAnalysis...20 RECOMMENDATIONS...23 APPENDICES...27 ListofTables Table1:8HourTurningMovementPercentages...13 Table2:CrashSummary(Jan2013Dec2015)...15 Table3:BeforeandAfterOperationalAnalysisResults...20 Table4:UnitValueofMOEs...21 Table5:Benefit/CostAnalysisResults...22 ListofFigures Figure1:LocationMap...4 Figure2:ConditionDiagram...12 Figure3:CrashDiagram...15 Figure4:ConceptualImprovementDiagram...25 ListofExhibits Exhibit1:LookingwesttowardstheintersectiononWBUS Exhibit2:LookingeastawayfromtheintersectiononWBUS Exhibit3:LookingeasttowardstheintersectiononEBUS Exhibit4:LookingwestawayfromtheintersectiononEBUS VHB, Inc. 1

63 Exhibit5:LookingnorthtowardstheintersectiononNBGarfieldAvenue...9 Exhibit6:LookingsouthawayfromtheintersectiononNBGarfieldAvenue...9 Exhibit7:LookingsouthtowardstheintersectiononSBGarfieldAvenue...10 Exhibit8:LookingnorthtowardstheintersectiononSBGarfieldAvenue...10 Exhibit9:TrackingonshoulderLookingeasttowardstheintersectiononEBUS VHB, Inc. 2

64 INTRODUCTION VHB,Inc.wasretainedtoperformanIntersectionAnalysisforUS92/InternationalSpeedway BoulevardattheintersectionofGarfieldAvenue,whichislocatedintheCityofDeLandinVolusia County,Florida,asillustratedinFigure1.ThisreportwaspromptedbyanapplicationbyVolusia Countytoconstructaneastboundrightturnlaneandtoextendtheexistingwestboundleftturn lane at the US 92/International Speedway Boulevard and Garfield Avenue intersection.the purpose of the analysis is to identify cost feasible intersection improvements that may be appropriatetoreduceintersectioncongestionanddelay.inadditiontotheseimprovements, thisstudyrecommendsinstallinganorthboundrightturnlane(basedoninformation/comments providedbyfdot)andsidewalkimprovementstopromotepedestriansafety.thisfinalreport wasrevisedbasedonthecommentsreceivedfromvolusiacountyandfloridadepartmentof Transportation(FDOT)onthedraftreport.ThecommentsprovidedbytheCountyandFDOT, along with comment responses, are provided in Appendix A. The analysis will particularly considerthebenefitsandfeasibilityofaddingadedicatedeastboundrightturnlane,northbound right turn lane and extending the westbound left turn lane at the intersection of US 92/InternationalSpeedwayBoulevardandGarfieldAvenue. TheanalysismethodsusedincompletingthisstudyareconsistentwiththeManualonUniform Traffic Control Devices (MUTCD), the Manual on Uniform Traffic Studies (MUTS), the Traffic EngineeringManual(TEM)andengineeringjudgment.Theremainderofthisreportdocuments existing conditions, vehicle and pedestrian counts, qualitative assessments, crash analyses, intersectionanalysis,b/canalysisandrecommendations. VHB, Inc. 3

65 N. Spring Garden Ave. \\vhb\proj\orlando\ US 92 at Garfield R2CTPO\graphics\FIGURES\AI Source: Perkins Hwy. N. Spring Garden Ave. Grand Ave. Glenwood Reserve Carter Rd. Clark Bay Conservation Area N Not To Scale Pineland Heights Glenwood Rd. 92 DeLand Municipal Airport E. International Speedway Blvd. N. Woodland Blvd. Glenwood DeLand Fams Grand Ave. North DeLand E. Plymouth Ave. W. Plymouth Ave. E. Plymouth Ave. Garfield Ave. 17 W. Minnesota Ave. E. New York Ave DeLand W. New York Ave. Figure 1 Site Location Map

66 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO EXISTINGCONDITIONS FieldInventory TheintersectionofUS92/InternationalSpeedwayBoulevardandGarfieldAvenueislocatedin thecityofdelandinvolusiacounty,florida.theexistingconditiondiagram,figure2,depicts the existing conditions at the study intersection including the general roadway geometry, pavementmarkings,landuse,andintersectiontrafficcontrol.inaddition,photographsofthe existingconditionsaroundtheintersectionareprovidedattheendofthissection.theconditions statedinthisreportreflectconditionsasobservedonthedateofthequalitativeassessment. The intersection of US 92/International Speedway Boulevard and Garfield Avenue is a plus shaped intersection with US 92/International Speedway Boulevard running eastwest and GarfieldAvenuerunningnorthsouth.Theintersectionisundersignalcontrol. US92/InternationalSpeedwayBoulevardisa4lanedividedroadwayandGarfieldAvenueisa2 lane undivided roadway. At the intersection, there is a separate left turn lane for all approaches,exceptthenorthboundwhichhasasharedleftthroughandrightturnlane.thereis aseparaterightturnlaneinwestbounddirectiononly.thepostedspeedlimitsare45mphalong US92/InternationalSpeedwayBoulevardand25mphand30mphalongGarfieldAvenuenorth andsouthoftheintersection,respectively. Thetrafficsignalisaboxspanstrainpoledesignwithconcretepoleslocatedinallfourquadrants of the intersection. The signal phasing provides protected/permissive left turns from US 92/InternationalSpeedwayBoulevardandpermissiveleftturnsfromGarfieldAvenue.Thereare signalized special emphasis pedestrian crosswalks across the north and west legs of the intersection.sidewalksrunalongthenorthsideofus92/internationalspeedwayboulevard (westofintersection)andtheeastsideofgarfieldavenue(northofintersection),andbotheast &westsidesofgarfieldavenue(southoftheintersection).thesidewalksalonggarfieldavenue do not extend to the intersection. A shareduse trail runs along the north side of US 92/InternationalSpeedwayBoulevardbetweenthesidewalkandtheroadway.Thereisnostreet lightingalongus92/internationalspeedwayboulevardoralonggarfieldavenue. VHB, Inc. 5

67 ThelandusewithinthevicinityoftheintersectionconsistsofaLowe shomeimprovementin thenorthwestquadrant,adqgrill&chillrestaurantinthenortheastquadrant,adunkindonuts andcomfortinninthesouthwestquadrantandanautozoneinthesoutheastquadrant.us 92/InternationalSpeedwayBoulevardisamajorarterialconnectingtheCityofDeLandtoI95 and the City of Daytona Beach.Garfield Avenue is largely developed; it provides access to commercialandorresidentialdevelopment. VHB, Inc. 6

68 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO US92/InternationalSpeedwayBoulevardatGarfieldAvenue Exhibit1:LookingwesttowardstheintersectiononWBUS92 Exhibit2:LookingeastawayfromtheintersectiononWBUS92 VHB, Inc. 7

69 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO US92/InternationalSpeedwayBoulevardatGarfieldAvenue Exhibit3:LookingeasttowardstheintersectiononEBUS92 Exhibit4:LookingwestawayfromtheintersectiononEBUS92 VHB, Inc. 8

70 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO US92/InternationalSpeedwayBoulevardatGarfieldAvenue Exhibit5:LookingnorthtowardstheintersectiononNBGarfieldAvenue Exhibit6:LookingsouthawayfromtheintersectiononNBGarfieldAvenue VHB, Inc. 9

71 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO US92/InternationalSpeedwayBoulevardatGarfieldAvenue Exhibit7:LookingsouthtowardstheintersectiononSBGarfieldAvenue Exhibit8:LookingnorthtowardstheintersectiononSBGarfieldAvenue VHB, Inc. 10

72 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO US92/InternationalSpeedwayBoulevardatGarfieldAvenue Exhibit9:TrackingonshoulderLookingeasttowardstheintersectiononEBUS92 VHB, Inc. 11

73

74 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO TrafficVolumeData The8hourintersectionturningmovementcountswerecollectedonDecember6,2016between 7:00 AM 9:00 AM, 11:00 AM 1:00 PM and 2:00 PM 6:00 PM along US 92/International SpeedwayBoulevardatLowe sentranceandgarfieldavenueintersections.fromthisdata,the AM,middayandPMpeaktraffichourswerefoundtooccurfrom7:15AMto8:15AM,11:30AM to12:30pmand4:45pmto5:45pm,respectively.theoverallpeakhourfortheintersection wasfoundtooccurduringthepmpeakhour. TheturningmovementcountsonUS92/InternationalSpeedwayBoulevardrevealthatthetraffic in eastbound direction peaks during AM conditions and traffic in westbound direction peaks duringpmconditions.duringmiddayconditions,thetrafficseemstobeequallydistributedin both the directions. The 8hour turning movement counts and pedestrian/bicycle counts are provided in greater detail in Appendix B. The following table summarizes the distribution of turningmovementsthroughthestudyintersection: Table1:8HourTurningMovementPercentages (AllVehicles) Movement Northbound Southbound Eastbound Westbound Leftturn/Uturn 32.3% 51.1% 3.7% 6.9% Through 31.4% 21.1% 90.2% 85.3% Rightturn 36.2% 27.8% 6.1% 7.8% Theexistingfieldcollectedturningmovementcountswerebalanced(basedonthepresenceof additionalaccesslocationsbetweenstudyintersections)andusedintheoperationalanalysis. VHB, Inc. 13

75 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO CrashData Crash reports compiled by Florida Signal Four Analytics were provided by River to Sea Transportation Planning Organization (R2CTPO).Based on this data, there were 16 crashes reportedwithintheinfluenceareaoftheintersectionduringthelatest36monthperiodcovering January1,2013toDecember31,2015.Thecrashesconsistedof11rearendcrashes,1leftturn crash,2sideswipecrashesand2anglecrashes.thecrashescaused7injuries,andtotalproperty damageamountedtoapproximately$115, therewerenofatalities.threeofthecrashes occurredatnightand10crashesoccurredeitherduringthedayoratduskandunknownforthe remaining3.pavementconditionsweredryfor13ofthecrashesandunknownfortheremaining 3. Basedonthisinformation,itisapparentthatrearendcrashesaccountforthemajorityofthe crashes at the intersection, with most of them occurring on US 92/International Speedway Boulevard rather than on the side streets.rear end crashes are inherent with signalized intersections,andtherewerenogeometricconstraintssuchasverticalorhorizontalcurvesor treesthatwouldpromoterearendcrashesorobstructthevisibilityofthetrafficsignal. Ofthe11rearendcrashes,4crashesoccurredontheoutsidethroughlanealongeastboundUS 92/InternationalSpeedwayBoulevard.Althoughthecrashreportsdidnotspecifywhetherthe eastboundvehiclesweretravelingthroughorturningrightatgarfieldavenue,3outofthese4 crashesoccurredduetoslowingdownorstoppingfortheredlightatthetrafficsignal. ACrashSummaryandCrashDiagramareprovidedinthefollowingpages. VHB, Inc. 14

