END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

Size: px
Start display at page:

Download "END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:"

Transcription

1 UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of Well Report: UL G 9-46 Unit 2H

2 UL G 9-46 Unit 2H END OF WELL REPORT Well Profile Breakdown Highlights 12 1/4 Vertical (BHA #1) Drilled from 4343 MD to 4409 MD 66 Drilled in 2.75 hours (Slide & Rotary) Rotation Footage 44 Slide Footage 22 Average Total ROP 24 ft/hr Average Rotary ROP 33 ft/hr Average Slide ROP ft/hr Slide Percentage: 33.33% 12 1/4 Vertical (BHA #2) Drilled from 4409 MD to 4409 MD 0 Drilled in 0 hours (Slide & Rotary) Rotation Footage 0 Slide Footage 0 Average Total ROP 0 ft/hr Average Rotary ROP 0 ft/hr Average Slide ROP 0 ft/hr Slide Percentage: 0% 12 1/4 Vertical (BHA #3) Drilled from 4409 MD to 6915 MD 2506 Drilled in hours (Slide & Rotary) Rotation Footage 2328 Slide Footage 178 Average Total ROP ft/hr Average Rotary ROP ft/hr Average Slide ROP ft/hr Slide Percentage: 7.1% 12 1/4 Vertical (BHA #4) Drilled from 0 MD to 0 MD 0 Drilled in 0 hours (Slide & Rotary) Rotation Footage 0 Slide Footage 0 Average Total ROP 0 ft/hr of Well Report: UL G 9-46 Unit 2H

3 UL G 9-46 Unit 2H END OF WELL REPORT Average Rotary ROP 0 ft/hr Average Slide ROP 0 ft/hr Slide Percentage: 0% 12 1/4 Vertical (BHA #5) Drilled from 6917 MD to 7653 MD 736 Drilled in hours (Slide & Rotary) Rotation Footage 599 Slide Footage 139 Average Total ROP ft/hr Average Rotary ROP ft/hr Average Slide ROP 8.26 ft/hr Slide Percentage: 18.61% 12 1/4 Vertical (BHA #6) Drilled from 7653 MD to 8430 MD 777 Drilled in hours (Slide & Rotary) Rotation Footage 732 Slide Footage 45 Average Total ROP ft/hr Average Rotary ROP ft/hr Average Slide ROP 9.31 ft/hr Slide Percentage: 5.79% 12 1/4 Vertical (BHA #7) Drilled from 8430 MD to 9900 MD 1470 Drilled in hours (Slide & Rotary) Rotation Footage 1470 Slide Footage 0 Average Total ROP ft/hr Average Rotary ROP ft/hr Average Slide ROP 0 ft/hr Slide Percentage: 0% of Well Report: UL G 9-46 Unit 2H

4 UL G 9-46 Unit 2H END OF WELL REPORT 8 3/4 Curve (BHA #8) Drilled from 9940 MD to MD 898 Drilled in hours (Slide & Rotary) Rotation Footage 383 Slide Footage 515 Average Total ROP ft/hr Average Rotary ROP ft/hr Average Slide ROP ft/hr Slide Percentage: 57.35% 8 3/4 Curve (BHA #9) Drilled from MD to MD 2083 Drilled in hours (Slide & Rotary) Rotation Footage 1639 Slide Footage 444 Average Total ROP ft/hr Average Rotary ROP ft/hr Average Slide ROP ft/hr Slide Percentage: 21.32% 8 3/4 Lateral (BHA #10) Drilled from MD to MD 1987 Drilled in hours (Slide & Rotary) Rotation Footage 1368 Slide Footage 619 Average Total ROP ft/hr Average Rotary ROP ft/hr Average Slide ROP ft/hr Slide Percentage: 31.15% 8 3/4 Lateral (BHA #11) Drilled from MD to MD 4263 Drilled in hours (Slide & Rotary) Rotation Footage 3973 Slide Footage 290 Average Total ROP ft/hr Average Rotary ROP ft/hr Average Slide ROP 9.89 ft/hr Slide Percentage: 6.8% of Well Report: UL G 9-46 Unit 2H

5 UL G 9-46 Unit 2H END OF WELL REPORT BHA Breakdown BHA #1: Bit: Smith XS716S 7x15 Motor: NOV 8, 7/8 4.0, 1.50 Stab.17 Total Footage: 66 Drilling Hours: 2.75 Slide Footage: 22 Slide Footage Percentage: 33.33% Slide Hours: 1.42 Slide Hours Percentage: 51.52% BHA #2: Bit: Smith Motor: Paradigm 8.0, 7/8 4.0 FBH 1.5 Stab.17 Total Footage: 0 Drilling Hours: 0 Slide Footage: 0 Slide Footage Percentage: 0% Slide Hours: 0 Slide Hours Percentage: 0% BHA #3: Bit: Smith XS716S 7x15 Motor: Paradigm 7/ NBS.17 Total Footage: 2506 Drilling Hours: Slide Footage: 178 Slide Footage Percentage: 7.10% Slide Hours: Slide Hours Percentage: 23.82% BHA #4: Bit: Smith XS7-16S Motor: NOV 7/ ¾ NBS Total Footage: 0 Drilling Hours: 0 Slide Footage: 0 Slide Footage Percentage: 0% Slide Hours: 0 Slide Hours Percentage: 0% of Well Report: UL G 9-46 Unit 2H

6 UL G 9-46 Unit 2H END OF WELL REPORT BHA #5: Bit: Smith XS716S 7x15 Motor: NOV 7/ NBS Total Footage: 736 Drilling Hours: Slide Footage: 137 Slide Footage Percentage: 18.61% Slide Hours: Slide Hours Percentage: 59.94% BHA #6: Bit: Drillformance DF616X2 6x16 Motor: NOV 8.0, 6/7 5.0 FBH 1.5 Slick Sleeve.18 Total Footage: 777 Drilling Hours: Slide Footage: 45 Slide Footage Percentage: 5.79% Slide Hours: 4.83 Slide Hours Percentage: 25.11% BHA #7: Bit: Smith SSi716 Motor: Renegade 8 7/ Slick.16 Total Footage: 1470 Drilling Hours: Slide Footage: 0 Slide Footage Percentage: 0% Slide Hours: 0 Slide Hours Percentage: 0% BHA #8: Bit: Ulterra U516M 5x16 Motor: NOV 6 ¾ 7/ Total Footage: 898 Drilling Hours: Slide Footage: 515 Slide Footage Percentage: 57.35% Slide Hours: Slide Hours Percentage: 67.56% of Well Report: UL G 9-46 Unit 2H

7 UL G 9-46 Unit 2H END OF WELL REPORT BHA #9: Bit: Ulterra U613M Motor: NOV 4 ¾ 7/ Total Footage: 2083 Drilling Hours: Slide Footage: 444 Slide Footage Percentage: 21.32% Slide Hours: Slide Hours Percentage: 49.36% BHA #10: Bit: Smith MDi513 3x18 3x12 Motor: Dynomax 5 7/ SlkSlv Total Footage: 1987 Drilling Hours: Slide Footage: 619 Slide Footage Percentage: 31.15% Slide Hours: Slide Hours Percentage: 56.94% BHA #11: Bit: Smith MDi613 3x12 3x16 Motor: NOV 4.75, 7/8 3.8 FBH 1.5 Slick Sleeve Total Footage: 4263 Drilling Hours: Slide Footage: 290 Slide Footage Percentage: 6.8% Slide Hours: Slide Hours Percentage: 37.93% of Well Report: UL G 9-46 Unit 2H

8 UL G 9-46 Unit 2H END OF WELL REPORT Days vs Depth of Well Report: UL G 9-46 Unit 2H

9 UL G 9-46 Unit 2H END OF WELL REPORT Days vs. Depth Depth (ft) (Days) of Well Report: UL G 9-46 Unit 2H

10 UL G 9-46 Unit 2H END OF WELL REPORT Section Analysis of Well Report: UL G 9-46 Unit 2H

11 UL G 9-46 Unit 2H END OF WELL REPORT 12 1/4" Vertical Hours Footage BHA #1 - Smith XS716S BHA #2 - Reed SK716M BHA #3 Smith XS716S BHA #4 Smith XS716S BHA #5 Smith XS716S BHA #6 Drillformance DF616 of Well Report: UL G 9-46 Unit 2H

12 UL G 9-46 Unit 2H END OF WELL REPORT 8 1/2" Curve BHA 8 Ulterra U516M BHA 9 Ulterra U613M of Well Report: UL G 9-46 Unit 2H

13 UL G 9-46 Unit 2H END OF WELL REPORT 8 1/2" Lateral BHA 10 Smith MDi513 BHA 11 Smith MDi613 of Well Report: UL G 9-46 Unit 2H

14 UL G 9-46 Unit 2H END OF WELL REPORT BHA Breakdown of Well Report: UL G 9-46 Unit 2H

15 UL G 9-46 Unit 2H END OF WELL REPORT Total Footage Slide footage Total Slide Footage % Drilling Hours Slide Hours Total Slide Hours % BHA 1 BHA 2 BHA 3 BHA 4 BHA 5 BHA 6 BHA 7 BHA 8 BHA 9 BHA 10 BHA 11 of Well Report: UL G 9-46 Unit 2H

16 UL G 9-46 Unit 2H END OF WELL REPORT Slide vs Rotate () of Well Report: UL G 9-46 Unit 2H

17 UL G 9-46 Unit 2H END OF WELL REPORT Hrs /4" Vertical BHA's 1-7 BHA Number 83/4" Curve BHA's 8&9 83/4" Lateral Slide Rotate of Well Report: UL G 9-46 Unit 2H

18 UL G 9-46 Unit 2H END OF WELL REPORT %Slide vs %Rotate () of Well Report: UL G 9-46 Unit 2H

19 UL G 9-46 Unit 2H END OF WELL REPORT Percent Footage 10 Slide Rotat e /4" Vertical BHA's /4" 8 3/4" Curve BHA's 8 & 9Lateral BHA's 10 & 11 BHA Number of Well Report: UL G 9-46 Unit 2H

20 UL G 9-46 Unit 2H END OF WELL REPORT Slide vs. Rotate (Depth) of Well Report: UL G 9-46 Unit 2H

21 UL G 9-46 Unit 2H END OF WELL REPORT Depth (ft) Slide 22 Rotate /4" Vertical BHA;s /4" Curve BHA's 8 & 9 8 3/4" Lateral BHA;s 10 & 11 BHA Number of Well Report: UL G 9-46 Unit 2H

22 UL G 9-46 Unit 2H END OF WELL REPORT % Slide vs % Rotate (Depth) of Well Report: UL G 9-46 Unit 2H

23 UL G 9-46 Unit 2H END OF WELL REPORT Percent Footage /4" Vertical 83/4" Curve 8 3/4" Lateral BHA Number Slide Rotate of Well Report: UL G 9-46 Unit 2H

24 UL G 9-46 Unit 2H END OF WELL REPORT Lateral View of Well Report: UL G 9-46 Unit 2H

25 UL G 9-46 Unit 2H END OF WELL REPORT 300 UL G 9-46 Unit 2H 9,000 BHA #9 BHA #10 BHA #11 TVD 9, , ,600 9,800 ROP - Cut Unit 150 TVD 10,000 10, , ,600 10, ,000 10,000 11,000 12,000 13,000 14,000 15,000 16,000 17,000 18,000 19,000 20,000 Measured Depth(ft) of Well Report: UL G 9-46 Unit 2H

26 UL G 9-46 Unit 2H END OF WELL REPORT Final PvA & Surveys of Well Report: UL G 9-46 Unit 2H

27 ELEVATION RESOURCES LLC County, TX (D27) NCZ UL G 9-46 Unit #2H #2H ST01 Plan #3 Trinidad 121 G T M Azimuths to Grid North True North: 2.76 Magnetic North: 9.24 Magnetic Field Strength: snT Dip Angle: Date: 2017/04/14 Model: IGRF2015 DESIGN TARGET DETAILS Name TVD +N/-S +E/-W Northing Easting Latitude Longitude PBHL UL G 9-46 ST01 Pln # ' N ' W - plan hits target center LP UL G 9-46 ST01 Pln # ' N ' W - plan hits target center ANNOTATIONS First 166' MD / 166' TVD Inc Azi TVD +N/-S +E/-W VSectDeparture Annotation Tie 10385' MD Top of 10394' MD Bottom of 10408' MD B/T 10.5 / ' MD ' MD / 90.5 Inc / 10445' TVD / T 2 /100 DLS ' MD TD at 18657' MD / 10376' TVD #2H 0 #2H Last 10803' MD / 10449' TVD #2H #2H 18642' MD / 10360' TVD Last 18589' MD / 10361' TVD First ST ' MD / 10386' TVD #2H 0 0 First 166' MD / 166' TVD West(-)/East(+) (200 usft/in) Last 10803' MD / 10449' TVD First ST ' MD / 10386' TVD 0 First ST ' MD / 10386' TVD #2H First 166' MD / 166' TVD #2H Last 10803' MD / 10449' TVD West(-)/East(+) (2000 usft/in) 18642' MD / 10360' TVD Last 18589' MD / 10361' TVD Vertical Section at (1500 usft/in)

28 County, TX (D27) NCZ UL G 9-46 Unit #2H #2H Lateral Design: Lateral 01 May, 2017

29 Survey Report Company: ELEVATION RESOURCES LLC Local Co-ordinate Reference: Well #2H Project: County, TX (D27) NCZ TVD Reference: usft (Trinidad 121) Site: UL G 9-46 Unit #2H MD Reference: usft (Trinidad 121) Well: #2H North Reference: Grid Wellbore: Lateral Survey Calculation Method: Minimum Curvature Design: Lateral Database: EDM Single User Db Project County, TX (D27) NCZ Map System: Geo Datum: Map Zone: US State Plane 1927 (Exact solution) D 1927 (DCON CONUS) Texas North Central 4202 System Datum: Mean Sea Level Site UL G 9-46 Unit #2H Site Position: From: Position Uncertainty: Map 0.0 usft Northing: Easting: Slot Radius: 204, usft Latitude: 32 7' N 436, usft Longitude: ' W 13-3/16 " Grid Convergence: Well #2H Well Position +N/-S +E/-W Position Uncertainty 0.0 usft 0.0 usft 0.0 usft Northing: Easting: Wellhead Elevation: 204, usft 436, usft 0.0 usft Latitude: Longitude: Ground Level: 32 7' N ' W 3,099.0 usft Wellbore Magnetics Lateral Model Name Sample Date Declination ( ) Dip Angle ( ) Field Strength (nt) IGRF /03/ , Design Audit Notes: Version: Lateral 1.0 Phase: ACTUAL Tie On Depth: 0.0 Vertical Section: Depth From (TVD) (usft) +N/-S (usft) +E/-W (usft) Direction ( ) Survey Program From (usft) To (usft) Date 2017/05/01 Survey (Wellbore) ,803.0 Survey #1 (Lateral) Tool Name MWD Description MWD v3:standard declination Survey Measured Depth (usft) Inclination ( ) Azimuth ( ) Vertical Depth (usft) +N/-S (usft) +E/-W (usft) Vertical Section (usft) Dogleg Rate ( /100usft) Build Rate ( /100usft) Turn Rate ( /100usft) First 166' MD / 166' TVD , , , , , , /05/01 7:46:26AM Page 2 COMPASS Build 85

30 Survey Report Company: ELEVATION RESOURCES LLC Local Co-ordinate Reference: Well #2H Project: County, TX (D27) NCZ TVD Reference: usft (Trinidad 121) Site: UL G 9-46 Unit #2H MD Reference: usft (Trinidad 121) Well: #2H North Reference: Grid Wellbore: Lateral Survey Calculation Method: Minimum Curvature Design: Lateral Database: EDM Single User Db Survey Measured Depth (usft) Inclination ( ) Azimuth ( ) Vertical Depth (usft) +N/-S (usft) +E/-W (usft) Vertical Section (usft) Dogleg Rate ( /100usft) Build Rate ( /100usft) Turn Rate ( /100usft) 1, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , /05/01 7:46:26AM Page 3 COMPASS Build 85

31 Survey Report Company: ELEVATION RESOURCES LLC Local Co-ordinate Reference: Well #2H Project: County, TX (D27) NCZ TVD Reference: usft (Trinidad 121) Site: UL G 9-46 Unit #2H MD Reference: usft (Trinidad 121) Well: #2H North Reference: Grid Wellbore: Lateral Survey Calculation Method: Minimum Curvature Design: Lateral Database: EDM Single User Db Survey Measured Depth (usft) Inclination ( ) Azimuth ( ) Vertical Depth (usft) +N/-S (usft) +E/-W (usft) Vertical Section (usft) Dogleg Rate ( /100usft) Build Rate ( /100usft) Turn Rate ( /100usft) 6, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , /05/01 7:46:26AM Page 4 COMPASS Build 85

32 Survey Report Company: ELEVATION RESOURCES LLC Local Co-ordinate Reference: Well #2H Project: County, TX (D27) NCZ TVD Reference: usft (Trinidad 121) Site: UL G 9-46 Unit #2H MD Reference: usft (Trinidad 121) Well: #2H North Reference: Grid Wellbore: Lateral Survey Calculation Method: Minimum Curvature Design: Lateral Database: EDM Single User Db Survey Measured Depth (usft) Inclination ( ) Azimuth ( ) Vertical Depth (usft) +N/-S (usft) +E/-W (usft) Vertical Section (usft) Dogleg Rate ( /100usft) Build Rate ( /100usft) Turn Rate ( /100usft) 10, , , , , , Last 10750' MD / 10446' TVD 10, , ' MD / 10449' TVD Design Targets Target Name - hit/miss target - Shape Dip Angle ( ) Dip Dir. ( ) TVD (usft) +N/-S (usft) +E/-W (usft) Northing (usft) Easting (usft) Latitude Longitude UL G 9-46 #2H SL , , ' N ' W - actual wellpath hits target center - Point Design Annotations Measured Depth (usft) Vertical Depth (usft) , , , , N/-S (usft) Local Coordinates E/-W (usft) Comment First 166' MD / 166' TVD Last 10750' MD / 10446' TVD 10803' MD / 10449' TVD Checked By: Approved By: Date: 2017/05/01 7:46:26AM Page 5 COMPASS Build 85

33 ELEVATION RESOURCES LLC County, TX (D27) NCZ UL G 9-46 Unit #2H #2H ST01 Plan #3 Trinidad 121 G T M Azimuths to Grid North True North: 2.76 Magnetic North: 9.24 Magnetic Field Strength: snT Dip Angle: Date: 2017/04/14 Model: IGRF2015 DESIGN TARGET DETAILS Name TVD +N/-S +E/-W Northing Easting Latitude Longitude PBHL UL G 9-46 ST01 Pln # ' N ' W - plan hits target center LP UL G 9-46 ST01 Pln # ' N ' W - plan hits target center ANNOTATIONS First 166' MD / 166' TVD Inc Azi TVD +N/-S +E/-W VSectDeparture Annotation Tie 10385' MD Top of 10394' MD Bottom of 10408' MD B/T 10.5 / ' MD ' MD / 90.5 Inc / 10445' TVD / T 2 /100 DLS ' MD TD at 18657' MD / 10376' TVD #2H 0 #2H Last 10803' MD / 10449' TVD #2H #2H 18642' MD / 10360' TVD Last 18589' MD / 10361' TVD First ST ' MD / 10386' TVD #2H 0 0 First 166' MD / 166' TVD West(-)/East(+) (200 usft/in) Last 10803' MD / 10449' TVD First ST ' MD / 10386' TVD 0 First ST ' MD / 10386' TVD #2H First 166' MD / 166' TVD #2H Last 10803' MD / 10449' TVD West(-)/East(+) (2000 usft/in) 18642' MD / 10360' TVD Last 18589' MD / 10361' TVD Vertical Section at (1500 usft/in)

34 County, TX (D27) NCZ UL G 9-46 Unit #2H #2H ST01 Design: ST01 01 May, 2017

35 Survey Report Company: ELEVATION RESOURCES LLC Local Co-ordinate Reference: Well #2H Project: County, TX (D27) NCZ TVD Reference: usft (Trinidad 121) Site: UL G 9-46 Unit #2H MD Reference: usft (Trinidad 121) Well: #2H North Reference: Grid Wellbore: ST01 Survey Calculation Method: Minimum Curvature Design: ST01 Database: EDM Single User Db Project County, TX (D27) NCZ Map System: Geo Datum: Map Zone: US State Plane 1927 (Exact solution) D 1927 (DCON CONUS) Texas North Central 4202 System Datum: Mean Sea Level Site UL G 9-46 Unit #2H Site Position: From: Position Uncertainty: Map 0.0 usft Northing: Easting: Slot Radius: 204, usft Latitude: 32 7' N 436, usft Longitude: ' W 13-3/16 " Grid Convergence: Well #2H Well Position +N/-S +E/-W Position Uncertainty 0.0 usft 0.0 usft 0.0 usft Northing: Easting: Wellhead Elevation: 204, usft 436, usft 0.0 usft Latitude: Longitude: Ground Level: 32 7' N ' W 3,099.0 usft Wellbore Magnetics ST01 Model Name Sample Date Declination ( ) Dip Angle ( ) Field Strength (nt) IGRF /04/ , Design Audit Notes: Version: ST Phase: ACTUAL Tie On Depth: 10,385.0 Vertical Section: Depth From (TVD) (usft) +N/-S (usft) +E/-W (usft) Direction ( ) Survey Program From (usft) To (usft) Date 2017/05/01 Survey (Wellbore) ,385.0 Survey #1 (Lateral) 10, ,642.0 Survey #1 (ST01) Tool Name MWD MWD Description MWD v3:standard declination MWD v3:standard declination Survey Measured Depth (usft) Inclination ( ) Azimuth ( ) Vertical Depth (usft) +N/-S (usft) +E/-W (usft) Vertical Section (usft) Dogleg Rate ( /100usft) Build Rate ( /100usft) Turn Rate ( /100usft) , , , , , , /05/01 7:34:28AM Page 2 COMPASS Build 85

36 Survey Report Company: ELEVATION RESOURCES LLC Local Co-ordinate Reference: Well #2H Project: County, TX (D27) NCZ TVD Reference: usft (Trinidad 121) Site: UL G 9-46 Unit #2H MD Reference: usft (Trinidad 121) Well: #2H North Reference: Grid Wellbore: ST01 Survey Calculation Method: Minimum Curvature Design: ST01 Database: EDM Single User Db Survey Measured Depth (usft) Inclination ( ) Azimuth ( ) Vertical Depth (usft) +N/-S (usft) +E/-W (usft) Vertical Section (usft) Dogleg Rate ( /100usft) Build Rate ( /100usft) Turn Rate ( /100usft) 1, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , /05/01 7:34:28AM Page 3 COMPASS Build 85

37 Survey Report Company: ELEVATION RESOURCES LLC Local Co-ordinate Reference: Well #2H Project: County, TX (D27) NCZ TVD Reference: usft (Trinidad 121) Site: UL G 9-46 Unit #2H MD Reference: usft (Trinidad 121) Well: #2H North Reference: Grid Wellbore: ST01 Survey Calculation Method: Minimum Curvature Design: ST01 Database: EDM Single User Db Survey Measured Depth (usft) Inclination ( ) Azimuth ( ) Vertical Depth (usft) +N/-S (usft) +E/-W (usft) Vertical Section (usft) Dogleg Rate ( /100usft) Build Rate ( /100usft) Turn Rate ( /100usft) 6, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , First ST ' MD / 10386' TVD 10, , , , /05/01 7:34:28AM Page 4 COMPASS Build 85

38 Survey Report Company: ELEVATION RESOURCES LLC Local Co-ordinate Reference: Well #2H Project: County, TX (D27) NCZ TVD Reference: usft (Trinidad 121) Site: UL G 9-46 Unit #2H MD Reference: usft (Trinidad 121) Well: #2H North Reference: Grid Wellbore: ST01 Survey Calculation Method: Minimum Curvature Design: ST01 Database: EDM Single User Db Survey Measured Depth (usft) Inclination ( ) Azimuth ( ) Vertical Depth (usft) +N/-S (usft) +E/-W (usft) Vertical Section (usft) Dogleg Rate ( /100usft) Build Rate ( /100usft) Turn Rate ( /100usft) 10, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , /05/01 7:34:28AM Page 5 COMPASS Build 85

39 Survey Report Company: ELEVATION RESOURCES LLC Local Co-ordinate Reference: Well #2H Project: County, TX (D27) NCZ TVD Reference: usft (Trinidad 121) Site: UL G 9-46 Unit #2H MD Reference: usft (Trinidad 121) Well: #2H North Reference: Grid Wellbore: ST01 Survey Calculation Method: Minimum Curvature Design: ST01 Database: EDM Single User Db Survey Measured Depth (usft) Inclination ( ) Azimuth ( ) Vertical Depth (usft) +N/-S (usft) +E/-W (usft) Vertical Section (usft) Dogleg Rate ( /100usft) Build Rate ( /100usft) Turn Rate ( /100usft) 14, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , /05/01 7:34:28AM Page 6 COMPASS Build 85

40 Survey Report Company: ELEVATION RESOURCES LLC Local Co-ordinate Reference: Well #2H Project: County, TX (D27) NCZ TVD Reference: usft (Trinidad 121) Site: UL G 9-46 Unit #2H MD Reference: usft (Trinidad 121) Well: #2H North Reference: Grid Wellbore: ST01 Survey Calculation Method: Minimum Curvature Design: ST01 Database: EDM Single User Db Survey Measured Depth (usft) Inclination ( ) Azimuth ( ) Vertical Depth (usft) +N/-S (usft) +E/-W (usft) Vertical Section (usft) Dogleg Rate ( /100usft) Build Rate ( /100usft) Turn Rate ( /100usft) 18, , , , , Last 18589' MD / 10361' TVD 18, , , , , ' MD / 10360' TVD Design Annotations Measured Depth (usft) Vertical Depth (usft) 10, , , , , , N/-S (usft) Local Coordinates , , E/-W (usft) 4.1-1, ,749.8 Comment First ST ' MD / 10386' TVD Last 18589' MD / 10361' TVD 18642' MD / 10360' TVD Checked By: Approved By: Date: 2017/05/01 7:34:28AM Page 7 COMPASS Build 85

41 UL G 9-46 Unit 2H END OF WELL REPORT BHA Summary & Reports of Well Report: UL G 9-46 Unit 2H

42 BHA # 1 SDI Job #: COMPANY: LOCATION: Elevation Resources Work Order: FIELD: Legal Desc. RIG ME: Trinidad 121 Lead DD: Tom Allen STATE: TX Co. Man: David Crow / Kelly Small COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: and Depths Motor Data Drilling Parameters Date In: 05:10 7/ Stab.17 SO/PU: / Date Out: 18:30 MFG.: NOV Rot Strg Wt: Hrs In Hole: PAD OD: 1/8 WOB: Start Depth: NB Stab: 12.0 TORQ: Depth: Bit to Bend: 7.0 SPP: Total Drilled: Bent Hsg/Sub : 1.5 / Motor RPM: 107 Avg. Total ROP: Lobe/Stage: 7/8 / 4 Rotary RPM: Circ Hrs: Tot/Only 3.67 /.92 Rev/Gal 0.17 Flow Rate: Percent Slide: Rotor Jet: 0 Avg Diff: 500 Percent Hrs: Prop BUR: 7.4 Stall Pres.: Slide Hours: 1.42 Act BUR: 7 Off Bot Pres.: 2100 Total Sliding: Mud Data Bit Record Avg. Slide ROP: Type Reserve Water SMITH / Bit PDC Smith XS716S 7x15 Percent Rotary: WT: 9.90 PPG GAS: 0 Run #: 1 Percent Hrs: Vis: 0 PV: 29 Type Bit: PDC Rotary Hours: 1.33 WL: 0 PH: 0 IADC#: TFA: 1.21 in² Total Rotary: SOL: 0 SAND: 0 JETS: 7-15 Avg. Rotary ROP: Oil %: 0 FT F P Drop: GPM Reason POOH: DTF Chlor: 0 YP: 0 Cond.: Fine MWD Gamma:.0 Restiv:.0 Sensor: 50.2 Last Casing O.D. Spacing GYRO:.0 DNSC:.0 Sonic:.0 INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 The rig had been drilling the 12 ¼" hole and it had built angle to over 9 degrees. We were called out to drop the inclination back to vertical and drill down to KOP. We ran a Smith XS716S bit with 7x15, an NOV 7/8 4.0 Adj. Motor 1.50 with a 12" lower stabilizer and the Janel Cricket MWD system. We ran a NM 12" stabilizer above the motor and another stabilizer above the pony monel. We tripped in the hole to 836' and tested. It took over 1 ½ hours of trouble shooting before we could get the MWD to decode on the surface test. The pulses were also very large for the amount of fluid we were running. We trippe on in and washed the last stand to bottom and began drilling. Upon starting to drill with 628 GPM the pulses were in the 400# range and actually lifting the drill sting an inch or two off bottom. We made a 22' slide and then rotated 44' before we got a 1200# pressure increase with 50 strokes less. The motor felt like it was turning but the MWD was not pulsing. We tripped out to check the BHA. At surface the motor drained fine and the bearing play was good, the bit looked fine and was graded 1-1. The MWD had a crushed ceramic sleeve in the pulser. We also checked the UBHO sub to make sure there was nothing packed off in it. BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. Bit PDC Smith XS716S 7x15 JM / /8 REGP SMITH Motor 6/ Stab /8 REGB NOV NM Stabilizer 12" Nortrac B&A /8 REGB B&A NM UBHO Sub U /8 REGB Janel MWD Monel B&A /16 8 1/ /8 REGB B&A NM Pony Collar B&A /16 8 1/ /8 REGB B&A Stabilizer 12" Nortrac B&A / /8 REGB B&A B&A / NC 56B B&A (9) 8" Drill Collars Rig 3 2 7/ NC 56B RIG Rig 1 2 7/ /2 XHB RIG (15) 6 1/2" Drill Collars Rig 4 2 7/8 6 1/ /2 XHB RIG Rig 2 3 1/2 6 3/ /2 IFB RIG (15) 5 Hevi HWDP /2 IFB Rig WinSURV II BHA Report - License: NP6459 Wildcat Township-Section-Range -- N/A

43 Description Serial # BHA Detail I.D. In. O.D. In. Length Sum Ft Ft Top Conn MFG. (15) 5 Hevi O.D.=5.000 In. Length= Ft O.D.=6.375 In. Length=3.96 Ft (15) 6 1/2" Drill Collars O.D.=6.500 In. Length= Ft O.D.=8.000 In. Length=2.20 Ft (9) 8" Drill Collars O.D.=8.000 In. Length= Ft O.D.=8.000 In. Length=2.23 Ft Stabilizer 12" Nortrac O.D.=8.000 In. Length=5.77 Ft FN=2.10 Ft NM Pony Collar O.D.=8.063 In. Length=10.04 Ft MWD Monel O.D.=8.063 In. Length=29.88 Ft NM UBHO Sub O.D.=8.000 In. Length=2.51 Ft NM Stabilizer 12" Nortrac O.D.=8.000 In. Length=6.47 Ft FN=2.50 Ft STAB OD= In. Motor 6/ Stab r O.D.=8.000 In. Length=28.32 Ft FN=1.75 Ft WinSURV II BHA Report - License: NP6459 Bit PDC Smith XS716S 7x15 O.D.= In.

