12
13
14
15
16 Page of RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES CHRISTENSEN / JAMES GIBSON DUSTIN PETRAITIS DOL 0.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 6,989 50,968 DCC: DCC: DCC: 6,989 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/2/204 MIDDLE WOLFCAMP SHALE 50,968 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: WAITING ON DAY LIGHT 24 HR SUMMARY: SAFETY MEETING, MOVE BACK YARD, DERRICK, SUBS, AND MISC, 95% MOVED, 25% RIGGED UP 24 HR FORECAST: CONTINUE RIG MOVE AND SETTING DERRICK AND BACK YARD OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 7: R-MOB-DEMOB WOD PP WAITING ON DAYLIGHT 7:00 7: R-MOB-DEMOB SFTY PP SAFETY MEETING WITH APACHE, PIONEER, AND MKH PERSONAL PRIOR TO RIG MOVE 7:30 2: R-MOB-DEMOB RU_RD PP MOVE GENS, TANKS, PARTS HOUSE, BACK YARD EQUIPMENT, MUD PUMPS, TOP DRIVE, PIONEER CAMP TO NEW LOCATION, SET IN TANKS, AND CAMP, FILL WASH OUT ON CELLAR AND MOUSE HOLE 2:00 8: R-MOB-DEMOB RU_RD PP LOAD OUT DERRICK AND MOVE TO NEW LOCATION, LOAD OUT SUBS AND MOVE TO NEW LOCATION, SET IN SUBS ~NOTE~ SHUT DOWN DUE TO WEATHER AT 800HRS 8:00 0: R-MOB-DEMOB WOD PP WAIT ON DAYLIGHT TO CONTINUE RIG MOVE = Total Hours Today :00-06: WAIT ON DAY LIGHT TO CONTINUE RIG MOVE 06:00 UP PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS PIONEER PUSHER SDS PETROLEUM PIONEER HANDS MKH TRANSPORTATION SAFETY DRILLS TOTAL PERSONNEL ON BOARD: 25 TOTAL HOURS ON BOARD: 456 RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/22/204 6:35:04AM
17 Page of RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES CHRISTENSEN / JAMES GIBSON DUSTIN PETRAITIS DOL.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 32, ,060 DCC: DCC: DCC: 32,092 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/22/204 MIDDLE WOLFCAMP SHALE 363,060 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: WAITING ON DAYLIGHT. 24 HR SUMMARY: RIG UP CAMP COMMUNICATIONS, SET DRAWWORKS, DERRICK, PIN ALEGS, SET IN BACK YARD, RIG UP AIR WATER AND ELECTRIC, RAISE DERRICK, AND RIG UP FLOOR, 95% MOVED, 50% RIGGED UP 24 HR FORECAST: CONTINUE RIGGING UP AND PREP TO SPUD OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: R-MOB-DEMOB WOD PP WAITING ON DAYLIGHT 6:00 7:30.50 R-MOB-DEMOB RU_RD PP RIG UP CAMP, RUN ELECTRICAL AND COMMUNICATIONS LINES 7:30 8: R-MOB-DEMOB SFTY PP SAFETY MEETING WITH APACHE, PIONEER, AND MKH 8:00 0: R-MOB-DEMOB RU_RD PP SET DRAWWORKS ON FLOOR AND RIG UP, SET CATWALK AND VEE DOOR, SET TOP DRIVE, SET EDS EQUIPMENT IN BACK YARD 0:00 0: R-MOB-DEMOB RU_RD PP SAFETY MEETING WITH APACHE, PIONEER, AND MKH HANDS PRIOR TO RAISING DERRICK TO FLOOR 0:30 3: R-MOB-DEMOB RU_RD PP RAISE DERRICK TO FLOOR AND PIN IN PLACE, RAISE A LEGS AND PIN IN PLACE, RAISE AND PIN ST-80, SET DOG HOUSE, SET STAIRS ON RIG, RAISE GAS BUSTER 3:00 8: R-MOB-DEMOB RU_RD PP SET IN PUMPS & 2, SET IN ELECTRICAL SUIT CASES, SET VFD HOUSE, SET ACCUMULATOR HOUSE, SET CONEX, SET DEISEL TANK, SET TOP DRIVE GENERATOR, RIG UP SAME 8:00 9:00.00 R-MOB-DEMOB RU_RD PP RIG UP AIR AND FUEL TO RIG FLOOR, SPOOL UP DRAWWORKS, AND UNHANG BLOCKS, PRE RAISE INSPECTION OF DERRICK PREFORMED BY RIG MANAGER 9:00 9: R-MOB-DEMOB SFTY PP SAFETY MEETING WITH APACHE AND PIONEER HANDS PRIOR TO RAISING DERRICK 9:30 22: R-MOB-DEMOB RU_RD PP RAISE DERRICK AND PIN, CONTINUE TO RIG UP ELECTRICAL, RIG UP RIG FLOOR 22:00 0: R-MOB-DEMOB WOD PP WAIT ON DAYLIGHT = Total Hours Today ~NOTE~ NIGHT CREW WILL BREAK TOUR 09/23/204 PREP FOR SUD 06:00 UP :00-06:00 WAIT ON DAYLIGHT Printed: 9/23/204 8:09:30AM
18 Page 2 of PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS PIONEER PUSHER SDS PETROLEUM PIONEER HANDS MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 3 TOTAL HOURS ON BOARD: 68 DIESEL, RIG FUEL gal 9948 SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/23/204 8:09:30AM
19 Page of RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES CHRISTENSEN / JAMES GIBSON DUSTIN PETRAITIS DOL 2.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 43, ,989 DCC: DCC: DCC: 43,648 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/23/204 MIDDLE WOLFCAMP SHALE 403,989 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: LOAD RACKS WITH BHA, STRAP AND CALIPER 24 HR SUMMARY: BRIDLE DOWN BLOCKS, RIG UP TOP DRIVE TRACK AND TOP DRIVE, COMPLETE RIGGING UP BACK YARD TO INCLUDE, PUMPS, PITS, EDS EQUIPMENT, MUD FARM. FUNCTION TEST ALL EQUIPMENT 24 HR FORECAST: DRILL SURFACE HOLE TO 500', TRIP OUT OF HOLE, RUN SURFACE, AND CEMENT OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: R-MOB-DEMOB WOD PP WAIT ON DAYLIGHT TO CONTINUE RIGGING UP 6:00 2: R-MOB-DEMOB RU_RD PP COMPLETE RIGGING UP FLOOR, HANDRAILS, AIR HOISTS, BRIDLE DOWN BLOCKS, HANG TOP DRIVE TRACK IN DERRECK 2:00 8: R-MOB-DEMOB RU_RD PP INSTALL SERVICE LOOPS, RIG UP STAND PIPE, RUN TOP DRIVE CONTROL WIRES, RIG UP ROTARY CHAIN AND GUARD 8:00 8: R-MOB-DEMOB SFTY PP SAFETY MEETING PRIOR TO PICKING UP TOP DRIVE 8:30 23: R-MOB-DEMOB RU_RD PP RAISE TOP DRIVE IN TO DERRICK AND RIG UP, FUNCTION TEST, INSTALL KEEPERS AND SAFETY CABLES ON ALL HIGH PRESSURE EQUIPMENT 23:00 0:00.00 R-MOB-DEMOB RU_RD PP RIG INSPECTION = Total Hours Today 06:00 UP :00-00:00 RIG 00:00 HRS ON 09/24/204 00:00-0:00 MAKE UP CONDUCTOR AND FLOW LINE 0:00-05:00 CHANGE PUMP LINERS FROM 5'' TO 6'', BURY TRANSFER LINES FROM TANK FARM TO PITS 05:00-06:00 LOAD RACKS WITH BHA, STRAP AND CALIPER, PREP TO MAKE UP BHA AND SPUD PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS PIONEER PUSHER SDS PETROLEUM EDS PIONEER HANDS DIESEL, RIG FUEL gal MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 5 TOTAL HOURS ON BOARD: 92 Printed: 9/24/204 4:20:47AM