76 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO Table2:CrashSummary(Jan2013Dec2015) # CrashID Date Time Crash Type Fatalities Injuries Property Damage Day/Night Wet/Dry C /19/2013 8:10PM RearEnd 0 0 $4,000 DarkLighted Dry C /19/2013 4:05PM Angle 0 1 $8,000 Daylight Dry C /9/2013 4:45PM RearEnd 0 1 $4,100 Dusk Dry C /1/ :23PM RearEnd 0 0 $4,000 Daylight Dry C /18/2014 6:20AM RearEnd 0 0 $8,000 Unknown Unknown C /23/2014 1:10PM RearEnd 0 0 $6,000 Daylight Dry C /3/2013 4:25PM RearEnd 0 2 $46,100 Daylight Dry C /20/2013 7:17PM Sideswipe 0 3 $2,000 DarkLighted Dry C /15/2013 7:40AM RearEnd 0 0 $0 Daylight Dry C /21/2014 4:00PM RearEnd 0 0 $1 Unknown Unknown C /31/2014 2:25PM RearEnd 0 0 $0 Unknown Unknown C /15/ :32AM RearEnd 0 0 $2,000 Daylight Dry C /31/2015 7:24PM Sideswipe 0 1 $4,000 Daylight Dry C /1/2015 2:58PM LeftTurn 0 4 $20,000 Daylight Dry C /23/2015 7:18PM RearEnd 0 0 $1,500 DarkLighted Dry C /30/2015 5:54PM Angle 0 3 $6,000 Daylight Dry CrashSummarybyCrashTypes(Jan2013Dec2015) CrashType Percent Angle % RearEnd % HeadOn % LeftTurn % Sideswipe % Pedestrian % RightTurn % Bicycle % Other % Total % VHB, Inc. 15

77 3

78 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO QUALITATIVEASSESSMENT A qualitative assessment (QA) was conducted in the field in order to evaluate the existing operatingconditionsoccurringonatypicalweekday,andtoidentifyareaswhereimprovements wouldbepotentiallybeneficialtotheoverallsafetyandefficiencyofthelocation.aregistered professionalengineerperformedtheqafrom4:30pm 5:30PMduringtheeveningpeakhour period. 1. During the QA, the intersection, as a whole, appeared to operate smoothly and with minimaldelay.thevolumeoftrafficobservedonus92/internationalspeedwayboulevard wassignificantlyhigherthanthevolumesobservedongarfieldavenue.theflowoftraffic onus92/internationalspeedwayboulevardwasheavierinthewestbounddirectionthanin theeastbounddirection.foracoupleofcyclesbetween5:00pmand5:20pm,queueson westbound US 92/International Speedway Boulevard were observed to back up approximately 800 feet, thus blocking the left turning vehicles and causing cycle failures (queuesclearedupinthenextcycle).duringthesameperiod(5:00 5:20PM),thequeues onwestboundus92/internationalspeedwayboulevardfrequentlybackedupapproximately 600feet.DuringtheremainderofthePMpeakhourtimeperiod,theintersectionoperated withoutsignificantqueuesorcyclefailures.itwasobservedthattheoutsidethroughlaneon eastbound US 92/International Speedway Boulevard was utilized more than the inside throughlane.inafewinstances,thequeuesoneastboundus92/internationalspeedway BoulevardwerebackeduptotheLowe sentrance;however,allqueuedvehicleswereable tocleartheintersectioninonecycle. 2.Thegeometryoftheintersectionis,ingeneral,straightandflat,sothesightdistanceto thesignalisnotimpededandwasnotobservedtopresentanyoperationalorsafetyconcerns. 3.Therearetrackingmarksontheshouldersoftheeastboundapproachwhichbearevidence thatvehiclesaretravelingontheshoulderstogetaroundstoppedthroughtraffictoproceed withtheirrightturn. VHB, Inc. 17

79 4. There are crosswalks with pedestrian signals across the north andwest legs of the US 92/InternationalSpeedwayBoulevardandGarfieldAvenueintersection.Thecrosswalksare markedwithspecialemphasispavementmarkings,whichareappropriateforacrossingata signalizedintersection.thewalktimesprovidedappearedadequateforpedestrianstocross atanormalpaceandwithintheallottedtime. 5.Crosswalksarenotprovidedonthesouthandeastlegsoftheintersection.Thesidewalks alongtheeastandwestsideofgarfieldavenue(southleg)areterminatedjustbeforethe intersection. VHB, Inc. 18

80 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO FEASIBILITYANALYSIS Background AnapplicationwasreceivedfromVolusiaCountytoperformafeasibilitystudytoconstructan eastbound right turn lane and to extend the existing westbound left turn lane along US 92/InternationalSpeedwayBoulevardatGarfieldAvenue.Thepurposeoftheeastboundright turnlaneistoenabletraffictomoveoutofthewayofthroughtrafficanddecelerateinthe separateturnlane,thusreducingdelayforvehiclesturningrightontogarfieldavenue.addinga neweastboundrightturnlanewillreducethelikelihoodofrearendcrashesassociatedwith trafficslowingdowntomaketheturnontogarfieldavenue.thetrafficmakingthewestbound left turn (sometimes) cannot reach the turn lane due to the westbound through queues. Therefore,extendingthewestboundleftturnwillenabletraffictomoveoutofthethroughlane andmoveintothedesignatedturnlane.anorthboundrightturnlaneisalsorecommendedat the intersection since the northbound right turn traffic consistently drives on the shoulder aroundnorthboundthroughtraffictoturnrightonred(basedoninformationprovidedbyfdot). Methodology Themethodologyfordeterminingthefeasibilityofconstructinganeastboundrightturnlane,a northbound right turn lane and extending the existing westbound left turn lane along US 92/InternationalSpeedwayBoulevardatGarfieldAvenueincludesperforminganassessmentof theproposedsite,acomparisonofbeforeandafteroperatingconditionsattheintersection utilizingtrafficoperationanalysissoftware,andpreparingabenefit/cost(b/c)analysisforany proposedimprovements. AssessmentofProposedSite US 92/International Speedway Boulevard is a fourlane divided roadway with a wide grass median.at its intersection with Garfield Avenue, US 92/International Speedway Boulevard widenstoincludeseparaterightandleftturnlanesonthewestboundapproachandaseparate leftturnlaneontheeastboundapproach.thedrainagesystemconsistsofopenswalesalong VHB, Inc. 19

81 thenorthandsouthsidesoftheroad,andacrossdrainwithmiteredendsectionsrunningunder thesouthlegofgarfieldavenue. Toinstallaseparaterightturnlaneontheeastboundapproach,theswalealongthesouthwest quadrantwouldneedtobereworkedandthecrossdrainextendedtonotconflictwiththe additionallane.theeastboundapproachcurrentlydrainsintotheswalealongus17,andthe additionofcurbandgutterandassociatedflumeswouldnotchangethat;althoughthevolume ofwaterwillincreasewiththeincreasedimpervioussurfaceareaofthenewlane.theswales shouldbeanalyzedtodetermineiftheycanaccommodatetheadditionalwater.thesouthwest quadrantoftheintersectionalsocontainsapedestriansignal,pullboxandapedestrianlanding equippedwithahandrailthatwouldneedtoberelocatedtoaccommodatetheadditionallane. Inordertoconstructanorthboundrightturnlane,curbandgutterwillberequiredtomaintain theclearzonealongtheeastsideofgarfieldavenue.thenorthboundapproachcurrentlydrains northtowardstheintersectionandintotheswalesalongus17,andtheadditionofcurband gutterwouldnotchangethat;althoughthevolumeofwaterwillincreasewiththeincreased impervioussurfaceareaofthenewlane.theswalesshouldbeanalyzedtodetermineiftheycan accommodatetheadditionalwater.surveywasnotprovidedfortheimprovementdiagrams; however,fromlotandparcellinespulledfromthevolusiacountypropertyappraiserswebpage, itappearsthattheturnlanecouldfitwithintheexistingrightofway.theoverheadutilitylines thatrunalongtheeastsideofgarfieldavenuewouldneedtoberelocated.itisnotanticipated thattheexistingtrafficsignalpoleinthesoutheastquadrantwillneedtobereplacedsincethe curbandgutterwillprovidetheappropriateclearzone. Therewerenophysicalconstraintsobservedthatwouldimpedetheextensionofthewestbound leftturnlane. OperationalAnalysis Anintersectionoperationanalysiswasperformedforbeforeandafterconditions.Thebefore conditionsassumethatthereisnochangeinintersectiongeometryandsignaltimings,whereas, the after conditions assume that the lane configuration on US 92/International Speedway Boulevard will be modified to include a separate eastbound right turn lane, a separate VHB, Inc. 20

82 northboundrightturnlaneandextensionofthewestboundleftturnlane.theexistingoperating conditionsofus92/internationalspeedwayboulevardandgarfieldavenueweredetermined usingsynchro9/simtrafficsimulationsoftware.thesignaltiminginformationwasobtainedfrom VolusiaCounty.Table2summarizestheintersectiondelayandlevelsofservice(LOS)forbefore andafterconditionsduringthethreepeakperiods.asshowninthetable,theintersectionofus 92/InternationalSpeedwayBoulevardandGarfieldAvenueisoverallexpectedtooperatebetter withtheproposedimprovements.thesimtrafficsimulationresultswereprovidedinappendix C. Intersection Delay (Sec.) Table3:BeforeandAfterOperationalAnalysisResults AMPeakHour MidDay PMPeakHour Before After Before After Before After LOS Delay (Sec.) LOS Delay (Sec.) LOS Delay (Sec.) LOS Delay (Sec.) LOS Delay (Sec.) Overall 10.9 B 9.4 A 12.9 B 9.1 A 19.0 B 17.5 B Note:Theresultsarebasedonaverageof10randomseedSimTrafficSimulationruns LOS Benefit/CostAnalysis Abenefitcostanalysiswasperformedforthestudyintersectiontoestimatetheeffectivenessof thepotentialintersectionimprovementsusingsimtrafficsimulation.thebenefitsaredefinedin termsofannualizedcostsavingsassociatedwithreductionsinthefollowingthreemeasuresof effectiveness(moes): o o o TotalDelay(VehicleHours) Stops FuelConsumption(Gallons) Thebenefitswerecalculatedfor300daysinayearaccountingforreducedbenefitsanticipated duetolowertrafficvolumesduringtheweekend.thevalueofdelaytimeperhour($17.67)and fuelcost($3.27)wereobtainedfrom TheMobilityDataforOrlando publishedbytexasa&m University.Stopswereestimatedtocost$0.014each.Table4summarizestheunitvalueofeach MOEinatabularformatalongwithitssource. VHB, Inc. 21

83 Table4:UnitValueofMOEs MOEValues UnitValue Source Stops($) Transyt7F Delay($) UrbanMobilityReportpublishedby TexasA&MTransportationInstitute(TTI) Fuel($/gal.) UrbanMobilityReportpublishedby TTI DaysperYear 300 Averagedayswithobservablepeaking characteristics Theestimatedcostfortheproposedmodificationis$135,474(presentdayvalue)andithasa correspondingannualizedcostamountingto$9, thecostestimatedoesnotincludethe potentialcostofrightofwayortherelocationofexistingutilitiesforthenorthboundrightturn laneimprovement.theservicelifeforthemodificationisassumed20yearsandtheinterestrate usedinthecalculationofannualizedcostsisassumed4%,whichisavaluefrequentlyusedbythe Florida Department of Transportation (FDOT) in their benefit cost computations.the Cost EstimatefortheproposedlaneadditionscanbefoundinAppendixD. Table5summarizesthebenefitcostanalysisfortheproposedimprovements.Theanalysisyields ab/cratioof5.39.thecalculatedb/cratioindicatesthattheanticipatedbenefitsoutweighthe estimatedcostsfortheproposedmodifications,withbenefitsderivedthroughreducedcosts associatedwithlowerdelay,stopsandfuelconsumption. VHB, Inc. 22

