Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Size: px
Start display at page:

Download "Endeavor Energy Resources, LP. DAILY DRILLING REPORT"

Transcription

1 Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: Cell Number: : Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment around, Start DP Inspection /CSG HGS/SAND % O/W RATIO OIL % MBT PH/ES Caustic Starch Salt R (rot motor or min max) PF/MF CL (P) CA (P) Magnesium Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS PowerDriveX6 Filter Sub XO Wenzel * ABH 8 /8 NM Spiral Stabilizer UBHO NC (MWD) Flow Sleeve Sub Flex NC 4 / Reg 4 / Reg X 4 / IF 4 / IF 4 / IF x 4 / Reg 4 / Reg X 4 / IF 5 / 4 / IF Depth 88 5,5 4 / IF Weight / IF P- 4 / IF 4 / IF DRILL PIPE IF , MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) SPR & PRESSURE 45/45 4/6 TEST SUB S&PSI 44/85 4/686 # Pump Proj To Proj To T D 5, Notes / Next 4 hrs: R/U Spud Drill Surface, Set 9 5/8 Csg

2 6 : 5.5 : 4:.5 4: : 6. : :. : :. : :.5 : 4:.5 4: :.5 : :.5 : 6: 4.5 Rigging up 8/4/ COST: SPUD Drilling 45,565,777 Completion Robert Soliz Report # Rig Number: Cell Number: R/U, Build New spool for flowline, Move solids control equipment around, Continue DP Inspection Pre Spud inspection Build and instal ' section of flowline (work on topdrive encoder) Load and strap new BHA Pump through lines and check for leaks tighten middle spool & dresser sleeve on flow line Service Top Drive Center torque track over the hole and center conductor Wait on /4 bit breaker M/U # & BHA F/ T/ 9' Rig Repairs (Blew ST-8 hose) Change hose.5 /CSG /4 Ultera U59M 97 HGS/SAND % Caustic 7 x 4s 45 O/W RATIO R (rot motor or min max) 45 9 OIL % MBT PH/ES Starch Salt PF/MF CL (P) CA (P) Magnesium Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Shock sub 8" DCs IBS 8" DCs XO Sub HWDP /8 Reg 6 5/8 Reg /8 Reg 6 5/8 Reg /8 Reg Size /8 Reg X 4 / IF Depth / IF Weight Grade DRILL PIPE IF 569. MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) SPR & PRESSURE 45/45 4/6 TEST SUB S&PSI 44/85 4/686 # Pump Proj To Proj To T D Notes / Next 4 hrs: Repair ST-8s, Spud, Drill T/ 847' Run 9 5/8 Csg TVD Incl. Az. DLS. V.S.

3 Weld On Well Head 8/5/ COST: SPUD 8/4/ Drilling,579 5,56 Completion,4,4 Robert Soliz Report # Rig Number: Cell Number: Rig Repairs (Blew ST-8 hose) Change hose Drlg F/-T/569 Drlg F/569-T/847 CIRC. Wait On Gyro To Get Tools Ready To Run Gyro Run Gyro On Wireline TOOH F/847-T98 Rigup Laydown Machine & Safety Meeting Laydown 8" DC'S & BHA T/ Rigup Casing Crew Change Out Bails & Safety Meeting Run jts. 9 5/8 #4 LT & C Casing Circ. Casing Rigdown Casing Crew & Laydown Machine Rigup Schlumberger & Safety Meeting Cmt. Casing W/4sx "C"+.%S+.5%D Circ. 84Sx To / Tank Or bbls WOC Cutoff Conductor Pipe & 9 5/8 Casing Weld On Head HO / /CSG /4 Ultera U59M 9// NC 7./6.4 Caustic 7 x 4s HGS/SAND % / 5 45 O/W RATIO R (rot motor or min max) 45 9 OIL % Starch MBT Salt PH/ES 9.. PF/MF./. CL (P) 7, CA (P) 68 Magnesium 46. Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled No A X IN No TD Still Looks Real Good Torque FT/LBS Shock sub 8" DCs IBS 8" DCs XO Sub HWDP /8 Reg 6 5/8 Reg /8 Reg 6 5/8 Reg /8 Reg Size 9 5/ /8 Reg X 4 / IF Depth / IF Weight 4 Grade J55 DRILL PIPE IF MP 4 4 e-clock.9 5 Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) SPR & PRESSURE TEST SUB S&PSI 44/85 4/686 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wqeld Head / Nippleup BOP / Test BOP / Pickup New BHA / TIH / Drill Cement / Drlg Vertical Hole

4 Pickup BHA & DC'S TIH 8/6/ COST: SPUD 8/4/ Drilling 74,45,86 Completion,4 Robert Soliz Report # 4 Rig Number: Cell Number: Cutoff 9 5/8 Casing Weld On Head Test Wellhead To psi Ok Nippleup BOP & Safety Meeting Rigup Tester & Safety Meeting Test BOP Rams & Choke Valves psi psi low Test Annular psi & psi low Test mud lines and floor valves psi & psi run accumilator function test Slip Cut Drlg Line & Service Rig & Topdrive Change Out Bails Move & Strap OD-ID BHA & DC'S Pickup BHA Tools & Orient MWD Tools Test MWD & Makeup Pickup DC'S F/Racks & TIH T/68 Note: New crew & driller on rig are pretty slow by not being used to topdrive and the rig taking a while to do anything HO / /CSG 8 /4 Ultera U59M 9// NC 7./6.4 Caustic &-8 HGS/SAND % / 5 5 O/W RATIO 9.9 R (rot motor or min max) 45 6 OIL % MBT PH/ES 9 Starch Salt PF/MF./. CL (P) CA (P) 7, 68 Magnesium 46. Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Motor Wenzel-7/8 6. (.6rpg) Motor 7/8 6.(.6rpg)@.5* / Reg 4 / Reg X 4 / IF IBS 8.5" OD UBHO NC (MWD) / IF 4 / IF 4 / IF Size 9 5/8 Flow Sleeve Sub / IF NC / IF Weight 4 IBS 8.5" OD / IF X-O DC'S / IF X 4 /XH 4 / XH X-O HWDP / XH X 4 / IF 4 / IF DRILL PIPE IF 68.9 MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) SPR & PRESSURE TEST SUB S&PSI # Pump Proj To Proj To T D Notes / Next 4 hrs: TIH / Test Casing / Drlg Cement / Drlg Formation TVD Incl. Az. DLS. V.S.

5 ,97 Rotate/Drlg Pilot Hole 8.5 8/7/ COST: SPUD 8/4/ Drilling 4,797 4,658 Completion 8,557 9,6 Roy Reeser Report # 5 Rig Number: Cell Number: TIH T/68 Wash Down To 8 Circ. Bottoms Up Test Casing psi Test Good Drlg Cement F/8-T/847 Rotate Drlg F/847-T/95 Circ. MWD Trouble Shoot No Comm. To Comp In Top Doghouse Slide/Drlg F/95-T/947 Wob-5 Rpm- Spm-95 Gpm-467 Rop-4. Rotate Drlg F/947-T/4 Wob- Rot-55 Rpm- Spm- Gpm-56 Psi- Dill-55 Rop-. Service Rig & Topdrive Rotate Drlg F/,4-T/,69 Wob- Rot-55 Rpm- Spm- Gpm-56 Psi- Dill-55 Rop-4. Service Rig & Topdrive & Chjange Dies In Backup Wrench Rotate Drlg F/,69-T/,85 Wob- Rot-55 Rpm- Spm- Gpm-56 Psi- Dill-55 Rop-7. Conn & Survey Rotate Drlg F/,85-T/, Wob- Rot-55 Rpm- Spm- Gpm-56 Psi- Dill-55 Rop-98. Con't On Page Note: Nathan Is Back As Of Yesterday Evening 5 & XC / /CSG 8 /4 Ultera U56M /4/ /. Caustic &-8 HGS/SAND % / 5 5 O/W RATIO 9.5 R (rot motor or min max) 45 6 OIL % Starch,97,97 MBT Salt PH/ES PF/MF./.7 CL (P) CA (P) 75,,6 Magnesium Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled 5 Torque FT/LBS 6,5 Motor Wenzel-7/8 6. (.6rpg) Motor 7/8 6.(.6rpg)@.5* / Reg 4 / Reg X 4 / IF IBS 8.5" OD UBHO NC (MWD) / IF 4 / IF 4 / IF Size 9 5/8 Flow Sleeve Sub / IF NC / IF Weight 4 IBS 8.5" OD / IF X-O DC'S / IF X 4 /XH 4 / XH X-O HWDP / XH X 4 / IF 4 / IF DRILL PIPE 66, IF., MP 8 tie in , Pressure (W/ max diff), S, LINER, STROKE LENGTH, OUTPUT (gal/stk) , OUTPUT (G) 56, SPR & PRESSURE, TEST SUB S&PSI, # Pump, Proj To, , Proj To T D Notes / Next 4 hrs: Slide / Rotate Drlg Pilot Hole