20 Page 2 of SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/24/204 4:20:47AM
21 Page of RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 0.57 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES CHRISTENSEN / JASEN WILSON DUSTIN PETRAITIS DOL 3.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 77,09 48,008 DCC: DCC: DCC: 77,09 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/25/204 MIDDLE WOLFCAMP SHALE 48,008 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD INC 0.47 AZM 08.0 ft CURRENT OPERATIONS: SURFACE DRILLED TO 522' WAITING ON 522' 24 HR SUMMARY: FINISH RIGING UP SPUD SURFACES DRILL TO 522 WITH 7.5 ULTERRA BIT CIRCULATE BOTTOMS UP TRIP OUT HOLE RUN 522' OF # H HR FORECAST: RIG UP CEMENT CREW, CEMENT SURFACE, CUT, INSTALL WELL HEAD AND TEST OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 0: R-MOB-DEMOB RU_RD PP RIG 00:00 HRS ON 09/24/20400, MAKE UP CONDUCTOR AND FLOW LINE CHANGE PUMP LINERS FROM 5'' TO 6'', BURY TRANSFER LINES FROM TANK FARM TO PITS, CONDUCT PRESPUD INSPECTION, LOAD RACKS WITH BHA, STRAP AND CALIPER, PREP TO MAKE UP BHA AND SPUD 0:30 6: S-DRL DRLG PP SPUD ON DRILL FROM/ 08'-TO/522' 44 ' 6 HRS, 69 FPH 20-25K WOB,80-80 SPM,672 GPM,20,ROT, ,TORQ,200 SPP 6:30 7: S-DRL CIRCT PP CRICULATE BEFORE 522' WORKING PIPE 6:30 6: S-DRL M_TDSrf PP TD 522' 7:00 9: S-DRL TRIP PP TRIP OUT HOLE FROM :00 9: S-DRL TRIPBHA PP BRAKE BIT AND LAYDOWN SHOCKSUB 9:30 20:30.00 S-CSG RU_RD PP HELD SAFETY MEETING RIG UP EXPRESS CREW 20:30 0: S-CSG R_PCSG PP RUN 3 3/8 AS FOLLOWED SHOE 522', FLOAT COLLAR 480' RUN 2 JOINTS OF 3 3/ = Total Hours Today 06:00 UP CIRCULATE RIG UP CEMENT CREW RIG UP CEMENT CREW TEST LINES TO 2,000 PSI. PUMP 20 BBL. FRESH WATER SPACER. CEMENT WITH 555 SKS. (34 BBLS.) CLASS C AT 4.8 PPG. WT,.33 YD,DISPLACED WITH 76 BBLS FRESH WATER AT 5 BPM. FCP AT 3.3 BPM. WAS 30 PSI. BUMP PLUG AT 0400 HRS.ON 09/25/4 WITH 760 PSI. FULL RETURNS, FLOATS HELD. CIRCULATED 4BBL.CEMENT TO SURFACE RIG DOWN CEMENT CREW AND WAIT ON CEMENT BIT / RUN BIT SIZE (in) BIT DATA MANUFACTURER TYPE SERIAL NO Ulterra Drilling Technologies 66S 2428 JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R / / WT-G---WT- Printed: 9/25/204 5:50:47AM
22 Page 2 of BIT / RUN WOB RPM FLOW RATE PRESS BIT OPERATIONS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG / /30.0 / MOTOR OUTPUT RPV: ROTARY CURRENT: 30 TOTAL RPM: 30 Company: VIS (s/qt ) Anchor Drilling Fluids PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) MUD PROPERTIES OIL/WAT (% ) LCM: % SAND/MBT (% )/(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Fresh Water Cl / / Ca H2S KCL CUM ROP Density (ppg ) 8.60 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH LGS (% ) (kip) 75.0 (kip) 70.0 (kip) 73.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Drill Collar 6" DRILL COLLARS Crossover Sub 3.62 Drill Collar 5 8" DRILL COLLARS Non-Mag Drill Collar UBHO Sub 3.5 Shock Sub Bit Sub 2.99 PDC Bit.70 Company: APACHE SURVEY # # 2 TYPE MD DEG ( ) AZI ( ) TVD NORMAL NORMAL NORMAL STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS ANCHOR DRILLING FLUIDS PIONEER PUSHER SDS PETROLEUM EDS PIONEER HANDS N/-S MATERIALS/CONSUMPTION +E/-W SPR SPM V.SECT D.L ( /00ft) PPSR TOTAL PERSONNEL ON BOARD: 6 TOTAL HOURS ON BOARD: 26 DIESEL, RIG FUEL gal 609 GEL, FRESH bbl Printed: 9/25/204 5:50:47AM
23 Page 3 of SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/25/204 5:50:47AM
24 Page of RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS.57 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES CHRISTENSEN / JASEN WILSON DUSTIN PETRAITIS DOL 4.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 39,82 520,829 DCC: DCC: DCC: 39,82 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/25/204 MIDDLE WOLFCAMP SHALE 520,829 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD INC 0.47 AZM ft ft CURRENT OPERATIONS: WORKING ON TOP DRIVE CHANGING SERVICE LOOP 24 HR SUMMARY: CEMENT SURFACE, WAIT ON CEMENT, NIPPLE UP AND TEST. 24 HR FORECAST: MAKE UP BIT BHA # 2 TRIP IN HOLE, DISPLACE WITH BRINE WATER, TEST, DRILL CEMENT AND FLOAT EQUIPMENT, AND DRILL OUT. OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 :30.50 S-CSG CSG PP CIRCULATE 522' RIG DOWN CEMENT CREW AND WAIT ON CEMENT :30 2:30.00 S-CMT RURDCU PP RIG UP CEMENT CREW (CREST) 2:30 4:00.50 S-CMT CMTPRI PP TEST LINES TO 2,000 PSI. PUMP 20 BBL. FRESH WATER SPACER. CEMENT WITH 555 SKS. (34 BBLS.) CLASS C AT 4.8 PPG. WT,.33 YD,DISPLACED WITH 76 BBLS FRESH WATER AT 5 BPM. FCP AT 3.3 BPM. WAS 30 PSI. BUMP PLUG AT 0400 HRS.ON 09/25/4 WITH 760 PSI. FULL RETURNS, FLOATS HELD. CIRCULATED 4BBL.CEMENT TO SURFACE 4:00 5:00.00 S-CMT RURDCU PP RIG DOWN CEMENT TRUCKS 5:00 9: S-CMT WOC PP WAIT ON CEMENT 9:00 : S-NUP WLHEAD PP CUT INSTALL WELL HEAD :00 7: S-NUP BOPS PP BOPS NIPPLE UP AND STACK RAMS 7:00 8:00.00 S-NUP RIGSER PP SERVICE RIG 8:00 20: S-NUP BOPS PP INSTALL BOPS TIGHTEN ALL BRAEKS 20:00 0: S-NUP BOPS PP TEST BLIND RAMS PIPE RAMS CHOKES MANUAL VALVE ON TOP DRIVE,TIW,AND DART VALVE TO 250 PSI LOW AND 3000 PSI HIGH. TEST ANNULLAR TO 250 PSI LOW AND 500 HIGH (TIW AND DART VALVE NEED REPLACED) = Total Hours Today RIG DOWN TEST CREW DOWN TROUBLE SHOOT TOP DRIVE CHANGE SERVICE LOOP 06:00 UP S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH 00 SURFACE Printed: 9/26/204 4:49:32AM
