1 - BEVERLY HILLS ITY OF BEVERLY HILLS TRAFFI & PARKING OMMISSION TO: FROM: SUBJET: ATTAHMENTS: Traffic & Parking ommission Aaron Kunz, Deputy Director of Transportation Martha Eros, Transportation Planner 1 North anon Drive losure Feasibility Study February 1, 218 A. Public Notice B. ProjectArea Map. Potential losure of N. anon Drive During Purple Line onstruction Summary of Transportation Impact Analysis D. Preliminary Design onceptual Plan Drawings This report provides background information on traffic mitigation option(s) for Wilshire/Rodeo Purple Line Extension station construction, and seeks Traffic & Parking ommission s recommendation for possible closure of North anon Drive at Wilshire Boulevard. Background On June 27, 217, ity ouncil approved a Memorandum of Agreement (MOA) for Metro construction work related to Section 2 of Purple Line Extension project. The MOA (AG #348-17) authorized staff to issue Metro necessary permits for Sourn alifornia Edison underground utility relocation work for future Wilshire/Rodeo Station1. The Wilshire/Rodeo underground station box will span Wilshire Boulevard between Beverly and rescent Drives, with on-street work zone spanning (approximately) west of El amino Drive to east of Rexford Drive. During public comment on June 27, representatives from Spago restaurant advocated placing a tall sound wall, creating a cul-de-sac and providing valet service to assist businesses and restaurants on North anon Drive during disruption created by construction. Spago reported general consensus of a proposed street closure from adjacent businesses. A key element highlighted for approval of MOA was inclusion of a feasibility analysis to study options for a temporary closure of North anon Drive at Wilshire Boulevard to vehicular traffic to address noise, vibration and pollution generated by construction activity, and to mitigate possible driver confusion due to lane closures required during various construction activities. The MOA includes ity ouncil consideration of closure by April 218, following two public outreach meetings by March 218 to solicit feedback from community. Following ity ouncil approval of MOA (AG #348-17), ity staff engaged Fehr & Peers consulting firm to conduct a transportation impact analysis (TIA) to evaluate potential. operational impacts to nearby intersections during peak morning and afternoon commute hours and midday business hours with a potential closure of North anon Drive at Wilshire Boulevard (Attachment-A). Psomas, ity s consultant for Metro project, was tasked with developing parking and travel lane design concepts for cul-de-sac alternatives (Attachment B). The study is funded by Metro. ity of Beverly Hills, ity ouncil Adjourned Meeting...Minutes, June 29, 217, Item G-2.

2 21.18 TP: 1 North anon Drive losure Page 2 Discussion Fehr & Peers completed feasibility analysis in November 217. The analysis evaluated potential traffic impacts to fifteen nearby intersections during peak hours for morning, midday and afternoon for both existing condition (217) and at a future date (222), and determined that four intersections (lifton/rescent, Wilshire/rescent, Wilshire/Beverly, and Dayton/anon) are considered to be significantly impacted in existing and/or Year 222 conditions. The analysis concludes that impacts can be mitigated by providing advanced vehicle detour signage, updating traffic signal timings, and signalization of North rescent Drive and lifton Way intersection. Estimated Street losure Duration The piling and decking for La ienega station took approximately one year, and Gale Drive was closed to through traffic for approximately 15 days. Assuming same (or similar) methodology used for Gale Drive closures in Section 1 is applied to North anon Drive, ity/psomas project team estimates approximately 3 days of closure impacts to North anon Drive for length of project. These closures would occur at various points throughout project and would require traffic control measures (i.e., cones, barricades, etc.) and temporary sound mitigation to be installed. If a closure at North anon Drive is approved by ity ouncil and implemented, staff anticipates overall construction schedule will be reduced with a consistent traffic control pattern. Also, re would be potential for more robust sound mitigation measures at closure location due to (long-term) installation of a sound wall. Public Outreach The MOA also requires at least two public outreach meetings be held prior to presenting recommendations to ity ouncil. Staff s public outreach plan includes following: 1. An overview of Traffic Impact Analysis report and three conceptual designs for a cul de-sac were presented at a Stakeholder s meeting held on January 9th and to general public at monthly ommunity Outreach meeting held on January 1, 218. Stakeholders at January 9th meeting included Beverly Hills hamber of ommerce and onference and Visitor s Bureau, Spago Beverly Hills restaurant, and businesses on North anon Drive. An overview of study and conceptual design plans will also be presented at monthly ommunity Outreach meeting on February 7, Traffic & Parking ommission review on February 1, 218. Public Notices were mailed on January 22 to all businesses on North anon Drive between Wilshire Boulevard and South Santa Monica Boulevard, and adjacent areas north and south of Beverly and rescent Drives (both commercial and residential areas). The Beverly Hills hamber of ommerce ed public notice to entire business community on January 23, 218. Additionally, as feasibility study includes installation of a traffic signal at North rescent Drive and lifton Way intersection as a mitigation measure, public notices advising of TP agenda item were mailed to residents on adjacent 1 and 2 street blocks between North rescent and Elm Drives.