84 Table5:Benefit/CostAnalysisResults MeasuresofEffectiveness BenefitPeriod TotalDelay FuelConsumption TotalStops (vehhrs) (gal) AMPeakHour Existing Proposed MidDay Existing Proposed PMPeakHour Existing 1, Proposed 1, EstimatedDaily(AM+ Existing 2, Mid+PM) Proposed 2, EstimatedDailySavings EstimatedUnitCost $0.014 $ $3.270 DailyUserBenefitbyMOE $1.92 $ $4.578 DailyUserBenefitTotal $ AnnualUserBenefit $53, TotalAnnualCost $9, BenefitCostRatio 5.39 Notes: 1) Theservicelifeoftheimprovementswaskeptat20years 2) Interestrateof4%wasusedtodeterminetheannualcostofimprovements 3) Annualuserbenefitwascalculatedfor300dayswith2hourseachofAM,MiddayandPMpeakperiods VHB, Inc. 23

85 Intersection Analysis US 92/International Speedway Blvd. at Garfield Ave. R2CTPO RECOMMENDATIONS Baseduponthecrashandspeedanalyses,qualitativeassessment,fieldobservations,intersection analysis,b/canalysisandengineeringjudgment,thefollowingmodificationsarerecommended toimprovethesafetyandoperationoftheintersection: 1:Extendtheexistingwestboundleftturnlane,constructaneastboundrightturnlaneand constructanorthboundrightturnlaneattheintersectionofus92/internationalspeedway BoulevardandGarfieldAvenue.Therewerenophysicalconstraintsfoundthatwouldimpede the extension of the westbound left turn lane at the intersection of US 92/International SpeedwayBoulevardandGarfieldAvenue.Therightofwayissufficienttoinstallaseparateright turnlaneontheeastboundapproach;however,theexistingdrainageswalewouldneedtobe reworkedandthecrossdrainwouldneedtobeextendedalongthesouthwestquadrantofthe intersection.theexistingpedestriansignal,pullboxandpedestrianlanding,equippedwitha handrail,wouldneedtoberelocated.inordertoconstructanorthboundrightturnlane,curb andgutterwouldberequiredtomaintaintheclearzonealongtheeastsideofgarfieldavenue. Survey was not provided for the Improvement Diagrams; however, from lot and parcel lines pulledfromthevolusiacountypropertyappraiserswebpage,itappearsthatthenorthbound turnlanecouldfitwithintheexistingrightofway;however,theoverheadutilitylinesthatrun alongtheeastsideofgarfieldavenuewouldneedtoberelocated.itisnotanticipatedthatthe existingtrafficsignalpoleinthesoutheastquadrantwillneedtobereplacedsincethecurband gutterwillprovidetheappropriateclearzone.withboththeeastboundandnorthboundright turnlanes,theswalesalongus17shouldbeanalyzedtodetermineiftheycanaccommodatethe additional water. These modifications can be implemented at an approximate cost of $135,473.65(doesnotincludethepotentialcostofrightofwayorrelocationoftheoverhead utilitiesforthenorthboundrightturn)andyieldsab/cratioof5.39,whichindicatesthatthe anticipatedbenefitsoutweightheestimatedcostsfortheproposedmodification. TheproposedimprovementsareillustratedintheFigure4shownonthefollowingpage. VHB, Inc. 24

86 2:ExtendtheexistingsidewalksalongtheeastandwestsidesofGarfieldAvenueonthesouth approach all the way to the intersection of US 92/International Speedway Boulevard and GarfieldAvenue.Theseconnectionswillprovideasafepassageforpedestriansbyeliminating theneedforthemtowalkonthepavementorinthegrass.providecrosswalksalongtheeast and south legs of the US 92/International Speedway Boulevard and Garfield Avenue intersection.thecostfortheserecommendations(providedasaseparateitem)isestimatedat $15, VHB, Inc. 25

87

88

89 APPENDICES VHB, Inc. 28

90 APPENDIXA:ResponsestoComments VHB, Inc. 1

91 Comments from Amir Asgarinik(FDOT) US 92 at Garfield Report Comments 1. Shouldn t we use Optional Base Group 9 instead of 13? Response: Base Group has been revised from 13 to Does the existing concrete signal assembly need to be upgraded based on the proposed improvements? Response: It is anticipated that the existing span wire traffic signal can be maintained since no new signal heads will be required, and Type F curb and gutter is being proposed along the east side of the NB right turn lane since there is not enough right of way to maintain an 18 CZ. 3. Need 36 concrete pipes to accommodate the proposed turning movements and sidewalks. Response: 36 round concrete pipe has been added to the estimate. 4. Most of the proposed sidewalks should be 6 thick due to its proximity to the EOP and traffic movement. Response: The cost estimate considers that the ramps and sidewalk within the immediate vicinity of the curb radius will be 6 concrete % Contingency may be excessive. Response: The contingency has been reduced to 15%. Comments from Keith Riger (City of Deland) 1. I would like to point out that we have a proposed project in the hopper called the DeLand Greenway Trail North Extension, FIN , Federal Aid Number A to build a trail to the SW corner of the intersection. Pertinent plans are attached. Let s coordinate. Response: Comment Noted. Comments from Jon Cheney (Volusia County) 1. No comments on justification for new turn lanes, but always a support new lanes. 2. Why is this separate from the other turn lane study in the same area? This project should be combined with other turn lane project on US92 and administered by FDOT since work is on a State Roadway. Response: Two different reports were created based on the two different feasibility study applications from Volusia county. However, the US 92 & Garfield report was included in the appendix of the US 92 from Woodland Boulevard to Garfield Avenue report. 3. Did they look at need for turn lanes on Garfield itself? Response: As per the information provided by FDOT, additional northbound right turn lane is proposed at Garfield Avenue.

92 4. Not enough information to perform a constructability review, however most construction appears to be in FDOT ROW. Comments from Christopher Cairns (FDOT) 1. Please clarify the input volumes utilized for the eastbound and westbound approaches in the Synchro analysis for AM, Midday, and PM. Response: The turning movement counts, provided in Appendix A, were taken and adjusted (balanced) for reasonableness considering the presence or absence of additional access points between study intersections. 2. There is visible wear on the northbound approach leg from right turns. An exclusive right turn lane would appear to reduce peak hour delay and queuing on Garfield Avenue. Response: Comment noted. Analysis is revised with the exclusive northbound right turn lane improvement. 3. Concur with need for sidewalk to extend to pedestrian signal on SW corner and for pedestrian features and crosswalk for the east and south approaches. Please show these improvements on the improvement diagram. Note that additional work may be required to make well designed sidewalk connectivity on these corners, which may cost more than estimated. Response: Comment noted. All the proposed improvements are shown in the improvements diagram (figure 4). 4. Concur with need for an eastbound right turn lane as recommended. However, some form of bulb out should be considered to break up the right turn lane. We should avoid creating a new continuous EB auxiliary lane between Amelia and Garfield Avenue (that crosses a median opening). Response: Comment noted. The proposed eastbound right turn lane will not create a continuous eastbound auxiliary lane between Amelia Avenue and Garfield Avenue 5. There does not appear to be any operational benefit to extending the existing 450 westbound left turn lane. We are not aware of any wear or queue storage issues to suggest a problem. Response: Comment noted. During field observations, for a couple of cycles between 5:00 PM and 5:20 PM, queues on westbound US 92/International Speedway Boulevard were observed to back up approximately 800 feet, thus blocking the left turning vehicles and causing cycle failures (queues cleared up in the next cycle). During the same period (5:00 5:20 PM), the queues on westbound US 92/International Speedway Boulevard frequently backed up approximately 600 feet. 6. Can the existing signal structure support retroreflective back plates to enhance signal conspicuity and/or 4section heads for FYA indications? Response: Comment noted. The report provides conceptual improvements and there is insufficient information regarding the soil conditions, foundation design and capacity of the existing signal system to provide accurate structural analysis for the proposed modifications.

93 APPENDIXB:TrafficData

94 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Lowes Driveway & US 92 Intn'l Speedway Blvd Date December 6, 2016 All Vehicles AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL , , Peak Hour 7:15 AM 8:15 AM , Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL , , Peak Hour 11:30 AM 12:30 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL , , Peak Hour 4:45 PM 5:45 PM ,282 30

95 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Lowes Driveway & US 92 Intn'l Speedway Blvd Date December 6, 2016 Trucks AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 7:15 AM 8:15 AM % 4% 2% 3% 0% 4% 0% Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:30 AM 12:30 PM % 1% 1% 5% 25% 5% 5% PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 4:45 PM 5:45 PM

96 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Lowes Driveway & US 92 Intn'l Speedway Blvd Date December 6, 2016 UTurns & RTOR AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 8:00 AM 9:00 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:00 AM 12:00 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 2:15 PM 3:15 PM

97 Pedestrian&BicycleSummary Project#: Date: 12/6/2016 NB/SB: LowesDriveway EB/WB: US92Intn'lSpeedwayBlvd Eastbound Hour 7:00 8:00 11:00 12:00 14:00 15:00 16:00 17: Bike Ped Westbound Bike Ped Southbound Northbound Hour PedBike PedBike LowesDriveway 7: :00 8: US92Intn'lSpeedwayBlvd :00 11: :00 12: :00 14: :00 US92Intn'lSpeedwayBlvd 15: :00 16: :00 17: : LowesDriveway Southbound Northbound PedBike PedBike Hour Eastbound Bike Ped Westbound Bike Ped Hour 7:00 8:00 11:00 12:00 14:00 15:00 16:00 17:

98 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Garfield Ave & US 92Intn'l Speedway Blvd Date December 6, 2016 All Vehicles AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL , , Peak Hour 7:15 AM 8:15 AM , Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL , , Peak Hour 11:30 AM 12:30 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL , , Peak Hour 4:45 PM 5:45 PM ,201 66

99 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Garfield Ave & US 92Intn'l Speedway Blvd Date December 6, 2016 Trucks AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 8:00 AM 9:00 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:15 AM 12:15 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 2:00 PM 3:00 PM

100 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Garfield Ave & US 92Intn'l Speedway Blvd Date December 6, 2016 UTurns & RTOR AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 7:00 AM 8:00 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:15 AM 12:15 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 2:45 PM 3:45 PM

101 Pedestrian&BicycleSummary Project#: Date: 12/6/2016 NB/SB: GarfieldAve EB/WB: US92Intn'lSpeedwayBlvd Eastbound Hour 7:00 8:00 11:00 12:00 14:00 15:00 16:00 17: Bike Ped Westbound Bike Ped Southbound Northbound Hour PedBike PedBike GarfieldAve 1 7: :00 2 8: US92Intn'lSpeedwayBlvd : : : : : : :00 US92Intn'lSpeedwayBlvd Southbound Northbound PedBike PedBike Hour 6 15: : : : : : GarfieldAve Eastbound Bike Ped Westbound Bike Ped :00 8:00 11:00 12:00 14:00 15:00 16:00 17: Hour