44 BHA # 2 SDI Job #: COMPANY: LOCATION: Elevation Resources Work Order: FIELD: Legal Desc. RIG ME: Trinidad 121 Lead DD: Tom Allen STATE: TX Co. Man: David Crow / Kelly Small COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: and Depths Motor Data Drilling Parameters Date In: 18:30 7/ Stab.17 SO/PU: / Date Out: 10:30 MFG.: Paradigm Rot Strg Wt: Hrs In Hole: PAD OD: 3/8 WOB: Start Depth:.00 NB Stab: 0.0 TORQ: - Depth:.00 Bit to Bend: 6.0 SPP: Total Drilled:.00 Bent Hsg/Sub : 1.5 / Motor RPM: - Avg. Total ROP: Lobe/Stage: 7/8 / 4 Rotary RPM: - Circ Hrs: Tot/Only 1.83 / 1.83 Rev/Gal 0.17 Flow Rate: Percent Slide: Rotor Jet: 0 Avg Diff: 0 Percent Hrs: Prop BUR: 7.4 Stall Pres.: Slide Hours:.00 Act BUR: Off Bot Pres.: Total Sliding:.00 Mud Data Bit Record Avg. Slide ROP: Type Reserve Water SMITH / Percent Rotary: WT: 9.90 PPG GAS: 0 Run #: RR1 Percent Hrs: Vis: 0 PV: 29 Type Bit: PDC Rotary Hours:.00 WL: 0 PH: 0 IADC#: TFA: 1.21 in² Total Rotary:.00 SOL: 0 SAND: 0 JETS: 7-15 Avg. Rotary ROP: Oil %: 0 FT F P Drop: GPM Reason POOH: DTF Chlor: 0 YP: 0 Cond.: Fine MWD Gamma:.0 Restiv:.0 Sensor: 50.1 Last Casing O.D. Spacing GYRO:.0 DNSC:.0 Sonic:.0 INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 We reran the Smith PDC bit, a new Paradigm 7/ FBH motor with a 12" stabilizer, and the Janel MWD system with a new MWD tool. We ran the stabilization in the same spot in the BHA. We tripped in the hole to 892' and tested, we again had problems getting the MWD up and running. We pulled out of the hole and it was decided to release Janel MWD and VON EVO was on the way. BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. Bit PDC Smith XS716S 7x15 JM / /8 REGP SMITH Motor 7/ Stab PDT /8 REGB Paradigm NM Stabilizer 12" Nortrac B&A /8 REGB B&A NM UBHO Sub U /8 REGB Janel MWD Monel B&A /16 8 1/ /8 REGB B&A NM Pony Collar B&A /16 8 1/ /8 REGB B&A Stabilizer 12" Nortrac B&A / /8 REGB B&A B&A / NC 56B B&A (9) 8" Drill Collars Rig 3 2 7/ NC 56B RIG Rig 1 2 7/ /2 XHB RIG (15) 6 1/2" Drill Collars Rig 4 2 7/8 6 1/ /2 XHB RIG Rig 2 3 1/2 6 3/ /2 IFB RIG (15) 5 Hevi HWDP /2 IFB Rig Wildcat Township-Section-Range -- N/A (15) 5 Hevi O.D.=5.000 In. Length= Ft O.D.=6.375 In. Length=3.96 Ft (15) 6 1/2" Drill Collars O.D.=6.500 In. Length= Ft O.D.=8.000 In. Length=2.20 Ft (9) 8" Drill Collars O.D.=8.000 In. Length= Ft O.D.=8.000 In. Length=2.23 Ft Stabilizer 12" Nortrac O.D.=8.000 In. Length=5.77 Ft FN=2.10 Ft NM Pony Collar O.D.=8.063 In. Length=10.04 Ft MWD Monel O.D.=8.063 In. Length=29.88 Ft NM UBHO Sub O.D.=8.000 In. Length=2.51 Ft NM Stabilizer 12" Nortrac O.D.=8.000 In. Length=6.47 Ft FN=2.50 Ft STAB OD= In. Motor 7/ Stab.17 re O.D.=8.000 In. Length=28.15 Ft WinSURV II BHA Report - License: NP6459 Bit PDC Smith XS716S 7x15 O.D.= In.

45 BHA # 3 SDI Job #: COMPANY: LOCATION: Elevation Resources Work Order: FIELD: Legal Desc. RIG ME: Trinidad 121 Lead DD: Tom Allen STATE: TX Co. Man: David Crow / Kelly Small COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: and Depths Motor Data Drilling Parameters Date In: 10:30 7/ NBS.17 SO/PU: / Date Out: 08:00 MFG.: Paradigm Rot Strg Wt: Hrs In Hole: PAD OD: 3/8 WOB: 0-45 Start Depth: NB Stab: 12.0 TORQ: Depth: Bit to Bend: 6.0 SPP: Total Drilled: Bent Hsg/Sub : 1.5 / Motor RPM: Avg. Total ROP: Lobe/Stage: 7/8 / 4 Rotary RPM: Circ Hrs: Tot/Only / 3.58 Rev/Gal 0.17 Flow Rate: Percent Slide: 7.10 Rotor Jet: 0 Avg Diff: 450 Percent Hrs: Prop BUR: 7.4 Stall Pres.: 1000 Slide Hours: Act BUR: 8 Off Bot Pres.: 1800 Total Sliding: Mud Data Bit Record Avg. Slide ROP: Type Reserve Water SMITH / Bit PDC Smith XS716S 7x15 Percent Rotary: WT: 9.60 PPG GAS: 0 Run #: RR1 Percent Hrs: Vis: 0 PV: 29 Type Bit: PDC Rotary Hours: WL: 0 PH: 0 IADC#: TFA: 1.21 in² Total Rotary: SOL: 1 SAND: 0 JETS: 7-15 Avg. Rotary ROP: Oil %: 0 FT F P Drop: GPM Reason POOH: PR Chlor: YP: 1 Cond.: Junk MWD Gamma: 51.7 Restiv:.0 Sensor: 52.9 Last Casing O.D. Spacing GYRO:.0 DNSC: Sonic:.0 INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 We reran the Smith XS716S bit, reran the Paradigm 7/ FBH motor with the 12" NBS, and the VON EVO MWD system. We ran a stabilizer right on top of the motor and another one on top of the top monel. We tripped in and surfaced tested with no problems and the continued in to where we washed and reamed the last 120' to bottom. We began rotating and when we did start sliding we weren't decoding very well, so the transducer was moved from the manifold down below the rig floor to up on the rig floor. Decoding became better and the EM signal got dialed in after making some antennae adjustments. We dropped angle from 8 back to 2 with doglegs in the 1 /100' range. We then drilled on making periodic slides to hold angle below 2. MWD decoding was less than ideal at times and mud pulse was very sporadic. We drilled on to 6915' where ROP had slowed to 27' an hour while running 45K. It was decided to trip out of hole for slow ROP. On the way out of the hole the motor did not hold fluid, and the bit and bit box could be turned by hand with the bit breaker. The bit was trashed, graded 4-6-RO, starting to ring out on the shoulder. Both stabilizers were worn badly and close to an inch under gauge (no gauge rings on location). BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. Bit PDC Smith XS716S 7x15 JM / /8 REGP SMITH Motor 7/ Stab PDT /8 REGB Paradigm NM Stabilizer 12" Nortrac B&A /8 REGB B&A NM Pony Collar B&A /16 8 1/ /8 REGB B&A VON EVO Tool Carrier C /4 8 1/ /8 REGB VON Directional NMDC B&A /16 8 1/ /8 REGB B&A Stabilizer 12" Nortrac B&A / /8 REGB B&A B&A / NC 56B B&A (9) 8" Drill Collars Rig 3 2 7/ NC 56B RIG Rig 1 2 7/ /2 XHB RIG (15) 6 1/2" Drill Collars Rig 4 2 7/8 6 1/ /2 XHB RIG Rig 2 3 1/2 6 3/ /2 IFB RIG (15) 5 Hevi HWDP /2 IFB Rig WinSURV II BHA Report - License: NP6459 Wildcat Township-Section-Range -- N/A

46 Description Serial # BHA Detail I.D. In. O.D. In. Length Sum Ft Ft Top Conn MFG. (15) 5 Hevi O.D.=5.000 In. Length= Ft O.D.=6.375 In. Length=3.96 Ft (15) 6 1/2" Drill Collars O.D.=6.500 In. Length= Ft O.D.=8.000 In. Length=2.20 Ft (9) 8" Drill Collars O.D.=8.000 In. Length= Ft O.D.=8.000 In. Length=2.23 Ft Stabilizer 12" Nortrac O.D.=8.000 In. Length=5.77 Ft FN=2.10 Ft NMDC O.D.=8.063 In. Length=29.88 Ft VON EVO Tool Carrier O.D.=8.063 In. Length=19.55 Ft NM Pony Collar O.D.=8.063 In. Length=10.04 Ft NM Stabilizer 12" Nortrac O.D.=8.000 In. Length=6.47 Ft FN=2.50 Ft STAB OD= In. Motor 7/ Stab.17 re O.D.=8.000 In. Length=28.15 Ft WinSURV II BHA Report - License: NP6459 Bit PDC Smith XS716S 7x15 O.D.= In.

47 BHA # 4 SDI Job #: COMPANY: LOCATION: Elevation Resources Work Order: FIELD: Legal Desc. RIG ME: Trinidad 121 Lead DD: Tom Allen STATE: TX Co. Man: David Crow / Kelly Small COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: and Depths Motor Data Drilling Parameters Date In: 08:00 7/ /4 NBS SO/PU: / Date Out: 22:30 MFG.: NOV Rot Strg Wt: Hrs In Hole: PAD OD: 8 3/8 WOB: 0-0 Start Depth:.00 NB Stab: 11.8 TORQ: - Depth:.00 Bit to Bend: 6.2 SPP: 0-0 Total Drilled:.00 Bent Hsg/Sub : 1.5 / Motor RPM: - Avg. Total ROP: Lobe/Stage: 7/8 / 4 Rotary RPM: - Circ Hrs: Tot/Only.83 /.83 Rev/Gal 0.17 Flow Rate: Percent Slide: Rotor Jet: 0 Avg Diff: 855 Percent Hrs: Prop BUR: 7.4 Stall Pres.: Slide Hours:.00 Act BUR: Off Bot Pres.: Total Sliding:.00 Mud Data Bit Record Avg. Slide ROP: Type WBM SMITH / Bits PDC XS716S Percent Rotary: WT: 8.90 PPG GAS: 0 Run #: 2 Percent Hrs: Vis: 30 PV: 4 Type Bit: PDC Rotary Hours:.00 WL: 0 PH: 11 IADC#: TFA: 1.21 in² Total Rotary:.00 SOL: 0.9 SAND: 0 JETS: 7-15 Avg. Rotary ROP: Oil %: 0 FT F P Drop: GPM Reason POOH: HP Chlor: YP: 4 Cond.: Green MWD Gamma: 57.1 Restiv:.0 Sensor: 58.3 Last Casing O.D. Spacing GYRO:.0 DNSC: Sonic: INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 While tripping in the hole with this BHA, we washed & reamed through several tight spots, beginning at 6036'. We encountered another at 6408', and when we broke circulation, we were packed off: SPP was very high for the flow rate; we did not have any returns at surface; and we were unable to move the string. After unsuccessfully trying to get free conventionally, we ran wireline to find the free-point, which was midway into the 6.5" collars; we got off the fish and picked up fishing tools including drilling jars, and after three days of fishing we got free. We were never able to circulate on this string, with signs suggesting the string was blocked/packed off. We did rotate this string for extended periods of time, without circulation, including backreaming through tight spots at 80rpm and a high of 30K ft-lbs of surface torque. The trip out was wet; we found that the BHA was packed off from the top of the EVO Tool Carrier to the motor. We attempted to drain the motor but could not turn the bit box with rotary table; axial play of bearings was in spec. The bit was green although was missing one jet. BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. Bits PDC XS716S JM / /8 REGP SMITH Motor 7/ /4" W /8 REGB NOV Nortrac Stabilizer 12" DR / /8 REGB DTI NM Pony Collar B&A /16 8 1/ /8 REGB B&A VON EVO Tool Carrier C /4 8 1/ /8 REGB VON Directional NMDC B&A /16 8 1/ /8 REGB B&A Nortrac Stabilizer 11 3/4" DR /8 8 1/ /8 REGB DTI B&A / NC 56B B&A (9) 8" Drill Collars Rig 3 2 7/ NC 56B RIG Rig 1 2 7/ /2 XHB RIG (15) 6 1/2" Drill Collars Rig 4 2 7/8 6 1/ /2 XHB RIG Rig 2 3 1/2 6 3/ /2 IFB RIG WinSURV II BHA Report - License: NP6459 Wildcat Township-Section-Range -- N/A

48 BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. (15) 5 Hevi HWDP /2 IFB Rig (15) 5 Hevi O.D.=5.000 In. Length= Ft O.D.=6.375 In. Length=3.96 Ft (15) 6 1/2" Drill Collars O.D.=6.500 In. Length= Ft O.D.=8.000 In. Length=2.20 Ft (9) 8" Drill Collars O.D.=8.000 In. Length= Ft O.D.=8.000 In. Length=2.23 Ft Nortrac Stabilizer 11 3/4" O.D.=8.063 In. Length=6.38 Ft FN=1.40 Ft STAB OD= In. NMDC O.D.=8.063 In. Length=29.88 Ft VON EVO Tool Carrier O.D.=8.063 In. Length=19.55 Ft NM Pony Collar O.D.=8.063 In. Length=10.04 Ft Nortrac Stabilizer 12" O.D.=8.000 In. Length=7.98 Ft FN=3.48 Ft STAB OD= In. Motor 7/ /4" NBS 0 O.D.=8.000 In. Length=28.63 Ft STAB OD= In. WinSURV II BHA Report - License: NP6459 Bits PDC XS716S O.D.= In.

49 BHA # 5 SDI Job #: COMPANY: LOCATION: Elevation Resources Work Order: FIELD: Legal Desc. RIG ME: Trinidad 121 Lead DD: Tom Allen STATE: TX Co. Man: David Crow / Kelly Small COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: lbf and Depths Motor Data Drilling Parameters Date In: 19:30 7/ NBS SO/PU: / Date Out: 20:50 MFG.: NOV Rot Strg Wt: Hrs In Hole: PAD OD: 8 1/4 WOB: 0-44 Start Depth: NB Stab: 11.8 TORQ: Depth: Bit to Bend: 7.3 SPP: Total Drilled: Bent Hsg/Sub : 1.5 / Motor RPM: 107 Avg. Total ROP: Lobe/Stage: 7/8 / 4 Rotary RPM: Circ Hrs: Tot/Only / 5.92 Rev/Gal 0.17 Flow Rate: Percent Slide: Rotor Jet: 0 Avg Diff: 400 Percent Hrs: Prop BUR: 7.4 Stall Pres.: Slide Hours: Act BUR: Off Bot Pres.: 1700 Total Sliding: Mud Data Bit Record Avg. Slide ROP: 8.26 Type WBM SMITH / Bits Smith PDC XS716S 7x15 Percent Rotary: WT: 9.40 PPG GAS: 0 Run #: 2RR Percent Hrs: Vis: 38 PV: 4 Type Bit: PDC Rotary Hours: WL: 0 PH: 10 IADC#: TFA: 1.21 in² Total Rotary: SOL: 5 SAND: 0 JETS: 7-15 Avg. Rotary ROP: Oil %: 0 FT F P Drop: GPM Reason POOH: PR Chlor: YP: 6 Cond.: Trashed MWD Gamma: 46.0 Restiv:.0 Sensor: 47.2 Last Casing O.D. Spacing GYRO:.0 DNSC: Sonic:.0 INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 After getting unstuck and making a dedicated clean up run, we picked up BHA #5. We reran the Smith XS716S bit from the previous run, a new 7/8 4.0 Adj. 1.5 with an 11.75" NBS, and the EVO MWD system. We ran a NM stabilizer above the motor and a steel stabilizer on top of the NMDC. We tripped to the shoe and then slipped and cut drill line before continuing in the hole filling every 30 stands. We washed and reamed the last 400' to bottom as a precautionary measure before beginning to drill. At the 1st connection we couldn't get a survey and after 3 attempts were instructed to drill ahead. We rotated another stand and again we couldn't get a survey after 2 attempts. We drilled another stand as instructed and when we got the stand down we couldn't get a survey, at that time we downlinked a.75 data rate to the MWD tool and got not only a pulse survey but also an EM survey. We were showing that we had built from 2.15 to 5.1 in the 3 stands we had rotated blind. We began sliding down on every stand, anywhere from 11' to as high as 28' on a stand. Our motor yields weren't very good, averaging 3.46 /100'. At 7653' it was decided to POOH to change the assembly. We had to slide too much and the assembly wouldn't hold or drop any angle while rotating. On surface, the motor looked good: it drained as expected; the bit box was tight and could not be turned by hand; and there was barely any axial or lateral play in the bearings. The bit was trashed: all 7 jets were missing with threads intact (not washed out); there was ring-out to the cone; the nose and shoulder sections looked Ok with a few smaller chips, but then all gauge cutters were chipped, broken or heat damaged. Many of the gauge-pad bumpers were worn or broken as well. BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. Bits Smith PDC XS716S 7x15 JM / /8 REGP SMITH Motor 7/ Stab 11 W /8 REGB NOV NM Nortrac Stabilizer 12" B&A / /8 REGB B&A VON EVO Tool Carrier C /4 8 1/ /8 REGB VON Directional NMDC B&A800S06 2 7/ /8 REGB B&A Nortrac Stabilizer 11 3/4" B&A / /8 REGB B&A B&A / NC 56B B&A (6) 8" Drill Collars Rig 3 2 7/ NC 56B RIG WinSURV II BHA Report - License: NP6459 Wildcat Township-Section-Range --

50 BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. Rig 1 2 7/8 6 1/ /2 XHB RIG (15) 6 1/2" Drill Collars Rig 4 2 7/8 6 1/ /2 XHB RIG Rig 2 3 1/2 6 3/ /2 IFB RIG (15) 5 Hevi HWDP /2 IFB Rig Jars SD700100R 2 7/8 6 1/ /2 IFB StabilDril Jars O.D.=6.500 In. Length=29.25 Ft FN=2.00 Ft (15) 5 Hevi O.D.=5.000 In. Length= Ft O.D.=6.375 In. (15) 6 1/2" Drill Collars O.D.=6.500 In. Length= Ft O.D.=8.000 In. (6) 8" Drill Collars O.D.=8.000 In. Length= Ft O.D.=8.000 In. Nortrac Stabilizer 11 3/4" O.D.=8.000 In. Length=4.18 Ft FN=1.55 Ft STAB OD= In. NMDC O.D.=8.000 In. Length=30.90 Ft VON EVO Tool Carrier O.D.=8.125 In. Length=19.53 Ft NM Nortrac Stabilizer 12" O.D.=8.063 In. Length=6.73 Ft FN=1.53 Ft STAB OD= In. Motor 7/ Stab 11 3/4.1 O.D.=8.000 In. Length=28.81 Ft FN=1.69 Ft STAB OD= In. WinSURV II BHA Report - License: NP6459 Bits Smith PDC XS716S 7x15 O.D.= In.

51 BHA # 6 SDI Job #: COMPANY: LOCATION: RIG ME: Elevation Resources Trinidad 121 Work Order: FIELD: Legal Desc. Lead DD: STATE: TX Co. Man: Jerry Dually / Kelly Small COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: lbf and Depths Motor Data Drilling Parameters Date In: 20:50 6/ SlkSlv.18 SO/PU: / Date Out: 12:10 MFG.: NOV Rot Strg Wt: Hrs In Hole: PAD OD: 8 1/4 WOB: 0-43 Start Depth: NB Stab: 0.0 TORQ: Depth: 843 Bit to Bend: 7.0 SPP: Total Drilled: Bent Hsg/Sub : 1.5 / Motor RPM: 113 Avg. Total ROP: Lobe/Stage: 6/7 / 5 Rotary RPM: Circ Hrs: Tot/Only / 4.92 Rev/Gal 0.18 Flow Rate: Percent Slide: 5.79 Rotor Jet: 0 Avg Diff: 500 Percent Hrs: Prop BUR: 3.8 Stall Pres.: Slide Hours: 4.83 Act BUR: 3.39 Off Bot Pres.: 1900 Total Sliding: Mud Data Bit Record Avg. Slide ROP: 9.31 Type WBM Drilformance / Bit PDC DF616X2 6x16 Percent Rotary: WT: 9.10 PPG GAS: 0 Run #: 3 Percent Hrs: Vis: 35 PV: 4 Type Bit: PDC Rotary Hours: WL: 0 PH: 10.5 IADC#: TFA: 1.18 in² Total Rotary: SOL: 4 SAND: 0.01 JETS: 6-16 Avg. Rotary ROP: Oil %: 0 FT F P Drop: GPM Reason POOH: PR Chlor: YP: 4 Cond.: Junk MWD Gamma: 66.0 Restiv:.0 Sensor: 67.2 Last Casing O.D. Spacing GYRO:.0 DNSC: Sonic:.0 INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 We ran a new Drilformance DF616X2 PDC bit with 6x16's, NOV 6/7 5.0 FBH 1.5 SlkSlv, and the EVO One MWD system. We placed the stabilization at 55' and 90' in an effort to get some drop or at least stay straight. After testing at surface we tripped in the hole, filling pipe every 30 stands to a depth of 7431', where we washed and reamed the last 220' to bottom. We rotary drilled the 1st 157' and then put in a 15' slide. Upon seeing the results of the slide we had actually built.4. On the next stand we slid 30' and rotated to the end of the slide. That slide gave us some drop, and showed a 3.39 /100' motor yield. We were down to 2.69 and rotated ahead. We continued rotating and the assembly was staying in the mid to low 2 range. ROP slowed to 18' and hour with differential and torque being lower. It was decided to POOH at 8430' for slow ROP. At surface the motor drained fine and bearing play was good, but was laid down as a precautionary measure. The bit was severely damaged and 1/32 out of gauge. It was graded 4-6-RO. Both stabilizers were badly worn and peeling metal over the edge. BHA Detail Description Serial # I.D. O.D. Length Sum Top Conn MFG. In. In. Ft Ft Wildcat Tom Allen Bit PDC DF616X2 6x / /8 REGP Drilformance Motor 6/ SLK Slv MM NC 56B NOV DR / / /8 REGB OTHER NM Pony DC B&A77571NM 3 1/4 8 1/ /8 REGB B&A NM Nortrac Stabilizer 12" B&A / /8 REGB B&A VON EVO Tool Carrier C /4 8 1/ /8 REGB VON Directional NM Pony DC DR / / /8 REGB DTI Nortrac Stabilizer 11 3/4" B&A / /8 REGB B&A B&A / NC 56B B&A (6) 8" Drill Collars Rig 3 2 7/ NC 56B RIG Rig 1 2 7/ /2 XHB RIG (15) 6 1/2" Drill Collars Rig 4 2 7/8 6 1/ /2 XHB RIG Rig 2 3 1/2 6 3/ /2 IFB RIG (15) 5 Hevi HWDP /2 IFB Rig Jars SD700100R 2 7/8 6 1/ /2 IFB StabilDril WinSURV II BHA Report - License: NP6459 Township-Section-Range -- Jars O.D.=6.500 In. Length=29.25 Ft FN=2.00 Ft (15) 5 Hevi O.D.=5.000 In. Length= Ft O.D.=6.375 In. (15) 6 1/2" Drill Collars O.D.=6.500 In. Length= Ft O.D.=8.000 In. (6) 8" Drill Collars O.D.=8.000 In. Length= Ft O.D.=8.000 In. Nortrac Stabilizer 11 3/4" O.D.=8.000 In. Length=4.18 Ft FN=1.55 Ft STAB OD= In. NM Pony DC O.D.=7.938 In. Length=11.32 Ft VON EVO Tool Carrier O.D.=8.125 In. Length=19.53 Ft NM Nortrac Stabilizer 12" O.D.=8.063 In. Length=6.73 Ft FN=1.53 Ft STAB OD= In. NM Pony DC O.D.=8.111 In. Length=15.06 Ft O.D.=7.938 In. Motor 6/ SLK Slv.18 rev O.D.=8.000 In. Length=32.13 Ft FN=1.42 Ft Bit PDC DF616X2 6x16 O.D.= In.

52 BHA # 7 SDI Job #: COMPANY: LOCATION: RIG ME: Elevation Resources Trinidad 121 Work Order: FIELD: Legal Desc. Lead DD: STATE: TX Co. Man: Jerry Dually / Kelly Small COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: lbf and Depths Motor Data Drilling Parameters Date In: 12:10 7/ Slick.16 SO/PU: / Date Out: 18:00 MFG.: Renegade Rot Strg Wt: Hrs In Hole: PAD OD: 8 WOB: 0-37 Start Depth: 843 NB Stab: 0.0 TORQ: Depth: 990 Bit to Bend: 5.0 SPP: Total Drilled: 147 Bent Hsg/Sub : 1.5 / Motor RPM: - Avg. Total ROP: Lobe/Stage: 7/8 / 4 Rotary RPM: Circ Hrs: Tot/Only / Rev/Gal 0.16 Flow Rate: Percent Slide:.00 Rotor Jet: 0 Avg Diff: 400 Percent Hrs:.00 Prop BUR: 4 Stall Pres.: Slide Hours:.00 Act BUR: Off Bot Pres.: 1950 Total Sliding:.00 Mud Data Bit Record Avg. Slide ROP: Type WBM SMITH / Bit PDC SSi716 7x15 Percent Rotary: 10 WT: 9.80 PPG GAS: 0 Run #: 3 Percent Hrs: 10 Vis: 37 PV: 4 Type Bit: PDC Rotary Hours: WL: 0 PH: 10.5 IADC#: TFA: 1.21 in² Total Rotary: 147 SOL: 4 SAND: 0.01 JETS: 7-15 Avg. Rotary ROP: Oil %: 0 FT F P Drop: GPM Reason POOH: TD Chlor: YP: 5 Cond.: Junk MWD Gamma: 57.9 Restiv:.0 Sensor: 59.1 Last Casing O.D. Spacing GYRO:.0 DNSC:.0 Sonic:.0 INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 We ran a new Smith SSi716 PDC bit with 7x15's, Renegade 7/ that we took the 12 " stabilizer off the bottom and had no sleeve to put on it, and the EVO One MWD system. We replaced both the stabilizers on this run. After testing at surface we tripped in the hole filling pipe every 30 stands. We washed the last 3 stands to bottom and began rotary drilling. The hole slowly dropped to under 1 and stayed there until TD. We drilled to planned casing point at 9900' without having to make any slides. We circulated on bottom and then short tripped to 5000'. We encountered a tight spot on the way out that we washed and reamed. We went back to bottom again, then circulated another 8 hours prior to tripping all the way out. At surface the motor drained fine and bearing play was acceptable. The bit was graded 8-2-CR, and had some junk damage on the top of the blades. BHA Detail Description Serial # I.D. O.D. Length Sum Top Conn MFG. In. In. Ft Ft Wildcat Tom Allen Bit PDC SSi716 7x15 JM / /8 REGP SMITH Motor 7/ Slick.16 RDM /8 REGB Renegade NM Pony DC B&A77571NM 3 1/4 8 1/ /8 REGB B&A NM Nortrac Stabilizer 12" DR /16 8 1/ /8 REGB DTI VON EVO Tool Carrier C /4 8 1/ /8 REGB VON Directional NM Pony DC DR / / /8 REGB DTI Nortrac Stabilizer 11 3/4" DR / /8 REGB DTI B&A / NC 56B B&A (6) 8" Drill Collars Rig 3 2 7/ NC 56B RIG Rig 1 2 7/ /2 XHB RIG (15) 6 1/2" Drill Collars Rig 4 2 7/8 6 1/ /2 XHB RIG Rig 2 3 1/2 6 3/ /2 IFB RIG (15) 5 Hevi HWDP /2 IFB Rig Jars SD700100R 2 7/8 6 1/ /2 IFB StabilDril Township-Section-Range -- Jars O.D.=6.500 In. Length=29.25 Ft FN=2.00 Ft (15) 5 Hevi O.D.=5.000 In. Length= Ft O.D.=6.375 In. (15) 6 1/2" Drill Collars O.D.=6.500 In. Length= Ft O.D.=8.000 In. (6) 8" Drill Collars O.D.=8.000 In. Length= Ft O.D.=8.000 In. Nortrac Stabilizer 11 3/4" O.D.=8.000 In. Length=6.06 Ft FN=2.50 Ft STAB OD= In. NM Pony DC O.D.=7.938 In. Length=11.32 Ft VON EVO Tool Carrier O.D.=8.125 In. Length=19.53 Ft NM Nortrac Stabilizer 12" O.D.=8.063 In. Length=4.67 Ft FN=2.15 Ft STAB OD= In. NM Pony DC O.D.=8.111 In. Length=15.06 Ft Motor 7/ Slick.16 rev/ga O.D.=8.000 In. Length=27.73 Ft STAB OD= In. WinSURV II BHA Report - License: NP6459 Bit PDC SSi716 7x15 O.D.= In.

