1 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft. / Day 760 Rotating Hours 16 Ttl. Rotating Hrs. 16 Brief Description Of Operations Work on top drive.rig inspection.pickup BHA.mist drlg. 17 1/2'' hole F/ 40 to 360.Service top drive.mist drlg. F/ 360 to 593. run 500' 1.26*.Mist drlg. F/ 593 to 800 1;00pm Lost 500' Daily Cost: $237,933 Accumulator Pressure: PSI

2 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/14/2011 Day # 2 Well Name University #1 H County Crockett Present Operation top out cement Depth 930 Ft. / Day 130 Rotating Hours 2 Ttl. Rotating Hrs. 18 Brief Description Of Operations Mist drlg. F/ 800 to 857.Break kelly saver sub.trip out of hole.change out die on backup wrench.trip in hole. Mist drlg. F/857 to930.load hole with drillcat polymer.trip out of hole.rigup casing crew and run 22 joint 13 3/8'' casing set at circulate and rig down laydown machine.rigup Halliburton and cement.wait on cement. Run temp. survey top of 350. top out wih hallibuton. Plug 10;30pm Daily Cost: $62,063 Accumulator Pressure: PSI

3 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/15/2011 Day # 3 Well Name University #1 H County Crockett Present Operation drlg. 12 1/4'' hole Depth 1489 Ft. / Day 559 Rotating Hours 6 Ttl. Rotating Hrs. 24 Brief Description Of Operations Top out cement.cutoff 13 3/8'' casing and weld on wellhead & test to 500psi.nipple up BOP and choke manifold. Test BOP and choke manifold with Monahans to 3000psi,test csing to 1000psi.Trip in hole with bit #3.Drlg cement and float equipment. drlg. 12 1/4'' hole F/ 930 to 1489 Daily Cost: $104,167 Accumulator Pressure: 1900 PSI

4 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/16/2011 Day # 4 Well Name University #1 H County Crockett Present Operation drlg. 12 1/4'' hole Depth 3108 Ft. / Day 1619 Rotating Hours 22 1/2 Ttl. Rotating Hrs. 46 1/2 Brief Description Of Operations Drlg. F/ 1489 to 1583.Run *, *.Drlg. F/ 1583 to 1869.Service rig.drlg. F/ 1869 to Run 2000 misrun. Drlg. F/ 2059 to Run *.Drlg. F/ 2154 to 2535.Run *.Drlg. F/ 2535 to Daily Cost: $48,667 Accumulator Pressure: 1900 PSI

5 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/17/2011 Day # 5 Well Name University #1 H County Crockett Present Operation Cement 9 5/8'' casing Depth 3833 Ft. / Day 725 Rotating Hours 7 Ttl. Rotating Hrs. 53 1/2 Brief Description Of Operations *.Drlg.F/ 3108 to 3585.Service rig & *.drlg. F/ 3585 to 3833.Pump sweeps and circulate to run gyro. Run gyro every 200ft.Trip out of hole,rigup laydown machine and laydown collars.rigup casing crew and run 85 joints 9 5/8'' 40# casing set circulate and rigdown laydown machine.cement with Halliburton. 2;30pm Plug 6;30am Daily Cost: $158,480 Accumulator Pressure: 1900 PSI

6 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/18/2011 Day # 6 Well Name University #1 H County Crockett Present Operation Test BOP Depth 3833 Ft. / Day Rotating Hours Ttl. Rotating Hrs. 53 1/2 Brief Description Of Operations Top out cement with Halliburton.rigdown halliburton.nipple down BOP.Set slips,cutoff casing, install B section and test.nipple up BOP.Wait on Monahans.Inspect derrick and top drive for droped part,part off of upper kelly valve controller.test BOP,choke,mud lines,floor valves and casing.replace 4'' valve on choke Daily Cost: $44,021 Accumulator Pressure: 1900 PSI

7 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/19/2011 Day # 7 Well Name University #1 H County Crockett Present Operation Wait on parts for rotary clutch Depth 3833 Ft. / Day Rotating Hours Ttl. Rotating Hrs. 53 1/2 Brief Description Of Operations Test 4'' valve on choke manifold.get floor and ground ready to pickup BHA ( safety).pickup Directional tools and surfuce test.work on rotary clutch and wait on parts. Daily Cost: $16,735 Accumulator Pressure: 1900 PSI

8 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/20/2011 Day # 8 Well Name University #1 H County Crockett Present Operation Rotate drlg. Depth Ft. / Day Rotating Hours 8 1/2 Ttl. Rotating Hrs. 62 Brief Description Of Operations to 4226 Wait on rotart clutch part.test MWD tools. Trip in hole.drlg. Cement and float equipment.rotate drlg. F/ 3833 Daily Cost; $19,881 Accumulator Pressure: 1900 PSI

9 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/21/2011 Day # 9 Well Name University #1 H County Crockett Present Operation slide drlg. Depth 5380 Ft. / Day 1154 Rotating Hours 24 Ttl. Rotating Hrs. 86 Brief Description Of Operations Rotate drlg. F/ 4226 to Slide drlg. f/ 5290 to 5380 Daily Cost: $31,451 Accumulator Pressure: 1900 PSI

10 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/22/2011 Day # 10 Well Name University #1 H County Crockett Present Operation slide drlg. Depth 5800 Ft. / Day 420 Rotating Hours 15 Ttl. Rotating Hrs. 101 Brief Description Of Operations Slide drlg. F/ 5380 to 5382.Trip out of hole.change out motor,bit and test MWD.service top drive.trip in hole. Slide drlg. F/ 5382 to 5528.Calibrate block tracking.slide drlg. F/ 5528 to 5800 Daily Cost: $62,751 Accumulator Pressure: 1900 PSI

11 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/23/2011 Day # 11 Well Name University #1 H County Crockett Present Operation trip out of hole Depth 6316 Ft. / Day 516 Rotating Hours 18 1/2 Ttl. Rotating Hrs /2 Brief Description Of Operations Trip out of hole. Service top drive.slide drlg. F/ 5800 to Rotate drlg. F/ 6224 to 6316.Circulate and cond. Hole for trip. Daily Cost: $39,110 Accumulator Pressure: 1900 PSI

12 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/24/2011 Day # 12 Well Name University #1 H County Crockett Present Operation Rotate drlg. Depth Ft. / Day Rotating Hours 15 1/2 Ttl. Rotating Hrs. 135 Brief Description Of Operations test tools.rotate drlg. F/ 6316 to 7264 Trip out of hole and change out motor,bit and MWD tools.service rig.replace MWD tools and test.trip in hole and Daily Cost: $ 41,900 Accumulator Pressure: 1900 PSI

13 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/25/2011 Day # 13 Well Name University #1 H County Crockett Present Operation Rotate & slide drlg.. Depth Ft. / Day Rotating Hours 21 1/2 Ttl. Rotating Hrs /2 Brief Description Of Operations Rotate & slide drlg.service rig.rotate & slide drlg. Circulate and clean hole. Rotate and slide drlg. Daily Cost: $35,292 Accumulator Pressure: 1900 PSI

14 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Well Name Present Operation Depth University it #1 H Rotate & slide drlg.. Ft. / Day Date 3/26/2011 Day # 14 County Rotating Hours 21 1/2 Crockett Ttl. Rotating Hrs. 178 Brief Description Of Operations Rotate and slide drlg. Circulate.rotate and slide drlg. Service rig. Rotate and slide drlg. Circulate.rotate and slide drlg. Accumulator Pressure: 1900 PSI Notify RRC of 6;00pm job #1843 ( IVY ) Nozzles Bit Bit Make Type Serial 32nds Depth Depth Total Hours on Ft./Hr. Bit RPM Number Size Number In Out Footage Bit Weight Run # /4'' Ulterra Z25RS CW416 3x / slide 6 8 3/4'' Varel VM616H x / Compressors 3 Booster(s) 1 CFM 3000 Nitrogen Unit on line at O2% Dusting (y/n) N Misting with: F/W bbls. 25 Foamer gph 5 Shale Treat gal./hr. Corrosion Inhibitor gal./hr. Hydraulics # 1 pump 95% - GPS = BPS = ) & # 2 95% - GPS = BPS = Pump # 1 Stroke Liners SPM GPM Pump Pressure Nat. oilwell FB '' off bot./2000 Pump#2 Stroke Liners SPM Nat. oilwell FB '' 65 Mud Properties Wt. Fun'l Filtrate Cake Chlorides Vis. PV/YP Gels PH CC/30 min. 32nds. Pm pf/mf PPM HT API GPM Pump Pressure 272 Calcium % % % Vis. PPM Sand Solids Oil Out FUEL Rig Diesel - " 23 Air Diesel - " 25 Propane - % Gallons of Diesel delivered Remarks Directional Surveys WLS Depth Angle 89.1*-2.10azm 90.4*-359.8azm 90.*-358.4azm 89.*-3.10azm 88.6*-3.00azm Bottom Hole Assembly (BHA) No Change (see prior report) Tool Description * New BHA Drill Pipe Size OD (in) Wt. ID (in) *-3.70azm 89.8*-2.30azm Grade Length (ft) PDC 8 3/4'' * motor 63/4'' float sub 6 5/16'' pony flex NMDC 6'' UBHO 63/16'' NMDC 6 1/8'' flex NMDC 6 5/8'' Brine on hand 500 Barrels Freshwater on hand 1000 Barrels Mud on hand 800 PU wt. 200 Barrels Slack Off Wt. 110 K Rotating Wt K BHA