3 TP: 1 North anon Drive losure Page 3 Per Memorandum of Agreement (MOA) with Metro, staff is planning to present recommendations regarding North anon Drive losure Feasibility Study at March 6, 218 ity ouncil meeting. preliminary design concept. Pehr & Peers prepared traffic analysis and Psomas prepared If ity ouncil decides to proceed with temporary closure, project would go into design development phase. Recommendation That Traffic & Parking ommission review public comment, and provide comments and/or consideration. Traffic Impact Analysis report and accept a recommendation(s) for ity ouncil

4 ATTAHMENT A

5 NOTIE OF PUBLI MEETING 1 Block of North anon Drive at Wilshire Boulevard ul-de-sac losure Study Metro Rodeo Station onstruction The ommunity Development Department invites your participation in review of a study to temporarily close North anon Drive at Wilshire Boulevard to mitigate traffic impacts during Metro Rodeo Station construction. The Rodeo Station work zone will span Wilshire Boulevard between El amino and Elm Drives and includes periodic lane closures throughout life of project (226). MEETING: Traffic & Parking ommission DATE: Thursday, February 1, 218 TIME: LOATION: 1: a.m., or as soon reafter as matter may be heard ity Hall, Room 28-A, 455 N. Rexford Drive Beverly Hills, A 921 \ f[r -,,.- \\c \\ \ % F _ -.. _j2s L_. \S\ PROPOSAL: Pending public comment, Traffic & Parking ommission will review following traffic mitigation measures outlined in study: (1) losure of North anon Drive at Wilshire Boulevard to create a cul-de-sac on north side of street; and (2) Replace stop signs with a signalized intersection at North rescent Drive and lifton Way to mitigate anticipated shift in vehicle flow resulting from construction and proposed North anon Drive closure. Persons wishing to comment on this item are invited to attend February 1, 218 Traffic & Parking ommission meeting and/or submit written comments. Please submit correspondence a minimum of 24-hours in advance of meeting date to allow for routing. Any communication received by ity becomes part of public record. Mail: transportation@beverlyhills.org ity of Beverly Hills ommunity Development - Transportation Planning 455 North Rexford Drive, Beverly Hills, A 921 The meeting agenda and staff report will be available online at by January 27, 217. If you would like additional information regarding this proposal, please contact Transportation Planning Division at (31) PLEASE NOTE: If you are unable to attend February Traffic & Parking ommission meeting, an evening ommunity Meeting is scheduled on Wednesday, February 7, 218, at ity Hall in Municipal Gallery starting at 6:3 p.m. The ity will provide an update at ommunity Meeting. For additional information, please call (31) In accordance with Americans with Disabilities Act, Room 28-A is wheelchair accessible and is equipped with audio equipment for hearing impaired. If you need special assistance to attend this meeting, please call Transportation Planning Division at (31) or TTY (31) Please notify Transportation Planning Division at least forty-eight (48) hours prior to meeting if you requite captioning service so that reasonable artangements can be made. Date Mailed: 1/2/218

6 ATTAHMENT B

7 North anon Drive Project Area V Alloro y Whole Food Mrkct O N. anon Dr/Wilshire BI Intersection N. rescent Dr/lifton Way Intersection litrflny Wilshire/Rodeo Station Box Tho Palm Eveiiy Hills Mastros Stcahous Suntise of Boetiy HL %% Yojisi Sushi Sweet Beverty Beveily añon Gardens Georqie SLGARFISH by :uh n_a 9 Montac QQ 1V Hills Soulycle 4. 9 Bdnk of West 1ibank Q?ZEN AK Beerty Hills Q Spaqa Shanqiai Gil rescent Park 9 Tho Prin Wilshire lvd Wilshire l3lvd Wilshire Blvd Q Melanie Borg Jewolr & Pearl Q (5 Atic Fnhrtinmørfl Union Bank Rolox Watch USA 9 SIXT Bevedy Hills Q