53 BHA # 8 SDI Job #: COMPANY: LOCATION: Elevation Resources Work Order: FIELD: Legal Desc. RIG ME: Trinidad 121 Lead DD: Tom Allen STATE: TX Co. Man: Jimmy Nobles COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: and Depths Motor Data Drilling Parameters Date In: 19:40 Motor 7/ SO/PU: / Date Out: 15:10 MFG.: NOV Rot Strg Wt: Hrs In Hole: PAD OD: 7.38 WOB: 0-40 Start Depth: 994 NB Stab: 0.0 TORQ: Depth: Bit to Bend: 5.0 SPP: Total Drilled: Bent Hsg/Sub : 2.38 / Motor RPM: Avg. Total ROP: Lobe/Stage: 7/8 / 6.4 Rotary RPM: Circ Hrs: Tot/Only / Rev/Gal 0.31 Flow Rate: Percent Slide: Rotor Jet: 0 Avg Diff: 1493 Percent Hrs: Prop BUR: 11.6 Stall Pres.: Slide Hours: Act BUR: 17.8 Off Bot Pres.: 2400 Total Sliding: Mud Data Bit Record Avg. Slide ROP: Type OB Ulterra / Bit PDC U516M 5x16 Percent Rotary: WT: PPG GAS: 0 Run #: 4 Percent Hrs: Vis: 76 PV: 25 Type Bit: PDC Rotary Hours: 6.08 WL: 4.2 PH: 10.5 IADC#: TFA: 0.98 in² Total Rotary: SOL: 18 SAND: 0.01 JETS: 5-16 Avg. Rotary ROP: Oil %: 66 FT F P Drop: GPM Reason POOH: LIH Chlor: YP: 15 Cond.: LIH MWD Gamma: 56.0 Restiv:.0 Sensor: 57.6 Last Casing O.D. Spacing GYRO:.0 DNSC:.0 Sonic:.0 INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 The purpose of this BHA was to drill an 8.5" curve at 11.7 /100' landing at 10430' and The assembly consisted of a new Ulterra U516M PDC bit with 5x16's, NOV 7/ TruSlk, and the VON EVO MWD system. After surface testing tools, we tripped in the hole and began drilling the curve at 9940'. We slid 100% until we could see what our motor was yielding and the first full survey showed a 17 /100' DLS. We began rotating some on each joint to get the DLS down to what we needed to land. We started encountering some hole problems and were hanging up frequently while sliding. We began back reaming and reaming each stand. We got a target change and the TVD was lowered from 10430' to 10445' and to land at 90. We drilled to a depth of 10863', where we were 6' below the line with 89. We circulated at TD for 2 hours while rotating and reciprocating the drill string, before beginning to back ream out of the curve. We back reamed from 10863' to 10610' and then pressured up and packed off. We worked stuck pipe with no circulation for a while and then it was decided to begin fishing operations. After running a freepoint we found that we were 100% free to the top of the directional tools. We backed off 2 joints above the directional tools and pulled out for jars. It didn't appear that we moved the fish during jarring. We were also experiencing hole problems while trying to free the stuck tools. The next time we ran a freepoint the stuck point had moved up to the 2nd joint above the tools. We made multiple clean out runs and were getting lots of medium to large pieces of shale back during the initial clean out runs. We were going to run a vibrating tool, but couldn't get screwed into the fish. After 6 days of fishing it was decided to run 7" casing to the top of the fish and then run a casing whipstock. All the problems can be traced back to not getting the 9 5/8" casing to the bottom of the 12 ¼" hole. We had 393' of exposed 12 ¼" hole that we were having troubles with. When finished the top of the fish was at 10418', the bottom was at 10610', and the end of the as drilled hole was at 10863'. BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. Bit PDC U516M 5x / /2 REGP Ulterra Motor 7/ TruSlk / /2 IFB NOV DR /16 6 1/ /2 XHB DTI NM Pony DC DR /8 6 1/ /2 XHB DTI VON EVO Tool Carrier C /16 6 5/ /2 XHB VON Directional NM DR /8 6 3/ /2 IFB DTI WinSURV II BHA Report - License: NP6459 Wildcat Township-Section-Range -- N/A

54 BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. NM Flex B&A6719FC 2 7/8 4 7/ /2 IFB B&A (20) 5 Drill Pipe DP S /2 IFB Rig (15) 5 Hevi HWDP /2 IFB Rig (15) 5 Hevi O.D.=5.000 In. Length= Ft (20) 5 Drill Pipe O.D.=5.000 In. Length= Ft NM Flex O.D.=4.875 In. Length=28.97 Ft FN=2.76 Ft NM O.D.=6.750 In. VON EVO Tool Carrier O.D.=6.625 In. Length=19.31 Ft NM Pony DC O.D.=6.500 In. Length=13.60 Ft O.D.=6.500 In. Motor 7/ TruSlk.31 re O.D.=6.750 In. Length=29.95 Ft FN=1.32 Ft WinSURV II BHA Report - License: NP6459 Bit PDC U516M 5x16 O.D.=8.500 In. Length=1.00 Ft

55 BHA # 9 SDI Job #: COMPANY: LOCATION: Elevation Resources Work Order: FIELD: Legal Desc. RIG ME: Trinidad 121 Lead DD: Tom Allen STATE: TX Co. Man: David Crow COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: and Depths Motor Data Drilling Parameters Date In: 07:00 Motor 7/ SO/PU: / Date Out: 09:05 MFG.: NOV Rot Strg Wt: Hrs In Hole: PAD OD: 5.38 WOB: 0-40 Start Depth: NB Stab: 0.0 TORQ: Depth: 1249 Bit to Bend: 4.1 SPP: Total Drilled: Bent Hsg/Sub : 1.83 / Motor RPM: 116 Avg. Total ROP: Lobe/Stage: 7/8 / 3.8 Rotary RPM: Circ Hrs: Tot/Only / Rev/Gal 0.52 Flow Rate: Percent Slide: Rotor Jet: 0 Avg Diff: 600 Percent Hrs: Prop BUR: 11.6 Stall Pres.: Slide Hours: Act BUR: 14 Off Bot Pres.: 2800 Total Sliding: Mud Data Bit Record Avg. Slide ROP: Type OB Ulterra / Ulterra U613M Percent Rotary: WT: PPG GAS: 0 Run #: 5 Percent Hrs: Vis: 62 PV: 20 Type Bit: PDC Rotary Hours: WL: 4.2 PH: 10.5 IADC#: TFA: 1.69 in² Total Rotary: SOL: 14.7 SAND: 0.01 JETS: 6-14 Avg. Rotary ROP: Oil %: 78 FT 153F P Drop: GPM Reason POOH: BHA Chlor: YP: 20 Cond.: Good MWD Gamma: 34.3 Restiv:.0 Sensor: 44.0 Last Casing O.D. Spacing GYRO:.0 DNSC:.0 Sonic:.0 INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 The purpose of the assembly was to drill a sidetrack curve from the bottom of the rathole from the whipstock. It consisted off a Ulterra U613M 6 1/8" PDC bit with 6x14's, NOV 7/ TruSlk, and the Gordon Shockmizer MWD system. After surface testing, we tripped in the hole filling pipe every 30 stands to 10337' where we tried to sync up the MWD but had some problems. We swapped pumps, changed flow rates, and had to change data rates before we could get synced up. Then we couldn't get toolface and had to download a different sequence to the floor monitor and then we started getting all the data. We oriented above the slide to 50R toolface and then kicked the pump out and slid down the slide to 2' from the bottom of the rathole. We then brought the pump back up and began slide drilling and at a slow rate for 5'. We made a connection and we pressured up multiple times and the pulled back up into casing to investigate. We could rotate and the pressure would go back to normal. We went back to bottom and tried again with more pressure increases. We kept circulating and rotating some until things started looking better. We went back to drilling and were sliding 100% for the 1st 132' before we began rotating. We got our 1st good survey at 10524' and things were going good. We continued slide rotational sequences to land at target TVD, we landed at 88 anticipating build in rotation but the assembly was dropping. The motor yield for the curve was /100'. We began drilling the lateral and the assembly was dropping in rotation, we got as low as 20' below the line before we got the inclination above where we were supposed to be. We were sliding a lot just to keep the angle up, and then we got into some very fast drilling and the assembly was getting up to 5 doglegs in rotation. The hole turned 4 to the left over the course of 3 stands and we slid 64' out of the last 178'. We drilled to the planned point where we were going to trip for the lateral assembly at 12490'. Assembly didn't track at all and there were a couple of large doglegs while rotating. We then pulled out for the stabilized lateral assembly. At surface the motor drained fine and bearing play was acceptable. The bit was like new but had 1 water course plugged and another jet was plugged. The bit was grade 1-1. BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. Ulterra U613M / /2 REGP Ulterra Motor 7/ Slk/Slv / /2 IFB NOV Shockmizer UBHO Sub GT B 2 3/8 4 3/ /2 IFB Gordon NMDC B&A /16 4 3/ /2 IFB B&A NM Flex B&A /16 4 3/ /2 IFB B&A WinSURV II BHA Report - License: NP6459 Wildcat Township-Section-Range -- N/A

56 BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. B&A47586XO 2 5/8 4 15/ XT39B B&A (66) 4'' Drill Pipe DP-3-S XT39B Rig (90) 4'' HWDP HWDP XT39B Rig (90) 4'' HWDP O.D.=4.000 In. Length= Ft (66) 4'' Drill Pipe O.D.=4.000 In. Length= Ft O.D.=4.938 In. NM Flex O.D.=4.750 In. Length=30.53 Ft FN=3.51 Ft NMDC O.D.=4.750 In. Length=30.79 Ft Shockmizer UBHO Sub O.D.=4.750 In. Motor 7/ Slk/Slv.52 O.D.=4.750 In. Length=23.88 Ft FN=1.00 Ft WinSURV II BHA Report - License: NP6459 Ulterra U613M O.D.=6.125 In. Length=.75 Ft

57 BHA # 10 SDI Job #: COMPANY: LOCATION: Elevation Resources Work Order: FIELD: Legal Desc. RIG ME: Trinidad 121 Lead DD: Tom Allen STATE: TX Co. Man: David Crow COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: and Depths Motor Data Drilling Parameters Date In: 09:05 7/ SlkSlv SO/PU: / Date Out: 21:35 MFG.: Dynomax Rot Strg Wt: Hrs In Hole: PAD OD: 5 7/16 WOB: Start Depth: 1249 NB Stab: 0.0 TORQ: Depth: Bit to Bend: 3.7 SPP: Total Drilled: Bent Hsg/Sub : 1.25 / Motor RPM: Avg. Total ROP: Lobe/Stage: 7/8 / 3.8 Rotary RPM: Circ Hrs: Tot/Only / Rev/Gal 0.52 Flow Rate: Percent Slide: Rotor Jet: 0 Avg Diff: 600 Percent Hrs: Prop BUR: 7.53 Stall Pres.: 1085 Slide Hours: Act BUR: 5 Off Bot Pres.: 3400 Total Sliding: Mud Data Bit Record Avg. Slide ROP: Type OB SMITH / Smith MDi513 3x18' & 3x12's Percent Rotary: WT: PPG GAS: 0 Run #: 6 Percent Hrs: Vis: 68 PV: 23 Type Bit: PDC Rotary Hours: WL: 4.8 PH: 10.5 IADC#: TFA: 1.92 in² Total Rotary: SOL: 14.7 SAND: 0.01 JETS: 2-12,15,3-18 Avg. Rotary ROP: Oil %: 80 FT 153F P Drop: GPM Reason POOH: BHA Chlor: YP: 19 Cond.: Good MWD Gamma: 40.2 Restiv:.0 Sensor: 50.0 Last Casing O.D. Spacing GYRO:.0 DNSC:.0 Sonic:.0 INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 We ran a new Smith MDi513 PDC bit with 3x12's and 3x18's, a Dynomax 7/ , Gordon MWD with ULF Shockmizer UBHO Sub with a steel stabilizer above the motor and a NM stabilizer between the monels. We tripped in the hole filling pipe every 30 stands to above the whipstock where we oriented to 40R and slid down the slide and then continued in the hole to 12322'. We attempted to wash to bottom but we almost got stuck and then were packing off, we back reamed out of hole to just below the whipstock and then pulled above the whipstock with no pump. We then circulated and oriented the toolface to 40R and kicked the pump out and slid to 10405', where we washed and reamed the entire curve to 10823', pumped a sweep and circulated it out before we tripped in the hole to 12322' and washed and reamed to bottom with no problems this time. We began drilling and we were having to slide quite a bit to maintain the direction and inclination we needed. The operator opened the left / right window to 100' and we were still having trouble controlling the direction, one 30' slide at 60L the hole turned almost 4 degrees to the right. While trying to get the direction back from 354 to 347 we lost 4 sliding at 60-70L. It appears the calculated toolface is 60 to the left of the actual toolface. We were going to slide at 30R to compensate but the engineer decided we would POOH to investigate the BHA and pick up a 1.5 motor to cut down on the sliding footage. On surface, we re-scribed to verify motor highside to muleshoe sleeve key. The motor scribe was 42 left of muleshoe sleeve key, the sleeve set screws were nice and tight. We then proceeded to check the break out torque on the following connections, the muleshoe sub break out torque was 19,200 ft/lbs. The stabilizer below the muleshoe sub break out was 14,400k. The top stabilizer break out was at 15,200k. These connections were torqued to specs at 9k prior to going in the hole. The motor connection between the stator housing and the fixed bend housing looked suspicious exhibiting signs of over torque also this might of happened when we almost got stuck earlier when tripping in with this assembly and saw torque of up to 20k while attempting to work pipe. Motor drained fine and bearing play was acceptable. The bit was graded a 1-2. BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. Smith MDi513 3x18' & 3x12's JM / /2 REGP SMITH Motor 7/ SlkSlv DD /2 IFB Dynomax Stabilizer Nortrac 5 7/8" B&A /4 4 3/ /2 IFB B&A Shockmizer UBHO Sub ULF GT * 2 3/8 4 3/ /2 IFB Gordon NMDC B&A /16 4 3/ /2 IFB B&A WinSURV II BHA Report - License: NP6459 Wildcat Township-Section-Range -- N/A

58 BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. NM Stabilizer Nortrac 5 7/8" B&A /16 4 3/ /2 IFB B&A NM Flex B&A /16 4 3/ /2 IFB B&A B&A47586XO 2 5/8 4 15/ XT39B B&A (66) 4'' Drill Pipe DP-3-S XT39B Rig Accelglide /4 5 3/ XT39B Driformance Accelglide /4 5 1/ XT39B Driformance (195) 4'' Drill Pipe DP-3-S XT39B Rig (90) 4'' HWDP HWDP XT39B Rig (90) 4'' HWDP O.D.=5.000 In. Length= Ft (195) 4'' Drill Pipe O.D.=4.000 In. Length= Ft Accelglide O.D.=5.125 In. Accelglide O.D.=5.188 In. (66) 4'' Drill Pipe O.D.=4.000 In. Length= Ft O.D.=4.938 In. Length=2.90 Ft NM Flex O.D.=4.750 In. Length=30.53 Ft FN=3.51 Ft NM Stabilizer Nortrac 5 7/8" O.D.=4.750 In. Length=4.94 Ft FN=2.01 Ft NMDC O.D.=4.750 In. Length=30.79 Ft Shockmizer UBHO Sub ULF O.D.=4.750 In. Length=3.27 Ft Stabilizer Nortrac 5 7/8" O.D.=4.750 In. Length=5.84 Ft FN=2.25 Ft Motor 7/ SlkSlv.52 rev O.D.=5.000 In. Length=23.74 Ft FN=1.47 Ft WinSURV II BHA Report - License: NP6459 Smith MDi513 3x18' & 3x12's O.D.=6.125 In.

59 BHA # 11 SDI Job #: COMPANY: LOCATION: Elevation Resources Work Order: FIELD: Legal Desc. RIG ME: Trinidad 121 Lead DD: Tom Allen STATE: TX Co. Man: David Crow COUNTY: TYPE: Steerable Assembly WELL ME: UL G 9-46 Unit 2H BHA WT: lbf Jars: and Depths Motor Data Drilling Parameters Date In: 21:35 Motor 7/ SlkSlv SO/PU: / Date Out: 04:30 MFG.: NOV Rot Strg Wt: Hrs In Hole: PAD OD: 5 3/8 WOB: Start Depth: NB Stab: 0.0 TORQ: Depth: Bit to Bend: 3.9 SPP: Total Drilled: Bent Hsg/Sub : 1.5 / Motor RPM: 130 Avg. Total ROP: Lobe/Stage: 7/8 / 3.8 Rotary RPM: Circ Hrs: Tot/Only / Rev/Gal 0.52 Flow Rate: Percent Slide: 6.80 Rotor Jet: 0 Avg Diff: 650 Percent Hrs: Prop BUR: 9.6 Stall Pres.: 803 Slide Hours: Act BUR: 11 Off Bot Pres.: 4500 Total Sliding: 29 Mud Data Bit Record Avg. Slide ROP: 9.89 Type OB SMITH / Bit PDC MDi613 3x12 3x16 Percent Rotary: WT: PPG GAS: 0 Run #: 7 Percent Hrs: Vis: 69 PV: 22 Type Bit: PDC Rotary Hours: WL: 4.6 PH: 10.5 IADC#: TFA: 1.71 in² Total Rotary: SOL: 16.4 SAND: 0.01 JETS: 3-12,3-16 Avg. Rotary ROP: Oil %: 85 FT 190F P Drop: GPM Reason POOH: Chlor: YP: 18 Cond.: MWD Gamma: 40.3 Restiv:.0 Sensor: 50.0 Last Casing O.D. Spacing GYRO:.0 DNSC:.0 Sonic:.0 INC IN:.0 INC OUT:.0 AZM IN:.00 AZM OUT:.00 Wildcat Township-Section-Range -- N/A (90) 4'' HWDP O.D.=5.000 In. Length= Ft (195) 4'' Drill Pipe O.D.=4.000 In. Length= Ft Accelglide O.D.=5.125 In. Accelglide O.D.=5.188 In. (66) 4'' Drill Pipe O.D.=4.000 In. Length= Ft O.D.=4.938 In. Length=2.90 Ft NM Flex O.D.=4.750 In. Length=30.53 Ft FN=3.51 Ft BHA Detail Description Serial # I.D. O.D. Length Sum In. In. Ft Ft Top Conn MFG. Bit PDC MDi613 3x12 3x16 JJ / /2 REGP SMITH Motor 7/ Slk/Slv / /2 IFB NOV Stabilizer Nortrac 5 7/8" B&A /4 4 3/ /2 IFB B&A Shockmizer UBHO Sub ULF GT B* 2 3/8 4 3/ /2 IFB Gordon NMDC B&A /16 4 3/ /2 IFB B&A NM Stabilizer Nortrac 5 7/8" B&A /4 4 3/ /2 IFB B&A NM Flex B&A /16 4 3/ /2 IFB B&A B&A47586XO 2 5/8 4 15/ XT39B B&A (66) 4'' Drill Pipe DP-3-S XT39B Rig Accelglide /4 5 3/ XT39B Driformance Accelglide /4 5 1/ XT39B Driformance (195) 4'' Drill Pipe DP-3-S XT39B Rig (90) 4'' HWDP HWDP XT39B Rig NM Stabilizer Nortrac 5 7/8" O.D.=4.750 In. Length=4.94 Ft FN=2.01 Ft NMDC O.D.=4.750 In. Length=30.79 Ft Shockmizer UBHO Sub ULF O.D.=4.750 In. Length=3.29 Ft Stabilizer Nortrac 5 7/8" O.D.=4.750 In. Length=5.84 Ft FN=2.25 Ft Motor 7/ Slk/Slv.52 rev O.D.=4.813 In. Length=23.98 Ft FN=1.00 Ft WinSURV II BHA Report - License: NP6459 Bit PDC MDi613 3x12 3x16 O.D.=6.125 In.

60 UL G 9-46 Unit 2H END OF WELL REPORT Motor Reports of Well Report: UL G 9-46 Unit 2H

61 BHA # SDI Job #: COMPANY: LOCATION: RIG ME: STATE: 1 COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. -- Trinidad 121 Lead DD: Tom Allen TX Co. Man: David Crow / Kelly Small Motor Failed? NO UL G 9-46 Unit 2H and Depths (This BHA) Motor Data Drilling Parameters Date In: 05:10 Desc: 7/ Stab.17 SO/PU: / Date Out: 18:30 MFG.: NOV Rot Wt: Hrs In Hole: BHA Circ/ All BHA: 3.67 / 3.67 WOB: Start Depth: Motor SN: TORQ: Depth: PAD OD: SPP: Total Drilled: NB Stab: Motor RPM: Avg. Total ROP: Bit to Bend: 6.95 Rotary RPM: Circ Hrs:Tot/Only 3.67 /.92 Bent Hsg / Sub: 1.5 / Flow Rate: Percent Slide: Lobe/Stage: 7/8 / 4 Avg Diff: 500 Percent Hrs: Revs/Gal 0.17 Stall Pres.: Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: 2100 Bit Record Avg. Slide ROP: Act BUR: 7 SMITH / Bit PDC Smith XS716S 7x15 Percent Rotary: Stator Clearance: Run #: 1 Percent Hrs: Lower Stab OD: Type Bit: PDC Rot / Total Hrs: 1.33 / 2.75 Upper Stab OD: IADC#: TFA: 1.21 in² Rotary Drilled: Extended Motor? NO JETS: 7-15 Avg. Rotary ROP: Number of Stalls: 0 P Drop: 628 GPM Reason POOH: DTF Stall Duration: 0 Cond.: Fine Mud Data Type Reserve Water WT: 9.9PPG Vis: 0 WL: 0 PV: 29 Flow T : 0.0 SAND: 0 Chlor: 0 GAS: 0 SOL: 0 Oil %: 0 YP: 0 PH: 0 Bottom Hole T : 0.0 Formation: EXPANDED REASON PULLED: Investigate pressure increase Township-Section-Range BHA PERFORMANCE: Didn't drill enough to see what my 22' slide did, pressured up and gained 1200# with 50 less strokes at the same time the MWD quit ADDITIOL COMMENTS: (Expands to next page if necessary) At surface motor drained fine and bearing play was good, WinSURV II Mud Motor Report

62 BHA # SDI Job #: COMPANY: LOCATION: RIG ME: STATE: 2 COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. -- Trinidad 121 Lead DD: Tom Allen TX Co. Man: David Crow / Kelly Small Motor Failed? NO UL G 9-46 Unit 2H and Depths (This BHA) Motor Data Drilling Parameters Date In: 18:30 Desc: 7/ Stab.17 SO/PU: / Date Out: 10:30 MFG.: Paradigm Rot Wt: Hrs In Hole: BHA Circ/ All BHA: 1.83 / WOB: Start Depth:.00 Motor SN: PDT77505 TORQ: - Depth:.00 PAD OD: SPP: Total Drilled:.00 NB Stab: Motor RPM: - Avg. Total ROP: Bit to Bend: 5.95 Rotary RPM: - Circ Hrs:Tot/Only 1.83 / 1.83 Bent Hsg / Sub: 1.5 / Flow Rate: Percent Slide: Lobe/Stage: 7/8 / 4 Avg Diff: 0 Percent Hrs: Revs/Gal 0.17 Stall Pres.: Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: Bit Record Avg. Slide ROP: Act BUR: SMITH / Percent Rotary: Stator Clearance: Run #: RR1 Percent Hrs: Lower Stab OD: Type Bit: PDC Rot / Total Hrs:.00 /.00 Upper Stab OD: IADC#: TFA: 1.21 in² Rotary Drilled:.00 Extended Motor? NO JETS: 7-15 Avg. Rotary ROP: Number of Stalls: 0 P Drop: 628 GPM Reason POOH: DTF Stall Duration: 0 Cond.: Fine Mud Data Type Reserve Water WT: 9.9PPG Vis: 0 WL: 0 PV: 29 Flow T : 0.0 SAND: 0 Chlor: 0 GAS: 0 SOL: 0 Oil %: 0 YP: 0 PH: 0 Bottom Hole T : 0.0 Formation: EXPANDED REASON PULLED: MWD wouldn't work at test Township-Section-Range BHA PERFORMANCE: Didn't drill, couldn't get MWD tool to surface test ADDITIOL COMMENTS: (Expands to next page if necessary) Motor looked good on surface and bit was fine WinSURV II Mud Motor Report

63 BHA # SDI Job #: COMPANY: LOCATION: RIG ME: STATE: 3 COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. -- Trinidad 121 Lead DD: Tom Allen TX Co. Man: David Crow / Kelly Small Motor Failed? NO UL G 9-46 Unit 2H and Depths (This BHA) Motor Data Drilling Parameters Date In: 10:30 Desc: 7/ NBS.17 SO/PU: / Date Out: 08:00 MFG.: Paradigm Rot Wt: Hrs In Hole: BHA Circ/ All BHA: / WOB: 0-45 Start Depth: Motor SN: PDT77505 TORQ: Depth: PAD OD: SPP: Total Drilled: NB Stab: Motor RPM: Avg. Total ROP: Bit to Bend: 5.97 Rotary RPM: Circ Hrs:Tot/Only / 3.58 Bent Hsg / Sub: 1.5 / Flow Rate: Percent Slide: 7.10 Lobe/Stage: 7/8 / 4 Avg Diff: 450 Percent Hrs: Revs/Gal 0.17 Stall Pres.: 1000 Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: 1800 Bit Record Avg. Slide ROP: Act BUR: 8 SMITH / Bit PDC Smith XS716S 7x15 Percent Rotary: Stator Clearance: Run #: RR1 Percent Hrs: Lower Stab OD: Type Bit: PDC Rot / Total Hrs: / Upper Stab OD: IADC#: TFA: 1.21 in² Rotary Drilled: Extended Motor? NO JETS: 7-15 Avg. Rotary ROP: Number of Stalls: 5 P Drop: 628 GPM Reason POOH: PR Stall Duration: 5 Cond.: Junk Mud Data Type Reserve Water WT: 9.6PPG Vis: 0 WL: 0 PV: 29 Flow T : 0.0 SAND: 0 Chlor: GAS: 0 SOL: 1 Oil %: 0 YP: 1 PH: 0 Bottom Hole T : 0.0 Formation: EXPANDED REASON PULLED: Slowing ROP Township-Section-Range BHA PERFORMANCE: Ok -- BHA was difficult to steer with limited and variable motor yields, although it did build within managable levels in rotation. ADDITIOL COMMENTS: (Expands to next page if necessary) On the way out of the hole the motor did not hold fluid, the bit and bit box could be turned by hand with the breaker WinSURV II Mud Motor Report

64 BHA # SDI Job #: COMPANY: LOCATION: RIG ME: STATE: 4 COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. -- Trinidad 121 Lead DD: Tom Allen TX Co. Man: David Crow / Kelly Small Motor Failed? NO UL G 9-46 Unit 2H Township-Section-Range and Depths (This BHA) Motor Data Drilling Parameters Date In: 08:00 Desc: 7/ /4 NBS SO/PU: / Date Out: 22:30 MFG.: NOV Rot Wt: Hrs In Hole: BHA Circ/ All BHA:.83 / 0.83 WOB: 0-0 Start Depth:.00 Motor SN: W TORQ: - Depth:.00 PAD OD: SPP: 0-0 Total Drilled:.00 NB Stab: Motor RPM: - Avg. Total ROP: Bit to Bend: 6.23 Rotary RPM: - Circ Hrs:Tot/Only.83 /.83 Bent Hsg / Sub: 1.5 / Flow Rate: Percent Slide: Lobe/Stage: 7/8 / 4 Avg Diff: 855 Percent Hrs: Revs/Gal 0.17 Stall Pres.: Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: Bit Record Avg. Slide ROP: Act BUR: SMITH / Bits PDC XS716S Percent Rotary: Stator Clearance: Run #: 2 Percent Hrs: Lower Stab OD: Type Bit: PDC Rot / Total Hrs:.00 /.00 Upper Stab OD: IADC#: TFA: 1.21 in² Rotary Drilled:.00 Extended Motor? NO JETS: 7-15 Avg. Rotary ROP: Number of Stalls: P Drop: 502 GPM Reason POOH: HP Stall Duration: Cond.: Green Mud Data Type WBM WT: 8.9PPG Vis: 30 WL: 0 PV: 4 Flow T : 0.0 SAND: 0 Chlor: GAS: 0 SOL: 0.9 Oil %: 0 YP: 4 PH: 11 Bottom Hole T : 0.0 Formation: EXPANDED REASON PULLED: While TIH to start the run, we became stuck; free-point was in middle of 6.5" collars. After backing off and getting back on fish with drilling jars, we fished for three days and finally got free. We were never able to circulate on the string after backing off of the fish, likely due to a string obstruction. BHA PERFORMANCE: Zero footage drilled. ADDITIOL COMMENTS: (Expands to next page if necessary) Once surface after the run, we found the string was packed off from the top of the EVO collar to the motor. We were unable to turn the bit box with the rotary table. Additionally, the bit was green but was missing one jet; threads appeared intact. WinSURV II Mud Motor Report

65 BHA # SDI Job #: COMPANY: LOCATION: RIG ME: STATE: 5 COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. -- Trinidad 121 Lead DD: Tom Allen TX Co. Man: David Crow / Kelly Small Motor Failed? NO UL G 9-46 Unit 2H and Depths (This BHA) Motor Data Drilling Parameters Date In: 19:30 Desc: 7/ NBS.17 SO/PU: / Date Out: 20:50 MFG.: NOV Rot Wt: Hrs In Hole: BHA Circ/ All BHA: / WOB: 0-44 Start Depth: Motor SN: W TORQ: Depth: PAD OD: SPP: Total Drilled: NB Stab: Motor RPM: Avg. Total ROP: Bit to Bend: 7.25 Rotary RPM: Circ Hrs:Tot/Only / 5.92 Bent Hsg / Sub: 1.5 / Flow Rate: Percent Slide: Lobe/Stage: 7/8 / 4 Avg Diff: 400 Percent Hrs: Revs/Gal 0.17 Stall Pres.: Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: 1700 Bit Record Avg. Slide ROP: 8.26 Act BUR: SMITH / Bits Smith PDC XS716S 7x15 Percent Rotary: Stator Clearance: Run #: 2RR Percent Hrs: Lower Stab OD: Type Bit: PDC Rot / Total Hrs: / Upper Stab OD: IADC#: TFA: 1.21 in² Rotary Drilled: Extended Motor? NO JETS: 7-15 Avg. Rotary ROP: Number of Stalls: 0 P Drop: 628 GPM Reason POOH: PR Stall Duration: 0 Cond.: Trashed Mud Data Type WBM WT: 9.4PPG Vis: 38 WL: 0 PV: 4 Flow T : 0.0 SAND: 0 Chlor: GAS: 0 SOL: 5 Oil %: 0 YP: 6 PH: 10 Bottom Hole T : 0.0 Formation: EXPANDED REASON PULLED: Slow ROP while sliding Township-Section-Range BHA PERFORMANCE: Building in rotation and slides not yielding as much as we would like, MWD problems at the start of the run ADDITIOL COMMENTS: (Expands to next page if necessary) At surface the motor drained normally and there was minimal axial or lateral play in the bearings. The bit box could not be turned by hand. WinSURV II Mud Motor Report

66 BHA # SDI Job #: COMPANY: LOCATION: RIG ME: STATE: 6 COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. -- Trinidad 121 Lead DD: Tom Allen TX Co. Man: Jerry Dually / Kelly Small Motor Failed? NO UL G 9-46 Unit 2H and Depths (This BHA) Motor Data Drilling Parameters Date In: 20:50 Desc: 6/ SlkSlv.18 SO/PU: / Date Out: 12:10 MFG.: NOV Rot Wt: Hrs In Hole: BHA Circ/ All BHA: / WOB: 0-43 Start Depth: Motor SN: MM TORQ: Depth: 843 PAD OD: SPP: Total Drilled: NB Stab: Motor RPM: Avg. Total ROP: Bit to Bend: 6.95 Rotary RPM: Circ Hrs:Tot/Only / 4.92 Bent Hsg / Sub: 1.5 / Flow Rate: Percent Slide: 5.79 Lobe/Stage: 6/7 / 5 Avg Diff: 500 Percent Hrs: Revs/Gal 0.18 Stall Pres.: Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: 1900 Bit Record Avg. Slide ROP: 9.31 Act BUR: 3.39 Drilformance / Bit PDC DF616X2 6x16 Percent Rotary: Stator Clearance: Run #: 3 Percent Hrs: Lower Stab OD: Type Bit: PDC Rot / Total Hrs: / Upper Stab OD: IADC#: TFA: 1.18 in² Rotary Drilled: Extended Motor? NO JETS: 6-16 Avg. Rotary ROP: Number of Stalls: 0 P Drop: 628 GPM Reason POOH: PR Stall Duration: 0 Cond.: Junk Mud Data Type WBM WT: 9.1PPG Vis: 35 WL: 0 PV: 4 Flow T : 0.0 SAND: 0.0 Chlor: GAS: 0 SOL: 4 Oil %: 0 YP: 4 PH: 10. Bottom Hole T : 0.0 Formation: EXPANDED REASON PULLED: Slow ROP Township-Section-Range BHA PERFORMANCE: Assembly held angle once we got it down in the 2 range, stabilizer spacing change looks like it eliminated the building tendency. ADDITIOL COMMENTS: (Expands to next page if necessary) Motor drained fine and bearing play was within specifications, laid down as a precautionary measure. WinSURV II Mud Motor Report

67 BHA # SDI Job #: COMPANY: LOCATION: RIG ME: STATE: 7 COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. -- Trinidad 121 Lead DD: Tom Allen TX Co. Man: Jerry Dually / Kelly Small Motor Failed? NO UL G 9-46 Unit 2H and Depths (This BHA) Motor Data Drilling Parameters Date In: 12:10 Desc: 7/ Slick.16 SO/PU: / Date Out: 18:00 MFG.: Renegade Rot Wt: Hrs In Hole: BHA Circ/ All BHA: / WOB: 0-37 Start Depth: 843 Motor SN: RDM78215 TORQ: Depth: 990 PAD OD: 8.00 SPP: Total Drilled: 147 NB Stab: Motor RPM: - Avg. Total ROP: Bit to Bend: 5.03 Rotary RPM: Circ Hrs:Tot/Only / Bent Hsg / Sub: 1.5 / Flow Rate: Percent Slide:.00 Lobe/Stage: 7/8 / 4 Avg Diff: 400 Percent Hrs:.00 Revs/Gal 0.16 Stall Pres.: Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: 1950 Bit Record Avg. Slide ROP: Act BUR: SMITH / Bit PDC SSi716 7x15 Percent Rotary: 10 Stator Clearance: Run #: 3 Percent Hrs: 10 Lower Stab OD: Type Bit: PDC Rot / Total Hrs: / Upper Stab OD: IADC#: TFA: 1.21 in² Rotary Drilled: 147 Extended Motor? NO JETS: 7-15 Avg. Rotary ROP: Number of Stalls: 0 P Drop: 628 GPM Reason POOH: TD Stall Duration: 0 Cond.: Junk Mud Data Type WBM WT: 9.8PPG Vis: 37 WL: 0 PV: 4 Flow T : 0.0 SAND: 0.0 Chlor: GAS: 0 SOL: 4 Oil %: 0 YP: 5 PH: 10. Bottom Hole T : 0.0 Formation: EXPANDED REASON PULLED: Reached TD of 12 1/4" hole Township-Section-Range BHA PERFORMANCE: Assembly dropped slowly to under 1 and maintained that down to casing point ADDITIOL COMMENTS: (Expands to next page if necessary) At surface the motor drained fine and bearing play was acceptable WinSURV II Mud Motor Report

68 BHA # SDI Job #: COMPANY: LOCATION: RIG ME: STATE: 8 COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. Trinidad 121 Lead DD: Tom Allen TX Co. Man: Jimmy Nobles Motor Failed? NO UL G 9-46 Unit 2H and Depths (This BHA) Motor Data Drilling Parameters Date In: 19:40 Desc: Motor 7/ TruSlk SO/PU: / Date Out: 15:10 MFG.: NOV Rot Wt: Hrs In Hole: BHA Circ/ All BHA: / WOB: 0-40 Start Depth: 994 Motor SN: TORQ: Depth: PAD OD: 7.38 SPP: Total Drilled: NB Stab: Motor RPM: Avg. Total ROP: Bit to Bend: 5.00 Rotary RPM: Circ Hrs:Tot/Only / Bent Hsg / Sub: 2.38 / Flow Rate: Percent Slide: Lobe/Stage: 7/8 / 6.4 Avg Diff: 1493 Percent Hrs: Revs/Gal 0.31 Stall Pres.: Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: 2400 Bit Record Avg. Slide ROP: Act BUR: 17.8 Ulterra / Bit PDC U516M 5x16 Percent Rotary: Stator Clearance: Run #: 4 Percent Hrs: Lower Stab OD: Type Bit: PDC Rot / Total Hrs: 6.08 / Upper Stab OD: IADC#: TFA:.98 in² Rotary Drilled: Extended Motor? NO JETS: 5-16 Avg. Rotary ROP: Number of Stalls: 0 P Drop: 596 GPM Reason POOH: LIH Stall Duration: 0 Cond.: LIH Mud Data Type OB WT: 11.0PPG Vis: 76 WL: 4.2 PV: 25 Flow T : 0.0 SAND: 0.0 Chlor: GAS: 0 SOL: 18 Oil %: 66 YP: 15 PH: 10. Bottom Hole T : 0.0 Formation: EXPANDED REASON PULLED: Got stuck while back reaming curve Township-Section-Range -- BHA PERFORMANCE: Tools performed fine, yield rate was 153% of book value, every thing went fine right up until we got stuck ADDITIOL COMMENTS: All tools were LIH (Expands to next page if necessary) WinSURV II Mud Motor Report