6 ,85,86 TOOH 8/8/ COST: SPUD 8/4/ Drilling 67,759 48,47 4 Completion,8,4 Roy Reeser Report # 6 Rig Number: Cell Number: Rotate Drlg F/,764-T/4,77 Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-8.4 Service Rig & Topdrive Rotate Drlg F/4,77-T/5,4 Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-8. Conn & Survey Swap Pumps Rotate Drlg F/5,4-T/5,8 Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-88. Conn & Survey Swap Pumps Rotate Drlg F/5,8-T/5, Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-9. Conn & Survey Swap Pumps Rotate Drlg F/5,-T/5,48 Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-9. Conn & Survey Swap Pumps Rotate Drlg F/5,48-T/5,85 Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-7.8 Pump & Circ. Sweep Out TOOH T/,444 For Steerable Assembly For Curve Lithology- 6% % Shale % Sand /8 /CSG 8 /4 Ultera U56M //.57 6 NC 9.9/4.96 Caustic 847 5, &-8 HGS/SAND % / 5 5 O/W RATIO 9. R (rot motor or min max) 45 6 OIL % Starch,86 5, MBT Salt 7.. PH/ES PF/MF./.6 CL (P) 85, CA (P),68 7, ,.5 Magnesium Corr Solids Tripping Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Motor Wenzel-7/8 6. (.6rpg) (SN-65M648) Motor 7/8 6.(.6rpg)@.5* / Reg 4 / Reg X 4 / IF IBS 8.5" OD UBHO NC (MWD) / IF 4 / IF 4 / IF Size 9 5/8 Flow Sleeve Sub / IF NC / IF Weight 4 IBS 8.5" OD / IF X-O DC'S / IF X 4 /XH 4 / XH X-O / XH X 4 / IF HWDP / IF 5,8 7 DRILL PIPE 65 5, IF ,85. MP, , Pressure (W/ max diff) 6 4, S 4, LINER 4, STROKE LENGTH 4, OUTPUT (gal/stk) , OUTPUT (G) 56 5, SPR & PRESSURE 5, TEST SUB S&PSI 5, # Pump 5, Proj To 5, , Proj To T D Notes / Next 4 hrs: TOOH / Change BHA / TIH / Slide/Rotate Drlg Curve

7 5,97 Slide/Rotate Drlg Building Curve SPUD 8/9/ 8/4/ 4 Roy Reeser COST: Drilling Completion Report # 58,67, 7 466,484 5,64 Rig Number: Cell Number: TOOH T/,444 For Steerable Assembly For Curve 7.5 Laydwon DC'S & Old BHA 4 4. Move & Pickup New BHA Tools TIH 4 5. Service Rig & Topdrive 5 8. Rig Repairs Topdrive, ST-8, Adjust Brakes, High Drum Clutch Control Valves TIH T/,79 Fill Pipe Every Stands Tag Bridge at, Fill Pipe & Wash Thru Bridge Twice Pull Up Thru It & Go Back In No Pump OK.5 TIH T/5,5 4. Wash & Ream To Bottom Log Well With MWD Slide/Rotate Drlg F/5,85-T/5,97 Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-6 Diff-5- Rop- Lithology- 5% Shale % % Silt Note: Reason for hi vis on mud check in pits is derrick hand failed to dump the sweeps we pumped into / tank like I told them too don't know if driller even told him too as Charle let him go yesterday /8 /CSG 8 /4 Ultera U56M 8 /4 Hughes VGD- /4/ NC 8.9/. Caustic 847 5, &-8 5,85-8s HGS/SAND % / O/W RATIO 9. R (rot motor or min max) 45 6 OIL % Starch,86 5, MBT Salt PH/ES PF/MF./.6 CL (P) 86, CA (P),64 8 Magnesium 7. Corr Solids k Ch. Seal (x/6ths) Dull Ch. Pulled 75k CT G X IN NO BHA 65k Had Chipped Cutter On Gage Row Torque FT/LBS 4,75 Motor Wenzel-7/8 6. (.6rpg) (SN 65-M6-44) Motor 7/8 6.(.6rpg)@.8* / Reg 4 / Reg X 4 / IF IBS 8.5" OD UBHO NC (MWD) / IF 4 / IF 4 / IF Size 9 5/8 Flow Sleeve Sub / IF Flex Monel / IF Weight 4 HWDP / IF 77 DRILL PIPE 8 5, IF ,97. MP 4, , Pressure (W/ max diff) 6 4, S 4, LINER 4, STROKE LENGTH 5, OUTPUT (gal/stk) , OUTPUT (G) 56 5, SPR & PRESSURE 5, TEST SUB S&PSI 5, # Pump 5, Proj To 5, , Proj To T D Notes / Next 4 hrs: Slide/Rotate Drlg Curve

8 ,59 6 Slide/Rotate Drlg Building Curve 8// COST: SPUD 8/4/ Drilling 7,5 58,55 6 Completion 9 5,68 Roy Reeser Report # 8 Rig Number: Cell Number: Slide/Rotate Drlg F/5,97-T/6,56 Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-6 Diff-5- Rop-.6 Service Rig & Topdrive Slide/Rotate Drlg F/6,56-T/,65 Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-75 Diff-5- Rop-. Calibrate Depth Sensor With Canrig Slide/Rotate Drlg F/6,5-T/6,59 Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-75 Diff-5- Rop-. Lithology- 5% Shale % % Silt //.494 /CSG 8 /4 Hughes VGD- / NC 8./. Caustic 5,85-8s HGS/SAND % / 45 O/W RATIO 9.8 R (rot motor or min max) OIL % Starch 6 74 MBT Salt.5 7. PH/ES PF/MF./.8 CL (P) 9, CA (P), Magnesium 97. Corr Solids k Ch. Seal (x/6ths) Dull Ch. Pulled 75k 7k Torque FT/LBS 4, Motor Wenzel-7/8 6. (.6rpg) (SN 65-M6-44) Motor 7/8 6.(.6rpg)@.8* IBS 8.5" OD UBHO NC (MWD) Flow Sleeve Sub Flex Monel HWDP / Reg 4 / Reg X 4 / IF / IF 4 / IF 4 / IF Size 9 5/ / IF / IF Weight / IF DRILL PIPE 6, IF , ,59. MP 5, , Pressure (W/ max diff) 8 6, S 6, LINER 6, STROKE LENGTH 6, OUTPUT (gal/stk) , OUTPUT (G) 56 6, SPR & PRESSURE 6, TEST SUB S&PSI 6, # Pump Proj To 6, , Proj To T D Notes / Next 4 hrs: Slide/Rotate Drlg Curve