102 APPENDIXC:TrafficOperationAnalysis(SimTrafficResults)

103 COUNTY OF VOLUSIA TRAFFIC SIGNAL TIMING SHEET LOCATION: US 92 & Garfield Avenue DeLand ISOLATED: DATE: 11/30/2015 SIGNAL #: 395 COORD: X Design By: M Tobin System #: 4 PHASE DIRECTION TURN TYPE MIN GREEN EXTENSION CLEARANCE ALL RED WALK FDW MAX 1 MAX 2 MAX 3 ADJUST RECALL DETECTOR FLASH SET CLEAR PHASES: EBL WB NB WBL EB SB PERM/PROT PERM/PROT NONLOCK 8 Controller Timing Chart MIN MIN LOCK NONLOCK NONLOCK LOCK NONLOCK BASE DAY MON #1 TUES#1 WED #1 THU #1 FRI #1 SAT #2 SUN #3 TIME PLAN TIME PLAN TIME PLAN TIME PLAN TIME PLAN TIME PLAN TIME PLAN 05:3010:00 C1O1S1 05:3010:00 C1O1S1 05:3010:00 C1O1S1 05:3010:00 C1O1S1 05:3010:00 C1O1S1 08:0018:00 C2O1S1 09:3017:00 C1O1S1 10:0014:30 C2O1S1 10:0014:30 C2O1S1 10:0014:30 C2O1S1 10:0014:30 C2O1S1 10:0014:30 C2O1S1 18:0000:00 Free 17:0000:00 Free 14:3019:00 C301S1 14:3019:00 C301S1 14:3019:00 C301S1 14:3019:00 C301S1 14:3019:00 C301S1 19:0000:00 Free 19:0000:00 Free 19:0000:00 Free 19:0000:00 Free 19:0000:00 Free CONTROLLER TYPE CONDITION OF OVERHEAD Fair PROM NUMBER OVERHEAD STREET NAMES NO Econolite ASC/3 CABINET TYPE CABINET DATE V 03/2005 ILLUMINATED STREET NAMES PREEMPTION PREEMPTION TYPE YES YES INFRARED IP ADDRESS Crosswalk Length LED P2 75 Feet P4 P6 P8 130 Feet SIGNAL OWNER FDOT YES REMARKS: Max 2 for Coordination Opticom not in Use

104 DATE: VOLUSIA COUNTY TRAFFIC ENGINEERING Switch IP.# SYSTEM INVENTORY Controller IP.# Camera IP # 5/16/2016 DESIGNED BY: M Tobin LOCATION: US 92 & Garfield Avenue CITY: SIGNAL ID NO: 395 SYSTEM ID: 4 DeLand CONTROLLER TIME CHART TP# 1 MVMNT MIN EXT CLR A.R. WALK FDW MAX1 MAX2 MAX3 ADJST REC DET FL SET CLR COORDINATION NL PLAN C1/S1 C2/S1 C3/S1 C4/S1 C5/S1 C6/S MIN L CYCLE OFF NL OFF NL OFF MIN L OFF 4 7 OFF NL PERM 10% 10% 10% 10% 10% 10% 10% 10% PHASE SPLITS (seconds) CY/SP PH 1 PH 2 PH 3 C1/S C2/S C3/S C4/S1 C5/S1 C6/S PH PH 5 PH 6 PH 7 PH BASE DAY MON #1 TUES#1 WED #1 THU #1 FRI #1 SAT #2 SUN #3 TIME PLAN TIME PLAN TIME PLAN TIME PLAN TIME PLAN TIME PLAN TIME PLAN 05:3010:00 C1O1S1 05:3010:00 C1O1S1 05:3010:00 C1O1S1 05:3010:00 C1O1S1 05:3010:00 C1O1S1 08:0018:00 C2O1S1 09:3017:00 C1O1S1 10:0014:30 C2O1S1 10:0014:30 C2O1S1 10:0014:30 C2O1S1 10:0014:30 C2O1S1 10:0014:30 C2O1S1 18:0000:00 Free 17:0000:00 Free 14:3019:00 C301S1 14:3019:00 C301S1 14:3019:00 C301S1 14:3019:00 C301S1 14:3019:00 C301S1 19:0000:00 Free 19:0000:00 Free 19:0000:00 Free 19:0000:00 Free 19:0000:00 Free

105 SimTraffic Simulation Summary Existing AM 01/30/2017 Summary of All Intervals Run Number Start Time 7:20 7:20 7:20 7:20 7:20 7:20 7:20 End Time 8:30 8:30 8:30 8:30 8:30 8:30 8:30 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Summary of All Intervals Run Number Avg Start Time 7:20 7:20 7:20 7:20 End Time 8:30 8:30 8:30 8:30 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 7:20 End Time 7:30 Total Time (min) 10 Volumes adjusted by Growth Factors. No data recorded this interval. US 92 US 17 to Garfield Ave SimTraffic Report SK Page 1

106 SimTraffic Simulation Summary Existing AM 01/30/2017 Interval #1 Information Recording Start Time 7:30 End Time 8:30 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #1 Information Recording Start Time 7:30 End Time 8:30 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Avg Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 2

107 SimTraffic Performance Report Existing AM 01/30/2017 5: Garfield Ave & Intnl Spdway Bv/US 92 Performance by approach Approach EB WB NB SB All Denied Delay (hr) Denied Del/Veh (s) Total Delay (hr) Total Del/Veh (s) Stop Delay (hr) Stop Del/Veh (s) Total Stops Stop/Veh Travel Dist (mi) Travel Time (hr) Avg Speed (mph) Fuel Used (gal) Fuel Eff. (mpg) HC Emissions (g) CO Emissions (g) NOx Emissions (g) Vehicles Entered Vehicles Exited Hourly Exit Rate Input Volume % of Volume Denied Entry Before Denied Entry After Density (ft/veh) Occupancy (veh) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 7

108 SimTraffic Simulation Summary Existing Mid 01/30/2017 Summary of All Intervals Run Number Start Time 11:20 11:20 11:20 11:20 11:20 11:20 11:20 End Time 12:30 12:30 12:30 12:30 12:30 12:30 12:30 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Summary of All Intervals Run Number Avg Start Time 11:20 11:20 11:20 11:20 End Time 12:30 12:30 12:30 12:30 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 11:20 End Time 11:30 Total Time (min) 10 Volumes adjusted by Growth Factors. No data recorded this interval. US 92 US 17 to Garfield Ave SimTraffic Report SK Page 1

109 SimTraffic Simulation Summary Existing Mid 01/30/2017 Interval #1 Information Recording Start Time 11:30 End Time 12:30 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #1 Information Recording Start Time 11:30 End Time 12:30 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Avg Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 2

110 SimTraffic Performance Report Existing Mid 01/30/2017 5: Garfield Ave & Intnl Spdway Bv/US 92 Performance by approach Approach EB WB NB SB All Denied Delay (hr) Denied Del/Veh (s) Total Delay (hr) Total Del/Veh (s) Stop Delay (hr) Stop Del/Veh (s) Total Stops Stop/Veh Travel Dist (mi) Travel Time (hr) Avg Speed (mph) Fuel Used (gal) Fuel Eff. (mpg) HC Emissions (g) CO Emissions (g) NOx Emissions (g) Vehicles Entered Vehicles Exited Hourly Exit Rate Input Volume % of Volume Denied Entry Before Denied Entry After Density (ft/veh) Occupancy (veh) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 7

111 SimTraffic Simulation Summary Existing PM 01/30/2017 Summary of All Intervals Run Number Start Time 4:30 4:30 4:30 4:30 4:30 4:30 4:30 End Time 5:40 5:40 5:40 5:40 5:40 5:40 5:40 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Summary of All Intervals Run Number Avg Start Time 4:30 4:30 4:30 4:30 End Time 5:40 5:40 5:40 5:40 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 4:30 End Time 4:40 Total Time (min) 10 Volumes adjusted by Growth Factors. No data recorded this interval. US 92 US 17 to Garfield Ave SimTraffic Report SK Page 1

112 SimTraffic Simulation Summary Existing PM 01/30/2017 Interval #1 Information Recording Start Time 4:40 End Time 5:40 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #1 Information Recording Start Time 4:40 End Time 5:40 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Avg Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 2

113 SimTraffic Performance Report Existing PM 01/30/2017 5: Garfield Ave & Intnl Spdway Bv/US 92 Performance by approach Approach EB WB NB SB All Denied Delay (hr) Denied Del/Veh (s) Total Delay (hr) Total Del/Veh (s) Stop Delay (hr) Stop Del/Veh (s) Total Stops Stop/Veh Travel Dist (mi) Travel Time (hr) Avg Speed (mph) Fuel Used (gal) Fuel Eff. (mpg) HC Emissions (g) CO Emissions (g) NOx Emissions (g) Vehicles Entered Vehicles Exited Hourly Exit Rate Input Volume % of Volume Denied Entry Before Denied Entry After Density (ft/veh) Occupancy (veh) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 7

114 SimTraffic Simulation Summary Alt2_Final AM 03/21/2017 Summary of All Intervals Run Number Start Time 6:57 6:57 6:57 6:57 6:57 6:57 6:57 End Time 8:07 8:07 8:07 8:07 8:07 8:07 8:07 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Summary of All Intervals Run Number Avg Start Time 6:57 6:57 6:57 6:57 End Time 8:07 8:07 8:07 8:07 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 6:57 End Time 7:07 Total Time (min) 10 Volumes adjusted by Growth Factors. No data recorded this interval. US 92 US 17 to Garfield Ave SimTraffic Report SK Page 1

115 SimTraffic Simulation Summary Alt2_Final AM 03/21/2017 Interval #1 Information Recording Start Time 7:07 End Time 8:07 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #1 Information Recording Start Time 7:07 End Time 8:07 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Avg Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 2

116 SimTraffic Performance Report Alt2_Final AM 03/21/2017 5: Garfield Ave & Intnl Spdway Bv/US 92 Performance by approach Approach EB WB NB SB All Denied Delay (hr) Denied Del/Veh (s) Total Delay (hr) Total Del/Veh (s) Stop Delay (hr) Stop Del/Veh (s) Total Stops Stop/Veh Travel Dist (mi) Travel Time (hr) Avg Speed (mph) Fuel Used (gal) Fuel Eff. (mpg) HC Emissions (g) CO Emissions (g) NOx Emissions (g) Vehicles Entered Vehicles Exited Hourly Exit Rate Input Volume % of Volume Denied Entry Before Denied Entry After Density (ft/veh) Occupancy (veh) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 7

117 SimTraffic Simulation Summary Alt2_Final Mid 03/21/2017 Summary of All Intervals Run Number Start Time 11:57 11:57 11:57 11:57 11:57 11:57 11:57 End Time 1:07 1:07 1:07 1:07 1:07 1:07 1:07 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Summary of All Intervals Run Number Avg Start Time 11:57 11:57 11:57 11:57 End Time 1:07 1:07 1:07 1:07 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 11:57 End Time 12:07 Total Time (min) 10 Volumes adjusted by Growth Factors. No data recorded this interval. US 92 US 17 to Garfield Ave SimTraffic Report SK Page 1

118 SimTraffic Simulation Summary Alt2_Final Mid 03/21/2017 Interval #1 Information Recording Start Time 12:07 End Time 1:07 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #1 Information Recording Start Time 12:07 End Time 1:07 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Avg Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 2

119 SimTraffic Performance Report Alt2_Final Mid 03/21/2017 5: Garfield Ave & Intnl Spdway Bv/US 92 Performance by approach Approach EB WB NB SB All Denied Delay (hr) Denied Del/Veh (s) Total Delay (hr) Total Del/Veh (s) Stop Delay (hr) Stop Del/Veh (s) Total Stops Stop/Veh Travel Dist (mi) Travel Time (hr) Avg Speed (mph) Fuel Used (gal) Fuel Eff. (mpg) HC Emissions (g) CO Emissions (g) NOx Emissions (g) Vehicles Entered Vehicles Exited Hourly Exit Rate Input Volume % of Volume Denied Entry Before Denied Entry After Density (ft/veh) Occupancy (veh) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 7

