1 Sidewalk Master Plan JULY 2017 Page 1 of 38

2 Sidewalk Master Plan July 2017 TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 BACKGROUND... 3 SIDEWALK PROGRAM 2006 TO PRESENT... 4 Sidewalk Project Selection... 4 St Lucie Transportation Planning Organization Transportation Alternative List... 4 Approved Sidewalk Projects... 5 Status... 6 MASTER PLAN... 7 Goal... 7 Policies... 8 Ranking Criteria... 8 APPROVED SIDEWALK PROJECT RANKING... 9 RECOMMENDED SIDEWALK PROJECTS AND RANKING TEN-YEAR SIDEWALK PLAN (FY 17-27) Table 1 FY 17/18 TPO TA List of Sidewalk Projects Within and Adjacent to City...4 Table 2 Approved Sidewalk Projects...5 Table 3 School Sidewalk Status...6 Table 4 Approved Sidewalk Project Ranking...9 Table 5 Recommended Sidewalk Projects...10 Table 6 Ten-Year Sidewalk Plan (FY 17-27)...11 Table 7 Ten-Year Sidewalk Plan (FY 17-27) Miles Per District...13 Table 8 Ten-Year Sidewalk Plan (FY 17-27) Construction Costs...13 Appendix A City of Port St Lucie September 2012 Comprehensive Plan Transportation Element, Table 2-1 Local Roadway System...14 Appendix B Approved Sidewalks: Map and Funding Schedule Spreadsheet...19 Appendix C Missing Major Road Sidewalks Within School Radius: One-Half Mile, One-Mile, Two-Mile...22 Appendix D Approved Sidewalk Projects Ranking...26 Appendix E Recommended Sidewalk Projects Ranking...28 Appendix F FY Ten-Year Sidewalk Plan: Map and Funding Schedule...30 Appendix G FY Sidewalk Program: District 1, District 2, District 3, District Page 2 of 38

3 Sidewalk Master Plan July 2017 EXECUTIVE SUMMARY This Sidewalk Master Plan fulfills a priority objective of the infrastructure goal in the City s Strategic Plan. The purpose of this Sidewalk Master Plan is to formalize the goals, policies, and ranking system to prioritize the construction of the sidewalk projects in the City. The goal of the Sidewalk Master Plan is to progressively expand the existing sidewalk network to include sidewalks on major roadways (i.e., arterials or collectors) 1 with an emphasis on areas within a two-mile radius of schools and to provide sidewalks with direct connections between the major roadways. This document provides a historical perspective of sidewalk construction within the City, a description of the current sidewalk program, Master Plan (goal, policies, and ranking criteria), and a ten-year implementation plan with the ranked approved and recommended sidewalks. Annual reviews of the tenyear plan by the City Council will update the schedule to maximize the use of grant opportunities and address any new issues or conditions. BACKGROUND During the 1960s, the developers of the City, General Development Corporation, only provided sidewalks within limited parts of the City, such as the Sandpiper/Club Med area. As the population increased, the following events added sidewalks to the City s major roadways. The original sidewalks, sidewalks improvements prior to 2000, and the turnover of roadways with sidewalks (e.g., St Lucie West) provided eighteen centerline miles of sidewalks. In the early 2000 s, several sidewalks were added with roadway improvement projects. These projects included: Airoso Boulevard, Gatlin Boulevard, Rosser Boulevard, Green River Parkway, Lennard Road, Westmoreland Boulevard, Crosstown Parkway, Bayshore Boulevard, and Becker Road. Construction of these roadways added twenty-six centerline miles of sidewalk. New City roadways, completed by developers, have added sidewalks along Crosstown Parkway from I/95 west, Village Parkway, Community Boulevard, Discovery Way, Aledo Lane, and Import Drive. These new roadways have added fourteen centerline miles of sidewalk. Since 2006, the sidewalk program has added thirty-one miles of sidewalks. In total, there are 407 miles of sidewalk within the City. This includes the sidewalks on City and privately-owned roadways. 1 Arterial and collector roadways are listed in the latest edition of the City s Comprehensive Plan Transportation Element, Table 2-1 Local Roadway System. This is provided as Appendix A. Page 3 of 38

4 Sidewalk Master Plan July 2017 SIDEWALK PROGRAM 2006 TO PRESENT Sidewalk Project Selection The identification of sidewalk projects is based upon a committee s recommendation. The committee is comprised of representatives from the School Board, Police Department, Planning and Zoning Department and Public Works Department. The committee s recommendation focuses on providing sidewalks: Within a two-mile radius of schools, That connect between existing sidewalks and parks, On major roadways, At locations requested by residents. The committee s recommended list is submitted to and approved by City Council. The approved list was first known as a Grant List which later became known as a Priority Sidewalk List. City Council has approved one Grant List and four Priority Sidewalk Lists (Phases 1, 2, 3, and 4). St Lucie Transportation Planning Organization Transportation Alternative List City Council approved sidewalk lists are provided to the St Lucie Transportation Planning Organization (TPO). The TPO collects the approved sidewalk project lists from the School Board, St Lucie County, City of Fort Pierce, and City of Port St Lucie and then ranks the projects. The TPO ranking is based on criteria approved by the TPO Board. The ranked TPO projects are published on the Transportation Alternative (TA) Project List. Adding projects to the TPO TA list is very important as projects on this list are eligible to apply for Florida Department of Transportation (FDOT) Local Agency Program (LAP) Grant funding. Twenty sidewalk projects within or adjacent to the City are on the TPO s TA List. These projects are listed below in Table 1 along with the ranking and submitting agency. Table 1 FY 17/18 TPO TA List of Sidewalk Projects Within and Adjacent to City Project City TPO Submittal Agency/ District Ranking City Priority List Walton Rd Lennard Rd to Green River Pkwy - 5 County Floresta Dr - Port St Lucie Blvd to Southbend Blvd 4 6 City / Phase 4 St James Dr Royce Ave to Lazy River Pkwy - 6 County East Torino Pkwy Volucia Dr to Conus St 2 9 School Board Selvitz Blvd Milner Dr to Peachtree Ave 1 10 School Board Southbend Blvd Oakridge Dr to Eagle Dr 4 11 City / Phase 4 Floresta Dr - Port St Lucie Blvd to Streamlet Ave 4 11 City / Phase 4 Tiffany Ave - Grand Dr to Green River Pkwy 4 13 City / Phase 4 Alcantarra Blvd Port St Lucie Blvd to Savona Blvd 3 14 City / Phase 4 Paar Dr Savona Blvd to Port St Lucie Blvd 3 16 City / Phase 4 Page 4 of 38

5 Sidewalk Master Plan July 2017 Table 1 FY 17/18 TPO TA List of Sidewalk Projects Within and Adjacent to City Project City TPO Submittal Agency/ District Ranking City Priority List Curtis St - Prima Vista Blvd to Marion Ave 1 16 City / Phase 3 Savage Blvd - Import Dr to Gatlin Blvd 2 20 City / Phase 4 Import Dr - Gatlin Blvd to Savage Blvd 2 20 City / Phase 4 Volucia Dr Blanton Blvd to Torino Pkwy 2 23 School Board Paar Dr - Bamberg St to Savona Blvd 3 26 City / Phase 4 Oakridge Dr - Southbend Blvd to Mountwell St 4 27 City / Phase 4 Bayshore Blvd- Mountwell St to Turnpike Access Rd 4 27 City / Phase 4 Rosser Blvd - Openview Dr to Bamberg St 3 27 City / Phase 4 Floresta Dr Port St Lucie Blvd to Southbend Blvd 4 30 City / Phase 4 Selvitz Rd - Floresta Dr to Bayshore Blvd 1 31 City / Phase 4 Approved Sidewalk Projects The design and construction of the approved sidewalks are scheduled to maximize the use of grants. Grants from St Lucie County, FDOT LAP, and the Community Development Block Grant (CDBG) have funded the construction of sidewalks within the City. Since 2006, $13.2M has been allocated for sidewalk construction of which $11.3 was from grants. Please note that this document refers to the present-day value of money. Currently, there are twenty City Council approved sidewalk projects of which ten are funded. Over the next five years, the funded projects will provide an additional 9.2 miles of sidewalk at an estimated $5.6M for design and construction. Table 2 lists the status of the approved sidewalk projects. The approved sidewalk projects are shown on the map and the budgeting/scheduling spreadsheet provided in Appendix B. Project Table 2 Approved Sidewalk Projects City District Construction Funding Source Construction Schedule Selvitz Rd Bayshore Blvd to Macedo Blvd 1 FDOT LAP July 2017 Village Green Dr Midport Place to City Center 4 City Summer 2017 Thornhill Dr Airoso Blvd to Bayshore Blvd 1 CDBG Summer 2017 Rosser Blvd Crawford Ave to Openview Dr 3 City Underway Tulip Blvd Cherry Rd to Port St Lucie Blvd 3 FDOT LAP FY 17/18 Idol Dr Charter School to Savona Blvd 3 City FY 17/18 Oakridge Dr Southbend Blvd to Turnpike Access 4 CDBG/City FY 17/18 Paar Dr Darwin Blvd to Port St Lucie Blvd 3 FDOT LAP FY 18/19 Paar Dr Port St Lucie Blvd to Savona Blvd 3 City FY 18/19 Page 5 of 38