15 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Well Name University it #1 H Present Operation Rotate & slide drlg.. Depth Ft. / Day Date 900 3/27/2011 Day # 15 County Rotating Hours 21 Crockett Ttl. Rotating Hrs. 199 Brief Description Of Operations Rotate and slide drlg. Circulate and cond. Hole.rotate and slide drlg.service rig. Rotate and slide drlg. Jet shale pit. Rotate and slide drlg. Accumulator Pressure: 1900 PSI Notify RRC of 6;00pm job #1843 ( IVY ) Nozzles Bit Bit Make Type Serial 32nds Depth Depth Total Hours on Ft./Hr. Bit RPM Number Size Number In Out Footage Bit Weight Run # /4'' Ulterra Z25RS CW416 3x / slide 6 8 3/4'' Varel VM616H x / Compressors 3 Booster(s) 1 CFM 3000 Nitrogen Unit on line at O2% Dusting (y/n) N Misting with: F/W bbls. 25 Foamer gph 5 Shale Treat gal./hr. Corrosion Inhibitor gal./hr. Hydraulics # 1 pump 95% - GPS = BPS = ) & # 2 95% - GPS = BPS = Pump # 1 Stroke Liners SPM GPM Pump Pressure Nat. oilwell FB '' off bot./2850 Pump#2 Stroke Liners SPM GPM Pump Pressure Nat. oilwell FB '' Mud Properties Wt. Fun'l Filtrate Cake Chlorides Calcium % % % Vis. Vis. PV/YP Gels PH CC/30 min. 32nds. Pm pf/mf PPM PPM Sand Solids Oil Out HT API FUEL Rig Diesel - " 54 Air Diesel - " 25 Propane - % Gallons of Diesel delivered 7000 Remarks Rot. Tq. Off bottom;5000=rot. Tq.on bottom;11700 WLS 1 2 Depth Angle * azm *-358.7azm *-358.azm *-359.3azm azm *-357.3azm *-357.5azm Bottom Hole Assembly (BHA) No Change (see prior report) Tool Description 1-PDC * Directional Surveys New BHA Drill Pipe Size Wt. OD (in) ID (in) 8 3/4'' * motor 63/4'' Grade Length (ft) float sub 6 5/16'' pony flex NMDC 6'' UBHO 63/16'' NMDC 6 1/8'' flex NMDC 6 5/8'' Brine on hand 500 Barrels Freshwater on hand 1000 Barrels Mud on hand 500 Barrels PU wt. 200 Slack Off Wt. K Rotating Wt K BHA

16 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Well Name Present Operation Depth University it #1 H Down wait on electrician Ft. / Day Date 3/28/2011 Day # 16 County Rotating Hours 7 1/2 Crockett Ttl. Rotating Hrs /2 Brief Description Of Operations Rotate and slide drlg. Service rig.rotate and slide drlg. Trip out of hole f/ motor.work on ST80.trip out of hole. laydown bad motor and pickup new motor and test.trip in hole and pickup agitator at 3054'.test MWD tool at 3933'. Wait on electrician Accumulator Pressure: 1900 PSI Notify RRC of 6;00pm job #1843 ( IVY ) Nozzles Bit Bit Make Type Serial 32nds Depth Depth Total Hours on Ft./Hr. Bit RPM Number Size Number In Out Footage Bit Weight Run # /4'' Varel DE x /4'' Varel VM616H x Compressors 3 Booster(s) 1 CFM 3000 Nitrogen Unit on line at O2% Dusting (y/n) N Misting with: F/W bbls. 25 Foamer gph 5 Shale Treat gal./hr. Corrosion Inhibitor gal./hr. Hydraulics # 1 pump 95% - GPS = BPS = ) & # 2 95% - GPS = BPS = Pump # 1 Stroke Liners SPM GPM Pump Pressure Nat. oilwell FB '' off bot./2850 Pump#2 Stroke Liners SPM Nat. oilwell FB '' 65 Mud Properties Wt. Fun'l Filtrate Cake Chlorides Vis. PV/YP Gels PH CC/30 min. 32nds. Pm pf/mf PPM HT API GPM Pump Pressure 272 Calcium % % % Vis. PPM Sand Solids Oil Out FUEL Rig Diesel - " 45 Air Diesel - " 25 Propane - % Gallons of Diesel delivered Remarks Directional Surveys WLS Depth Angle 88.8*-358.2azm Bottom Hole Assembly (BHA) No Change (see prior report) Tool Description 1-PDC * New BHA Drill Pipe Size OD (in) 8 3/4'' * motor 6 3/4'' Wt. Grade ID (in) Length (ft) float sub 6 5/16'' pony flex NMDC 6'' UBHO 63/16'' NMDC 6 1/8'' flex NMDC 6 5/8'' agitator ---1 shock sub 6 3/4'' 6 5/8'' 20.9 Brine on hand 500 Barrels Freshwater on hand 1000 Barrels Mud on hand 500 Barrels PU wt. 200 Slack Off Wt. K Rotating Wt K BHA

17 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date Day # 3/29/ Well Name University #1 H County Crockett Present Operation rotate and slide drlg. Depth Ft. / Day 482 Rotating Hours 11 Ttl. Rotating Hrs /2 Brief Description Of Operations wait on electrican.trip in hole. Work on hy-drum clutch.trip in hole.wash to bottom F/ 9579 to adjust brakes. wash to bottom F/10148 to work on pumps.rotate and slide drlg.change out swab on pump. Rotate and slide drlg. Change out viberator hose. Accumulator Pressure: 1900 PSI

18 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date Day # 3/30/ Well Name University #1 H County Crockett Present Operation trip out of hole for motor Depth Ft. / Day 765 Rotating Hours 19 Ttl. Rotating Hrs /2 Brief Description Of Operations Rotate and slide drlg.service rig.rotate and slide drlg.circulate and clean hole.trip out of hole for motor Accumulator Pressure: 1900 PSI

19 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/31/2011 Day # 19 Well Name University #1 H County Crockett Present Operation rotate and slide drlg. Depth Ft. / Day Rotating Hours 7 1/2 Ttl. Rotating Hrs. 244 Brief Description Of Operations trip out of hole.laydown motor,pickup new motor and test.trip in hole to casing shoe.test agitator,and MWD tools. slip and cut drlg. Line.trip in hole.ream F/ to rotate and slide drlg. f/ to Daily Cost: $49,599 Accumulator Pressure: 1900 PSI

20 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 4/1/2011 Day # 20 Well Name University #1 H County Crockett Present Operation Laydown drillpipe Depth Ft. / Day 550 Rotating Hours 10 1/2 Ttl. Rotating Hrs /2 Brief Description Of Operations Rig up laydown machine.laydown drillpipe. Rotate and slide drlg. F/ to.circulate and cond. Hole.Trip out of hole to 5200'.wait on laydown machine. 4;30pm Daily Cost: $29,982 Accumulator Pressure: 1900 PSI