8 ATTAHMENT

9 FEHR PEERs LA November 217 ity of Beverly Hills Prepared for: Summary of Transportation Impact Analysis During Purple Line onstruction Potential losure of N. anon Drive

10 F, j N. anon Drive losure Transportation Impact Anatysis SUMMARY OF TRANSPORTATION IMPAT ANALYSIS A transportation impact analysis (TIA) was prepared for potential closure of N. anon Drive at Wilshire Boulevard during construction of Rodeo Drive Purple Line Station in Beverly Hills. A feasibility analysis was conducted to evaluate potential operational impacts to nearby intersections during peak morning and afternoon commute hours and midday business hours with potential closure of N. anon Drive at Wilshire Boulevard. The potential closure of N. anon Drive would occur just north of Wilshire Boulevard. Vehicles would no longer be able to access Wilshire Boulevard directly from N. anon Drive, or access N. anon Drive directly from Wilshire Boulevard. Instead, vehicles would be rerouted to adjacent roadways, such as N. Beverly Drive and N. rescent Drive. Local vehicle access to sourn end of N. anon Drive prior to closure would be provided on lifton Way and Dayton Way. The following study intersections were selected for analysis based on locations most likely to be impacted due to closure of N. anon Drive: 1. Brighton Way & N. Beverly Drive 2. Brighton Way & N. anon Drive 3. Brighton Way & N. rescent Drive 4. Dayton Way & N. Beverly Drive 5. Dayton Way & N. anon Drive 6. Dayton Way & N. rescent Drive 7. Wilshire Boulevard & Beverly Drive 2. lifton Way & N. anon Drive 9. lifton Way & N. rescent Drive 1. Wilshire Boulevard & anon Drive 11. Wilshire Boulevard & rescent Drive 12. Wilshire Boulevard & Rexford Drive 13. harleville Boulevard & S. Reeves Drive 14. harleville Boulevard & S. anon Drive 15. harleville Boulevard & S. rescent Drive The study area and intersections selected for analysis are shown in Figure ES-i. I) ES-i

11 \pi3data\jobsv\ctv&27s\ Metro Rrpk. LEne Sceto 2 RodeoGraphics\GS\MXD\FX Studyintersecteons mxd.. %Jt J o o -. -o D I DJ o N D td U-I. Q (D m -I in m in S ROXBURY DR S BEDFORD DR 4 ) 1- p P -z2 i 4e ItP S PEK DR O & 1- S AMDEN DR SRODEODR S ELAMINO DR I.3) m I m S BEVERLY DR NALPINEDR N FOOTHILL RD SRESENTDR SELMDR I,, NELMDR SREXFORDDR N MAPLE DR I z S MAPLE DR N PALM DR S PALM DR m D m -I S OAKHURST DR N OAKHURST DR

12 anon Drive losure Transpoation Impact Analysis ANALYSIS SENARIOS The operations of study locations were analyzed for following scenarios: Existing (217) onditions: The analysis of existing conditions was based on traffic counts collected in Fall 216 and September 217. Existing Plus Roadway losure onditions: This scenario reflects potential closure of N. anon Drive and rerouting of vehicles based on existing traffic volumes and travel demands. Mid-onstruction (Year 222) Baseline onditions: Future traffic projections without roadway closure were developed for Year 222. The objective of this scenario was to forecast future traffic growth and operating conditions that could be expected to result from regional growth and related projects in vicinity of project site mid-construction. Year 222 reflects time period four years into construction assuming an eight-year construction duration beginning in 218 and ending in 226. Mid-onstruction (Year 222) Plus Roadway losure onditions: This scenario reflects potential closure of N. anon Drive and rerouting of vehicles based on forecasted Year 222 traffic volumes and travel demands. The traffic impact analysis was prepared in accordance with Beverly Hilts Traffic Thresholds of Significance (Planning ommission of ity of Beverly Hills, October 21). DOWNTOWN TRIANGLE AESS With potential closure of N. anon Drive, vehicles would be rerouted to adjacent roadways, such as Beverly Drive and rescent Drive. Additional roadway characteristics that factor into route choices that drivers use when traveling to/from Golden Triangle are as follows: S. anon Drive is restricted to right-turns only onto Wilshire Boulevard; refore, vehicles traveling north on S. anon Drive cannot continue directly into Golden Triangle on N. anon Drive. Dayton Way provides eastbound only travel through downtown triangle and two-way travel east of N. rescent Drive. Brighton Way provides westbound only travel through downtown triangle between N. rescent Drive and Wilshire Boulevard. N. Beverly Drive does not permit vehicles to make a southbound left-turn movement from N. Beverly Drive onto eastbound Wilshire Boulevard. I) ES-3