6 Project Table 2 Approved Sidewalk Projects City District Sidewalk Master Plan July 2017 Construction Funding Source Construction Schedule Curtis St - Prima Vista to Floresta Dr Floresta Dr - Port St Lucie Blvd to Southbend Blvd Floresta Dr - Port St Lucie Blvd to Streamlet Ave Import Dr - Gatlin Blvd to Savage Blvd Paar Dr. - Bamberg St to Savona Blvd Rosser Blvd Open View Dr to Bamberg St Savage Blvd - Import Dr to Gatlin Blvd Selvitz Rd. - Floresta Dr to Bayshore Blvd Southbend Blvd - Oakridge Dr to Eagle Dr Tiffany Ave. - School Site to Green River Pkwy Status The goal of the sidewalk program is to progressively expand the sidewalk network to include sidewalks on major roadways with an emphasis on areas within a two-mile radius of schools and to provide sidewalks with direct connections between the major roadways. The purpose of this goal is to establish a network of connecting sidewalks rather than numerous non-connecting segments. As shown in Table 3, there are twenty-four charter and public schools in the City. Seventeen have sidewalks within a one-half mile radius, six within a one-mile radius, and two within a two-mile radius. Table 3 School Sidewalk Status School Type District Sidewalks on City-Owned Major Roadways Within a Radius of: ½ Mile 1 Mile 2 Miles Allapattah Flats Elementary Public 2 Yes Yes Yes Bayshore Elementary Public 1 Yes No No Centennial High Public 2 Yes Yes No Floresta Elementary Public 4 No No No Imagine - Nau Campus Charter 3 No No No Manatee Academy Public 2 Yes No No Mariposa Elementary Public 4 Yes No No Morningside Elementary Public 4 Yes No No Northport K-8 Public 1 Yes No No Oak Hammock K-8 Public 2 Yes No No Palm Tradition Public 2 Yes No No Parkway Elementary Public 1 No No No Page 6 of 38

7 Table 3 School Sidewalk Status School Type District Sidewalk Master Plan July 2017 Sidewalks on City-Owned Major Roadways Within a Radius of: ½ Mile 1 Mile 2 Miles Port St Lucie High Public 4 Yes Yes No Renaissance Charter 2 Yes Yes No Tradition Charter 3 Yes Yes Yes Rivers Edge Elementary Public 1 Yes No No Somerset College Prep Academy Charter 2 No No No Southern Oaks Middle Public 1 Yes No No Southport Middle School Public 4 No No No St Lucie West K-8 Public 2 Yes Yes No Treasure Coast High Public 3 Yes No No Village Green Environmental Public 4 No No No West Gate K-8 Public 2 Yes No No Windmill Point Elementary Public 3 No No No An itemization of the missing major roadway sidewalks within the one-half, one-mile and two-mile radius for each school is provided in Appendix C. Future roadway improvements for Floresta Drive and Port St Lucie Boulevard are within the two-mile radius of five schools. There are 137 centerline miles of major roadway owned by the City (based on the Transportation Element of the City s Comprehensive Plan - Appendix A). Sidewalks on the original roadways and those within St Lucie West that were turned over to the City include eighteen centerline miles, the City s roadway projects have added twenty-six miles, developer funded road projects added fourteen miles, and the sidewalk program has added thirty-one miles for a total of eighty-nine miles of sidewalks on the major roadways. Based on this, sixty-five percent of the major roadways owned by the City have sidewalks. MASTER PLAN This Sidewalk Master Plan is a key component of the City s Strategic Plan. The purpose of the plan is to provide a guide for prioritizing the construction of sidewalks within the City. The goal, policies, and ranking criteria for the Sidewalk Master Plan are presented below. Goal The primary goal of the Sidewalk Master Plan is to progressively expand the existing sidewalk network to include sidewalks on major roadways with an emphasis on areas within a two-mile radius of schools and to provide sidewalks with direct connections between the major roadways. Page 7 of 38

8 Sidewalk Master Plan July 2017 Policies The following policies will guide the development of the sidewalk network on City-owned road rights-ofway. Progressively expand the existing sidewalks to create an interconnected network. Provide sidewalks within a two-mile radius of elementary, middle, or high schools on major roadways. The reason for this distance is that bus service, unless hazardous conditions exist, is not provided within a two-mile radius of a school. Provide sidewalks on all major roadways because these roadways have greater traffic volumes and higher speeds. Provide sidewalks on roadways that provide a direct connection to major roadway sidewalks. These provide a neighborhood with a connection to the major roadway sidewalk network. A sidewalk on a local street will be considered, on a case by case basis. For example, if a local road serves a school or park with obvious signs of regular pedestrian traffic (i.e., worn path) and provides a significant improvement to connectivity it may be considered for a sidewalk Sidewalks shall be on: Both sides of new or improved arterial or collector roadways that are four or more lanes. One side of roadways with two lanes except near a school or attractor where sidewalks may be provided on both sides of the roadway. Sidewalks will be coordinated with future roadway improvements. This policy helps ensure fiscal responsibility by requiring major sidewalk projects meet long-term rather than short-term objectives. Residents who wish to expedite the construction of a sidewalk or construct a sidewalk that is not on the list, may do so by contacting the City to request assistance with establishing a Special Assessment District (SAD) for the neighborhood. The details for the SAD will be determined by the City on a case by case basis. City Council will review the ten-year plan on an annual basis to: Modify the work plan to accommodate grant opportunities or address issues/conditions that may occur Add new projects to the program and the TPO TA List. Historically, the TPO asks for updates to the TA list in May. Staff recommends that City Council review the plan after the TPO announces the award of the FDOT LAP Grant, which is usually in March. Ranking Criteria The criteria and weight for ranking sidewalks emphases a safe pedestrian facility along major roadways with a focus on a two-mile radius from schools and on roads that provide direct connections to the major roadways. The criteria and weight used to rank the sidewalk projects are listed below. Within a two-mile radius of schools - 50 Page 8 of 38

9 On arterial or collector roadways 2-20 Bus stop locations (school and transit) - 10 Provides connections to existing sidewalks - 10 Provides direct access to an attractor (i.e., park, library or grocery) - 5 Requested by a resident - 5 Sidewalk Master Plan July 2017 Each criterion is assigned a weighted score, and if a sidewalk meets that criteria, the sidewalk receives that score. The scores are added together for a total score. In certain cases, other considerations that are outside the ranking criteria may be considered. For example, an impending road improvement project may delay the construction of a sidewalk until the road improvement project is constructed. Other examples may include adjustments to the schedule/ranking for projects that are eligible for grant funding, projects that address an immediate health and/or safety issue, or projects that have constructability issues. APPROVED SIDEWALK PROJECT RANKING The ranking of the approved sidewalk projects that remain to be funded are provided in Table 4. As shown below, the Floresta Drive sidewalks have higher total scores; however, the projects are moved to the bottom of the list until a master plan, including sidewalks, for the Floresta Drive corridor is developed. A scoring spreadsheet is provided in Appendix D. Table 4 Approved Sidewalk Project Ranking Project District Total Ranking Score Considerations Ranking Import Dr Gatlin Blvd to Savage Blvd Savage Blvd Import Dr to Gatlin Blvd Bus Stops 2 Rosser Blvd Open View Dr to Bamberg St Bus Stops 3 Paar Dr Bamberg St to Savona Blvd Bus Stops 4 Tiffany Ave School Site to Green River Pkwy Bus Stops. 5 Selvitz Rd Floresta Dr to Bayshore Blvd Bus Stops 6 Curtis St Prima Vista Blvd to Floresta Dr Southbend Blvd Oakridge Dr to Eagle Dr Floresta Dr PSL Blvd to Streamlet Av Moved to end due to future improvements 9 to Floresta Dr. Floresta Dr PSL Blvd to Southbend Blvd 4 95 Moved to end due to future improvements to Floresta Dr 10 2 Arterial and collector roadways are listed in the latest edition of the City s Comprehensive Plan Transportation Element, Table 2-1 Local Roadway System. This is provided as Appendix A Page 9 of 38