21 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 4/2/2011 Day # 21 Well Name University #1 H County Crockett Present Operation Run 5 1/2'' 17# casing Depth Ft. / Day Rotating Hours Ttl. Rotating Hrs /2 Brief Description Of Operations Laydown drillpipe.laydown MWD tools and motor.trip in hole.laydown drillpipe.trip in hole.laydown drillpipe Rigup CRT tool to run casing.run 5 1/2'' 17# P110 casing. Daily Cost: $29,860 Accumulator Pressure: 1900 PSI

22 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 4/3/2011 Day # 22 Well Name University #1 H County Crockett Present Operation Nipple down Depth Ft. / Day Rotating Hours Ttl. Rotating Hrs /2 Brief Description Of Operations Ran 300 joints 5 1/2'' 17# P110 casing set at Circulate and wait on cement head f/ halliburton. Cement 5 1/2'' casing with halliburton.nipple down to set slips on casing. Daily Cost: $428,029 Plug 2;30am Accumulator Pressure: 1900 PSI

23 APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 4/4/2011 Day # 23 Well Name University #1 H County Crockett Present Operation Rig Down Depth Ft. / Day Rotating Hours Ttl. Rotating Hrs /2 Brief Description Of Operations Nipple Down BOP. Set slips and cut off casing. Nipple up Tubing head and Jet and clean pits. Rig Down. Daily Cost: $21,455 Accumulator Pressure: PSI Released 6:00am 4/4/2011

24 1 UNIVERSITY H APRIL 14, ' LOG WELL /2" 11.6# N-80 Notched Pkr. CIBP CIBP MOVE IN RIG UP E+P WIRELINE TO LOG WELL.RUN IN HOLE WITH GAMA-RAY, CASING COLLAR AND CEMENT BOND LOGGING TOOLS. RUN DOWN TO 6100' PULL LOGS UP TO 3500'. FOUND TOP OF CEMENT AT ' AND SHORT JOINT FROM 5527' TO 5547'. PULL OUT OF HOLE RIG E+P WIRELINE DOWN FROM WELL. BWTR BWR BWUL 0 Daily Cost $12, Cum Completion Cost: $12,040.00

25 2 UNIVERSITY H ' RUN TBG /2" 11.6# N /8" 4.7# N-80 Notched Pkr. CIBP CIBP MIRU NABORS WELL SERVICES. PICK UP 4 3/4" DRILL BIT, RIH W/ 64 JTS OF PH-6 TBG AND 266 JTS OF P-110 TBG. TBG STOP FALLING IN HOLE AT 11495'. DECIDED TO SHUT DOWN OVERNIGHT BWTR BWR BWUL 0 Daily Cost $4, Cum Completion Cost: $16,540.00

26 3 UNIVERSITY H ' RUN TBG /2" 17# N /8" 4.7# N Notched Pkr. CIBP 12495' CIBP MOVE IN RIG UP WEATHERFORD POWER SWIVEL AND NABORS PUMP TRUCK. CONTINUE TO RUN IN HOLE WITH 300-JTS OF 2-7/8" CS HYDRILL TUBING. INSTAL -OVER AND RUN IN HOLE WITH 36-JTS OF 2-7/8" 8-RD UP SET TUBING.MIED FR MATERIAL AND CIRCULATED HOLE. TOTAL TUBING RUN 64-JTS OF PH 6 = 2034' 2034' 300-JTS OF CS HYDILL = ' 36-JTS OF 8-RD UP-SET = 1111' 12496' RIG POWER SWIVEL DOWN FROM WELL. RIG UP B- J SERVICES TO PICKLE TUBING. PUMP 500-GALS OF 15% NEFE HCL ACID DOWN TUBING. FLUSH ACID DOWN TUBING AND BACK THROUGH CASING WITH 290-BBLS OF 5% KCL WATER. RIG B-J SERVICES DOWN FROM WELL. PULL 20-JTS OF TUBING, NIPPLE DOWN B-O-P AND TUBING HANGER. NIPPLE UP NEW TUBING HANGER WITH 7-1/8" 10-K FLANGE. HANG TUBING IN WELL HEAD WITH WRAP AROUND. SHUT WELL IN OVER NIGHT. Max Torque Max drag - 60,000 before FR - 22,000 after FR BWTR BWR BWUL 0 Daily Cost $15, Cum Completion Cost: $30,790.00

27 4 UNIVERSITY H ' RUN TBG /2" 17# N /8" 4.7# N Notched Pkr. CIBP 12495' CIBP MET BJ SERVICES ON LOCATION. RIG UP ON TBG, PRESSURE WELL TO 7500 PSI TO SLIDE SLEEVE AT 12602'. AFTER SEVERAL ATTEMPTS SLEEVE OPENED WITH 9000 PSI. MET IN OFFICE TO DISCUSS PRE FRAC PROCEDURES WITH MANAGEMENT AND HALIBURTON PERSONEL. ON LOCATION, PREPARE WELL TO BE ACIDIZED. HALIBURTON COULD NOT ACIDIZE WELL TODAY SHUT WELL IN OVERNIGHT. BWTR BWR BWUL 0 Daily Cost $8, Cum Completion Cost: $39,090.00

28 5 UNIVERSITY H ' PERF WELL /2" 17# N /8" 4.7# N Notched Pkr. CIBP 12495' CIBP ON LOCATION, RIG UP APPROACH PUMP TRUCK TO WELL HEAD. PUMP 500 GALS OF 10% ACETIC ACID DOWN TBG AND DISPLACED ACID TO END OF TBG WITH 75 BBLS OF 5% KCL WATER. PULL TBG OUT OF HOLE LAYING DOWN. RIG UP HALIBURTON WIRELINE, PREPARED TO RUN IN HOLE WITH 3 1/8" CSG GUNS. CALLED IN TO FIND OUT WHEN PUMPTRUCKS WOULD BE ON LOCATION FOUND THAT THEY WOULD NOT BE ON LOCATION UNITIL 9:30 PM DECIDED TO SHUT DOWN OVER NIGHT. BWTR BWR BWUL 0 Daily Cost $5, Cum Completion Cost: $44,640.00

29 6 UNIVERSITY H ' PERF /2" 17# N /8" 4.7# N Notched Pkr. CIBP 12495' CIBP ON LOCATION, RIG UP HALLIBURTON WIRELINE AND HALIBURTON PUMP TRUCK TO WELL HEAD. RIH W/ 3 1/8: CSG GUNS TO 6100'. START PUMPING WATER TO PUMP GUNS DOWN HOLE. PUMP MA INJECTION RATE OUT AT 8 BPM WITH 5200 PSI. PUMP RATE WAS NOT STRONG ENOUGH TO GUNS TO END OF TBG. DECIDED TO SHUT DOWN AND PULL GUN OUT OF HOLE. COULD NOT FIND PUMPS FROM OTHER SERVICE COMPANY'S, HAD TO SHUT DOWN. DECIDED TO LET HALLIBURTON PUMP GUNS DOWN WITH FRAC TRUCKS ON SATURDAY BEFORE STARTING FRAC JOB. SHUT WELL IN RIG DOWN HALLIBURTON AND NABORS WELL SERVICE DOWN FROM WELL. BWTR BWR BWUL 0 Daily Cost $2, Cum Completion Cost: $47,140.00

30 7 UNIVERSITY H ' LOG AND PERF /2" 17# N /8" 4.7# N Notched Pkr. CIBP 12495' CIBP 12499' TO 12502' 12399' TO 12402' MIRU HALIBURTON FOR FRAC JOB. ATTENDED HALIBURTONS SAFETY MEETINGTHEN TESTED LINES TO 9000 PSI. RIH W/ GUNS, CEMENT BOND LOGS, AND PUMPING GUNS AT 12 BPM. HAD TO INCREASE RATE TO 15 BPM TO GET GUNS DOWN HOLE. SHOT PERFORATIONS AS FOLLOWS: 12499' TO 12502' WITH 6 SPF = 19 HOLES 12399' TO 12402' WITH 6 SPF = 19 HOLES 38 HOLES TOTAL CAME BACK OUT OF HOLE CLOSED IN WELL HEAD FOR NET DAY START. COMENTS: DOWN HOLE BLENDER NOT ON LOCATION YET AND STILL HAVE TO RIG UP 4 PUMPS FROM LAST SHOT WE LOG COMING OUT OF HOLE TO HAVE A MARKER TO GO BY WITH THE CSG TALLY. BWTR BWR BWUL 0 Daily Cost $1, Cum Completion Cost: $48,180.00