9 , 6 Rotate/Drlg In Laterial 8// COST: SPUD 8/4/ Drilling 78,97 67,46 7 Completion, 6,985 Roy Reeser Report # 9 Rig Number: Cell Number: Slide/Rotate Drlg F/6,59-T/6,7 Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-75 Diff-5- Rop-5. Service Rig & Topdrive Slide/Rotate Drlg F/6,7-T/7, Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-75 Diff-5- Rop-4.6 SPR & Test Sub & BOP Drill Both Pumps Slide/Rotate Drlg F/7,-T/7, Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-75 Diff-5- Rop-4.5 Lithology- 8% Shale % / /CSG 8 /4 Hughes VGD- // NC 8./.8 Caustic 5,85-8s HGS/SAND % / 45 O/W RATIO 9.8 BTC 4 R (rot motor or min max) OIL % Starch 6,5 MBT Salt PH/ES PF/MF./.4 CL (P) 95, 86 CA (P),56 57 Magnesium Corr Solids k Ch. Seal (x/6ths) Dull Ch. Pulled 75k 7k Torque FT/LBS 8, Motor Wenzel-7/8 6. (.6rpg) (SN 65-M6-44) Motor 7/8 6.(.6rpg)@.8* IBS 8.5" OD UBHO NC (MWD) Flow Sleeve Sub Flex Monel HWDP / Reg 4 / Reg X 4 / IF / IF 4 / IF 4 / IF Size 9 5/ / IF / IF Weight / IF DRILL PIPE 9 6, IF 5 7,4 88 7,.58 MP 6, , Pressure (W/ max diff) 8 6, S 6, LINER 6, STROKE LENGTH 6, OUTPUT (gal/stk) , OUTPUT (G) 56 6, SPR & PRESSURE 45/7 4/59 7, TEST SUB S&PSI 4/78 4/6 7, # Pump Proj To 7, Proj To T D, Notes / Next 4 hrs: Circ. Sweep Out / TOOH / Change BHA / TIH / Rotate Drlg Laterial

10 ,55 47 Rotate/Drlg In Laterial 8// COST: SPUD 8/4/ Drilling 85,9 7,854 8 Completion,794,779 Roy Reeser Report # Rig Number: Cell Number: Circ. Sweep Around & Build Slug Pump Slug Work Pipe TOOH T/9 Had Drag On Stand & 5-k No Other Drag On Trip Out Change Out Bolt & Hinge Pin On Clamp On Rotating Head Bowl & Change Mousehole To ft Laydown Old BHA Pickup & Makeup New BHA TIH Service Rig & Topdrive TIH T/,7 Slip & Cut Drlg Line Test MWD & Motor TIH T/6558 Wash Then Then 6,56 Wash & Ream To Bottom F/6,558-T/7, Service Rig & Topdrive Rotate Drlg F/7,-T/7,55 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-6. Note: Kept Rop at 8 to make sure that we were getting the turn we needed to direction corrected at 5:Am Speed up to 5ft/hr Lithology- 9% Shale % / /CSG 8 /4 Hughes VGD- 8 / Ulterra U59M // NC 8.5/.6 Caustic 7 5,85 7, -8s 7, 7-s HGS/SAND % / O/W RATIO 9.5 BTC R (rot motor or min max) OIL % Starch 6, MBT Salt PH/ES PF/MF./. CL (P) CA (P) 9,,48 Magnesium. 4 8 Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled 75 5 BT M & G E IN LT BHA 6 Middle & Outers Lost Lots Teeth Torque FT/LBS 65-7 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-56)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab) / Reg 4 / Reg X 4 / IF Filter Sub X-O Double Pin / IF 4 / IF X 4 / Reg Motor Wenzel 7/8 6.(.6rpg) / Reg X 4 / IF IBS 8 /4" / IF UBHO / IF Weight 4 NC (MWD) / IF Flow Sleeve Sub Flex Monel / IF 4 / IF ,7 DRILL PIPE 7 7, / IF ,55. MP 7, , Pressure (W/ max diff) 9 7, S 5 7, LINER 7, STROKE LENGTH 7, OUTPUT (gal/stk) OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To 7, Proj To T D, Notes / Next 4 hrs: Rotate Drlg Laterial

11 7,55,89 Rotate/Drlg In Laterial 8// COST: SPUD 8/4/ Drilling 5,9 87,847 9 Completion 4,75 4,954 Roy Reeser Report # Rig Number: Cell Number: Rotate Drlg F/7,55-T/7,79 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop Repairs To Shaker Slide Nov Hand Broke Off With Track Hoe 8. Rotate Drlg F/7,79-T/8,7 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop Conn & Survey Swap Pumps.5 Rotate Drlg F/8,7-T/8,66 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-88.. Conn & Survey Trouble Shoot Tool Not Getting In Sync 4.5 Rotate Drlg F/8,66-T/8,6 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop Service Rig & Topdrive Rotate Drlg F/8,6-T/8,79 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop Circ. Bottoms Up & Survey 8.5 TOOH T/5,85 For Pump Motor Repairs Motor Knocking & No Oil Pressure Normal drag out of laterial & curve 6. Wait On Mechanic For Pump Motor Repairs Pump Motor Is Going To Have To Be Replaced Waiting On Pump Motor Lithology- 9% Shale % / /CSG 8 /4 Ulterra U59M // NC 8.9/. 7, 7-s HGS/SAND % / 5 O/W RATIO 9. BTC R (rot motor or min max) 45 6 OIL % Starch,89,56 MBT Salt PH/ES PF/MF./.4 CL (P) CA (P),,4 Magnesium Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-56)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab) / Reg 4 / Reg X 4 / IF Filter Sub X-O Double Pin / IF 4 / IF X 4 / Reg Motor Wenzel 7/8 6.(.6rpg) / Reg X 4 / IF IBS 8 /4" / IF UBHO / IF Weight 4 NC (MWD) / IF Flow Sleeve Sub Flex Monel / IF 4 / IF ,67 56 DRILL PIPE 7 8, / IF. 8,79.44 MP 7, , Pressure (W/ max diff) 9 7, S 5 7, LINER 8, STROKE LENGTH 8, OUTPUT (gal/stk) , OUTPUT (G) 56 8, SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To 8, Proj To T D, Notes / Next 4 hrs: TOOH T/Casing / Change out pump# / TIH / Rotate Drlg Laterial

12 ,85 Rotate/Drlg In Laterial 8/4/ COST: SPUD 8/4/ Drilling 74,59 88,48 Completion,58 7,46 Roy Reeser Report # Rig Number: Cell Number: Wait On Pump Motor Repairs Pump Motor Is Going To Have To Be Replaced Waiting On Pump Motor Replace Motor & Run Out TIH T/7 Tag Start Trying to ream down packed off losing fluid pull up out to 7,777 got back full returns Reaming back to bottom F7,777-T/7,97 Circ. & Change Backup Wrench Dies & Service Rig & Topdrive Reaming back to bottom F7,97-T/8,79 Rotate Drlg F/8,79-T/8,85 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-5. Lithology-9% Shale % / /CSG 8 /4 Ulterra U59M // NC 7, 8.5/ s HGS/SAND % / 5 O/W RATIO 9.5 BTC R (rot motor or min max) 45 6 OIL % Starch,647 MBT Salt. 5. PH/ES PF/MF./. CL (P) CA (P) 95,,5 6 Magnesium Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled 8 6 Torque FT/LBS 75-8 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-56)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab) / Reg 4 / Reg X 4 / IF Filter Sub X-O Double Pin / IF 4 / IF X 4 / Reg Motor Wenzel 7/8 6.(.6rpg) / Reg X 4 / IF IBS 8 /4" / IF UBHO / IF Weight 4 NC (MWD) / IF Flow Sleeve Sub Flex Monel / IF 4 / IF 9 75 DRILL PIPE 79 8, / IF ,85. MP 8, Pressure (W/ max diff) 9 S 5 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To 8, Proj To T D, Notes / Next 4 hrs: Rotate Drlg Laterial