10 Sidewalk Master Plan July 2017 RECOMMENDED SIDEWALK PROJECTS AND RANKING In following the goal of the Sidewalk Master Plan, the recommended sidewalk projects will include the sidewalks for the remaining major roadways as well as the primary direct connectors. Except for the following, Staff recommends the inclusion of the remaining collector and arterial roadways identified in the Transportation Element of the Comprehensive Plan into the sidewalk program. Becker Road Florida Turnpike to Gilson Road (District 4). Sidewalks on this roadway will be provided when it is widened by developers per current Development Order for St Lucie Lands. Biltmore Street South Macedo Boulevard to Thornhill Drive (District 1). The road is in an industrial/work area where minimal pedestrian traffic occurs. Commerce Center Parkway Crosstown Parkway to Glades Cut Off Road (District 2). Except for the industrial area at the northern limits of the road, sidewalk is provided. Most of the sidewalk in this northern area will be completed by the property owners as the land develops. Grand Drive Lennard Road to Walton Road (District 4). The approved sidewalk projects include a parallel sidewalk located less than one-half mile away. This approved sidewalk extends along Tiffany Avenue from Lennard Road to Grand Drive then along Grand Drive to the canal right-of-way, along the canal right-of-way to Green River Parkway. The first section of the Tiffany Avenue sidewalk from Lennard Road to the school site has been constructed. A connection to Walton Road can be provided along Grand when Walton Road is improved by the County. North Macedo Boulevard Selvitz Road to Bayshore Boulevard (District 1). This roadway segment is within a 0.10 mile of an existing sidewalk on the parallel Bayshore Boulevard segment. Village Green Drive (District 4). US Highway 1 to Tiffany Avenue. There is a sidewalk between Tiffany Avenue and the Spanish Lakes Community. Sidewalks for the remainder of this road are being considered as part of the improvements to accommodate the Crosstown Parkway Extension project. Table 5 lists the twenty-recommended major roadway and direct connector sidewalk projects along with the ranking of the projects. Upon City Council approval of these sidewalk projects, they will be added to the TPO 2018/2019 TA List. A spreadsheet providing the ranking details is provided in Appendix E. Project Table 5 Recommended Sidewalk Projects District Total Score Ranking Considerations Ranking Major Roadways Alcantarra Blvd - PSL Blvd to Savona Blvd East Torino Pkwy - Vizcaya Falls to Midway Rd Bus Stops 2 West Torino Pkwy Blanton Rd to California Blvd Bus Stops 3 Torino Pkwy - Cashmere Blvd to California Blvd Bus Stops 4 Hillmoor Dr - Hospital to Woodstork Trail Bus Stops 5 Page 10 of 38

11 Table 5 Recommended Sidewalk Projects Sidewalk Master Plan July 2017 Project District Total Ranking Score Considerations Ranking Hillmoor Dr -Lennard Rd to Playground Bus Stops 6 North Tornio Pkwy East Torino Pkwy to Blanton Bus Stops 7 Selvitz Rd - Milner Dr to Peachtree Blvd Bus Stops 8 Morningside Blvd - Treasure Island Rd to Cambridge Bus Stops 9 Connector Roadways Kestor Dr - Darwin Blvd to Becker Rd Volucia Dr - Blanton Blvd to East Torino Pkwy Bus Stops 11 Brescia St - Savage Blvd to Gatlin Blvd Bus Stops 12 Lakehurst Dr - Bayshore Blvd to Airoso Blvd Bus Stops 13 Blanton Blvd East to West Torino Pkwy Bus Stops 14 Sandia Dr - Crosstown Pkwy to Thornhill Dr Bus Stops 15 Sandia Dr - Lakehurst Dr to Crosstown Pkwy Bus Stops 16 Abingdon Ave - Import Dr to Savona Blvd Bus Stops 17 Galiano Rd - Cadima St to Import Dr Bus Stops 18 Fairgreen Rd Cadima St to Crosstown Pkwy Bus Stops 19 Cadima St - Fairgreen Rd to Galiano Rd Bus Stops 20 TEN-YEAR SIDEWALK PLAN (FY 17-27) Combining the approved sidewalk projects with the recommended projects creates the Ten-Year Sidewalk Plan (FY 17-27). The projects (funded and unfunded) and anticipated construction schedule is provided in Table 6. A spreadsheet along with a map showing the Ten-Year Sidewalk Plan (FY 17-27) is provided in Appendix F. Project Table 6 Ten-Year Sidewalk Plan (FY 17-27) District Overall Ranking Construction Funding Source Construction Schedule Approved (Funded) Projects Selvitz Rd Bayshore Blvd to Macedo Blvd 1 - LAP July 2017 Thornhill Dr Airoso Blvd to Bayshore Blvd 1 - CDBG/City Summer 2017 Rosser Blvd Crawford Ave to Openview Dr 3 - City Underway Tulip Blvd Cherry Rd to Port St Lucie Blvd 3 - LAP FY 17/18 Idol Dr Charter School to Savona Blvd 3 - City FY 17/18 Oakridge Dr Southbend Blvd to Tpke Access 4 - CDBG/City FY 17/18 Page 11 of 38

12 Sidewalk Master Plan July 2017 Project Table 6 Ten-Year Sidewalk Plan (FY 17-27) District Overall Ranking Construction Funding Source Construction Schedule Paar Dr Darwin Blvd to Port St Lucie Blvd 3 - LAP FY 18/19 Paar Dr Port St Lucie Blvd to Savona Blvd 3 - City FY 18/19 Macedo Blvd Selvitz Rd to St James Blvd 1 - LAP FY 19/20 Import Dr Gatlin Blvd to Savage Blvd 2 1 City FY 19/20 20/21 Savage Blvd Import Dr to Gatlin Blvd 2 2 City FY 20/21 21/22 Rosser Blvd Open View Dr to Bamberg St 3 3 City FY 22/23 Paar Dr Bamberg St to Savona Blvd 3 4 City FY 22/23 23/24 Tiffany Ave School Site to Green River Pkwy 4 5 City FY 24/25 Selvitz Rd Floresta Dr to Bayshore Blvd 1 6 City FY 25/26 Curtis St Prima Vista Blvd to Floresta Dr 1 7 City FY 25/26 Approved (Unfunded) Projects Southbend Blvd Oakridge Dr to Eagle Dr Floresta Dr PSL Blvd to Streamlet Av Floresta Dr PSL Blvd to Southbend Blvd Recommended (Unfunded) Projects Alcantarra Blvd - PSL Blvd to Savona Blvd East Torino Pkwy - Vizcaya Falls to Midway Rd West Torino Pkwy Blanton Rd to California Blvd Torino Pkwy - Cashmere Blvd to California Blvd Hillmoor - Hospital to Woodstork Trail Hillmoor -Lennard Rd to Playground North Tornio Pkwy East Torino Pkwy to Blanton Rd Selvitz Rd - Milner Dr to Peachtree Blvd Morningside Blvd - Treasure Island Rd to Cambridge S Kestor Dr - Darwin Blvd to Becker Rd Volucia Dr - Blanton Blvd to East Torino Pkwy Brescia St - Savage Blvd to Gatlin Blvd Lakehurst Dr - Bayshore Blvd to Airoso Blvd Blanton Blvd East to West Torino Pkwy Sandia Dr - Crosstown Pkwy to Thornhill Dr Sandia Dr - Lakehurst Dr to Crosstown Pkwy Abingdon Ave - Import Dr to Savona Blvd Fairgreen Rd Cadima St to Crosstown Pkwy Cadima St - Fairgreen Rd to Galiano Rd Galiano Rd Cadima St to Import Dr Page 12 of 38

13 Sidewalk Master Plan July 2017 The miles of sidewalk, by district, for the completed and proposed FY Sidewalk Program is provided in Table 7. Table 8 provides a summary of the construction costs for the completed and FY Sidewalk Program. An itemization of the FY Sidewalk Program for each District is provided in Appendix G. Table 7 Ten-Year Sidewalk Program (FY 17-27) Miles Per District Sidewalk Status Total Description Approved Projects Recommended Completed (Unfunded) (Miles) (Miles) Funded Unfunded (Miles) (Miles) (Miles) District District District District Total Funding Source Table 8 Ten-Year Sidewalk Program (FY 17-27) Construction Costs (1) Sidewalk Status Approved Projects Recommended Completed (2) Funded (3) Unfunded (4) Unfunded (5) Total County $ 2,496,140 $ - $ - $ - $ 2,496,140 CDBG $ 948,271 $ 1,027,355 $ - $ - $ 1,975,626 LAP $ 7,841,389 $ 2,271,164 $ - $ - $ 10,112,553 Total Grant $ 11,285,800 $ 3,298,519 $ - $ - $ 14,584,319 City $ 1,901,879 $ 8,235,819 $ 10,137,698 Unfunded $ - $ - $ 2,775,635 $ 10,420,000 $ 13,195,635 Total $ 13,187,680 $ 11,534,338 $ 2,775,635 $ 10,420,000 $ 37,917,653 (1) As a general budgetary practice, sidewalks are estimated at $400,000 per mile. (2) The average construction cost of the completed projects per mile is $420,000. This reflects three pedestrian bridges which increases the cost per mile. (3) These costs are based upon a preliminary engineering estimate that considers specific field conditions and historical unit costs per the FDOT LAP. Although the FDOT LAP unit costs tend to be significantly higher than actual costs; the higher unit costs are used to ensure that the City obtains equitable grant funding to cover the cost of the project. (4) A pedestrian bridge and embankment for approaches is a large component of this total estimated cost. Additionally, the cost issues associated with Note 3 also apply. (5) Please refer to Note 3. Page 13 of 38