31 8 UNIVERSITY H ' PERF - FRAC /2" 17# N /8" 4.7# N Notched Pkr. CIBP 12340' 12499' TO 12502' 12399' TO 12402' 12299' TO 12302' 12199' TO 12202' 12099' TO 12102' 12495' CIBP STAGE 1 PUMPED AS FOLLOWS: TOOK 6886PSI TO BREAK FORMATION 4.3BPM SPEAR HEADED 3,500GALS OF 15% NE HCL ACID TO TOP OF PERFS SHUT DOWN TO FI WELL HEAD STARTED BACK UP ON PAD AND WENT WITH REGULAR SCHEDULE FROM THAT POINT OF JOB TOTAL FLUID INJECTED=223,212GALS TOTAL SAND INJECTED=312,229LBS MA TREATING PSI=6970PSI AVG TREATING PSI=6087PSI MA INJECTION RATE=78.7BPM AVG INJECTION RATE=72BPM ISIP=2754PSI 5 MIN=2693PSI 10 MIN=2683PSI 15 MIN=2577PSI SHUT IN WELL RIGGED UP WIRE LINE TO SET PLUG AND PERF AS FOLLOWS: RAN TO 12,340' SET PLUG PERF WELL AT 12099' TO 12,102 WITH 6SPF=19HOLES 12199' TO WITH 6SPF=19HOLES 12299' TO 12302' WITH 6SPF=19HOLES 57HOLES TOTAL WIRE LINE CAME OUT OF HOLE SHUT IN WELL FOR OVERNITE BWTR BWR BWUL 0 Daily Cost $1, Cum Completion Cost: $49,220.00

32 UNIVERSITY H ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' ' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 12495' STAGE2 STAGE 3 PUMPED AS FOLLOWS: TOOK 4578PSI TO BREAK FORMATION 4.3BPM SPEAR HEADED 3,500GALS OF 15% NE HCL ACID WITH BALL IN FRONT OF ACID MADE RATE ADJUSTMENTS FOR BALL TO HIT THEN STAGE INTO OUR PAD AND FOLLOW SCHEDULE TOTAL FLUID INJECTED=227,497GALS TOTAL SAND INJECTED=319,044LBS MA TREATING PSI=5969PSI AVG TREATING PSI=4393PSI MA INJECTION RATE=78.5BPM AVG INJECTION RATE=65BPM ISIP=2480PSI 5 MIN=2325PSI 10 MIN=2265PSI 15 MIN=2210PSI SHUT IN WELL RIGGED UP WIRE LINE TO SET PLUG AND PERF AS FOLLOWS: RAN TO 12,050' SET PLUG PERF WELL AT 11,799'' TO 11,802' WITH 6SPF=19HOLES 11,899' TO 11,902' WITH 6SPF=19HOLES 11,999' TO 12,002' WITH 6SPF=19HOLES 57HOLES TOTAL PUMPED AS FOLLOWS: TOOK 4265PSI TO BREAK FORMATION 5.3BPM PUMPED 3,500 GALS OF 15%NE HCL ACID BEHIND BALL WHEN BALL HIT MADE ADJUSTMENTS TO BE ON SCHEDULE AND PUMPED AS FOLLOWS: TOTAL FLUID INJECTED=224,574GALS TOTAL SAND INJECTED=312,144LBS MA TREATING PSI=6235PSI AVG TREATING PSI=4461PSI MA INJ=78BPM AVG RATE=62BPM ISIP=2373PSI 5 MIN=2170PSI 10 MIN=2088PSI 15 MIN=2032PSI RAN TO 11,760'' SET PLUG PERF WELL AT 11,499'' TO 11,502' WITH 6SPF=19HOLES (NET PAGE) BWTR BWR BWUL Daily Cost $1, Cum Completion Cost: $50,260.00

33 UNIVERSITY H ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' ' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 12495' 11,599' TO 11602' WITH 6SPF=19 HOLES STAGE 4 11,699' TO 11,702' WITH 6SPF=19 HOLES 57 HOLES TOTAL TOOK 4873PSI TO BREAK FORMATION AT 6.2BPM FOLLOWED UP WITH 3,500GALS OF 15%HCL ACID MA TREATING PSI=6274PSI AVG TREATING PSI=4305PSI MA INJECTION RATE=79.1BPM AVG INJECTION RATE=60BPM TOTAL SAND INJECTED=316,234LBS TOTAL FLUID INJECTED=230,303.9GALS ISIP=2502PSI 5 MIN=2438PSI 10 MIN=2383PSI 15 MIN=2328PSI SHUT IN WELL WIND TO HIGH FOR CRANE SET UP FOR AM START BWTR BWR BWUL Daily Cost $1, Cum Completion Cost: $50,260.00

34 9 UNIVERSITY H ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' ' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 12495' ' to 11102' WENT IN HOLE WITH GUNS AND FRAC PLUG PUMPED GUNS DOWN AT 12BPM AND A AVG PSI OF 2,430PSI STAGE 5 STAGE 6 PLUG AND PERFORATIONS WENT AS FOLLOWS:PLUG PERFS:11,199' 199' TO 11,202' WITH 6SPF=19HOLES 11,299' TO 11,302' WITH 6SPF=19HOLES 11,399' TO 11402' WITH 6SPF=19HOLES 57HOLES TOTAL DROPPED BALL CHASED IT WITH 3,500GALS OF 15% HCL 20BPM SLOWED RATE DOWN WHEN BALL WAS GOING TO HIT ONCE BALL HIT ESTABLISHED RATE ACCORDING TO BREAK BACK THEN WENT WITH SCHEDULE AS FOLLOWS:MA TREATING PSI=6,224PSI AVG TREATING PSI=4,359PSI MA INJECTION RATE=80BPM AVG INJECTION RATE=65BPM TOTAL FLUID INJECTED=235,069GALS TOTAL SAND INJECTED=292,877LBS TOOK 3,881PSI TO BREAK FORMATION AT 10BPM (LOST ONE PUMP TOLD IT COULD BE FIED) ISIP=2,448PSI 5 MIN=2,300PSI 10 MIN=2,245PSI 15 MIN=2,200PSI WENT IN HOLE WITH GUNS AND FRAC PLUG PUMPED GUNS DOWN AT 12BPM AND A AVG PSI OF 2,270PSI PLUG AND PERFORATIONS WENT AS FOLLOWS:PLUG PERFS:10,879' TO 10,882' WITH 6SPF=19HOLES 10,979' TO 10,982' WITH 6SPF=19HOLES 11,099' TO 11,102' WITH 6SPF=19HOLES 57HOLES TOTAL COMENTS:WE DID HAVE A MISS FIRE TOLD WIRE LINE TO COME OUT OF HOLE SLOW PLUG WAS STILL ON NET PAGE BWTR BWR BWUL Daily Cost $1, Cum Completion Cost: $51,300.00

35 9 UNIVERSITY H ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' ' 12050' 11760' ' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 12495' ' to 11102' STAGE 6 TOOK 3,807PSI TO BREAK FORMATION AT 9BPM WE CHASED BALL WITH 3,500GALS OF 15% HCL 15BPM SLOWED THE RATE DOWN TO 9BPM WHEN BALL WAS ABOUT TO HIT THEN CAME UP ON OUR RATE ACCORDING TO THE BREAKS IN FORMATION TO OUR SCHEDULED RATE AND FOLLOWED FRAC SCHEDULE AS FOLLOWS: MA TREATING PSI=5,867PSI AVG TREATING PSI=4,308PSI MA INJECTION RATE=79.9 AVG INJECTION RATE=63.0 TOTAL FLUID INJECTED=219,569GALS TOTAL SAND INJECTED=310,524LBS ISIP=2,458PSI 5 MIN=2,263PSI 10 MIN=2,211PSI 15 MIN=2,159PSI COMENTS:HP WAS SHORT MAKING ADJUSTMENTS AS WE WENT PUMPS GETTING HOT,LOSING ANTI FREEZE TURBO ON ONE PUMP ON FIRE AT ONE POINT WITH HALIBURTON CREW HAVING TO SHUT PUMP IN AND ATTEND TO PROBLEM.ON 4# SAND WE HAD TO BUMP RATE UP TO BREAK OVER HIGHER SAND CONS. BY DOING THIS PUMPS WERE GETTING OVERWORKED DUE TO LACK OF HP WE DID GET ALL SAND RAN RAN IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET FRAC PUMPED GUNS AVG PSI OF=2584PSI PERFS AS FOLLOWS: 10,579' TO 10,582' WITH 6SPF=19HOLES 10,679' TO 10,682' WITH 6SPF=19HOLES 10,779' TO 10,782' WITH 6SPF=19HOLES COMENTS: 57HOLES TOTAL PERFORATING WAS DELAYED DUE TO WIND,HALIBURTON WORKED ON PUMPS WAITING ON REPORT FROM THEM ABOUT HP FRAC WOULD BE DELAYED TILL THE AM BWTR BWR BWUL Daily Cost $1, Cum Completion Cost: $51,300.00