120 SimTraffic Simulation Summary Alt2_Final PM 03/21/2017 Summary of All Intervals Run Number Start Time 4:57 4:57 4:57 4:57 4:57 4:57 4:57 End Time 6:07 6:07 6:07 6:07 6:07 6:07 6:07 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Summary of All Intervals Run Number Avg Start Time 4:57 4:57 4:57 4:57 End Time 6:07 6:07 6:07 6:07 Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 4:57 End Time 5:07 Total Time (min) 10 Volumes adjusted by Growth Factors. No data recorded this interval. US 92 US 17 to Garfield Ave SimTraffic Report SK Page 1

121 SimTraffic Simulation Summary Alt2_Final PM 03/21/2017 Interval #1 Information Recording Start Time 5:07 End Time 6:07 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #1 Information Recording Start Time 5:07 End Time 6:07 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Avg Vehs Entered Vehs Exited Starting Vehs Ending Vehs Denied Entry Before Denied Entry After Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 2

122 SimTraffic Performance Report Alt2_Final PM 03/21/2017 5: Garfield Ave & Intnl Spdway Bv/US 92 Performance by approach Approach EB WB NB SB All Denied Delay (hr) Denied Del/Veh (s) Total Delay (hr) Total Del/Veh (s) Stop Delay (hr) Stop Del/Veh (s) Total Stops Stop/Veh Travel Dist (mi) Travel Time (hr) Avg Speed (mph) Fuel Used (gal) Fuel Eff. (mpg) HC Emissions (g) CO Emissions (g) NOx Emissions (g) Vehicles Entered Vehicles Exited Hourly Exit Rate Input Volume % of Volume Denied Entry Before Denied Entry After Density (ft/veh) Occupancy (veh) US 92 US 17 to Garfield Ave SimTraffic Report SK Page 7

123 APPENDIXD:CostEstimates

124 ENGINEER'S ESTIMATE FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 5 FINANCIAL PROJECT ID: FILE VERSION: PAGE NUMBER: Garfield Avenue Cost Estimate PAY ITEM # ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST CLEARING & GRUBBING AC $ 10, $ 2, REGULAR EXCAVATION CY $ 7.58 $ 3, EMBANKMENT CY $ $ TYPE B STABILIZATION SY 1, $ 2.15 $ 3, OPTIONAL BASE,BASE GROUP 09 SY 1, $ $ 17, SUPERPAVE ASPH CONC, TRAF C, PG7622 (1", 110 lb/yd2) TN $ $ 5, ASPH CONC FC,TRAF C,FC9.5,PG 7622, ARB (1", 110 lb/yd2)) TN $ $ 7, MODIFY EXISTING DRAINAGE STRUCTURE EA $ 1, $ 3, INLETS, CLOSED FLUME EA $ 3, $ 7, MITERED END SECT, OPTIONAL RD, 36" CD EA $ 3, $ 7, PIPE CULV, OPT MATL, ROUND, 36"S/CD LF $ $ 3, CONCRETE CURB & GUTTER, TYPE F LF $ $ 11, CONCRETE SIDEWALK AND DRIVEWAYS, 4" SY $ $ 5, CONCRETE SIDEWALK AND DRIVEWAYS, 6" SY $ $ DETECTABLE WARNINGS SF $ $ PERFORMANCE TURF, SOD SY $ 4.00 $ CONDUIT, F& I, OPEN TRENCH LF $ 6.24 $ 3, CONDUIT, F& I, DIRECTIONAL BORE LF $ $ 4, SIGNAL CABLE NEW OR RECO, FUR & INSTALL PI $ 4, $ 9, PULL & SPLICE BOX, F&I, 13" x 24" EA $ $ 3, ALUMINUM SIGNALS POLE, PEDESTAL EA $ 1, $ 2, ALUMINUM SIGNALS POLE, REMOVE EA $ $ TRAFFIC SIGNAL,F&I ALUMINUM, 3 S 1 W AS $ $ PEDESTRIAN SIGNAL, F&I LED COUNT, 1 WAY AS $ $ PEDESTRIAN SIGNAL, F&I LED COUNT, 2 WAYS AS $ 1, $ 2, PEDESTRIAN SIGNAL, RELOCATE AS $ $ LOOP ASSEMBLY, F&I, TYPE B AS $ $ 2, LOOP ASSEMBLY, F&I, TYPE F AS $ $ 2, PEDESTRIAN DETECTOR, F&I, STANDARD EA $ $ 1, TRAF CNTL ASSEM, MODIFY AS $ 1, $ 2, SINGLE POST SIGN, F&I GM, <12 SF AS $ $ SINGLE POST SIGN, RELOCATE AS $ $ MULTI POST SIGN, F&I GM, SF AS $ 6, $ RETROREFLECTIVE PAVEMENT MARKERS EA $ 3.34 $ THERMOPLASTIC, STD, WHITE, SOLID, 12" LF $ 2.06 $ THERMOPLASTIC, STD, WHITE, SOLID, 18" LF $ 2.90 $ THERMOPLASTIC, STD, WHITE, SOLID, 24" LF $ 4.50 $ 1, THERMOPLASTIC, STD, WHITE, DOT GUIDE, 6" GM $ 1, $ THERMOPLASTIC, STD, WHITE, MESSAGE EA $ $ THERMOPLASTIC, STD, WHITE, ARROW EA $ $ THERMOPLASTIC, STDOTH, WHITE, SKIP, 6" GM $ 1, $ THERMOPLASTIC, STDOTH, WHITE, SOLID, 6" GM $ 3, $ THERMOPLASTIC, STDOTH,YELLOW, SOLID, 6" GM $ 5, $ THERMOPLASTIC, REMOVE SF $ 1.99 $ TOTAL OF IMPROVEMENTS: $ 120, DESIGN (0%): MOBILIZATION (5%): MAINTENANCE OF TRAFFIC (5%): CONTINGENCY (15%): $ $ $ 6, , , COMPONENT TOTAL $ 151, FDOTD7 \\vhb\proj\orlando\ US 92 at Garfield R2CTPO\reports\US 92 Improvements Cost Estimate_Garfield /31/2017

125 ENGINEER'S ESTIMATE FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 5 FINANCIAL PROJECT ID: FILE VERSION: PAGE NUMBER: WB Left Turn at Garfield Avenue (L=200') PAY ITEM # ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST CLEARING & GRUBBING AC $ 10, $ REGULAR EXCAVATION CY $ 7.58 $ EMBANKMENT CY $ $ TYPE B STABILIZATION SY $ 2.15 $ OPTIONAL BASE,BASE GROUP 09 SY $ $ 4, SUPERPAVE ASPH CONC, TRAF C, PG7622 (1", 110 lb/yd2) TN $ $ 1, ASPH CONC FC,TRAF C,FC9.5,PG 7622, ARB (1", 110 lb/yd2)) TN $ $ 1, MODIFY EXISTING DRAINAGE STRUCTURE EA $ 1, $ INLETS, CLOSED FLUME EA $ 3, $ MITERED END SECT, OPTIONAL RD, 36" CD EA $ 3, $ PIPE CULV, OPT MATL, ROUND, 36"S/CD LF $ $ CONCRETE CURB & GUTTER, TYPE F LF $ $ CONCRETE SIDEWALK AND DRIVEWAYS, 4" SY $ $ CONCRETE SIDEWALK AND DRIVEWAYS, 6" SY $ $ DETECTABLE WARNINGS SF $ $ PERFORMANCE TURF, SOD SY $ 4.00 $ CONDUIT, F& I, OPEN TRENCH LF $ 6.24 $ CONDUIT, F& I, DIRECTIONAL BORE LF $ $ SIGNAL CABLE NEW OR RECO, FUR & INSTALL PI $ 4, $ PULL & SPLICE BOX, F&I, 13" x 24" EA $ $ ALUMINUM SIGNALS POLE, PEDESTAL EA $ 1, $ ALUMINUM SIGNALS POLE, REMOVE EA $ $ TRAFFIC SIGNAL,F&I ALUMINUM, 3 S 1 W AS $ $ PEDESTRIAN SIGNAL, F&I LED COUNT, 1 WAY AS $ $ PEDESTRIAN SIGNAL, F&I LED COUNT, 2 WAYS AS $ 1, $ PEDESTRIAN SIGNAL, RELOCATE AS $ $ LOOP ASSEMBLY, F&I, TYPE B AS $ $ LOOP ASSEMBLY, F&I, TYPE F AS $ $ PEDESTRIAN DETECTOR, F&I, STANDARD EA $ $ TRAF CNTL ASSEM, MODIFY AS $ 1, $ SINGLE POST SIGN, F&I GM, <12 SF AS $ $ SINGLE POST SIGN, RELOCATE AS $ $ MULTI POST SIGN, F&I GM, SF AS $ 6, $ RETROREFLECTIVE PAVEMENT MARKERS EA $ 3.34 $ THERMOPLASTIC, STD, WHITE, SOLID, 12" LF $ 2.06 $ THERMOPLASTIC, STD, WHITE, SOLID, 18" LF $ 2.90 $ THERMOPLASTIC, STD, WHITE, SOLID, 24" LF $ 4.50 $ THERMOPLASTIC, STD, WHITE, DOT GUIDE, 6" GM $ 1, $ THERMOPLASTIC, STD, WHITE, MESSAGE EA $ $ THERMOPLASTIC, STD, WHITE, ARROW EA $ $ THERMOPLASTIC, STDOTH, WHITE, SKIP, 6" GM $ 1, $ THERMOPLASTIC, STDOTH, WHITE, SOLID, 6" GM $ 3, $ THERMOPLASTIC, STDOTH,YELLOW, SOLID, 6" GM $ 5, $ THERMOPLASTIC, REMOVE SF $ 1.99 $ TOTAL OF IMPROVEMENTS: $ 11, DESIGN (0%): MOBILIZATION (5%): MAINTENANCE OF TRAFFIC (5%): CONTINGENCY (15%): $ $ $ , COMPONENT TOTAL $ 13, FDOTD7 \\vhb\proj\orlando\ US 92 at Garfield R2CTPO\reports\US 92 Improvements Cost Estimate_Garfield /31/2017