14 Sidewalk Master Plan July 2017 APPENDIX A City of Port St Lucie September 2012 Comprehensive Plan Transportation Element, Table 2-1 Local Roadway System Page 14 of 38

15 Table 2-1 Local Roadway System Local Name From To Airoso Boulevard Alcantarra Boulevard Bayshore Boulevard Federal Functional Classification System Port St. Lucie Functional Classification St. James Drive Port St. Lucie Boulevard Urban Principal Arterial Urban Principal Arterial Savona Boulevard Port St. Lucie Boulevard NDA Urban Collector St. James Drive Port St. Lucie Boulevard Urban Minor Arterial Urban Principal Arterial Port St. Lucie Boulevard Oakridge Boulevard Urban Collector Urban Minor Arterial Village Parkway Savona Blvd Urban Collector Urban Principal Arterial Becker Road Savona Boulevard Port St. Lucie Boulevard Urban Minor Arterial Urban Principal Arterial Port St. Lucie Boulevard Florida Turnpike Urban Principal Arterial Urban Principal Arterial Florida Turnpike Gilson Road Urban Minor Arterial Urban Principal Arterial Biltmore Street S. Macedo Boulevard Thornhill Drive NDA Urban Collector Del Rio Boulevard Savona Blvd Urban Collector NDA California Boulevard Savona Boulevard St. Lucie West Blvd Urban Minor Arterial U-PA south SLW Blvd to Crosstown Pkwy St. Lucie West West Torino Parkway Urban Minor Arterial Urban Minor Arterial Cameo Boulevard Crosstown Parkway Port St. Lucie Boulevard NDA Urban Collector Cane Slough Road U.S. 1 Lennard Road Urban Minor Arterial Urban Minor Arterial Del Rio Boulevard Crosstown Parkway Urban Collector Urban Minor Arterial Cashmere Boulevard Crosstown Parkway St. Lucie West Blvd Urban Collector Urban Principal Arterial St. Lucie West Blvd East Torino Parkway Urban Collector Urban Principal Arterial Commerce Center Parkway North City Limit Crosstown Parkway Urban Minor Arterial Urban Minor Arterial Community Boulevard Westcliffe Lane Discovery Way NDA Urban Principal Arterial Crosstown Parkway Village Parkway Manth Lane Urban Minor Arterial Urban Principal Arterial City of Port St. Lucie 2-2 Adopted Comprehensive Plan: September 10, 2012

16 Local Name From To Federal Functional Classification System Port St. Lucie Functional Classification Port St. Lucie Darwin Boulevard Becker Road Urban Collector Urban Principal Arterial Boulevard Port St. Lucie Boulevard California Boulevard Urban Collector Urban Principal Arterial Del Rio Boulevard California Boulevard McKenzie Street Urban Collector Urban Minor Arterial Discovery Way Community Boulevard Village Parkway NDA Urban Principal Arterial East Torino Pkwy/Torino Pkwy California Boulevard Midway Road Urban Minor Arterial Urban Minor Arterial Urban Minor Arterial from Prima Vista Boulevard to Airoso Boulevard and Bayshore Boulevard Prima Vista Boulevard Urban Collector Urban Collector from Airoso Floresta Drive Boulevard to Bayshore Boulevard Prima Vista Boulevard Port S. Lucie Blvd Urban Minor Arterial Urban Principal Arterial Port S. Lucie Blvd Southbend Boulevard Urban Minor Arterial Urban Principal Arterial Florida Turnpike South City Limit North City Limit FIHS FIHS Gatlin Boulevard I-95 Port St. Lucie Blvd Urban Principal Arterial Urban Principal Arterial Glades Cut-Off Road (SLC) Range Line Road Midway Road Urban Minor Arterial Urban Minor Arterial Gowin Drive Port St. Lucie Boulevard Westmoreland Blvd NDA Urban Collector Grand Drive Jennings Road Walton Road NDA Urban Collector Green River Parkway Walton Road Martin County Line Urban Collector Urban Minor Arterial Heatherwood Boulevard California Boulevard Cashmere Boulevard NDA Urban Collector Hillmoor Drive Tiffany Avenue Lennard Road NDA Urban Collector Import Drive Salvateirra Boulevard Gatlin Boulevard Urban Collector Urban Collector Indian River Drive South City Limit North City Limit Urban Minor Arterial Urban Minor Arterial Interstate 95 South City Limit North City Limit FIHS FIHS Jennings Road U.S. 1 Lennard Road Urban Collector Urban Minor Arterial City of Port St. Lucie 2-3 Adopted Comprehensive Plan: September 10, 2012

17 Local Name From To Federal Functional Classification System Port St. Lucie Functional Classification Lennard Road U.S. 1 Walton Road Urban Minor Arterial Urban Principal Arterial Walton Road North City Limit NDA Urban Minor Arterial LTC Parkway Midway Road Glades Cut-Off Road NDA NDA Lyngate Drive Veteran's Memorial Parkway U.S. 1 Urban Collector Urban Minor Arterial Manville Drive Selvitz Road St. James Drive NDA Urban Collector Mariposa Avenue Lennard Road Calais Street Urban Collector Urban Collector Melaleuca Boulevard Lennard Road Green River Parkway Urban Collector Urban Principal Arterial Midway Road (1) West City Limit McCarty Road Rural Principal Arterial NDA McCarty Road East City Limit Urban Principal Arterial NDA Morningside Boulevard Lyngate Drive River Vista Drive Urban Collector to Westmoreland, Urban Local to end Urban Collector North Macedo Blvd Selvitz Road Bayshore Boulevard NDA Urban Collector North Torino Parkway Torino Parkway West Blanton Road Urban Collector Urban Minor Arterial Oakridge Boulevard Bayshore Boulevard Southbend Boulevard Urban Collector Urban Minor Arterial Paar Drive Rosser Boulevard Darwin Boulevard Urban Collector Urban Principal Arterial Peacock Boulevard Cashmere Boulevard St. Lucie West Boulevard Urban Collector Urban Principal Arterial Port St. Lucie Boulevard South City Limit U.S. 1 Urban Principal Arterial Urban Principal Arterial Prima Vista Boulevard Bayshore U.S. 1 Urban Principal Arterial Urban Principal Arterial Range Line Road (1) South City Limit Midway Road Urban Minor Arterial Urban Minor Arterial Rosser Boulevard Gatlin Boulevard Paar Drive Urban Collector Urban Collector Savage Boulevard Import Drive Gatlin Boulevard Urban Collector Urban Collector Savona Boulevard Becker Road California Boulevard Urban Minor Arterial Urban Principal Arterial City of Port St. Lucie 2-4 Adopted Comprehensive Plan: September 10, 2012