69 BHA # SDI Job #: COMPANY: LOCATION: RIG ME: STATE: 9 COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. Trinidad 121 Lead DD: Tom Allen TX Co. Man: David Crow Motor Failed? NO UL G 9-46 Unit 2H and Depths (This BHA) Motor Data Drilling Parameters Date In: 07:00 Desc: Motor 7/ SlkSlv SO/PU: / Date Out: 09:05 MFG.: NOV Rot Wt: Hrs In Hole: BHA Circ/ All BHA: / WOB: 0-40 Start Depth: Motor SN: TORQ: Depth: 1249 PAD OD: 5.38 SPP: Total Drilled: NB Stab: Motor RPM: Avg. Total ROP: Bit to Bend: 4.06 Rotary RPM: Circ Hrs:Tot/Only / Bent Hsg / Sub: 1.83 / Flow Rate: Percent Slide: Lobe/Stage: 7/8 / 3.8 Avg Diff: 600 Percent Hrs: Revs/Gal 0.52 Stall Pres.: Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: 2800 Bit Record Avg. Slide ROP: Act BUR: 14 Ulterra / Ulterra U613M Percent Rotary: Stator Clearance: Run #: 5 Percent Hrs: Lower Stab OD: Type Bit: PDC Rot / Total Hrs: / Upper Stab OD: IADC#: TFA: 1.69 in² Rotary Drilled: Extended Motor? NO JETS: 6-14 Avg. Rotary ROP: Number of Stalls: 2 P Drop: 502 GPM Reason POOH: BHA Stall Duration: 1 Cond.: Good Mud Data Type OB WT: 10.6PPG Vis: 62 WL: 4.2 PV: 20 Flow T : SAND: 0.0 Chlor: GAS: 0 SOL: 14.7 Oil %: 78 YP: 20 PH: 10. Bottom Hole T : Formation: EXPANDED REASON PULLED: Planned trip at 12500' for push pipe Township-Section-Range -- BHA PERFORMANCE: Some MWD problems at the start, motor yield rates were 13.5 /100' for the curve, wouldn't track in the lateral ADDITIOL COMMENTS: (Expands to next page if necessary) At surface the motor drained fine and bearing play was good WinSURV II Mud Motor Report

70 BHA # 10 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. Trinidad 121 Lead DD: Tom Allen TX Co. Man: David Crow Motor Failed? NO UL G 9-46 Unit 2H and Depths (This BHA) Motor Data Drilling Parameters Date In: 09:05 Desc: 7/ SlkSlv SO/PU: / Date Out: 21:35 MFG.: Dynomax Rot Wt: Hrs In Hole: BHA Circ/ All BHA: / WOB: Start Depth: 1249 Motor SN: DD TORQ: Depth: PAD OD: SPP: Total Drilled: NB Stab: Motor RPM: Avg. Total ROP: Bit to Bend: 3.71 Rotary RPM: Circ Hrs:Tot/Only / Bent Hsg / Sub: 1.25 / Flow Rate: Percent Slide: Lobe/Stage: 7/8 / 3.8 Avg Diff: 600 Percent Hrs: Revs/Gal 0.52 Stall Pres.: 1085 Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: 3400 Bit Record Avg. Slide ROP: Act BUR: 5 SMITH / Smith MDi513 3x18' & 3x12's Percent Rotary: Stator Clearance: Run #: 6 Percent Hrs: Lower Stab OD: Type Bit: PDC Rot / Total Hrs: / Upper Stab OD: IADC#: TFA: 1.92 in² Rotary Drilled: Extended Motor? NO JETS: 2-12,15,3-18 Avg. Rotary ROP: Number of Stalls: 2 P Drop: 250 GPM Reason POOH: BHA Stall Duration: 1 Cond.: Good Mud Data Type OB WT: 10.7PPG Vis: 68 WL: 4.8 PV: 23 Flow T : 80.0 SAND: 0.0 Chlor: GAS: 0 SOL: 14.7 Oil %: 80 YP: 19 PH: 10. Bottom Hole T : Formation: EXPANDED REASON PULLED: Hole not responding correctly to where toolface was run Township-Section-Range -- BHA PERFORMANCE: MWD working great, hole very erratic, hole not responding to where toolface was run ADDITIOL COMMENTS: (Expands to next page if necessary) At surface the motor drained fine and bearing play was good. The connection between stator housing and fixed bend housing looked unusual and tapered. WinSURV II Mud Motor Report

71 BHA # 11 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Mud Motor Report FIELD: Wildcat Elevation Resources Legal Desc. Trinidad 121 Lead DD: Tom Allen TX Co. Man: David Crow Motor Failed? NO UL G 9-46 Unit 2H and Depths (This BHA) Motor Data Drilling Parameters Date In: 21:35 Desc: Motor 7/ SlkSlv SO/PU: / Date Out: 04:30 MFG.: NOV Rot Wt: Hrs In Hole: BHA Circ/ All BHA: / WOB: Start Depth: Motor SN: TORQ: Depth: PAD OD: SPP: Total Drilled: NB Stab: Motor RPM: Avg. Total ROP: Bit to Bend: 3.92 Rotary RPM: Circ Hrs:Tot/Only / Bent Hsg / Sub: 1.5 / Flow Rate: Percent Slide: 6.80 Lobe/Stage: 7/8 / 3.8 Avg Diff: 650 Percent Hrs: Revs/Gal 0.52 Stall Pres.: 803 Slide Hours: Total Sliding: Rotor Jet: Prop BUR: Off Bot Pres.: 4500 Bit Record Avg. Slide ROP: 9.89 Act BUR: 11 SMITH / Bit PDC MDi613 3x12 3x16 Percent Rotary: Stator Clearance: Run #: 7 Percent Hrs: Lower Stab OD: Type Bit: PDC Rot / Total Hrs: / Upper Stab OD: IADC#: TFA:.92 in² Rotary Drilled: Extended Motor? NO JETS: 3-12,3-16 Avg. Rotary ROP: Number of Stalls: P Drop: 250 GPM Reason POOH: Stall Duration: Cond.: Mud Data Type OB WT: 11.0PPG Vis: 69 WL: 4.6 PV: 22 Flow T : SAND: 0.0 Chlor: GAS: 0 SOL: 16.4 Oil %: 85 YP: 18 PH: 10. Bottom Hole T : Formation: EXPANDED REASON PULLED: Reached TD at 18,642' Township-Section-Range -- BHA PERFORMANCE: BHA responded better than the 1.25 on previous run, slide percentage was less ADDITIOL COMMENTS: (Expands to next page if necessary) Motor drained fine and bearing play was acceptable WinSURV II Mud Motor Report

72 UL G 9-46 Unit 2H END OF WELL REPORT Slide Sheet Reports of Well Report: UL G 9-46 Unit 2H

73 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H FIELD: Legal Desc. Wildcat Township-Section-Range MOTOR INFORMATION Desc: 7/ Stab.17 rev/gal Bent Hsg/Sub: 1.50 / 0 Bit to Bend: 6.95 PAD OD: NB Stab: -- Slide Report for BHA # 1 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 1 17-Mar Sliding 10:55 12: Mar Drilling 12:20 12: Mar Drilling 12:35 13: Total Drilled: 66 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 44 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 22 Ft Avg. Slide ROP: Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 1 of 1

74 SDI Job #: FIELD: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Legal Desc. Township-Section-Range MOTOR INFORMATION Desc: 7/ Stab.17 rev/gal Bent Hsg/Sub: 1.50 / 0 Bit to Bend: 5.95 PAD OD: NB Stab: -- Slide Report for BHA # 2 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note Total Drilled: 0 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 0 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 0 Ft Avg. Slide ROP: Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : - Page 1 of 1

75 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H FIELD: Legal Desc. Wildcat Township-Section-Range MOTOR INFORMATION Desc: 7/ NBS.17 rev/gal Bent Hsg/Sub: 1.50 / 0 Bit to Bend: 5.97 PAD OD: NB Stab: Slide Report for BHA # 3 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 3 18-Mar Drilling 14:15 14: Mar Sliding 14:25 14: Mar Sliding 15:20 16: Mar Drilling 16:05 16: Mar Drilling 16:50 18: Mar Drilling 18:10 18: Mar Sliding 18:20 19: Mar Drilling 19:00 20: Mar Drilling 20:05 20: Mar Sliding 20:15 21: Mar Drilling 21:15 22: Mar Drilling 22:15 22: Mar Sliding 22:25 23: Mar Drilling 23:00 23: Mar Drilling 23:45 24: Mar Sliding 00:00 00: Mar Drilling 00:30 01: Mar Drilling 01:20 02: Mar Drilling 02:50 03: Mar Drilling 03:55 04: Mar Sliding 04:10 04: Mar Drilling 04:55 05: Mar Drilling 05:50 08: Mar Drilling 08:05 10: Mar Drilling 10:05 14: Mar Drilling 14:45 16: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 1 of 2

76 Slide Report for BHA # 3 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 3 19-Mar Sliding 16:30 17: M Mar Drilling 17:10 17: Mar Sliding 17:25 18: M Mar Drilling 18:20 19: Mar Drilling 19:25 19: Mar Sliding 19:45 21: M Mar Drilling 21:05 22: Mar Sliding 22:40 24: M Mar Drilling 00:00 00: Mar Drilling 00:55 01: Mar Sliding 01:40 02: M Mar Drilling 02:45 05: Mar Drilling 05:05 08: Mar Drilling 08:30 11: Mar Drilling 11:50 14: Mar Drilling 14:55 16: Mar Drilling 17:05 17: Mar Sliding 17:40 18: M 3 20-Mar Sliding 19:15 20: M 3 20-Mar Drilling 20:20 21: Total Drilled: 2506 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 2328 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 178 Ft Avg. Slide ROP: Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 2 of 2

77 SDI Job #: FIELD: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Legal Desc. Township-Section-Range MOTOR INFORMATION Desc: 7/ /4 NBS.17 rev/gal Bent Hsg/Sub: 1.50 / 0 Bit to Bend: 6.23 PAD OD: NB Stab: -- Slide Report for BHA # 4 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note Total Drilled: 0 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 0 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 0 Ft Avg. Slide ROP: Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : - Page 1 of 1

78 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H FIELD: Legal Desc. Wildcat Township-Section-Range MOTOR INFORMATION Desc: 7/ NBS.17 rev/gal Bent Hsg/Sub: 1.50 / 0 Bit to Bend: 7.25 PAD OD: NB Stab: -- Slide Report for BHA # 5 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 5 26-Mar Drilling 06:15 07: Mar Drilling 07:15 08: Mar Drilling 08:25 09: Mar Drilling 10:00 10: Mar Sliding 10:20 12: R Mar Drilling 12:30 13: Mar Drilling 13:50 14: Mar Sliding 14:00 17: R Mar Drilling 17:00 17: Mar Drilling 17:55 18: Mar Sliding 18:15 18: R Mar Drilling 18:40 19: Mar Sliding 19:10 21: R Mar Drilling 21:05 21: Mar Sliding 21:50 23: R Mar Drilling 23:45 24: Mar Drilling 00:00 00: Mar Sliding 00:45 02: R 5 27-Mar Drilling 02:10 03: Mar Drilling 03:55 04: Mar Sliding 04:10 05: R 5 27-Mar Drilling 05:30 05: Mar Sliding 05:40 06: R 5 27-Mar Drilling 06:40 08: Mar Sliding 08:20 10: R 5 27-Mar Sliding 10:20 12: R SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 1 of 2

79 Slide Report for BHA # 5 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note Total Drilled: 736 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 599 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 137 Ft Avg. Slide ROP: 8.26 Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : - Page 2 of 2

80 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H FIELD: Legal Desc. Wildcat Township-Section-Range MOTOR INFORMATION Desc: 6/ SlkSlv.18 rev/gal Bent Hsg/Sub: 1.50 / 0 Bit to Bend: 6.95 PAD OD: NB Stab: -- Slide Report for BHA # 6 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 6 28-Mar Drilling 04:05 04: Mar Drilling 05:55 06: Mar Drilling 06:55 07: Mar Sliding 07:05 08: M Mar Drilling 08:45 10: Mar Drilling 10:05 10: Mar Sliding 10:10 13: Mar Drilling 13:20 14: Mar Drilling 14:35 14: Mar Drilling 15:05 16: Mar Drilling 16:35 18: Mar Drilling 18:15 20: Mar Drilling 20:25 22: Mar Drilling 22:45 24: Mar Drilling 00:00 01: Total Drilled: 777 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 732 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 45 Ft Avg. Slide ROP: 9.31 Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 1 of 1

81 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H FIELD: Legal Desc. Wildcat Township-Section-Range MOTOR INFORMATION Desc: 7/ Slick.16 rev/gal Bent Hsg/Sub: 1.50 / 0 Bit to Bend: 5.03 PAD OD: 8.00 NB Stab: -- Slide Report for BHA # 7 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 7 29-Mar Drilling 20:30 20: Mar Drilling 22:05 23: Mar Drilling 23:50 24: Mar Drilling 00:00 02: Mar Drilling 02:00 02: Mar Drilling 03:45 08: Mar Drilling 08:10 08: Mar Drilling 08:45 10: Mar Drilling 10:35 11: Mar Drilling 12:50 16: Mar Drilling 17:05 19: Mar Drilling 19:10 20: Mar Drilling 21:00 23: Mar Drilling 23:30 24: Mar Drilling 00:00 01: Mar Drilling 01:25 03: Mar Drilling 03:10 04: Mar Drilling 04:30 05: Mar Drilling 05:25 06: Mar Drilling 07:20 08: Mar Drilling 08:20 10: Mar Drilling 10:30 13: Total Drilled: 1470 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 1470 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 0 Ft Avg. Slide ROP: Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 1 of 1

82 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H FIELD: Legal Desc. Wildcat Township-Section-Range MOTOR INFORMATION Desc: Motor 7/ TruSlk.31 rev/gal Bent Hsg/Sub: 2.38 / 0 Bit to Bend: 5.00 PAD OD: 7.38 NB Stab: -- Slide Report for BHA # 8 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 8 5-Apr Sliding 05:30 07: M Apr Sliding 07:10 08: M Apr Drilling 08:20 08: Apr Sliding 08:25 08: R Apr Drilling 08:55 09: Apr Drilling 09:10 09: Apr Sliding 09:25 10: R Apr Sliding 10:30 10: R Apr Drilling 10:45 11: Apr Sliding 11:00 11: R Apr Drilling 11:40 11: Apr Sliding 11:55 12: R Apr Drilling 12:15 12: Apr Sliding 12:30 12: R Apr Drilling 12:55 13: Apr Drilling 13:35 13: Apr Sliding 13:45 14: R Apr Drilling 14:20 15: Apr Drilling 15:15 15: Apr Sliding 15:25 15: R Apr Drilling 15:55 16: Apr Sliding 16:10 16: R Apr Drilling 16:45 16: Apr Sliding 16:55 17: R Apr Drilling 17:15 17: Apr Sliding 17:25 17: R SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 1 of 2

83 Slide Report for BHA # 8 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 8 5-Apr Drilling 17:50 18: Apr Drilling 18:20 18: Apr Sliding 18:30 19: R Apr Drilling 19:15 19: Apr Sliding 19:35 20: R Apr Drilling 20:50 21: Apr Sliding 21:10 21: R Apr Sliding 21:30 21: R Apr Drilling 21:55 22: Apr Sliding 22:20 23: R Apr Drilling 00:00 00: Apr Sliding 00:05 01: R Apr Drilling 01:20 01: Apr Sliding 01:45 02: R Apr Drilling 02:20 02: Apr Drilling 03:05 04: Apr Sliding 04:00 04: L Total Drilled: 898 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 383 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 515 Ft Avg. Slide ROP: Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 2 of 2

84 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H FIELD: Legal Desc. Wildcat Township-Section-Range MOTOR INFORMATION Desc: Motor 7/ SlkSlv.52 rev/gal Bent Hsg/Sub: 1.83 / 0 Bit to Bend: 4.06 PAD OD: 5.38 NB Stab: -- Slide Report for BHA # 9 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 9 19-Apr Sliding 17:25 17: R 9 19-Apr Sliding 20:15 22: R 9 19-Apr Sliding 23:00 24: R 9 20-Apr Sliding 00:00 00: R 9 20-Apr Sliding 00:35 01: R 9 20-Apr Sliding 03:00 04: R 9 20-Apr Drilling 04:45 05: Apr Sliding 05:00 06: L 9 20-Apr Drilling 06:40 06: Apr Sliding 06:55 08: Apr Drilling 08:10 08: Apr Sliding 08:30 09: L 9 20-Apr Drilling 09:15 09: Apr Sliding 09:30 10: R 9 20-Apr Drilling 10:10 10: Apr Sliding 10:30 10: R 9 20-Apr Drilling 11:05 11: Apr Sliding 11:20 12: L 9 20-Apr Drilling 12:15 12: Apr Sliding 12:30 13: L 9 20-Apr Drilling 13:25 13: Apr Sliding 13:40 14: L 9 20-Apr Drilling 14:50 15: Apr Drilling 15:35 16: Apr Drilling 17:15 18: Apr Drilling 18:45 19: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 1 of 3

85 Slide Report for BHA # 9 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 9 20-Apr Sliding 19:00 19: R 9 20-Apr Drilling 19:25 20: Apr Drilling 20:35 20: Apr Sliding 20:55 21: R 9 20-Apr Drilling 21:25 22: Apr Drilling 22:25 22: Apr Sliding 22:50 23: R 9 20-Apr Drilling 23:30 24: Apr Drilling 00:00 00: Apr Drilling 00:35 00: Apr Sliding 00:50 01: R 9 21-Apr Drilling 01:50 03: Apr Drilling 03:10 04: Apr Drilling 04:35 05: Apr Drilling 05:50 06: Apr Sliding 06:10 06: R 9 21-Apr Drilling 06:50 07: Apr Drilling 07:40 08: Apr Drilling 09:00 09: Apr Sliding 09:15 09: L 9 21-Apr Drilling 09:30 10: Apr Drilling 10:05 10: Apr Drilling 11:05 11: Apr Sliding 11:15 11: L 9 21-Apr Drilling 11:35 12: Apr Drilling 12:10 12: Apr Drilling 13:05 13: Apr Sliding 13:15 13: R 9 21-Apr Drilling 13:45 14: Apr Sliding 14:15 14: R 9 21-Apr Drilling 14:35 14: Apr Drilling 15:05 16: Apr Drilling 16:40 16: Apr Sliding 16:50 17: R 9 21-Apr Drilling 17:30 18: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 2 of 3

86 Slide Report for BHA # 9 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note 9 21-Apr Sliding 18:25 19: R 9 21-Apr Drilling 19:35 19: Apr Sliding 19:45 20: R 9 21-Apr Drilling 20:45 21: Apr Sliding 21:55 22: R Total Drilled: 2083 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 1639 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 444 Ft Avg. Slide ROP: Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 3 of 3

87 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H FIELD: Legal Desc. Wildcat Township-Section-Range MOTOR INFORMATION Desc: 7/ SlkSlv 0.52rev/gal Bent Hsg/Sub: 1.25 / 0 Bit to Bend: 3.71 PAD OD: NB Stab: -- Slide Report for BHA # 10 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note Apr Drilling 02:10 02: Apr Drilling 02:35 03: Apr Sliding 03:20 04: R Apr Drilling 04:00 04: Apr Drilling 05:05 05: Apr Sliding 05:15 05: R Apr Drilling 05:55 07: Apr Sliding 07:00 08: R Apr Drilling 08:35 09: Apr Sliding 09:15 10: Apr Drilling 10:45 10: Apr Drilling 11:05 11: Apr Drilling 11:40 12: Apr Drilling 12:45 13: Apr Sliding 13:00 14: L Apr Drilling 14:45 15: Apr Drilling 15:15 15: Apr Sliding 15:25 16: L Apr Drilling 16:05 16: Apr Drilling 17:05 18: Apr Drilling 18:10 18: Apr Sliding 18:35 19: L Apr Drilling 19:50 20: Apr Drilling 20:20 20: Apr Sliding 20:35 21: L Apr Drilling 21:20 22: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 1 of 3

88 Slide Report for BHA # 10 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note Apr Drilling 22:15 22: Apr Sliding 22:40 23: L Apr Drilling 23:25 24: Apr Drilling 00:00 00: Apr Drilling 00:15 00: Apr Sliding 00:35 01: L Apr Drilling 01:25 01: Apr Sliding 02:00 02: L Apr Drilling 02:35 02: Apr Sliding 02:55 03: L Apr Drilling 03:30 04: Apr Drilling 04:25 04: Apr Sliding 04:45 05: L Apr Drilling 05:45 06: Apr Drilling 06:45 07: Apr Sliding 07:00 07: L Apr Drilling 07:55 08: Apr Drilling 08:50 09: Apr Sliding 09:20 10: L Apr Drilling 10:00 10: Apr Drilling 10:45 11: Apr Sliding 11:00 12: L Apr Drilling 12:05 12: Apr Drilling 12:50 13: Apr Sliding 13:05 14: L Apr Drilling 14:20 14: Apr Drilling 15:10 15: Apr Drilling 15:30 16: Apr Sliding 16:10 17: L Apr Drilling 17:45 17: Apr Sliding 18:05 19: L Apr Drilling 19:45 20: Apr Sliding 20:20 22: L Apr Sliding 23:00 23: L Apr Drilling 00:00 00: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 2 of 3

89 Slide Report for BHA # 10 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note Apr Sliding 00:55 02: L Apr Drilling 02:45 03: Apr Drilling 03:30 03: Apr Sliding 03:50 05: L Apr Drilling 05:50 06: Apr Drilling 06:10 06: Apr Sliding 06:25 06: R Total Drilled: 1987 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 1368 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 619 Ft Avg. Slide ROP: Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 3 of 3

90 SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H FIELD: Legal Desc. Wildcat Township-Section-Range MOTOR INFORMATION Desc: Motor 7/ SlkSlv.52 rev/gal Bent Hsg/Sub: 1.50 / 0 Bit to Bend: 3.92 PAD OD: NB Stab: -- Slide Report for BHA # 11 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note Apr Sliding 16:00 16: L Apr Sliding 16:50 17: L Apr Drilling 17:40 17: Apr Sliding 17:55 19: L Apr Drilling 19:10 19: Apr Drilling 19:50 20: Apr Drilling 20:25 21: Apr Sliding 21:15 21: Apr Sliding 22:40 23: Apr Drilling 23:30 24: Apr Drilling 00:00 00: Apr Drilling 00:30 02: Apr Drilling 02:20 02: Apr Sliding 02:45 04: R Apr Drilling 04:15 05: Apr Drilling 05:05 05: Apr Sliding 05:25 06: R Apr Drilling 06:05 06: Apr Drilling 06:55 08: Apr Drilling 08:10 08: Apr Sliding 08:30 09: R Apr Drilling 09:10 10: Apr Drilling 10:10 11: Apr Drilling 11:20 12: Apr Drilling 12:30 12: Apr Sliding 12:45 13: R SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 1 of 4

91 Slide Report for BHA # 11 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note Apr Drilling 13:45 14: Apr Drilling 14:50 16: Apr Drilling 16:05 17: Apr Drilling 17:25 17: Apr Sliding 17:40 20: R Apr Drilling 20:00 20: Apr Drilling 20:50 21: Apr Sliding 21:05 21: R Apr Drilling 21:40 21: Apr Sliding 22:15 24: R Apr Sliding 00:00 00: R Apr Drilling 00:20 01: Apr Drilling 01:10 02: Apr Drilling 02:20 02: Apr Sliding 02:50 03: R Apr Drilling 03:40 04: Apr Drilling 04:40 04: Apr Sliding 04:50 06: R Apr Drilling 06:30 07: Apr Drilling 07:30 07: Apr Sliding 07:40 08: Apr Drilling 08:50 09: Apr Sliding 09:15 09: Apr Drilling 09:45 10: Apr Drilling 10:20 10: Apr Sliding 10:45 11: Apr Drilling 11:20 11: Apr Drilling 12:00 12: Apr Sliding 12:40 13: R Apr Drilling 13:20 13: Apr Drilling 13:40 14: Apr Drilling 14:45 15: Apr Drilling 15:50 16: Apr Drilling 17:55 18: Apr Sliding 18:05 19: R SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 2 of 4

92 Slide Report for BHA # 11 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note Apr Drilling 19:05 19: Apr Drilling 19:50 20: Apr Sliding 20:10 21: R Apr Drilling 21:20 22: Apr Drilling 23:30 24: Apr Drilling 00:00 00: Apr Drilling 00:35 00: Apr Drilling 01:00 01: Apr Sliding 01:50 02: R Apr Drilling 02:35 02: Apr Drilling 02:55 03: Apr Sliding 03:10 04: R Apr Drilling 04:05 04: Apr Drilling 04:20 04: Apr Drilling 05:05 05: Apr Sliding 05:50 06: Apr Drilling 06:35 06: Apr Drilling 06:55 07: Apr Drilling 08:20 09: Apr Drilling 09:30 10: Apr Drilling 10:50 12: Apr Drilling 12:10 12: Apr Sliding 12:50 14: Apr Drilling 14:10 14: Apr Drilling 14:40 15: Apr Sliding 15:40 17: Apr Drilling 18:10 18: Apr Sliding 18:40 19: R Apr Drilling 19:35 19: Apr Drilling 20:00 20: Apr Drilling 20:40 21: Apr Drilling 22:05 22: Apr Drilling 22:30 22: Apr Sliding 22:55 23: R Apr Drilling 23:40 24: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 3 of 4

93 Slide Report for BHA # 11 Note: Surveys listed are interpolated from the actual surveys # Date Drill Mode Start Hours Start MD MD Depth Drilled WOB ROP RPM Surf. Torque Flow Rate SPP TFO INC AZM DLS Note Apr Drilling 00:00 00: Apr Drilling 00:35 02: Apr Drilling 02:15 02: Apr Sliding 02:40 04: Apr Drilling 04:00 04: Apr Drilling 04:50 06: Apr Drilling 06:45 07: Apr Sliding 07:00 08: Apr Drilling 08:00 09: Apr Drilling 09:15 09: Apr Drilling 09:45 10: Apr Drilling 10:45 11: Total Drilled: 4263 Ft Avg. Total ROP: DEPTH% - TIME % Total Rotary Drilled: 3973 Ft Avg. Rotary ROP: Percent Rotary: Total Drilled Sliding: 290 Ft Avg. Slide ROP: 9.89 Percent Slide: SDI BHA SLIDE REPORT NP6459 Slide Report for JOB# : Page 4 of 4

94 UL G 9-46 Unit 2H END OF WELL REPORT Daily Drilling Reports of Well Report: UL G 9-46 Unit 2H

95 DAILY TOTALS Start Depth Depth Below Rot Hrs. Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Avg. Slide ROP: Rotate Footage: Rotary Hours Avg. Rot ROP: Circ Hours Ream Hours Rotary Hrs%: Slide Hrs%: Rotary Ftg% Slide Ftg% Casing Size lbf/ft MD SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Lead Dir Hand 2nd Dir Hand From March 16, 2017 at 0000 to March 16, 2017 at 2400 Assembly Totals BHA # Motor SN / R.S. SN Slide Ftg Slide Hrs Rotate Ftg Legal Desc. Company Man Rotate Hrs Circ Hrs Drilling Mud Record Bit Record Reserve Water Bit No: WOB: Rot Wt: Pick UP: Slack Off: SPP: 0 Weight: 9.90 PPG 0 Visc: 0 Chlorides: 0 YP: 0 PV: Model 0 SN.: 0 MFG. 0 Type 29 IADC Flow: 0-0 PH: 0 JETS SPM: 0 GAS: 0 TFA: in² Rot. RPM - SAND: 0 Hole ID: N/A Mot RPM: - WL: 0 Bit Hrs: Incl. In: 7.49 SOLID: 0 Bit Ftg Azm. In: 2.07 BHT :.0F Pumps Incl. Out: Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice D & C Hrs BHA Ftg 1 of 48 Township-Section-Range Tom Allen -- Current BHA # 0 Avg ROP Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 06:00 20: Standby Standby - Travel to location 20:00 23: Standby Standby - Rig up computers and start well files w waiting on tools Winserve II Daily Report for March 16, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

96 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 17, 2017 at 0000 to March 17, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: PDT Avg. Total ROP: Slide Footage: Slide Hours 1.42 Current BHA # 2 Avg. Slide ROP: Bit PDC Smith XS716S 7x15 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Stabilizer 12" Nortrac NM UBHO Sub Circ Hours 2.75 MWD Monel Ream Hours NM Pony Collar Rotary Hrs%: Stabilizer 12" Nortrac Slide Hrs%: Rotary Ftg% (9) 8" Drill Collars Slide Ftg% Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Drilling Mud Record Bit Record Reserve Water Bit No: RR1 WOB: Rot Wt: Pick UP: Slack Off: SPP: 35 Weight: 9.90 PPG 192 Visc: 195 Chlorides: 190 YP: 2600 PV: Model 0 SN.: 0 MFG. 0 Type 29 IADC Bit PDC Smith JM6989 SMITH PDC Flow: PH: 0 JETS 7-15 SPM: 150 GAS: 0 TFA: 1.21 in² Rot. RPM SAND: 0 Hole ID: 12.3 In. Mot RPM: 0-0 WL: 0 Bit Hrs: 2.75 hrs Incl. In: 9.89 SOLID: 0 Bit Ftg Ft Azm. In: 0 BHT :.0F Pumps Incl. Out: Flow T :.0F Liner In Azm. Out: 0 Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small 2 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP Depth Depth Depth Code COMMENT 00:00 01: Other Wait on tools to arrive 01:30 02: Other Strap tools and stage same 02:30 05: Change BHA Pick up directional tools 05:10 06: TIH TIH to 836' 06:30 08: Other Test tools, motor working fine but can't get anything on MWD computer, change out surface equipment and MWD working 08:40 10: TIH TIH to 4282' 10:20 10: Circulating Break circulation and wash 4282' to 4343', sync MWD 10:55 12: Sliding Sliding (WOB:35; GPM:628; TFO:180) 12:20 12: Drilling Driling (WOB:35; GPM:628: RPM:70) 12:30 12: Other Connection 12:35 13: Drilling Drilling - (WOB:35;GPM :628;RPM:70) 13:45 14: Circulating Trouble shoot pressure increase of 1200# with 5 less strokes, MWD quit pulsing at the same time Winserve II Daily Report for March 17, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

97 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 14:05 17: POOH POOH for pressure increase 17:05 18: Change BHA Check MWD, Motor, UBHO sub and float valve, bit was fine, MWD had a crushed ceramic sleeve in the pulser 18:30 19: Other Unload backup motor and strap same 19:00 20: Change BHA Change out MWD due to crushed ceramic sleeve, pick up new motor as a precautionary measure, rerun same bit 20:00 21: TIH TIH to 892' 21:00 22: Circulating Test tools, cant get MWD to test 22:50 23: POOH POOH 23:45 24: Other Put NM Pony and stabilizer in mousehole while w pull the tool Winserve II Daily Report for March 17, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

