ST. LUCIE COUNTY. TRAFFIC COUNTS PROGRAM EVALUATION Technical Memorandum No. 1 - Data Collection

Size: px
Start display at page:

Download "ST. LUCIE COUNTY. TRAFFIC COUNTS PROGRAM EVALUATION Technical Memorandum No. 1 - Data Collection"

Transcription

1 ST. LUCIE COUNTY TRAFFIC COUNTS PROGRAM EVALUATION Technical Memorandum No. 1 - Data Collection Prepared For: St. Lucie Transportation Planning Organization 2300 Virginia Avenue Fort Pierce, FL ph (772) , fax (772) Prepared By: Tindale-Oliver & Associates, Inc Ashley Drive, Suite 100 Tampa, Florida ph (813) , fax (813) August, 2009

2 TABLE OF CONTENTS Section 1: INTRODUCTION Section 2: INTERVIEWS AND CONFERECE CALLS Kick-off Meeting Phone Interviews FDOT District 4 Meeting Section 3: DATA COLLECTED City of Port St. Lucie City of Fort Pierce St. Lucie County Florida Department of Transportation LIST OF APPENDICES Appendix A. Data Needs Memo Appendix B. List of Questions Concerning Traffic Count Practices Appendix C. City of Port St. Lucie Turning Movement Counts Appendix D. City of Fort Pierce Seven-Day Counts Appendix E. St. Lucie TPO Traffic Count Program Expenses Appendix F. Defining Traffic Breaks Using GIS PowerPoint Presentation Appendix G. FDOT Traffic Count Program Expenses Tindale-Oliver & Associates, Inc. St. Lucie County August 2009 i Traffic Counts Program Evaluation

3 Section 1 INTRODUCTION The St. Lucie Transportation Planning Organization (TPO) has requested the service of Tindale-Oliver & Associates (TOA) to review the current traffic count practices used by County and Cities to develop recommendations concerning how to select traffic count locations, frequency of performing traffic counts, quality control techniques to determine the reasonableness of the traffic count data, and the overall management of historical traffic count data and its use in various planning and engineering processes and studies. To develop recommendations, the consultant interviewed members of County and City departments currently responsible for traffic counts, as well as the departments who use traffic count data. This technical memorandum was prepared to summarize the data collection phase of the study, and is organized into three major sections including this introduction, with supporting appendices. The remaining sections are summarized below. Section 2 documents on site Interviews and Conference Calls with county, city and FDOT staff, where past and current count practices were discussed, as well as desired changes and improvements to the traffic count programs. Section 3 documents the Data Collected and compiled for use in the study. This section includes summaries of information collected during the interviews and conference calls and data provided by TPO, county, city, and FDOT staff. The Appendices contain data worksheets that supplement the summaries of selected data items contained in Sections 2 and 3. Tindale-Oliver & Associates, Inc. St. Lucie County August Traffic Counts Program Evaluation

4 Section 2 INTERVIEWS AND CONFERENCE CALLS With the purpose of identifying traffic count practices, a series of on site interviews and conference calls were conducted. A list of describing the desired data necessary to complete the Traffic Count Program evaluations was prepared (Data Needs Memo) and provided to the TPO s Project Manager before the project kick-off meeting. The Data Needs Memo has been included as Appendix A. Additionally, a list of questions concerning the data received, past and current Traffic Count Practices, and GIS and Concurrency was prepared for the interviews/conference calls. The list of questions been included as Appendix B. Below, a list of meeting and phone interviews, including date and participants, have been included. KICK-OFF MEETING Held on May 7, 2009 o Participants: Peter Buchwald (St. Lucie TPO Director) Neelam Fatima (St. Lucie TPO Project Manager) Robin Meyer (St. Lucie County Growth Management Assistant Director) Kara Wood (St. Lucie County Growth Management Planning Manager TVC) Michael Brillhart (St. Lucie County- CIP Manager) o In addition, Kara Schwartz (FDOT District 4 PL&EM) attended via telephone. During this meeting the following items were discussed: o Project Scope o Project Schedule o Data Needs Memo Tindale-Oliver & Associates, Inc. St. Lucie County August Traffic Counts Program Evaluation

5 PHONE INTERVIEWS City of Port St Lucie staff: held on May 14, 2009 o Participants: Kim Graham (City of Port St Lucie) Dennis Madebach (City of Port St Lucie) Ken Johnson (City of Port St Lucie) Neelam Fatima (St Lucie TPO) Fabricio Ponce (Tindale-Oliver & Associates) During this phone interview the following items were discussed: o City of Port St Lucie traffic count practices o Count data that the city can provide City of Fort Pierce staff: held on May 15, 2009 o Participants: Bob Frank (City of Fort Pierce) Neelam Fatima (St Lucie TPO) Fabricio Ponce (Tindale-Oliver & Associates) During this phone interview the following items were discussed: o City of Fort Pierce traffic count practices o Additional traffic count locations recommended by the City St Lucie County: held on May 14, 2009 o Participants: Michael Brillhart (St Lucie County) Neelam Fatima (St Lucie TPO) Fabricio Ponce (Tindale-Oliver & Associates) and May 20, 2009 o Participants: Ann Amandro (St Lucie County) James Beams (St Lucie County) Neelam Fatima (St Lucie TPO) Tindale-Oliver & Associates, Inc. St. Lucie County August Traffic Counts Program Evaluation

6 Fabricio Ponce (Tindale-Oliver & Associates) During these phone interviews the following items were discussed: o Current St Lucie County Traffic Count Program practices o Equipment Inventory Florida Department of Transportation: held on May 27, 2009 o Participants: Kara Schwartz (FDOT District 4) Amazia Kiboko (F.R. Aleman & Associates, Inc. representing FDOT District 4) Neelam Fatima (St Lucie TPO) Fabricio Ponce (Tindale-Oliver & Associates) During this meeting the following items were discussed: o FDOT District 4 provided information o Data collection process explanation o Traffic count program expenses in St Lucie County o Additional information to be provided by FDOT District 4 FDOT DISTRICT 4 MEETING Held on June 25, 2009 o Participants: Kara Schwartz (FDOT District 4) Jaime Albelaez (F.R. Aleman & Associates, Inc. representing FDOT District 4) Neelam Fatima (St Lucie TPO) Fabricio Ponce (Tindale-Oliver & Associates) During this meeting the following items were discussed: o FDOT District 4 Counties traffic count agreements o Traffic breaks definition o Additional data collection data collection process explanation Tindale-Oliver & Associates, Inc. St. Lucie County August Traffic Counts Program Evaluation

7 Section 3 DATA COLLECTED CITY OF PORT ST LUCIE The City of Port St. Lucie currently does not have formal a traffic count program. However, traffic count are being collected at some specific locations to address neighborhood complains or where, due to specific circumstances (i.e. significant changes in travel pattern due to the construction of new roads), traffic count data is considered necessary. Even though, and as mentioned above, the City of Port St. Lucie does not have a formal traffic count program, AM and PM peak hour turning movement counts are being collected as part of the Signal System Retiming program. Turning movement counts were collected at the following intersections and have been provided: Port St. Lucie Boulevard at Airoso Boulevard Port St. Lucie Boulevard at Bayshore Boulevard Port St. Lucie Boulevard at Cameo Boulevard Port St. Lucie Boulevard at Floresta Drive Port St. Lucie Boulevard at Gatlin Boulevard Port St. Lucie Boulevard at Gowin Drive Port St. Lucie Boulevard at Midport Boulevard Port St. Lucie Boulevard at Morningside Boulevard Gatlin Boulevard at Rosser Boulevard Gatlin Boulevard at Savage Boulevard Gatlin Boulevard at Savona Boulevard Lennard Road at Hillmoor Drive Lennard Road at Melaleuca Boulevard Lennard Road at Mariposa Avenue Lennard Road at Tiffany Avenue Lennard Road at Walton Road St. Lucie West Boulevard at Bayshore Boulevard St. Lucie West Boulevard at Bethany Drive St. Lucie West Boulevard at Cashmere Boulevard Tindale-Oliver & Associates, Inc. St. Lucie County August Traffic Counts Program Evaluation

8 St. Lucie West Boulevard at Country Club Drive St. Lucie West Boulevard at Kings Isle Boulevard St. Lucie West Boulevard at Lake Charles Boulevard St. Lucie West Boulevard at Peacock Boulevard Tradition Parkway at Village Parkway U.S.1 at Jennings Road U.S.1 at Lennard Road U.S.1 at Lyngate Drive U.S.1 at Midport Road U.S.1 at Port St. Lucie Boulevard U.S.1 at Village Green Drive Port St. Lucie Turning Movement Counts have been included in Appendix C. In addition, drafts of the Port St. Lucie Boulevard at U.S.1 and Midway Road at U.S.1 Signal System Retiming Report have also been provided. Finally, the city of Port St. Lucie provided a list of recommended locations to be considered to be considered for inclusion in the countywide traffic count program. The list has been included below: Central Zone Midway Road east of I-95 Walton Road west of U.S.1 South Zone Lennard Road north of U.S.1 Crosstown Parkway east of California Boulevard Crosstown Parkway east of Bayshore Boulevard Crosstown Parkway west of I-95 California Boulevard south of Del Rio Boulevard Cameo Boulevard south of Crosstown Parkway Savona Boulevard south of Gatlin Boulevard Savona Boulevard north of Gatlin Boulevard Port St. Lucie Boulevard on the Turnpike Bridge Port St. Lucie Boulevard north of Gatlin Boulevard Tindale-Oliver & Associates, Inc. St. Lucie County August Traffic Counts Program Evaluation