25 Page 2 of PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS ANCHOR DRILLING FLUIDS PIONEER PUSHER SDS PETROLEUM EDS PIONEER HANDS MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 6 TOTAL HOURS ON BOARD: 26 DIESEL, RIG FUEL gal 845 BASE OIL bbl 675 GEL, FRESH bbl 420 SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/26/204 4:49:32AM
26 Page of RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 2.57 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES CHRISTENSEN / JASEN WILSON DUSTIN PETRAITIS DOL 5.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 79, ,856 DCC: DCC: DCC: 79,028 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/26/204 MIDDLE WOLFCAMP SHALE 599,856 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD INC 0.86 AZM ft ,660.0 ft CURRENT OPERATIONS: CIRCULATING WAITING ON SECORP DEW TO H2S ALARMS GOING OF ON 708 ' 24 HR SUMMARY: WORK ON TOP DRIVE, PICK UP INTERMEDIATE BHA, DRILL CEMENT AND FLOAT EQUIPMENT, TEST, DRILL OUT. 24 HR FORECAST: DRILL INTERMEDIATE AND DISPLACE BRINE WATER WITH FRESH WATER MUD OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 :00.00 S-NUP BOPS PP RIG DOWN TEST CREW :00 3: S-DRL RU_RD PN TD DOWN TROUBLE SHOOT TOP DRIVE CHANGE SERVICE LOOP 3:30 4:30.00 S-DRL RU_RD PP CHANGE BALES AND LAYOUT BHA 4:30 7: S-DRL TRIP PP MAKE UP BIT TRIP IN HOLE TAG 476' 7:30 8: S-NUP BOPS PP TEST 500 PSI 8:00 9:30.50 S-CMT DOCMT PP DRILL CEMEMT & FLOAT EQUIPMENT 9:30 0: INT-DRL DRLG PP DRILLING FROM 522'-950' 428', 4.5 HRS, 95' FPH, 30-35K WOB, SPM, 750 GPM, 45 ROT, TORQUE, 277 SPP, 250 PSI. DP, 65 MOTOR RPM. 9:30 9: INT-DRL M_SINT PP START 522' = Total Hours Today 06:00 UP ROTATE FROM 950'- 708, 758' 5.5 HRS, 37 FPH, 30-35K WOB, SPM, 750 GPM, 45 ROT, TORQUE, 277 SPP, 2250 PSI.,27 MOTOR RPM. LAST SURVEY AT 575' INC..87, AZM WAITING ON SECORP TO ARIVE ON LOCATION TO GIVE THE ALL 708'. BIT DATA BIT / RUN BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Ulterra Drilling Technologies 66S JETS OR TFA 6x6 DEPTH IN / IN / I-O-D-L-B-G-O-R BIT OPERATIONS BIT / RUN WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /30.0 / MOTOR OUTPUT RPV: ROTARY CURRENT: 45 TOTAL RPM: 73 Printed: 9/27/204 7:44:00AM
27 Page 2 of Company: Anchor Drilling Fluids MUD PROPERTIES LCM: MUD TYPE: NaCl Brine VIS (s/qt ) PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) OIL/WAT (% ) % SAND/MBT (% )/(lbm/bbl ) ph/pm Pf/Mf (cc ) Cl Ca H2S KCL LGS (% ) PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH (kip) 95.0 (kip) 95.0 (kip) 95.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub CROSS OVER /2 XH Drill Collar DRILL COLLAR /2 XH Crossover Sub XO SUB 3.62 Drill Collar DRILL COLLAR Non-Mag Drill Collar NO MAG DC UBHO Sub SUB 3.5 Shock Sub SHOCK SUB Integral Blade Stabilizer STABILIZER 8.06 Fixed Bend Housing MOTOR PDC Bit ULTERRA 66S Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL NORMAL N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) SPR SPM PPSR PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS MS SURVEY ANCHOR DRILLING FLUIDS PIONEER PUSHER EDS SDS PETROLEUM PIONEER HANDS DIESEL, RIG FUEL gal 808 4,458 MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 7 TOTAL HOURS ON BOARD: 240 Printed: 9/27/204 7:44:00AM
28 Page 3 of SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/27/204 7:44:00AM
29 Page of , , , RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 3.57 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES CHRISTENSEN / JASEN WILSON DUSTIN PETRAITIS DOL 6.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 40, ,588 DCC: DCC: DCC: 40,374 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/28/204 MIDDLE WOLFCAMP SHALE 662,588 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 3,767.0 INC 0.4 AZM ft ,660.0 ft CURRENT OPERATIONS: DRILLING 3950' LAST INC 0.4 AZM HR SUMMARY: DRILL FROM 950'-3326' DISPLACE BRINE WATER WITH FRESH WATER MUD 24 HR FORECAST: DRILL INTERMEDIATE WITH LIGNITE MUD OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 5: INT-DRL DRLG PP ROTATE FROM 950'- 708, 758' 5.5 HRS, 37 FPH, 30-35K WOB, SPM, 750 GPM, 45 ROT, TORQUE, 277 SPP, 2250 PSI.,27 MOTOR RPM. LAST SURVEY AT 575' INC..87, AZM :30 7:00.50 INT-DRL CIRC PN WC ABANDON RIG DUE TO H2S WAITING ON SECORP TO ARIVE ON LOCATION TO GIVE THE ALL 708'. 7:00 3: INT-DRL DRLG PP ROTATE FROM 708'-2580' 872' 6.5 HRS, 34 FPH, K WOB,90-90 SPM,750 GPM,20 ROT TORQUE, 2750 SPP,27 MOTOR RPM,LAST 2427 INC.69 AZM :30 4:30.00 INT-DRL CIRC PN WC ABANDON RIG DUE TO H2S WAITING ON SECORP TO ARIVE ON LOCATION TO GIVE THE ALL 2580'. 4:30 7: INT-DRL DRLG PP ROTATE FROM ' 307' 2.5 HRS, 22 FPH, K WOB,90-90 SPM,750 GPM,20 ROT TORQUE, 2750 SPP,27 MOTOR RPM,LAST 2805 INC.30 AZM :00 8:00.00 INT-DRL RIGSER PP SERVICE RIG 8:00 0: INT-DRL DRLG PP ROTATE FROM 2887'-3326' 439' 6 HRS, 73 FPH, K WOB,90-90 SPM,520 GPM,20 ROT TORQUE, 2750 SPP,27 MOTOR RPM,LAST 382 INC.48 AZM = Total Hours Today 06:00 UP ROTATE FROM 3326' ' 6 HRS, 04 FPH, K WOB,90-90 SPM,750 GPM,20 ROT TORQUE, 2750 SPP,27 MOTOR RPM,LAST 3767 INC.4 AZM 32.4 BIT DATA BIT / RUN BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Ulterra Drilling Technologies 66S JETS OR TFA 6x6 DEPTH IN / IN / I-O-D-L-B-G-O-R Printed: 9/28/204 6::39AM