13 ,9,7 Rotate/Drlg In Laterial 8/5/ COST: SPUD 8/4/ Drilling 96, ,47 Completion 87 7,849 Roy Reeser Report # Rig Number: Cell Number: Rotate Drlg F/8,85-T/8,98 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-56. Conn. & Survey & Downlink Rotate Drlg F/8,98-T/9, Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-9. Trouble Shoot MWD No Surveys Rotate Drlg F/9,-T/9,877 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-.4 Service Rig & Topdrive Trouble Shoot MWD No Surveys Rotate Drlg F/9,877-T/9,9 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-86. Pump Slug TOOH T/4 For MWD Tool Change Out MWD Tool, Motor & Filter Sub Screen On BHA TIH T/97 Test MWD With Both Pumps TIH T/6,85 Fill Pipe Every Stands Lithology- 95% Shale 5% 5 RR # / /CSG 8 /4 Ulterra U59M // NC 6.8/.6 7, 7-s HGS/SAND % / 5 O/W RATIO 9. BTC R (rot motor or min max) 45 6 OIL % Starch,7,77 MBT Salt 8.. PH/ES PF/MF./.4 CL (P) CA (P) 8,,84 9 Magnesium. 4 8 Corr Solids Tripping Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab) / Reg 4 / Reg X 4 / IF Filter Sub X-O Double Pin / IF 4 / IF X 4 / Reg Motor Wenzel 7/8 6.(.6rpg) / Reg X 4 / IF IBS 8 /4" / IF UBHO / IF Weight 4 NC (MWD) / IF Flow Sleeve Sub Flex Monel / IF 4 / IF ,58 49 DRILL PIPE 9, / IF ,9. MP 8, , Pressure (W/ max diff) 9 9, S 5 9, LINER 9, STROKE LENGTH 9, OUTPUT (gal/stk) OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To 9, Proj To T D, Notes / Next 4 hrs: Rotate Drlg Laterial

14 ,9 Washing & Reaming To Bottom Lithology- 95% Shale 5% 8/6/ COST: SPUD 8/4/ Drilling 9,6,7,9 Completion 5,957 5,86 Roy Reeser Report # 4 Rig Number: Cell Number: TIH T/6,66 Fill Pipe Every Stands Tag Bridge Work Tight Hole TOOH Pipe Back Out To 5,8 Circ. Start Up TOOH T/5,7 Circ. Up Raised Strokes To 8 Packed Off TOOH T/5,9 Circ.& Condition speed pump up to 7stks packed off pickup stand to 5,44 Wash & Ream F/5,44-T/5,8 / 7stks 4rot Note: Have raised mud weight F/9. T/9.6 Vis To 6 WL-8. Still have to ream real slow to prevent packing off and have to pickup and start over stiil adding salt as we ream down to maintain 9.6 mud wt and try to raise it a little more 5 RR # /6 /CSG 8 /4 Ulterra U59M // , 8.9/ s HGS/SAND % / 5 O/W RATIO 9. BTC R (rot motor or min max) 45 6 OIL % Starch 6,77 MBT Salt. PH/ES PF/MF./.4 CL (P) CA (P) 9,, 45 6 Magnesium Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled 5 45 Torque FT/LBS 5- Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab) Filter Sub X-O Double Pin Motor Wenzel 7/8 6.(.6rpg) IBS 8 /4" UBHO NC (MWD) Flow Sleeve Sub Flex Monel DRILL PIPE / Reg 4 / Reg X 4 / IF / IF 4 / IF X 4 / Reg / Reg X 4 / IF / IF / IF Weight / IF / IF 4 / IF / IF 74 9, MP 8 Pressure (W/ max diff) S 7 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 59 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wash & Ream To Bottom / Rotate Drlg Laterial 9,

15 ,9 TOOH 8/7/ COST: SPUD 8/4/ Drilling 74,8,44, Completion 9,45 6, Roy Reeser Report # 5 Rig Number: Cell Number: Wash & Ream F/5,8-T/6,87 6psi 5stks Raised Strokes as we increased Rop ft/hr Service Rig & Topdrive Wash & Ream F/6,87-T/6,66 6psi 5stks Raised Strokes as we increased Rop 5ft/hr Packed Off work pipe back out T/5,4 TOOH T/5,7 Build & Pump Slug TOOH T/,7 Had Drag All The Way From 5,7- To,7 7 5 RR # /8 /CSG 8 /4 Ulterra U59M // , 5.6/.5 7-s HGS/SAND % / 5 O/W RATIO 89.4 BTC 5 R (rot motor or min max) 45 6 OIL % Starch,77 MBT Salt. PH/ES PF/MF TR/.4 CL (P) CA (P) 74,, 8 Magnesium Corr Solids.45.9 Tripping Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab) Filter Sub X-O Double Pin Motor Wenzel 7/8 6.(.6rpg) IBS 8 /4" UBHO NC (MWD) Flow Sleeve Sub Flex Monel DRILL PIPE / Reg 4 / Reg X 4 / IF / IF 4 / IF X 4 / Reg / Reg X 4 / IF / IF / IF Weight / IF / IF 4 / IF / IF 4.66 MP 9, Pressure (W/ max diff) S 7 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 59 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: TOOH / Change Out BHA / TIH / Wash & Ream Back To Bottom Of Curve

16 ,9 Washing & Reaming Hole Clean 8/8/ COST: SPUD 8/4/ Drilling 6,,4,55 4 Completion 8 6,59 Roy Reeser Report # 6 Rig Number: Cell Number: TOOH T/ Had Drag All The Way From 5,7- To,7 Laydow Flex Monel & MWD Tool Stand Back Rest BHA Pickup New BHA TIH T/954 Slip & Cut Drlg Line And Service Rig & Topdrive TIH T/,95 Wash & Ream F/,44-T/,4 6psi 5stks 7rotary Added Texzan Raise Vis-4 Circ. Service Rig & Topdrive Note: Started Raising 4:am /7 /CSG 8 /4 STC FDS 57 //.56 PF ,9 /.8 -&-4 HGS/SAND % / 5 O/W RATIO 89 BTC R (rot motor or min max) 6 75 OIL % MBT PH/ES 9 Starch Salt PF/MF./. CL (P) CA (P) 6,,8 Magnesium Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS,9 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Sub / Reg 4 / Reg X 4 / XH X-O DRILL PIPE / XH X 4 / IF 4 / IF RT TOOL / IF Weight 4 DRILL PIPE 96, / IF,4.6 MP 8 Pressure (W/ max diff) S 7 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 59 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wash & Reaming Hole Clean 9,

17 6 6:. 6: 7:. 7: :. : :. : :.5 : 4:.5 4: 4: 4. 4: 4:.5 4: 6:.5 9,9 Washing & Reaming Hole Clean 8/9/ COST: SPUD 8/4/ Drilling 79,7,8,8 5 Completion 6,957 9,496 Robert Soliz Report # 7 Rig Number: Cell Number: Wash & Ream F/,4 T/,9 6psi 5stks 7rotary Added Texzan Raise Vis-7 (hard fill) Service Rig & Top Drive Wash & Ream F/,9 T/,4 6psi 5stks 7rotary (Fell thru no more reall big rocks coming over shaker) Change out Rotating head Rubber Wash & Ream F/,4 T/,48 6psi 5stks 7rotary Attempt to run a stand out of the derrick but still stacking Wash & Ream F/,454 T/,67 6psi 5stks 7rotary (soft fill) Service Top Drive Wash & Ream F/,67 T/,7 6psi 5stks 7rotary (soft fill) 4: /8 /CSG /4 STC FDS 57 6/ PF ,9 /.5/. -&-4 HGS/SAND % / 5 O/W RATIO 87.5 BTC R (rot motor or min max) 6 75 OIL % MBT PH/ES 9.5 Starch Salt PF/MF./.4 CL (P) CA (P) 64,,44 Magnesium. 4 8 Corr Solids.. 8 Ch. Seal (x/6ths) Dull Ch. Pulled 5 9 Torque FT/LBS,9 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Sub / Reg 4 / Reg X 4 / XH X-O DRILL PIPE / XH X 4 / IF 4 / IF RT TOOL / IF Weight 4 DRILL PIPE 5, / IF,7.7 MP 6 Pressure (W/ max diff) S 7 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wash & Reaming Hole Clean 9,