9 Port St. Lucie Boulevard north of Becker Road Del Rio Avenue east of California Boulevard Tulip Boulevard east of Gatlin Boulevard Rosser Road south of Gatlin Boulevard Gatlin Boulevard west of Port St. Luce Boulevard Gatlin Boulevard west of Savona Boulevard Gatlin Boulevard west of Rosser Boulevard Tradition Parkway west of I-95 Darwin Boulevard east of Port St. Lucie Boulevard Paar Drive east of Savona Boulevard Becker Road east of Turnpike Becker Road west of Turnpike Becker Road west of Port St. Lucie Boulevard Becker Road east of I-95 Village Parkway north of tradition Parkway Village Parkway south of Crosstown Parkway Future counts 2011 Village Parkway south of Tradition Parkway Village Parkway north of Becker Road CITY OF FORT PIERCE The City of Fort Pierce currently does not have a formal traffic count program. However, traffic count are being collected at some specific locations to address neighborhood complains or where, due to specific circumstances (i.e. significant changes in travel pattern due to the construction of new roads), traffic count data is considered necessary. Even though, and as mentioned above, the City of Fort Pierce does not have a formal traffic count program; seven-day traffic counts collected by FDOT at the following intersections have been provided: 25 th Street between Avenue I and Avenue D 25 th Street between St. Lucie Boulevard and Juanita Avenue A1A between north A1A and Old Dixie Highway Tindale-Oliver & Associates, Inc. St. Lucie County August Traffic Counts Program Evaluation

10 Midway Road easy of I-95 Okeechobee Road between Virginia Avenue and Central Mall Port St. Lucie Boulevard between Airoso Boulevard and Bayshore Boulevard U.S.1 between Savanna Cub Boulevard and Spanish Lakes U.S.1 between Delaware Avenue and Georgia Avenue U.S.1 between Emil Avenue and Gardenia Avenue U.S.1 between Jennings Road and Lyngate Drive Virginia Avenue between 25 th Street and 13 th Street The city of Fort Pierce seven-day counts (collected by FDOT) have been included in Appendix D. The city has also provided a traffic count equipment inventory that includes the following: Five (5) converted Streeter Amet cases with Jamar Trax TC Counter/Classifiers Three (3) Jamar Solar Powered Trax RD Counter/Classifiers Two (2) Jamar Radar Recorders In addition, the city of Fort Pierce provided a list of recommended locations to be considered to be considered for inclusion in the countywide traffic count program. The list has been included below: 2 nd Street south of Orange Avenue 2 nd Street north of Orange Avenue 17 th Street north of Avenue D 17 th Street north of Orange Avenue 25 th Street north-south of Avenue I 29 th Street-north of Avenue D Avenue I east of 25 th Street North Avenue Q east of 25 th Street North Sunrise Boulevard west of U.S.1 Tindale-Oliver & Associates, Inc. St. Lucie County August Traffic Counts Program Evaluation

11 ST LUCIE COUNTY Saint Lucie County does currently have a formal traffic count program in place. As such the county has provided the following information: 1. Traffic Count Data corresponding to the following years and seasons: Spring 2009 Spring 2008 Fall 2007 Spring 2006 Fall 2006 Spring 2005 Fall 2005 Spring 2004 Fall 2004 Spring 2003 Fall 2003 Spring 2002 Fall 2002 Spring 2001 Fall 2001 Spring 2000 Fall 2000 Spring 1999 Fall Traffic Count Analysis corresponding to the following years and seasons: Spring 2008 Fall 2007 Fall 2006 Spring 2006 Spring The county has also provided a traffic count equipment inventory that includes the following: 12 (twelve) 241 Jamar All TRAX Tindale-Oliver & Associates, Inc. St. Lucie County August Traffic Counts Program Evaluation

12 25 (twenty five) Peek ADR 14 (fourteen) Metro 4. St. Lucie TPO Traffic Count Program Expenses, which have been included in Appendix E. 5. GIS data coverage of St. Lucie County Count Stations FLORIDA DEPARTMENT OF TRANSPORTATION FDOT has provided the following information: 1. Raw Traffic Count Data for the time period. 2. SPS Software P 3. FDOT Counts Check Software developed for FDOT District Florida Traffic Information & Highway Data CD 6. GIS data coverage of St. Lucie County: FDOT Count Stations St. Lucie County Count Stations Roadway Map Traffic Breaks Map 7. Defining Traffic Breaks Using GIS PowerPoint Presentation. Included as Appendix F. 8. FDOT Traffic Count Program Expenses, which have been included in Appendix G. Tindale-Oliver & Associates, Inc. St. Lucie County August Traffic Counts Program Evaluation

13 APPENDIX A ST. LUCIE COUNTY TRAFFIC COUNTS PROGRAM EVALUATION Data Needs Memo

14 Tindale-Oliver & Associates, Inc. Planning and Engineering To: Peter Buchwald, St. Lucie TPO Director From: Robert P. Wallace, P. E., AICP, Principal-In-Charge Fabricio Ponce, P.E., Project Manager Date: May 4, 2009 Re: St. Lucie County TPO Review of Current Traffic Count Practices Data Needs Request This memorandum identifies the list of data needs required to undertake the St. Lucie County Current Traffic Count Practices and Development of a Standardized Traffic Count Methodology Project in accordance with the project scope. All data will be collected through the Transportation Planning Organization s (TPO) Project Manager. It is noted that data needs relate all the agencies involved in the management, collection, review, quality control and reporting of traffic counts and the use of traffic count data by the various county and city departments, including FDOT. The following summarizes the requested data: 1. Organization Charts and Staffing, both permanent and part time 2. Traffic Data Collection Operating Processes and Procedures for the county, cities and FDOT 3. Data Sharing Agreements including agreements between FDOT and the County 4. Inventory of Equipment used to Perform Counts: a. Permanent Counts b. Temporary Counts 5. Traffic Count Information a. Traffic Count Locations and assignment of traffic counts to analysis segments and links b. Frequency of collection of traffic counts c. Duration of traffic counts d. Formats of Raw Traffic Count Data (15 minute interval or 1 hour interval as available) e. Traffic count adjustment factors (peak season, Average Annual Daily Traffic (AADT) and 30 th and 100 th highest peak hours f. Spreadsheets, Databases, and GIS Data Coverage and related specialized tools and scripts g. Traffic count software h. Quality Control practices of traffic count data i. Traffic Count Reports j. Count Statistics and Graphics (if produced) A - 1

15 Tindale-Oliver & Associates, Inc. Planning and Engineering 6. Traffic counts performed by consultants on behalf of governmental agencies, including the name and contact information of the consultant, contract price and most recent and/or planned traffic counts 7. Transportation Analysis Information: a. Level of Service Analysis Spreadsheets b. Any additional data and analyses, including turning movement data and refined level of service analysis completed for Kings Highway and Midway Road corridors c. Concurrency Management Tracking System and Data 8. Budgets a. Last two fiscal years, current year and next year personnel and operating budgets b. Last two fiscal years, current year and next year capital budgets 9. Traffic Count Programs Contact Information (names and addresses) for: a. St. Lucie County b. City of Fort Pierce c. City of Port St. Lucie d. Florida Department of Transportation District 4 We appreciate your assistance in providing the project data described above. If you have any questions, please do not hesitate to contact me. A - 2

16 APPENDIX B ST. LUCIE COUNTY TRAFFIC COUNTS PROGRAM EVALUATION List of Questions Concerning Traffic Count Practices

17 Tindale-Oliver & Associates, Inc. Planning and Engineering To: Peter Buchwald, St. Lucie TPO Director From: Robert P. Wallace, P. E., AICP, Principal-In-Charge Fabricio Ponce, P.E., Project Manager Date: May 4, 2009 Re: St. Lucie County TPO Review of Current Traffic Count Practices Data Needs Request This memorandum identifies the list of data needs required to undertake the St. Lucie County Current Traffic Count Practices and Development of a Standardized Traffic Count Methodology Project in accordance with the project scope. All data will be collected through the Transportation Planning Organization s (TPO) Project Manager. It is noted that data needs relate all the agencies involved in the management, collection, review, quality control and reporting of traffic counts and the use of traffic count data by the various county and city departments, including FDOT. The following summarizes the requested data: 1. Organization Charts and Staffing, both permanent and part time 2. Traffic Data Collection Operating Processes and Procedures for the county, cities and FDOT a. Do you have any operating process or procedures? b. Templates with locations where they need to set the hoses? c. How many people do you send out? 3. Data Sharing Agreements including agreements between FDOT and the County 4. Inventory of Equipment used to Perform Counts: a. Permanent Counts: How do you collect the data from the permanent count stations? b. Temporary Counts 5. Traffic Count Information B - 1

18 Tindale-Oliver & Associates, Inc. Planning and Engineering a. Traffic Count Locations and assignment of traffic counts to analysis segments and links b. Frequency of collection of traffic counts c. Duration of traffic counts d. Formats of Raw Traffic Count Data (15 minute interval or 1 hour interval as available) e. Traffic count adjustment factors (peak season, Average Annual Daily Traffic (AADT) and 30 th and 100 th highest peak hours f. Spreadsheets, Databases, and GIS Data Coverage and related specialized tools and scripts g. Traffic count software h. Quality Control practices of traffic count data i. Traffic Count Reports Historical Counts j. Count Statistics and Graphics (if produced) 6. Traffic counts performed by consultants on behalf of governmental agencies, including the name and contact information of the consultant, contract price and most recent and/or planned traffic counts 7. Transportation Analysis Information: a. Level of Service Analysis Spreadsheets b. Any additional data and analyses, including turning movement data and refined level of service analysis completed for Kings Highway and Midway Road corridors c. Concurrency Management Tracking System and Data 8. Budgets B - 2

19 Tindale-Oliver & Associates, Inc. Planning and Engineering a. Last two fiscal years, current year and next year personnel and operating budgets b. Last two fiscal years, current year and next year capital budgets 9. Traffic Count Programs Contact Information (names and addresses) for: a. St. Lucie County b. City of Fort Pierce c. City of Port St. Lucie d. Florida Department of Transportation District 4 We appreciate your assistance in providing the project data described above. If you have any questions, please do not hesitate to contact me. B - 3