30 Page 2 of , , , BIT OPERATIONS BIT / RUN WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /35.0 / , , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 20 TOTAL RPM: 48 Company: VIS (s/qt ) Anchor Drilling Fluids PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) MUD PROPERTIES OIL/WAT (% ) LCM: 0.0 % SAND/MBT (% )/(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Freshwater Gel /8 0/2 / Density (ppg ) 8.80 PP DAILY COST 0 CUM COST 0 %OIL 0.00 % H2O BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH Cl Ca H2S KCL LGS (% ) (kip) 45.0 (kip) 35.0 (kip) 40.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub CROSS OVER /2 XH Drill Collar DRILL COLLAR /2 XH Crossover Sub XO SUB 3.62 Drill Collar DRILL COLLAR Non-Mag Drill Collar NO MAG DC UBHO Sub SUB 3.5 Shock Sub SHOCK SUB Integral Blade Stabilizer STABILIZER 8.06 Fixed Bend Housing MOTOR PDC Bit ULTERRA 66S Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 2, , NORMAL 2, , NORMAL 2, , NORMAL 2, , NORMAL 2, , NORMAL 2, , NORMAL, , NORMAL, , NORMAL, , NORMAL, , NORMAL, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH 00 SURFACE H Printed: 9/28/204 6::39AM
31 Page 3 of , , , # # 2 STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) PERSONNEL DATA SPR SPM COMPANY QTY HRS COMPANY QTY HRS MS SURVEY PIONEER PUSHER ANCHOR DRILLING FLUIDS SDS PETROLEUM EDS PIONEER HANDS DIESEL, RIG FUEL gal ,42 GEL, FRESH bbl MATERIALS/CONSUMPTION SAFETY DRILLS PPSR TOTAL PERSONNEL ON BOARD: 7 TOTAL HOURS ON BOARD: 240 BASE OIL bbl 675 RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/28/204 6::39AM
32 Page of , , , RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 4.57 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES CHRISTENSEN / JASEN WILSON DUSTIN PETRAITIS DOL 7.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 43,99 706,508 DCC: DCC: DCC: 43,99 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/28/204 MIDDLE WOLFCAMP SHALE 706,508 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 5,464.0 INC 0.09 AZM ft ,660.0 ft CURRENT OPERATIONS: DRILLING 5806' 5464 INC.09 AZM HR SUMMARY: DRILL INTERMEDIATE WITH FRESH WATER MUD. 24 HR FORECAST: DRILL 500 GPM OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 7: INT-DRL DRLG PP ROTATE FROM 3326'-4862' 536' 7 HRS, 90 FPH, K WOB,90,90-20 SPM, GPM,20 ROT TORQUE, SPP,27-86 MOTOR RPM 7:00 8:00.00 INT-DRL RIGSER PP SERVICE RIG 8:00 0: INT-DRL DRLG PP ROTATE FROM ' 396' 6 HRS, 66 FPH, K WOB,90,90-20 SPM, GPM,20 ROT TORQUE, SPP,27-86 MOTOR RPM = Total Hours Today 06:00 UP ROTATE FROM 5260'-5806' 546' 6 HRS, 9 FPH, K WOB,90,90-20 SPM, GPM,20 ROT TORQUE, SPP,27-86 MOTOR RPM 5464 INC.09 AZM 53.3 BIT DATA BIT / RUN BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Ulterra Drilling Technologies 66S JETS OR TFA 6x6 DEPTH IN / IN / I-O-D-L-B-G-O-R BIT OPERATIONS BIT / RUN WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /25.0 / , , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 25 TOTAL RPM: 0 Company: VIS (s/qt ) Anchor Drilling Fluids PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) MUD PROPERTIES OIL/WAT (% ) LCM: 3.0 % SAND/MBT (% )/(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Freshwater Gel /2 7/29 / / /0.30 0, Density (ppg ) 8.90 PP DAILY COST 0 CUM COST 0 %OIL 0.00 % H2O Cl Ca H2S KCL LGS (% ) Printed: 9/29/204 6:06:49AM
33 Page 2 of , , , BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH (kip) 60.0 (kip) 42.0 (kip) 55.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub CROSS OVER /2 XH Drill Collar DRILL COLLAR /2 XH Crossover Sub XO SUB 3.62 Drill Collar DRILL COLLAR Non-Mag Drill Collar NO MAG DC UBHO Sub SUB 3.5 Shock Sub SHOCK SUB Integral Blade Stabilizer STABILIZER 8.06 Fixed Bend Housing MOTOR PDC Bit ULTERRA 66S Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL 5, , NORMAL 5, , NORMAL 5, , NORMAL 4, , NORMAL 4, , NORMAL 4, , NORMAL 4, , NORMAL 4, , NORMAL 3, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # 00 SURFACE H STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) SPR SPM PPSR PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS MS SURVEY PIONEER PUSHER ANCHOR DRILLING FLUIDS EDS SDS PETROLEUM PIONEER HANDS MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 7 TOTAL HOURS ON BOARD: 240 DIESEL, RIG FUEL gal ,385 Printed: 9/29/204 6:06:49AM
34 Page 3 of , , , SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/29/204 6:06:49AM