18 6 7:. 7: 8:. 8: 8:.5 8: :.5 : :. : :.5 : 4:.5 4: 7:. 7: : 4. : : 6. : :.5 : 6:.5 9,9 Washing & Reaming Hole Clean 8// COST: SPUD 8/4/ Drilling 6,477,47, 6 Completion,6,6 Robert Soliz Report # 8 Rig Number: Cell Number: Wash & Ream F/,7 T/,795 6psi 5stks 7rotary (fell thru attempt to run pipe from derrick) T.I.H. F/,795 T/ 6,54 (Tag start washing and reaming) Wash & Ream F/ 6,54 T/ 6,59 bit packing off P/U and circulate Circulate and add pp bbl of Soletex (shale stabilizer) and circulate around Wash & Ream F/ 6,59 T/ 6,67 6psi 5stks 7rotary T.I.H. F/ 6,67 T/ 7,9 (tag start washing and reaming) Wash & Ream F/ 7,9 T/ 7,4 6psi 5stks 7rotary (soft fill) Circulate and 7,4 T.O.H. F/ 7,4 T/,945 ( Tight Hole F/ 4,6 T/,5 had to pull 5 over to keep it moving, never got sticky just tight) Wash and Ream F/,945 T/,7 6psi 5stks 6rpms Service Top Drive Wash and Ream F/,7 T/ 4, 6psi 5stks 6rpms (hole is a little tight but seems to be cleanning up quickly shakers are not as bad as they have been) 5: / /CSG /4 STC FDS 57 8/7 PF677 7 /.6/.94 9,9 -&-4 HGS/SAND % / 5 O/W RATIO 88.4 BTC R (rot motor or min max) 6 75 OIL % MBT PH/ES 9 Starch Salt PF/MF./. CL (P) 6, CA (P),48 Magnesium 7. Sol Tex Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS 9- Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Sub X-O DRILL PIPE RT TOOL / Reg 4 / Reg X 4 / XH / XH X 4 / IF 4 / IF / IF Weight 4 DRILL PIPE 9, / IF -8. 4,.46 MP 9,67 6 Pressure (W/ max diff) S 7 5 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wash & Reaming Hole Clean, Trip out P/U Latteral BHA

19 6 8:. 8: 8:.5 8: 9:.5 9: :. : :.5 : :.5 : 4:. 4: 7:. 7: 8:. 8: 9:. 9: :. : :.5 : :.5 : 4:. 4: :. : :. : 6:. 9,9 Washing & Reaming Hole Clean 8// COST: SPUD 8/4/ Drilling,9,446,8 7 Completion,767,79 Robert Soliz Report # 9 Rig Number: Cell Number: Wash & Ream F/4, T/ 4,7 6psi 5stks 7rotary (fell thru attempt to run pipe from derrick) T.I.H. F/ 4,7 T/ 4,746 (Tag start washing and reaming) Wash & Ream F/4,746 T/ 4,84 6psi 5stks 7rotary (fell thru attempt to run pipe from derrick) T.I.H. F/ 4,84 T/ 6,54 (Tag start washing and reaming) Wash & Ream F/ 6,54 T/ 6,67 6psi 5stks 7rotary T.I.H. F/ 6,67 T/ 7,4 Circulate and 7,4 T.O.H. F/ 7,4 T/ (All Good No Tight Spots) Service Rig & Top Drive M/U Latteral BHA & # 7 T.I.H. 9 stands and Test MWD Service Top Drive T.I.H. F/ 988 T/,9 Tag Wash & Ream F/,9 T/,7 8psi 5stks 7rotary T.I.H. F/,7 T/ 6,9 Tag Packed off Worked pipe out of tight spot and started to wash and ream Wash & Ream F/ 6,9 T/ 6,465 9psi 5stks 7rotary 5: RR #4. 46 /7 /CSG 48 8 / Ultera U59M / /./.7 7, 7 x s HGS/SAND % / 5 O/W RATIO 87.7 BTC R (rot motor or min max) 45 6 OIL % Starch,77 MBT Salt. PH/ES 9 8. PF/MF./.5 CL (P) CA (P) 6,,6 4 Magnesium 7. Sol Tex Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled 65 6 NO A IN NO TD 6 Torque FT/LBS -5 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6W/ 8 /4 Stab Filter Sub XO Double pin Motor Wenzel 7/8 6. (.6 rpg) IBS 8 /4 UBHO NC (MWD) Flow sleeve Flex Monel DRILL PIPE / Reg 4 / Reg X 4 / IF, / IF 4 / IF x 4 / Reg / Reg X 4 / IF / IF / IF Weight / IF / IF 4 / IF / IF 4.66 MP 6 Pressure (W/ max diff) S 7 5 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wash & Reaming Hole Clean, Resume Drilling Latteral TVD Incl. Az. DLS. V.S.

20 6 4: 8. 4: 7:. 7: 8:. 8: : 8.5 : :.5 : 6:.,88,898 Drilling Lattteral 9// COST: SPUD 8/4/ Drilling 6,89,59,9 8 Completion,86 7,85 Robert Soliz Report # Rig Number: Cell Number: T.I.H. Wash & Ream F/ 6,465 T/ 9,9,,88 5 stks 7rpms Rotary Drill F/ 9,9 T/,5 WOB 5, 5 stks, 56 G, r6 +4 mtr,,95psi + 45 Diff,,9 -, Service Rig & Top Drive Rotary Drill F/,5 /,488 WOB 5, 5 stks, 56 G, r6 +4 mtr,,95psi + 45 Diff,,9 -, Service Top Drive Rotary Drill F/,488 T/,88 WOB 5, 5 stks, 56 G, r6 +4 mtr,,psi + 45 Diff,,9-6, Also updated the motor circulating hrs from yesterday Lythology: % Shale 5: RR #4. 45 / /CSG / Ultera U59M 7/ 978 /./.66 7, 7 x s HGS/SAND % / 5 O/W RATIO 87.7 BTC R (rot motor or min max) 45 6 OIL % Starch,898 4,65 MBT Salt PH/ES PF/MF TR/.5 CL (P) CA (P) 6,,6 9, , Magnesium 49. Sol Tex 5 45 Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled 7 68 Torque FT/LBS -6 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6W/ 8 /4 Stab / Reg 4 / Reg X 4 / IF, Filter Sub XO Double pin / IF 4 / IF x 4 / Reg Motor Wenzel 7/8 6. (.6 rpg) / Reg X 4 / IF IBS 8 / / IF UBHO / IF Weight 4 NC (MWD) / IF Flow sleeve Flex Monel / IF 4 / IF ,5 67 DRILL PIPE 7, / IF -5.7,88. MP, , Pressure (W/ max diff) 78, S 5, LINER, STROKE LENGTH, OUTPUT (gal/stk) , OUTPUT (G) 56, SPR & PRESSURE 45/7 4/59, TEST SUB S&PSI 4/78 4/6, # Pump, Proj To, Proj To T D, Notes / Next 4 hrs: TD Latteral Circulate 7 Bottoms up