36 11 UNIVERSITY H ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' , ' ' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 10879' to 11102' STAGE 7 TOOK 4,242PSI TO BREAK FORMATION AND SEAT BALL AT 10BPM FOLLOWED BY 3,500GALS OF 15% HCL ACID ONCE ACID ON MADE ADJUSTMENTS ON RATE TO GET MAIMUM BREAKS IN FORMATION THEN FOLLOWED FRAC SCHEDULE AS FOLLOWS: MA TREATING PSI=6,537PSI AVG TREATING PSI=4,367PSI ISIP=2,515PSI 5 MIN=2,389PSI MA INJECTION RATE=80BPM AVG INJECTION RATE=64BPM 10 MIN=2,355PSI 15 MIN=2,334PSI TOTAL FLUID INJECTED=223,032GALS TOTAL SAND INJECTED=312,876LBS RAN IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET PERFS AS FOLLOW: 10,279' TO 10,282' WITH 6SPF =19HOLES 10,379' TO 10,382' WITH 6SPF =19HOLES 10,479' TO 10,482' WITH 6SPF =19HOLES 57HOLES TOTAL STAGE 8 TOOK 4,150PSI TO BREAK FORMATION AND SEAT BALL AT 10BPM FOLLOWED BY 3,500GALS OF 15% HCL ACID ONCE ACID ON MADE ADJUSTMENTS ON RATE TO GET MAIMUM BREAKS IN FORMATION THEN FOLLOWED FRAC SCHEDULE AS FOLLOWS: MA TREATING PSI=6,381PSI AVG TREATING PSI=4,434PSI ISIP=2,566PSI 5 MIN=2,553PSI MA INJECTION RATE=81.6BPM AVG INJECTION RATE=77BPM 10 MIN=2,534PSI 15 MIN=2,465PSI TOTAL FLUID INJECTED=267,033GALS TOTAL SAND INJECTED=312,715LBS RAN IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET PERFS AS FOLLOW: 9,979' TO 9,982' WITH 6SPF =19HOLES 10,079' TO 10,082 WITH 6SPF=19HOLES 10,170' TO 10,182' WITH 6SPF=19HOLES 57 HOLES TOTAL NET PAGE; BWTR BWR BWUL Daily Cost $1, Cum Completion Cost: $52,340.00

37 11 UNIVERSITY H ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' ' 12050' 11760' ' 10235' 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 12495' ' to 11102' COMENTS: WHEN SETTING PLUG DID NOT LOOK LIKE PLUG SET SO CAME OUT OF HOLE SLOW STAGE 9 PLUG WAS SET WENT BACK IN AND TAGGED PLUG AND SHOT PERFS TOOK 3.890PSI TO BREAK FORMATION AT 10BPM WITH 3,500GALS OF 15%HCL ACID BEHIND THE BALL CAME UP ON RATE AS FORMATION BROKE BACK TO THE SCHEDULE AS FOLLOWS: MA TREATING PSI=6,229PSI AVG TREATING PSI=4,294PSI MA INJECTION RATE=82BPM AVG INJECTION RATE=77BPM TOTAL FLUID INJECTED=209,030GALS ISIP = 2511 PSI 5 MIN = 2550 PSI 10 MIN = 2545 PSI 15 MIN = 2540 PSI COMENTS: WHEN ON 4# SAND PRESSURE WAS INCREASING SO WE CUT SAND EARLY FOR DESIGN SHUT DOWN FOR 4HRS FOR BREAK TO START STAGE 10 WIRE LINE PERFORATING WAS DELAYED DUE TO WIND,HALIBURTON WORKED ON PUMPS WAITING ON REPORT FORM THEM ABOUT HP FRAC WOULD BE DELAYED TILL THE AM BWTR BWR BWUL Daily Cost $1, Cum Completion Cost: $52,340.00

38 12 UNIVERSITY H ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' , ' 9630' 12495' ' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9382' 10879' to 11102' WENT IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET FRAC SHOT PERFS AS FOLLOWS:9,670' TO 9,682' WITH 6SPF 19HOLES AVG PUMP DOWN PSI=2570 9,779' TO 9,782' WITH 6SPF 19HOLES AVG PUMP DOWN RATE=13BPM 9,879' TO 9,882' WITH 6SPF 19HOLES 57HOLES TOTAL STAGE 10 TOOK 10BPM TO SEAT BALL AND BREAK FORMATION WITH 3,500GALS OF 15% HCL ACID BEHIND BALL CAME UP ON RATE AS FORMATION GAVE IN THEN FOLLOWED FRAC SHEDULE AS FOLLOWS: MA TREATING PSI=6,354PSI AVG TREATING PSI=4,463PSI MA INJECTION RATE=79BPM AVG INJECTION RATE=77BPM TOTAL FLUID INJECTED=220,330GALS TOTAL SAND INJECTED=309,417LBS COMENTS:CUT SAND ON 4# NOT RUNNING THE DESIGN DUE TO PSI ISIP=2,550PSI 5 MIN=2,489PSI 10 MIN=2,478PSI 15 MIN=2,352PSI WENT IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET FRAC SHOT PERFS AS FOLLOWS:9,379' TO 9,382' WITH 6SPF 19HOLES AVG PUMP DOWN PSI=2475PSI 9,479' TO 9,482' WITH 6SPF 19HOLES AVG PUMP DOWN RATE=13BPM 9,579' TO 9,582' WITH 6SPF 19HOLES 57HOLES TOTAL STAGE 11 TOOK 10BPM TO SEAT BALL AND BREAK FORMATION WITH 3,500GALS OF 15% HCL ACID BEHIND BALL CAME UP ON RATE AS FORMATION GAVE IN THEN FOLLOWED FRAC SHEDULE AS FOLLOWS: MA TREATING PSI=6,154PSI AVG TREATING PSI=4,392PSI MA INJECTION RATE=80BPM AVG INJECTION RATE=77BPM CONT NET PAGE BWTR BWR BWUL Daily Cost $1, Cum Completion Cost: $53,380.00

39 13 UNIVERSITY H ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' , ' 9630' 9250' 12495' ' 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 10879' to 11102' 8989' to 9192' HAD TO SHUT DOWN DUE TO THE WIND. BWTR BWR BWUL Daily Cost $0.00 Cum Completion Cost: $53,380.00

40 14 UNIVERSITY H /30/ ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' , ' 9630' 9250' 8650' 8350' 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 12495' ' 10879' to 11102' 8989' to 9192' WENT IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET FRAC SHOT PERFS AS FOLLOWS:8,389' TO 8,392' WITH 6SPF 19HOLES AVG PUMP DOWN PSI=2,615PSI 8,489' TO 8492' WITH 6SPF 19HOLES AVG PUMP DOWN RATE=13BPM 8,589 TO 8,592 WITH 6SPF 19HOLES 57HOLES TOTAL STAGE 14 TOOK 10BPM TO SEAT BALL AND BREAK FORMATION WITH 3,500GALS OF 15% HCL ACID BEHIND BALL CAME UP ON RATE AS FORMATION GAVE IN THEN FOLLOWED FRAC SHEDULE AS FOLLOWS: MA TREATING PSI=5,336PSI AVG TREATING PSI=3,940PSI MA INJECTION RATE=79BPM AVG INJECTION RATE=76BPM TOTAL FLUID INJECTED=237,875GALS TOTAL SAND INJECTED=313,081LBS COMENTS: WHEN WE STARTED ON PAD WE COULD NOT MOVE GEL SHUT DOWN TO FI ISIP=2,468PSI 5 MIN=2,443PSI 10 MIN=2,410PSI 15 MIN=2,352PSI WENT IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET FRAC SHOT PERFS AS FOLLOWS:8,089' TO 8,092' WITH 6SPF 19HOLES AVG PUMP DOWN PSI=2480PSI 8,189' TO 8,192' WITH 6SPF 19HOLES AVG PUMP DOWN RATE=13BPM 8,289' TO 8,292' WITH 6SPF 19HOLES 57HOLES TOTAL STAGE 15 TOOK 10BPM TO SEAT BALL AND BREAK FORMATION WITH 3,500GALS OF 15% HCL ACID BEHIND BALL CAME UP ON RATE AS FORMATION GAVE IN THEN FOLLOWED FRAC SHEDULE AS FOLLOWS: MA TREATING PSI=5,260PSI AVG TREATING PSI=4,031PSI MA INJECTION RATE=78BPM AVG INJECTION RATE=77BPM CONT NET PAGE BWTR BWR BWUL Daily Cost $4,361, Cum Completion Cost: $4,414,567.00