98 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 18, 2017 at 0000 to March 18, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs PDT Total Drilled: PDT Avg. Total ROP: Slide Footage: Slide Hours 3.25 Current BHA # 3 Avg. Slide ROP: Bit PDC Smith XS716S 7x15 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Stabilizer 12" Nortrac NM Pony Collar Circ Hours 0.25 VON EVO Tool Carrier Ream Hours NMDC Rotary Hrs%: Stabilizer 12" Nortrac Slide Hrs%: Rotary Ftg% (9) 8" Drill Collars Slide Ftg% Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Drilling Mud Record Bit Record Reserve Water Bit No: RR1 WOB: Rot Wt: 30 Weight: 9.90 PPG 200 Visc: Model 0 SN.: Bit PDC Smith JM6989 Pick UP: Slack Off: SPP: 210 Chlorides: 195 YP: 2300 PV: MFG. 1 Type 29 IADC SMITH PDC Flow: PH: 0 JETS 7-15 SPM: 150 GAS: 0 TFA: 1.21 in² Rot. RPM SAND: 0 Hole ID: 12.3 In. Mot RPM: WL: 0 Bit Hrs: 2.75 hrs Incl. In: 9.89 SOLID: 1 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 3.67 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small 3 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP Depth Depth Depth Code COMMENT 00:00 01: Other Pull MWD and hook up to computer, tool appears be fine 01:00 01: Other Lay down NM UBHO sub and prepare to pick up VON EVO MWD 01:30 03: Other Wait on EVO tool 03:30 09: Other Unload truck and rig up EVO tool 09:45 10: Change BHA Pick up EVO tool carreir, monel and stabilizer 10:30 11: TIH TIH to 1029' 11:35 11: Other Test tools 11:45 14: TIH TIH to 4299' 14:00 14: Circulating Wash & Ream 4299'-4409' 14:15 14: Drilling Drilling - (WOB:35;GPM :628;RPM:70) 14:25 14: Sliding Sliding - (WOB:35;GPM :628;TFO:180) 14:40 15: Other Change position of MWD transducer 15:20 16: Sliding Sliding - (WOB:30;GPM :628;TFO:180)) 16:05 16: Drilling Drilling - (WOB:30;GPM :628;RPM:70) Daily Report for JOB#: Page 1 of 2 Winserve II Daily Report for March 18, 2017 License: NP6459

99 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 16:40 16: Other SPR's 16:45 16: Survey & Conn. Survey & Inc 7.49 Azm :50 18: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 18:05 18: Survey & Conn. Survey & Conn.@4517' Inc 7.02 Azm :10 18: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 18:20 19: Sliding Sliding - (WOB:30;GPM :628;TFO:180)) 19:00 20: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 20:00 20: Survey & Conn. Survey & Conn.@4608' Inc 6.05 Azm :05 20: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 20:15 21: Sliding Sliding - (WOB:30;GPM :628;TFO:180) 21:15 22: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 22:10 22: Survey & Conn. Survey & Conn.@4699' Inc 4.89 Azm :15 22: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 22:25 23: Sliding Sliding - (WOB:30;GPM :628;TFO:180)) 23:00 23: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 23:40 23: Survey & Conn. Survey & Conn.@4791' Inc 3.67 Azm :45 24: Drilling Drilling - (WOB:30;GPM :628;RPM:70) Winserve II Daily Report for March 18, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

100 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 19, 2017 at 0000 to March 19, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs PDT , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours 5.50 Current BHA # 3 Avg. Slide ROP: Bit PDC Smith XS716S 7x15 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Stabilizer 12" Nortrac NM Pony Collar Circ Hours 0.67 VON EVO Tool Carrier Ream Hours NMDC Rotary Hrs%: Stabilizer 12" Nortrac Slide Hrs%: Rotary Ftg% (9) 8" Drill Collars Slide Ftg% 6.71 Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Drilling Mud Record Bit Record Reserve Water Bit No: RR1 WOB: Rot Wt: 30 Weight: 9.60 PPG 210 Visc: Model 0 SN.: Bit PDC Smith JM6989 Pick UP: Slack Off: SPP: 230 Chlorides: 190 YP: 1700 PV: MFG. 1 Type 29 IADC SMITH PDC Flow: PH: 0 JETS 7-15 SPM: 120 GAS: 0 TFA: 1.21 in² Rot. RPM SAND: 0 Hole ID: 12.3 In. Mot RPM: WL: 0 Bit Hrs: 2.75 hrs Incl. In: 3.67 SOLID: 1 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 2.07 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice 4 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Sliding Sliding - (WOB:30;GPM :628;TFO:180) 00:30 01: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 01:15 01: Survey & Conn. Survey & Conn.@4883' Inc 2.79 Azm :20 02: Drilling Drilling - (WOB:35;GPM :628;RPM:70) lost returns 02:10 02: Circulating Circulating, reciprocating pipe while attempting to gain returns, pump sweep with LCM 02:50 03: Drilling Drilling - (WOB:25;GPM :509;RPM:80) 03:50 03: Survey & Conn. Survey & Conn.@4976' Inc 2.73 Azm :55 04: Drilling Drilling - (WOB:25;GPM :509;RPM:80) 04:10 04: Sliding Sliding - (WOB:30;GPM :628;TFO:180) 04:55 05: Drilling Drilling - (WOB:25;GPM :509;RPM:80) 05:45 05: Survey & Conn. Survey & Conn.@5067' Inc 2.07 Azm :50 08: Drilling Drilling - (WOB:25;GPM :509;RPM:80) 08:00 08: Survey & Conn. Survey & Conn.@5250' Inc 1.67 Azm :05 10: Drilling Drilling - (WOB:25;GPM :509;RPM:80) Winserve II Daily Report for March 19, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

101 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 10:00 10: Survey & Conn. Survey & Inc 1.7 Azm :05 14: Drilling Drilling - (WOB:25;GPM :500;RPM:80) 14:35 14: Survey & Conn. Survey & Conn.@5618' Inc 1.34 Azm :45 16: Drilling Drilling - (WOB:25;GPM :500;RPM:80) 16:30 17: Sliding Sliding - (WOB:30;GPM :628;TFO:360M)) 17:10 17: Drilling Drilling - (WOB:30;GPM :500;RPM:80) 17:25 18: Sliding Sliding - (WOB:30;GPM :586;TFO:360M)) 18:20 19: Drilling Drilling - (WOB:30;GPM :500;RPM:70) 19:15 19: Survey & Conn. Survey & Conn.@5800' Inc 2.43 Azm :25 19: Drilling Drilling - (WOB:30;GPM :500;RPM:70) 19:45 21: Sliding Sliding - (WOB:30;GPM :628;TFO:360M)) 21:05 22: Drilling Drilling - (WOB:30;GPM :500;RPM:70) 22:40 24: Sliding Sliding - (WOB:30;GPM :628;TFO:360M)) Winserve II Daily Report for March 19, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

102 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 20, 2017 at 0000 to March 20, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs PDT , , Total Drilled: 94 Avg. Total ROP: Slide Footage: Slide Hours 3.42 Current BHA # 3 Avg. Slide ROP: Bit PDC Smith XS716S 7x15 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Stabilizer 12" Nortrac NM Pony Collar Circ Hours 2.67 VON EVO Tool Carrier Ream Hours NMDC Rotary Hrs%: Stabilizer 12" Nortrac Slide Hrs%: Rotary Ftg% (9) 8" Drill Collars Slide Ftg% 4.15 Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Drilling Mud Record Bit Record Reserve Water Bit No: RR1 WOB: Rot Wt: 0 Weight: 9.60 PPG 240 Visc: Model 0 SN.: Bit PDC Smith JM6989 Pick UP: Slack Off: SPP: 255 Chlorides: 225 YP: 0 PV: MFG. 1 Type 29 IADC SMITH PDC Flow: PH: 0 JETS 7-15 SPM: 120 GAS: 0 TFA: 1.21 in² Rot. RPM SAND: 0 Hole ID: 12.3 In. Mot RPM: 0-70 WL: 0 Bit Hrs: 2.75 hrs Incl. In: 2.07 SOLID: 1 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 1.66 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice 5 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Drilling Drilling - (WOB:30;GPM :500;RPM:70) 00:50 00: Survey & Conn. Survey & Conn.@5983' Inc 1.83 Azm :55 01: Drilling Drilling - (WOB:30;GPM :500;RPM:70) 01:40 02: Sliding Sliding - (WOB:20;GPM :628;TFO:360M)) 02:45 05: Drilling Drilling - (WOB:30;GPM :544;RPM:70) 05:00 05: Survey & Conn. Survey & Conn.@6177' Inc 1.76 Azm :05 08: Drilling Drilling - (WOB:30;GPM :544;RPM:70) 08:25 08: Survey & Conn. Survey & Conn.@6350' Inc 1.47 Azm :30 11: Drilling Drilling - (WOB:30;GPM :544;RPM:70) 11:45 11: Survey & Conn. Survey & Conn.@6532' Inc 1.34 Azm :50 14: Drilling Drilling - (WOB:38;GPM :628;RPM:70) 14:40 14: Other SPR's 14:45 14: Survey & Conn. Survey & Conn.@6715' Inc 1.66 Azm :55 16: Drilling Drilling - (WOB:38;GPM :628;RPM:70) Winserve II Daily Report for March 20, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

103 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 16:55 17: Rig Service-Inhole Rig Service-Inhole 17:05 17: Drilling Drilling - (WOB:38;GPM :628;RPM:70) 17:40 18: Sliding Sliding - (WOB:45;GPM :628;TFO:360M)) 18:55 19: Circulating Circulate & Rotate Above Slide to Clean Hole 19:05 19: Other Move MWD Transducer -- Decoding Issues 19:15 20: Sliding Sliding - (WOB:45;GPM :628;TFO:15M)) 20:20 21: Drilling Drilling - (WOB:45;GPM :628;RPM:70) 21:00 22: Circulating Wash & Ream 6915' ' Before POOH 22:10 22: Other Rack Back One Stand 22:20 23: Circulating Wash & Ream 6864' ' 23:30 24: POOH POOH to 6139' Winserve II Daily Report for March 20, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

104 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 21, 2017 at 0000 to March 21, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs PDT , , Total Drilled: 4 W Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 4 Avg. Slide ROP: Bits PDC XS716S Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Nortrac Stabilizer 12" NM Pony Collar Circ Hours 0.83 VON EVO Tool Carrier Ream Hours NMDC Rotary Hrs%: Nortrac Stabilizer 11 3/4" Slide Hrs%: Rotary Ftg% (9) 8" Drill Collars Slide Ftg% Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Drilling Mud Record Bit Record Reserve Water Bit No: 2 WOB: Rot Wt: 0 Weight: 9.60 PPG 240 Visc: Model 0 SN.: Bits PDC JM6528 Pick UP: Slack Off: SPP: 255 Chlorides: 225 YP: 0 PV: MFG. 1 Type 29 IADC SMITH PDC Flow: PH: 0 JETS 7-15 SPM: 120 GAS: 0 TFA: 1.21 in² Rot. RPM - SAND: 0 Hole ID: 12.3 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 1.66 SOLID: 1 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 1.66 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice 6 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP Depth Depth Depth Code COMMENT 00:00 03: POOH POOH 03:30 05: Change BHA Lay down bit, motor, stabilizers and change out M tool 05:00 06: Other Wait on stabilizers 06:15 08: Change BHA Pick up new motor, lower stabilizer and EVO carrier, orient MWD, make up new bit, pick up NMDC and new upper stabilzer 08:00 09: TIH TIH to 916' 09:00 09: Circulating Test tools 09:15 10: TIH TIH to 4005' 10:50 11: Other Fill pipe 11:05 12: TIH TIH to 6036' (tight) 12:15 12: Circulating Wash & Ream 6010' to 6134' 12:50 13: TIH TIH to 6408' (tight) 13:00 18: Work Pipe Attempt to break circulation, standpipe pressured up, work stuck pipe with varrying flow rates with no returns. Daily Report for JOB#: Page 1 of 2 Winserve II Daily Report for March 21, 2017 License: NP6459

105 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 18:45 23: Work Pipe Reciprocate & Rotate w/out Circulation 23:35 24: Other Rig Up Wireline to find Free-point Winserve II Daily Report for March 21, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

106 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 22, 2017 at 0000 to March 22, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs W Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 4 Avg. Slide ROP: Bits PDC XS716S Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Nortrac Stabilizer 12" NM Pony Collar Circ Hours VON EVO Tool Carrier Ream Hours NMDC Rotary Hrs%: Nortrac Stabilizer 11 3/4" Slide Hrs%: Rotary Ftg% (9) 8" Drill Collars Slide Ftg% Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Drilling Mud Record Bit Record Reserve Water Bit No: 2 WOB: Rot Wt: 0 Weight: 8.50 PPG 240 Visc: Model 28 SN.: Bits PDC JM6528 Pick UP: Slack Off: SPP: 255 Chlorides: 225 YP: 0 PV: MFG. 1 Type 1 IADC SMITH PDC Flow: PH: 8 JETS 7-15 SPM: 120 GAS: 0 TFA: 1.21 in² Rot. RPM - SAND: 0 Hole ID: 12.3 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 1.66 SOLID: 0.7 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 1.66 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice 7 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP Depth Depth Depth Code COMMENT 00:00 09: Wireline Rig Up & RIH with Wireline to Find Free-Point, ba off at 5845', rig down wireline 09:00 12: POOH POOH from 5845' 12:30 13: Other Rig performs pre-jarring inspection 13:00 15: Other Strap and pick up fishing tools Rig 15:00 15: Service-Outhole Service top drive 15:30 21: TIH TIH; Tag 5824' 21:00 21: Other Circulate Above Fish 21:30 24: Fishing Jar on Fish Winserve II Daily Report for March 22, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

107 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 23, 2017 at 0000 to March 23, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs W Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 4 Avg. Slide ROP: Bits PDC XS716S Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Nortrac Stabilizer 12" NM Pony Collar Circ Hours VON EVO Tool Carrier Ream Hours NMDC Rotary Hrs%: Nortrac Stabilizer 11 3/4" Slide Hrs%: Rotary Ftg% (9) 8" Drill Collars Slide Ftg% Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Drilling Mud Record Bit Record Reserve Water Bit No: 2 WOB: Rot Wt: 0 Weight: 8.50 PPG 235 Visc: Model 28 SN.: Bits PDC JM6528 Pick UP: Slack Off: SPP: 375 Chlorides: 150 YP: 0 PV: MFG. 1 Type 1 IADC SMITH PDC Flow: PH: 8 JETS 7-15 SPM: 0 GAS: 0 TFA: 1.21 in² Rot. RPM - SAND: 0 Hole ID: 12.3 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 1.66 SOLID: 0.7 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 1.66 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice 8 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 05: Fishing Jar on Fish until jars gave out 05:00 05: Rig repair Rig repair - Troubleshoot drawworks, radiator fan 05:30 06: Wireline Wireline - Rig up wireline 06:30 10: Other Run freepoint and back off at 5855' 10:00 10: Wireline Wireline - Rig down wireline 10:30 13: POOH POOH 13:30 15: Fishing Handle fishing tools, they got 1 more 6 1/2" drill c out, pick up new fishhing tools 15:00 16: Other Pick Up New Fishing Tools 16:00 19: TIH TIH 19:50 20: Other Circulate 20:10 23: Fishing Get On Fish & Begin Jarring 23:15 23: Work Pipe Able to Rotate String w/out Torqueing Up; Press Up when Attempted to Circulate 23:45 24: Work Pipe Work Pipe Winserve II Daily Report for March 23, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

108 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 24, 2017 at 0000 to March 24, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs W Total Drilled: 5 W Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 5 Avg. Slide ROP: Bits Smith PDC XS716S Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Nortrac Stabilizer 12" VON EVO Tool Carrier Circ Hours NMDC Ream Hours Nortrac Stabilizer 11 3/4" Rotary Hrs%: Slide Hrs%: (6) 8" Drill Collars Rotary Ftg% Slide Ftg% Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Jars Drilling Mud Record Bit Record Reserve Water Bit No: 2RR WOB: Rot Wt: 0 Weight: 8.90 PPG 235 Visc: Model 30 SN.: Bits Smith JM6528 Pick UP: Slack Off: SPP: 375 Chlorides: 150 YP: 0 PV: MFG. 2 Type 1 IADC SMITH PDC Flow: 0-0 PH: 7.5 JETS 7-15 SPM: 0 GAS: 0 TFA: 1.21 in² Rot. RPM - SAND: 0 Hole ID: 12.3 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 1.66 SOLID: 1.4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 1.66 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice 9 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 01: Work Pipe Reciprocate Pipe with & without Rotation 01:10 01: POOH Rack Back One Stand 01:15 03: Work Pipe Work Pipe 03:00 03: Wireline R/U Wireline to Perforate 03:30 06: Wireline RIH with Perforating Guns and attempt to perfora pull gun and make another attempt 06:00 12: Work Pipe Can't circulate, work pipe backreaming with 80 RPM's 12:00 18: POOH POOH 18:00 19: Change BHA Lay Down Directional BHA 19:30 24: Standby Standby While Rig Cleans Up Hole Winserve II Daily Report for March 24, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

109 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 25, 2017 at 0000 to March 25, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs W Total Drilled: 5 W Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 5 Avg. Slide ROP: Bits Smith PDC XS716S Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Nortrac Stabilizer 12" VON EVO Tool Carrier Circ Hours 0.17 NMDC Ream Hours Nortrac Stabilizer 11 3/4" Rotary Hrs%: Slide Hrs%: (6) 8" Drill Collars Rotary Ftg% Slide Ftg% Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Jars Drilling Mud Record Bit Record WBM Bit No: 2RR WOB: Rot Wt: 0 Weight: 9.40 PPG 235 Visc: Model 36 SN.: Bits Smith JM6528 Pick UP: Slack Off: SPP: 375 Chlorides: 150 YP: 0 PV: MFG. 4 Type 4 IADC SMITH PDC Flow: PH: 10 JETS 7-15 SPM: 100 GAS: 0 TFA: 1.21 in² Rot. RPM - SAND: 0 Hole ID: 12.3 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 1.66 SOLID: 0.9 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 1.66 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice 10 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 22: Other Standby while rig makes clean up run 22:30 23: Change BHA Begin Picking Up BHA #5 23:40 23: Circulating Test Tools 23:50 24: Other Continue Picking Up BHA #5 Winserve II Daily Report for March 25, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

110 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 26, 2017 at 0000 to March 26, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs W Total Drilled: 52 Avg. Total ROP: Slide Footage: Slide Hours 8.92 Current BHA # 5 Avg. Slide ROP: 9.20 Bits Smith PDC XS716S Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Nortrac Stabilizer 12" VON EVO Tool Carrier Circ Hours 3.17 NMDC Ream Hours Nortrac Stabilizer 11 3/4" Rotary Hrs%: Slide Hrs%: (6) 8" Drill Collars Rotary Ftg% Slide Ftg% Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Jars Drilling Mud Record Bit Record WBM Bit No: 2RR WOB: Rot Wt: 30 Weight: 9.40 PPG 240 Visc: Model 38 SN.: Bits Smith JM6528 Pick UP: Slack Off: SPP: 260 Chlorides: 220 YP: 2050 PV: MFG. 6 Type 4 IADC SMITH PDC Flow: PH: 10 JETS 7-15 SPM: 150 GAS: 0 TFA: 1.21 in² Rot. RPM SAND: 0 Hole ID: 12.3 In. Mot RPM: WL: 0 Bit Hrs: hrs Incl. In: 1.66 SOLID: 5 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 4.18 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice 11 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Other Finish Picking Up BHA 00:15 01: TIH TIH to 1650' 01:30 02: Rig Service-Inhole Cut & Slip Drill Line 02:55 05: TIH TIH to 6516' 05:40 06: Circulating Wash & Ream 6516' to 6917' 06:15 07: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 07:00 07: Connection Connection, no survey 3 attempts 07:15 08: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 08:15 08: Connection Connection, no survey 2 attempts 08:25 09: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 09:30 09: Connection Connection 09:35 09: Circulating Downlink.75 to MWD tool 09:55 10: MWD Survey MWD Survey@7197' Inc 4.67 Azm :00 10: Drilling Drilling - (WOB:30;GPM :628;RPM:70) Winserve II Daily Report for March 26, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

111 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 10:20 12: Sliding Sliding - (WOB:30;GPM :628;TFO:160R)) 12:30 13: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 13:20 13: Circulating Lost returns, circlate and work pipe 13:45 13: Survey & Conn. Survey & Conn.@7288' Inc 4.33 Azm :50 14: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 14:00 17: Sliding Sliding - (WOB:30;GPM :628;TFO:160R) 17:00 17: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 17:40 17: Circulating SPR's 17:45 17: Survey & Conn. Survey & Conn.@7381' Inc 4.18 Azm :55 18: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 18:15 18: Sliding Sliding - (WOB:30;GPM :628;TFO:135R)) 18:25 18: Circulating Lost Returns While Sliding Above: Circulate 18:40 19: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 19:10 21: Sliding Sliding - (WOB:37;GPM :628;TFO:135R)) 21:05 21: Drilling Drilling - (WOB:30;GPM :628;RPM:70) 21:50 23: Sliding Sliding - (WOB:35;GPM :628;TFO:135R)) 23:30 23: Survey & Conn. Survey & Conn.@7381' Inc 4.18 Azm :45 24: Drilling Drilling - (WOB:30;GPM :628;RPM:70) Winserve II Daily Report for March 26, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

112 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 27, 2017 at 0000 to March 27, 2017 at 2400 Assembly Totals Drilling Mud Record Bit Record WBM Bit No: 3 WOB: Rot Wt: 0 Weight: 9.50 PPG 240 Visc: Model 35 SN.: Bit PDC Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 0 PV: MFG. 4 Type 4 IADC Drilformance PDC Flow: PH: 10.5 JETS 6-16 SPM: 120 GAS: 0 TFA: 1.18 in² Rot. RPM SAND: 0 Hole ID: 12.3 In. Mot RPM: 0-70 WL: 0 Bit Hrs: hrs Incl. In: 4.18 SOLID: 4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 4.16 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice 12 of 48 Township-Section-Range Tom Allen Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs W Total Drilled: MM Avg. Total ROP: Slide Footage: Slide Hours 7.67 Current BHA # 6 Avg. Slide ROP: 7.17 Bit PDC DF616X2 6x16 Rotate Footage: Motor 6/ SLK Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours 2.92 NM Nortrac Stabilizer 12" Ream Hours VON EVO Tool Carrier Rotary Hrs%: NM Pony DC Slide Hrs%: Nortrac Stabilizer 11 3/4" Rotary Ftg% Slide Ftg% Casing (6) 8" Drill Collars Size lbf/ft MD (15) 6 1/2" Drill Collars (15) 5 Hevi Jars -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Drilling Drilling - (WOB:35;GPM :628;RPM:70) 00:45 02: Sliding Sliding - (WOB:35;GPM :628;TFO:145R)) 02:10 03: Drilling Drilling - (WOB:44;GPM :628;RPM:70) 03:45 03: Survey & Conn. Survey & Conn.@7472' Inc 3.48 Azm :55 04: Drilling Drilling - (WOB:44;GPM :628;RPM:70) 04:10 05: Sliding Sliding - (WOB:35;GPM :628;TFO:145R) 05:20 05: Circulating Circulating - lost returns 05:30 05: Drilling Drilling - (WOB:44;GPM :628;RPM:70) 05:40 06: Sliding Sliding - (WOB:35;GPM :628;TFO:145R) 06:40 08: Drilling Drilling - (WOB:44;GPM :628;RPM:70) 08:20 10: Sliding Sliding - (WOB:35;GPM :628;TFO:145R) 10:00 10: Rig repair Rig repair - liner washer 10:20 12: Sliding Sliding - (WOB:43;GPM :628;TFO:160R) 12:45 15: Circulating Circulating prior to tripping Winserve II Daily Report for March 27, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

113 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 15:10 20: POOH POOH for BHA change 20:00 20: Change BHA Lay Down BHA #5 20:50 22: Other Pick Up BHA #6 22:45 23: Circulating Test Tools 23:05 23: Other Finish Picking Up BHA #6 23:25 24: TIH TIH Winserve II Daily Report for March 27, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

114 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 28, 2017 at 0000 to March 28, 2017 at 2400 Assembly Totals Drilling Mud Record Bit Record WBM Bit No: 3 WOB: Rot Wt: 34 Weight: 9.10 PPG 250 Visc: Model 35 SN.: Bit PDC Pick UP: Slack Off: SPP: 275 Chlorides: 230 YP: 2300 PV: MFG. 4 Type 4 IADC Drilformance PDC Flow: PH: 10.5 JETS 6-16 SPM: 150 GAS: 0 TFA: 1.18 in² Rot. RPM SAND: 0.01 Hole ID: 12.3 In. Mot RPM: WL: 0 Bit Hrs: hrs Incl. In: 4.16 SOLID: 4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 2.09 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow / Kelly Small Jonathan Rice 13 of 48 Township-Section-Range Tom Allen Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs MM Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours 4.83 Current BHA # 6 Avg. Slide ROP: 9.31 Bit PDC DF616X2 6x16 Rotate Footage: Motor 6/ SLK Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours 0.83 NM Nortrac Stabilizer 12" Ream Hours VON EVO Tool Carrier Rotary Hrs%: NM Pony DC Slide Hrs%: Nortrac Stabilizer 11 3/4" Rotary Ftg% Slide Ftg% 6.15 Casing (6) 8" Drill Collars Size lbf/ft MD (15) 6 1/2" Drill Collars (15) 5 Hevi Jars -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 03: TIH TIH to 7431' 03:40 04: Circulating Wash & ream 7431' to 7653' 04:05 04: Drilling Drilling - (WOB:29; :628;RPM:80) 04:55 05: Survey & Conn. Survey & Conn.@7638' Inc 3.5 Azm :55 06: Drilling Drilling - (WOB:29; :628;RPM:80) 06:45 06: Survey & Conn. Survey & Conn.@7731' Inc 3.27 Azm :55 07: Drilling Drilling - (WOB:29; :628;RPM:80) 07:05 08: Sliding Sliding - (WOB:43;GPM :628;TFO:90M)) 08:45 10: Drilling Drilling - (WOB:29;GPM :628;RPM:80) 10:00 10: Survey & Conn. Survey & Conn.@7823' Inc 3.69 Azm :05 10: Drilling Drilling - (WOB:29;GPM :628;RPM:80) 10:10 13: Sliding Sliding - (WOB:29;GPM :628;TFO:0)) 13:20 14: Drilling Drilling - (WOB:29;GPM :628;RPM:80) 14:15 14: Connection Attempt Survey x 3 Winserve II Daily Report for March 28, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

115 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 14:35 14: Drilling Drilling - (WOB:29;GPM :628;RPM:80) 14:55 15: MWD Survey MWD Survey@7930' Inc 2.69 Azm :05 16: Drilling Drilling - (WOB:29;GPM :628;RPM:80) 16:20 16: Rig Service-Inhole Rig Service-Inhole 16:35 18: Drilling Drilling - (WOB:30;GPM :628;RPM:80) 18:05 18: Survey & Conn. Survey & Conn.@8096' Inc 2.73 Azm :15 20: Drilling Drilling - (WOB:30;GPM :628;RPM:80) 20:20 20: Survey & Conn. Survey & Conn.@8188' Inc 2.33 Azm :25 22: Drilling Drilling - (WOB:30;GPM :628;RPM:80) 22:35 22: Survey & Conn. Survey & Conn.@8280_Inc 0 _Azm 0 22:45 24: Drilling Drilling - (WOB:34;GPM :628;RPM:80) Winserve II Daily Report for March 28, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

116 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 29, 2017 at 0000 to March 29, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs MM Total Drilled: RDM Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 7 Avg. Slide ROP: Bit PDC SSi716 7x15 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC NM Nortrac Stabilizer 12" Circ Hours 6.33 VON EVO Tool Carrier Ream Hours 0.50 NM Pony DC Rotary Hrs%: 10 Nortrac Stabilizer 11 3/4" Slide Hrs%:.00 Rotary Ftg% 10 (6) 8" Drill Collars Slide Ftg%.00 Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Jars Drilling Mud Record Bit Record WBM Bit No: 3 WOB: Rot Wt: 30 Weight: 9.40 PPG 250 Visc: Model 35 SN.: Bit PDC SSi716 JM5737 Pick UP: Slack Off: SPP: 275 Chlorides: 230 YP: 2300 PV: MFG. 5 Type 3 IADC SMITH PDC Flow: PH: 9.5 JETS 7-15 SPM: 150 GAS: 0 TFA: 1.21 in² Rot. RPM SAND: 0.01 Hole ID: 12.3 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 2.09 SOLID: 3 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 1.74 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jerry Dually / Kelly Small Jonathan Rice 14 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP Depth Depth Depth Code COMMENT 00:00 01: Drilling Drilling - (WOB:37;GPM :628;RPM:80) 01:45 05: Circulating Circulating prior to POOH for slow ROP 05:30 10: POOH POOH 10:30 10: Other Safety Meeting 10:40 12: Change BHA Lay down both stabilzers, bit and motor 12:10 14: Change BHA Pick up new motor, EVO collar with new electronics, NM stabilizer, orient, make up bit, pick up upper NM pony and stabilzer 14:30 15: Circulating Test tools 15:00 16: TIH TIH 16:30 16: Rig Service-Inhole Rig Service-Inhole 16:45 20: TIH TIH to 8200' 20:00 20: Reaming Wash & Ream to 8430' 20:30 20: Drilling Drilling - (WOB:15;GPM :625;RPM:80) 20:40 22: Circulating Circulating: Condition Mud due to Decreased Returns Winserve II Daily Report for March 29, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

117 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 22:00 22: Survey & Conn. Survey & Inc 2.05 Azm :05 23: Drilling Drilling - (WOB:25;GPM :625;RPM:80) 23:45 23: Survey & Conn. Survey & Conn.@8465' Inc 1.74 Azm :50 24: Drilling Drilling - (WOB:30;GPM :625;RPM:80) Winserve II Daily Report for March 29, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

118 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 30, 2017 at 0000 to March 30, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs RDM , , Total Drilled: 85 Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 7 Avg. Slide ROP: Bit PDC SSi716 7x15 Rotate Footage: 85 Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC NM Nortrac Stabilizer 12" Circ Hours 0.92 VON EVO Tool Carrier Ream Hours NM Pony DC Rotary Hrs%: 10 Nortrac Stabilizer 11 3/4" Slide Hrs%:.00 Rotary Ftg% 10 (6) 8" Drill Collars Slide Ftg%.00 Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Jars Drilling Mud Record Bit Record WBM Bit No: 3 WOB: Rot Wt: 37 Weight: 9.40 PPG 255 Visc: Model 37 SN.: Bit PDC SSi716 JM5737 Pick UP: Slack Off: SPP: 280 Chlorides: 230 YP: 2350 PV: MFG. 4 Type 4 IADC SMITH PDC Flow: PH: 9.5 JETS 7-15 SPM: 150 GAS: 0 TFA: 1.21 in² Rot. RPM SAND: 0.01 Hole ID: 12.3 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 1.74 SOLID: 4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 0.42 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jerry Dually / Kelly Small Jonathan Rice 15 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 02: Drilling Drilling - (WOB:30;GPM :502;RPM:80) 02:00 02: Drilling Drilling - (WOB:30;GPM :625;RPM:80) 02:35 02: Circulating Circulating -- Get Returns Back 02:50 03: Survey & Conn. Survey & Conn.@8556' Inc 1.52 Azm :00 03: Other Remove Trip Nipple & Install Rotating Head 03:45 08: Drilling Drilling - (WOB:30;GPM :625;RPM:80) 08:00 08: Survey & Conn. Survey & Conn.@8739' Inc 0.87 Azm :10 08: Drilling Drilling - (WOB:35;GPM :625;RPM:80) 08:30 08: Other Fix leak on orbit valve connection 08:45 10: Drilling Drilling - (WOB:35;GPM :625;RPM:80) 10:20 10: Survey & Conn. Survey & Conn.@8831' Inc 0.7 Azm :35 11: Drilling Drilling - (WOB:35;GPM :625;RPM:80) picked up multiple times 11:10 11: Circulating Circulating prior to changing out rotating rubber 11:50 12: Other Change out rotating rubber Winserve II Daily Report for March 30, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

119 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 12:50 16: Drilling Drilling - (WOB:35;GPM :625;RPM:80) 16:55 17: Survey & Conn. Survey & Conn.@9015' Inc 0.76 Azm :05 19: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 19:05 19: Survey & Conn. Survey & Conn.@9107' Inc 0.79 Azm :10 20: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 20:55 21: Survey & Conn. Survey & Conn.@9200' Inc 0.56 Azm :00 23: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 23:25 23: Survey & Conn. Survey & Conn.@9292' Inc 0.42 Azm :30 24: Drilling Drilling - (WOB:37;GPM :625;RPM:80) Winserve II Daily Report for March 30, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