126 ENGINEER'S ESTIMATE FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 5 FINANCIAL PROJECT ID: FILE VERSION: PAGE NUMBER: EB Right Turn at Garfield Avenue (L=250') PAY ITEM # ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST CLEARING & GRUBBING AC $ 10, $ 1, REGULAR EXCAVATION CY $ 7.58 $ 1, EMBANKMENT CY $ $ TYPE B STABILIZATION SY $ 2.15 $ 1, OPTIONAL BASE,BASE GROUP 09 SY $ $ 6, SUPERPAVE ASPH CONC, TRAF C, PG7622 (1", 110 lb/yd2) TN $ $ 2, ASPH CONC FC,TRAF C,FC9.5,PG 7622, ARB (1", 110 lb/yd2)) TN $ $ 2, MODIFY EXISTING DRAINAGE STRUCTURE EA $ 1, $ 1, INLETS, CLOSED FLUME EA $ 3, $ 7, MITERED END SECT, OPTIONAL RD, 36" CD EA $ 3, $ 3, PIPE CULV, OPT MATL, ROUND, 36"S/CD LF $ $ 1, CONCRETE CURB & GUTTER, TYPE F LF $ $ 5, CONCRETE SIDEWALK AND DRIVEWAYS, 4" SY $ $ CONCRETE SIDEWALK AND DRIVEWAYS, 6" SY $ $ DETECTABLE WARNINGS SF $ $ PERFORMANCE TURF, SOD SY $ 4.00 $ CONDUIT, F& I, OPEN TRENCH LF $ 6.24 $ 2, CONDUIT, F& I, DIRECTIONAL BORE LF $ $ 2, SIGNAL CABLE NEW OR RECO, FUR & INSTALL PI $ 4, $ 4, PULL & SPLICE BOX, F&I, 13" x 24" EA $ $ 2, ALUMINUM SIGNALS POLE, PEDESTAL EA $ 1, $ 1, ALUMINUM SIGNALS POLE, REMOVE EA $ $ TRAFFIC SIGNAL,F&I ALUMINUM, 3 S 1 W AS $ $ PEDESTRIAN SIGNAL, F&I LED COUNT, 1 WAY AS $ $ PEDESTRIAN SIGNAL, F&I LED COUNT, 2 WAYS AS $ 1, $ 1, PEDESTRIAN SIGNAL, RELOCATE AS $ $ LOOP ASSEMBLY, F&I, TYPE B AS $ $ 2, LOOP ASSEMBLY, F&I, TYPE F AS $ $ PEDESTRIAN DETECTOR, F&I, STANDARD EA $ $ TRAF CNTL ASSEM, MODIFY AS $ 1, $ SINGLE POST SIGN, F&I GM, <12 SF AS $ $ SINGLE POST SIGN, RELOCATE AS $ $ MULTI POST SIGN, F&I GM, SF AS $ 6, $ RETROREFLECTIVE PAVEMENT MARKERS EA $ 3.34 $ THERMOPLASTIC, STD, WHITE, SOLID, 12" LF $ 2.06 $ THERMOPLASTIC, STD, WHITE, SOLID, 18" LF $ 2.90 $ THERMOPLASTIC, STD, WHITE, SOLID, 24" LF $ 4.50 $ THERMOPLASTIC, STD, WHITE, DOT GUIDE, 6" GM $ 1, $ THERMOPLASTIC, STD, WHITE, MESSAGE EA $ $ THERMOPLASTIC, STD, WHITE, ARROW EA $ $ THERMOPLASTIC, STDOTH, WHITE, SKIP, 6" GM $ 1, $ THERMOPLASTIC, STDOTH, WHITE, SOLID, 6" GM $ 3, $ THERMOPLASTIC, STDOTH,YELLOW, SOLID, 6" GM $ 5, $ THERMOPLASTIC, REMOVE SF $ 1.99 $ TOTAL OF IMPROVEMENTS: $ 57, DESIGN (0%): MOBILIZATION (5%): MAINTENANCE OF TRAFFIC (5%): CONTINGENCY (15%): $ $ $ 2, , , COMPONENT TOTAL $ 72, FDOTD7 \\vhb\proj\orlando\ US 92 at Garfield R2CTPO\reports\US 92 Improvements Cost Estimate_Garfield /31/2017

127 ENGINEER'S ESTIMATE FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 5 FINANCIAL PROJECT ID: FILE VERSION: PAGE NUMBER: NB Right Turn at Garfield Avenue (L=250') PAY ITEM # ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST CLEARING & GRUBBING AC $ 10, $ 1, REGULAR EXCAVATION CY $ 7.58 $ 1, EMBANKMENT CY $ $ TYPE B STABILIZATION SY $ 2.15 $ 1, OPTIONAL BASE,BASE GROUP 09 SY $ $ 6, SUPERPAVE ASPH CONC, TRAF C, PG7622 (1", 110 lb/yd2) TN $ $ 2, ASPH CONC FC,TRAF C,FC9.5,PG 7622, ARB (1", 110 lb/yd2)) TN $ $ 2, MODIFY EXISTING DRAINAGE STRUCTURE EA $ 1, $ 1, INLETS, CLOSED FLUME EA $ 3, $ MITERED END SECT, OPTIONAL RD, 36" CD EA $ 3, $ 3, PIPE CULV, OPT MATL, ROUND, 36"S/CD LF $ $ 1, CONCRETE CURB & GUTTER, TYPE F LF $ $ 5, CONCRETE SIDEWALK AND DRIVEWAYS, 4" SY $ $ 4, CONCRETE SIDEWALK AND DRIVEWAYS, 6" SY $ $ DETECTABLE WARNINGS SF $ $ PERFORMANCE TURF, SOD SY $ 4.00 $ CONDUIT, F& I, OPEN TRENCH LF $ 6.24 $ CONDUIT, F& I, DIRECTIONAL BORE LF $ $ 1, SIGNAL CABLE NEW OR RECO, FUR & INSTALL PI $ 4, $ PULL & SPLICE BOX, F&I, 13" x 24" EA $ $ ALUMINUM SIGNALS POLE, PEDESTAL EA $ 1, $ ALUMINUM SIGNALS POLE, REMOVE EA $ $ TRAFFIC SIGNAL,F&I ALUMINUM, 3 S 1 W AS $ $ PEDESTRIAN SIGNAL, F&I LED COUNT, 1 WAY AS $ $ PEDESTRIAN SIGNAL, F&I LED COUNT, 2 WAYS AS $ 1, $ PEDESTRIAN SIGNAL, RELOCATE AS $ $ LOOP ASSEMBLY, F&I, TYPE B AS $ $ LOOP ASSEMBLY, F&I, TYPE F AS $ $ 1, PEDESTRIAN DETECTOR, F&I, STANDARD EA $ $ TRAF CNTL ASSEM, MODIFY AS $ 1, $ 1, SINGLE POST SIGN, F&I GM, <12 SF AS $ $ SINGLE POST SIGN, RELOCATE AS $ $ MULTI POST SIGN, F&I GM, SF AS $ 6, $ RETROREFLECTIVE PAVEMENT MARKERS EA $ 3.34 $ THERMOPLASTIC, STD, WHITE, SOLID, 12" LF $ 2.06 $ THERMOPLASTIC, STD, WHITE, SOLID, 18" LF $ 2.90 $ THERMOPLASTIC, STD, WHITE, SOLID, 24" LF $ 4.50 $ THERMOPLASTIC, STD, WHITE, DOT GUIDE, 6" GM $ 1, $ THERMOPLASTIC, STD, WHITE, MESSAGE EA $ $ THERMOPLASTIC, STD, WHITE, ARROW EA $ $ THERMOPLASTIC, STDOTH, WHITE, SKIP, 6" GM $ 1, $ THERMOPLASTIC, STDOTH, WHITE, SOLID, 6" GM $ 3, $ THERMOPLASTIC, STDOTH,YELLOW, SOLID, 6" GM $ 5, $ THERMOPLASTIC, REMOVE SF $ 1.99 $ TOTAL OF IMPROVEMENTS: $ 39, DESIGN (0%): MOBILIZATION (5%): MAINTENANCE OF TRAFFIC (5%): CONTINGENCY (15%): $ $ $ 1, , , COMPONENT TOTAL $ 49, FDOTD7 \\vhb\proj\orlando\ US 92 at Garfield R2CTPO\reports\US 92 Improvements Cost Estimate_Garfield /31/2017

128 ENGINEER'S ESTIMATE FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 5 FINANCIAL PROJECT ID: FILE VERSION: PAGE NUMBER: Garfield Avenue Cost Estimate (Sidewalks & Crosswalks) PAY ITEM # ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST CLEARING & GRUBBING AC $ 10, $ REGULAR EXCAVATION CY $ 7.58 $ EMBANKMENT CY $ $ TYPE B STABILIZATION SY $ 2.15 $ OPTIONAL BASE,BASE GROUP 09 SY $ $ SUPERPAVE ASPH CONC, TRAF C, PG7622 (1", 110 lb/yd2) TN $ $ ASPH CONC FC,TRAF C,FC9.5,PG 7622, ARB (1", 110 lb/yd2)) TN $ $ MODIFY EXISTING DRAINAGE STRUCTURE EA $ 1, $ INLETS, CLOSED FLUME EA $ 3, $ MITERED END SECT, OPTIONAL RD, 36" CD EA $ 3, $ PIPE CULV, OPT MATL, ROUND, 36"S/CD LF $ $ CONCRETE CURB & GUTTER, TYPE F LF $ $ CONCRETE SIDEWALK AND DRIVEWAYS, 4" SY $ $ CONCRETE SIDEWALK AND DRIVEWAYS, 6" SY $ $ DETECTABLE WARNINGS SF $ $ PERFORMANCE TURF, SOD SY $ 4.00 $ CONDUIT, F& I, OPEN TRENCH LF $ 6.24 $ CONDUIT, F& I, DIRECTIONAL BORE LF $ $ SIGNAL CABLE NEW OR RECO, FUR & INSTALL PI $ 4, $ 4, PULL & SPLICE BOX, F&I, 13" x 24" EA $ $ ALUMINUM SIGNALS POLE, PEDESTAL EA $ 1, $ 1, ALUMINUM SIGNALS POLE, REMOVE EA $ $ TRAFFIC SIGNAL,F&I ALUMINUM, 3 S 1 W AS $ $ PEDESTRIAN SIGNAL, F&I LED COUNT, 1 WAY AS $ $ PEDESTRIAN SIGNAL, F&I LED COUNT, 2 WAYS AS $ 1, $ 1, PEDESTRIAN SIGNAL, RELOCATE AS $ $ LOOP ASSEMBLY, F&I, TYPE B AS $ $ LOOP ASSEMBLY, F&I, TYPE F AS $ $ PEDESTRIAN DETECTOR, F&I, STANDARD EA $ $ TRAF CNTL ASSEM, MODIFY AS $ 1, $ 1, SINGLE POST SIGN, F&I GM, <12 SF AS $ $ SINGLE POST SIGN, RELOCATE AS $ $ MULTI POST SIGN, F&I GM, SF AS $ 6, $ RETROREFLECTIVE PAVEMENT MARKERS EA $ 3.34 $ THERMOPLASTIC, STD, WHITE, SOLID, 12" LF $ 2.06 $ THERMOPLASTIC, STD, WHITE, SOLID, 18" LF $ 2.90 $ THERMOPLASTIC, STD, WHITE, SOLID, 24" LF $ 4.50 $ 1, THERMOPLASTIC, STD, WHITE, DOT GUIDE, 6" GM $ 1, $ THERMOPLASTIC, STD, WHITE, MESSAGE EA $ $ THERMOPLASTIC, STD, WHITE, ARROW EA $ $ THERMOPLASTIC, STDOTH, WHITE, SKIP, 6" GM $ 1, $ THERMOPLASTIC, STDOTH, WHITE, SOLID, 6" GM $ 3, $ THERMOPLASTIC, STDOTH,YELLOW, SOLID, 6" GM $ 5, $ THERMOPLASTIC, REMOVE SF $ 1.99 $ TOTAL OF IMPROVEMENTS: $ 12, DESIGN (0%): MOBILIZATION (5%): MAINTENANCE OF TRAFFIC (5%): CONTINGENCY (15%): $ $ $ , COMPONENT TOTAL $ 15, FDOTD7 \\vhb\proj\orlando\ US 92 at Garfield R2CTPO\reports\US 92 Improvements Cost Estimate_Garfield /31/2017