41 14 UNIVERSITY H /30/ ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' , ' 9630' 9250' 8650' 8350' 8050' 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 7789' to ' ' 10879' to 11102' 8989' to 9192' CONT 15 TOTAL SAND INJECTED=314,713LBS TOTAL FLUID INJECTED=206,268GALS ISIP=2,466PSI 5 MIN=2,488PSI 10 MIN=2,462PSI 15 MIN=2,431PSI COMENTS:STAGE WENT VERY WELL FOLLOWED FRAC SCHEDULE GOOD FLUSH WENT IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET PUMP DOWN AVG PSI=2,480PSI PUMP DOWN AVG RATE=13.2BPM SHOT PERFS AS FOLLOWS: 7,789'' TO 7,792'' WITH 6SPF 19HOLES 7,869' TO 7,872'' WITH 6SPF 19HOLES 7,985' TO 7,992' WITH 6SPF 19HOLES 57HOLES TOTAL STAGE 16 TOOK 3250PSI TO BREAK FORMATION AND SEAT BALL AT 10BPM CHASING BALL WITH 3,500GALS OF 15%HCL ACID ONCE ACID ON FORMATION MADE RATE CHANGES AS FORMATION BROKE THEN FOLLOWED FRAC SCHEDULE AS FOLLOWS:MA INJECTION RATE 78BPM AVG INJECTION RATE=77BPM MA TREATING PSI=5,399PSI AVG TREATING PSI=4,182PSI TOTAL SAND INJECTED=315,495LBS TOTAL FLUID INJECTED=205,774GALS ISIP=2,671PSI 5 MIN=2,593PSI 10 MIN=2,491PSI 15 MIN=2,482PSI COMENTS:BEFORE THE STAGE THE FRAC VAN SHUT DOWN ON US WITH OUT STARTING ANYTHING THEY CHECKED OUT THE COMPUTER SYSTEM AND WENT AHEAD AND PUMPED JOB CONT NET PAGE BWTR BWR BWUL Daily Cost $4,361, Cum Completion Cost: $4,414,567.00

42 14 UNIVERSITY H /30/ ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' , ' 9630' 9250' 8650' 8350' 8050' 7730' 7430' 12495' ' 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 7789' to ' to 7692' 10879' to 11102' 8989' to 9192' 7189' to 7392' WENT IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET PUMP DOWN AVG PSI=2,585PSI PUMP DOWN AVG RATE=13.2BPM SHOT PERFS AS FOLLOWS:7,489' TO 7,492' WITH 6SPF 19HOLES 7,589' TO 7,592' WITH 6SPF 19HOLES 7,689' TO 7,692' WITH 6SPF 19HOLES 57HOLES TOTAL STAGE 17 TOOK 3,780PSI TO BREAK FORMATION AND SEAT BALL CHASING BALL WITH 3,500GALS OF 15% HCL ACID AT 10BPM MAKING RATE ADJUSTMENTS AS ACID GETS ON FORMATION THEN FOLLOW FRAC SCHEDULE AS FOLLOWS: MA TREATING PSI=5,243PSI AVG TREATING PSI=4,015PSI MA INJECTION RATE=82BPM AVG INJECTION RATE=80BPM TOTAL FLUID INJECTED=211,873GALS TOTAL SAND INJECTED=310,146LBS ISIP=2,465PSI 5 MIN=2,444PSI 10 MIN=2,375PSI 15 MIN=2,320PSI COMENTS:WE LOST THE HOPPER TWO TIMES IN 3# SAND WE THE GOT THE HOPPER BACK AND WE KNEW THAT WE COULD GET BACK INTO FORMATION DECIDED TO RAMP OUR SAND SINCE SAND CONS. WAS SO LOW WE RAMPED SAND FROM A 2.6 TO GET TO A 4# SYSTEM WORKED WELL GOT OUR FORMATION TO TAKE OUR PLANED SAND VOLUME OF 4# SAND WENT IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET PUMP DOWN AVG PSI=2,628PSI PUMP DOWN AVG RATE=13.2BPM SHOT PERFS AS FOLLOWS:7,189' TO 7,192' WITH 6SPF 19HOLES 7,289' TO 7,292' WITH 6SPF 19HOLE 7,389' TO 7,392' WITH 6SPF 19HOLES:57HOLES TOTAL BWTR BWR BWUL Daily Cost $4,361, Cum Completion Cost: $4,414,567.00

43 14 UNIVERSITY H /30/ ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' , ' 9630' 9250' 8650' 8350' 8050' 7730' 7430' 12495' ' 7130' 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 7789' to ' to 7692' 6889' to 7092' 10879' to 11102' 8989' to 9192' 7189' to 7392' STAGE 18 TOOK 3,290PSI TO BREAK FORMATION AND SEAT BALL AT 10BPM CHASING BALL WITH 3,500GALS OF 15%HCL ACID ONCE ACID ON FORMATION MADE RATE CHANGES AS FORMATION BROKE THEN FOLLOWED FRAC SCHEDULE AS FOLLOWS:MA INJECTION RATE 81BPM AVG INJECTION RATE=79BPM MA TREATING PSI=5,276PSI AVG TREATING PSI=3,965PSI TOTAL SAND INJECTED=297,531LBS TOTAL FLUID INJECTED=199,317GALS ISIP=2,691PSI 5 MIN=2,575PSI 10 MIN=2,533PSI 15 MIN=2,503PSI COMENTS:WE MADE A FEW ADJUSTMENTS WITH THE SAND CONVEYER STOPPING AND STARTING WHEN SAND CONC. WENT DOWN ON OTTAWA SAND WE STEPPED UP TO 4# TO MAKE IT BACK UP AND STAYED OF 4# LONGER THAN SCHEDULE TO MAKE UP THE SAND IN FORMATION WENT IN HOLE WITH GUNS AND FRAC PLUG AND CCL AND SET 7,130' PUMP DOWN RATE=13BPM PUMP DOWN AVG PSI= 2,620PSI SHOT PERFS AS FOLLOWS:6,889' TO 6,892' WITH 6SPF 19HOLES 6,989' TO 6,992 WITH 6 SPF 19HOLES 7,089' TO 7,092' WITH 6SPF 19HOLES 57HOLES TOTAL STAGE 19 TOOK 3,345PSI TO BREAK FORMATION AND SEAT BALL AT 10BPM CHASING BALL WITH 3,500GALS OF 15%HCL ACID ONCE ACID ON FORMATION MADE RATE CHANGES AS FORMATION BROKE THEN FOLLOWED FRAC SCHEDULE AS FOLLOWS:MA INJECTION RATE 77BPM AVG INJECTION RATE=77BPM MA TREATING PSI=5,259PSI AVG TREATING PSI=3,777PSI TOTAL SAND INJECTED=318,087LBS TOTAL FLUID INJECTED=198,812GALS ISIP=2,696PSI 5 MIN=2,530PSI 10 MIN=2,503PSI 15 MIN=2,474PSI BWTR BWR BWUL Daily Cost $4,361, Cum Completion Cost: $4,414,567.00