13 anon Drive losure Transpoation Impact Anatys N. ANON DRIVE LOAL AESS Local vehicle access would continue to be provided on N. anon Drive south of lifton Way. The sourn end of N. anon Drive just prior to Wilshire Boulevard would serve as a cul-de-sac to allow vehicles traveling southbound to make a U-turn and continue northbound on N. anon Drive. Figure ES-2 displays on-street parking, valet operations, and local access driveways along N. anon Drive in vicinity of potential closure. The following travel patterns were considered in development of traffic diversions with roadway closure. Figure ES-3 displays potential trip diversions with N. anon Drive closure. Turning Movement Restrictions at N. anon Drive & Wilshire Boulevard: With closure of N. anon Drive just north of Wilshire Boulevard, following turning movements will no longer be permitted: eastbound left-turn and westbound right-turn from Wilshire Boulevard onto N. anon Drive; and southbound left-turn and right-turn from N. anon Drive onto Wilshire Boulevard. N. anon Drive Local Access Needs between lifton Way and losure: South of lifton Way, N. anon Drive has on-street metered parking on both sides of roadway. Several of parking spaces on east side of N. anon Drive operate as valet parking zones for Spago and itizen restaurants. Or than on-street parking spaces and valet zones, no or uses have direct access to/from this block of N. anon Drive. Parking Structure at N. anon Drive & lifton Way: The west leg of intersection of N. anon Drive & lifton Way provides direct access to a parking structure. With closure of N. anon Drive, vehicles would exit garage onto lifton Way or make a left-turn onto N. anon Drive. To enter garage, vehicles would be routed to N. rescent Drive to utilize lifton Way, or travel on N. Beverly Drive to Dayton Way to access N. anon Drive. N. anon Drive Local Access Needs between lifton Way and Dayton Way: North of lifton Way, Montage Beverly Hills Hotel s motor court is accessed to/from N. anon Drive. Just north of hotel, a public parking garage also has direct inbound and outbound access on N. anon Drive. In addition, N. anon Drive has on-street metered parking on both sides of roadway and several of parking spaces operate as valet parking zones during designated time periods. N. anon Drive Access Needs between Dayton Way and South Santa Monica Boulevard: N. anon Drive provides access to several parking structures between Dayton Way and South Santa Monica Boulevard, and has on-street parking with valet zones during designated time periods. ii

14 I L1 U 4-, -J cci cci 4-4- cci 4- - cci a c\j Vj LI, LU Q) 4-I D D G) U 4-J D > c?5 D 4-a 4-I I U U D U -J

15 I 1 ri Art t -c > 2< -c U U, 2 >., o U, 4-., U, > o o o D U, U, LI LI 4- -J -s o o 4- V ) 4-., ci ci) z t, > I.? o m ci) Lf) LU D Lt t, ci)

16 PtN. anon Drive tosure Transportation Impact Anatysis MID-ONSTRUTION TRAFFI FOREASTS The mid-construction plus roadway closure condition evaluates traffic volumes for Year 222 with rerouting of vehicles due to closure of N. anon Drive. The following sources were utilized to develop mid-construction traffic forecasts: Existing traffic counts Traffic from approved and pending projects in ity of Beverly Hills, ity of Los Angeles, and ity of West Hollywood Ambient growth in existing traffic volumes to reflect growth in regional traffic; a growth rate of one (1) percent per year was applied to reflect this ambient growth POTENTIAL IMPATS WITH N. ANON LOSURE Impacts to intersection operations, active transportation facilities and transit service with potential closure of N. anon Drive are described below: Traffic Operations of Study Intersections: The study intersections were analyzed during existing and mid-construction (Year 222) conditions with vehicle trip diversions and rerouting due to potential N. anon Drive closure. The ity of Beverly Hills traffic impact criteria consider following changes in V/ at signalized intersection or delay at unsignalized to be a significant impact: Project-Related Increase LOS with Project in V/ Ratio Project-Related Increase in Seconds of Average Total Delay D E or F equal to or greater than.3 equal to or greater than.2 equal to or greater than 4. seconds equal to or greater than 3. seconds Source: ity of Beverty Hills, October 21. 1