35 Page of , ,026.8 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 5.57 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES CHRISTENSEN / JASEN WILSON DUSTIN PETRAITIS DOL 8.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 45,27 75,779 DCC: DCC: DCC: 45,27 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/30/204 MIDDLE WOLFCAMP SHALE 75,779 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 5,88.0 INC 0.2 AZM ft ,660.0 ft CURRENT OPERATIONS: DRILLING 6087', LAST 588 INC.2 AZM HR SUMMARY: DRILL INTERMEDIATE TO 6027', MAKE TRIP OUT HOLE FOR BIT. 24 HR FORECAST: TRIP IN HOLE, FINISH INTERMEDIATE. OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 2: INT-DRL DRLG PP ROTATE FROM 5260'-6027' 767' 2HRS, 64 FPH, K WOB,20 SPM,504 GPM,20-35 ROT TORQUE, 700 SPP,86 MOTOR RPM 2:00 4: INT-DRL CIRCT PP CIRCULATE BEFORE 6027' 4:00 7: INT-DRL TRIPBHA PP TRIP OUT HOLE FROM 6027'-0' FOR BIT 7:30 20: INT-DRL TRIPBHA PP CHANGE MOTOR AND BIT 20:30 2:30.00 INT-DRL RIGSER PP SERVICE RIG 2:30 22:30.00 INT-DRL TRIPBHA PP TRIP IN HOLE TO :30 0:00.50 INT-DRL CUTDL PP CUT AND SLIP DRILLING LINE = Total Hours Today :30 SLIP AND CUT DRILL LINE TRIP IN HOLE WITH NEW MOTOR AND BIT DRILL FROM 6027'-6087' BIT / RUN BIT SIZE (in) 06:00 UP BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R 3 / Ulterra Drilling Technologies 73M x5 6, / / Ulterra Drilling Technologies 66S x / RO-N-8--LT-PR BIT / RUN WOB RPM FLOW RATE PRESS BIT OPERATIONS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG 2/ /30.0 / , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 25 TOTAL RPM: 0 CUM ROP Printed: 9/30/204 6:2:36AM
36 Page 2 of , ,026.8 Company: VIS (s/qt ) Anchor Drilling Fluids PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) MUD PROPERTIES OIL/WAT (% ) LCM: % SAND/MBT (% )/(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Freshwater Gel Cl Ca H2S /3 2/ / / Density (ppg ) 8.70 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 3 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 3 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH KCL LGS (% ) (kip) (kip) (kip) (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub CROSS OVER /2 XH Drill Collar DRILL COLLAR /2 XH Crossover Sub XO SUB 3.62 Drill Collar DRILL COLLAR Non-Mag Drill Collar NO MAG DC UBHO Sub SUB 3.5 Shock Sub SHOCK SUB Integral Blade Stabilizer STABILIZER 8.06 Fixed Bend Housing MOTOR PDC Bit ULTERRA 73M Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL 5, , NORMAL 5, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # 00 SURFACE H STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) SPR SPM PPSR PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS MS SURVEY PIONEER PUSHER ANCHOR DRILLING FLUIDS SDS PETROLEUM EDS PIONEER HANDS MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 7 TOTAL HOURS ON BOARD: 240 DIESEL, RIG FUEL gal BASE OIL bbl 675 DIESEL, MUD gal 0 GEL, FRESH bbl 400 Printed: 9/30/204 6:2:36AM
37 Page 3 of , ,026.8 SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/30/204 6:2:36AM
38 Page of , , RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 6.57 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES CHRISTENSEN / JASEN WILSON DUSTIN PETRAITIS DOL 9.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 58,972 80,75 DCC: DCC: DCC: 58,972 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/30/204 MIDDLE WOLFCAMP SHALE 80,75 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 6,573.0 INC 0.72 AZM ft ,660.0 ft CURRENT OPERATIONS: INC.69 AZM HR SUMMARY: TRIP IN HOLE WITH NEW BIT AND MOTOR, DRILL INTERMEDIATE 24 HR FORECAST: DRILL INTERMEDIATE TO 7648' OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 0: INT-DRL CUTDL PP SLIP AND CUT DRILL LINE. 0:30 5: INT-DRL TRIPBHA PP TRIP IN HOLE WITH NEW MOTOR AND BIT. 5:30 7: INT-DRL DRLG PP DRILL FROM 6027'-6090' 2 HRS, 3.5 FPH, K WOB,20 SPM,-504 GPM,20 ROT TORQUE, 700 SPP,-86 MOTOR RPM 7:30 8: INT-DRL DRLG PN SV TROUBLE SHOOT SURVEY TOOL 8:00 3: INT-DRL DRLG PP DRILL FROM HRS, 38 FPH, K WOB,20 SPM,504 GPM,20 ROT TORQUE, 700 SPP,-86 MOTOR RPM 3:00 3: INT-DRL DRLG PN SV TROUBLE SHOOT SURVEY TOOL 3:30 5: INT-DRL DRLG PP DRILL FROM 6280'-6373'2 HRS, 46.5 FPH, K WOB,20 SPM,504 GPM,20 ROT TORQUE, 700 SPP,-86 MOTOR RPM 5:30 6:30.00 INT-DRL RIGSER PP RIG SERVICE 6:30 0: INT-DRL DRLG PP DRILL FROM 6373' HRS, 49.5 FPH, K WOB,20 SPM,504 GPM,20 ROT TORQUE, 700 SPP,86 MOTOR RPM = Total Hours Today 06:00 UP ROTATE FROM-6745'-7034' 6 HRS, 48 FPH, K WOB,20 SPM,504 GPM,20 ROT TORQUE, 700 SPP,86 MOTOR RPM BIT / RUN 6763 INC.69 AZM BIT SIZE (in) BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R 3 / Ulterra Drilling Technologies 73M x5 6, / BIT / RUN WOB RPM FLOW RATE PRESS BIT OPERATIONS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG 3/ /30.0 / MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 45 TOTAL RPM: 3 CUM ROP Printed: 0//204 0:04:04AM
39 Page 2 of , , Company: VIS (s/qt ) Anchor Drilling Fluids PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) MUD PROPERTIES OIL/WAT (% ) LCM: 3.0 % SAND/MBT (% )/(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Lignosulfonate Cl Ca H2S /3 2/ / / Density (ppg ) 8.70 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 3 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 3 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH KCL LGS (% ) (kip) (kip) 60.0 (kip) 70.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub CROSS OVER /2 XH Drill Collar DRILL COLLAR /2 XH Crossover Sub XO SUB 3.62 Drill Collar DRILL COLLAR Non-Mag Drill Collar NO MAG DC UBHO Sub SUB 3.5 Shock Sub SHOCK SUB Integral Blade Stabilizer STABILIZER 8.06 Fixed Bend Housing MOTOR PDC Bit ULTERRA 73M Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL 6, , NORMAL 6, , NORMAL 6, , NORMAL 6, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH 00 SURFACE H STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS PIONEER PUSHER ANCHOR DRILLING FLUIDS MS SURVEY 0.00 SDS PETROLEUM EDS PIONEER HANDS MATERIALS/CONSUMPTION SPR SPM PPSR TOTAL PERSONNEL ON BOARD: 8 TOTAL HOURS ON BOARD: 228 DIESEL, RIG FUEL gal Printed: 0//204 0:04:04AM