20 APPENDIX C ST. LUCIE COUNTY TRAFFIC COUNTS PROGRAM EVALUATION City of Port St. Lucie Turning Movement Counts

21 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : AIROSO BLVD AND Site Code : Start Date : 10/31/2007 Page No : 1 Groups Printed- AUTOS - HEAVY VEHICLES AIROSO BLVD From North From East AIROSO BLVD From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 1

22 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : AIROSO BLVD AND Site Code : Start Date : 10/31/2007 Page No : 1 Groups Printed- HEAVY VEHICLES AIROSO BLVD From North From East AIROSO BLVD From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM *** BREAK *** Total Grand Total Apprch % Total % C - 2

23 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : AIROSO BLVD AND Site Code : Start Date : 10/31/2007 Page No : 2 AIROSO BLVD From North From East AIROSO BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF AIROSO BLVD Rght Left U-TURNS Peak Hour Data Left Rght 1 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS AIROSO BLVD C - 3

24 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : AIROSO BLVD AND Site Code : Start Date : 10/31/2007 Page No : 3 AIROSO BLVD From North From East AIROSO BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM :15 AM :30 AM :45 AM Total Volume % App. Total PHF AIROSO BLVD Rght Left U-TURNS Peak Hour Data Left Rght U-TURNS North Peak Hour Begins at 08:00 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS AIROSO BLVD C - 4

25 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : AIROSO BLVD AND Site Code : Start Date : 10/31/2007 Page No : 4 AIROSO BLVD From North From East AIROSO BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:45 AM 11:45 AM :00 PM :15 PM :30 PM Total Volume % App. Total PHF AIROSO BLVD Rght Left U-TURNS Peak Hour Data Left Rght 1 U-TURNS North Peak Hour Begins at 11:45 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS AIROSO BLVD C - 5

26 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : AIROSO BLVD AND Site Code : Start Date : 10/31/2007 Page No : 5 AIROSO BLVD From North From East AIROSO BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF AIROSO BLVD Rght Left U-TURNS Peak Hour Data Left Rght 1 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS AIROSO BLVD C - 6

27 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : BAYSHORE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 1 Groups Printed- AUTOS - HEAVY VEHICLES BAYSHORE BLVD From North From East BAYSHORE BLVD From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 7

28 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : BAYSHORE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 1 Groups Printed- HEAVY VEHICLES BAYSHORE BLVD From North From East BAYSHORE BLVD From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % C - 8

29 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : BAYSHORE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 2 BAYSHORE BLVD From North From East BAYSHORE BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM :30 PM :45 PM :00 PM Total Volume % App. Total PHF BAYSHORE BLVD Rght Left U-TURNS Peak Hour Data Left Rght 0 U-TURNS North Peak Hour Begins at 04:15 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS BAYSHORE BLVD C - 9

30 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : BAYSHORE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 3 BAYSHORE BLVD From North From East BAYSHORE BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM :15 AM :30 AM :45 AM Total Volume % App. Total PHF BAYSHORE BLVD Rght Left U-TURNS Peak Hour Data Left Rght 0 U-TURNS North Peak Hour Begins at 08:00 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS BAYSHORE BLVD C - 10

31 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : BAYSHORE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 4 BAYSHORE BLVD From North From East BAYSHORE BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:15 AM 11:15 AM :30 AM :45 AM :00 PM Total Volume % App. Total PHF BAYSHORE BLVD Rght Left U-TURNS Peak Hour Data Left Rght 1 U-TURNS North Peak Hour Begins at 11:15 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS BAYSHORE BLVD C - 11

32 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : BAYSHORE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 5 BAYSHORE BLVD From North From East BAYSHORE BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM :30 PM :45 PM :00 PM Total Volume % App. Total PHF BAYSHORE BLVD Rght Left U-TURNS Peak Hour Data Left Rght 0 U-TURNS North Peak Hour Begins at 04:15 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS BAYSHORE BLVD C - 12

33 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : CAMEO BLVD Site Code : Start Date : 10/31/2007 Page No : 1 CAMEO BLVD From North Groups Printed- AUTOS - HEAVY VEHICLES CAMEO BLVD From East From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 13

34 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : CAMEO BLVD Site Code : Start Date : 10/31/2007 Page No : 1 CAMEO BLVD From North Groups Printed- HEAVY VEHICLES CAMEO BLVD From East From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM *** BREAK *** Total Grand Total Apprch % Total % C - 14

35 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : CAMEO BLVD Site Code : Start Date : 10/31/2007 Page No : 2 CAMEO BLVD From North From East CAMEO BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF CAMEO BLVD Rght Left U-TURNS Peak Hour Data Left Rght 1 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS CAMEO BLVD C - 15

36 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : CAMEO BLVD Site Code : Start Date : 10/31/2007 Page No : 3 CAMEO BLVD From North From East CAMEO BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM :00 AM :15 AM :30 AM Total Volume % App. Total PHF CAMEO BLVD Rght Left U-TURNS Peak Hour Data Left Rght U-TURNS North Peak Hour Begins at 07:45 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS CAMEO BLVD C - 16

37 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : CAMEO BLVD Site Code : Start Date : 10/31/2007 Page No : 4 CAMEO BLVD From North From East CAMEO BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:00 AM 11:00 AM :15 AM :30 AM :45 AM Total Volume % App. Total PHF CAMEO BLVD Rght Left U-TURNS Peak Hour Data Left Rght U-TURNS North Peak Hour Begins at 11:00 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS CAMEO BLVD C - 17

38 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : CAMEO BLVD Site Code : Start Date : 10/31/2007 Page No : 5 CAMEO BLVD From North From East CAMEO BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF CAMEO BLVD Rght Left U-TURNS Peak Hour Data Left Rght 1 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS CAMEO BLVD C - 18

39 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : FLORESTA DR AND Site Code : Start Date : 10/31/2007 Page No : 1 FLORESTA DR From North Groups Printed- AUTOS - HEAVY VEHICLES FLORESTA DR From East From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 19

40 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : FLORESTA DR AND Site Code : Start Date : 10/31/2007 Page No : 1 FLORESTA DR From North Groups Printed- HEAVY VEHICLES FLORESTA DR From East From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % C - 20

41 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : FLORESTA DR AND Site Code : Start Date : 10/31/2007 Page No : 2 FLORESTA DR From North From East FLORESTA DR From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM :45 AM :00 AM :15 AM Total Volume % App. Total PHF FLORESTA DR Rght Left U-TURNS Peak Hour Data Left Rght 0 U-TURNS North Peak Hour Begins at 07:30 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS FLORESTA DR C - 21

42 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : FLORESTA DR AND Site Code : Start Date : 10/31/2007 Page No : 3 FLORESTA DR From North From East FLORESTA DR From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 10:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:45 AM 11:45 AM :00 PM :15 PM :30 PM Total Volume % App. Total PHF FLORESTA DR Rght Left U-TURNS Peak Hour Data Left Rght 0 U-TURNS North Peak Hour Begins at 11:45 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS FLORESTA DR C - 22

43 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : FLORESTA DR AND Site Code : Start Date : 10/31/2007 Page No : 4 FLORESTA DR From North From East FLORESTA DR From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 01:00 PM to 03:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 01:00 PM 01:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF FLORESTA DR Rght Left U-TURNS Peak Hour Data Left 0 Rght 0 U-TURNS North Peak Hour Begins at 01:00 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left 0 0 RghtU-TURNS FLORESTA DR C - 23

44 Default Comments Change These in The Preferences Window *** BREAK *** *** BREAK *** *** BREAK *** City of Port St Lucie Engineering Dept Traffic Division File Name : GATLIN~3 Site Code : Start Date : 8/26/2008 Page No : 1 Groups Printed- Group 1 SB PSL SB WB Gatlin WB NB PSL NB EB Gatlin EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds Int. Total Factor : : : : Total : : : : Total : : : : Total Grand Total Apprch % Total % C - 24

45 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : GOWIN DR AND Site Code : Start Date : 10/31/2007 Page No : 1 GOWIN DR From North Groups Printed- AUTOS - HEAVY VEHICLES GOWIN DR From East From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 25

46 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : GOWIN DR AND Site Code : Start Date : 10/31/2007 Page No : 1 GOWIN DR From North Groups Printed- HEAVY VEHICLES From East GOWIN DR From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 05:15 PM :30 PM :45 PM Total Grand Total Apprch % Total % C - 26

47 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : GOWIN DR AND Site Code : Start Date : 10/31/2007 Page No : 2 GOWIN DR From North From East GOWIN DR From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF GOWIN DR Rght Left U-TURNS Peak Hour Data Left Rght 3 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left 82 6 RghtU-TURNS GOWIN DR C - 27

48 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : GOWIN DR AND Site Code : Start Date : 10/31/2007 Page No : 3 GOWIN DR From North From East GOWIN DR From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM :15 AM :30 AM :45 AM Total Volume % App. Total PHF GOWIN DR Rght Left U-TURNS Peak Hour Data Left Rght 1 U-TURNS North Peak Hour Begins at 08:00 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left 20 5 RghtU-TURNS GOWIN DR C - 28

49 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : GOWIN DR AND Site Code : Start Date : 10/31/2007 Page No : 4 GOWIN DR From North From East GOWIN DR From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:30 AM 11:30 AM :45 AM :00 PM :15 PM Total Volume % App. Total PHF GOWIN DR Rght Left U-TURNS Peak Hour Data Left Rght U-TURNS North Peak Hour Begins at 11:30 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left 19 1 RghtU-TURNS GOWIN DR C - 29