18 Local Name From To Federal Functional Classification System Port St. Lucie Functional Classification Selvitz Road Midway Road Bayshore Boulevard Urban Minor Arterial Urban Principal Arterial Bayshore Boulevard Floresta Drive Urban Collector Urban Principal Arterial Southbend Boulevard Becker Road Floresta Drive Urban Minor Arterial Urban Principal Arterial South Macedo Boulevard Bayshore Boulevard Thornhill Drive NDA Urban Collector St. James Drive Airoso Boulevard Midway Road Urban Principal Arterial Urban Principal Arterial St. Lucie West Blvd I-95 Bayshore Boulevard Urban Principal Arterial Urban Principal Arterial Thornhill Drive Bayshore Boulevard Floresta Drive Urban Collector Urban Minor Arterial Tiffany Avenue U.S. 1 Grand Drive Urban Collector Urban Collector Tradition Parkway Stony Creek Way I-95 NDA Urban Principal Arterial Tulip Boulevard Port St. Lucie Boulevard Port St. Lucie Boulevard Urban Collector Urban Minor Arterial U.S. 1 South City Limit North City Limit Urban Principal Arterial Urban Principal Arterial Veterans Memorial Parkway U.S. 1 Port St. Lucie Boulevard Urban Minor Arterial Urban Principal Arterial Village Green Drive U.S. 1 Tiffany Avenue Urban Collector Urban Principal Arterial Village Parkway Crosstown Parkway Becker Road Urban Principal Arterial Urban Principal Arterial Walton Road U.S. 1 Indian River Drive Urban Minor Arterial Urban Principal Arterial Westcliffe Lane SW Community Boulevard Village Parkway NDA Urban Principal Arterial Westmoreland Boulevard U.S. 1 Port St. Lucie Boulevard Urban Collector Urban Minor Arterial West Torino Parkway West Blanton Road California Boulevard Urban Collector Urban Minor Arterial Source: FDOT, City of Port St. Lucie, 2012 NDA - No data available (1) Not maintained by City of Port St. Lucie. City of Port St. Lucie 2-5 Adopted Comprehensive Plan: September 10, 2012

19 Sidewalk Master Plan July 2017 APPENDIX B Approved Sidewalk Projects: Map Funding Schedule Spreadsheet Page 19 of 38

20

21 R&B CIP New Sidewalks Carryforward R&B CIP New Sidewalks Description Approved Sidewalk Projects Funding Schedule Sidewalk Master Plan July 2017 Appendix B Sheet 2/2 Page 21 of 38 List Phase Source Anticipated Revenues FY 16/17 FY 17/18 FY 18/19 FY 19/20 FY 20/21 $ 160,135 $ 349,275 $ 8,077 $ 512,763 $ 1,331,135 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 Selvitz Rd Bayshore Blvd to Macedo Blvd Tulip Blvd Cherry Rd to PSL Blvd Paar Dr Darwin Blvd to PSL Blvd Macedo Blvd Selvitz Rd to St James Blvd Thornhill Dr Airoso Blvd to Bayshore Blvd Potential..Oakridge Dr Southbend Blvd to Turnpike Access Rd Grant Const FDOT $ 187,662 Grant Const FDOT $ 543,178 Phase III Const FDOT $ 368,728 Phase III Const FDOT $ 690,615 Phase III Const CDBG $ 473,000 Phase IV Const CDBG $ 554,355 Total Revenues $ 1,820,797 $ 2,446,808 $ 1,376,805 $ 2,203,378 $ 2,331,135 Description District FY 17/18 Anticipated Expenditures Length TPO TA List Phase (Miles) Cost FY 16/17 FY 17/18 FY 18/19 FY 19/20 FY 20/21 Ranking Approved (Funded) Projects Selvitz Rd Bayshore Blvd to Macedo Blvd Grant Const $ 220,064 $ 220,064 Village Green Dr Midport Place to City Center Missing Link Const $ 23,400 $ 23,400 Rosser Blvd Phase I Newport Isles to Open View Dr Phase IV Const $ 508,663 $ 508,663 Thornhill Dr Airoso Blvd to Bayshore Blvd Phase III Const $ 511,590 $ 511,590 Idol Dr Charter School to Savona Blvd Phase IV Const $ 596,204 $ 596,204 Tulip Blvd Cherry Rd to PSL Blvd Grant Const $ 682,858 $ 682,858 Potential CDBG..Oakridge Dr Southbend Blvd to Turnpike Rd Paar Dr Darwin Blvd to PSL Blvd Paar Dr PSL Blvd to Savona Blvd Macedo Blvd Selvitz Rd to St James Blvd Approved (Unfunded) Projects Phase IV Phase III Phase III Phase III Dsgn $ 95,000 $ 95,000 Const $ 1,055,000 $ 1,055,000 Dsgn $ 73,280 $ 73,280 Const $ 520,022 $ 520,022 Dsgn $ 62,925 $ 62,925 Const $ 344,020 $ 344,020 Dsgn $ 104,669 $ 104,669 Const $ 872,243 $ 872,243 Curtis St Prima Vista to Floresta Dr Floresta Dr. Port St Lucie Blvd to Southbend Blvd Floresta Dr. Port St Lucie Blvd to Streamlet Ave Import Dr. Gatlin Blvd to Savage Blvd Paar Dr. Bamberg St to Savona Blvd Rosser Blvd. Openview Dr to Bamberg St Savage Blvd. Import Dr to Gatlin Blvd Selvitz Rd. Floresta Dr to Bayshore Blvd Southbend Blvd Oakridge Dr to Eagle Dr Tiffany Ave. School Site to Green River Pkway Phase III Phase IV Phase IV Phase IV Phase IV Phase IV Phase IV Phase IV Phase IV Phase IV Dsgn Dsgn Dsgn Dsgn Dsgn Dsgn Dsgn Dsgn Dsgn Dsgn $ 55,394 $ 58,779 $ 91,168 $ 150,619 $ 121,767 $ 75,952 $ 155,184 $ 115,492 $ 183,130 $ 71,835 Const Const Const Const Const Const Const Const Const Const $ 461,620 $ 489,821 $ 759,730 $ 1,255,162 $ 1,014,728 $ 632,937 $ 1,293,199 $ 962,435 $ 1,526,085 $ 598,625 Total Expenditures $ 1,471,522 $ 2,438,731 $ 864,042 $ 872,243 $ Carry Forward = Total Revenues Total Expenditures = $ 349,275 $ 8,077 $ 512,763 $ 1,331,135 $ 2,331,135

22 Sidewalk Master Plan July 2017 APPENDIX C Missing Major Road Sidewalks Within School Radius: One-half Mile One Mile Two Miles Page 22 of 38

23 Sidewalk Master Plan July 2017 Appendix C Sheet 1/3 Page 23 of 38 Roadway From To City Owned Major Roadways Missing Sidewalks Within One Half Mile Radius of School Centennial High Allapattah Flats Elementary Bayshore Elementary Imagine Nau Campus Floresta Elementary Manatee Academy Mariposa Elementary Morningside Elementary Northport K 8 Palm Point Parkway Elementary Port St Lucie High Renaissance Tradition Rivers Edge Elementary Somerset College Prep Acad Oak Hammock K 8 Approved Sidewalks Import Dr Gatlin Blvd Savage Blvd Macedo Blvd Selvitz Road St. James Blvd X Oakridge Dr Southbend Dr Turnpike Access Rd Paar Dr Port St Lucie Blvd Savona Blvd Paar Dr Darwin Blvd Port St Lucie Blvd Paar Dr Bamberg St Savona Blvd Rosser Blvd Newport Isle Open View Dr Savage Blvd Import Dr Gatlin Blvd Selvitz Rd Bayshore Blvd North Macedo Blvd Selvitz Rd Floresta Dr Bayshore Blvd Southbend Blvd Eagle Dr Oakridge Dr Thornhill Dr Airoso Blvd Bayshore Blvd Tiffany Ave School Site Green River Pkwy Tulip Blvd Cherryhill Rd Port St Lucie Blvd Rosser Blvd Open View Dr Bamberg St Southport Middle School Southern Oaks Middle St Lucie West K 8 Treasure Coast High Sidewalk Projects To Be Recommended Alcantarra Blvd PSL Blvd Savona Blvd East Torino Pkwy Vizcaya Falls Midway Rd Hillmoor Dr Hospital Wood Stork Trail X Hillmoor Dr Lennard Rd Playground X Morningside Blvd Treasure Island Rd Cambridge St X North Tornio Pkwy East Torino Pkwy Blanton Rd Selvitz Rd Milner Dr Peachtree Blvd Torino Pkwy Cashmere Blvd California Blvd X West Torino Pkwy Blanton Rd California Blvd X Road Improvement Projects Floresta Dr Southbend Dr Port St Lucie Blvd Floresta Dr Port St Lucie Blvd Streamlet Ave Floresta Dr Walters Terrace Crosstown Pkwy X Floresta Dr Crosstown Pkwy Prima Vista Blvd Port St Lucie Blvd Becker Rd Paar Dr X Port St Lucie Blvd Paar Dr Darwin Blvd X Port St Lucie Blvd Darwin Blvd Gatlin Blvd X Village Green Env Studies West Gate K 8 Windmill Point Elementary