17 ! N. anon Drive losure Transportation Impact Analysis The following thresholds above intersections during one would experience an increase in V/ or delay or more analysis periods: greater than o o o o Wilshire Boulevard & Beverly Drive during Wilshire Boulevard & rescent Drive during lifton Way & N. rescent Drive during Dayton Way & N. anon Drive during AM peak hour AM and PM peak hours AM, midday and PM peak hours PM peak hour Based on intersection ity s operations threshold in The following measures are N. anon Drive closure: guidelines, vicinity of project impact would be N. anon Drive closure. recommended to mitigate traffic impacts due to potentiatty significant to vehicle rerouting with o o o Provide Advanced Vehicle Detour Signage: The impact analysis of vehicles currently utilizing N. anon Drive will shift such as N. Beverly Drive and N. rescent Drive. While experience an increase in vehicle delay with multiple access select options to/from alternate routes furr to east to se assumes that majority closest nearby intersections, intersections are expected to N. anon Drive closure, drivers have Downtown Triangle. Therefore, drivers are likely and west to avoid overly congested locations. Update Traffic Signal Timings: Traffic signal timings should be modified along N. anon Drive and on accommodate additional green time to parallel roadways of N. Beverly Drive and N. rescent Drive shift in vehicle flows with heaviest turning movements. Signalization of lifton Way & N. rescent Drive Intersection: With Drive at Wilshire Boulevard, vehicles will shift to to to N. anon Drive closure and provide closure of N. anon N. rescent Drive. This will result in traffic volume increases along N. rescent Drive and also a intersection of lifton Way & N. rescent Drive as vehicles utilize lifton Way to access local uses along portion of N. anon Drive. With additional traffic volumes with increase in vehicle delay will result in a significant impact increase in traffic volumes will also result in traffic volume warrant for signal would result in LOS or based intersection meeting sourn potential closure, on ity thresholds, and peak hour installation of a traffic signal. The installation of a traffic better operations during peak travel hours. Bicycle Facilities & Access: The potential closure may restrict direct bicycle access anon Drive and Wilshire Boulevard, bicyclists would have ability to walk depending ir on bikes utilizing ultimate design of pedestrian pathway, between N. cul-de-sac. While y may not ES-8

18 between N. anon Drive and Wilshire Boulevard with approximately 5 bicyclists traveling from N. beginning process of preparing a omplete Streets Plan that will provide guidance on new AM and midday peak hours (no bicyclists were observed during PM peak hour). The ity is anon Drive onto Wilshire Boulevard, or from Wilshire Boulevard onto N. anon Drive in both I N anon Drive tosure Transportation Impact Anatysts 1 ES-9 Metro Line 14/37 would need to be rerouted to an adjacent roadway, such as N. Beverly Drive along with relocating bus stops. impact would be potentially significant but could be mitigated with rerouting of bus line between Wilshire Boulevard and N. Santa Monica Boulevard, as shown in Figure ES-4. Therefore, The potential closure of N. anon Drive would result in a disruption to existing transit service as study area, eastbound buses travel through ity of Beverly Hills by traveling in a northbound direction on S. Beverly Drive, making a right turn onto Wilshire Boulevard and n an immediate located at Wilshire Boulevard, lifton Way, Dayton Way, and S. Santa Monica Boulevard. fifteen minutes on weekdays and thirty minutes on weekends. Bus stops on N. anon Drive are n make an immediate left turn onto Beverly Boulevard. Service is provided approximately every Boulevard, make a left turn onto N. anon Drive, make a right turn onto Wilshire Boulevard and travel east. Buses traveling in westbound direction through ity utilize N. Santa Monica left turn onto N. anon Drive where y continue until reach N. Santa Monica Boulevard to service between downtown Los Angeles and ity of Beverly Hills. Line 14/37 is a local service bus and has frequent stops with most stops approximately one to two blocks apart. Within Transit Service: Existing transit service is provided along N. anon Drive. Metro Line 14/37 provides crossing signage are planned by ity and are expected to be implemented later this year. These Drive and lifton Way, high visibility continental crosswalks along with additional pedestrian between Wilshire Boulevard and N. anon Drive. At stop controlled intersection of N. anon pedestrian enhancements will benefit those walking along N. anon Drive. There are no additional tess than significant and no mitigation is required. planned pedestrian facilities in vicinity of roadway closure. Therefore, project impact is Pedestrian Facilities & Access: The closure of N. anon Drive would maintain pedestrian access mitigation is required. planned adjacent to project site. Therefore, project impact is tess than significant and no active transportation facilities throughout ity. At this time, no additional bicycle facilities are bicyclists were counted during peak hours. The volumes indicate a fairly low bicycle demand be able to ride between two roadways with closure. As part of data collection effort,