44 14 UNIVERSITY H /30/ ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' , ' 9630' 9250' 8650' 8350' 8050' 7730' 7430' 12495' ' 7130' 6828' 6530' 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 7789' to ' to 7692' 6889' to 7092' 6589' to 6792' 6285' to 6492' 10879' to 11102' 8989' to 9192' 7189' to 7392' WENT IN HOLE WITH GUNS AND FRAC PLUG AND CCL SET PUMP DOWN AVG PSI=2,609PSI PUMP DOWN AVG RATE=13.2BPM SHOT PERFS AS FOLLOWS:6,589' TO 6,592' WITH 6SPF 19HOLES 6,689' TO 6,692' WITH 6SPF 19HOLES 6,789' TO 6,792' WITH 6SPF 19HOLES 57HOLES TOTAL STAGE 20 TOOK 3,896PSI TO BREAK FORMATION AND SEAT BALL CHASING BALL WITH 3,500GALS OF 15% HCL ACID AT 10BPM MAKING RATE ADJUSTMENTS AS ACID GETS ON FORMATION THEN FOLLOW FRAC SCHEDULE AS FOLLOWS: MA TREATING PSI=5,034PSI AVG TREATING PSI=3,825PSI MA INJECTION RATE=78.6BPM AVG INJECTION RATE=76.8BPM TOTAL FLUID INJECTED=201,619GALS TOTAL SAND INJECTED=314,673LBS ISIP=2,737PSI 5 MIN=2,605PSI 10 MIN=2,528PSI 15 MIN=2,480PSI WENT IN HOLE WITH GUNS AND FRAC PLUG AND CCL AND SET PUMP DOWN AVG PSI=2,580PSI PUMP DOWN AVG RATE=13.2BPM SHOT PERFS AS FOLLOWS:6,285' TO 6,292' WITH 6SPF 19HOLES 6,389' TO 6,392' WITH 6SPF 19HOLES 6,489' TO 6,492' WITH 6SPF 19HOLES 57HOLE TOTAL STAGE 21 TOOK 3,646PSI TO BREAK FORMATION AND SEAT BALL CHASING BALL WITH 3,500GALS OF 15% HCL ACID AT 10BPM MAKING RATE ADJUSTMENTS AS ACID GETS ON FORMATION THEN FOLLOW FRAC SCHEDULE AS FOLLOWS: MA TREATING PSI=5,034PSI AVG TREATING PSI=0PSI MA INJECTION RATE=78.6BPM AVG INJECTION RATE=77BPM BWTR BWR BWUL Daily Cost $4,361, Cum Completion Cost: $4,414,567.00

45 14 UNIVERSITY H /30/ ' PERF - FRAC /2" 17# N /8" 4.7# N ' 12050' 11760' , ' 9630' 9250' 8650' 8350' 8050' 7730' 7430' 12495' ' 7130' 6828' 6530' 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 7789' to ' to 7692' 6889' to 7092' 6589' to 6792' 6285' to 6492' 10879' to 11102' 8989' to 9192' 7189' to 7392' STAGE 21 TOTAL SAND INJECTED=275,311LBS TOTAL FLUID INJECTED=195,313GALS CON ISIP=2,628PSI 5 MIN=2,371PSI 10 MIN= 2.301PSI 15 MIN=2,242PSI COMENTS: STILL WAITING FOR TICKET AND FINAL TREATMENT REPORT ON STAGE 21 TOTAL FLUID TO RECOVER =108,758BBLS FLOWING WELL BACK : SOUTHWEST WELL TENDING REPORT TIME: 6:00 AM 5/1/11 DOWN SALES LINE: N TBG PSI: 0 CSG PSI: 1820 RATE: 72 BWPH 0 BOPH Co2: 0 CHOKE: 14/64 FLUID RECOVERED LAST 24 HRS: 81 BW 0 BO TOTAL FLUID RECOVERED: 81 BW 0 BO TOTAL SAND INJECTED: MESH = OTTAWA 20/40 = SUPER LC 20/40 = WHITE 20/40 = BWTR BWR 81 BWUL Daily Cost $4,361, Cum Completion Cost: $4,414,567.00

46 15 UNIVERSITY H ' FLOW BACK /2" 17# N /8" 4.7# N ' 12050' 11760' , ' 9630' 9250' 8650' 8350' 8050' 7730' 7430' 12495' ' 7130' 6828' 6530' 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 7789' to ' to 7692' 6889' to 7092' 6589' to 6792' 6285' to 6492' 10879' to 11102' 8989' to 9192' 7189' to 7392' FLOWING WELL BACK : SOUTHWEST WELL TENDING REPORT TIME: 6:00 AM 5/2/11 DOWN SALES LINE: N TBG PSI: 0 CSG PSI: 1200 RATE: 74 BWPH 0 BOPH Co2: 0 CHOKE: 16/64 FLUID RECOVERED LAST 24 HRS: 1805 BW 0 BO TOTAL FLUID RECOVERED: 1886 BW 0 BO BWTR BWR 1886 BWUL Daily Cost $1, Cum Completion Cost: $4,415,567.00

47 16 UNIVERSITY H ' DRILL PLUGS /2" 17# N ' 12050' 11760' , ' 9630' 9250' 8650' 8350' Drilled 8050' Drilled 7730' Drilled 7430' Drilled ' 7130' Drilled 6828' Drilled 6530' Drilled 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 7789' to ' to 7692' 6889' to 7092' 6589' to 6792' 6285' to 6492' 10879' to 11102' 8989' to 9192' 7189' to 7392' MOVE IN HALLIBURTON COIL TUBING UNIT AND RIGG THEM UP AND ATTEND SAFETY MEETING STARTED IN HOLE WITH COIL BROKE CIRCULATION STARTED IN AFTER FIRST PLUG TAGGED FIRST WITH A CIRCULATE PSI OF 2,722PSI AND A RATE OF 2BBLS IN AND 4BBLS OUT DRILLED THREW PLUG WITH WELL HEAD PSI 801 THEN RAN A GEL SWEEP HEADING TO NET PLUG TAGGED WITH A CIRCULATE PSI OF 3,384PSI AND A RATE OF 2BBLS IN AND 4BBLS OUT DRILLED THREW PLUG WITH WELL HEAD PSI 840 THEN RAN A GEL SWEEP HEADING TO NET PLUG TAGGED NET THEN SHORT TRIPPED TO 5,200' AND WENT BACK IN HOLE TO 7,107 AND 4BBLS OUT WITH A WELLHEAD PSI OF 690 TAGGED 7,407' WITH A CIRCULATE PSI OF 4,100 AND A RATE OF 2.5BLS IN AND 4 BBLS OUT DRILLED THREW PLUG WITH WELL HEAD PSI 767 THEN RAN GEL SWEEP HEADING TO NET PLUG TAGGED NET THEN SHORT TRIPPED TO 5,200' AND WENT BACK IN HOLE TO 7,706' DRILLED THREW PLUG WITH 4,670 CIRCULATING PSI AND A RATE OF 2BBLS IN AND 3BBLS OUT WITH A WELL HEAD PSI 792 THEN RAN GEL SWEEP AND CLEANED OUT CHOKE DROPPING OUR CIRCULATING PSI TO 3,860 AND WELL HEAD TO 700 PSI AND HEADED TO NET PLUG TAGGED 8,029' WITH A CIRCULATE PSI OF 3,465 AND A RATE OF 2BLS IN AND 4 BBLS OUT WITH A WELL HEAD PSI 678 THEN RAN GEL SWEEP HEADING TO NET PLUG BWTR BWR 1886 BWUL Daily Cost $1, Cum Completion Cost: $4,415,567.00

48 16 UNIVERSITY H ' DRILL PLUGS /2" 17# N /8" 4.7# N ' 12050' 11760' , ' 9630' 9250' 8650' 8350' Drilled 8050' Drilled 7730' Drilled 7430' Drilled 12495' ' 7130' Drilled 6828' Drilled 6530' Drilled 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 7789' to ' to 7692' 6889' to 7092' 6589' to 6792' 6285' to 6492' 10879' to 11102' 8989' to 9192' 7189' to 7392' TAGGED THEN SHORT TRIPPED TO 5200' RAN BACK IN HOLE TO 8,330' END OF REPORT FOR THE DAY FLOWING WELL BACK : SOUTHWEST WELL TENDING REPORT TIME: 6:00 AM 5/3/11 DOWN SALES LINE: N TBG PSI: 0 CSG PSI: 640 RATE: 101 BWPH 123 BWIPH Co2: 0 CHOKE: 45/64 FLUID RECOVERED LAST 24 HRS: 2238 BW 2147 BW INJECTED TOTAL FLUID RECOVERED: 4168 BW 2147 BW INJECTED BWTR BWR 4168 BWUL Daily Cost $1, Cum Completion Cost: $4,415,567.00