21 ,78,96 T.O.H. SPUD 9// 8/4/ 9 Robert Soliz COST: Drilling Completion Report # 7,5,49,58,79 8,677 Rig Number: Cell Number: :. Rotary Drill F/,88 T/,47 WOB 5, 5 stks, 56 G, r6 +4 mtr,,55psi + 59 Diff,,9-8, 7: 8:. Service Rig & Top Drive 8: :. Rotary Drill F/,47 T/,756 WOB 5, 5 stks, 56 G, r6 +4 mtr,,58psi + 6 Diff,,9-8, : :.5 Service Top Drive : :. Rig Repairs retorque saver sub clamps on I-BOP : :.5 Rotary Drill F/,756 T/,78 WOB 5, 5 stks, 56 G, r6 +4 mtr,,58psi + 6 Diff,,9-8, : 4: 6. Circulate 6 bottoms up and condition mud 4: 5:.5 Spot bbl Lube pill and work into latteral 5: 6:.5 Start out of the hole Lythology: % Shale RR # / /CSG / Ultera U59M 5/ /.6/.95 7, 7 x s HGS/SAND % / 5 O/W RATIO 87.4 BTC R (rot motor or min max) 45 6 OIL % Starch 48,96 6,577 MBT Salt.5 5. PH/ES PF/MF TR/.4 CL (P) CA (P) 66,,6,96.5 6, Magnesium 49. Sol Tex 5 6 Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled 9 75 Torque FT/LBS 8, Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6W/ 8 /4 Stab / Reg 4 / Reg X 4 / IF, Filter Sub XO Double pin / IF 4 / IF x 4 / Reg Motor Wenzel 7/8 6. (.6 rpg) / Reg X 4 / IF IBS 8 / / IF UBHO / IF Weight 4 NC (MWD) / IF Flow sleeve Flex Monel / IF 4 / IF 75,49 58 DRILL PIPE 4, / IF -6.,78.59 MP, , Pressure (W/ max diff) 8, S 5, LINER, STROKE LENGTH, OUTPUT (gal/stk) , OUTPUT (G) 56, SPR & PRESSURE 45/7 4/59, TEST SUB S&PSI 4/78 4/6, # Pump, Proj To Proj To T D, Notes / Next 4 hrs: T.O.H. T/ Top of Curve L/D DP

22 6 : 4.5 : :. : :. : 5:. 5: 6:. 6: 8:.5 8: :. : :.5 : :.5 : 4:. 4: :.5 : 5: 4.5 5: 6:.,78 Wash & Ream 9// COST: SPUD 8/4/ Drilling 48,59,6,48 Completion,9 4,69 Robert Soliz Report # Rig Number: Cell Number: T.O.H. F/,78 T/ 5,87 Safety Meeeting and R/U Laydown Machine L/D DP F/ 5,87 T/ 4, Work Stuck pipe Rig Repairs retorque saver sub clamps on I-BOP and change dies in back up wrench T.O.H. F/ 4, T/,65 Work Tight Spot F/,65 T/,445 & T.O.H. T/ 4' L/D Directional BHA & load out Service Top Drive Slip and Cut Drill Line Rig Repairs Change out Crown O Matic M/U Clean out BHA & T.I.H. T/,9 Wash & Ream F/,9 T/,4 S 7, 7rpm, 7 psi Lythology: % Shale RR #4 8 RR #6. 4 / /CSG / Ultera U59M 8 /4 STC FDS 57 /7 978 PF677 /.4/ ,,78 7 x s,78 - & -4 HGS/SAND % / 5 5 O/W RATIO 87.6 BTC R (rot motor or min max) OIL % Starch,96 6,577 MBT Salt.5 5. PH/ES PF/MF TR/.5 CL (P) CA (P) 65,,,96.5 6, Magnesium. Sol Tex 5 6 Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled RR4 WT A IN NO TD 5 Torque FT/LBS, Sub XO DP RT-Tool / Reg 4 / Reg X 4 / XH / XH X 4 / IF 4 / IF / IF Weight 4 DRILL PIPE 5, / IF 75,49 58,4.66 MP Pressure (W/ max diff) 7 S 7 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D, Notes / Next 4 hrs: Wash and Ream hole T/ 7,4 EOC, T.O.H. T/ 5,86 L/D DP

23 6 8:. 8: 9:. 9: :. : :. : 8: 5. 8: 5:.5 5: 6:.5,78 Wash & Ream 9/4/ COST: SPUD 8/4/ Drilling 5,,68,4 Completion,56 54,45 Robert Soliz Report # Rig Number: Cell Number: Wash & Ream F/,4 T/ 4,76 S 7, 7rpm, 7 psi T.I.H. F/ 4,76 T/ 5,48 Work Stuck pipe T.O.H. F/ 5,48 T/,945 Pulled Tight about 7 over the entire way up, Circulate and condition mud to a 7 vis.+ Wash and Ream F/,945 T/,4 7 S, 7rpm, 948 psi at kelly down slow rps to and circulate until shaker is clean Service Top Drive Lythology: % Shale 8: RR # /8 /CSG /4 STC FDS 57 5/ PF677 6 /.5/.86,78 - & -4 HGS/SAND % / 5 O/W RATIO 87.5 BTC R (rot motor or min max) OIL % MBT PH/ES 9.5 Starch Salt 6 PF/MF./.4 CL (P) CA (P) 64,, Magnesium. Sol Tex 4 Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS, Sub / Reg 4 / Reg X 4 / XH XO DP / XH X 4 / IF 4 / IF RT-Tool / IF Weight 4 DRILL PIPE 6, / IF 75, ,4.8 MP Pressure (W/ max diff) 948 S 5 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D, Notes / Next 4 hrs: Wash and Ream hole T/ 7,4 EOC, T.O.H. T/ 5,86 L/D DP

24 6 : 5.5 : :. : 5:.5 5: 6:. 6: 6:.5 6: 8:. 8: : : :.5 : :. : :.5 : 6:.,78 Wash & Ream 9/5/ COST: SPUD 8/4/ Drilling 9,78,7, Completion,64 64,749 Robert Soliz Report # 4 Rig Number: Cell Number: Wash & Ream F/,4 T/ 4,8 S 5, 7rpm, 75 psi Service Rig & Top Drive Wash & Ream F/ 4,8 T/ 4,66 S 5, 7rpm, 8 psi T.I.H. F/ 4,66 T/ 5,5 Wash & Ream F/ 5,5 T/ 5,9 S 5, 7rpm, 8 psi T.I.H. F/ 5,9 T/ 6,477 Wash & Ream F/ 6,477 T/ 7,5 S 5, 7rpm, 8 psi Service Top Drive Rig Repairs work on pumps Broken spring on one trash under a valve on the other Wash & Ream F/ 7,5 T/ 7,4 S 5, 7rpm, 4 psi Circulate and condition mud watch shakers to see when they clean up then circulate one more bottoms up Lythology: % Shale 7: 68 8 RR # /7 /CSG /4 STC FDS 57 6/5 PF677 9 /.8/.,78 - & -4 HGS/SAND % / 5 O/W RATIO 87. BTC R (rot motor or min max) OIL % MBT PH/ES 9 Starch Salt PF/MF TR/.5 zdsh 6 CL (P) CA (P) 66,, 4 Magnesium 46. Sol Tex Corr Solids.9 Ch. Seal (x/6ths) Dull Ch. Pulled 75 5 Torque FT/LBS 5,5 Sub XO DP RT-Tool / Reg 4 / Reg X 4 / XH / XH X 4 / IF 4 / IF / IF Weight 4 DRILL PIPE 8 7, / IF 75, ,4. MP Pressure (W/ max diff) 4 S 5 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D, Notes / Next 4 hrs: Cirulate hole clean Trip to TOC L/D DP