120 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From March 31, 2017 at 0000 to March 31, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth 990 # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs RDM , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 7 Avg. Slide ROP: Bit PDC SSi716 7x15 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC NM Nortrac Stabilizer 12" Circ Hours 6.00 VON EVO Tool Carrier Ream Hours 0.58 NM Pony DC Rotary Hrs%: 10 Nortrac Stabilizer 11 3/4" Slide Hrs%:.00 Rotary Ftg% 10 (6) 8" Drill Collars Slide Ftg%.00 Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Jars Drilling Mud Record Bit Record WBM Bit No: 3 WOB: Rot Wt: 0 Weight: 9.80 PPG 280 Visc: Model 37 SN.: Bit PDC SSi716 JM5737 Pick UP: Slack Off: SPP: 315 Chlorides: 255 YP: 0 PV: MFG. 5 Type 4 IADC SMITH PDC Flow: PH: 10.5 JETS 7-15 SPM: 150 GAS: 0 TFA: 1.21 in² Rot. RPM SAND: 0.01 Hole ID: 12.3 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 0.42 SOLID: 4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 0.64 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jerry Dually / Kelly Small Jonathan Rice 16 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 01: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 01:20 01: Survey & Conn. Survey & Conn.@9384' Inc 0.28 Azm :25 03: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 03:05 03: Survey & Conn. Survey & Conn.@9476' Inc 0.36 Azm :10 04: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 04:05 04: Circulating Circulating 04:30 05: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 05:20 05: Survey & Conn. Survey & Conn.@9567' Inc 0.62 Azm :25 06: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 06:30 07: Circulating Circulating with 1 pump while swab is changed on #2 07:20 08: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 08:15 08: Survey & Conn. Survey & Conn.@9659' Inc 0.56 Azm :20 10: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 10:25 10: Survey & Conn. Survey & Conn.@9750' Inc 0.67 Azm Winserve II Daily Report for March 31, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

121 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 10:30 13: Drilling Drilling - (WOB:37;GPM :625;RPM:80) 13:20 13: MWD Survey MWD Survey@9838' Inc 0.64 Azm :25 17: Circulating TD of 12 1/4" hole 17:30 19: POOH POOH -- Short Trip To 7500' -- Pulling Tight 19:35 20: Reaming Wash & Ream this Stand 20:00 21: POOH POOH to 5000' 21:40 23: TIH TIH to 9720' 23:50 24: Reaming Wash & Ream to 9812' Winserve II Daily Report for March 31, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

122 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 01, 2017 at 0000 to April 01, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs RDM , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 7 Avg. Slide ROP: Bit PDC SSi716 7x15 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC NM Nortrac Stabilizer 12" Circ Hours 8.42 VON EVO Tool Carrier Ream Hours NM Pony DC Rotary Hrs%: Nortrac Stabilizer 11 3/4" Slide Hrs%: Rotary Ftg% (6) 8" Drill Collars Slide Ftg% Casing (15) 6 1/2" Drill Collars Size lbf/ft MD (15) 5 Hevi Jars Drilling Mud Record Bit Record WBM Bit No: 3 WOB: Rot Wt: 0 Weight: 9.80 PPG 280 Visc: Model 37 SN.: Bit PDC SSi716 JM5737 Pick UP: Slack Off: SPP: 315 Chlorides: 255 YP: 0 PV: MFG. 5 Type 4 IADC SMITH PDC Flow: PH: 10.5 JETS 7-15 SPM: 150 GAS: 0 TFA: 1.21 in² Rot. RPM - SAND: 0.01 Hole ID: 12.3 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 0.64 SOLID: 4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 0.64 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jerry Dually / Kelly Small Jonathan Rice 17 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 08: Circulating Circulating at TD, rotate and reciprocate pipe 08:25 15: POOH POOH 15:30 16: POOH Lay down 8" drill collars 16:30 18: Change BHA Lay down directional tools 18:00 24: Standby While rig runs 9 5/8" casing Winserve II Daily Report for April 01, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

123 DAILY TOTALS Start Depth Depth Below Rot Hrs. Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Avg. Slide ROP: Rotate Footage: Rotary Hours Avg. Rot ROP: Circ Hours Ream Hours Rotary Hrs%: Slide Hrs%: Rotary Ftg% Slide Ftg% Casing Size lbf/ft MD SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Lead Dir Hand 2nd Dir Hand From April 02, 2017 at 0000 to April 02, 2017 at 2400 Assembly Totals BHA # Motor SN / R.S. SN Slide Ftg Slide Hrs Rotate Ftg Legal Desc. Company Man Rotate Hrs Circ Hrs Drilling Mud Record Bit Record WBM Bit No: WOB: Rot Wt: 0 Weight: 9.80 PPG 280 Visc: Model 37 SN.: Pick UP: Slack Off: SPP: 315 Chlorides: 255 YP: 0 PV: MFG. 5 Type 4 IADC Flow: PH: 10.5 JETS SPM: 150 GAS: 0 TFA: in² Rot. RPM - SAND: 0.01 Hole ID: N/A Mot RPM: - WL: 0 Bit Hrs: Incl. In: 0.64 SOLID: 4 Bit Ftg Azm. In: BHT :.0F Pumps Incl. Out: 0.64 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jerry Dually / Kelly Small 18 of 48 Township-Section-Range Tom Allen Fernando Cano / Jonathan Rice D & C Hrs -- BHA Ftg Current BHA # 0 Avg ROP Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 24: Standby Standby while rig runs 9 5/8" casing and cement same Winserve II Daily Report for April 02, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

124 DAILY TOTALS Start Depth Depth Below Rot Hrs. Total Drilled: Avg. Total ROP: Slide Footage: 7.33 Slide Hours Avg. Slide ROP: Rotate Footage: Rotary Hours Avg. Rot ROP: Circ Hours Ream Hours Rotary Hrs%: Slide Hrs%: Rotary Ftg% Slide Ftg% Casing Size lbf/ft MD SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Lead Dir Hand 2nd Dir Hand From April 03, 2017 at 0000 to April 03, 2017 at 2400 Assembly Totals BHA # Motor SN / R.S. SN Slide Ftg Slide Hrs Rotate Ftg Legal Desc. Company Man Rotate Hrs Circ Hrs Drilling Mud Record Bit Record WBM Bit No: WOB: Rot Wt: 0 Weight: 9.80 PPG 280 Visc: Model 37 SN.: Pick UP: Slack Off: SPP: 315 Chlorides: 255 YP: 0 PV: MFG. 5 Type 4 IADC Flow: PH: 10.5 JETS SPM: 150 GAS: 0 TFA: in² Rot. RPM - SAND: 0.01 Hole ID: N/A Mot RPM: - WL: 0 Bit Hrs: Incl. In: 0.64 SOLID: 4 Bit Ftg Azm. In: BHT :.0F Pumps Incl. Out: 0.64 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jerry Duley Fernando Cano D & C Hrs BHA Ftg 19 of 48 Township-Section-Range Tom Allen -- Current BHA # 0 Avg ROP Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 03: Standby Standby while cementing 03:00 06: Standby Standby / Wait on cement 06:00 15: Standby Standby while rig nipples down,sets casing slips, nipple back up and test BOP and install wear bus 15:00 16: Standby Standby while rig picks up bit, bit sub, drill collars HWDP, and TIH to 914' 16:40 17: Other Slip & Cut drill line 17:30 18: Other Rig service 18:00 19: TIH TIH to 2593' 19:30 20: Other Drilling cement and DV Tool from 2593' to 2640' 20:50 23: TIH TIH from 2640' to 7499' 23:00 24: Other Drill cement and DV Tool from 7596' Winserve II Daily Report for April 03, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

125 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 04, 2017 at 0000 to April 04, 2017 at 2400 Assembly Totals Start Depth 990 BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth 994 # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: 4 Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 8 Avg. Slide ROP: Bit PDC U516M 5x16 Rotate Footage: 4 Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours 5.00 VON EVO Tool Carrier Ream Hours NM Rotary Hrs%: 10 NM Flex Slide Hrs%:.00 (20) 5 Drill Pipe Rotary Ftg% 10 (15) 5 Hevi Slide Ftg%.00 Casing Size lbf/ft MD Drilling Mud Record Bit Record WBM Bit No: 4 WOB: Rot Wt: 35 Weight: 9.80 PPG 280 Visc: Model 37 SN.: Bit PDC U516M Pick UP: Slack Off: SPP: 315 Chlorides: 255 YP: 750 PV: MFG. 5 Type 4 IADC Ulterra PDC Flow: PH: 10.5 JETS 5-16 SPM: 103 GAS: 0 TFA: 0.98 in² Rot. RPM SAND: 0.01 Hole ID: 8.5 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 0.64 SOLID: 4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 0.64 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jerry Duley Fernando Cano 20 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Other Drill cement and DV Tool from 7596' to 7625' 00:30 01: Other Install Rotating head 01:00 02: TIH TIH from 7625' to 9435' 02:00 03: Other Drill cement and float equipment from 9435' to 9515' 03:00 04: Other Ream from 9515' to 9900' 04:00 06: Drilling Drilling - (WOB:35;GPM :430;RPM:70) 06:50 11: Circulating Circulating 11:10 16: POOH POOH for curve assembly 16:00 18: Other L/D /2 Drill collars 18:00 18: Other Crew change 18:30 19: Change BHA Pick Up BHA #8 (Curve Assembly) 19:40 20: Other Fill slugging tank to test Motor and MWD Tool 20:15 20: Circulating Test Motor and MWD 20:20 21: Other M/U Bit and Flex Monel Winserve II Daily Report for April 04, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

126 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 21:00 21: Rig Service-Inhole Rig Service-Inhole 21:30 23: TIH TIH to 2744' 23:15 23: Circulating Fill Pipe 23:20 24: TIH 4600' Winserve II Daily Report for April 04, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

127 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 05, 2017 at 0000 to April 05, 2017 at 2400 Assembly Totals Start Depth 994 BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth 1072 # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 8 Avg. Slide ROP: Bit PDC U516M 5x16 Rotate Footage: 29 Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours 4.67 VON EVO Tool Carrier Ream Hours NM Rotary Hrs%: NM Flex Slide Hrs%: (20) 5 Drill Pipe Rotary Ftg% (15) 5 Hevi Slide Ftg% Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 4 WOB: Rot Wt: 40 Weight: PPG 240 Visc: Model 37 SN.: Bit PDC U516M Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2550 PV: MFG. 5 Type 4 IADC Ulterra PDC Flow: PH: 10.5 JETS 5-16 SPM: 111 GAS: 0 TFA: 0.98 in² Rot. RPM SAND: 0.01 Hole ID: 8.5 In. Mot RPM: 0-30 WL: 0 Bit Hrs: hrs Incl. In: 0.64 SOLID: 4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jimmy Nobles Fernando Cano 21 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: TIH TIH to 5570' 00:30 00: Circulating Fill Pipe 00:35 02: TIH TIH to 9440'' 02:30 02: Circulating Fill Pipe 02:35 03: TIH TIH to 9900' 03:10 03: Circulating Fill pipe and test MWD (good) 03:35 03: Circulating Wash to bottom 03:45 04: Circulating Displacing to oil base / Reciprocate string 04:30 05: Circulating Ream from 9900' to 9940' 05:30 07: Sliding Sliding - (WOB:30;GPM :459;TFO:345M)) 07:00 07: Survey & Conn. Survey & Conn.@9925' Inc 0.79 Azm :10 08: Sliding Sliding - (WOB:35;GPM :459;TFO:345M)) 08:15 08: MWD Survey MWD Survey@9971' Inc 6.01 Azm :20 08: Drilling Drilling - (WOB:25;GPM :430;RPM:25) Winserve II Daily Report for April 05, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 3

128 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 08:25 08: Sliding Sliding - (WOB:35;GPM :459;TFO:10R)) 08:55 09: Drilling Drilling - (WOB:25;GPM :430;RPM:25) 09:00 09: Survey & Conn. Survey & Conn.@10017' Inc Azm :10 09: Drilling Drilling - (WOB:25;GPM :500;RPM:25) 09:25 10: Sliding Sliding - (WOB:35;GPM :500;TFO:10R)) 10:00 10: Circulating Wash & Ream, had to rotate pipe to break frre fro sliding 10:30 10: Sliding Sliding - (WOB:35;GPM :500;TFO:10R)) sticky 10:45 11: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 11:00 11: Sliding Sliding - (WOB:35;GPM :500;TFO:10R)) sticky 11:25 11: Survey & Conn. Survey & Conn.@10109' Inc Azm :40 11: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 11:55 12: Sliding Sliding - (WOB:35;GPM :500;TFO:20R)) sticky 12:15 12: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 12:30 12: Sliding Sliding - (WOB:40;GPM :500;TFO:30R)) sticky 12:55 13: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 13:00 13: Circulating Back ream and ream stand 13:30 13: Survey & Conn. Survey & Conn.@10201' Inc 33.8 Azm :35 13: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 13:45 14: Sliding Sliding - (WOB:40;GPM :500;TFO:30R) 14:20 15: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 15:00 15: Circulating Back ream and ream stand 15:05 15: Circulating SPR 15:10 15: Survey & Conn. Survey & Conn.@10293' Inc Azm :15 15: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 15:25 15: Sliding Sliding - (WOB:40;GPM :500;TFO:30R)) 15:55 16: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 16:10 16: Sliding Sliding - (WOB:40;GPM :500;TFO:30R)) 16:30 16: Circulating Back ream and ream stand 16:40 16: Survey & Conn. Survey & Conn.@10385' Inc Azm :45 16: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 16:55 17: Sliding Sliding - (WOB:40;GPM :500;TFO:30R)) 17:15 17: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 17:25 17: Sliding Sliding - (WOB:40;GPM :500;TFO:30R)) 17:50 18: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 18:00 18: Circulating Back ream and ream stand 18:10 18: Survey & Conn. Survey & Conn.@10476' Inc Azm :20 18: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 18:30 19: Sliding Sliding - (WOB:40;GPM :500;TFO:30R) 19:10 19: MWD Survey MWD Survey@10522' Inc Azm :15 19: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 19:35 20: Sliding Sliding - (WOB:40;GPM :500;TFO:30R)) 20:25 20: Circulating Back ream and ream stand 20:40 20: Survey & Conn. Survey & Conn.@10567' Inc 69.3 Azm :50 21: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 21:10 21: Sliding Sliding - (WOB:40;GPM :500;TFO:30R)) 21:25 21: Other Pump #2 OffLine 21:30 21: Sliding Sliding - (WOB:40;GPM :465;TFO:30R)) Winserve II Daily Report for April 05, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 3

129 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 21:50 21: MWD Survey MWD Inc Azm :55 22: Drilling Drilling - (WOB:22;GPM :500;RPM:30) 22:20 23: Sliding Sliding - (WOB:40;GPM :465;TFO:20R)) 23:45 23: Circulating Back ream and ream stand 23:55 24: Survey & Conn. Survey & Conn.@10659' Inc Azm Winserve II Daily Report for April 05, 2017 License: NP6459 Daily Report for JOB#: Page 3 of 3

130 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 06, 2017 at 0000 to April 06, 2017 at 2400 Assembly Totals Start Depth 1072 BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: Avg. Total ROP: Slide Footage: 5 Slide Hours 1.92 Current BHA # 8 Avg. Slide ROP: Bit PDC U516M 5x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours 3.75 VON EVO Tool Carrier Ream Hours NM Rotary Hrs%: NM Flex Slide Hrs%: (20) 5 Drill Pipe Rotary Ftg% (15) 5 Hevi Slide Ftg% Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 4 WOB: Rot Wt: 40 Weight: PPG 240 Visc: Model 37 SN.: Bit PDC U516M Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2850 PV: MFG. 5 Type 4 IADC Ulterra PDC Flow: PH: 10.5 JETS 5-16 SPM: 120 GAS: 0 TFA: 0.98 in² Rot. RPM SAND: 0.01 Hole ID: 8.5 In. Mot RPM: WL: 0 Bit Hrs: hrs Incl. In: SOLID: 4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 89 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jimmy Nobles Fernando Cano 22 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Drilling Drilling - (WOB:20;GPM :502;RPM:30) 00:05 01: Sliding Sliding - (WOB:40;GPM :465;TFO:15R)) 01:10 01: MWD Survey MWD Survey@10704' Inc Azm :20 01: Drilling Drilling - (WOB:20;GPM :502;RPM:30) 01:45 02: Sliding Sliding - (WOB:40;GPM :465;TFO:15R)) 02:20 02: Drilling Drilling - (WOB:20;GPM :502;RPM:30) 02:45 02: Circulating Back ream and ream stand 02:55 03: Survey & Conn. Survey & Conn.@10750' Inc Azm :05 04: Drilling Drilling - (WOB:20;GPM :502;RPM:30) 04:00 04: Sliding Sliding - (WOB:40;GPM :465;TFO:15L)) 04:15 04: MWD Survey MWD Survey@10803' Inc Azm :20 06: Circulating Circulating at Curve TD, rotate and reciprocate pipe 06:30 07: Circulating Back ream curve from 10863' to 10610', pressure and packed off 07:10 12: Pipe Stuck Work stuck pipe Winserve II Daily Report for April 06, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

131 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 12:00 19: Wireline Wireline - Rig up wireline and RIH to freepoint. Free to 10510',back 1st attempt failed, POOH w/ Wireline reload and & run in hole, 2nd attempt successful / Retract and R/D Wireline 19:00 21: Other Circulating / Condition mud 21:00 21: Rig Service-Inhole Rig Service-Inhole 21:30 24: POOH POOH Winserve II Daily Report for April 06, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

132 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 07, 2017 at 0000 to April 07, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 8 Avg. Slide ROP: Bit PDC U516M 5x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours 0.50 VON EVO Tool Carrier Ream Hours NM Rotary Hrs%: NM Flex Slide Hrs%: (20) 5 Drill Pipe Rotary Ftg% (15) 5 Hevi Slide Ftg% Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 4 WOB: Rot Wt: 40 Weight: PPG 240 Visc: Model 37 SN.: Bit PDC U516M Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2850 PV: MFG. 5 Type 4 IADC Ulterra PDC Flow: PH: 10.5 JETS 5-16 SPM: 120 GAS: 0 TFA: 0.98 in² Rot. RPM - SAND: 0.01 Hole ID: 8.5 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 89 SOLID: 4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 89 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jimmy Nobles Fernando Cano 23 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP Depth Depth Depth Code COMMENT 00:00 01: POOH POOH to surface 01:30 03: POOH POOH to surface 03:00 03: Other Clean up rig floor 03:30 06: Other Make up clean out assembly 06:30 11: Other TIH to 9400' filling pipe every 30 stands 11:00 11: Rig Service-Inhole Rig Service-Inhole 11:30 12: TIH TIH to 9896' 12:00 15: Other Wash & Ream 9896' to 10413', slack off to with no rotary to verify top of fish at 10418' 15:00 16: Other Circulating while rotating and reciprocating 16:20 16: Other Circulating while rotating and reciprocating 16:40 17: POOH POOH, got tight at 10080', gradually increase pickup weight to 60K over rotating weight but won't come free, attempt to circulate but cant. Work pipe down with rotation but no pump. 17:00 18: Other Work pipe down from 10090' to 10130' / 300 PSI RPM Daily Report for JOB#: Page 1 of 2 Winserve II Daily Report for April 07, 2017 License: NP6459

133 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 18:30 21: Other Condition mud, circulate, reciprocate and rotate p 134 SPM / Ream out of hole from to :00 24: Other Condition mud, circulate, reciprocate and rotate p 150 SPM, 120 RPM, Raising mud weight to 10.9 Winserve II Daily Report for April 07, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

134 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 08, 2017 at 0000 to April 08, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 8 Avg. Slide ROP: Bit PDC U516M 5x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours 1.75 VON EVO Tool Carrier Ream Hours NM Rotary Hrs%: NM Flex Slide Hrs%: (20) 5 Drill Pipe Rotary Ftg% (15) 5 Hevi Slide Ftg% Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 4 WOB: Rot Wt: 0 Weight: PPG 240 Visc: Model 37 SN.: Bit PDC U516M Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2500 PV: MFG. 5 Type 4 IADC Ulterra PDC Flow: PH: 10.5 JETS 5-16 SPM: 143 GAS: 0 TFA: 0.98 in² Rot. RPM - SAND: 0.01 Hole ID: 8.5 In. Mot RPM: - WL: 0 Bit Hrs: hrs Incl. In: 89 SOLID: 4 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 89 Flow T :.0F Liner In Azm. Out: Oil %: 0 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jimmy Nobles Fernando Cano 24 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP Depth Depth Depth Code COMMENT 00:00 04: Other Continue to Condition mud, circulate, reciprocate and rotate pipe. 150 SPM, 120 RPM, Raising mud weight to :45 06: Other Pumped sweep, circulate out sweep, a fair amou bigger shale pieces coming out 06:30 09: Other Wash & ream back to 1' above the top of the fish SPM, 120 RPM 09:00 12: Other Circulate, rotate and reciprocate pipe 12:00 13: Other Back ream out of curve to 9900' 13:15 15: Circulating Circulate while rotating and reciprocating pipe, kepping the bit in the 8 1/2" straight hole, pump sweep, 120 RPM 150 SPM 15:00 20: POOH POOH for fishing tools 20:30 21: Other L/D Clean out assembly 21:00 24: Other P/U Fishing Tools Winserve II Daily Report for April 08, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

135 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 09, 2017 at 0000 to April 09, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 8 Avg. Slide ROP: Bit PDC U516M 5x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours VON EVO Tool Carrier Ream Hours NM Rotary Hrs%: NM Flex Slide Hrs%: (20) 5 Drill Pipe Rotary Ftg% (15) 5 Hevi Slide Ftg% Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 4 WOB: Rot Wt: 0 Weight: PPG 240 Visc: Model 76 SN.: Bit PDC U516M Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2500 PV: MFG. 15 Type 25 IADC Ulterra PDC Flow: PH: 10.5 JETS 5-16 SPM: 143 GAS: 0 TFA: 0.98 in² Rot. RPM - SAND: 0.01 Hole ID: 8.5 In. Mot RPM: - WL: 4.2 Bit Hrs: hrs Incl. In: 89 SOLID: 18 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 89 Flow T :.0F Liner In Azm. Out: Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jimmy Nobles Fernando Cano 25 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Other Continue to P/U Fishing Tools 00:30 04: TIH TIH with fishing assembly at 9400', filling pipe ev 30 stands 04:00 06: Other Wash & ream 9930' to 10418', SPR 100, RPM 5 monitor shakers for cuttings, screw into fish 06:30 11: Fishing Jar on fish, aternating directions, after awhile we were able to get circulation 11:00 24: Other - Circulating Jar on fish while circulating Winserve II Daily Report for April 09, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

136 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 10, 2017 at 0000 to April 10, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 8 Avg. Slide ROP: Bit PDC U516M 5x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours VON EVO Tool Carrier Ream Hours NM Rotary Hrs%: NM Flex Slide Hrs%: (20) 5 Drill Pipe Rotary Ftg% (15) 5 Hevi Slide Ftg% Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 4 WOB: Rot Wt: 0 Weight: PPG 240 Visc: Model 76 SN.: Bit PDC U516M Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2600 PV: MFG. 15 Type 25 IADC Ulterra PDC Flow: PH: 10.5 JETS 5-16 SPM: 120 GAS: 0 TFA: 0.98 in² Rot. RPM - SAND: 0.01 Hole ID: 8.5 In. Mot RPM: - WL: 4.2 Bit Hrs: hrs Incl. In: 89 SOLID: 18 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 89 Flow T :.0F Liner In Azm. Out: Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jimmy Nobles Fernando Cano 26 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 04: Circulating Jar on fish while circulating, 400K to 100K, 120 SPM 04:30 08: Circulating Jars failed, work stuck pipe while circulating, K, 120 SPM 08:00 09: Circulating Post jarring inspection 09:30 10: Circulating Work stuck pipe while circulating, 350K to 150K, SPM 10:30 12: Wireline Wireline - Rig up wireline and RIH with freepoint tool, now partially stuck on 2nd joint above the directional tools, back off at screw in sub 12:00 23: Wireline RIH with Wireline / successill backoff) 23:00 24: Other R/D Wireline Winserve II Daily Report for April 10, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

137 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 11, 2017 at 0000 to April 11, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 8 Avg. Slide ROP: Bit PDC U516M 5x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours 0.50 VON EVO Tool Carrier Ream Hours NM Rotary Hrs%: NM Flex Slide Hrs%: (20) 5 Drill Pipe Rotary Ftg% (15) 5 Hevi Slide Ftg% Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 4 WOB: Rot Wt: 0 Weight: PPG 240 Visc: Model 76 SN.: Bit PDC U516M Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2600 PV: MFG. 15 Type 25 IADC Ulterra PDC Flow: PH: 10.5 JETS 5-16 SPM: 120 GAS: 0 TFA: 0.98 in² Rot. RPM - SAND: 0.01 Hole ID: 8.5 In. Mot RPM: - WL: 4.2 Bit Hrs: hrs Incl. In: 89 SOLID: 18 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 89 Flow T :.0F Liner In Azm. Out: Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jimmy Nobles Fernando Cano 27 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 04: POOH POOH from 10480' to BHA 04:30 07: POOH POOH - Lay down 6 1/2" collars, rack back 7 sta of drill pipe, and lay down fishing BHA 07:30 08: Other Clean floor 08:00 12: TIH Make up bit, bit sub, and X/O sub, TIH filling pipe every 30 stands to 9430' 12:00 14: Other Slip & cut drill line 14:00 14: Rig Service-Inhole Rig Service-Inhole 14:30 14: TIH TIH to 9896' 14:50 16: Other Wash & ream 9896' to 10417' 16:05 20: Other Circulate while rotating and reciprocating pipe, 120 SPM, 120 RPM's, pump sweep and circulate out same 20:00 21: Other Ream out of hole from 10363' to SPM 130 RPM :30 24: POOH POOH from 9800' to 4575' Winserve II Daily Report for April 11, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

138 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 12, 2017 at 0000 to April 12, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 8 Avg. Slide ROP: Bit PDC U516M 5x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours 0.50 VON EVO Tool Carrier Ream Hours NM Rotary Hrs%: NM Flex Slide Hrs%: (20) 5 Drill Pipe Rotary Ftg% (15) 5 Hevi Slide Ftg% Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 4 WOB: Rot Wt: 0 Weight: PPG 240 Visc: Model 76 SN.: Bit PDC U516M Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2600 PV: MFG. 15 Type 25 IADC Ulterra PDC Flow: PH: 10.5 JETS 5-16 SPM: 120 GAS: 0 TFA: 0.98 in² Rot. RPM - SAND: 0.01 Hole ID: 8.5 In. Mot RPM: - WL: 4.2 Bit Hrs: hrs Incl. In: 89 SOLID: 18 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 89 Flow T :.0F Liner In Azm. Out: Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jimmy Nobles Fernando Cano 28 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 01: POOH Continue to POOH to BHA 01:30 02: Other L/D X-O, bit sub and bit 02:00 06: TIH M/U screw in sub and TIH to 9347' filling pipe ev 30 stands 06:00 06: Rig Service-Inhole Rig Service-Inhole 06:30 07: Other Pre jarring inspection 07:30 08: TIH TIH to 9887' 08:00 08: Other Wash & ream in the hole to 10415' 08:45 10: Other Circulating above the fish while rotating and reciprocating pipe 10:55 12: Other Attempt to get screwed into fish but can't 12:00 18: POOH POOH for clean out run prior to running 7" 18:00 19: Other L/D screw in sub / Clean rig floor 19:00 20: Other P/U Bit, Bit Sub and X-Over / TIH with 7stds of D 2stds HWDP, Jars and 3stds HWDP 20:00 22: TIH TIH with clean out assembly to 4877' Winserve II Daily Report for April 12, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

139 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 22:00 23: Other Fill pipe and wait on lightning to pass 23:00 24: TIH TIH from 4877' Winserve II Daily Report for April 12, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

140 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 13, 2017 at 0000 to April 13, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 8 Avg. Slide ROP: Bit PDC U516M 5x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: NM Pony DC Circ Hours VON EVO Tool Carrier Ream Hours NM Rotary Hrs%: NM Flex Slide Hrs%: (20) 5 Drill Pipe Rotary Ftg% (15) 5 Hevi Slide Ftg% Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 4 WOB: Rot Wt: 0 Weight: PPG 240 Visc: Model 76 SN.: Bit PDC U516M Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2600 PV: MFG. 15 Type 25 IADC Ulterra PDC Flow: PH: 10.5 JETS 5-16 SPM: 120 GAS: 0 TFA: 0.98 in² Rot. RPM - SAND: 0.01 Hole ID: 8.5 In. Mot RPM: - WL: 4.2 Bit Hrs: hrs Incl. In: 89 SOLID: 18 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 89 Flow T :.0F Liner In Azm. Out: Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT Jimmy Nobles Fernando Cano 29 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: TIH Continue to TIH to 8358' 00:40 01: Other Wait on high winds to pass 01:15 02: TIH TIH from 8358' to 9900'' 02:00 02: Other Wash and ream from 9900' to 10418'. SPM=130 RPM=120 02:30 08: Other Condition mud and circ. RPM=120, SPM=130. Reciprocate and rotate pipe from 10385' to :00 09: Other Back ream out of curve to 9850' 09:00 10: Other Circulate while rotating and reciprocating pipe 98 to 9930' 10:00 11: Other Wash & ream 9850' to 10418' 11:30 14: Other Circulate while rotating and reciprocating pipe 14:20 15: Other Back ream out of hole 9830' 15:10 22: POOH POOH to run 7" casing 22:00 24: Standby Standby while rig prepares to run 7'' Casing Winserve II Daily Report for April 13, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

141 DAILY TOTALS Start Depth Depth Below Rot Hrs. Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Avg. Slide ROP: Rotate Footage: Rotary Hours Avg. Rot ROP: Circ Hours Ream Hours Rotary Hrs%: Slide Hrs%: Rotary Ftg% Slide Ftg% Casing Size lbf/ft MD SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Lead Dir Hand 2nd Dir Hand From April 14, 2017 at 0000 to April 14, 2017 at 2400 Assembly Totals BHA # Motor SN / R.S. SN Slide Ftg Slide Hrs Rotate Ftg Legal Desc. Company Man Rotate Hrs Circ Hrs Drilling Mud Record Bit Record OB Bit No: WOB: Rot Wt: 0 Weight: PPG 240 Visc: Model 76 SN.: Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2600 PV: MFG. 15 Type 25 IADC Flow: PH: 10.5 JETS SPM: 120 GAS: 0 TFA: in² Rot. RPM - SAND: 0.01 Hole ID: N/A Mot RPM: - WL: 4.2 Bit Hrs: Incl. In: 89 SOLID: 18 Bit Ftg Azm. In: BHT :.0F Pumps Incl. Out: 89 Flow T :.0F Liner In Azm. Out: Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano D & C Hrs BHA Ftg 30 of 48 Township-Section-Range Tom Allen -- Current BHA # 0 Avg ROP Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 24: Standby Standby while rig runs 7'' casing and cements same Winserve II Daily Report for April 14, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

142 DAILY TOTALS Start Depth Depth Below Rot Hrs. Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Avg. Slide ROP: Rotate Footage: Rotary Hours Avg. Rot ROP: Circ Hours Ream Hours Rotary Hrs%: Slide Hrs%: Rotary Ftg% Slide Ftg% Casing Size lbf/ft MD SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Lead Dir Hand 2nd Dir Hand From April 15, 2017 at 0000 to April 15, 2017 at 2400 Assembly Totals BHA # Motor SN / R.S. SN Slide Ftg Slide Hrs Rotate Ftg Legal Desc. Company Man Rotate Hrs Circ Hrs Drilling Mud Record Bit Record OB Bit No: WOB: Rot Wt: 0 Weight: PPG 240 Visc: Model 76 SN.: Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2600 PV: MFG. 15 Type 25 IADC Flow: PH: 10.5 JETS SPM: 120 GAS: 0 TFA: in² Rot. RPM - SAND: 0.01 Hole ID: N/A Mot RPM: - WL: 4.2 Bit Hrs: Incl. In: SOLID: 18 Bit Ftg Azm. In: BHT :.0F Pumps Incl. Out: Flow T :.0F Liner In Azm. Out: Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano D & C Hrs BHA Ftg 31 of 48 Township-Section-Range Tom Allen -- Current BHA # 0 Avg ROP Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 06: Standby While rig nipples down, sets casing slips, cuts ca installs pack off, trouble shoot same 06:00 13: Standby Continue to attempt to set packoff 13:00 14: Standby Nipple up BOP's and perform pull test 14:00 16: Standby Pressure test BOP's 16:30 24: Standby Install turnbuckles on BOP, remove BOP wrangler, remove tools, start laying down 5" drill pipe out of derrick Winserve II Daily Report for April 15, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