50 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : GOWIN DR AND Site Code : Start Date : 10/31/2007 Page No : 5 GOWIN DR From North From East GOWIN DR From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF GOWIN DR Rght Left U-TURNS Peak Hour Data Left Rght 3 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left 82 6 RghtU-TURNS GOWIN DR C - 30

51 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MIDPORT RD AND Site Code : Start Date : 10/31/2007 Page No : 1 MIDPORT BLVD From North Groups Printed- AUTOS - HEAVY VEHICLES MIDPORT BLVD From East From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 31

52 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MIDPORT RD AND Site Code : Start Date : 10/31/2007 Page No : 1 MIDPORT BLVD From North Groups Printed- HEAVY VEHICLES MIDPORT BLVD From East From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % C - 32

53 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MIDPORT RD AND Site Code : Start Date : 10/31/2007 Page No : 2 MIDPORT BLVD From North From East MIDPORT BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM :30 PM :45 PM :00 PM Total Volume % App. Total PHF MIDPORT BLVD Rght Left U-TURNS Peak Hour Data Left Rght U-TURNS North Peak Hour Begins at 04:15 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS MIDPORT BLVD C - 33

54 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MIDPORT RD AND Site Code : Start Date : 10/31/2007 Page No : 3 MIDPORT BLVD From North From East MIDPORT BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM :45 AM :00 AM :15 AM Total Volume % App. Total PHF MIDPORT BLVD Rght Left U-TURNS Peak Hour Data Left Rght U-TURNS North Peak Hour Begins at 07:30 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS MIDPORT BLVD C - 34

55 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MIDPORT RD AND Site Code : Start Date : 10/31/2007 Page No : 4 MIDPORT BLVD From North From East MIDPORT BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:15 AM 11:15 AM :30 AM :45 AM :00 PM Total Volume % App. Total PHF MIDPORT BLVD Rght Left U-TURNS Peak Hour Data Left Rght U-TURNS North Peak Hour Begins at 11:15 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS MIDPORT BLVD C - 35

56 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MIDPORT RD AND Site Code : Start Date : 10/31/2007 Page No : 5 MIDPORT BLVD From North From East MIDPORT BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM :30 PM :45 PM :00 PM Total Volume % App. Total PHF MIDPORT BLVD Rght Left U-TURNS Peak Hour Data Left Rght U-TURNS North Peak Hour Begins at 04:15 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS MIDPORT BLVD C - 36

57 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MORNINGSIDE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 1 Groups Printed- AUTOS - HEAVY VEHICLES MORNINGSIDE BLVD From North From East MORNINGSIDE BLVD From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 37

58 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MORNINGSIDE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 1 Groups Printed- HEAVY VEHICLES MORNINGSIDE BLVD From North From East MORNINGSIDE BLVD From South From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM *** BREAK *** Total Grand Total Apprch % Total % C - 38

59 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MORNINGSIDE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 2 MORNINGSIDE BLVD From North From East MORNINGSIDE BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF MORNINGSIDE BLVD Rght Left U-TURNS Peak Hour Data Left Rght 4 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS MORNINGSIDE BLVD C - 39

60 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MORNINGSIDE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 3 MORNINGSIDE BLVD From North From East MORNINGSIDE BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM :00 AM :15 AM :30 AM Total Volume % App. Total PHF MORNINGSIDE BLVD Rght Left U-TURNS Peak Hour Data Left Rght 3 U-TURNS North Peak Hour Begins at 07:45 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS MORNINGSIDE BLVD C - 40

61 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MORNINGSIDE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 4 MORNINGSIDE BLVD From North From East MORNINGSIDE BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:00 AM 11:00 AM :15 AM :30 AM :45 AM Total Volume % App. Total PHF MORNINGSIDE BLVD Rght Left U-TURNS Peak Hour Data Left Rght 6 U-TURNS North Peak Hour Begins at 11:00 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS MORNINGSIDE BLVD C - 41

62 CLIENT : FALLER DAVIS JOB NO.: PROJECT: ST LUCIE COUNTY SIGNAL RETIMING COUNTY : ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : MORNINGSIDE BLVD AND Site Code : Start Date : 10/31/2007 Page No : 5 MORNINGSIDE BLVD From North From East MORNINGSIDE BLVD From South From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF MORNINGSIDE BLVD Rght Left U-TURNS Peak Hour Data Left Rght 4 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS Left RghtU-TURNS MORNINGSIDE BLVD C - 42

63 Default Comments Change These in The Preferences Window *** BREAK *** *** BREAK *** *** BREAK *** City of Port St Lucie Engineering Dept Traffic Division File Name : GATLIN~2 Site Code : Start Date : 9/2/2008 Page No : 1 Groups Printed- Group 1 SB WB Gatlin WB NB Rosser NB EB Gatlin EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds Int. Total Factor : : : : Total : : : : Total : : : : Total Grand Total Apprch % Total % C - 43

64 Default Comments Change These in The Preferences Window City of Port St Lucie Engineering Dept Traffic Division Groups Printed- 1 - Unshifted File Name : GATLIN~1 Site Code : Start Date : 12/2/2008 Page No : 1 *** BREAK *** SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds Int. Total Factor : Total : : : : Total : Total : : : : Total : *** BREAK *** Total *** BREAK *** 17: Total : : : : Total Grand Total Apprch % Total % C - 44

65 Default Comments Change These in The Preferences Window *** BREAK *** *** BREAK *** *** BREAK *** City of Port St Lucie Engineering Dept Traffic Division File Name : GA7B90~1 Site Code : Start Date : 9/10/2008 Page No : 1 Groups Printed- Group 1 SB Savona SB WB Gatlin WB NB Savona NB EB Gatlin EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds Int. Total Factor : : : : Total : : : : Total : : : : Total Grand Total Apprch % Total % C - 45

66 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- Unshifted File Name : LENNAR~2 Site Code : Start Date : 1/13/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds *** BREAK *** *** BREAK *** Factor : : : : Total : : : : Total : : : : Total : : : : Total : Total : : : : Total : : : Grand Total Apprch % Total % Int. Total C - 46

67 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- Unshifted File Name : LENNAR~1 Site Code : Start Date : 1/13/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds Factor : Total : : : : Total : : : *** BREAK *** Total *** BREAK *** 11: Total : : : : Total : : : *** BREAK *** Total *** BREAK *** 16: Total : : : : Total : : : Grand Total Apprch % Total % Int. Total C - 47

68 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- 1 - Unshifted File Name : LED791~1 Site Code : Start Date : 1/8/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds *** BREAK *** *** BREAK *** Factor : Total : : : : Total : : : : Total : Total : : : : Total : : : : Total : Total : : : : Total : : : : Total Grand Total Apprch % Total % Int. Total C - 48

69 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- 1 - Unshifted File Name : LE6287~1 Site Code : Start Date : 1/7/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds *** BREAK *** *** BREAK *** Factor : Total : : : : Total : : : : Total : Total : : : : Total : : : : Total : Total : : : : Total : : : : Total Grand Total Apprch % Total % Int. Total C - 49

70 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- Unshifted File Name : LENNAR~3 Site Code : Start Date : 1/15/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds Factor : Total : : : : Total : : : *** BREAK *** Total *** BREAK *** *** BREAK *** 12: : : : Total : : : : Total : : : Total : : : : Total : Grand Total Apprch % Total % Int. Total C - 50

71 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- 1 - Unshifted File Name : SLWAND~4 Site Code : Start Date : 1/22/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds Factor *** BREAK *** Int. Total *** BREAK *** *** BREAK *** 09: : : : Total : : : : Total : : : : Total Grand Total Apprch % Total % C - 51

72 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- 1 - Unshifted File Name : SL2EA4~1 Site Code : Start Date : 1/27/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds *** BREAK *** *** BREAK *** Factor : : : : Total : : : : Total : : : : Total Grand Total Apprch % Total % Int. Total C - 52

73 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- 1 - Unshifted File Name : SL90B3~1 Site Code : Start Date : 3/4/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds *** BREAK *** *** BREAK *** Factor : : : : Total : : : : Total : : : : Total Grand Total Apprch % Total % Int. Total C - 53

74 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- 1 - Unshifted File Name : SLWCC~1 Site Code : Start Date : 2/25/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds *** BREAK *** *** BREAK *** *** BREAK *** Factor : : : : Total : : : : Total : : : : Total Grand Total Apprch % Total % Int. Total C - 54

75 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- 1 - Unshifted File Name : SLWAND~1 Site Code : Start Date : 4/22/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds *** BREAK *** *** BREAK *** Factor : : : : Total : : : : Total : : : : Total Grand Total Apprch % Total % Int. Total C - 55

76 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- 1 - Unshifted File Name : SLWAND~2 Site Code : Start Date : 1/28/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds *** BREAK *** *** BREAK *** Factor : : : : Total : : : : Total : : : : Total Grand Total Apprch % Total % Int. Total C - 56

77 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- 1 - Unshifted File Name : SLWAND~3 Site Code : Start Date : 2/3/2009 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds *** BREAK *** *** BREAK *** Factor : : : : Total : : : : Total : : : : Total Grand Total Apprch % Total % Int. Total C - 57

78 City of Port St Lucie Engineering Dept Default Comments Traffic Division Change These in The Preferences Window Groups Printed- 1 - Unshifted File Name : TRADIT~1 Site Code : Start Date : 8/27/2008 Page No : 1 SB WB NB EB Start Time Left Right Peds Left Right Peds Left Right Peds Left Right Peds Factor : : : : Total : *** BREAK *** Total *** BREAK *** *** BREAK *** 11: : : : Total : : : : Total *** BREAK *** Grand Total Apprch % Total % Int. Total C - 58

79 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@jenings Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- AUTOS - HEAVY VEHICLES JENNINGS ROAD From East From South JENNINGS ROAD From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 59