24 Sidewalk Master Plan July 2017 Appendix C Sheet 2/3 Page 24 of 38 Roadway From To City Owned Major Roadways Missing Sidewalks Within One Mile Radius of School Allapattah Flats Elementary Bayshore Elementary Centennial High Floresta Elementary Imagine Nau Campus Manatee Academy Mariposa Elementary Morningside Elementary Northport K 8 Palm Point Parkway Elementary Port St Lucie High Renaissance Tradition Rivers Edge Elementary Somerset College Prep Acad Oak Hammock K 8 Southern Oaks Middle St Lucie West K 8 Southport Middle School Treasure Coast High Approved Sidewalks Import Dr Gatlin Blvd Savage Blvd X X Macedo Blvd Selvitz Road St. James Blvd X X X Oakridge Dr Southbend Dr Turnpike Access Rd Paar Dr Port St Lucie Blvd Savona Blvd X Paar Dr Darwin Blvd Port St Lucie Blvd X X Paar Dr Bamberg St Savona Blvd X Rosser Blvd Newport Isle Open View Dr Savage Blvd Import Dr Gatlin Blvd X Selvitz Rd Bayshore Blvd North Macedo Blvd X X X Selvitz Rd Floresta Dr Bayshore Blvd X X X X Southbend Blvd Eagle Dr Oakridge Dr Thornhill Dr Airoso Blvd Bayshore Blvd X Tiffany Ave School Site Green River Pkwy X X Tulip Blvd Cherryhill Rd Port St Lucie Blvd X X Rosser Blvd Open View Dr Bamberg St Sidewalk Projects To Be Recommended Alcantarra Blvd PSL Blvd Savona Blvd X X East Torino Pkwy Vizcaya Falls Midway Rd Hillmoor Dr Hospital Wood Stork Trail X X Hillmoor Dr Lennard Rd Playground X X Morningside Blvd Treasure Island Rd Cambridge St X X North Tornio Pkwy East Torino Pkwy Blanton Rd Selvitz Rd Milner Dr Peachtree Blvd X X Torino Pkwy Cashmere Blvd California Blvd X X X West Torino Pkwy Blanton Rd California Blvd X Road Improvement Projects Floresta Dr Southbend Dr Port St Lucie Blvd Floresta Dr Port St Lucie Blvd Streamlet Ave X Floresta Dr Walters Terrace Crosstown Pkwy X Floresta Dr Crosstown Pkwy Prima Vista Blvd X Port St Lucie Blvd Becker Rd Paar Dr X Port St Lucie Blvd Paar Dr Darwin Blvd X X X Port St Lucie Blvd Darwin Blvd Gatlin Blvd X X Village Green Env Studies West Gate K 8 Windmill Point Elementary

25 Roadway From To Allapattah Flats Elementary Bayshore Elementary Centennial High Floresta Elementary Imagine Nau Campus Manatee Academy Mariposa Elementary Morningside Elementary Northport K 8 Oak Hammock K 8 Palm Point Parkway Elementary Port St Lucie High Renaissance City Owned Major Roadways Missing Sidewalks Within Two Mile Radius of School Approved Sidewalk Projects Import Dr Gatlin Blvd Savage Blvd X X X Macedo Blvd Selvitz Road St. James Blvd X X X X X X X Oakridge Dr Southbend Dr Turnpike Access Rd X X X X Paar Dr Port St Lucie Blvd Savona Blvd X X X Paar Dr Darwin Blvd Port St Lucie Blvd X X X Paar Dr Bamberg St Savona Blvd X X X Rosser Blvd Newport Isle Open View Dr X X Savage Blvd Import Dr Gatlin Blvd X X Selvitz Rd Bayshore Blvd North Macedo Blvd X X X X X X X Selvitz Rd Floresta Dr Bayshore Blvd X X X X X X X Southbend Blvd Eagle Dr Oakridge Dr Thornhill Dr Airoso Blvd Bayshore Blvd X X X X X Tiffany Ave School Site Green River Pkwy X X X X Tulip Blvd Cherryhill Rd Port St Lucie Blvd X X X Rosser Blvd Open View Dr Bamberg St X X Sidewalk Projects To Be Recommended Alcantarra Blvd PSL Blvd Savona Blvd X X X East Torino Pkwy Vizcaya Falls Midway Rd X X X X X Hillmoor Dr Hospital Wood Stork Trail X X X X X X Hillmoor Dr Lennard Rd Playground X X X X X Morningside Blvd Treasure Island Rd Cambridge St X X North Tornio Pkwy East Torino Pkwy Blanton Rd X X X X X Selvitz Rd Milner Dr Peachtree Blvd X X X X Torino Pkwy Cashmere Blvd California Blvd X X X X West Torino Pkwy Blanton Rd California Blvd X X X X Road Improvement Projects Floresta Dr Southbend Dr Port St Lucie Blvd X Floresta Dr Port St Lucie Blvd Streamlet Ave X Floresta Dr Walters Terrace Crosstown Pkwy X Floresta Dr Crosstown Pkwy Prima Vista Blvd X Port St Lucie Blvd Becker Rd Paar Dr X X X Port St Lucie Blvd Paar Dr Darwin Blvd X X X Port St Lucie Blvd Darwin Blvd Gatlin Blvd X X X Sidewalk Master Plan July 2017 Appendix C Sheet 3/3 Tradition Rivers Edge Elementary Somerset College Prep Acad Southern Oaks Middle Southport Middle School St Lucie West K 8 Treasure Coast High Village Green Env Studies West Gate K 8 Windmill Point Elementary Page 25 of 38

26 Sidewalk Master Plan July 2017 APPENDIX D Approved Sidewalk Projects Ranking Page 26 of 38

27 Approved Sidewalk Projects Ranking Scoring Criteria Considerations Sidewalk Master Plan - July 2017 Appendix D Sheet 1/1 Page 27 of 38 Ranking Description Curtis St Prima Vista Blvd to Floresta Dr Floresta Dr Port St Lucie Blvd to Southbend Blvd Floresta Dr Port St Lucie Blvd to Streamlet Ave Import Dr Gatlin Blvd to Savage Blvd Paar Dr Bamberg St to Savona Blvd Rosser Blvd Open View Dr to Bamberg St Savage Blvd Import Dr to Gatlin Blvd Selvitz Rd Floresta Dr to Bayshore Blvd Southbend Blvd Oakridge Dr to Eagle Dr Tiffany Ave School Site to Green River Pkwy FY 17/18 TPO TA Ranking District Priority List Length (Miles) Estimated Cost Design Construction Total Weight Two Mile Radius of School Arterial or Collector Bus Stops (School & Transit) Connector (Both Ends) (1) Attractor Request Score Score Score Score Score Score $ 55,394 $ 461,620 $ 517, $ 58,779 $ 489,821 $ 548, $ 91,168 $ 759,730 $ 850, Parallel sidewalk on Irving between Prima Vista and Marion. Segment between Marion and Floresta serves school. Future improvements to Floresta may impact location/width of sidewalk. Future improvements to Floresta may impact location/width of sidewalk. 7 Move to bottom of list $ 150,619 $ 1,255,162 $ 1,405, $ 121,767 $ 1,014,728 $ 1,136, $ 75,952 $ 632,937 $ 708, Requires right of way from FDOT or switch sidewalk to other side of road and acquire easements from property owners $ 155,184 $ 1,293,199 $ 1,448, $ 115,492 $ 962,435 $ 1,077, $ 183,130 $ 1,526,085 $ 1,709, $ 71,835 $ 598,625 $ 670, (1) Includes future connections provided by the sidewalks on this list and roads included in the five year capital improvement program. Total Score Number of Bus Stops (School & Transit) Other Ongoing Feasibility Study to determine if sidewalk can be added to existing bridge. Relocate fence on school site. Requires agreement with neighborhood to locate sidewalk at rear of lots along canal. If not feasible, look at one of the other ways to take sidewalk to Green River. Score Adjustment Ranking 8 5