143 DAILY TOTALS Start Depth Depth Below Rot Hrs. Total Drilled: Avg. Total ROP: Slide Footage: 0.50 Slide Hours Avg. Slide ROP: Rotate Footage: Rotary Hours Avg. Rot ROP: Circ Hours Ream Hours Rotary Hrs%: Slide Hrs%: Rotary Ftg% Slide Ftg% Casing Size lbf/ft MD SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Lead Dir Hand 2nd Dir Hand From April 16, 2017 at 0000 to April 16, 2017 at 2400 Assembly Totals BHA # Motor SN / R.S. SN Slide Ftg Slide Hrs Rotate Ftg Legal Desc. Company Man Rotate Hrs Circ Hrs Drilling Mud Record Bit Record OB Bit No: WOB: Rot Wt: 0 Weight: PPG 240 Visc: Model 76 SN.: Pick UP: Slack Off: SPP: 270 Chlorides: 220 YP: 2600 PV: MFG. 15 Type 25 IADC Flow: PH: 10.5 JETS SPM: 120 GAS: 0 TFA: in² Rot. RPM - SAND: 0.01 Hole ID: N/A Mot RPM: - WL: 4.2 Bit Hrs: Incl. In: SOLID: 18 Bit Ftg Azm. In: BHT :.0F Pumps Incl. Out: Flow T :.0F Liner In Azm. Out: Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano D & C Hrs BHA Ftg 32 of 48 Township-Section-Range Tom Allen -- Current BHA # 0 Avg ROP Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 05: Standby Finish laying down 5" drill pipe out of derrick 05:45 07: Standby Clean floor, lay down 5' handling tools and pick u tools 07:30 08: Standby Change out saver sub, die blocks, and bell guides Rig Service-Outhole 08:30 09: Rig Service-Outhole 09:00 09: Standby Strap remainder of 4" HWDP & install trip nipple 09:30 14: Standby Pick up bit, bit sub, and 4" HWDP off racks 14:00 21: Standby Pick up 4" drill pipe off racks to 6928' 21:00 21: Standby Tag DV 6928', slack off 50K WOB set too drill out same f/6928', t/6932' 21:30 23: Standby L/O and strap 4'' DP 23:30 24: Standby P/U 4'' DP off racks from 6932' Winserve II Daily Report for April 16, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

144 DAILY TOTALS Start Depth Depth Below Rot Hrs. Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Avg. Slide ROP: Rotate Footage: Rotary Hours Avg. Rot ROP: Circ Hours Ream Hours Rotary Hrs%: Slide Hrs%: Rotary Ftg% Slide Ftg% Casing Size lbf/ft MD SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Lead Dir Hand 2nd Dir Hand From April 17, 2017 at 0000 to April 17, 2017 at 2400 Assembly Totals BHA # Motor SN / R.S. SN Slide Ftg Slide Hrs Rotate Ftg Legal Desc. Company Man Rotate Hrs Circ Hrs Drilling Mud Record Bit Record OB Bit No: WOB: Rot Wt: 0 Weight: PPG 190 Visc: Model 76 SN.: Pick UP: Slack Off: SPP: 200 Chlorides: 180 YP: 2600 PV: MFG. 15 Type 25 IADC Flow: PH: 10.5 JETS SPM: 120 GAS: 0 TFA: in² Rot. RPM - SAND: 0.01 Hole ID: N/A Mot RPM: - WL: 4.2 Bit Hrs: Incl. In: SOLID: 18 Bit Ftg Azm. In: BHT :.0F Pumps Incl. Out: Flow T :.0F Liner In Azm. Out: Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano D & C Hrs BHA Ftg 33 of 48 Township-Section-Range Tom Allen -- Current BHA # 0 Avg ROP Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 05: Standby P/U 4'' DP off racks to 10368' 05:00 05: Standby Tag float collar at 10368' and drill out same, drill cement to 10412' 05:45 08: Standby Circulating, displace to oil base 08:15 13: Standby POOH for whipstock 13:30 15: Standby Pick up whipstock and orient same 15:50 24: Standby TIH with 9754' Winserve II Daily Report for April 17, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

145 DAILY TOTALS Start Depth Depth Below Rot Hrs. Total Drilled: Avg. Total ROP: Slide Footage: 7.50 Slide Hours Avg. Slide ROP: Rotate Footage: Rotary Hours Avg. Rot ROP: Circ Hours 0.50 Ream Hours Rotary Hrs%: Slide Hrs%: Rotary Ftg% Slide Ftg% Casing Size lbf/ft MD SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Lead Dir Hand 2nd Dir Hand From April 18, 2017 at 0000 to April 18, 2017 at 2400 Assembly Totals BHA # Motor SN / R.S. SN Slide Ftg Slide Hrs Rotate Ftg Legal Desc. Company Man Rotate Hrs Circ Hrs Drilling Mud Record Bit Record OB Bit No: WOB: Rot Wt: 0 Weight: PPG 190 Visc: Model 76 SN.: Pick UP: Slack Off: SPP: 200 Chlorides: 180 YP: 2600 PV: MFG. 15 Type 25 IADC Flow: PH: 10.5 JETS SPM: 120 GAS: 0 TFA: in² Rot. RPM - SAND: 0.01 Hole ID: N/A Mot RPM: - WL: 4.2 Bit Hrs: Incl. In: SOLID: 18 Bit Ftg Azm. In: BHT :.0F Pumps Incl. Out: Flow T :.0F Liner In Azm. Out: Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano D & C Hrs BHA Ftg 34 of 48 Township-Section-Range Tom Allen -- Current BHA # 0 Avg ROP Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Standby TIH with whipstock to 10412' 00:30 01: Standby R/U Wireline 01:30 02: Standby Run Gyro Wireline, seat 4 times, Orient, seat 3 m times and confirm tool face at Right 02:45 03: Standby Retract and R/D wireline 03:30 04: Standby Set Whipstock 04:15 09: Standby POOH for milling assembly, lay down setting assembly 09:30 13: TIH Pick up milling assembly and TIH to 5765' 13:00 14: Other Slip & cut drill line 14:00 14: Rig Service-Inhole Rig Service-Inhole 14:30 17: TIH TIH from 5765' to 10394' 17:00 22: Standby Mill casing 10394' to 10407' / SPM=10 RPM=60, SPP= :00 24: Standby Condition mud and circulate / Clean up window in casing, reciprocate and rotate pipe / SPM=103, RPM=70 Winserve II Daily Report for April 18, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

146 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 19, 2017 at 0000 to April 19, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: 6 Avg. Total ROP: Slide Footage: 6 Slide Hours 4.08 Current BHA # 9 Avg. Slide ROP: Ulterra U613M Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Shockmizer UBHO Sub NMDC Circ Hours 5.00 NM Flex Ream Hours Rotary Hrs%:.00 (66) 4'' Drill Pipe Slide Hrs%: 10 (90) 4'' HWDP Rotary Ftg%.00 Slide Ftg% 10 Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 5 WOB: Rot Wt: 12 Weight: PPG 190 Visc: Model 76 SN.: Ulterra U613M Pick UP: Slack Off: SPP: 200 Chlorides: 195 YP: 2750 PV: MFG. 15 Type 25 IADC Ulterra PDC Flow: PH: 10.5 JETS 6-14 SPM: 77 GAS: 0 TFA: 1.69 in² Rot. RPM - SAND: 0.01 Hole ID: 6.1 In. Mot RPM: 0-0 WL: 4.2 Bit Hrs: hrs Incl. In: SOLID: 18 Bit Ftg Ft Azm. In: BHT :.0F Pumps Incl. Out: 53.3 Flow T :.0F Liner In Azm. Out: 347 Oil %: 66 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 35 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 05: POOH POOH 05:00 06: Other Lay down milling assembly 06:00 07: Change BHA Pik up motor and UBHO sub, scribe, pick up MW monel and insert MWD tool 07:00 07: Other Test tools 07:15 08: Other Make up bit and pick up flex monel 08:15 09: TIH TIH to 2680' 09:20 09: Other Fill pipe 09:30 12: TIH TIH to 5685', picked up 30 joints of HWDP of the rack 12:00 12: Other Fill pipe 12:10 13: TIH TIH to 8525' 13:10 13: Other Fill pipe 13:20 14: TIH TIH to 10337' Winserve II Daily Report for April 19, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

147 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 14:15 17: Circulating Circulating, attempting to sync MWD, tried multiple flow rates and both pumps, set surface computer to different data rates, finally got synced up in 1 second data rate and got a survey, couldn't get tool faces, continue troubleshooting, now working 17:00 17: Other Slack off without pump past bottom of slide at 10402' 17:10 17: Circulating Wash to bottom at 10407' 17:25 17: Sliding Sliding - (WOB:7.00;GPM :224;TFO:55R)) 17:50 18: Connection Connection 18:00 18: Circulating Attempt to slide but motor pressuring up 18:10 18: Other Rack back stand and pull up above whipstock an check pressure 18:25 20: Circulating Check pressure, gradually pressuring up again, rotated pipe and pressure fell off to normal. Orient toolface, make connection and go to bottom and try sliding again 20:10 20: Connection Connection 20:15 22: Sliding Sliding - (WOB:1;GPM :224;TFO:55R)) 22:55 23: Circulating Check Inc :00 24: Sliding Sliding - (WOB:12.00;GPM :224;TFO:30R)) Winserve II Daily Report for April 19, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

148 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 20, 2017 at 0000 to April 20, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 9 Avg. Slide ROP: Ulterra U613M Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Shockmizer UBHO Sub NMDC Circ Hours 2.00 NM Flex Ream Hours Rotary Hrs%: (66) 4'' Drill Pipe Slide Hrs%: (90) 4'' HWDP Rotary Ftg% Slide Ftg% Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 5 WOB: Rot Wt: 28 Weight: PPG 205 Visc: Model 62 SN.: Ulterra U613M Pick UP: Slack Off: SPP: 220 Chlorides: 195 YP: 3200 PV: MFG. 20 Type 20 IADC Ulterra PDC Flow: PH: 10.5 JETS 6-14 SPM: 77 GAS: 0 TFA: 1.69 in² Rot. RPM SAND: 0.01 Hole ID: 6.1 In. Mot RPM: 0-45 WL: 4.2 Bit Hrs: hrs Incl. In: 53.3 SOLID: 14.7 Bit Ftg Ft Azm. In: 347 BHT : 153.0F Pumps Incl. Out: Flow T : 116.0F Liner In Azm. Out: Oil %: 78 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 36 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP Depth Depth Depth Code COMMENT 00:00 00: Sliding Sliding - (WOB:12.00;GPM :224;TFO:30R)) 00:30 00: Other Check 10430' Inc :35 01: Sliding Sliding - (WOB:12.00;GPM :224;TFO:10R)) 01:50 01: Circulating SPR's 01:55 02: Connection Connection 02:05 03: Circulating Attempt to slide, pressuring up like before while off bottom and now MWD Tool quits pulsing due to same. Worked pipe while rotating and eventually pressure fell back down to normal and MWD working fine 03:00 04: Sliding Sliding - (WOB:25.00;GPM :224;TFO:15R)) 04:35 04: MWD Survey MWD Survey@0' Inc 0 Azm 0 04:45 05: Drilling Drilling - (WOB:2;GPM :224.00;RPM:30) 05:00 06: Sliding Sliding - (WOB:25.00;GPM :224;TFO:30l)) 06:30 06: MWD Survey MWD Survey@0' Inc 0 Azm 0 06:40 06: Drilling Drilling - (WOB:2;GPM :224.00;RPM:30) Winserve II Daily Report for April 20, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

149 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 06:55 08: Sliding Sliding - (WOB:2;GPM :224;TFO:0)) 08:00 08: Survey & Conn. Survey & Conn.@0' Inc 0 Azm 0 08:10 08: Drilling Drilling - (WOB:2;GPM :224.00;RPM:30) 08:30 09: Sliding Sliding - (WOB:2;GPM :224;TFO:20L)) 09:05 09: MWD Survey MWD Survey@0' Inc 0 Azm 0 09:15 09: Drilling Drilling - (WOB:2;GPM :224.00;RPM:30) 09:30 10: Sliding Sliding - (WOB:2;GPM :224;TFO:20R)) 10:05 10: MWD Survey MWD Survey@0' Inc 0 Azm 0 10:10 10: Drilling Drilling - (WOB:2;GPM :224.00;RPM:30) 10:30 10: Sliding Sliding - (WOB:25.00;GPM :224;TFO:20R)) 10:55 11: Survey & Conn. Survey & Conn.@0' Inc 0 Azm 0 11:05 11: Drilling Drilling - (WOB:2;GPM :224.00;RPM:30) 11:20 12: Sliding Sliding - (WOB:25.00;GPM :224;TFO:22L)) 12:10 12: MWD Survey MWD Survey@0' Inc 0 Azm 0 12:15 12: Drilling Drilling - (WOB:2;GPM :224.00;RPM:30) 12:30 13: Sliding Sliding - (WOB:25.00;GPM :224;TFO:20L)) 13:20 13: MWD Survey MWD Survey@0' Inc 0 Azm 0 13:25 13: Drilling Drilling - (WOB:2;GPM :224.00;RPM:30) 13:40 14: Sliding Sliding - (WOB:25.00;GPM :224;TFO:20L)) 14:40 14: Survey & Conn. Survey & Conn.@0' Inc 0 Azm 0 14:50 15: Drilling Drilling - (WOB:2;GPM :224.00;RPM:30) 15:30 15: Other Check 10776' Inc Az :35 16: Drilling Drilling - (WOB:2;GPM :224.00;RPM:30) 16:50 17: Rig Service-Inhole Rig Service-Inhole 17:05 17: Survey & Conn. Survey & Conn.@0' Inc 0 Azm 0 17:15 18: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 18:40 18: Survey & Conn. Survey & Conn.@0' Inc 0 Azm 0 18:45 19: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 19:00 19: Sliding Sliding - (WOB:25.00;GPM :224;TFO:35R)) 19:25 20: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 20:20 20: Survey & Conn. Survey & Conn.@0' Inc 0 Azm 0 20:35 20: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 20:55 21: Sliding Sliding - (WOB:25.00;GPM :224;TFO:25R)) 21:25 22: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 22:20 22: Survey & Conn. Survey & Conn.@0' Inc 0 Azm 0 22:25 22: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 22:50 23: Sliding Sliding - (WOB:25.00;GPM :224;TFO:25R)) 23:30 24: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) Winserve II Daily Report for April 20, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

150 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 21, 2017 at 0000 to April 21, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth 1249 # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours 6.75 Current BHA # 9 Avg. Slide ROP: Ulterra U613M Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Shockmizer UBHO Sub NMDC Circ Hours 1.08 NM Flex Ream Hours Rotary Hrs%: (66) 4'' Drill Pipe Slide Hrs%: (90) 4'' HWDP Rotary Ftg% Slide Ftg% 9.91 Casing Size lbf/ft MD Drilling Mud Record Bit Record OB Bit No: 5 WOB: Rot Wt: 40 Weight: PPG 205 Visc: Model 62 SN.: Ulterra U613M Pick UP: Slack Off: SPP: 220 Chlorides: 175 YP: 3200 PV: MFG. 20 Type 20 IADC Ulterra PDC Flow: PH: 10.5 JETS 6-14 SPM: 77 GAS: 0 TFA: 1.69 in² Rot. RPM SAND: 0.01 Hole ID: 6.1 In. Mot RPM: WL: 4.2 Bit Hrs: hrs Incl. In: SOLID: 14.7 Bit Ftg Ft Azm. In: BHT : 153.0F Pumps Incl. Out: Flow T : 116.0F Liner In Azm. Out: Oil %: 78 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 37 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 00:30 00: Survey & Conn. Survey & Conn.@0' Inc 0 Azm 0 00:35 00: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 00:50 01: Sliding Sliding - (WOB:25.00;GPM :224;TFO:10R)) 01:50 03: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 03:00 03: Survey & Conn. Survey & Conn.@11310_Inc _Azm :10 04: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 04:25 04: Survey & Conn. Survey & Conn.@11404_Inc _Azm :35 05: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 05:45 05: Survey & Conn. Survey & Conn.@11499_Inc _Azm :50 06: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 06:10 06: Sliding Sliding - (WOB:4;GPM :224;TFO:70R)) 06:50 07: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 07:35 07: Survey & Conn. Survey & Conn.@11593_Inc _Azm Winserve II Daily Report for April 21, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

151 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 07:40 08: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 08:55 09: Survey & Conn. Survey & Conn.@11687_Inc _Azm :00 09: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 09:15 09: Sliding Sliding - (WOB:4;GPM :224.00;TFO:70R) 09:30 10: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 10:00 10: Survey & Conn. Survey & Conn.@11782_Inc _Azm :05 10: Drilling Drilling - (WOB:28.00;GPM :224.00;RPM:45) 10:55 11: Survey & Conn. Survey & Conn.@11876_Inc _Azm :05 11: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 11:15 11: Sliding Sliding - (WOB:4;GPM :224;TFO:20L)) 11:35 12: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 12:00 12: Survey & Conn. Survey & Conn.@11921_Inc _Azm :10 12: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 12:55 13: Survey & Conn. Survey & Conn.@12066_Inc _Azm :05 13: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 13:15 13: Sliding Sliding - (WOB:4;GPM :224;TFO:30R)) 13:45 14: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 14:15 14: Sliding Sliding - (WOB:4;GPM :224.00;TFO:30R) 14:35 14: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 14:55 15: Survey & Conn. Survey & Conn.@12160_Inc _Azm :05 16: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 16:35 16: Survey & Conn. Survey & Conn.@12254_Inc _Azm :40 16: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 16:50 17: Sliding Sliding - (WOB:4;GPM :224;TFO:60R)) 17:30 18: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 18:20 18: Other Check 12333' Inc Azm :25 19: Sliding Sliding - (WOB:4;GPM :224;TFO:85R)) 19:25 19: Survey & Conn. Survey & Conn.@12349_Inc _Azm :35 19: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 19:45 20: Sliding Sliding - (WOB:4;GPM :224;TFO:90R)) 20:45 21: Drilling Drilling - (WOB:25.00;GPM :224.00;RPM:45) 21:50 21: Other Check 12427' Inc Azm :55 22: Sliding Sliding - (WOB:4;GPM :224;TFO:95R)) 22:55 23: MWD Survey MWD Survey@12443_Inc _Azm :00 24: Circulating Circulate, reciprocate and rotate pipe to POOH fo lateral assembly Winserve II Daily Report for April 21, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

152 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 22, 2017 at 0000 to April 22, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: 10 DD Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 10 Avg. Slide ROP: Smith MDi513 3x18' & 3x12's Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours 8.58 NMDC Ream Hours NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% (66) 4'' Drill Pipe Slide Ftg% Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 6 WOB: Rot Wt: 40 Weight: PPG 205 Visc: Model 62 SN.: Smith MDi513 JM1777 Pick UP: Slack Off: SPP: 220 Chlorides: 175 YP: 3200 PV: MFG. 20 Type 20 IADC SMITH PDC Flow: PH: 10.5 JETS 2-12,15,3-18 SPM: 77 GAS: 0 TFA: 1.92 in² Rot. RPM - SAND: 0.01 Hole ID: 6.1 In. Mot RPM: - WL: 4.2 Bit Hrs: hrs Incl. In: SOLID: 14.7 Bit Ftg Ft Azm. In: BHT : 153.0F Pumps Incl. Out: Flow T : 116.0F Liner In Azm. Out: Oil %: 78 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 38 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 02: Circulating Circulate, reciprocate and rotate pipe to POOH fo lateral assembly 02:00 03: POOH POOH from 12,490' to top of 10,394' 03:30 03: Circulating Check 10,394' 03:40 08: POOH POOH 08:30 09: Change BHA Pull MWD tool and lay down bit and motor 09:05 10: Change BHA Pick up new motor, stabilizer and ulra low flow UBHO sub, orient, pick up MWD monel and insert MWD tool, pick up NM stabilizer and flex monel 10:25 10: Circulating Test tools 10:35 11: TIH TIH 22 stands to 2181' 11:35 11: Circulating Test pressure before picking up 2 Accelglides 68 strokes # 11:45 12: Other Pick up 2 Accelglides 12:00 12: Circulating Test pressure after picking up Accelglides 68 stro # pulse height 250# 12:10 13: TIH TIH to 5038' Winserve II Daily Report for April 22, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

153 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 13:30 13: Other Fill pipe 13:40 14: TIH TIH to 7875' 14:45 14: Other Fill pipe 14:55 16: TIH TIH to 10358' 16:00 16: Circulating Orient tool face to 40R 16:15 16: Other Slide down whipstock face with no pump 16:30 18: TIH TIH to 12322' 18:00 20: Circulating Attempt to wash to bottom, hole packing off. Wor pipe and ream from 12,322' to bottom of whipsto 20:30 20: Other Pull through window above 10394', no pump 20:40 21: Circulating Circulate and orient tool face to 40R 21:00 21: Other Slide down through window to 10410', no pump 21:10 23: Circulating Wash and ream from 10410' to bottom of 10823' 23:00 24: Circulating Pump sweep, circulate around Winserve II Daily Report for April 22, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

154 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 23, 2017 at 0000 to April 23, 2017 at 2400 Assembly Totals Start Depth 1249 BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs DD , , Total Drilled: Avg. Total ROP: Slide Footage: 21 Slide Hours 9.42 Current BHA # 10 Avg. Slide ROP: Smith MDi513 3x18' & 3x12's Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours 1.58 NMDC Ream Hours NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% (66) 4'' Drill Pipe Slide Ftg% Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 6 WOB: Rot Wt: 25 Weight: PPG 205 Visc: Model 68 SN.: Smith MDi513 JM1777 Pick UP: Slack Off: SPP: 220 Chlorides: 175 YP: 3900 PV: MFG. 19 Type 23 IADC SMITH PDC Flow: PH: 10.5 JETS 2-12,15,3-18 SPM: 79 GAS: 0 TFA: 1.92 in² Rot. RPM SAND: 0.01 Hole ID: 6.1 In. Mot RPM: 0-80 WL: 4.8 Bit Hrs: hrs Incl. In: SOLID: 14.7 Bit Ftg Ft Azm. In: BHT : 153.0F Pumps Incl. Out: Flow T : 80.0F Liner In Azm. Out: Oil %: 80 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 39 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Circulating Circulating sweep around 00:50 01: TIH TIH from 10823' to 11,322' 01:40 02: Circulating Fill pipe / Wash and ream from 11,322' to 11,490' 02:10 02: Drilling Drilling - (WOB:15.00;GPM :23;RPM:70) 02:30 02: Connection Connection 02:35 03: Drilling Drilling - (WOB:2;GPM :23;RPM:70) 03:15 03: Other Check 12489' Inc Azm :20 04: Sliding Sliding - (WOB:4;GPM :230;TFO:145R)) 04:00 04: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 04:45 05: Survey & Conn. Survey & Conn.@12553m Inc 93 Azm :05 05: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 05:15 05: Sliding Sliding - (WOB:4;GPM :230;TFO:145R)) 05:55 07: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 07:00 08: Sliding Sliding - (WOB:4;GPM :23;TFO:145R) Winserve II Daily Report for April 23, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

155 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 08:25 08: Survey & Conn. Survey & Inc Azm :35 09: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 09:15 10: Sliding Sliding - (WOB:4;GPM :23;TFO:160R) 10:45 10: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 10:55 11: Survey & Conn. Survey & Conn.@12742m Inc Azm :05 11: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 11:35 11: Other Check 12781' Inc Az :40 12: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 12:20 12: Rig Service-Inhole Rig Service-Inhole 12:35 12: Survey & Conn. Survey & Conn.@12836m Inc Azm :45 13: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 13:00 14: Sliding Sliding - (WOB:4;GPM :230;TFO:150L)) 14:45 15: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 15:05 15: Survey & Conn. Survey & Conn.@12931m Inc 91.9 Azm :15 15: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 15:25 16: Sliding Sliding - (WOB:4;GPM :23;TFO:150L) 16:05 16: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 16:45 17: Survey & Conn. Survey & Conn.@13026m Inc Azm :05 18: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 18:00 18: Survey & Conn. Survey & Conn.@13120m Inc 89.3 Azm :10 18: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 18:35 19: Sliding Sliding - (WOB:4;GPM :230;TFO:170L)) 19:50 20: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 20:15 20: Survey & Conn. Survey & Conn.@13215m Inc Azm :20 20: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 20:35 21: Sliding Sliding - (WOB:4;GPM :230;TFO:90L)) 21:20 22: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 22:10 22: Survey & Conn. Survey & Conn.@13215m Inc Azm :15 22: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 22:40 23: Sliding Sliding - (WOB:3;GPM :230;TFO:90L)) 23:25 24: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) Winserve II Daily Report for April 23, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

156 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 24, 2017 at 0000 to April 24, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs DD , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 10 Avg. Slide ROP: Smith MDi513 3x18' & 3x12's Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours 0.42 NMDC Ream Hours NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% (66) 4'' Drill Pipe Slide Ftg% Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 6 WOB: Rot Wt: 40 Weight: PPG 205 Visc: Model 68 SN.: Smith MDi513 JM1777 Pick UP: Slack Off: SPP: 220 Chlorides: 175 YP: 4000 PV: MFG. 19 Type 23 IADC SMITH PDC Flow: PH: 10.5 JETS 2-12,15,3-18 SPM: 79 GAS: 0 TFA: 1.92 in² Rot. RPM SAND: 0.01 Hole ID: 6.1 In. Mot RPM: WL: 4.8 Bit Hrs: hrs Incl. In: SOLID: 14.7 Bit Ftg Ft Azm. In: BHT : 153.0F Pumps Incl. Out: Flow T : 80.0F Liner In Azm. Out: Oil %: 80 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 40 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 00:10 00: Survey & Conn. Survey & Conn.@13403m Inc Azm :15 00: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 00:35 01: Sliding Sliding - (WOB:3;GPM :230;TFO:120L)) 01:25 01: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 01:55 02: Other Check 13482' Inc Azm :00 02: Sliding Sliding - (WOB:3;GPM :230;TFO:90L)) 02:30 02: Survey & Conn. Survey & Conn.@13498m Inc Azm :35 02: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 02:55 03: Sliding Sliding - (WOB:3;GPM :230;TFO:90L)) 03:30 04: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 04:20 04: Survey & Conn. Survey & Conn.@13592m Inc Azm :25 04: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 04:40 04: Other Check 13604' Inc Azm Winserve II Daily Report for April 24, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

157 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 04:45 05: Sliding Sliding - (WOB:3;GPM :230;TFO:80L)) 05:45 06: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 06:40 06: Survey & Conn. Survey & Conn.@13687m Inc Azm :45 07: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 07:00 07: Sliding Sliding - (WOB:3;GPM :23;TFO:80L) 07:55 08: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 08:45 08: Survey & Conn. Survey & Conn.@13781m Inc Azm :50 09: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 09:20 10: Sliding Sliding - (WOB:4;GPM :230;TFO:140L)) 10:00 10: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 10:40 10: Survey & Conn. Survey & Conn.@13875m Inc Azm :45 11: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 11:00 12: Sliding Sliding - (WOB:4;GPM :23;TFO:140L) 12:05 12: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 12:40 12: Survey & Conn. Survey & Conn.@13970m Inc Azm :50 13: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 13:05 14: Sliding Sliding - (WOB:4;GPM :230;TFO:90L)) 14:20 14: Drilling Drilling - (WOB:25.00;GPM :23;RPM:70) 14:45 15: Rig Service-Inhole Rig Service-Inhole 15:00 15: Survey & Conn. Survey & Conn.@14064m Inc Azm :10 15: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 15:20 15: Other Check 14079' Inc ' Az :30 16: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 16:00 16: Other Check shot 14110' Inc Az :10 17: Sliding Sliding - (WOB:4;GPM :230;TFO:90L)) 17:40 17: Survey & Conn. Survey & Conn.@14158m Inc 91.6 Azm :45 17: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 17:55 18: Other Swap pumps 18:05 19: Sliding Sliding - (WOB:4;GPM :230;TFO:90L)) 19:40 19: Other Check 14195' Inc Azm :45 20: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 20:10 20: Other Check 14215' Inc Azm :20 22: Sliding Sliding - (WOB:4;GPM :230;TFO:90L)) 22:50 23: Other Swap pumps 23:00 23: Sliding Sliding - (WOB:4;GPM :230;TFO:90L)) 23:40 23: Circulating Ream stand 23:50 24: Survey & Conn. Survey & Conn.@14252m Inc Azm Winserve II Daily Report for April 24, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

158 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 25, 2017 at 0000 to April 25, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs DD , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours 4.17 Current BHA # 11 Avg. Slide ROP: Bit PDC MDi613 3x12 3x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours 5.00 NMDC Ream Hours NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% 5 (66) 4'' Drill Pipe Slide Ftg% 5 Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 7 WOB: Rot Wt: 40 Weight: PPG 205 Visc: Model 68 SN.: Bit PDC JJ7640 Pick UP: Slack Off: SPP: 220 Chlorides: 175 YP: 4000 PV: MFG. 19 Type 23 IADC SMITH PDC Flow: PH: 10.5 JETS 3-12,3-16 SPM: 85 GAS: 0 TFA: 1.71 in² Rot. RPM SAND: 0.01 Hole ID: 6.1 In. Mot RPM: WL: 4.8 Bit Hrs: hrs Incl. In: SOLID: 14.7 Bit Ftg Ft Azm. In: BHT : 153.0F Pumps Incl. Out: Flow T : 80.0F Liner In Azm. Out: Oil %: 80 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 41 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 00:25 00: Other Check 14284' Inc Azm :35 00: Circulating Orient tool face, increase to 250 GPM and work prior to slide 00:55 02: Sliding Sliding - (WOB:4;GPM :230;TFO:60L)) 02:40 02: Other Check 14315' Inc Azm :45 03: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 03:15 03: Circulating Ream stand 03:20 03: Survey & Conn. Survey & Conn.@14347m Inc Azm :30 03: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 03:45 03: Circulating Orient tool face and work pipe 03:50 05: Sliding Sliding - (WOB:4;GPM :23;TFO:60L) 05:50 06: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 06:00 06: Other Check 14409' Inc Az :10 06: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) Winserve II Daily Report for April 25, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

159 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 06:25 06: Sliding Sliding - (WOB:4;GPM :250;TFO:30R)) 06:50 10: Circulating Circulating prior to tripping to investigate tool face alignment, rack back 1 stand an hour while rotating and reciprocating pipe 10:30 13: POOH POOH to 10450' 13:10 13: Circulating Orient below whipstock and pull up above whipst with no pump 13:40 17: POOH POOH to Accelglides 17:15 17: Other Lay down Accelglides 17:30 18: POOH POOH 18:30 20: Other L/D MWD Tool, drain motor break bit off. Inspect BHA #10, re-scribe to verify with muleshoe sleeve key and check break out torque on muleshoe sub and both stabilizer connections. L/D Motor and UBHO Sub. 20:00 21: Change BHA P/U BHA #11 21:35 21: Circulating Test Motor and MWD Tool 21:45 22: TIH TIH to 2,181' 22:30 22: Other P/U Accelglides 22:40 23: TIH TIH to 3,130' 23:05 23: Circulating Fill pipe 23:15 24: TIH 5,130' Winserve II Daily Report for April 25, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

160 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 26, 2017 at 0000 to April 26, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours 3.75 Current BHA # 11 Avg. Slide ROP: Bit PDC MDi613 3x12 3x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours NMDC Ream Hours 6.00 NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% (66) 4'' Drill Pipe Slide Ftg% Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 7 WOB: Rot Wt: 25 Weight: PPG 205 Visc: Model 78 SN.: Bit PDC JJ7640 Pick UP: Slack Off: SPP: 220 Chlorides: 175 YP: 4200 PV: MFG. 17 Type 20 IADC SMITH PDC Flow: PH: 10.5 JETS 3-12,3-16 SPM: 86 GAS: 0 TFA: 1.71 in² Rot. RPM SAND: 0.01 Hole ID: 6.1 In. Mot RPM: WL: 4.8 Bit Hrs: hrs Incl. In: SOLID: 15 Bit Ftg Ft Azm. In: BHT : 176.0F Pumps Incl. Out: Flow T : 80.0F Liner In Azm. Out: Oil %: 82 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 42 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP Depth Depth Depth Code COMMENT 00:00 00: TIH TIH to 5,970' 00:20 00: Circulating Fill Pipe 00:25 02: TIH TIH to 10,358' 02:15 02: Circulating Fill pipe and orient tool face to 40R 02:30 02: Other Slide through window, no pump 02:35 02: TIH TIH to 10,435' where we saw 30k WOB 02:40 02: Circulating Circulate wash and ream from 10,410' to 10,435' where hole attempted to pack off. Reciprocate and rotate pipe from 10,410' to 10,440' 02:45 03: Circulating Wash and ream from 10,440' to 10,727' 03:15 04: TIH TIH to 12,880' 04:15 04: Circulating Fill pipe 04:20 05: TIH TIH to 14205' 05:10 06: Circulating Attempt to wash to bottom but hole packing off, b ream out to 14025' 06:00 06: POOH POOH to 13365' Winserve II Daily Report for April 26, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