40 Page 3 of , , SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 0//204 0:04:04AM
41 Page of , , RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 7.57 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES CHRISTENSEN / JASEN WILSON DUSTIN PETRAITIS DOL 0.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 54,82 865,563 DCC: DCC: DCC: 54,82 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 0//204 MIDDLE WOLFCAMP SHALE 865,563 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 7,566.0 INC.20 AZM ft ,660.0 ft CURRENT OPERATIONS: RIGGING UP CREW TO RUN 9 5/8 INTERMEDIATE 24 HR SUMMARY: DRILL INTERMEDIATE TO 7648', TRIP OUT HOLE TO RUN 9 5/8. 24 HR FORECAST: RIG UP CREW, RUN 7648' OF 9 5/8, BEGAIN 2 STAGE CEMENT JOB. OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 5: INT-DRL DRLG PP ROTATE FROM-6745'-7598' 5 HRS, 38.8 FPH, K WOB,20 SPM,504 GPM,20 ROT TORQUE, 700 SPP,86 MOTOR RPM 7566 INC.20 AZM :00 6:00.00 INT-DRL RIGSER PP SERVICE RIG 6:00 7:00.00 INT-DRL DRLG PP ROTATE FROM 7598'-7648 HRS, 50 FPH, K WOB,20 SPM,504 GPM,20 ROT TORQUE, 700 SPP,86 MOTOR RPM 7566 INC.20 AZM :00 7: INT-DRL M_TDINT PP T.D INTERMEDIATE DRILLING AT 7648' 7:00 20: INT-DRL CIRCT PP CIR BOTTOMS 7648' TO RUN INTERMEDIATE. 20:00 0: INT-DRL TRIP PP TRIPING OUT HOLE FROM 7648'-287' = Total Hours Today 06:00 UP TRIP OUT HOLE FROM 287'-50' RIG UP LAYDOWN TRUCK TO LAYDOWN DRILL COLLARS LAYDOWN (7) 6.25 DRILL COLLARS AND (5) 8 INCH DRILL COLLARS HELD SAFETY MEETING AND RIG UP CRT AND CREW. BIT / RUN BIT SIZE (in) BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R 3 / Ulterra Drilling Technologies 73M x5 6, / BIT / RUN WOB RPM FLOW RATE PRESS BIT OPERATIONS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG 3/ /30.0 / , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 45 TOTAL RPM: 30 CUM ROP Printed: 0/2/204 9:46:44AM
42 Page 2 of , , Company: VIS (s/qt ) Anchor Drilling Fluids PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) MUD PROPERTIES OIL/WAT (% ) LCM: % SAND/MBT (% )/(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Dispersed Cl Ca H2S /5 22/ / / Density (ppg ) 8.90 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 3 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 3 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH KCL LGS (% ) (kip) 20.0 (kip) 95.0 (kip) (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub CROSS OVER /2 XH Drill Collar DRILL COLLAR /2 XH Crossover Sub XO SUB 3.62 Drill Collar DRILL COLLAR Non-Mag Drill Collar NO MAG DC UBHO Sub SUB 3.5 Shock Sub SHOCK SUB Integral Blade Stabilizer STABILIZER 8.06 Fixed Bend Housing MOTOR PDC Bit ULTERRA 73M Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL 7, , NORMAL 7, , NORMAL 7, , NORMAL 7, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # 00 SURFACE H STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) SPR SPM PPSR PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS MS SURVEY 0.00 ANCHOR DRILLING FLUIDS PIONEER PUSHER SDS PETROLEUM EDS PIONEER HANDS MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 8 TOTAL HOURS ON BOARD: 228 DIESEL, RIG FUEL gal 22 0,080 DIESEL, MUD gal 3655 Printed: 0/2/204 9:46:44AM
43 Page 3 of , , SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 0/2/204 9:46:44AM
44 Page of , , RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 8.57 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES CHRISTENSEN / JASEN WILSON DUSTIN PETRAITIS DOL.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 84, ,404 DCC: DCC: DCC: 84,842 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 0/2/204 MIDDLE WOLFCAMP SHALE 950,404 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 7,566.0 INC.20 AZM ft ,648.0 ft CURRENT OPERATIONS: CIR BETWEEN CEMENT STAGE 4 HOURS 24 HR SUMMARY: TRIP OUT HOLE FROM INTERMEDIATE, RUN INTERMEDIATE 9 5/8, BEGAIN TO CEMENT 24 HR FORECAST: CEMENT INTERMEDIATE NIPPLE UP AND TRIP IN HOLE. OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 :00.00 INT-DRL TRIP PP TRIP OUT HOLE TO RUN INTERMEDIATE FROM 287'-50' :00 2:00.00 INT-DRL RU_RD PP RIG UP LAYDOWN TRUCK TO LAYDOWN DRILL COLLARS 2:00 4: INT-DRL TRIPBHA PP LAYDOWN (7) 6.25 DRILL COLLARS AND (5) 8 INCH DRILL COLLARS 4:00 4: INT-CSG SFTY PP CONDUCT SAFETY MEETING WITH PIONEER & EXPRESS CREW AND CRT OPERATORS 4:30 7: INT-CSG RU_RD PP RIG UP CREW AND CRT 7:00 2: INT-CSG CSG PP RUN 9.625" 40#, HC L-80, LTC THREADED AS FOLLOWS:FLOAT SHOE 7648', JOINT, FLOAT COLLAR 7,606'' 8 JOINTS,ECP, DV TOOL 427', AND 02 JOINTS. 7,653' OVERALL 7,648'. 2:00 22:00.00 INT-CSG CIRC PP CIR WITH FULL /2 CAPACITY.' 22:00 22: INT-CSG SFTY PP SAFETY MEETING WITH CREST CEMENT CREW 22:30 23: INT-CSG RU_RD PP RIG UP CEMENT CREW 23:00 0:00.00 INT-CSG CSG PP CEMENT INTERMEDIATE WITH CREST CEMENTERS AS FOLLOWS,TEST LINES TO 4000PSI CEMENT ST STAGE CEMENT, 30 BBL FRESH WATER SPACER, LEAD 665 SACKS (290 BBLS).90 PPG YIELD /50 POZ H, TAIL 20 SACKS (54 BBLS ) CLASS H PREMIUM PLUS 3.2 PPG YIELD.6, START DISPLACEMENT 577. BBLS BUMPED 045 0/03/204, FINAL LIFT PRESSURE 00 3 BBLS MIN, PRESSURED UP TO 60 PSI ON PLUG HELD 5 MIN, RELEASED PRESSURE FLOATS HELD,PARTIAL RETURNS DURING CEMENT JOB = Total Hours Today Printed: 0/3/204 7:3:07AM