28 Sidewalk Master Plan July 2017 APPENDIX E Recommended Sidewalk Projects Ranking Page 28 of 38

29 Description Alcantarra Blvd PSL Blvd to Savona Blvd East Torino Pkwy Vizcaya Falls to Midway Rd Hillmoor Hospital to Woodstork Trail Hillmoor Lennard Rd to Playground Morningside Blvd Treasure Island Rd to Cambridge St North Tornio Pkwy East Torino Pkwy to Blanton Rd. Selvitz Rd Milner Dr to Peachtree Blvd Torino Pkwy Cashmere Blvd to California Blvd West Torino Pkwy Blanton Rd to California Blvd Abingdon Ave Import Dr to Savona Blvd Blanton Blvd East to West Torino Pkwy Brescia St Savage Blvd to Gatlin Blvd Cadima St Fairgreen Rd to Galiano Rd Fairgreen Rd Cadima St to Crosstown Pkwy Galiano Rd Cadima St to Import Dr Kestor Dr Darwin Blvd to Becker Rd Lakehurst Dr Bayshore Blvd to Airoso Blvd Sandia Dr Crosstown Pkwy to Thornhill Dr Sandia Dr Lakehurst Dr to Crosstown Pkwy Volucia Dr Blanton Blvd to East Torino Pkwy ded by the sidewalks on this list and road improveement projects in CIP. FY 17/18 TPO TA Ranking District Priority List Length (Miles) Recommended Sidewalk Projects Ranking Estimated Cost Design Construction Total Weight Two Mile Radius of School Arterial or Collector Scoring Criteria Bus Stops (School & Transit) Connector (Both Ends) (1) Attractor Request Score Score Score Score Score Score $ 84,000 $ 703,000 $ 787, ` $ 91,000 $ 760,000 $ 851, $ 37,000 $ 311,000 $ 348, $ 8,000 $ 63,000 $ 71, $ 37,000 $ 305,000 $ 342, $ 70,000 $ 582,000 $ 652, $ 62,000 $ 520,000 $ 582, Project submitted by the School Board to TPO $ 69,000 $ 576,000 $ 645, $ 183,000 $ 1,527,000 $ 1,710, Pedestrian bridge or extension of culvert pipes $ 62,000 $ 513,000 $ 575, $ 74,000 $ 616,000 $ 690, $ 35,000 $ 288,000 $ 323, $ 10,000 $ 86,000 $ 96, $ 56,000 $ 467,000 $ 523, Developer of commercial lot will be required to construct. Sidewalk Master Plan July 2017 Appendix E Sheet 1/1 Page 29 of $ 31,000 $ 259,000 $ 290, Requires approval of FDOT $ 93,000 $ 772,000 $ 865, $ 88,000 $ 737,000 $ 825, $ 35,000 $ 288,000 $ 323, $ 55,000 $ 461,000 $ 516, $ 69,000 $ 576,000 $ 645, Total Score Number of Bus Stops (School & Transit) Considerations Other Ranking Total Score Adjustment Ranking 3 19

30 Sidewalk Master Plan July 2017 APPENDIX F FY Ten-Year Sidewalk Plan: Map Funding Schedule Page 30 of 38

31

32 R&B CIP New Sidewalks Carryforward R&B CIP New Sidewalks Description List Phase Source Ten Year Sidewalk Plan (FY 17 27) Sidewalk Master Plan July 2017 Appendix F Sheet 2/3 Page 32 of 38 Anticipated Revenues FY 16/17 FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 $ 160,135 $ 349,275 $ 8,077 $ 362,144 $ 397,750 $ 123,570 $ 279,251 $ 138,950 $ 559,751 $ 790,239 $ 183,054 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 Selvitz Rd Bayshore Blvd to Macedo Blvd Tulip Blvd Cherry Rd to PSL Blvd Paar Dr Darwin Blvd to PSL Blvd Macedo Blvd Selvitz Rd to St James Blvd Thornhill Dr Airoso Blvd to Bayshore Blvd Potential..Oakridge Dr Southbend Blvd to Turnpike Access Rd Grant Const FDOT $ 187,662 Grant Const FDOT $ 543,178 Phase III Const FDOT $ 368,728 Phase III Const FDOT $ 690,615 Phase III Const CDBG $ 473,000 Phase IV Const CDBG $ 554,355 Total Revenues $ 1,820,797 $ 2,446,808 $ 1,376,805 $ 2,052,758 $ 1,397,750 $ 1,123,570 $ 1,279,251 $ 1,138,950 $ 1,559,751 $ 1,790,239 $ 1,183,054 Approved (Funded) Projects Description District FY 17/18 TPO TA Ranking Selvitz Rd Bayshore Blvd to Macedo Blvd Grant Const $ 220,064 $ 220,064 Village Green Dr Midport Place to City Center Missing Const $ 23,400 $ 23,400 Rosser Blvd Newport Isles to Open View Dr Phase IV Const $ 508,663 $ 508,663 Thornhill Dr Airoso Blvd to Bayshore Blvd Phase III Const $ 511,590 $ 511,590 City Rank Idol Dr Charter School to Savonna Blvd Phase IV Const $ 596,204 $ 596,204 Length (Miles) List Phase Anticipated Expenditures Cost FY 16/17 FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Tulip Blvd Cherry Rd to Port St Lucie Grant Const $ 682,858 $ 682,858 Oakridge Dr Southbend Blvd to Turnpike Access Rd Phase IV Dsgn $ 95,000 $ 95,000 Const $ 1,055,000 $ 1,055,000 Paar Dr Darwin Blvd to Port St Lucie Blvd Phase III Dsgn $ 73,280 $ 73,280 Const $ 520,022 $ 520,022 Paar Dr Port St Lucie Blvd to Savona Blvd Phase III Dsgn $ 62,925 $ 62,925 Const $ 344,020 $ 344,020 Macedo Blvd Selvitz Rd to St James Blvd Phase III Dsgn $ 104,669 $ 104,669 Const $ 872,243 $ 872,243 Import Dr Gatlin Blvd to Savage Blvd Phase IV Dsgn $ 150,619 $ 150,619 Const $ 1,255,162 $ 627,581 $ 627,581 Savage Blvd Import Dr to Gatlin Blvd Phase IV Dsgn $ 155,184 $ 155,184 Const $ 1,293,199 $ 646,600 $ 646,600 Rosser Blvd Open View Dr to Bamberg St Phase IV Dsgn $ 75,952 $ 75,952 Const $ 632,937 $ 632,937 Paar Dr. Bamberg St to Savona Blvd Phase IV Dsgn $ 121,767 $ 121,767 Const $ 1,014,728 $ 507,364 $ 507,364 Tiffany Ave. School Site to Green River Pkwy Phase IV Dsgn $ 71,835 $ 71,835 Const $ 598,625 $ 598,625 Selvitz Rd. Floresta Dr to Bayshore Blvd Phase IV Dsgn $ 115,492 $ 115,492 Const $ 962,435 $ 962,435 Curtis St Prima Vista to Floresta Dr Phase III Dsgn $ 55,394 $ 55,394 Const $ 461,620 $ 461,620 Approved (Unfunded) Projects Southbend Blvd Oakridge Dr to Eagle Dr (Ped Bridge) Phase IV Dsgn $ 183,130 $ 183,130 Const $ 1,526,085 Floresta Dr Port St Lucie Blvd to Southbend Blvd Phase IV Dsgn $ 58,779 Const $ 489,821 Floresta Dr Port St Lucie Blvd to Streamlet Ave Phase IV Continued on Page 33 of 38 Dsgn $ 91,168 Const $ 759,730

ST. LUCIE COUNTY. TRAFFIC COUNTS PROGRAM EVALUATION Technical Memorandum No. 1 - Data Collection

ST. LUCIE COUNTY. TRAFFIC COUNTS PROGRAM EVALUATION Technical Memorandum No. 1 - Data Collection ST. LUCIE COUNTY TRAFFIC COUNTS PROGRAM EVALUATION Technical Memorandum No. 1 - Data Collection Prepared For: St. Lucie Transportation Planning Organization 2300 Virginia Avenue Fort Pierce, FL 34982 ph

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

DRAFT Subject to modifications

DRAFT Subject to modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by 2. Assessment of Current Conditions and Needs In order to prepare a plan to reach the vision desired by the residents of Texarkana, it is first necessary to ascertain the current situation. Since there

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA Project Development & Environment Study Broward County Intermodal Center And People Mover AASHTO Value Engineering Conference Presentation September 1, 2009 San Diego, CA Background P D & E Study Regional

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

Major Widening/New Roadway

Major Widening/New Roadway Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

Citizens Committee for Facilities

Citizens Committee for Facilities Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on

More information

Dixie Transportation Planning Office

Dixie Transportation Planning Office A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Fire Station Location Study

Fire Station Location Study Fire Rescue Department Fire Station Location Study March 24, 2015 PRESENTATION OUTLINE BACKGROUND SCOPE OF THE STUDY STUDY METHODOLOGY STUDY COMPONENTS SUMMARY QUESTIONS CURRENT SERVICE LEVEL NUMBER OF

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

Chapter 7: Corridor Visions

Chapter 7: Corridor Visions Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United

More information

Appendix 3 Traffic Technical Memorandum

Appendix 3 Traffic Technical Memorandum Appendix 3 Traffic Technical Memorandum DRAFT TECHNICAL MEMORANDUM Southport Connector Project Traffic Development Comparison of Future Year Model Results Date: September 10, 2015 Project #:11730.030 To:

More information

3.14 Parks and Community Facilities

3.14 Parks and Community Facilities 3.14 Parks and Community Facilities 3.14.1 Introduction This section identifies the park and community facility resources in the study area and examines the potential impacts that the proposed Expo Phase

More information

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013 CITY OF MORENO VALLEY DEPARTMENT OF PUBLIC WORKS TRANSPORTATION ENGINEERING DIVISION Administration Policy #A-14A POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION Effective Date: July 10, 2013 Approved

More information

Transportation Statistical Data Development Report BAY COUNTY 2035 LONG RANGE TRANSPORTATION PLAN

Transportation Statistical Data Development Report BAY COUNTY 2035 LONG RANGE TRANSPORTATION PLAN Transportation Statistical Data Development Report BAY COUNTY 2035 LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation,

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET CREATING CONNECTIONS IN THE TOWN OF NEWMARKET NICK SPENSIERI, DIRECTOR, CORRIDOR INFRASTRUCTURE METROLINX ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX APRIL 10, 2017 GRIDLOCK

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1. Traffic Engineering.