49 17 UNIVERSITY H ' DRILL PLUGS /2" 17# N /8" 4.7# N ' 12050' 11760' Drilled 9930' Drilled 9630' Drilled 9250' Drilled 8650' Drilled 8350' Drilled 8050' Drilled 7730' Drilled 7430' Drilled 12495' ' Drilled 7130' Drilled 6828' Drilled 6530' Drilled 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 7789' to ' to 7692' 6889' to 7092' 6589' to 6792' 6285' to 6492' 10879' to 11102' 8989' to 9192' 7189' to 7392' WENT BACK IN HOLE WITH NEW BIT ON SHORT TRIP DRILLED PLUG WITH A CIRCULATING PSI OF 2,180 AND A RATE OF 2.5BBLS IN AND 3.5 OUT AND A WELL HEAD PSI OF 582 THREW PLUG THEN RAN A GEL SWEEP HEADING TO NET PLUG TAGGED PLUG WAS SUPPOSE TO DETERMINED THAT WE WERE PUSHING NUMBER SEVEN PLUG DOWN TO IT DRILL THREW IT WITH A CIRCULATING PSI OF 3,100 AND A RATE OF 2BBLS IN AND 3BBLS OUT AND WELL HEAD PSI OF 623 THEN RAN A GEL SWEEP HEADING TO NET PLUG TAGGED NET DRILLED THREW IT WITH A CIRCULATING PSI OF 2,600 AND A RATE OF 2.5BBLS IN AND 3.5BBLS OUT AND WELL HEAD PSI OF 624 THEN RAN GEL SWEEP HEAD TAGGED THEN CAME OUT FOR A SHORT TRIP THEN BACK IN HOLE TO 9,238' DRILLED THREW PLUG WITH A CIRCULATING PSI OF 2,764 AND A RATE OF 2BBLS IN AND 3.5BBLS OUT AND A WELL HEAD PSI OF 581 AND THEN RAN A GEL SWEEP TAGGED 9,630' WITH A CIRCULATE PSI OF 2,914 AND A RATE OF 2BLS IN AND 4 BBLS OUT AND A WELL HEAD PSI OF 606 AND THEN RAN A GEL SWEEP HEADING TO NET PLUG TAGGED THEN CAME OUT FOR A SHORT TRIP THEN BACK IN HOLE TO 9,930' DRILLED THREW PLUG WITH A CIRCULATING PSI OF 2,560 AND A RATE OF 2BBLS IN AND 3BBLS OUT AND A WELL HEAD PSI OF 573 THEN RAN A GEL SWEEP HEADING TO NET PLUG TAGGED WITH A CIRCULATING PSI OF 2,800 AND A RATE OF 2BBLS IN AND BWTR BWR 6429 BWUL Daily Cost $1, Cum Completion Cost: $4,415,567.00

50 17 UNIVERSITY H ' DRILL PLUGS /2" 17# N /8" 4.7# N ' 12050' 11760' Drilled 9930' Drilled 9630' Drilled 9250' Drilled 8650' Drilled 8350' Drilled 8050' Drilled 7730' Drilled 7430' Drilled 12495' ' Drilled 7130' Drilled 6828' Drilled 6530' Drilled 12499' to 12402' 12099' to 12302' 11799' to 12002' 11499' to 11702' 11199' to 11402' 10579' to 10782' 10279' to 10483' 9979' to 10182' 9670' to 9882' 9379' to 9582' 8689' to 8892' 8389' to 8592' 8089' to 8292' 7789' to ' to 7692' 6889' to 7092' 6589' to 6792' 6285' to 6492' 10879' to 11102' 8989' to 9192' 7189' to 7392' 4BBLS OUT WITH A WELL HEAD PSI OF 585 THEN RAN A GEL SWEEP HEADING TO NET PLUG TAGGED THEN CAME OUT OF HOLE FOR SHORT TRIP END OF REPORT FOR DAY FLOWING WELL BACK : SOUTHWEST WELL TENDING REPORT TIME: 6:00 AM 5/4/11 DOWN SALES LINE: N TBG PSI: 0 CSG PSI: 420 RATE: 170 BWPH 149 BWIPH Co2: 0 CHOKE: 41/64 FLUID RECOVERED LAST 24 HRS: 2305 BW 3005 BW INJECTED NET RECOVERED 5310 TOTAL FLUID RECOVERED: 6429 BW 5152 BW INJECTED NET RECOVERED BWTR BWR 6429 BWUL Daily Cost $1, Cum Completion Cost: $4,415,567.00

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford 2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

Completion Solutions Inc.

Completion Solutions Inc. Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi Ballistics on Tractor Conveyance Brian Schwanitz- VP Welltec MENAPS 2011, Abu Dhabi Outline Tractor Activity with Ballisticservices Tractor and Ballistic Safe Sub Operation Addressable Switches and Related

More information

Composite Plugs. Index

Composite Plugs. Index Composite Plugs Downhole Isolation Tools - Multi-Stage Operations Index Rapid Mill Ball Drop... 1-2 Rapid Mill Flo-Back Flapper... 3-4 Series (Ball Drop, Bridge, Flo-Back, Flo-Back with Bio-Ball)... 5-6

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

Casing Scraper. Service Equipment. Features

Casing Scraper. Service Equipment. Features Casing Scraper The Casing Scraper is a spring type, mechanical casing scraper, featuring a large by-pass area between the blades to allow circulation of debris. The body is constructed of the highest quality

More information

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

TABLE OF CONTENT. Description

TABLE OF CONTENT. Description TABLE OF CONTENT Description Page OQLH Liner Hanger Packer Combo 1 Set Liner Packer Hydraulic or Mechanical Set 2 Quartus QLG Liner Extension Assembly 3 Quartus Liberty Liner Hangers Single & Dual Cone

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

LEE NAK GUI TCP SERVICE COORDINATOR APPS

LEE NAK GUI TCP SERVICE COORDINATOR APPS Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

WLTC Retrievable Bridge Plug

WLTC Retrievable Bridge Plug service Tools WLTC Retrievable Bridge Plug The WLTC Retrievable Bridge Plug is designed to perform all tasks normally required of a tubing run packer-type bridge plug and can be quickly converted to run

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 2 Brand Wilson Power: 550 HP Year: 1982 (Repotenciado en el 2009) Double Drum: Drawworks and Sandline Drums

More information

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500 SCHEDULE 1 DATE: NOVEMBER 2018 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

NeoProducts, LLC New Orleans, LA USA Ph:

NeoProducts, LLC New Orleans, LA USA Ph: NeoHybridPositiveDisplacementBailer Systems General Preparation & Run-in Procedures (NeoHybridPDB Systems) Document # ********************************************************************************************

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 4 Brand Taylor Power: 500 HP Year: 2004 Double Drum: Drawworks and Sandline Drums : Self-propelled Land Rig

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

DeltaBase 540 Technical Data Sheet

DeltaBase 540 Technical Data Sheet Release Date: May 10th, 2008 Page 1 of 7 PRODUCT OVERVIEW The DeltaBase 540 is a powerful and versatile Multipurpose drill rig. With the ability to perform coring, DTH drilling, rotary flush, auger drilling

More information

APPENDIX A TOOLS AND RECORDS

APPENDIX A TOOLS AND RECORDS A-i APPENDIX A TOOLS AND RECORDS A - 1 A - 2 A - 3 A - 4 A - 5 A - 6 A - 7 A - 8 A - 9 A - 10 A - 11 A - 12 A - 13 A - 14 A - 15 A - 16 API pump Designations. API Sizes of Pumping Unit Designations. Pump

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 6 Brand Loadcraft Power: 550 HP Year: 2013 Double Drum: Drawworks and Sandline Drums : Self-propelled Land

More information

Understanding & Calculating the Impact of Oil-Related Traffic

Understanding & Calculating the Impact of Oil-Related Traffic Understanding & Calculating the Impact of Oil-Related Traffic Jack Olson, Asst. Director Planning/Asset Management Division ND Department of Transportation Bismarck, ND October 26, 2011 1. An overview

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

Intervention Barriers

Intervention Barriers Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective

More information