19 x 4, 4 m D W 3RD ST D D V OZ E &,c 4I/% / 4) - 4, 4) 4) 4- <a LU z. -J z -J.1 I_a. 2-3 LU z DAYTON WY LIFTON WY LU --3 z I- D z z --3, z z LU 2 -J U LU 1: o LU a- o LU - LU HARLELLE BLVD > z 2 LU LU < LU c -I LU o La. LU -3. <. D I (4, NORTH Metro 14/37 Route Metro Local Routes Potential Street losure of N. anon Drive Existing Route Metro Rapid Routes Potential Alternate Routing Route 14/37 Stops Figure ES-4 )- Transit Rerouting and Bus Stop Relocation with N. anon Drive losure

20 ATTAHMENT D

21

22

23

STAFF REPORT. Meeting Date: March 6, 2018 To: From:

STAFF REPORT. Meeting Date: March 6, 2018 To: From: STAFF REPORT Meeting Date: March 6, 2018 To: From: Subject: Honorable Mayor & City Council Aaron Kunz, Deputy Director of Transportation North Canon Drive Closure Feasibility Study Attachments: 1. Public

More information

Purple Line Extension. Rodeo Station AUR MOA October 24, 2017

Purple Line Extension. Rodeo Station AUR MOA October 24, 2017 Purple Line Extension Rodeo Station AUR MOA October 24, 2017 1 Agenda Project Overview Section 2 Pre-Construction Updates Rodeo Drive Station Advance Utility Relocation (AUR) SCE Phase I, underway SCE

More information

Purple Line Extension Updates on La Cienega and Rodeo Stations January 10, 2018

Purple Line Extension Updates on La Cienega and Rodeo Stations January 10, 2018 Purple Line Extension Updates on La Cienega and Rodeo Stations January 10, 2018 1 Agenda Project Overview Section 1 Construction Updates 2017 Accomplishments Wilshire/La Cienega Station Decking and Jet

More information

BEVERLY HILLS STAFF REPORT

BEVERLY HILLS STAFF REPORT BEVERLY HILLS STAFF REPORT Meeting Date: June 17, 2014 To: From: Honorable Mayor & City Council Aaron Kunz, Deputy Director of Transportation Martha Eros, Transportation Planner Subject: Request by Councilmembers

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

Purple Line Extension Updates on La Cienega and Rodeo Stations December 13, 2017

Purple Line Extension Updates on La Cienega and Rodeo Stations December 13, 2017 Purple Line Extension Updates on La Cienega and Rodeo Stations December 13, 2017 1 Agenda Project Overview Section 1 Construction Updates Wilshire/La Cienega Station La Cienega Decking Decking Overview

More information

MEMORANDUM CITY OF BEVERLY HILLS

MEMORANDUM CITY OF BEVERLY HILLS MEMORANDUM CITY OF BEVERLY HILLS TO: FROM: City Council and Traffic and Parking Commission Liaison Committee Chad Lynn, Assistant Public Works Director Genevieve Row, Parking Services Manager Judi Tamasi,

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Purple Line Extension, Section 2 Southern California Edison, Phase I

Purple Line Extension, Section 2 Southern California Edison, Phase I Purple Line Extension, Section 2 Southern California Edison, Phase I 1 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work: 10am-6pm Left