80 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@jenings Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- HEAVY VEHICLES JENNINGS ROAD From East From South JENNINGS ROAD From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % C - 60

81 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@jenings Site Code : Start Date : 10/24/2007 Page No : 2 From North JENNINGS ROAD From East From South JENNINGS ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data JENNINGS ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 05:00 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS JENNINGS ROAD Left RghtU-TURNS C - 61

82 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@jenings Site Code : Start Date : 10/24/2007 Page No : 3 From North JENNINGS ROAD From East From South JENNINGS ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM :00 AM :15 AM :30 AM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data JENNINGS ROAD Left Rght U-TURNS North Peak Hour Begins at 07:45 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS JENNINGS ROAD Left RghtU-TURNS C - 62

83 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@jenings Site Code : Start Date : 10/24/2007 Page No : 4 From North JENNINGS ROAD From East From South JENNINGS ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:00 PM 12:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data JENNINGS ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 12:00 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS JENNINGS ROAD Left RghtU-TURNS C - 63

84 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@jenings Site Code : Start Date : 10/24/2007 Page No : 5 From North JENNINGS ROAD From East From South JENNINGS ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data JENNINGS ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 05:00 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS JENNINGS ROAD Left RghtU-TURNS C - 64

85 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lennard Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- AUTOS - HEAVY VEHICLES LENNARD ROAD From East From South LENNARD ROAD From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 65

86 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lennard Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- HEAVY VEHICLES LENNARD ROAD From East From South LENNARD ROAD From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM *** BREAK *** 05:45 PM Total Grand Total Apprch % Total % C - 66

87 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lennard Site Code : Start Date : 10/24/2007 Page No : 2 From North LENNARD ROAD From East From South LENNARD ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM :00 PM :15 PM :30 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data LENNARD ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 04:45 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS LENNARD ROAD Left RghtU-TURNS C - 67

88 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lennard Site Code : Start Date : 10/24/2007 Page No : 3 From North LENNARD ROAD From East From South LENNARD ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM :30 AM :45 AM :00 AM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data LENNARD ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 07:15 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS LENNARD ROAD Left RghtU-TURNS C - 68

89 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lennard Site Code : Start Date : 10/24/2007 Page No : 4 From North LENNARD ROAD From East From South LENNARD ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:00 PM 12:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data LENNARD ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 12:00 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS LENNARD ROAD Left RghtU-TURNS C - 69

90 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lennard Site Code : Start Date : 10/24/2007 Page No : 5 From North LENNARD ROAD From East From South LENNARD ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM :00 PM :15 PM :30 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data LENNARD ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 04:45 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS LENNARD ROAD Left RghtU-TURNS C - 70

91 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lyngate Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- AUTOS - HEAVY VEHICLES LYNGATE DRIVE From East From South LYNGATE DRIVE From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 71

92 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lyngate Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- HEAVY VEHICLES LYNGATE DRIVE From East From South LYNGATE DRIVE From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % C - 72

93 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lyngate Site Code : Start Date : 10/24/2007 Page No : 2 From North LYNGATE DRIVE From East From South LYNGATE DRIVE From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data LYNGATE DRIVE Left Rght 1 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS LYNGATE DRIVE Left RghtU-TURNS C - 73

94 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lyngate Site Code : Start Date : 10/24/2007 Page No : 3 From North LYNGATE DRIVE From East From South LYNGATE DRIVE From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM :00 AM :15 AM :30 AM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data LYNGATE DRIVE Left Rght 0 U-TURNS North Peak Hour Begins at 07:45 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS LYNGATE DRIVE Left RghtU-TURNS C - 74

95 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lyngate Site Code : Start Date : 10/24/2007 Page No : 4 From North LYNGATE DRIVE From East From South LYNGATE DRIVE From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:00 PM 12:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data LYNGATE DRIVE Left Rght 0 U-TURNS North Peak Hour Begins at 12:00 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS LYNGATE DRIVE Left RghtU-TURNS C - 75

96 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@lyngate Site Code : Start Date : 10/24/2007 Page No : 5 From North LYNGATE DRIVE From East From South LYNGATE DRIVE From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data LYNGATE DRIVE Left Rght 1 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS LYNGATE DRIVE Left RghtU-TURNS C - 76

97 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@midport Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- AUTOS - HEAVY VEHICLES MIDPORT ROAD From East From South MIDPORT ROAD From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 77

98 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@midport Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- HEAVY VEHICLES MIDPORT ROAD From East From South MIDPORT ROAD From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % C - 78

99 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@midport Site Code : Start Date : 10/24/2007 Page No : 2 From North MIDPORT ROAD From East From South MIDPORT ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data MIDPORT ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS MIDPORT ROAD Left RghtU-TURNS C - 79

100 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@midport Site Code : Start Date : 10/24/2007 Page No : 3 From North MIDPORT ROAD From East From South MIDPORT ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM :45 AM :00 AM :15 AM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data MIDPORT ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 07:30 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS MIDPORT ROAD Left RghtU-TURNS C - 80

101 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@midport Site Code : Start Date : 10/24/2007 Page No : 4 From North MIDPORT ROAD From East From South MIDPORT ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:00 PM 12:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data MIDPORT ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 12:00 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS MIDPORT ROAD Left RghtU-TURNS C - 81

102 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@midport Site Code : Start Date : 10/24/2007 Page No : 5 From North MIDPORT ROAD From East From South MIDPORT ROAD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data MIDPORT ROAD Left Rght 0 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS MIDPORT ROAD Left RghtU-TURNS C - 82

103 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@pslblvd Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- AUTOS - HEAVY VEHICLES PORT ST. LUCIE BLVD From East From South PORT ST. LUCIE BLVD From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 83

104 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@pslblvd Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- HEAVY VEHICLES PORT ST. LUCIE BLVD From East From South PORT ST. LUCIE BLVD From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % C - 84

105 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@pslblvd Site Code : Start Date : 10/24/2007 Page No : 2 From North PORT ST. LUCIE BLVD From East From South PORT ST. LUCIE BLVD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM :00 PM :15 PM :30 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data PORT ST. LUCIE BLVD Left Rght 0 U-TURNS North Peak Hour Begins at 04:45 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS PORT ST. LUCIE BLVD Left RghtU-TURNS C - 85

106 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@pslblvd Site Code : Start Date : 10/24/2007 Page No : 3 From North PORT ST. LUCIE BLVD From East From South PORT ST. LUCIE BLVD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM :30 AM :45 AM :00 AM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data PORT ST. LUCIE BLVD Left Rght 0 U-TURNS North Peak Hour Begins at 07:15 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS PORT ST. LUCIE BLVD Left RghtU-TURNS C - 86

107 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@pslblvd Site Code : Start Date : 10/24/2007 Page No : 4 From North PORT ST. LUCIE BLVD From East From South PORT ST. LUCIE BLVD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:00 PM 12:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data PORT ST. LUCIE BLVD Left Rght 0 U-TURNS North Peak Hour Begins at 12:00 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS PORT ST. LUCIE BLVD Left RghtU-TURNS C - 87

108 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@pslblvd Site Code : Start Date : 10/24/2007 Page No : 5 From North PORT ST. LUCIE BLVD From East From South PORT ST. LUCIE BLVD From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM :00 PM :15 PM :30 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data PORT ST. LUCIE BLVD Left Rght 0 U-TURNS North Peak Hour Begins at 04:45 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS PORT ST. LUCIE BLVD Left RghtU-TURNS C - 88

109 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@villagegreen Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- AUTOS - HEAVY VEHICLES VILLAGE GREEN DRIVE From East From South VILLAGE GREEN DRIVE From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % AUTOS % AUTOS HEAVY VEHICLES % HEAVY VEHICLES C - 89

110 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@villagegreen Site Code : Start Date : 10/24/2007 Page No : 1 From North Groups Printed- HEAVY VEHICLES VILLAGE GREEN DRIVE From East From South VILLAGE GREEN DRIVE From West Start Time Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Rght Left U-TURNS Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total *** BREAK *** 11:00 AM :15 AM :30 AM :45 AM Total :00 PM :15 PM :30 PM :45 PM Total *** BREAK *** 04:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % C - 90

111 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@villagegreen Site Code : Start Date : 10/24/2007 Page No : 2 From North VILLAGE GREEN DRIVE From East From South VILLAGE GREEN DRIVE From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data VILLAGE GREEN DRIVE Left 0 Rght 0 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS VILLAGE GREEN DRIVE Left RghtU-TURNS C - 91

112 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@villagegreen Site Code : Start Date : 10/24/2007 Page No : 3 From North VILLAGE GREEN DRIVE From East From South VILLAGE GREEN DRIVE From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM :15 AM :30 AM :45 AM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data VILLAGE GREEN DRIVE Left 0 Rght 0 U-TURNS North Peak Hour Begins at 08:00 AM AUTOS HEAVY VEHICLES Rght Left U-TURNS VILLAGE GREEN DRIVE Left RghtU-TURNS C - 92

113 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@villagegreen Site Code : Start Date : 10/24/2007 Page No : 4 From North VILLAGE GREEN DRIVE From East From South VILLAGE GREEN DRIVE From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:00 PM 12:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data VILLAGE GREEN DRIVE Left 0 Rght 0 U-TURNS North Peak Hour Begins at 12:00 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS VILLAGE GREEN DRIVE Left RghtU-TURNS C - 93

114 CLIENT : FALLER DAVIS JOB NO : PROJECT : ST LUCIE SIGNAL RETIMING COUNTY: ST LUCIE CROSSROADS ENGINEERING SW 120TH ST MIAMI, FL TEL: FAX: File Name : us1@villagegreen Site Code : Start Date : 10/24/2007 Page No : 5 From North VILLAGE GREEN DRIVE From East From South VILLAGE GREEN DRIVE From West Start Time Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Rght Left U-TURNS App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM :45 PM :00 PM :15 PM Total Volume % App. Total PHF Rght Left U-TURNS Peak Hour Data VILLAGE GREEN DRIVE Left 0 Rght 0 U-TURNS North Peak Hour Begins at 04:30 PM AUTOS HEAVY VEHICLES Rght Left U-TURNS VILLAGE GREEN DRIVE Left RghtU-TURNS C - 94