25 6 : 6. : :. : 8: 5. 8: 5:.5 5: 6:.5,78 Circulate & Condition 9/6/ COST: SPUD 8/4/ Drilling 4,58,76,8 Completion 4,58 78,86 Robert Soliz Report # 5 Rig Number: Cell Number: Circulate & Condition mud. wt 7 vis wait on shakers to clean up Service Rig & Top Drive Circulate & Condition mud. wt 7 vis (add gals. Of diesel & pp bbl gilsonite) wait on shakers to clean up Circulate 7 vis. wt mud checking shakers every hr. finger nail size rocks Service Top Drive Lythology: % Shale 4: 8 8 RR # /4 /CSG /4 STC FDS 57 8/9 PF677 7 / /.9 95,78 - & -4 HGS/SAND % / 5 O/W RATIO 84.8 BTC R (rot motor or min max) OIL % Starch MBT PH/ES 9 Sure Guage Drum Sure Guage 5 Gal PF/MF./.5 zdsh 7 CL (P) CA (P) 67,,8 8 Magnesium 8. Sol Tex 8 Corr Solids.98. Ch. Seal (x/6ths) Dull Ch. Pulled 75 5 Torque FT/LBS 5,5 Sub / Reg 4 / Reg X 4 / XH XO DP / XH X 4 / IF 4 / IF RT-Tool / IF Weight 4 DRILL PIPE 8 7, / IF 75, ,4. MP Pressure (W/ max diff) 55 S 5 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D, Notes / Next 4 hrs: Cirulate hole clean T.O.H. Run 5 / Csg

26 6 : 6. : :. : 8: 5. 8: 5:.5 5: 6:.5,78 Circulate & Condition 9/7/ COST: SPUD 8/4/ Drilling 5,88,84,6 4 Completion 7,4 86,6 Robert Soliz Report # 6 Rig Number: Cell Number: Circulate & Condition mud. wt 7 vis wait on shakers to clean up Service Rig & Top Drive Circulate & Condition mud. wt 7 vis Pump high vis sweeps vis ( add sks f gel) Circulate 8 vis. wt cut pump out put to 9 spm check shaker after first bottoms up shakers are clean, pump bbl of mud to frac tanks and add 5 bbl of brine vis only came down to 7 but wt cmae down to 9.8 wait on desco or more brine Service Top Drive Lythology: % Shale 9:5 9 8 RR # /54 /CSG /4 STC FDS 57 /7 PF677 6 / /.5 9,78 - & -4 HGS/SAND % / 5 O/W RATIO 85 BTC R (rot motor or min max) OIL % Starch 7 MBT PH/ES 4 9 Sure Guage Drum Sure Guage 5 Gal PF/MF./.6 zdsh CL (P) CA (P) 64,, Magnesium 97. Sol Tex Corr Solids.5. Ch. Seal (x/6ths) Dull Ch. Pulled 75 5 Torque FT/LBS 5,5 Sub XO DP RT-Tool / Reg 4 / Reg X 4 / XH / XH X 4 / IF 4 / IF / IF Weight 4 DRILL PIPE 8 7, / IF 75, ,4. MP Pressure (W/ max diff) S 9 LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 44 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D, Notes / Next 4 hrs: Cirulate hole clean T.O.H. Run 5 / Csg

27 ,78 Wash & Ream SPUD 9/8/ 8/4/ 5 Robert Soliz COST: Drilling Completion Report # 48,954 4,844 7,86,6 9,6 Rig Number: Cell Number: : 6. Circulate & Condition mud. wt 7 vis 9 spm wait on shakers are clean, lower vis to 5 started getting rocks over raise vis T/6 : :. Service Rig & Top Drive : 5:.5 Circulate & Condition mud. wt 6 vis wait on shakers to clean up & build Pipe Slug 5: 8:. Circulate & condition hole W/. wt 6 vis 9 spm shakers clean pump pipe slug T.O.H. F/ 7, T/ 6,4@ 5 mins a stand 8: 9:.5 Work stuck pipe back down F/ 6,4 T/ 6,7 and establish circulation, circulate and build another pipe slug 9: 9:.5 T.O.H. F/ 6,7 T/ 5,845 9: :.5 Pump Pipe 5,845 : :. T.O.H. F/ 5,845 5 mins a stand (very tight hole F/ 4,56 T/,654) : :.5 Service Top Drive : :.5 Circulate & condition mud T/. wt 75 vis : :.5 T.I.H. F/,85 T/,8 Tag : 6:.5 Wash and Ream F/,8 T/,84 spm, psi 7rpm we have washed to,4 but the hole continues to fall in on us wt.+ Vis 75 Lythology: % Shale 4: 9 8 RR # /7 /CSG /4 STC FDS 57 /9 PF677 5 /.5/.86 6,78 - & -4 HGS/SAND % / 5 O/W RATIO 86. Desco R (rot motor or min max) OIL % MBT PH/ES 9.5 Starch Sure Guage Drum Sure Guage 5 Gal 5 PF/MF./.5 zdsh CL (P) CA (P) 64,,4 Magnesium. Sol Tex Corr Solids.64. Ch. Seal (x/6ths) Dull Ch. Pulled 75 5 Torque FT/LBS 5,5 Sub / Reg 4 / Reg X 4 / XH XO DP / XH X 4 / IF 4 / IF RT-Tool / IF Weight 4 DRILL PIPE 8 7, / IF 75, ,4. MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 49 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D, Notes / Next 4 hrs: Wash & Ream to the EOC, Cirulate hole clean T.O.H. Run 5 / Csg

28 6 4: 8.5 4: 5:.5 5: 6:.5 6: 8:. 8: :. : :.5 : :.5 : 6:,78 Circulate & Condition 9/9/ COST: SPUD 8/4/ Drilling 5,5,878,6 6 Completion 4,48 5,54 Robert Soliz Report # 8 Rig Number: Cell Number: Wash & ream F/,48 T/ 4,84 spm, psi 7rpm Service Rig & Top Drive T.I.H. F/ 4,84 T/ 5,94 stuck Work Stuck Pipe F/ 5,94 T/ 5,88 Circulate and condition hole with vis mud. wt. T.O.H. F/ 5,88 T/,945 pull tight F/ 4,84 T/ 4,95 Service Top Drive Wash & Ream F/,945 T/,795 spm,4 psi 7 rpm (maintaning vis) Lythology: % Shale 6: 9 8 RR #6. 6 /54 /CSG /4 STC FDS 57 8/45 PF677 6 /.8/ ,78 - & -4 HGS/SAND % / 5 O/W RATIO 8 Desco R (rot motor or min max) OIL % Starch MBT PH/ES Sure Guage Drum Sure Guage 5 Gal 6 PF/MF./.6 zdsh CL (P) 67, CA (P),4 7 Magnesium 7. Sol Tex 4 Corr Solids.9.5 Ch. Seal (x/6ths) Dull Ch. Pulled 5 Torque FT/LBS 4,6 Sub XO DP RT-Tool / Reg 4 / Reg X 4 / XH / XH X 4 / IF 4 / IF / IF Weight 4 DRILL PIPE, / IF 75,49 58,795.4 MP Pressure (W/ max diff) 4 S LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 49 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D, Notes / Next 4 hrs: Cirulate hole clean T.O.H. Run 5 / Csg