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017 Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work:

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

City of Beverly Hills North Santa Monica Blvd Reconstruction. Traffic & Parking Commission June 04, 2015

City of Beverly Hills North Santa Monica Blvd Reconstruction. Traffic & Parking Commission June 04, 2015 City of Beverly Hills North Santa Monica Blvd Reconstruction Traffic & Parking Commission June 04, 2015 1 Overview of June 4 TPC Overview of Possible Traffic Mitigation Measures Toolbox During Construction

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Purple Line Extension Section 1 Construction Community Meeting January 17, 2019

Purple Line Extension Section 1 Construction Community Meeting January 17, 2019 Purple Line Extension Section 1 Construction Community Meeting January 17, 2019 1 Agenda Section 1 MOW 64 Facility Project Construction Updates: Fossils Project-wide Tunneling Wilshire/Western Wilshire/La

More information

Purple Line Extension Section 1 Construction Community Meeting April 19, 2018

Purple Line Extension Section 1 Construction Community Meeting April 19, 2018 Purple Line Extension Section 1 Construction Community Meeting April 19, 2018 1 Agenda Section 1 MOW 64 Facility Project Construction Updates: Wilshire/Western Wilshire/La Brea Wilshire/Fairfax Wilshire/La

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

CITY HALL 455 North Rexford Drive 4th. Floor Conference Room A Beverly Hills, CA Thursday, November 30, :00 AM AGENDA

CITY HALL 455 North Rexford Drive 4th. Floor Conference Room A Beverly Hills, CA Thursday, November 30, :00 AM AGENDA Beverly Hills City Council Liaison I Public Works Commission Committee will conduct a Special Meeting, at the following time and place, and will address the agenda listed below: CITY HALL 455 North Rexford

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

TRAFFIC & PARKING COMMISSION. Request for a Customer Loading Zone on the west side of the 100 Block of South Beverly Drive

TRAFFIC & PARKING COMMISSION. Request for a Customer Loading Zone on the west side of the 100 Block of South Beverly Drive ~LS CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION April 3, 2014 TO: FROM: SUBJECT: Attachments: Traffic & Parking Commission Martha Eros, Transportation Planner Request for a Customer Loading Zone

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

,ILLS CITY OF BEVERLY HILLS TRAFFIC AND PARKING COMMISSION. July 12, 2018 TO: Traffic and Parking Commission FROM: Transportation Staff SUBJECT:

,ILLS CITY OF BEVERLY HILLS TRAFFIC AND PARKING COMMISSION. July 12, 2018 TO: Traffic and Parking Commission FROM: Transportation Staff SUBJECT: Transportation Staff TO: FROM: Traffic and Parking Commission July 12, 2018 A. Preferential Parking Permit Test District Survey and FAQ Sheet All businesses and households located within 1,000 feet of

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

STAFF REPORT. Honorable Mayor & City Council Aaron Kunz, Deputy Director of Transportation Martha Eros, Transportation Planner.

STAFF REPORT. Honorable Mayor & City Council Aaron Kunz, Deputy Director of Transportation Martha Eros, Transportation Planner. STAFF REPORT Meeting Date: August 18, 2015 To: From: Subject: Honorable Mayor & City Council Aaron Kunz, Deputy Director of Transportation Martha Eros, Transportation Planner Tour Bus Activity Attachments:

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site Project Scoping Report Appendix B Project Web Site APPENDIX B Project Web Site WESTSIDE EXTENSION TRANSIT CORRIDOR STUDY February 4, 2008 News and Info of 1 http://metro.net/projects_programs/westside/news_info.htm#topofpage

More information

Doran Street and Broadway/Brazil Grade Separation Project

Doran Street and Broadway/Brazil Grade Separation Project Doran Street and Broadway/Brazil Grade Separation Project Public Outreach Meeting October 4, 2017 Agenda Introductions Project Overview Grade Separation Alternative Traffic Report Update Interim Condition

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Sound Transit East Link: Bus/LRT System Integration Study

Sound Transit East Link: Bus/LRT System Integration Study Sound Transit East Link: Bus/LRT System Integration Study Prepared For: Sound Transit King County Metro Mercer Island WSDOT Prepared By: CH2M HILL July, 2014 1 SOUND TRANSIT EAST LINK: BUS/LRT SYSTEMES