115 APPENDIX D ST. LUCIE COUNTY TRAFFIC COUNTS PROGRAM EVALUATION City of Fort Pierce Seven-Day Counts

116 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: TH STREET BTWN AVENUE I AND AVENUE D Start Date Start Time October 26, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 06: : : :30 16: :00 16: :15 16: D - 1

117 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: TH STREET BTWN AVENUE I AND AVENUE D Start Date Start Time October 27, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 11: :30 12: :45 15: D - 2

118 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: TH STREET BTWN AVENUE I AND AVENUE D Start Date Start Time October 28, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 10: : : :30 18: :15 13: :30 18: D - 3

119 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: TH STREET BTWN AVENUE I AND AVENUE D Start Date Start Time October 29, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 06: : : :30 06: :15 16: :30 16: D - 4

120 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: TH STREET BTWN AVENUE I AND AVENUE D Start Date Start Time October 30, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 06: : : :30 16: :15 16: :15 16: D - 5

121 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: TH STREET BTWN AVENUE I AND AVENUE D Start Date Start Time October 31, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 06: : : :30 16: :30 16: :30 16: D - 6

122 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: TH STREET BTWN AVENUE I AND AVENUE D Start Date Start Time November 01, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 06: : : :30 16: :30 16: :30 16: D - 7

123 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1004 N 25TH STREET BTWN ST LUCIE AND JUANITA AVE Start Date Start Time October 24, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 04: : : :00 04: :45 04: :30 04: D - 8

124 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1004 N 25TH STREET BTWN ST LUCIE AND JUANITA AVE Start Date Start Time October 25, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 04: : : :15 04: :30 04: :45 04: D - 9

125 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1004 N 25TH STREET BTWN ST LUCIE AND JUANITA AVE Start Date Start Time October 26, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 01: : : :45 01: :00 03: :00 03: D - 10

126 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1004 N 25TH STREET BTWN ST LUCIE AND JUANITA AVE Start Date Start Time October 27, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 06: : : :00 18: :45 18: :00 19: D - 11

127 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1004 N 25TH STREET BTWN ST LUCIE AND JUANITA AVE Start Date Start Time October 28, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 04: : : :00 04: :45 04: :45 04: D - 12

128 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1004 N 25TH STREET BTWN ST LUCIE AND JUANITA AVE Start Date Start Time October 29, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 04: : : :15 04: :00 04: :00 04: D - 13

129 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1004 N 25TH STREET BTWN ST LUCIE AND JUANITA AVE Start Date Start Time October 30, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 04: : : :15 04: :45 04: :45 04: D - 14

130 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1003 A1A BTWN N A1A AND OLD DIXIE HIGHWAY Start Date Start Time November 28, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 15: :15 15: :15 15: D - 15

131 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1003 A1A BTWN N A1A AND OLD DIXIE HIGHWAY Start Date Start Time November 29, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 15: :30 14: :15 15: D - 16

132 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1003 A1A BTWN N A1A AND OLD DIXIE HIGHWAY Start Date Start Time November 30, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :30 13: :45 15: :15 15: D - 17

133 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1003 A1A BTWN N A1A AND OLD DIXIE HIGHWAY Start Date Start Time December 01, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 11: :00 12: :00 11: D - 18

134 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1003 A1A BTWN N A1A AND OLD DIXIE HIGHWAY Start Date Start Time December 02, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 12: :30 15: :30 12: D - 19

135 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1003 A1A BTWN N A1A AND OLD DIXIE HIGHWAY Start Date Start Time December 03, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 14: :00 15: :45 14: D - 20

136 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1003 A1A BTWN N A1A AND OLD DIXIE HIGHWAY Start Date Start Time December 04, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 16: :45 16: :45 16: D - 21

137 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1005 MIDWAY RD EAST OF I-95 Start Date Start Time October 24, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 06: : : :45 06: :30 07: :45 07: D - 22

138 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1005 MIDWAY RD EAST OF I-95 Start Date Start Time October 25, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :00 07: :30 07: :45 07: D - 23

139 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1005 MIDWAY RD EAST OF I-95 Start Date Start Time October 26, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :00 17: :30 15: :30 15: D - 24

140 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1005 MIDWAY RD EAST OF I-95 Start Date Start Time October 27, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :30 12: :45 14: :15 12: D - 25

141 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1005 MIDWAY RD EAST OF I-95 Start Date Start Time October 28, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 16: :15 12: :15 12: D - 26

142 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1005 MIDWAY RD EAST OF I-95 Start Date Start Time October 29, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 06: : : :30 06: :30 07: :30 07: D - 27

143 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1005 MIDWAY RD EAST OF I-95 Start Date Start Time October 30, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 06: : : :00 06: :30 07: :45 07: D - 28

144 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1009 OKEECHOBEE RD BTWN VIRGINIA AND CENTRAL MALL Start Date Start Time October 26, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :45 07: :45 16: :15 16: D - 29

145 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1009 OKEECHOBEE RD BTWN VIRGINIA AND CENTRAL MALL Start Date Start Time October 27, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :45 11: :00 16: :00 16: D - 30

146 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1009 OKEECHOBEE RD BTWN VIRGINIA AND CENTRAL MALL Start Date Start Time October 28, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 14: :15 12: :15 12: D - 31

147 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1009 OKEECHOBEE RD BTWN VIRGINIA AND CENTRAL MALL Start Date Start Time October 29, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :45 07: :45 16: :45 16: D - 32

148 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1009 OKEECHOBEE RD BTWN VIRGINIA AND CENTRAL MALL Start Date Start Time October 30, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :30 07: :45 16: :30 16: D - 33

149 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1009 OKEECHOBEE RD BTWN VIRGINIA AND CENTRAL MALL Start Date Start Time October 31, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :00 07: :45 16: :45 16: D - 34

150 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1009 OKEECHOBEE RD BTWN VIRGINIA AND CENTRAL MALL Start Date Start Time November 01, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :15 07: :15 16: :15 16: D - 35

151 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1002 SE BTWN AIROSO AND BAYSHORE Start Date Start Time November 28, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :00 07: :30 16: :30 16: D - 36

152 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1002 SE BTWN AIROSO AND BAYSHORE Start Date Start Time November 29, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :15 07: :30 16: :15 16: D - 37

153 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1002 SE BTWN AIROSO AND BAYSHORE Start Date Start Time November 30, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :15 07: :30 16: :30 16: D - 38

154 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1002 SE BTWN AIROSO AND BAYSHORE Start Date Start Time December 01, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 11: :30 16: :45 12: D - 39

155 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1002 SE BTWN AIROSO AND BAYSHORE Start Date Start Time December 02, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 10: : : :15 12: :30 12: :15 12: D - 40

156 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1002 SE BTWN AIROSO AND BAYSHORE Start Date Start Time December 03, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :15 07: :30 16: :30 16: D - 41

157 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1002 SE BTWN AIROSO AND BAYSHORE Start Date Start Time December 04, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :30 07: :30 16: :30 16: D - 42

158 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1007 BTWN SAVANNAH CLUB AND SPANISH LAKES Start Date Start Time December 15, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :45 14: :00 11: :00 11: D - 43

159 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1007 BTWN SAVANNAH CLUB AND SPANISH LAKES Start Date Start Time December 16, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 16: :45 12: :45 12: D - 44

160 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1007 BTWN SAVANNAH CLUB AND SPANISH LAKES Start Date Start Time December 17, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :45 16: :00 07: :00 15: D - 45

161 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1007 BTWN SAVANNAH CLUB AND SPANISH LAKES Start Date Start Time December 18, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 14: :15 07: :00 15: D - 46

162 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1007 BTWN SAVANNAH CLUB AND SPANISH LAKES Start Date Start Time December 19, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 15: :30 13: :00 15: D - 47

163 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1007 BTWN SAVANNAH CLUB AND SPANISH LAKES Start Date Start Time December 20, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :45 16: :15 13: :45 16: D - 48

164 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1007 BTWN SAVANNAH CLUB AND SPANISH LAKES Start Date Start Time December 21, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :30 16: :00 07: :30 16: D - 49

165 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1011 BTWN DELAWARE AVE AND GEORGIA AVE Start Date Start Time November 09, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 11: :15 13: :45 16: D - 50

166 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1011 BTWN DELAWARE AVE AND GEORGIA AVE Start Date Start Time November 10, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 10: : : :00 10: :30 10: :30 10: D - 51

167 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1011 BTWN DELAWARE AVE AND GEORGIA AVE Start Date Start Time November 11, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :30 12: :00 16: :15 12: D - 52

168 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1011 BTWN DELAWARE AVE AND GEORGIA AVE Start Date Start Time November 12, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 17: :45 16: :00 17: D - 53

169 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1011 BTWN DELAWARE AVE AND GEORGIA AVE Start Date Start Time November 13, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :45 16: :15 12: :45 16: D - 54

170 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1011 BTWN DELAWARE AVE AND GEORGIA AVE Start Date Start Time November 14, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :30 16: :45 15: :30 16: D - 55

171 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1011 BTWN DELAWARE AVE AND GEORGIA AVE Start Date Start Time November 15, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :45 16: :00 17: :45 16: D - 56

172 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1012 BTWN EMIL AVENUE AND GARDINIA AVENUE Start Date Start Time November 28, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 12: :00 07: :00 07: D - 57

173 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1012 BTWN EMIL AVENUE AND GARDINIA AVENUE Start Date Start Time November 29, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 07: : : :00 12: :00 07: :00 07: D - 58