29 6 : 6. : :. : :.5 : 5:.5 5: 6:. 6: 7:. 7: : 5. : : 5. : :.5 : 6:.5,78 Remove Beals 9// COST: SPUD 8/4/ Drilling 4,97,955,5 7 Completion,957 9,497 Robert Soliz Report # 9 Rig Number: Cell Number: Wash & ream F/,795 T/ 6,67 spm, psi 7rpm Circulate and condition hole with vis mud. wt. Service Rig & Top Drive Wash & ream F/ 6,67 T/ 6,67 spm, psi 7rpm Circulate and condition hole with vis mud. wt. Wash & ream F/ 6,67 T/ 7,4 spm, psi 7rpm Circulate and condition hole with vis mud. wt. mix ppbl of desco just before pumping pipe slug T.O.H. F/ 7,4 T/ only pulled tight in one 6,8 Service Top Drive Pull Wear Bushing, change out pipe rams and loosen Beals There will be no thread rep on location F/ Patriot so I will be acting thread rep Lythology: % Shale 9: /8 /CSG 45 /9 HGS/SAND % O/W RATIO OIL % MBT PH/ES 8 /.8/.5 / Desco Starch Sure Guage 5 Gal 5 R (rot motor or min max) PF/MF./.6 zdsh CL (P) CA (P) 65,,4 4 7 Magnesium 7. Sol Tex Corr Solids.5.7 Ch. Seal (x/6ths) Dull Ch. Pulled 5 Torque FT/LBS 4,6 Sub XO DP RT-Tool Weight 4 DRILL PIPE 75, MP Pressure (W/ max diff) 4 S LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) 49 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D, Notes / Next 4 hrs: R/U CRT, Csg Crew & Torque Turn Run 5 / Csg

30 6 8:.5 8: 9:. 9: 5: 5.5 5: 8:. 8: :.5 : :.5 : : 4. : :. : :.5 : :. : 6:.5,78 Run 5 / Csg 9// COST: SPUD 8/4/ Drilling,645,988,46 8 Completion 5,89 4,886 Robert Soliz Report # Rig Number: Cell Number: Change Rams & Beals R/U Csg Crew M/U Shoe & Run 5 / Csg test float after jts, F/ T/, Wash & ream Csg F/, T/,4 6 spm 5 psi 5rpm Torque, T/,5 Run 5 / Csg F/,4 T/ 4,9 Circulate hole clean and watch returns over shakers Run 5 / Csg F/ 4,9 T/ 8, Circulate hole clean and watch returns over shakers Run 5 / Csg F/ 8, T/ 8,48' Service Rig & Top Drive Run 5 / Csg F/ 8,48 T/ 9,8 Lateral is in really good condition Lythology: % Shale 4: / /CSG 45 /8 HGS/SAND % O/W RATIO OIL % MBT PH/ES /.5/.86 / Desco Starch Sure Guage 5 Gal R (rot motor or min max) PF/MF./.7 zdsh CL (P) CA (P) 64,,6 Magnesium. Sol Tex Corr Solids..49 Ch. Seal (x/6ths) Dull Ch. Pulled 5 Torque FT/LBS 4,6 Sub XO DP RT-Tool Weight 4 DRILL PIPE 75, MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D, Notes / Next 4 hrs: Run 5 / Csg, Circulate & Condition mud, Pump Cement, Set Csg Slips

31 ,78 Laydown BOP 9// COST: SPUD 8/4/ Drilling 548,84,59,7 9 Completion,57 8,4 Roy Reeser Report # Rig Number: Cell Number: Adjust Brakes & Service Rig Attempt to break circ. Laydown 9 Joints Casing To,5 Run 5 / Csg F/,5 T/,78 Got returns back on fillup and washing thru tight Circ. Casing Rigdown Cosi Casing Crew & Laydown Machine Fix bbl mud to pump in front of cement Rigdown CRT Tool Rigup Schlumberger & safety meeting Circ. Casing Pump bbls mud from premix pit Cement Casing W/Lead 89sx 5:5Poz H+lb/sk D4+.5lb/sk D+47lb/sk D+.% D+.5% D+4lb/sk D5+.7% D8+.% D46+4% D54 Tail sx H+. D65+.% D8+4lb/sk D5+% D+.5% D7+.% D46+4% D54 Circ bbls or sx Cement to / tank Rigdown Schlumberger Nipple Down BOP Set Slips Cutoff Casing Change Rams Bop Back To 5" Laydown BOP Cap Wellhead Note: Set 55, On Slips / /CSG /5/.5 HGS/SAND % O/W RATIO OIL % MBT PH/ES 8 /./. / Desco Starch Sure Guage 5 Gal 8 R (rot motor or min max) PF/MF./. zdsh CL (P) CA (P) 6,, Magnesium 4. Sol Tex Corr Solids. 9.8 Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS 5 /,778 Weight 4 7 P MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) OUTPUT (G) SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D, Notes / Next 4 hrs: Finish Capping well / Rigup Laydown Machine / Laydown Dp From Derrick / Clean Pits With T-Rex / Rig Down Nov Close Loop

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

Drillmec HH-300 spec.

Drillmec HH-300 spec. Drillmec HH-300 spec. Drillmec HH-300 Fast moving trailer mounted automatic drilling rig. Designed for cold climate and Geothermal applications and is fully capable of working in heavy winds. It is capable

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

Superintendent Rig Checklist

Superintendent Rig Checklist Superintendent Rig Checklist Rig #: Operating Company: Well Name & #: Date/Time of Inspection: Inspected By: Company Man: Tool pusher: Driller: Ton Miles Logged and up to date: BOP Drill date and time:

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

Using Drilling Dynamics To Reduce Drilling costs

Using Drilling Dynamics To Reduce Drilling costs 1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures IADC Southern Arabian Peninsula Chapter February 15 th, 2018 Top Drive Automation Overcoming Inefficiencies

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG. DRILL PIPE CARE DRILL PIPE INTRODUCTION Box End Hardbanding Tapered Shoulder Tong Area Weld DEFINITION The drillpipe connects the rig surface equipment with the bottomhole assembly and the bit, both to

More information

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500 SCHEDULE 1 DATE: NOVEMBER 2018 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

Latest Advancements in DrillString Mechanics

Latest Advancements in DrillString Mechanics Services, Trainings, Softwares Latest Advancements in DrillString Mechanics SPE Gulf Coast Section 03/09/2016 Stephane Menand, Ph.D. stephane.menand@drillscan.com 1 DrillScan Intro Directional Drilling

More information

CONSTRUCTION OF AN AUTONOMOUS LABORATORY SCALE-DRILLING RIG FOR TESTING AND CONTROL OF DRILLING SYSTEMS

CONSTRUCTION OF AN AUTONOMOUS LABORATORY SCALE-DRILLING RIG FOR TESTING AND CONTROL OF DRILLING SYSTEMS CONSTRUCTION OF AN AUTONOMOUS LABORATORY SCALE-DRILLING RIG FOR TESTING AND CONTROL OF DRILLING SYSTEMS Authors: Erik Andreas Løken (UiS) & Suranga C.H. Geekiyanage (UiS) Co-Authors: Dan Sui (UiS) & Robert

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

Abandonment BAS-3. Frisia Zout B.V. 4 December 2013

Abandonment BAS-3. Frisia Zout B.V. 4 December 2013 Abandonment BAS-3 Frisia Zout B.V. 4 December 213 Contents BAS-3 status Definitieve afsluiting van caverne BAS-3 verdere plannen Algemene aandachtspunten 2 BAS-3 Start Item Description Well diagram version

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

COMMITMENT TO EXCELLENCE

COMMITMENT TO EXCELLENCE PERFORMANCE DRIVEN OPERATIONS IN TEXAS AND OKLAHOMA COMMITMENT TO EXCELLENCE Basin Drilling, LP 1121 ESE Loop 323 Suite 218 Tyler, Texas 75701 (903) 561-8211 (903) 561-5844 fax www.basindrilling.com About

More information

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS BASK1 BASK2 BASK3 BASK6 SLING1 SLING2 BASKETS/SLINGS CARRYING TOOL BASKET 4' X 4' GALVANIZED CERT. RATED SWL 6,800 LBS TOOL BASKET 4' X 6' GALVANIZED CERT. RATED SWL 8,950 LBS TOOL BASKET 4' X 8' GALVANIZED

More information