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY Planned Development Application 1450 Sherman Avenue Evanston, IL 60201 14 TRAFFIC CIRCULATION IMPACT STUDY Traffic Impact Study 1454 Sherman Mixed-Use Development Evanston, Illinois Prepared for Prepared

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2 TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

WILSHIRE/RODEO. Westside Subway Extension - DRAFT IMAGES FOR DISCUSSION PURPOSES ONLY. Torti Gallas and Partners, Inc. June SAAG Workshops 2011

WILSHIRE/RODEO. Westside Subway Extension - DRAFT IMAGES FOR DISCUSSION PURPOSES ONLY. Torti Gallas and Partners, Inc. June SAAG Workshops 2011 WILSHIRE/RODEO 1 WILSHIRE/RODEO: BANK OF AMERICA FULL PORTAL (OPTION A) Note for Option A: Beverly Drive: Retains 2 northbound & 2 southbound lanes Loss of 40 Bank of America underground parking spaces

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

Project Status Update January 2017

Project Status Update January 2017 Project Status Update January 2017 1 What is the Purple Line? A new 16 mile east-west light rail line Operates mostly on the surface with 21 stations Connects New Carrollton in Prince George s County and

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Project Status Update Meeting West End Corridor Segment C Culver City Senior Center May 27, 2010 Phase 1 Project Description 8.6 mile corridor from Downtown Los Angeles

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

Community Open Houses November 29 December 7, 2017

Community Open Houses November 29 December 7, 2017 Community Open Houses November 29 December 7, 2017 1 Community Open House Agenda 6:00 PM Open House 6:30-7:30 PM Presentation and Q&A 7:30-8:00 PM Open House Resumes after the presentation and Q&A Thank

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

7359 WISCONSIN AVENUE MONTGOMERY COUNTY, MARYLAND

7359 WISCONSIN AVENUE MONTGOMERY COUNTY, MARYLAND 7359 WISCONSIN MONTGOMERY COUNTY, MARYLAND September 1, 2017 7359 Wisconsin Avenue September 2017 7359 WISCONSIN Local Area Transportation Review Montgomery County, Maryland September 1, 2017 Prepared

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

TRANSPORTATION TECHNICAL REPORT

TRANSPORTATION TECHNICAL REPORT TRANSPORTATION TECHNICAL REPORT for Sunrise Elementary School Replacement PREPARED FOR: Puyallup School District PREPARED BY: 6544 NE 61 st Street, Seattle, WA 98115 ph: (26) 523-3939 fx: (26) 523-4949

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site. Project Manager Ed Collins LJA Engineering, Inc. Transportation Planning Manager 5316 Highway 290 West Austin Public Infrastructure Group Austin, TX 78735 (512) 762-6301 cell (512) 439-4757 office CARTS

More information

Project Scoping Open House Welcome

Project Scoping Open House Welcome Scoping Meeting Project Scoping Open House Welcome Alternatives Analysis (AA) and Draft Environmental Impact Statement/Draft Environmental Impact Report (DEIS/DEIR) Project Purpose Purpose of the Project

More information

PARKING OCCUPANCY IN WINDSOR CENTER

PARKING OCCUPANCY IN WINDSOR CENTER PARKING OCCUPANCY IN WINDSOR CENTER TOWN OF WINDSOR, CONNECTICUT REPORT JUNE 2017 CONTENTS Background... 3 Other Relevant Data... 3 Parking Survey Design... 6 Parking Supply Inventory... 6 Parking Demand

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Mississauga Bus Rapid Transit Preliminary Design Project

Mississauga Bus Rapid Transit Preliminary Design Project Mississauga Bus Rapid Transit Preliminary Design Project PUBLIC INFORMATION CENTRE OCTOBER 2008 WELCOME The Mississauga Bus Rapid Transit (BRT) Project Thank you for attending this Public Information Centre.

More information

LCPS Valley Service Center

LCPS Valley Service Center Traffic Impact Study LCPS Valley Service Center Loudoun County, Virginia November 4, 2015 Prepared For: Loudoun County Public Schools 21000 Education Court Ashburn, VA 20148 Prepared by: 1140 Connecticut

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 CTfastrak Expansion Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 Today s Agenda Phase I Update 2016 Service Plan Implementation Schedule & Cost Update Phase II Services Timeline Market Analysis

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information