174 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1012 BTWN EMIL AVENUE AND GARDINIA AVENUE Start Date Start Time November 30, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 16: :15 07: :00 07: D - 59

175 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1012 BTWN EMIL AVENUE AND GARDINIA AVENUE Start Date Start Time December 01, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :30 12: :00 11: :30 12: D - 60

176 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1012 BTWN EMIL AVENUE AND GARDINIA AVENUE Start Date Start Time December 02, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 15: :30 17: :15 15: D - 61

177 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1012 BTWN EMIL AVENUE AND GARDINIA AVENUE Start Date Start Time December 03, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 12: :00 07: :00 07: D - 62

178 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1012 BTWN EMIL AVENUE AND GARDINIA AVENUE Start Date Start Time December 04, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 16: :00 07: :00 07: D - 63

179 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1001 BETWEEN JENNINGS RD AND LYNGATE DR Start Date Start Time October 26, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 13: :00 12: :00 13: D - 64

180 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1001 BETWEEN JENNINGS RD AND LYNGATE DR Start Date Start Time October 27, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :45 12: :00 11: :30 12: D - 65

181 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1001 BETWEEN JENNINGS RD AND LYNGATE DR Start Date Start Time October 28, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :15 15: :00 11: :15 13: D - 66

182 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1001 BETWEEN JENNINGS RD AND LYNGATE DR Start Date Start Time October 29, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 13: :30 16: :00 17: D - 67

183 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1001 BETWEEN JENNINGS RD AND LYNGATE DR Start Date Start Time October 30, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :30 16: :00 12: :30 16: D - 68

184 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1001 BETWEEN JENNINGS RD AND LYNGATE DR Start Date Start Time October 31, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 17: :00 12: :00 17: D - 69

185 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1001 BETWEEN JENNINGS RD AND LYNGATE DR Start Date Start Time November 01, :00 Roadway ID: Direction: N Direction: S Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :45 16: :00 11: :30 16: D - 70

186 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1008 VIRGINIA AVE BTWN 25TH STREET AND I3TH STREET Start Date Start Time October 24, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 08: : : :45 16: :30 16: :45 16: D - 71

187 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1008 VIRGINIA AVE BTWN 25TH STREET AND I3TH STREET Start Date Start Time October 25, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :45 16: :45 16: :45 16: D - 72

188 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1008 VIRGINIA AVE BTWN 25TH STREET AND I3TH STREET Start Date Start Time October 26, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :45 16: :30 16: :45 16: D - 73

189 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1008 VIRGINIA AVE BTWN 25TH STREET AND I3TH STREET Start Date Start Time October 27, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 11: :15 13: :00 11: D - 74

190 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1008 VIRGINIA AVE BTWN 25TH STREET AND I3TH STREET Start Date Start Time October 28, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 12: :15 12: :00 12: D - 75

191 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1008 VIRGINIA AVE BTWN 25TH STREET AND I3TH STREET Start Date Start Time October 29, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :30 16: :00 17: :45 16: D - 76

192 Florida Department of Transportation December 21, 2007 County 94 Station Site Description: 1008 VIRGINIA AVE BTWN 25TH STREET AND I3TH STREET Start Date Start Time October 30, :00 Roadway ID: Direction: E Direction: W Combined Time 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total 1st ¼ 2nd ¼ 3rd ¼ 4th ¼ Total Total 00: : : : : : : : : : : : : : : : : : : : : : : : Hour Total Hour Total A.M. P.M. Daily Peak Information Direction: E Direction: W Combined Directions Hour Volume Hour Volume Hour Volume 11: : : :00 16: :45 16: :45 16: D - 77

193 APPENDIX E ST. LUCIE COUNTY TRAFFIC COUNTS PROGRAM EVALUATION St. Lucie TPO Traffic Count Program Expenses

194 TPO Expanses-Traffic Count Program Ist Quarter July-Sept (2006) 2nd Quarter 3rd Quarter Oct-Dec (2006) Jan-Mar (2007) 4th Quarter Apr-June (2007) Ist Quarter July-Sept (2007) 2nd Quarter Oct-Dec (2007) 3rd Quarter Jan-Mar (2008) 4th Quarter Ist Quarter Apr-June (2008) July-Sept (2008) 2nd Quarter 3rd Quarter Oct-Dec (2008) Jan-Mar (2009) 4th Quarter Apr-June (2009) Salaries $1, $1, $ $0.00 $ $1, $ $1, $0.00 $0.00 $1, $0.00 Benefits $ $1, $58.69 $0.00 $ $ $ $ $0.00 $0.00 $1, $0.00 $2, $2, $ $0.00 $ $2, $1, $1, $0.00 $0.00 $2, $0.00 $4, $ $3, $3, $0.00 $2, $3, $3, $4, $2, E - 1

195 APPENDIX F ST. LUCIE COUNTY TRAFFIC COUNTS PROGRAM EVALUATION Defining Traffic Breaks Using GIS PowerPoint Presentation

196 Kara Schwartz Planning & Environmental Management FDOT District 4 F - 1

197 Overview Uses Old method (prior GIS) vs. New method (after GIS) Advantages Questions Contact F - 2

198 Definition: Segments which have similar traffic conditions and roadway characteristics Traffic break criteria: Changes in traffic volume (including truck traffic) Functional classification Speed limits Zoning F - 3

199 Design & enhancement planning of: Pavement Roadway Describes behavior of the roadway network Aids in asset management F - 4

200 F - 5

201 AADT Speed Limit Traffic Break Functional Classification Zoning F - 6

202 State & local level Increase & decrease in traffic volume Under 5,000 vehicles Changes that exceed 20% Over 5,000 vehicles Changes that exceed 10% F - 7

203 Defines road character of service in relation to total network Correlate traffic breaks to Number of lanes Major intersections Functional classification may remain the same even if there is a change in the number of lanes F - 8

204 F - 9

205 Decreases in speed limit cause traffic breaks F - 10

206 F - 11 Malls Stadiums Air/Sea Ports Commercial land use generates more traffic than residential «««Used about 5% of the time Major activity centers include:

207 F - 12

208 GIS allows the use of a wider analysis area Reduced analysis time Increased amount of information used during analysis Higher accuracy Reduced maintenance time Save Trees!!!! F - 13

209 QUESTIONS F - 14

210 Kara Schwartz Florida Department of Transportation 3400 W. Commercial Blvd. Ft. Lauderdale, FL Jaime Arbelaez F.R. Aleman/FDOT In-House Support F - 15

211 APPENDIX G ST. LUCIE COUNTY TRAFFIC COUNTS PROGRAM EVALUATION FDOT Traffic Count Program Expenses

212 G - 1

213 G- 2

Sidewalk Master Plan JULY 2017

Sidewalk Master Plan JULY 2017 Sidewalk Master Plan JULY 2017 Page 1 of 38 Sidewalk Master Plan July 2017 TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 BACKGROUND... 3 SIDEWALK PROGRAM 2006 TO PRESENT... 4 Sidewalk Project Selection... 4

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017 Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: Sue Polka, City Engineer, City of Arden Hills From:

More information

Appendix 3 Traffic Technical Memorandum

Appendix 3 Traffic Technical Memorandum Appendix 3 Traffic Technical Memorandum DRAFT TECHNICAL MEMORANDUM Southport Connector Project Traffic Development Comparison of Future Year Model Results Date: September 10, 2015 Project #:11730.030 To:

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Citizens Committee for Facilities

Citizens Committee for Facilities Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

2002 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Special Locality Report 129

2002 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Special Locality Report 129 Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Special Locality Report 129 Prepared By In Cooperation With U.S. Department of Transportation Federal Highway Administration

More information

HISTORIC TRAFFIC COUNT DATA ( )

HISTORIC TRAFFIC COUNT DATA ( ) HISTORIC TRAFFIC COUNT DATA (1980 2015) Highlights The traffic trends for 25 locations in the 22202 zip code area have decreased by 20 percent (on average) since 2000, when traffic peaked. Currently, average

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station 203 North LaSalle Street, Suite 2100 Chicago, IL 60601 (312) 558-1345 Fax: (312) 346-9603 E-Mail: cquandel@quandelconsultants.com www.quandel.com Scope of Services January 26, 2010 Project Development

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Re: Notification of RMS RiskLink 11.0.SP1 Submission Revision Postcode-county relationship

Re: Notification of RMS RiskLink 11.0.SP1 Submission Revision Postcode-county relationship Risk Management Solutions, Inc. 7575 Gateway Boulevard Newark California 94560 tel 510 505 2500 fax 510 505 2501 Sept ember 2, 2011 Chair, Florida Commission on Hurricane Loss Projection Methodology State

More information

Expansion Projects Description

Expansion Projects Description Expansion Projects Description The Turnpike expansion program was authorized by the Florida Legislature in 1990 to meet the State s backlog of needed highway facilities. The Legislature set environmental

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site. Project Manager Ed Collins LJA Engineering, Inc. Transportation Planning Manager 5316 Highway 290 West Austin Public Infrastructure Group Austin, TX 78735 (512) 762-6301 cell (512) 439-4757 office CARTS

More information

Travel Forecasting Methodology

Travel Forecasting Methodology Travel Forecasting Methodology Introduction This technical memorandum documents the travel demand forecasting methodology used for the SH7 BRT Study. This memorandum includes discussion of the following:

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Shoppes at Pine Meadow BPUD DeBary, Florida. Traffic Impact Analysis

Shoppes at Pine Meadow BPUD DeBary, Florida. Traffic Impact Analysis Shoppes at Pine Meadow BPUD DeBary, Florida Traffic Impact Analysis Prepared for: CPH, Inc. By: Lassiter Transportation Group, Inc. Revised October 2015 Table of Contents Introduction... 1 Study Procedures...

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St.