129 APPENDIXB: ResponsestoComments

130 Comments from Amir Asgarinik US 92 from US 17 to Garfield Report Comments 1. Shouldn t we use Optional Base Group 9 instead of 13? Response: Base Group has been revised from 13 to Does the existing concrete signal assembly need to be upgraded based on the proposed improvements? Response: It is anticipated that the existing span wire traffic signal can be maintained since no new signal heads will be required, and Type F curb and gutter is being proposed along the east side of the NB right turn lane since there is not enough right of way to maintain an 18 CZ from the signal pole using rural design criteria. 3. Need 36 concrete pipes to accommodate the proposed turning movements and sidewalks. Response: 36 mitered end sections, which per the Basics of Estimates (BOE) include the pipe, are already proposed for under Garfield Ave. to accommodate the additional pavement for the EB right turn lane and sidewalks/ramps. 4. Most of the proposed sidewalks should be 6 thick due to its proximity to the EOP and traffic movement. Response: The cost estimate considers that the ramps and sidewalk within the immediate vicinity of the curb radius will be 6 concrete % Contingency may be excessive. Response: The contingency has been reduced to 15%. Comments from Keith Riger 1. I would like to point out that we have a proposed project in the hopper called the DeLand Greenway Trail North Extension, FIN , Federal Aid Number A to build a trail to the SW corner of the intersection. Pertinent plans are attached. Let s coordinate. Response: Comment Noted. Comments from Jon Cheney Volusia County 1. No comments on justification for new turn lanes, but always a support new lanes. 2. Why is this separate from the other turn lane study in the same area? This project should be combined with other turn lane project on US92 and administered by FDOT since work is on a State Roadway. Response: Two different reports were created based on the two different feasibility study applications from Volusia county. However, the US 92 & Garfield report was included in the appendix of the US 92 from Woodland Boulevard to Garfield Avenue report. 3. Did they look at need for turn lanes on Garfield itself?

131 Response: As per the information provided by FDOT, additional northbound right turn lane is proposed. 4. Not enough information to perform a constructability review, however most construction appears to be in FDOT ROW. Comments from Christopher Cairns FDOT US92betweenUS17(WoodlandBlvd)andGarfieldAvenue 1. Please clarify where the input volumes come from for the following Synchro analyses: a. US 17/ Woodland Boulevard and International Speedway Boulevard/ US 92 Westbound approach (All time periods) b. Amelia Avenue and International Speedway Boulevard/ US 92 Eastbound and Westbound approaches (All time periods) c. Garfield Avenue and International Speedway Boulevard/ US 92 Eastbound and Westbound approaches (All time periods) Response: The turning movement counts, provided in Appendix A, were taken and adjusted (balanced) for reasonableness considering the presence or absence of additional access points between study intersections. 2. The department s concrete rehab project ( ) recently made improvements for US 92 WB right turn lane at US 17 which is not shown on the condition diagram. Response: Comment noted and Figures 2 & 3 were updated. 3. Do not concur with Alternative 1 or 2. There does not appear to be a significant capacity need to provide a continuous WB auxiliary lane in relation to potential for crash types to occur, specifically left turn crashes due to longer crossing distances across potentially higher speed outside through lane. Continuous right turn lanes may also increase conflicts for cyclists choosing to utilize the paved shoulder. Response: Comment noted. The study evaluated Alternative 1 strictly based on the improvement requests mentioned in the feasibility application, which was not considered as the recommended alternative. Based on the input received FDOT and Volusia County on Alternative 2 shown in the Draft Report, this current report shows the modified Alternative Concur with recommendation to extend the existing sidewalk along the south side of International Speedway Boulevard/ US 92 from the east side of Alabama Avenue to Garfield Avenue would improve connectivity and pedestrian safety. Response: Comment noted. 5. Concur with recommendation to install guidelines through the intersection at US 17/ Woodland Blvd to guide eastbound left turning vehicles into the inside northbound through lane will improve the safely and flow of traffic through the intersection. Response: Comment noted.

132 APPENDIXC: TrafficData and ExhibitsforUS92/InternationalSpeedwayBlvd&US17/WoodlandBlvdIntersection

133 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection US 17Woodland Blvd & US 92Intn'l Speedway Blvd Date December 6, 2016 All Vehicles AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL , Peak Hour 7:15 AM 8:15 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:30 AM 12:30 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL 319 2, ,238 1, , ,853 1,659 Peak Hour 4:45 PM 5:45 PM

134 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection US 17Woodland Blvd & US 92Intn'l Speedway Blvd Date December 6, 2016 Trucks AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 8:00 AM 9:00 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:30 AM 12:30 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 2:30 PM 3:30 PM

135 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection US 17Woodland Blvd & US 92Intn'l Speedway Blvd Date December 6, 2016 UTurns & RTOR AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 7:30 AM 8:30 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:30 AM 12:30 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 3:00 PM 4:00 PM

136 Pedestrian&BicycleSummary Project#: Date: 12/6/2016 NB/SB: US17WoodlandBlvd EB/WB: US92Intn'lSpeedwayBlvd Eastbound Hour 7:00 8:00 11:00 12:00 14:00 15:00 16:00 17: Bike Ped Westbound Bike Ped Southbound Northbound Hour PedBike PedBike US17WoodlandBlvd 7: :00 8: US92Intn'lSpeedwayBlvd :00 11: :00 12: :00 14: :00 US92Intn'lSpeedwayBlvd 15: :00 16: :00 17: : US17WoodlandBlvd Southbound Northbound PedBike PedBike Hour Eastbound Bike Ped Westbound Bike Ped :00 8:00 11:00 12:00 14:00 15:00 16:00 17: Hour

137 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Amelia Ave & US 92Intn'l Speedway Blvd Date December 6, 2016 All Vehicles AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL , , Peak Hour 7:15 AM 8:15 AM , Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL , , Peak Hour 11:30 AM 12:30 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL , , Peak Hour 4:45 PM 5:45 PM ,

138 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Amelia Ave & US 92Intn'l Speedway Blvd Date December 6, 2016 Trucks AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 8:00 AM 9:00 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:30 AM 12:30 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 2:00 PM 3:00 PM

139 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Amelia Ave & US 92Intn'l Speedway Blvd Date December 6, 2016 UTurns & RTOR AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 7:30 AM 8:30 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:30 AM 12:30 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 4:45 PM 5:45 PM

140 Pedestrian&BicycleSummary Project#: Date: 12/6/2016 NB/SB: AmeliaAve EB/WB: US92Intn'lSpeedwayBlvd Eastbound Hour 7:00 8:00 11:00 12:00 14:00 15:00 16:00 17: Bike Ped Westbound Bike Ped Southbound Northbound Hour PedBike PedBike AmeliaAve 7: :00 8: US92Intn'lSpeedwayBlvd :00 11: :00 12: :00 14: :00 US92Intn'lSpeedwayBlvd 15: :00 16: :00 17: : AmeliaAve Southbound Northbound PedBike PedBike Hour Eastbound Bike Ped Westbound Bike Ped :00 8:00 11:00 12:00 14:00 15:00 16:00 17: Hour

141 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Lowes Driveway & US 92 Intn'l Speedway Blvd Date December 6, 2016 All Vehicles AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL , , Peak Hour 7:15 AM 8:15 AM , Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL , , Peak Hour 11:30 AM 12:30 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL , , Peak Hour 4:45 PM 5:45 PM ,282 30

142 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Lowes Driveway & US 92 Intn'l Speedway Blvd Date December 6, 2016 Trucks AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 7:15 AM 8:15 AM % 4% 2% 3% 0% 4% 0% Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:30 AM 12:30 PM % 1% 1% 5% 25% 5% 5% PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 4:45 PM 5:45 PM

143 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Lowes Driveway & US 92 Intn'l Speedway Blvd Date December 6, 2016 UTurns & RTOR AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 8:00 AM 9:00 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:00 AM 12:00 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 2:15 PM 3:15 PM

144 Pedestrian&BicycleSummary Project#: Date: 12/6/2016 NB/SB: LowesDriveway EB/WB: US92Intn'lSpeedwayBlvd Eastbound Hour 7:00 8:00 11:00 12:00 14:00 15:00 16:00 17: Bike Ped Westbound Bike Ped Southbound Northbound Hour PedBike PedBike LowesDriveway 7: :00 8: US92Intn'lSpeedwayBlvd :00 11: :00 12: :00 14: :00 US92Intn'lSpeedwayBlvd 15: :00 16: :00 17: : LowesDriveway Southbound Northbound PedBike PedBike Hour Eastbound Bike Ped Westbound Bike Ped Hour 7:00 8:00 11:00 12:00 14:00 15:00 16:00 17:

145 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Garfield Ave & US 92Intn'l Speedway Blvd Date December 6, 2016 All Vehicles AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL , , Peak Hour 7:15 AM 8:15 AM , Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL , , Peak Hour 11:30 AM 12:30 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL , , Peak Hour 4:45 PM 5:45 PM ,201 66

146 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Garfield Ave & US 92Intn'l Speedway Blvd Date December 6, 2016 Trucks AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 8:00 AM 9:00 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:15 AM 12:15 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 2:00 PM 3:00 PM

147 Roadway Count Summary Vanasse Hangen Brustlin, Inc. County Volusia City DeLand Intersection Garfield Ave & US 92Intn'l Speedway Blvd Date December 6, 2016 UTurns & RTOR AM Peak Hour VHB Project #: Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 7:00 AM 7:15 AM :15 AM 7:30 AM :30 AM 7:45 AM :45 AM 8:00 AM :00 AM 8:15 AM :15 AM 8:30 AM :30 AM 8:45 AM :45 AM 9:00 AM TOTAL Peak Hour 7:00 AM 8:00 AM Midday Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 11:00 AM 11:15 AM :15 AM 11:30 AM :30 AM 11:45 AM :45 AM 12:00 PM :00 PM 12:15 PM :15 PM 12:30 PM :30 PM 12:45 PM :45 PM 1:00 PM TOTAL Peak Hour 11:15 AM 12:15 PM PM Peak Hour Time Period Northbound Southbound Eastbound Westbound Left Through Right Left Through Right Left Through Right Left Through Right 2:00 PM 2:15 PM :15 PM 2:30 PM :30 PM 2:45 PM :45 PM 3:00 PM :00 PM 3:15 PM :15 PM 3:30 PM :30 PM 3:45 PM :45 PM 4:00 PM :00 PM 4:15 PM :15 PM 4:30 PM :30 PM 4:45 PM :45 PM 5:00 PM :00 PM 5:15 PM :15 PM 5:30 PM :30 PM 5:45 PM :45 PM 6:00 PM TOTAL Peak Hour 2:45 PM 3:45 PM

148 Pedestrian&BicycleSummary Project#: Date: 12/6/2016 NB/SB: GarfieldAve EB/WB: US92Intn'lSpeedwayBlvd Eastbound Hour 7:00 8:00 11:00 12:00 14:00 15:00 16:00 17: Bike Ped Westbound Bike Ped Southbound Northbound Hour PedBike PedBike GarfieldAve 1 7: :00 2 8: US92Intn'lSpeedwayBlvd : : : : : : :00 US92Intn'lSpeedwayBlvd Southbound Northbound PedBike PedBike Hour 6 15: : : : : : GarfieldAve Eastbound Bike Ped Westbound Bike Ped :00 8:00 11:00 12:00 14:00 15:00 16:00 17: Hour