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1. Traffic Engineering. ORANGE COUNTY TRAFFIC COMMITTEE SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INITIATED BY: INVESTIGATOR: REQUEST: Speed Limit Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1 Traffic Engineering

More information

Committee Report. Transportation Committee. Business Item No

Committee Report. Transportation Committee. Business Item No Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

STAFF REPORT # CHANGE OF ZONING

STAFF REPORT # CHANGE OF ZONING STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 8.b Meeting Date: December 19, 2016 Department: PUBLIC WORKS SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Public Works Director City Manager Approval: File No.: 18.01.79

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Purpose and Need Report

Purpose and Need Report Purpose and Need Report State Highway (SH) 29 From Southwestern Boulevard to SH 95 Williamson County, Texas (CSJ: 0337-02-045) Prepared by Blanton & Associates, Inc. Date: November, 2015 The environmental

More information

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation Municipal Road and Bridge Revolving Loan Fund 2014 Program Summary Rhode Island Department of Transportation The Basics The FY2014 Budget passed by the Rhode Island General Assembly included Article 20,

More information

Parking Management Element

Parking Management Element Parking Management Element The State Transportation Planning Rule, adopted in 1991, requires that the Metropolitan Planning Organization (MPO) area implement, through its member jurisdictions, a parking

More information

TransNet Dollars Keep San Diego Moving

TransNet Dollars Keep San Diego Moving TransNet Dollars Keep San Diego Moving In 1987, San Diego region voters approved the TransNet program a half-cent sales tax to fund a variety of important transportation projects throughout the region.

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS TPO Facility/ Name Prior s Detailed Description TA000100 MDT - DADE / MONROE EXPRESS BUS ROUTE COMMUTER TRANS ASSISTANCE C-6 $12,978 $7,385 4180513, 4409141 Operating assistance of Dade/Monroe Express

More information

Click to edit Master title style

Click to edit Master title style Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment

More information

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview Session 1 Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview Joe Santos, PE, FDOT, State Safety Office October, 23, 2013 Florida Statistics

More information

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011)

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011) (Amended May 23, 2011) 1. Speed humps are an appropriate mechanism for reducing speeds on certain streets in Pasadena when properly installed under the right circumstances. 2. Speed humps can be considered

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018 NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3

More information

Chapter 740, Street Vending One Year Review

Chapter 740, Street Vending One Year Review STAFF REPORT ACTION REQUIRED Chapter 740, Street Vending One Year Review Date: April 7, 2015 To: From: Wards: Reference Number: Licensing and Standards Committee Executive Director, Municipal Licensing

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars. Sound Transit Phase 2 South Corridor LRT Design Report: SR 99 and I-5 Alignment Scenarios (S 200 th Street to Tacoma Dome Station) Tacoma Link Extension to West Tacoma Prepared for: Sound Transit Prepared

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Community Advisory Committee. October 5, 2015

Community Advisory Committee. October 5, 2015 Community Advisory Committee October 5, 2015 1 Today s Topics Hennepin County Community Works Update Project Ridership Estimates Technical Issue #4:Golden Valley Rd and Plymouth Ave Stations Technical

More information

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009 HDR Engineering HART North / South BRT Corridor PD&E Tampa Bay Applications Group Meeting May 14, 2009 1 Agenda Update on Project Development and Environment (PD&E) Study Project Overview System Branding

More information

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION DATE: March 21, 2017 REPORT NO. PW2017-022 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

Utilizing GIS Models in Prioritizing and Selecting Transportation Projects

Utilizing GIS Models in Prioritizing and Selecting Transportation Projects Utilizing GIS Models in Prioritizing and Selecting Transportation Projects GIS-T Conference Raleigh, NC April 7, 2016 Tyler Meyer, AICP Tram Truong, GISP Outline Case Studies: 1. MPO project selection

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

SCHEDULE OF CAPITAL PROJECTS BY FUND

SCHEDULE OF CAPITAL PROJECTS BY FUND CIP Project Funding Summary 5 7 8 9 10 11 Streets & Highways Fund 3,950,541 2,148,259 1,250,000 1,290,000 1,250,000 9,888,800 Prop C Fund 20,936,435 700,000 700,000 700,000 700,000 23,736,435 Measure R

More information

City Council. DATE: October 6, SUBJECT: PCR # B-4 Culinary Arts and Hospitality District Text

City Council. DATE: October 6, SUBJECT: PCR # B-4 Culinary Arts and Hospitality District Text TO: City Council DATE: SUBJECT: PCR #16-008 B-4 Culinary Arts and Hospitality District Text BACKGROUND PCR #16-009 Food Truck Regulations PCR #16-010 B-4 Culinary Arts and Hospitality District Rezoning

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

SOUTH TEXAS COMMISSION MEETING

SOUTH TEXAS COMMISSION MEETING SOUTH TEXAS COMMISSION MEETING September 26, 2013 Pharr District Commission Meeting Pharr District: Overview The Pharr District plans, designs, builds, operates and maintains the state transportation system

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE

5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE 5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the

More information

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project MOTION NO. M2014 64 Preferred Alternative for the Puyallup Station Access Improvement Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 8/14/14 8/28/14 Recommendation

More information

PUBLIC FACILITIES DIRECTORY

PUBLIC FACILITIES DIRECTORY PUBLIC FACILITIES DIRECTORY PROPOSED TOWN INFRASTRUCTURE PROJECT DIRECTORY 2002 Town Beautification E 6 2105 Old Library Re-use E 8 2103 HVAC Upgrades Old Library E 10 2302 Building Replacement at Corporation

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle Chapter 7: Travel Demand Analysis Chapter 8 Plan Scenarios LaSalle Community Center. Image Credit: Town of LaSalle 164 Chapter 8: Plan Scenarios Moving Ahead for Progress in the 21 st Century Act (MAP

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina Public Meeting & Open House July 23, 2013 Project Roadway Limits From: FM 1957 To: FM 471 MAP OR PHOTO Counties Bexar & Medina 1 I. Project History II. III. IV. Project Overview Project Alternatives Response

More information

DART Priorities Overview

DART Priorities Overview City of Dallas Transportation and Trinity River Project Committee DART Priorities Overview Gary C. Thomas President/Executive Director August 10, 2015 City of Dallas Transportation & Trinity River Committee

More information

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay TO: FROM: Chair and Members Engineering and Public Works Committee Mark Misko, C.E.T. Manager, Roads Maintenance and Construction DATE: March 23, 2016 SUBJECT: REPORT NO: Designation of a Community Safety

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

MPO Staff Report Technical Advisory Committee: July 12, 2017

MPO Staff Report Technical Advisory Committee: July 12, 2017 MPO Staff Report Technical Advisory Committee: July 12, 2017 RECOMMENDED ACTION: 2 nd TAC Meeting with Kimley-Horn/WSB in Updating the Street/Highway Element of 2045 Metropolitan Transportation Plan. Matter

More information

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014 Presented To: Operations Committee Request for Decision Pedestrian Lighting Standards for Road Right-of-ways Presented: Monday, Mar 17, 2014 Report Date Thursday, Mar 06, 2014 Type: Presentations Recommendation

More information

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX:

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX: 435 Martin Street, #3000 BLAINE, WA 98230 BUS: 360.332.8311 FAX: 360.332.8330 www.cityofblaine.com September 10, 2018 To: From: Subject: City Council Department Heads Michael Jones, City Manager Jeffrey

More information

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014 Midtown Corridor Alternatives Analysis Policy Advisory Committee Meeting February 12, 2014 Today s Agenda Introductions Outreach efforts and survey results Other updates since last meeting Evaluation results

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia

More information

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014 Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update

More information

Rail alignment and benefits (rab) study

Rail alignment and benefits (rab) study Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study June 5, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create

More information

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis Transit Coalition September 26, 2012 2 Study Area Pacific Electric Rightof-Way/West Santa Ana Branch (PEROW/ WSAB) extends

More information