161 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 06:45 07: Circulating Attempt to circulate but hole packing off 07:00 07: POOH POOH to 12130' 07:50 09: Circulating Circulating, rotate and reciprocate pipe 09:40 15: Reaming Wash & ream 12130' to 12490' 15:40 16: Circulating Downlink to MWD.5 data rate 16:00 16: Sliding Sliding - (WOB:4;GPM :250;TFO:20L)) 16:30 16: Circulating Circulating out sweep 16:50 17: Sliding Sliding - (WOB:4;GPM :25;TFO:20L) 17:30 17: Survey & Conn. Survey & Conn.@14441m Inc Azm :40 17: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 17:55 19: Sliding Sliding - (WOB:25.00;GPM :250;TFO:35L)) 19:05 19: Other Check 14472' Inc Azm :10 19: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 19:45 19: Other Check 14504' Inc Azm :50 20: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 20:20 20: Survey & Conn. Survey & Conn.@14535m Inc Azm :25 21: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 21:10 21: Other Check 14566' Inc Azm :15 21: Sliding Sliding - (WOB:4;GPM :250;TFO:0)) 21:50 22: Circulating MWD Tool quit pulsing, decoding issues, troubleshoot and recycle several times 22:40 23: Sliding Sliding - (WOB:4;GPM :250;TFO:0)) 23:30 24: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) Winserve II Daily Report for April 26, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

162 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 27, 2017 at 0000 to April 27, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours 8.50 Current BHA # 11 Avg. Slide ROP: 8.71 Bit PDC MDi613 3x12 3x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours 0.75 NMDC Ream Hours NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% (66) 4'' Drill Pipe Slide Ftg% 6.82 Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 7 WOB: Rot Wt: 40 Weight: PPG 205 Visc: Model 78 SN.: Bit PDC JJ7640 Pick UP: Slack Off: SPP: 230 Chlorides: 160 YP: 5100 PV: MFG. 17 Type 20 IADC SMITH PDC Flow: PH: 10.5 JETS 3-12,3-16 SPM: 86 GAS: 0 TFA: 1.71 in² Rot. RPM SAND: 0.01 Hole ID: 6.1 In. Mot RPM: WL: 4.8 Bit Hrs: hrs Incl. In: SOLID: 15 Bit Ftg Ft Azm. In: BHT : 176.0F Pumps Incl. Out: Flow T : 80.0F Liner In Azm. Out: Oil %: 82 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 43 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 00:25 00: Survey & Conn. Survey & Conn.@14629m Inc Azm :30 02: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 02:15 02: Survey & Conn. Survey & Conn.@14724m Inc Azm :20 02: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 02:40 02: Other Check 14744' Inc Azm :45 04: Sliding Sliding - (WOB:4;GPM :250;TFO:20R)) 04:15 05: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 05:00 05: Survey & Conn. Survey & Conn.@14818m Inc Azm :05 05: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 05:25 06: Sliding Sliding - (WOB:4;GPM :250;TFO:20R)) 06:05 06: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) 06:45 06: Survey & Conn. Survey & Conn.@14912m Inc Azm :55 08: Drilling Drilling - (WOB:25.00;GPM :23;RPM:80) Winserve II Daily Report for April 27, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

163 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 08:00 08: Survey & Conn. Survey & Inc Azm :10 08: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 08:30 09: Sliding Sliding - (WOB:4;GPM :250;TFO:20R)) 09:10 10: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 10:00 10: Survey & Conn. Survey & Conn.@15101m Inc Azm :10 11: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 11:15 11: Survey & Conn. Survey & Conn.@15194m Inc Azm :20 12: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 12:25 12: Survey & Conn. Survey & Conn.@15288m Inc Azm :30 12: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 12:45 13: Sliding Sliding - (WOB:4;GPM :25;TFO:20R) 13:45 14: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 14:30 14: Rig Service-Inhole Rig Service-Inhole 14:45 14: Survey & Conn. Survey & Conn.@15383m Inc Azm :50 16: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 16:00 16: Survey & Conn. Survey & Conn.@15477m Inc 91.9 Azm :05 17: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 17:20 17: Survey & Conn. Survey & Conn.@15571m Inc Azm :25 17: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 17:40 20: Sliding Sliding - (WOB:4;GPM :250;TFO:60R)) 20:00 20: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 20:45 20: Survey & Conn. Survey & Conn.@15665m Inc Azm :50 21: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 21:05 21: Sliding Sliding - (WOB:4;GPM :250;TFO:80R)) 21:40 21: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 21:45 22: Circulating Back ream and ream from 15,710' to 15,738' 22:15 24: Sliding Sliding - (WOB:4;GPM :250;TFO:70R)) Winserve II Daily Report for April 27, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

164 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 28, 2017 at 0000 to April 28, 2017 at 2400 Assembly Totals Start Depth BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth 1689 # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours 7.92 Current BHA # 11 Avg. Slide ROP: Bit PDC MDi613 3x12 3x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours 3.58 NMDC Ream Hours 1.00 NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% (66) 4'' Drill Pipe Slide Ftg% 9.42 Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 7 WOB: Rot Wt: 25 Weight: PPG 205 Visc: Model 66 SN.: Bit PDC JJ7640 Pick UP: Slack Off: SPP: 230 Chlorides: 160 YP: 5100 PV: MFG. 18 Type 21 IADC SMITH PDC Flow: PH: 10.5 JETS 3-12,3-16 SPM: 86 GAS: 0 TFA: 1.71 in² Rot. RPM SAND: 0.01 Hole ID: 6.1 In. Mot RPM: WL: 4.6 Bit Hrs: hrs Incl. In: SOLID: 16.3 Bit Ftg Ft Azm. In: BHT : 190.0F Pumps Incl. Out: Flow T : 110.0F Liner In Azm. Out: Oil %: 84 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 44 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Sliding Sliding - (WOB:4;GPM :250;TFO:70R)) 00:20 01: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 01:05 01: Survey & Conn. Survey & Conn.@15760m Inc Azm :10 02: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 02:05 02: Reaming Back ream and ream stand 02:10 02: Circulating SPR's 02:15 02: Survey & Conn. Survey & Conn.@15854m Inc Azm :20 02: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 02:35 02: Reaming Back ream and ream prior to slide 02:50 03: Sliding Sliding - (WOB:4;GPM :250;TFO:150R)) 03:40 04: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 04:30 04: Reaming Back ream and ream stand 04:35 04: Survey & Conn. Survey & Conn.@15948m Inc Azm :40 04: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) Winserve II Daily Report for April 28, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

165 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 04:50 06: Sliding Sliding - (WOB:4;GPM :25;TFO:150R) 06:30 07: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 07:20 07: Reaming Back ream and ream stand 07:25 07: Survey & Conn. Survey & Conn.@16042m Inc Azm :30 07: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 07:40 08: Sliding Sliding - (WOB:4;GPM :250;TFO:180)) 08:50 09: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 09:10 09: Other Check 16105' Inc Az :15 09: Sliding Sliding - (WOB:4;GPM :25;TFO:180) 09:45 10: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 10:00 10: Reaming Back ream and ream stand 10:05 10: Circulating SPR's 10:15 10: Survey & Conn. Survey & Conn.@16137m Inc Azm :20 10: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 10:40 10: Other Check 16169' Inc Az :45 11: Sliding Sliding - (WOB:4;GPM :250;TFO:0)) 11:20 11: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 11:50 11: Reaming Back ream and ream stand 11:55 12: Survey & Conn. Survey & Conn.@16231m Inc Azm :00 12: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 12:40 13: Sliding Sliding - (WOB:4;GPM :250;TFO:140R)) 13:20 13: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 13:30 13: Reaming Back ream and ream stand 13:35 13: Survey & Conn. Survey & Conn.@16326m Inc 90.9 Azm :40 14: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 14:35 14: Reaming Back ream and ream stand 14:40 14: Survey & Conn. Survey & Conn.@16420m Inc Azm :45 15: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 15:40 15: Reaming Back ream and ream stand 15:45 15: Survey & Conn. Survey & Conn.@16514m Inc Azm :50 16: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 16:50 16: Reaming Back ream and ream stand 16:55 17: Rig Service-Inhole Rig Service-Inhole 17:50 17: Survey & Conn. Survey & Conn.@16609m Inc Azm :55 18: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 18:05 19: Sliding Sliding - (WOB:4;GPM :250;TFO:140R)) 19:05 19: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 19:40 19: Circulating Back ream and ream stand 19:45 19: Survey & Conn. Survey & Conn.@16703m Inc Azm :50 20: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 20:10 21: Sliding Sliding - (WOB:4;GPM :250;TFO:170L)) 21:20 22: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 22:05 22: Circulating Back ream and ream stand 22:15 23: Other - Circulating Work on Axion Driller 23:25 23: Survey & Conn. Survey & Conn.@16797m Inc Azm :30 24: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) Winserve II Daily Report for April 28, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

166 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 29, 2017 at 0000 to April 29, 2017 at 2400 Assembly Totals Start Depth 1689 BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth 1804 # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: 125 Avg. Total ROP: Slide Footage: Slide Hours 6.83 Current BHA # 11 Avg. Slide ROP: 7.02 Bit PDC MDi613 3x12 3x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours 2.17 NMDC Ream Hours 1.08 NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% (66) 4'' Drill Pipe Slide Ftg% 3.84 Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 7 WOB: Rot Wt: 23 Weight: PPG 205 Visc: Model 66 SN.: Bit PDC JJ7640 Pick UP: Slack Off: SPP: 230 Chlorides: 160 YP: 5100 PV: MFG. 18 Type 21 IADC SMITH PDC Flow: PH: 10.5 JETS 3-12,3-16 SPM: 86 GAS: 0 TFA: 1.71 in² Rot. RPM SAND: 0.01 Hole ID: 6.1 In. Mot RPM: WL: 4.6 Bit Hrs: hrs Incl. In: SOLID: 16.3 Bit Ftg Ft Azm. In: BHT : 190.0F Pumps Incl. Out: Flow T : 110.0F Liner In Azm. Out: Oil %: 84 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 45 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 00:25 00: Reaming Back ream and ream stand 00:30 00: Survey & Conn. Survey & Conn.@16892m Inc Azm :35 00: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 00:55 01: Other Check 16,912' Inc Azm :00 01: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 01:30 01: Other Check 16967' Inc Azm :35 01: Reaming Ream prior to slide 01:50 02: Sliding Sliding - (WOB:55.00;GPM :250;TFO:35R)) 02:35 02: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 02:40 02: Reaming Back ream and ream stand 02:45 02: Circulating SPR's 02:50 02: Survey & Conn. Survey & Conn.@16986m Inc 87.2 Azm :55 03: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) Winserve II Daily Report for April 29, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 3

167 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 03:05 03: Other Check 17006' Inc Azm :10 04: Sliding Sliding - (WOB:55.00;GPM :250;TFO:35R)) 04:05 04: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 04:15 04: Other Check 17032' Inc Azm :20 04: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 04:55 05: Reaming Back ream and ream stand 05:00 05: Survey & Conn. Survey & Conn.@17080m Inc Azm :05 05: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 05:50 06: Sliding Sliding - (WOB:55.00;GPM :25;TFO:35R) 06:35 06: Drilling Drilling - (WOB:25.00;GPM :25;RPM:80) 06:45 06: Reaming Back ream and ream stand 06:50 06: Survey & Conn. Survey & Conn.@17175m Inc Azm :55 07: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 07:55 08: Reaming Back ream and ream stand 08:00 08: Survey & Conn. Survey & Conn.@17269m Inc Azm :20 09: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 09:20 09: Reaming Back ream and ream stand 09:25 09: Survey & Conn. Survey & Conn.@17364m Inc 90.9 Azm :30 10: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 10:40 10: Reaming Back ream and ream stand 10:45 10: Survey & Conn. Survey & Conn.@17458m Inc Azm :50 12: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 12:00 12: Reaming Back ream and ream stand 12:05 12: Survey & Conn. Survey & Conn.@17553m Inc Azm :10 12: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 12:50 14: Sliding Sliding - (WOB:5;GPM :250;TFO:0)) 14:10 14: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 14:30 14: Reaming Back ream and ream stand 14:35 14: Survey & Conn. Survey & Conn.@17647m Inc Azm :40 15: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 15:40 17: Sliding Sliding - (WOB:5;GPM :25;TFO:0) 17:05 17: Reaming Back ream and ream stand 17:10 18: Rig Service-Inhole Rig Service-Inhole 18:00 18: Survey & Conn. Survey & Conn.@17741m Inc Azm :10 18: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 18:35 18: Other Check 17761' Inc Azm :40 19: Sliding Sliding - (WOB:5;GPM :250;TFO:170R)) 19:35 19: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 19:55 20: Other Check 17792' Inc Azm :00 20: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 20:30 20: Circulating Back ream and ream stand 20:35 20: Survey & Conn. Survey & Conn.@17835m Inc Azm :40 21: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 21:50 22: Other Work on pumps 22:05 22: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 22:15 22: Circulating Back ream and ream stand 22:20 22: Survey & Conn. Survey & Conn.@17930m Inc Azm :30 22: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) Winserve II Daily Report for April 29, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 3

168 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 22:50 22: Other Check 17957' Inc Azm :55 23: Sliding Sliding - (WOB:5;GPM :250;TFO:45R)) 23:40 24: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) Winserve II Daily Report for April 29, 2017 License: NP6459 Daily Report for JOB#: Page 3 of 3

169 DAILY TOTALS SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From April 30, 2017 at 0000 to April 30, 2017 at 2400 Assembly Totals Start Depth 1804 BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours 2.33 Current BHA # 11 Avg. Slide ROP: 7.29 Bit PDC MDi613 3x12 3x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours NMDC Ream Hours NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% (66) 4'' Drill Pipe Slide Ftg% 2.82 Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 7 WOB: Rot Wt: 23 Weight: PPG 205 Visc: Model 69 SN.: Bit PDC JJ7640 Pick UP: Slack Off: SPP: 230 Chlorides: 160 YP: 5100 PV: MFG. 18 Type 22 IADC SMITH PDC Flow: PH: 10.5 JETS 3-12,3-16 SPM: 86 GAS: 0 TFA: 1.71 in² Rot. RPM SAND: 0.01 Hole ID: 6.1 In. Mot RPM: WL: 4.6 Bit Hrs: hrs Incl. In: SOLID: 16.4 Bit Ftg Ft Azm. In: BHT : 190.0F Pumps Incl. Out: Flow T : 110.0F Liner In Azm. Out: Oil %: 85 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 46 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 00:25 00: Circulating Back ream and ream stand 00:30 00: Survey & Conn. Survey & Conn.@18024m Inc Azm :35 02: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 02:00 02: Circulating Back ream and ream stand 02:05 02: Survey & Conn. Survey & Conn.@18118m Inc Azm :15 02: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 02:35 02: Other Check 18144' Inc Azm :40 04: Sliding Sliding - (WOB:5;GPM :250;TFO:180)) 04:00 04: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 04:40 04: Circulating Back ream and ream stand 04:45 04: Survey & Conn. Survey & Conn.@18213m Inc Azm :50 06: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 06:30 06: Circulating Back ream and ream stand Winserve II Daily Report for April 30, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

170 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 06:35 06: Survey & Conn. Survey & Inc Azm :45 07: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 07:00 08: Sliding Sliding - (WOB:5;GPM :25;TFO:180) 08:00 09: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 09:00 09: Circulating Back ream and ream stand 2 times 09:10 09: Survey & Conn. Survey & Conn.@18402m Inc Azm :15 09: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 09:35 09: Other Swap pumps 09:45 10: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 10:30 10: Circulating Back ream and ream stand 2 times 10:40 10: Survey & Conn. Survey & Conn.@18496m Inc Azm :45 11: Drilling Drilling - (WOB:23.00;GPM :25;RPM:80) 11:50 12: Circulating Back ream and ream stand 2 times 12:00 12: MWD Survey MWD Survey@18589m Inc Azm :05 12: Circulating Program MWD to 1 second data rate to conserve battery and verify same with check shot 12:20 17: Circulating Circulating at TD, rotate and reciprocate pipe, pu sweeps, condition mud and raise weight to 11.3# 17:30 21: Circulating Circulate, rotate and reciprocate pipe. Rack back stands every 30 minutes to 17,900'. SPM:86, GPM:250, RPM:80, Torque:4-6K 21:30 22: Circulating Back ream from 17,900' to 17,510'. SPM:86, SPP:4600, RPM:80, Torque: 5-6K 22:30 24: Short Trip Short Trip Winserve II Daily Report for April 30, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

171 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From May 01, 2017 at 0000 to May 01, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 11 Avg. Slide ROP: Bit PDC MDi613 3x12 3x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours NMDC Ream Hours NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% (66) 4'' Drill Pipe Slide Ftg% Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 7 WOB: Rot Wt: 23 Weight: PPG 205 Visc: Model 69 SN.: Bit PDC JJ7640 Pick UP: Slack Off: SPP: 230 Chlorides: 160 YP: 5200 PV: MFG. 18 Type 22 IADC SMITH PDC Flow: PH: 10.5 JETS 3-12,3-16 SPM: 86 GAS: 0 TFA: 1.71 in² Rot. RPM - SAND: 0.01 Hole ID: 6.1 In. Mot RPM: - WL: 4.6 Bit Hrs: hrs Incl. In: SOLID: 16.4 Bit Ftg Ft Azm. In: BHT : 190.0F Pumps Incl. Out: Flow T : 110.0F Liner In Azm. Out: Oil %: 85 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 47 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 03: Short Trip Short Trip to 10,419' 03:30 03: Circulating Attempt to synch MWD Tool to orient tool face to 40R. Tool did not pulse 03:40 05: TIH TIH from 10419' to 12980' 05:05 05: Circulating Fill pipe and circulate 05:25 06: TIH TIH to 14015' 06:05 06: Circulating Fill pipe and circulate 06:20 07: TIH TIH to 15900' 07:10 07: Circulating Fill piipe and circulate 07:35 08: TIH TIH to 17790' 08:25 10: Circulating Fill pipe and circulate, trying to pack off 10:00 14: Circulating Wash & ream 17794' to 18642' 14:00 17: Circulating Circulate while rotating and reciprocating pipe, p sweeps 17:00 19: Circulating Condition mud and circulate racking stands every minutes to 18,170' Winserve II Daily Report for May 01, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 2

172 Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 19:40 24: POOH 10,800' Winserve II Daily Report for May 01, 2017 License: NP6459 Daily Report for JOB#: Page 2 of 2

173 DAILY TOTALS Start Depth SDI Job #: COMPANY: LOCATION: RIG ME: STATE: COUNTY: WELL ME: Geologist : Elevation Resources Trinidad 121 TX UL G 9-46 Unit 2H Tim Roepke Report : API JOB # WORK ORDER# Legal Desc. Company Man Lead Dir Hand 2nd Dir Hand From May 02, 2017 at 0000 to May 02, 2017 at 2400 Assembly Totals BHA Motor SN / R.S. Slide Ftg Slide Hrs Rotate Rotate Circ D & C Depth # SN Ftg Hrs Hrs Hrs BHA Ftg Avg ROP Below Rot Hrs , , Total Drilled: Avg. Total ROP: Slide Footage: Slide Hours Current BHA # 11 Avg. Slide ROP: Bit PDC MDi613 3x12 3x16 Rotate Footage: Motor 7/ Rotary Hours Avg. Rot ROP: Stabilizer Nortrac 5 7/8" Shockmizer UBHO Sub ULF Circ Hours NMDC Ream Hours NM Stabilizer Nortrac 5 7/8" Rotary Hrs%: NM Flex Slide Hrs%: Rotary Ftg% (66) 4'' Drill Pipe Slide Ftg% Casing Accelglide Accelglide Size lbf/ft MD (195) 4'' Drill Pipe (90) 4'' HWDP Drilling Mud Record Bit Record OB Bit No: 7 WOB: Rot Wt: 23 Weight: PPG 205 Visc: Model 69 SN.: Bit PDC JJ7640 Pick UP: Slack Off: SPP: 230 Chlorides: 160 YP: 5200 PV: MFG. 18 Type 22 IADC SMITH PDC Flow: PH: 10.5 JETS 3-12,3-16 SPM: 86 GAS: 0 TFA: 1.71 in² Rot. RPM - SAND: 0.01 Hole ID: 6.1 In. Mot RPM: - WL: 4.6 Bit Hrs: hrs Incl. In: SOLID: 16.4 Bit Ftg Ft Azm. In: BHT : 190.0F Pumps Incl. Out: Flow T : 110.0F Liner In Azm. Out: Oil %: 85 Stroke In Cost Breakdown Effic % 95.00% Gal/Stk BBL/Stk GENERAL COMMENT David Crow Fernando Cano 48 of 48 Township-Section-Range Tom Allen -- Start Start Delta Activity Hours ROP COMMENT Depth Depth Depth Code 00:00 00: POOH POOH to 10,419' 00:15 00: POOH Slide thru window smoothly, no pump 00:20 00: Circulating Pump slug 00:35 04: POOH 2800' Winserve II Daily Report for May 02, 2017 License: NP6459 Daily Report for JOB#: Page 1 of 1

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #: MIDLAND OPERATIONS CENTER OFFICE: (432) 538-3195 P.O Box 8587 MIDLAND, TX 79708 Rail Road Commission of Texas Oil and Gas Division P.O. Box 12967 Capitol Station Austin, TX 78711 December 20, 2016 Attention:

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures IADC Southern Arabian Peninsula Chapter February 15 th, 2018 Top Drive Automation Overcoming Inefficiencies

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

Latest Advancements in DrillString Mechanics

Latest Advancements in DrillString Mechanics Services, Trainings, Softwares Latest Advancements in DrillString Mechanics SPE Gulf Coast Section 03/09/2016 Stephane Menand, Ph.D. stephane.menand@drillscan.com 1 DrillScan Intro Directional Drilling

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE 2009NTCE-04-01 DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network Figures v Tables vii Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Well Planning 5 Bits 9 Bit Selection 9 Bit Design 11 How Bits Drill 12 Roller Cone Bits 13 Natural Diamond Bits

More information

ONYX 360. Rolling PDC cutter

ONYX 360. Rolling PDC cutter ONYX 360 Rolling PDC cutter ONYX 360 Rolling PDC Cutter Applications Drilling conditions that cause and accelerate PDC cutter wear Abrasive environments Benefits Extends bit durability Increases run footage

More information

Using Drilling Dynamics To Reduce Drilling costs

Using Drilling Dynamics To Reduce Drilling costs 1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements

Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements AADE-03-NTCE-49 Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements Copyright 2003 AADE Technical Conference

More information

SPE Distinguished Lecturer Program

SPE Distinguished Lecturer Program SPE Distinguished Lecturer Program The SPE Distinguished Lecturer Program is funded principally through a grant from the SPE Foundation. The society gratefully acknowledges the companies that support this

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

Highlights of Achievements at Loc. TU

Highlights of Achievements at Loc. TU Highlights of Achievements at Loc. TU Planned-80 days / Actual-74 days. Different BHAs for drilling in rotary mode designed by in-house expertise. Sliding was limited to

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

Motor Handbook. 4th Edition Ver. 1.0a ALL RIGHTS RESERVED. Issue Date; December 23, 2013 Wenzel Downhole Tools

Motor Handbook. 4th Edition Ver. 1.0a ALL RIGHTS RESERVED.  Issue Date; December 23, 2013 Wenzel Downhole Tools MOTOR HANDBOOK Motor Handbook 4th Edition Ver. 1.0a Issue Date; December 23, 2013 Wenzel Downhole Tools ALL RIGHTS RESERVED The information contained in this manual is provided for informational and illustration

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

Ashmin HammR Drill Motor

Ashmin HammR Drill Motor Ashmin HammR Drill Motor By: Dr. Gunther (Doc) Tuesday, September 12 th, 2017 Research. Innovate. Test. Deploy. Agenda Drilling Challenges Alternative Designs Drilling Hammer Trends Ashmin HammR Drill

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

Gyrodata Incorporated

Gyrodata Incorporated Gyrodata is an independent supplier and service provider delivering precision wellbore placement and evaluation solutions for drilling, completions and production challenges. Since 1980, we have been partnering

More information

Gyrodata Incorporated

Gyrodata Incorporated Gyrodata is an independent supplier and service provider delivering precision wellbore placement and evaluation solutions for drilling, completions and production challenges. Since 1980, we have been partnering

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Megaton Impact Tools optimize your drilling operations. Megaton Impact Tools Ulti-Torq high-torque, double shoulder connections Involute spline design High-strength steel developed

More information

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation 2/5/2013 Roger L. Schultz TTS Drilling Solutions Presentation Overview Frictional Forces, Vibratory

More information

POWR Series. Performance and Steerable Drilling Motors

POWR Series. Performance and Steerable Drilling Motors POWR Series Performance and Steerable Drilling Motors Drilling Reliable. Innovative. Premium. We are proud of our products and their contribution to the downhole drilling and thru-tubing industries. Research

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

Neyrfor Turbodrill Handbook

Neyrfor Turbodrill Handbook Neyrfor Handbook Neyrfor Handbook Schlumberger 375 Briarpark Drive Houston, Texas 7742 www.slb.com Produced by Schlumberger Marketing Communications Copyright 212 Schlumberger. All rights reserved. No

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Upper Connector Megaton Impact Tools optimize your drilling operations. Drive Mandrel Female Spline Bearing Female Spline New-Generation Drilling Tools Megaton Drilling Jar Frees the

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

Common Coiled Tubing Drilling (ComCTD)

Common Coiled Tubing Drilling (ComCTD) Common Coiled Tubing Drilling (ComCTD) www. renhesun.com 2-1/2 in. Common Coiled Tubing Drilling-Wireline (ComCTD-2W) Features Flexible setup the integrated CTD system Data transmission & communication

More information

Thru-Tubing. Motors and standard tools

Thru-Tubing. Motors and standard tools Thru-Tubing Motors and standard tools Thru-Tubing Reliable. Innovative. Premium. We are proud of our products and their contribution to the downhole drilling and thru-tubing industries. Research Innovate

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve Todd Gooding Business Development Manager WELL COMMANDER A COMPLETE redesign of the ball-activated Centurion

More information

Product Portfolio. Behind every bit is a company that knows every bit about it. When Every Run Counts TM. An ESCO Oil & Gas Company

Product Portfolio. Behind every bit is a company that knows every bit about it. When Every Run Counts TM. An ESCO Oil & Gas Company An ESCO Oil & Gas Company Product Portfolio Behind every bit is a company that knows every bit about it. When Every Run Counts TM Ulterra designs and manufactures high- ULTERRA Advantages Fast and effective

More information

NEW TECHNOLOGIES INCREASE DRILLING PERFORMANCE IN OMV PETROM. March 20, Bucharest

NEW TECHNOLOGIES INCREASE DRILLING PERFORMANCE IN OMV PETROM. March 20, Bucharest NEW TECHNOLOGIES INCREASE DRILLING PERFORMANCE IN OMV PETROM March 20, Bucharest Route to Drilling performance? Engineering could be the key! Engineering identify real drilling problems ( check deeper

More information

Daily Drilling Report

Daily Drilling Report Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 120.0 120.0 120.0 0.0 SPUD DATE API DFS: STATE COUNTY DIVISION 4230133110 TEXAS

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

Internal Pressure Pipe Cutters. Manual E540

Internal Pressure Pipe Cutters. Manual E540 Internal Pressure Pipe Cutters Manual E540 Contents Logan Internal Pressure Pipe Cutters Overview...2 Uses...2 Construction...2 Tool Illustration...3 Operation...2 Single Cut from a Fixed Platform... 2

More information

AADE 01-NC-HO-54. Abstract

AADE 01-NC-HO-54. Abstract AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

Experience with a new 200 C Triple-Combo LWD system

Experience with a new 200 C Triple-Combo LWD system Experience with a new 200 C Triple-Combo LWD system Arthur Walmsley Technical Advisor Pressure HP/HT Ranges 30K PSI Ultra HPHT 20K PSI 15K PSI 10K PSI Extreme HPHT HPHT Standard Temperature 150 C 175 C

More information

Coiled-Tubing High Pressure Jet Drilling System

Coiled-Tubing High Pressure Jet Drilling System A Noble Drilling Corporation Subsidiary Coiled-Tubing High Pressure Jet Drilling System April 19, 2001 Dr. William C. Maurer TT00-38 1 Exxon High Pressure Drill Rig HP Pump HP Rotary Hose HP Swivel HP

More information

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity

More information

The Impact of Well Features on CT Reach. Presented by Patrick Kelleher

The Impact of Well Features on CT Reach. Presented by Patrick Kelleher The Impact of Well Features on CT Reach Presented by Patrick Kelleher ICoTA Calgary Round Table 2014 October 29, 2014 Based on Forthcoming SPE-173666-MS Patrick Kelleher, Ken Newman - Athena Engineering

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE

Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE - 114191 C. A. Rubio P. A. Agudelo: Weatherford Colombia Limited J. E. Peñaloza: Meta Petroleum Limited Houston

More information

Completion Solutions Inc.

Completion Solutions Inc. Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both

More information

Casing Drilling Technology Implementation In Petrom

Casing Drilling Technology Implementation In Petrom Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga

More information

2 1 /8 in Neyrfor TTT. Thru Tubing Turbodrill

2 1 /8 in Neyrfor TTT. Thru Tubing Turbodrill 2 1 /8 in Neyrfor TTT Thru Tubing Turbodrill In 1956, the first Neyrfor turbodrill was developed. Today, Neyrfor turbodrilling systems have become more advanced and power-efficient than ever before. Based

More information

PENETRATION Diameter BIT BIT IADC Serial Jets or DEPTH Last 24 hr R.O.P. CUMUL In Maker Type Code N TFA Start Mtrs Hours m/h Mtrs Hours

PENETRATION Diameter BIT BIT IADC Serial Jets or DEPTH Last 24 hr R.O.P. CUMUL In Maker Type Code N TFA Start Mtrs Hours m/h Mtrs Hours Date : jun15 DAILY DRILLING REPORT Report N 1 Well : HONGT01S1 Sidetrack code: S2 Depth ref: Basket handrail Rig : BPC HWU SpaceSaver II From (m MD): TBA BHR to GL = 17,93m GL to NAP = 0,57m Size Weight

More information

Powered Rotary Steerable System Technology

Powered Rotary Steerable System Technology Powered Rotary Steerable System Technology B.Antony Fayaz 1,Govindan.S 2 1,2 Department of Petroleum Engineering, AMET University, Chennai -603112 Abstract: As the demand of hydrocarbons are growing high

More information

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford 2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

SPE MS. Abstract

SPE MS. Abstract SPE-179088-MS Optimizing Bridge Plug Milling Efficiency Utilizing Weight-On-Bit to Control Debris Size: A Comparative Study of the Debris Size vs Weight-On-Bit Utilizing Five Bladed Carbide Mill, Tri-Cone

More information

Deepwater Solutions. Tesco offers casing and tubular running services for both land and offshore applications

Deepwater Solutions. Tesco offers casing and tubular running services for both land and offshore applications Deepwater Solutions Tesco offers casing and tubular running services for both land and offshore applications From North America to Indonesia, from Mexico to the North Sea, Tesco delivers superior tubular

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x Services Gun Shot Coiled Phasing Density Gun Size Explosive Tubing Slick Line Tubing Wireline Deep Big Hole Gun Type (Degrees) (SPF)Max (inches) Type Conveyed Conveyed Conveyed Conveyed Penetrating Thru

More information

PDC BITS PRODUCT BROCHURE

PDC BITS PRODUCT BROCHURE PDC BITS PRODUCT BROCHURE 2 Infinity Tool Manufacturing provides a complimentary line of down the hole bits, horizontal directional drilling consumables and various drilling accessories. With a facility

More information

Drilling 3 Mile Horizontal Wells in the Williston Basin February 17, Justin Beougher Sr. Drilling Engineer

Drilling 3 Mile Horizontal Wells in the Williston Basin February 17, Justin Beougher Sr. Drilling Engineer Drilling 3 Mile Horizontal Wells in the Williston Basin February 17, 2016 Justin Beougher Sr. Drilling Engineer Overview Williston Basin Introduction Why 3 Mile Laterals? Pad Progression Drilling Analytics

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

Technology Demonstration

Technology Demonstration Advanced Geothermal Drilling Technology Demonstration in the Chocolate Mountains, CA David W. Raymond California Geothermal Forum October 20, 2016 Sandia National Laboratories is a multi-mission laboratory

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

Successful New Technology Introduction and Applications of Rotary Steerable System.

Successful New Technology Introduction and Applications of Rotary Steerable System. Successful New Technology Introduction and Applications of Rotary Steerable System. Mohammed Ibrahim Schlumberger Copyright 2003, MPC 2004 This paper was prepared for the 8th MEDITERRANEAN PETROLEUM CONFERENCE

More information