149 TRAFFIC COUNT DATA VHB PROJECT NO: LOCATION CODE: 1 COUNT LOCATION: US 92 WB Approach of US 17 intersection (between US 17 and Alabama) EQUIPMENT ID: P250 TYPE OF COUNT: 72 Hour Classification Count TIME OF COUNT: Start Date: 12/6/2016 Start Time: Midnight End Date: 12/9/2016 End Time: Midnight VOLUMES: Peak Hour Start Time: 4:45 PM Average Daily: 12,144 Average Peak Hour: 1,118 Daily Truck Avg: 1,472 Max Hour Truck Avg: 142 Peak Hour Truck Avg: 137 TRAVEL CHARACTERISTICS: K MEASURED D MEASURED K= 9.2% D= 100.0% T Max Hour 12.7% T daily 12.1% T med (max) 6.9% T med Daily 7.5% T heavy (max) 5.8% T heavy Daily 4.6% T Peak Hour 12.2% T med Peak Hour 6.5% T heavy Peak Hour 5.8%

150 HOURLY DISTRIBUTIONS OF TRAFFIC VOLUMES HOUR ENDING AT HOURLY VOLUME DIRECTION (NB OR EB) VHB PROJECT NO: LOCATION CODE: 1 COUNT LOCATION: US 92 WB Approach of US 17 intersection (between US 17 and Alabama) EQUIPMENT ID: P250 HOURLY VOLUME DIRECTION (SB OR WB) TOTAL VOLUME BOTH DIRECTIONS DISTRIBUTION PERCENT DIRECTION (NB OR EB) DISTRIBUTION PERCENT DIRECTION (SB OR WB) TOTAL PERCENT BOTH DIRECTIONS 1:00 AM #DIV/0! 0.65% 0.65% 2:00 AM #DIV/0! 0.39% 0.39% 3:00 AM #DIV/0! 0.40% 0.40% 4:00 AM #DIV/0! 0.37% 0.37% 5:00 AM #DIV/0! 0.51% 0.51% 6:00 AM #DIV/0! 1.19% 1.19% 7:00 AM #DIV/0! 2.93% 2.93% 8:00 AM #DIV/0! 5.28% 5.28% 9:00 AM #DIV/0! 5.42% 5.42% 10:00 AM #DIV/0! 5.13% 5.13% 11:00 AM #DIV/0! 5.36% 5.36% 12:00 PM #DIV/0! 6.49% 6.49% 1:00 PM #DIV/0! 6.87% 6.87% 2:00 PM #DIV/0! 6.55% 6.55% 3:00 PM #DIV/0! 6.91% 6.91% 4:00 PM #DIV/0! 7.48% 7.48% 5:00 PM #DIV/0! 7.99% 7.99% 6:00 PM 0 1,114 1,114 #DIV/0! 9.18% 9.18% 7:00 PM #DIV/0! 6.96% 6.96% 8:00 PM #DIV/0! 4.71% 4.71% 9:00 PM #DIV/0! 3.58% 3.58% 10:00 PM #DIV/0! 2.85% 2.85% 11:00 PM #DIV/0! 1.58% 1.58% 12:00 AM #DIV/0! 1.22% 1.22% TOTALS 0 12,144 12,144 #DIV/0! 100.0% 100.0% 1,200 Vehicles Per Hour 1, :00 AM 3:00 AM 5:00 AM 7:00 AM 9:00 AM 11:00 AM 1:00 PM 3:00 PM 5:00 PM 7:00 PM 9:00 PM 11:00 PM Ending Hour of Day Total Volume SB/WB NB/EB

151 ANNUAL VEHICLE CLASSIFICATION REPORT VHB PROJECT NO: LOCATION CODE: 1 COUNT LOCATION: US 92 WB Approach of US 17 intersection (between US 17 and Alabama) EQUIPMENT ID: P250 Vehicle Vehicle Average Daily Statistics Classification Type Volume Percentage Class 1 Motorcycles % Class 2 Cars 12, % Class 3 PickUps & Vans 2, % Class 4 Buses % Class 5 2 Axle, Single Unit Trucks 1, % Class 6 3 Axle, Single Unit Trucks % Class 7 4 Axle, Single Unit Trucks % Class 8 2 Axle Trctr with 1 or 2 Axle Trlr, 3 Axle Trctr with 1 Axle % Class 9 3 Axle Tractor with 2 Axle Trailer % Class 10 3 Axle Tractor with 3 Axle Trailer % Class 11 5 Axle Multi Trailer % Class 12 6 Axle Multi Trailer % Class 13 7 or more Axles % Class 14 Not Used % Class 15 Other % TOTALS 18, %

152 US92/InternationalSpeedwayBoulevardatUS17/WoodlandBoulevard Exhibit1:LookingwesttowardstheintersectiononWBUS92 Exhibit2:LookingeastawayfromtheintersectiononWBUS92

153 US92/InternationalSpeedwayBoulevardatUS17/WoodlandBoulevard Exhibit3:LookingeasttowardstheintersectiononEBUS92 Exhibit4:LookingwestawayfromtheintersectiononEBUS92

154 US92/InternationalSpeedwayBoulevardatUS17/WoodlandBoulevard Exhibit5:LookingnorthtowardstheintersectiononNBUS17/WoodlandBoulevard Exhibit6:LookingsouthawayfromtheintersectiononNBUS17/WoodlandBoulevard

155 US92/InternationalSpeedwayBoulevardatUS17/WoodlandBoulevard Exhibit7:LookingsouthtowardstheintersectiononSBUS17/WoodlandBoulevard Exhibit8:LookingnorthtowardstheintersectiononSBUS17/WoodlandBoulevard

Intersection Analysis for US 92/International Speedway Blvd. at Garfield Ave.

Intersection Analysis for US 92/International Speedway Blvd. at Garfield Ave. FinalReport IntersectionAnalysisfor US92/InternationalSpeedwayBlvd. atgarfieldave. April2017 Preparedfor: RivertoSeaTransportationPlanningOrganization (R2CTPO) 2570W.InternationalSpeedwayBlvd.,Suite100

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Introduction and Executive Summary... 1 Existing Conditions... 3 Intersection Volume Conditions... 5 Intersection Operations... 9 Safety

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

TABLE OF CONTENTS. P a g e i

TABLE OF CONTENTS. P a g e i P a g e i TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 1 INTRODUCTION... 2 2 EXISTING CONDITIONS... 3 3 QUALITATIVE ASSESSMENT... 18 4 IMPROVEMENT CONCEPT... 23 5 CONCLUSION... 27 APPENDIX... 28 Section 79230:

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Mineola Village Green

Mineola Village Green Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Corridor Analysis. For COUNTY LINE ROAD (S.R. 1001) CORRIDOR. located in. File No March 2019

Corridor Analysis. For COUNTY LINE ROAD (S.R. 1001) CORRIDOR. located in. File No March 2019 Corridor Analysis For COUNTY LINE ROAD (S.R. 1001) CORRIDOR located in Radnor Township Delaware County Lower Merion Township Montgomery County File No. 16-11060-02 March 2019 Prepared For: Radnor Township

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

Proposed Lowe s Home Improvement Center

Proposed Lowe s Home Improvement Center Traffic Impact and Access Study Proposed Lowe s Home Improvement Center Dennis, Massachusetts Prepared for Prepared by Lowe s Home Centers, Inc. 1605 Curtis Bridge Road Wilkesboro, North Carolina 28697

More information

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Safety Assessment for Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Prepared by: VIRGINIA DEPARTMENT OF TRANSPORTATION Northwestern Regional Operations - Traffic

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

Citizens Committee for Facilities

Citizens Committee for Facilities Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on

More information

Chester Road PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Chester Road PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management Transportation Impact Analysis Chester Road PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for Raydient + Places, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc. Landmark

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Qualitative Assessment US 1 at Old Dixie Highway 1

Qualitative Assessment US 1 at Old Dixie Highway 1 Qualitative Assessment US 1 at Old Dixie Highway 1 Project Location Map NOT TO SCALE US 1 at Old Dixie Highway LEGEND STUDY INTERSECTION Feature Summary of Existing Conditions Description Main Street US

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017 Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: Sue Polka, City Engineer, City of Arden Hills From:

More information

TRANSPORTATION TECHNICAL REPORT

TRANSPORTATION TECHNICAL REPORT TRANSPORTATION TECHNICAL REPORT for Sunrise Elementary School Replacement PREPARED FOR: Puyallup School District PREPARED BY: 6544 NE 61 st Street, Seattle, WA 98115 ph: (26) 523-3939 fx: (26) 523-4949

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

LCPS Valley Service Center

LCPS Valley Service Center Traffic Impact Study LCPS Valley Service Center Loudoun County, Virginia November 4, 2015 Prepared For: Loudoun County Public Schools 21000 Education Court Ashburn, VA 20148 Prepared by: 1140 Connecticut

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

Study Area and Location District PSA Ward ANC Phase Description B Existing 600 Block New York Avenue Northeast Westbound

Study Area and Location District PSA Ward ANC Phase Description B Existing 600 Block New York Avenue Northeast Westbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6 Block New York Avenue NE Study Area and Location District PSA Ward ANC Phase Description 5 55 5 5B

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St.

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St. I. Overview Consultant A was retained by the Ohio Department of Transportation to conduct traffic signal timing analyses on approximately one mile of roadway on between the Main Street and the Fourth Street

More information

Portland-Milwaukie Light Rail Project Johnson Creek Boulevard

Portland-Milwaukie Light Rail Project Johnson Creek Boulevard Portland-Milwaukie Light Rail Project Johnson Creek Boulevard EXISTING AND FUTURE OPERATIONS AND POTENTIAL MITIGATIONS Presented by Alan Snook DKS Associates October 12, 2009 1 AGENDA Traffic 101 Study

More information

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Market Street Road Diet Wilmington, NC 2016 Final Technical Report US 17 Corridor Study Update (Market Street Road Diet) Wilmington, NC Parsons Brinckerhoff January 2016 FINAL TECHNICAL REPORT US 17 Corridor

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 4 Block 4th Street SW Study Area and Location District PSA Ward ANC Phase Description 27 6 6D Existing

More information

DLZ OHIO, US 322 #10 ODOT SAFETY ANALYST 2010 REPORT OCTOBER 2012

DLZ OHIO, US 322 #10 ODOT SAFETY ANALYST 2010 REPORT OCTOBER 2012 DLZ OHIO, INC. CUY-322-13.60-14.20 SAFETY STUDY US 322 #10 ODOT SAFETY ANALYST 2010 REPORT OCTOBER 2012 Cuyahoga Study Location Prepared for: The Ohio Department of Transportation District 12 5500 Transportation

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit Study Area and Location District PSA Ward ANC Phase Description

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Task 5.1: Existing Conditions Review and Analysis

Task 5.1: Existing Conditions Review and Analysis City of Oceanside Coast Highway Corridor Task 5.1: Existing Conditions Review and Analysis Technical Memorandum August 2014 DOCUMENT CONTROL Client: Project Name: Report Title: City of Oceanside City of

More information

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT MONTEREY, CALIFORNIA Prepared for Denise Duffy & Associates 947 Cass St. Suite 5 Monterey, CA 93940 April 16,

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information