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St. I. Overview Consultant A was retained by the Ohio Department of Transportation to conduct traffic signal timing analyses on approximately one mile of roadway on between the Main Street and the Fourth Street

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Attachment C: Benefit-Cost Analysis Spreadsheet

Attachment C: Benefit-Cost Analysis Spreadsheet Attachment C: Benefit-Cost Analysis Spreadsheet TIGER VII Application Collier Blvd. Corridor Improvements June 5 th, 2015 Collier Blvd BCA Summary The Collier Boulevard Benefit Cost Analysis (BCA) has

More information

Missouri Seat Belt Usage Survey for 2017

Missouri Seat Belt Usage Survey for 2017 Missouri Seat Belt Usage Survey for 2017 Conducted for the Highway Safety & Traffic Division of the Missouri Department of Transportation by The Missouri Safety Center University of Central Missouri Final

More information

Peachtree Streetscape Atlanta, Georgia

Peachtree Streetscape Atlanta, Georgia Operational Analysis reetscape Atlanta, Georgia Prepared for: Central Atlanta Progress Prepared by: Kimley-Horn and Associates, Inc. Kimley-Horn and Associates, Inc. November 26 192812 reetscape Operational

More information

Chapter 12 VEHICLE SPOT SPEED STUDY

Chapter 12 VEHICLE SPOT SPEED STUDY Chapter 12 VEHICLE SPOT SPEED STUDY 12.1 PURPOSE (1) The Vehicle Spot Speed Study is designed to measure the speed characteristics at a specified location under the traffic and environmental conditions

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay TO: FROM: Chair and Members Engineering and Public Works Committee Mark Misko, C.E.T. Manager, Roads Maintenance and Construction DATE: March 23, 2016 SUBJECT: REPORT NO: Designation of a Community Safety

More information

Kansas City Missouri Public Works 414 East 12th Street Kansas City, Mo

Kansas City Missouri Public Works 414 East 12th Street Kansas City, Mo Page No : 1 Groups Printed- Unshifted Southbound Westbound Northbound Eastbound Start Time Peds App. Total Peds App. Total Peds App. Total Peds App. Total Exclu. Total Inclu. Total Int. Total 07:00 AM

More information

Task Force Meeting January 15, 2009

Task Force Meeting January 15, 2009 Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized

More information

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What

More information

Speed Evaluation Saw Mill Drive

Speed Evaluation Saw Mill Drive Speed Evaluation Saw Mill Drive Prepared for: Mount Laurel Township Burlington County, New Jersey Prepared by: Dana Litwornia Litwornia & Associates, Inc. Transportation, Traffic & Environmental Engineering

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject:

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject: MEMORANDUM Date: August 12, 2014 TG: 13329.01 To: From: Subject: Jeremy Krout EPD Solutions Inc. Rafik Albert EPD Solutions Inc. Rawad Hani Transpo Group AP North Lake Solar Project Traffic Scoping The

More information

Engineering Dept. Highways & Transportation Engineering

Engineering Dept. Highways & Transportation Engineering The University College of Applied Sciences UCAS Engineering Dept. Highways & Transportation Engineering (BENG 4326) Instructors: Dr. Y. R. Sarraj Chapter 4 Traffic Engineering Studies Reference: Traffic

More information

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270

More information

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No. TECHNICAL MEMORANDUM TO: FROM: Molly McCartney MnDOT Project Manager Haifeng Xiao, PE Tom Sohrweide, PE, PTOE DATE: November 27, 2012 RE: Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions

More information

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1. Traffic Engineering.

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1. Traffic Engineering. ORANGE COUNTY TRAFFIC COMMITTEE SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INITIATED BY: INVESTIGATOR: REQUEST: Speed Limit Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1 Traffic Engineering

More information

DELICETO, LLC PALM BEACH COUNTY, FL

DELICETO, LLC PALM BEACH COUNTY, FL COMPREHENSIVE PLAN AMENDMENT TRAFFIC ANALYSIS DELICETO, LLC PALM BEACH COUNTY, FL PREPARED FOR: DELICETO, LLC Project #042787007 April 18, 2018 Revised May 29, 2018 CA 00000696 Kimley-Horn and Associates,

More information

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach,

More information

Transportation Statistical Data Development Report BAY COUNTY 2035 LONG RANGE TRANSPORTATION PLAN

Transportation Statistical Data Development Report BAY COUNTY 2035 LONG RANGE TRANSPORTATION PLAN Transportation Statistical Data Development Report BAY COUNTY 2035 LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation,

More information

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA Project Development & Environment Study Broward County Intermodal Center And People Mover AASHTO Value Engineering Conference Presentation September 1, 2009 San Diego, CA Background P D & E Study Regional

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Dear New Clean Cities Stakeholder:

Dear New Clean Cities Stakeholder: Dear New Clean Cities Stakeholder: I am writing to invite you to join the Florida Gold Coast Clean Cities Coalition. We are a voluntary public and private partnership, which is dedicated to reducing the

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

Florida Department of Transportation. Road Ranger Performance Measures Annual Report. July 1, 2015 to June 30, 2016 Fiscal Year (FY) 2015/2016

Florida Department of Transportation. Road Ranger Performance Measures Annual Report. July 1, 2015 to June 30, 2016 Fiscal Year (FY) 2015/2016 Florida Department of Transportation Road Ranger Performance Measures Annual Report July 1, 2015 to June 30, 2016 Fiscal Year (FY) 2015/2016 Prepared by: Florida Department of Transportation Commercial

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate

More information

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS 2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

NOTICE OF PUBLIC HEARING ANAHEIM PUBLIC UTILITES BOARD IS HOLDING A PUBLIC HEARING ON THE FORMATION OF UNDERGROUND DISTRICT No. 66 (BEACH) TO UNDERGROUND OVERHEAD FACILTIIES, INCLUDING POWER AND COMMUNICATION

More information

35 One Gateway Plaza Los Angeles, CA

35 One Gateway Plaza Los Angeles, CA 35 One Gateway Plaza Los Angeles, CA 90012-2952 2 13-9 2 2.2000 Tel metro. net SYSTEM SAFETY AND OPERATIONS COMMITTEE FEBRUARY 21, 2013 SUBJECT: ACTION: TURBOCHARGERS APPROVE CONTRACT AWARDS RECOMMENDATION

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

Metropolitan Freeway System 2007 Congestion Report

Metropolitan Freeway System 2007 Congestion Report Metropolitan Freeway System 2007 Congestion Report Minnesota Department of Transportation Office of Traffic, Safety and Operations Freeway Operations Section Regional Transportation Management Center March

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

November 7, Mr. Francis J. Hanney District Traffic Services Manager PennDOT District Geerdes Boulevard King of Prussia, PA 19406

November 7, Mr. Francis J. Hanney District Traffic Services Manager PennDOT District Geerdes Boulevard King of Prussia, PA 19406 November 7, 216 Mr. Francis J. Hanney District Traffic Services Manager PennDOT District 6 7 Geerdes Boulevard King of Prussia, PA 1946 McMAHON ASSOCIATES, INC. 84 Springdale Drive Exton, PA 19341 p 61

More information

1. Traffic Count Balancing Methodology. 2. Design-Year No-Build & Build Traffic Growth and Balancing D-1

1. Traffic Count Balancing Methodology. 2. Design-Year No-Build & Build Traffic Growth and Balancing D-1 1. Traffic Count alancing Methodology 1. The raw 3-day data was consolidated and averaged to provide a single 24-hour average weekday daily traffic () count. Heavy vehicle percentages were also tabulated

More information

Do Standard Trip Generation Rates Overstate Impact of Commercial Uses?

Do Standard Trip Generation Rates Overstate Impact of Commercial Uses? Do Standard Trip Generation Rates Overstate Impact of Commercial Uses? Presented by: Tindale-Oliver & Associates, Inc. Presentation Overview 1 2 3 4 5 Introduction Trip Characteristics Database TOA Demand

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

SCOPE OF ENGINEERING SERVICES City of Charlottesville Task Order No. 19 City of Charlottesville Pedestrian Lighting Study

SCOPE OF ENGINEERING SERVICES City of Charlottesville Task Order No. 19 City of Charlottesville Pedestrian Lighting Study SCOPE OF ENGINEERING SERVICES City of Charlottesville Task Order No. 19 City of Charlottesville Pedestrian Lighting Study Task Order No. 19 will be completed in accordance with the following Scope of Services

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

Mineola Village Green

Mineola Village Green Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared

More information

Final Traffic Technical Memorandum

Final Traffic Technical Memorandum SR 54 Project Development and Environment (PD&E) Study From CR 577 (Curley Road) to CR 579/CR 54 (Morris Bridge Road) Final Traffic Technical Memorandum WPI Segment No: 416561-1 Pasco County Prepared for

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

Traffic Counts

Traffic Counts www.trafficcounts.co.nz www.trafficcounts.co.nz Quality Assurance Information Prepared for: Job Number: Prepared by: Reviewed by: Abley Limited 0000 Shane Ingley, Transportation Engineer Courtney Groundwater,

More information

Puerto Rico Observational Survey of Seat Belt Use, 2017

Puerto Rico Observational Survey of Seat Belt Use, 2017 Puerto Rico Observational Survey of Seat Belt Use, 2017 Final Report Submitted to: Traffic Safety Commission of Puerto Rico September 29, 2017 TABLE OF CONTENT Introduction... 3 Methodology... 3 FINDINGS...

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

Michelin Dealer List for Contract Florida

Michelin Dealer List for Contract Florida Michelin Dealer List for Contract 15-17-07-0220 - Florida 8-31-18 Call Dealers in advance to make sure they currently participate in the Michelin Government Sales Program Passenger & Lt Truck A OK Tire

More information

Committee Report. Transportation Committee. Business Item No

Committee Report. Transportation Committee. Business Item No Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope

More information