45 Page 2 of , , :00 UP CEMENT INTERMEDIATE WITH CREST CEMENTERS AS FOLLOWS,TEST LINES TO 4000PSI CEMENT ST STAGE CEMENT, 30 BBL FRESH WATER SPACER, LEAD 665 SACKS (290 BBLS).90 PPG YIELD /50 POZ H, TAIL 20 SACKS (54 BBLS ) CLASS H PREMIUM PLUS 3.2 PPG YIELD.6, START DISPLACEMENT 577. BBLS BUMPED 2:5AM 0/03/204, FINAL LIFT PRESSURE 00 3 BBLS MIN, PRESSURED UP TO 60 PSI ON PLUG HELD 5 MIN, RELEASED PRESSURE FLOATS HELD,PARTIAL RETURNS DURING CEMENT JOB SET PACKER TEST LINES TO 4K START STAGING UP PRESSURE TO INFLATE 2280 PSI WITH 90 PSI DROP, CONTINUED TO 380 PSI TO CLOSE VALVES, BBLS USED IN PACKER 4 BBLS DISPLACED, PACKER SET. DROPPED BOMB DV TOOL 640 PSI BIT / RUN CIR 4 HOURS OPEN DV TOOL PORTS WITH 680 PSI BIT SIZE (in) BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R 3 / Ulterra Drilling Technologies 73M x5 6, / BT-T--2-BT-TD MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: TOTAL RPM: Company: Anchor Drilling Fluids MUD PROPERTIES LCM: MUD TYPE: Dispersed VIS (s/qt ) PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) OIL/WAT (% ) % SAND/MBT (% )/(lbm/bbl ) /0 22/ / / Density (ppg ) 8.80 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 3 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH ph/pm Pf/Mf (cc ) Cl Ca H2S KCL LGS (% ) (kip) (kip) (kip) (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub CROSS OVER /2 XH Drill Collar DRILL COLLAR /2 XH Crossover Sub XO SUB 3.62 Drill Collar DRILL COLLAR Non-Mag Drill Collar NO MAG DC UBHO Sub SUB 3.5 Shock Sub SHOCK SUB Integral Blade Stabilizer STABILIZER 8.06 Fixed Bend Housing MOTOR PDC Bit ULTERRA 73M S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH 00 SURFACE H STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: SPR SPM PPSR Printed: 0/3/204 7:3:07AM
46 Page 3 of , , PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS MS SURVEY 0.00 PIONEER PUSHER ANCHOR DRILLING FLUIDS SDS PETROLEUM EDS EXPRESS ENERGY SERVICES, LLC PIONEER HANDS MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 28 TOTAL HOURS ON BOARD: 252 DIESEL, RIG FUEL gal SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 0/3/204 7:3:07AM
47 Page of , , RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW (days) DFS 9.57 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 MIKE DOVER / JASEN WILSON DUSTIN PETRAITIS DOL 2.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,666.0 AFE COSTS DAILY COSTS 44,924,392,328 DCC: DCC: DCC: 44,924 CUMULATIVE COSTS LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 0/3/204 MIDDLE WOLFCAMP SHALE,392,328 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 7,566.0 INC.20 AZM ,648.0 ft ,600.0 ft CURRENT OPERATIONS: TRIPPING IN HOLE WITH DRILL OUT HR SUMMARY: CEMENT ,NIPPLE UP B SECTION,TEST BOPS, 24 HR FORECAST: TRIP IN HOLE, TEST, DRLG CEMENT AND FLOAT EQIPMENT,DISPLACE WITH OILBASE, TRIP OUT HOLE, PICK UP DIR TOOLS. OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 2: INT-CMT CMTPRI PP CEMENT INTERMEDIATE WITH CREST CEMENTERS AS FOLLOWS,TEST LINES TO 4000PSI CEMENT ST STAGE CEMENT, 30 BBL FRESH WATER SPACER, LEAD 665 SACKS (290 BBLS).90 PPG YIELD /50 POZ H, TAIL 20 SACKS (54 BBLS ) CLASS H PREMIUM PLUS 3.2 PPG YIELD.6, START DISPLACEMENT 577. BBLS BUMPED 2:5AM 0/03/204, FINAL LIFT PRESSURE 00 3 BBLS MIN, PRESSURED UP TO 60 PSI ON PLUG HELD 5 MIN, RELEASED PRESSURE FLOATS HELD,PARTIAL RETURNS DURING CEMENT JOB. 2:30 3:30.00 INT-CMT CMTPRI PP SET PACKER TEST LINES TO 4K START STAGING UP PRESSURE TO INFLATE 2280 PSI WITH 90 PSI DROP, CONTINUED TO 380 PSI TO CLOSE VALVES, BBLS USED IN PACKER 4 BBLS DISPLACED, PACKER SET. DROPPED BOMB DV TOOL 640 PSI 3:30 7: INT-CMT CIRC PP CIR 4 HOURS OPEN DV TOOL PORTS WITH 680 PSI 7:30 8: INT-CMT SFTY PP PJSM CEMENT CREWS 8:00 : INT-CMT CMTPRI PP CEMENT INTERMEDIATE WITH CREST CEMENTERS AS FOLLOWS,TEST LINES TO 4000PSI CEMENT 2nd STAGE CEMENT, 30 BBL FRESH WATER SPACER, LEAD 865 SACKS (350 BBLS).90 PPG YIELD /50 POZ H, TAIL 80 SACKS (50 BBLS ) CLASS H PREMIUM PLUS 4.8 PPG YIELD 2.4, START DISPLACEMENT 305. BBLS BUMPED 0:25AM 0/03/204, FINAL LIFT PRESSURE BBLS MIN, PRESSURED UP TO 2400 PSI ON PLUG HELD 5 MIN, RELEASED PRESSURE FLOATS HELD,FULL RETURNS DURING CEMENT JOB. :30 20: INT-NUP WLHEAD PP NIPPLE DOWN BOPS INSTALL B SECTION 20:00 22: INT-NUP WLHEAD PP TEST BOPS 5000 PSI HIGH 250PSI LOW BLINDS, PIPE,TEST ANNULAR TO 500 PSI HIGH AND 250 LOW 22:30 23:30.00 INT-NUP RIGSER PP RIG SERVICE 23:30 0: INT-NUP RIH PP MAKE UP BIT AND BIT SUB TO DRILL OUT CEMENT AND FLOAT EQUIPMENT = Total Hours Today TRIP IN HOLE FROM O- 4207' DRILL CEMENT AND DV 4207'-4209' TRIP IN HOLE FROM 4209'-7577' TAG 759' 06:00 UP Printed: 0/4/204 9:02:55AM
APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00
More informationDaily Drilling Report
Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES
More informationDaily Drilling Report
Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204
More informationDaily Drilling Report
Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM
More informationDaily Drilling Report
Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG
More informationPartner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig
: 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.
More informationAPPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28
MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move
More information19,683 8,
General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg
More informationAPPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28
MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:
More informationAPACHE CORPORATION. Daily Land - Orig Comp Report
APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int
More informationDAILY DRILLING REPORT DATE : 08/01/2012
DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:
More informationDATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS
DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud
More informationDaily Drilling Summary Report
Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well
More informationAPACHE CORPORATION. Daily Land - Orig Comp Report
APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report
More informationDrilling & Completion Summary
API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,
More information02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00
DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University
More informationCallon Petroleum Company Drilling Report
LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP
More information8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250
DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz
More informationGulftex Energy III LP DAILY COMPLETION REPORT
07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM
More informationDAILY DRILLING REPORT
UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED
More informationEndeavor Energy Resources, LP. DAILY DRILLING REPORT
Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing
More informationWell Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:
Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.
More informationGeneral Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN
UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014
More informationEP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017
Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original
More informationDaily Activity Report
605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT
More informationCurrent Depth. Proposed TD. Current Operation
Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI
More informationCurrent Depth. Proposed TD. Current Operation
Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University
More informationOPERATIONS SUMMARY REPORT
Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor
More information3/25/15 University DC 1H Devonian Completion
3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped
More informationDrilling & Completion Summary - Ascending
UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014
More informationEP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017
1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:
More informationDAILY OPERATIONS REPORT Date:
OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:
More informationSpud meeting with Periscope Connect electric lines, r/u v-door install shak
Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect
More informationEND OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:
UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of
More informationMLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations
MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From
More informationReport No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE
Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well
More informationDATE: 01/03/ DAILY COMPLETION REPORT
DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing
More informationDAILY DRILLING REPORT DATE : 04/20/2011
DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539
More informationMcKissick 200mt. Stabbing board
MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #
More information5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.
MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b
More informationMORNING DRILLING REPORT
APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.
More informationMORNING DRILLING REPORT
APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i
More informationRig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading
Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80
More informationIdeco - H25 Information Document
Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig
More informationRotary Snubbing Technology Option for Long Reach
Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results
More informationView Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013
Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,
More informationExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #
6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main
More information1042 FNL, 1935 FEL - ECTOR, TX
Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:
More informationCUSTOMER WELL NAME COUNTY, STATE
DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed
More informationElevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:
FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar
More informationPROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..
DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks
More informationCompletion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00
Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217
More informationLAGO Energy Presents,
LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION
More informationCNL, CCL, GR, CBL. RDMO
Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.
More informationRig 1 Sky top 4 Axle Carrier 6500 Drilling Depth
Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping
More informationCasing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas
Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing
More informationH. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas
H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)
More informationSCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth
SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95
More informationRENTAL TOOL SERVICES. Megaton Impact Tools
Megaton Impact Tools Upper Connector Megaton Impact Tools optimize your drilling operations. Drive Mandrel Female Spline Bearing Female Spline New-Generation Drilling Tools Megaton Drilling Jar Frees the
More informationRENTAL TOOL SERVICES. Megaton Impact Tools
Megaton Impact Tools Megaton Impact Tools optimize your drilling operations. Megaton Impact Tools Ulti-Torq high-torque, double shoulder connections Involute spline design High-strength steel developed
More informationHM MT DRILLING RIG HUISMAN PRODUCT BROCHURE
HM150 150MT DRILLING RIG HUISMAN PRODUCT BROCHURE M150 ENERAL INTRODUCTION 02 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation
More informationLOC 400 Drilling Rig
TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP
More informationDRILLING BARGE SS AMEQ CASPIAN SEA
DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months
More informationSCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.
SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL
More informationPlug & Abandonment Light Drilling Workover Well Intervention
Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE
More informationCasing Drilling Technology Implementation In Petrom
Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga
More informationSuperintendent Rig Checklist
Superintendent Rig Checklist Rig #: Operating Company: Well Name & #: Date/Time of Inspection: Inspected By: Company Man: Tool pusher: Driller: Ton Miles Logged and up to date: BOP Drill date and time:
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL
More informationEP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017
6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion
More informationFOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)
FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH
More informationMOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES
MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October
More informationDaily Drilling Report
Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 120.0 120.0 120.0 0.0 SPUD DATE API DFS: STATE COUNTY DIVISION 4230133110 TEXAS
More informationAADE 01-NC-HO-54. Abstract
AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling
More informationMast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)
General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads
More informationROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT
DRILLING EQUIPMENT ROTARY TOOLS Romfor International Ltd. Backup Hand DRILLING EQUIPMENT & ROTARY TOOLS Backup Hand DRILLING EQUIPMENT ROTARY TOOLS 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves,
More informationAbout Cobra Downhole Motors
February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL
More informationAbout Cobra Downhole Motors
October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.
More informationbbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P
Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels
More informationElevation Resources LLC
FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.
More informationSchede tecniche Corsair 300 PDB
Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015
More informationVDD 370 Super Single Rig - Automatic Pipehandling System
Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles
More informationMaersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced
Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore
More informationAshmin HammR Drill Motor
Ashmin HammR Drill Motor By: Dr. Gunther (Doc) Tuesday, September 12 th, 2017 Research. Innovate. Test. Deploy. Agenda Drilling Challenges Alternative Designs Drilling Hammer Trends Ashmin HammR Drill
More informationPATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL
PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL
More informationAtlas Copco Oil and Gas Rigs. The Predator Advantage
Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India
More informationRIG 32. Rig 32. Page 1 of 13
Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with
More informationVDD 200 Super Single Rig - Automated Pipehandling System
Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles
More informationCompletion Solutions Inc.
Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both
More informationWith its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.
PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE
More informationDrillmec HH-300 spec.
Drillmec HH-300 spec. Drillmec HH-300 Fast moving trailer mounted automatic drilling rig. Designed for cold climate and Geothermal applications and is fully capable of working in heavy winds. It is capable